11/28/03 - Ltr to F. Oshinowo, Edlow, Frm J. Shea, Nsir/Dns, Approval of Highway Route to Transport Spent Nuclear Fuel from Athens, AL, to Pleasonton, CA (NRC Route No. 209)ML033320093 |
Person / Time |
---|
Site: |
Browns Ferry, Zion, 07001252 |
---|
Issue date: |
11/28/2003 |
---|
From: |
James Shea NRC/NSIR/DNS |
---|
To: |
Oshinowo F Edlow International Co |
---|
Bennington G NSIR/DNS 301-415-8183 |
Shared Package |
---|
ML033320079 |
List: |
---|
References |
---|
+kBR1SISP20060113, -RFPFR, 07001252920R |
Download: ML033320093 (5) |
|
|
---|
Category:Letter
MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000295/20240012024-09-0404 September 2024 NRC Inspection Report No. 07201037/2024001; 05000295/2024001; and 05000304/2024001 - Zion Nuclear Power Station IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24192A1752024-07-10010 July 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2024401 ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24136A2392024-06-11011 June 2024 ISFSI - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 (EPID L-2023-LLE-0089 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc RS-24-052, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information RS-24-047, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision 2024-09-04
[Table view] |
Text
SAFEGUARDS INFORMATIONSAFEGUARDS INFORMATIONNovember 28, 2003Mrs. Franchone OshinowoVice President, Spent Fuel Program Edlow International Company 1666 Connecticut Ave., N.W., Suite 201 Washington, D.C. 20009
SUBJECT:
APPROVAL OF HIGHWAY ROUTE TO TRANSPORT SPENT NUCLEAR FUELFROM ATHENS, AL, TO PLEASANTON, CA (NRC ROUTE NO. 209)
Dear Mrs. Oshinowo:
On behalf of the U. S. Nuclear Regulatory Commission (NRC), I am responding to yoursubmittal of July 17, 2003, which requested the NRC approve a route for transporting spent nuclear fuel (SNF) from Browns Ferry Nuclear Plant, Athens, AL, to GE Vallecitos Nuclear Center, Pleasanton, CA (NRC Route No. 209). The NRC has reviewed Edlow International Company's submittal and concluded that theinformation satisfies the requirements of 10 CFR 73.37. Specific details of Route No. 209 are enclosed [Enclosure 1]. Specific details of Route No. 209 combined with additional Safeguards Information (SGI) are also enclosed [Enclosure 2]. Enclosure 2 will not be released to the public and you should protect it in accordance with the requirements of 10 CFR 73.21.
Approval of Route No. 209 will expire two years from the date of this letter. The NRC issued additional security measures for the transportation of SNF for NRC licenseeswho ship greater than 100 grams of SNF. Licensees are required to comply with the requirements of 10 CFR 73.37 and these measures when shipping SNF. Licensees are also required to comply with the U.S. Departments of Transportation and Homeland Security regulations on the shipment of hazardous materials.In addition, the NRC also issued Regulatory Issue Summary (RIS) 2002-12I, Rev. 1, onOctober 3, 2002, "Transportation of Spent Nuclear Fuel Greater than 100 Grams - NRC Threat Advisory and Protective Measures System." The RIS advised licensees shipping SNF to consider various recommendations to be taken in conjunction with changes to the national or transportation-sector threat levels.WARNING: Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil and Criminal PenaltiesWhen separated from Enclosure 2 this document is DECONTROLLED SAFEGUARDS INFORMATIONF. Oshinowo- 2 -SAFEGUARDS INFORMATIONIf you are requested by State officials to deviate from a portion of the approved route (due tohighway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail atGMB@nrc.sgov.gov
.Sincerely,/RA/Joseph W. Shea, Project DirectorNuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident ResponseDocket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)
SAFEGUARDS INFORMATIONF. Oshinowo- 2 -SAFEGUARDS INFORMATIONIf you are requested by State officials to deviate from a portion of the approved route (due tohighway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail atGMB@nrc.sgov.gov
.Sincerely,/RA/Joseph W. Shea, Project DirectorNuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident ResponseDocket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)DISTRIBUTION: (07001252920R) (TAC # D91386)w/enclosures 1 and 2:
DOCKETCase File 70-1252 OSmith, R-IIMShannon, R-IVw/o Enclosure 2RidsOgcRidsNsirDnsMtwsRidsNsirDNSRidsNsirPmda1 NJensen, OGCEPoteat, OCIOKJabbour, NRRADAMS Package Accession # ML033320079ADAMS Document Accession # ML033320093 is SGI and is not entered into ADAMS g:dns staff\bennington\edlowltr.209.wpd* see previous concurrenceOFCMTWSEMTWSnMTWSnNSP-PDNAMEGBennington/gb *PBrochman *MLayton *JSheaDATE 11/26/03 11/28/03 11/28/03 11/28 /03 OFFICIAL RECORD COPYC = COVERE = COVER & ENCLOSUREN = NO COPY Mailing Labels M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009 M RS. FRANCHONE OSHINOWO VICE PRESIDENT , S PENT F UEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT A VE., N.W., SUITE 201 WASHINGTON , D.C. 20009