Pages that link to "GO2-20-063, Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System"
Jump to navigation
Jump to search
The following pages link to GO2-20-063, Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System:
Displayed 50 items.
- GO2-09-011, License Amendment Request to Revise Control Rod Notch Testing Frequency Using the Consolidated Line Item Improvement Process (CLIIP) for TSTF-475 (← links)
- GO2-08-124, License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.3.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 (← links)
- GO2-08-071, License Amendment Request for Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities (← links)
- GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level (← links)
- GO2-07-116, Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP) (← links)
- GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves (← links)
- GO2-06-080, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing (← links)
- GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test (← links)
- GO2-06-059, License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat Load (← links)
- GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process (← links)
- GO2-19-090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (← links)
- GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power (← links)
- GO2-05-057, Emergency Technical Specification Change Request for One-Time Extension of Completion Time for Limiting Condition for Operation Condition 3.5.1.B (← links)
- GO2-05-009, Corrected Page for the License Amendment Request to Revise the Reactor Pressure Vessel Material Surveillance Program (← links)
- GO2-04-177, License Amendment Request: Control Rod Drop Accident Analysis (← links)
- GO2-04-164, License Amendment Request to Revise the Reactor Pressure Vessel Material Surveillance Program (← links)
- GO2-04-165, License Amendment Request - Removal of the Monthly Operating Report and the Occupational Radiation Exposure Report from Technical Specification Using the Consolidated Line Item Improvement Process (← links)
- GO2-04-161, License Amendment Request Adoption of TS Task Force Traveler - 447, Revision 1, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors (← links)
- GO2-04-137, Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval (← links)
- GO2-04-107, License Amendment Request to Revise Technical Specification 3.4.11, Reactor Coolant System Pressure and Temperature Limits (← links)
- ML041540545 (← links)
- GO2-04-074, License Amendment Request Adoption of TS Task Force (TSTF) Traveler - 287, Revision 5, Ventilation System Envelope Allowed Outage Time (← links)
- GO2-03-167, Revision to Technical Specification LCO 3.0.4 and SR 3.0.4 Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process (CLIIP) (← links)
- GO2-03-063, Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal (← links)
- ML030160139 (← links)
- GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal (← links)
- GO2-02-173, License Amendment Request - Technical Specification Change to Section 5.0, Administrative Controls (← links)
- GO2-02-172, Request for Amendment to Operating License NPF-21 (← links)
- GO2-02-174, License Amendment Request to Eliminate Requirements for Post Accident Sampling System (PASS) (← links)
- GO2-02-135, Revised Request for Amendment on the Alternate Source Term (← links)
- GO2-02-136, License Amendment Request - Alternative Source Term Response to Request for Additional Information (← links)
- GO2-02-114, Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process (← links)
- GO2-02-111, Amendment Request to Revise Minimum Emergency Diesel Generator Output Voltage Specified in Technical Specification Limiting Condition for Operation 3.8.1 (← links)
- GO2-02-066, Request for Amendment Re Technical Specification 5.5.10, Technical Specification (TS) Bases Control Program (← links)
- GO2-02-050, Technical Specification Amendment Request to Technical Specification Surveillance Requirement 3.6.1.3.6 (← links)
- ML020990351 (← links)
- GO2-20-052, Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems (← links)
- GO2-20-063 (redirect page) (← links)
- ML20107G017 (redirect page) (← links)
- EPID:L-2020-LLA-0079 (← links)
- ML20114E191 (← links)
- ML20114E170 (← links)
- ML20113E984 (← links)
- GO2-20-095, Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (← links)
- GO2-20-104, On-Site Cooling System Sediment Disposal (← links)
- GO2-20-108, License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO (← links)
- GO2-21-042, License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement (← links)
- GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits (← links)
- GO2-21-133, License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)