Category:Report
MONTHYEARML1101201202010-12-31031 December 2010 MUAP-10023-NP(R0), Initial Type Test Result of Class 1E Gtg System-NP(R0) ML1100702962010-12-31031 December 2010 MUAP-10017-NP, Rev. 1, US-APWR Methodology of Pipe Break Hazard Analysis ML1100604362010-12-31031 December 2010 MUAP-09026(R5), US-APWR DCD Revision 2 RAI Tracking Report ML1036401742010-12-31031 December 2010 MUAP-08007-NP (R2), Evaluation Results of US-APWR Fuel System Structural Response to Seismic and LOCA Loads ML1102605042010-12-28028 December 2010 MUAP-10024, Rev. 0, Structural Design Criteria for US-APWR Access Building. ML1102507832010-12-28028 December 2010 MUAP-09002-NP, Rev. 2, Summary of Seismic and Accident Load Conditions for Primary Components and Piping. ML1034204262010-12-22022 December 2010 Enclosure to US-APWR Spm Letter, Details of Key Technical Issues Resulting from the NRC Staff Review of Spms 2010-12-31
[Table view] Category:Miscellaneous
MONTHYEARML1034204262010-12-22022 December 2010 Enclosure to US-APWR Spm Letter, Details of Key Technical Issues Resulting from the NRC Staff Review of Spms 2010-12-22
[Table view] |