Pages that link to "L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement"
Jump to navigation
Jump to search
The following pages link to L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement:
Displayed 50 items.
- L-2012-314, Turkey Point, Units 3 and 4, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement (redirect page) (← links)
- L-2012-314 (redirect page) (← links)
- L-2013-002, Response to NRC Request for Additional Information Regarding License Amendment Request No. 224 on Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement (← links)
- L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement (← links)
- L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues (← links)
- L-2010-021, Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request (← links)
- L-2013-219, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d (← links)
- L-2012-426, Extended Power Uprate Cycle 26 Startup Report (← links)
- L-2012-318, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate Amendment 245 and License Condition 3.K.1 on Spent Fuel Pool Cooling System Supplemental Heat Exchanger Structural Design (← links)
- L-2012-179, Response to NRC Request for Additional Information Regarding Extended Power Uprate and Unit 3 License Condition 3.J.1 on Spent Fuel Pool Cooling System Heat Exchange Design (← links)
- L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues (← links)
- L-2018-100, Submittal of 10 CFR 50.59(d)(2) Summary Report (← links)
- L-2017-100, License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... (← links)
- L-2017-006, Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b. (← links)
- L-2014-369, License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B. (← links)
- L-2014-033, License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- L-2013-019, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications (← links)
- L-2012-313, Administrative License Amendment Request No. 223 Regarding Control Room Emergency Ventilation System Technical Specification (← links)
- L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report (← links)
- L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report (← links)
- L-2012-068, Response to NRC Instrumentation and Control Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 (← links)
- L-2012-034, Response to NRC Instrumentation and Control Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205, Cover Letter & Attachment 1 (Non-Proprietary) (← links)
- L-2012-039, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Non-LOCA Analyses (← links)
- L-2012-033, Response to NRC Instrumentation and Control Engineering Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 (← links)
- L-2012-019, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation (← links)
- L-2012-020, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Thermal Conductivity Degradation (← links)
- L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242 (← links)
- L-2011-539, Draft Environmental Assessment Review Supporting Extended Power Uprate License Amendment Request No. 205 (← links)
- L-2011-386, License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 2 (← links)
- L-2011-302, Response to NRC RAI Regarding EPU LAR No. 205 Technical Specification and Instrumentation and Control Issues (← links)
- L-2011-334, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues (← links)
- L-2011-305, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues (← links)
- L-2011-233, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues (← links)
- L-2011-276, Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System (← links)
- L-2011-278, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review (Snpb) Issues (← links)
- L-2011-237, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues (← links)
- L-2011-264, Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope Habitability (← links)
- L-2011-223, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues (← links)
- L-2011-210, Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.5 (← links)
- L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 (← links)
- L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues (← links)
- L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues (← links)
- L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues (← links)
- L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues (← links)
- L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 (← links)
- L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues (← links)
- L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues (← links)
- L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity (← links)
- L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) (← links)
- L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 (← links)
- L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System (← links)
- L-2010-136, Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 196 (← links)