Pages that link to "ASME Code Case N-695"
Jump to navigation
Jump to search
The following pages link to ASME Code Case N-695:
Displayed 50 items.
- GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 (← links)
- LIC-10-0004, Response to Request for Additional Information Re Use of Alternate Depth Sizing Qualification (← links)
- LR-N17-0102, Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1 (← links)
- LR-N17-0053, Request for Use of American Society of Mechanical Engineers (ASME) Code Cases N-695-1 and N-696-1 (← links)
- RS-12-040, Response to Request for Additional Information Related to Braidwood Station Relief Request 13R-08 (← links)
- RS-11-173, Response to Request for Additional Information Related to Relief Request I3R-08 (← links)
- RS-11-087, Supplemental Information Supporting Relief Request 13R-08: Alternative Requirements to ASME Code Requirements for Class 1 Pressure Retaining Welds (← links)
- RBG-47110, Inservice Inspection Plan for the Third 10-Year Interval (← links)
- NL-10-1663, VEGP-ISI-ALT-03, Version 3, Proposed Alternative for the Third ISI Interval (← links)
- NL-10-0706, VEGP-ISI-ALT-03, Version 2, Proposed Alternative for the Third ISI Interval (← links)
- NL-10-0266, Proposed Alternative FNP-ISI-ALT-08 (← links)
- NL-09-0410, Proposed Alternatives for the Fourth ISI Interval (← links)
- 1CAN050807, Inservice Inspection Plan for the Fourth 10 - Year Interval (← links)
- ML19011A137 (← links)
- ML19007A342 (← links)
- ML19037A041 (← links)
- RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) (← links)
- PNP 2015-075, Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement (← links)
- RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 (← links)
- L-11-321, CFR 50.55a Request for Alternative Examination Requirements for Reactor Vessel Safe-End Welds (← links)
- SBK-L-11132, Submittal of Third Ten-Year Interval Inservice Inspection and Second Ten-Year Containment Inservice Inspection Program (← links)
- NL-11-0463, Proposed Relief Request for the Fourth ISI Interval (FNP-ISI-RR-01) (← links)
- SBK-L-10148, Response to Draft Request for Additional Information Re Request for Alternate Depth Sizing Qualification (← links)
- SBK-L-10056, Request for Use of an Alternate Depth Sizing Qualification (← links)
- LIC-09-0088, Request for Use of an Alternate Depth Sizing Qualification (← links)
- SBK-L-08190, Supplement to a Request for Use of an Alternate Depth Sizing Qualification (← links)
- L-2008-043, Fourth Ten-Year Inservice Inspection Interval ISI Program Plan - Revision 0 (← links)
- NRC 2008-0017, CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval (← links)
- DCL-16-102, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternative Depth Sizing Criteria (← links)
- 1CAN071601, Request for Relief from ASME Section XI Table IWB-2500-1 Requirements (← links)
- 1CAN041603, Request for Relief from ASME Section XI, Table IWB-2500-1 Requirements (← links)
- L-2013-112, ASME Section XI, Inservice Inspection, Relief Requests No. 11 Alternative Through-Wall Sizing Requirements for Implementation of Appendix Viii, Supplement 10 (← links)
- DCL-13-038, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria (← links)
- CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) (← links)
- DCL-10-103, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-2R16, Use of Alternate Sizing Qualification Criteria Through Protective Clad Layer (← links)
- DCL-10-051, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria (← links)
- AEP-NRC-2009-42, Response to Request for Additional Information Regarding Relief Request (ISIR-28) for Use of Weld Inlays as an Alternate Repair Technique for Alloy 82/182 Dissimilar Metal Welds in Reactor Vessel Safe End-to-Primary Nozzles (← links)
- ML19128A326 (← links)
- AEP-NRC-2008-25, Use of Weld Inlays as an Alternative Repair Technique for Reactor Vessel Safe End-to-Primary Nozzle Alloy 82/182 Welds (← links)
- SBK-L-08174, Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface (← links)
- RNP-RA/08-0048, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, Appendix Viii (Supplements 2 and 10) for the Fourth Ten-Year Inservice Inspection Program Interval (← links)
- 1CAN010801, Request for Relief from ASME Section XI, Table IWB-2500-1 Requirements (← links)
- NL-06-2088, Unit 1, Vogtle Electric Generating Plant - Units 1 & 2, Revised Page to Enclosure 2 in Response to NRC Request for Additional Information Re Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations (← links)
- NL-06-1832, Units 1 & 2, Response to NRC Request for Additional Information Regarding Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations (← links)
- RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) (← links)
- ML052660331 (← links)
- ML052560029 (← links)
- ML051590468 (← links)
- ML19319A541 (← links)
- ML050210222 (← links)