Pages that link to "ML18053A190"
Jump to navigation
Jump to search
The following pages link to ML18053A190:
Displayed 49 items.
- RS-17-170, Company Emergency Plan Annex and Addendum Revisions (← links)
- RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. (← links)
- RS-12-036, License Amendment Request to Technical Specifications Section 5.6.5, Core Operating Limits Report (Colr). (← links)
- RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System (← links)
- RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage (← links)
- RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License (← links)
- RS-07-066, Request for License Amendment to Revise Turbine Condenser Vacuum - Low Scram Instrumentation Function (← links)
- RS-17-117, Radiological Emergency Plan Addendum Revision (← links)
- RS-16-245, Radiological Emergency Plan Revisions (← links)
- RS-15-237, /Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel (← links)
- RS-13-148, License Amendment Request - Use of Neutron Absorbing Inserts in Units 1 and 2 Spent Fuel Pool Storage Racks (← links)
- RS-05-078, Submittal Letter and Attachments 1 Through 5, Request for License Amendment Regarding Transition to Westinghouse Fuel; Dresden Units 2 and 3, Quad Cities Units 1 and 2 (← links)
- RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements (← links)
- RS-05-091, Revision of License Amendment Request for Activation of the Trip Outputs of the Oscillation Power Range Monitor System (← links)
- RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation (← links)
- RS-05-010, Application for Amendments to Renew Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Supporting Transition to Westinghouse SVEA-96 Optima2 Fuel (← links)
- RS-05-003, Revision of License Amendment Request for Activation of the Trip Outputs of the Oscillation Power Range Monitor System (← links)
- RS-04-133, Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits. (← links)
- RS-04-062, Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation (← links)
- RS-04-002, License Amendment Request Regarding Activation of the Trip Outputs of the Oscillation Power Range Monitor System (← links)
- RS-04-005, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Valves and Associated Relief Requests (← links)
- RS-03-204, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-03-209, Request for Amendment to Technical Specifications to Add Requirement to Modify Linear Heat Generation Rate Limit During Single Recirculation Loop Operation (← links)
- RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing (← links)
- RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D (← links)
- L-98-010, Request for Technical Specifications Changes Related to Reactor Protection System Instrumentation (Scram Discharge Volume Water Level - High) (← links)
- RS-03-044, Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. (← links)
- ML022940296 (← links)
- RS-02-174, Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1 (← links)
- RS-02-171, Request for License Amendment Related to Heavy Loads Handling (← links)
- RS-02-152, . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation (← links)
- RS-02-095, Application for Amendment to License DPR-29 for Quad Cities, Unit 1 Ts. Amendment Would Revise Values of Safety Limit for Minimum Critical Power Ratio (Slmcpr)In TS 2.1.1 for Cycle 18 (← links)
- RS-02-044, Request for Technical Specification Change, Revises Emergency Diesel Generator Required Start Time (← links)
- RS-02-073, Request for Amendment, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 (← links)
- ML20342A384 (← links)
- ML21257A420 (← links)
- RS-21-065, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 (← links)
- RS-21-108, Application to Revise Technical Specification 3.1.4, Control Rod Scam Times (← links)
- RS-22-069, Constellation Nuclear Radiological Emergency Plan Addendum Revision. Includes EP-AA-1006, Addendum 3, Revision 10, Emergency Action Levels for Quad Cities Station (← links)
- RS-22-056, Constellation Radiological Emergency Plan Addendum Revision (← links)
- RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR (← links)
- RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location (← links)
- RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days (← links)
- RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions (← links)