Pages that link to "05000333/LER-2024-001"
Jump to navigation
Jump to search
The following pages link to 05000333/LER-2024-001:
Displayed 36 items.
- 05000333/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000333/LER-1995-013, Forwards Suppl 1 to LER 95-013,revising Corrective Actions Re Simulator Mod & Development of Plant Computer Display (← links)
- 05000333/LER-1995-006, Forwards Suppl 1 to LER 95-006,providing Results of Analysis Performed on as-found Actuation Pressures of 11 SRVs Removed & Tested During 1994/1995 Refueling Outage.Analysis Performd Performed to Determine Margin to Rv Pressure (← links)
- 05000333/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000333/LER-1983-009, Forwards LER 83-009/03L-0 (← links)
- 05000333/LER-1982-004, Forwards LER 82-004/03X-1 (← links)
- 05000333/LER-1978-105, Forwards LER 78-105/03L-0 (← links)
- 05000333/LER-1978-085, Forwards LER 78-085/04L-0 (← links)
- 05000333/LER-1978-056, Forwards LER 78-056/03L-1 (← links)
- 05000333/LER-1978-082, Forwards LER 78-082/03L-0 (← links)
- 05000333/LER-1978-075, Forwards LER 78-075/03L-1 (← links)
- 05000333/LER-1982-051, Forwards Updated LER 82-051/03L-1 (← links)
- 05000333/LER-1996-010, Forwards LER 96-010-01,plant Shut Down Due to Human Error Re Inadvertently Connecting Two Terminals While Calibrating Protective Relay.Revises Rept to Include Corrective Action for Human Performance Deficiencies.W/Status of Com (← links)
- 05000333/LER-1982-030, Forwards Updated LER 82-030/03L-1 (← links)
- 05000333/LER-1997-011, Forwards LER 97-011-00 Re Invalid ESF Actuation & Failure to Perform TS Required Acltions While Performing Troubleshooting Activities (← links)
- 05000333/LER-1997-010, Forwards LER 97-010-00 Re Surveillance Testing of Pressure Suppression Chamber.No Commitments Contained in Rept (← links)
- 05000333/LER-1997-013, Forwards LER 97-013-00 Re High Pressure Coolant Injection Sys Which Was Declared Inoperable Due to Instrument Malfunction During Surveillance Testing.No Commitments Made (← links)
- 05000333/LER-1999-001, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments (← links)
- 05000333/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73(a)(2)(i)(B).One New Commitment Is Contained in Rept (← links)
- 05000333/LER-1997-001, Forwards LER 97-001-01,manual Reactor Scram Occurred Due to Fouling of Circulating Water Sys Traveling Screens.Revised LER Being Submitted to Amend Info Reported in CA 6 & 7 (← links)
- 05000333/LER-1982-028, Forwards Updated LER 82-028/03X-1 (← links)
- 05000333/LER-1998-005, Forwards LER 98-005-00 Re HPCI Sys Being Inoperable Due to Lower than Normal Flow Controller Output.No New Commitments Are Contained in Rept (← links)
- 05000333/LER-1998-003, Forwards LER 98-003-00 Re Design Condition & Assumed Single Failure Resulting in Loss of Redundant ECCS Function Required for Small Break Loca.No Commitments Contained in Rept (← links)
- 05000333/LER-1998-004, Forwards LER 98-004-00 Re Initiation of Manual Reactor Scram Due to Rod Position Info Sys Power Supply Failure.No Commitments Contained in Rept (← links)
- 05000333/LER-1987-004, Responds to Open Items in Insp Repts 50-333/85-022 & 50-333/83-04 & LER 87-004-01 & Provides Summary of 2-stage Target Rock Safety Relief Valve Setpoint Issue,Per Resident Inspector Request (← links)
- 05000333/LER-1997-005, Forwards LER 97-005-01 Re Manual Reactor Scram Due to Failure of Number 3 Turbine Control Valves.Revised LER Submitted to Include Addl Corrective Actions (← links)
- 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete (← links)
- 05000333/LER-1997-008, Forwards LER 97-008-00 Re Inoperability of Both Trains of SGTS Due to Flow Restriction in Discharge Line (← links)
- 05000333/LER-1998-002, Forwards LER 98-002-00 Re Safety Relief Valve Setpoint Drift.New Commitment Listed in Attachment 1 (← links)
- 05000333/LER-1997-009, Forwards LER 97-009-00 Re Exceeded Quarterly Calibr Frequency for Radwaste Bldg Exhaust Radiation Monitor.No Commitments Contained in Rept (← links)
- 05000333/LER-1990-008, Forwards LER 90-008-01,revising Corrective Action Section as Reported in LER 90-008-00.Corrective Action Does Not Provide Human Factor Issues Pertinent to Cause of Event.Issues Related to TS Amend Are Being Reviewed (← links)
- 05000333/LER-1985-024, Forwards Corrected LER 85-024-00.Ltr Incorrectly Referenced LER 85-023-00 (← links)
- 05000333/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- IR 05000333/2024011 (← links)
- 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation (← links)
- 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket (← links)