Pages that link to "ML17094A576"
Jump to navigation
Jump to search
The following pages link to ML17094A576:
Displayed 50 items.
- L-PI-17-006, Emergency Action Level (EAL) Matrix for Cold Condition (← links)
- L-PI-16-060, License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action (← links)
- L-PI-16-020, License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating. (← links)
- L-PI-16-003, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process (← links)
- L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit (← links)
- L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process (← links)
- L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation (← links)
- L-PI-14-071, July 21, 2014 ML14204A052 (← links)
- L-PI-14-072, License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture (← links)
- L-PI-14-037, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits (← links)
- L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan (← links)
- L-PI-13-076, Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement (← links)
- L-PI-13-048, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria (← links)
- L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). (← links)
- L-PI-13-017, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown (← links)
- L-PI-12-110, License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria (← links)
- L-PI-12-055, License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement (← links)
- L-PI-12-054, Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (← links)
- L-PI-09-133, License Amendment Request for Measurement Uncertainty Recapture - Power Uprate (← links)
- L-PI-09-125, License Amendment Request and Exemption Request to Support the Use of Optimized Zirlotm Fuel Rod Cladding (← links)
- L-PI-09-114, License Amendment Request to Adopt the Alternative Source Term Methodology (← links)
- L-PI-09-079, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 (← links)
- L-PI-09-076, License Amendment Request (LAR) to Revise Technical Specifications in Accordance with TSTF-448, Revision 3 - Control Room Habitability (← links)
- L-PI-09-017, License Amendment Request (LAR) to Apply Surveillance Requirement (SR) 3.0.2 Interval Extension to SR 3.8.1.8 (← links)
- L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 (← links)
- L-PI-08-046, Application for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW) Pump Inoperable Using Consolidated Line Item Improvement Process (← links)
- L-PI-07-086, License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR) (← links)
- L-PI-07-075, License Amendment Request (LAR) to Add a Power Factor to the Emergency Diesel Generators' (EDG) 24-Hour Load Test (Surveillance Requirements 3.8.1.9) (← links)
- L-PI-07-061, License Amendment Request (LAR) to Increase the Unit 1 Emergency Diesel Generators' (EDG) Monthly Test Load (← links)
- L-PI-07-049, License Amendment Request (LAR) Adopting Provisions of Regulator Guide (Rg) 1.52, Revision 3 (← links)
- L-PI-07-048, License Amendment Request (LAR) Incorporating Technical Specification Task Force (TSTF) Industry Travelers TSTF-479, TSTF-485, and TSTF-497 (← links)
- L-PI-06-097, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem (← links)
- L-PI-06-043, License Amendment Request (LAR) for Miscellaneous Technical Specification (TS) Improvements (← links)
- L-PI-06-045, License Amendment Request (LAR) to Incorporate Large Break Loss of Coolant Accident (LOCA) Analyses Using Astrum) (← links)
- L-PI-06-017, License Amendment Request (LAR) to Reduce Monthly Test Load for Emergency Diesel Generators (Edgs) D5 and D6 (← links)
- L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency (← links)
- L-PI-08-024, Application for Renewed Operating Licenses to Be Extended 20 Years Beyond Current Expiration Dates (← links)
- L-PI-05-036, License Amendment Request (LAR) for Extension of Technical Specification (TS) 3.8.1, AC Sources-Operating, Emergency Diesel Generator Completion Time (← links)
- L-PI-05-081, License Amendment Request (LAR) to Clarify Technical Specification Requirements for Surveillance Requirements for Installed Spare Components and Miscellaneous Corrections (← links)
- L-PI-05-104, License Amendment Request (LAR) to Add a Condition to TS 3.6.5 Containment Spray and Cooling System (← links)
- ML051400280 (← links)
- L-PI-05-014, License Amendment Request (LAR) to Incorporate Revisions to Small Break Loss of Coolant Accident Methodology Into the Prairie Island Nuclear Generating Plant Licensing Basis (← links)
- L-PI-04-129, License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage. (← links)
- L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-PI-04-105, Sept. 22, 2004 ML042750402 (← links)
- ML20058F943 (← links)
- L-PI-04-120, Emergency Action Levels Revision Submittal (← links)
- L-PI-04-112, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process (← links)
- L-PI-04-098, Supplement to License Amendment Request (LAR) Dated December 23. 2003. Adoption of Consolidated Line Item Improvement Process (CLIIP) Technical Specification Change Regarding Technical Specification Task Force (TSTF) Generic Traveler - T (← links)
- L-PI-04-082, Supplement to License Amendment Request (LAR) Dated January 20. 2004, Selective Scope Implementation of Alternate Source Term for Fuel Handling Accident Applied to Containment Technical Specifications (← links)