Pages that link to "JAFP-21-0014, Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs"
Jump to navigation
Jump to search
The following pages link to JAFP-21-0014, Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs:
Displayed 50 items.
- JAFP-06-0179, JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports (← links)
- JAFP-06-0041, JAFNPP - Site Audit Requests - Jan 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0054, JAFNPP - Site Audit Requests - Feb 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0061, JAFNPP - Site Audit Requests - Mar 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0083, JAFNPP - Site Audit Requests - Apr 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0115, JAFNPP - Site Audit Requests - Jun 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0144, JAFNPP - Site Audit Requests - Aug 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0130, JAFNPP - Site Audit Requests - Jul 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0154, JAFNPP - Site Audit Requests - Sept 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0164, JAFNPP - Site Audit Request - Oct 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-16-0148, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation (← links)
- JAFP-16-0060, James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments (← links)
- JAFP-15-0073, J.A. Fitzpatrick - Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 (← links)
- JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai- (← links)
- JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid (← links)
- JAFP-13-0150, JAFP-13-0150, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements (← links)
- JAFP-12-0037, Entergy Nuclear Operations, Incorporateds Answer to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- JAFP-12-0036, Entergy Nuclear Operations, Incorporateds - Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) (← links)
- JAFP-11-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. F (← links)
- JAFP-07-0092, Response to Request for Additional Information Regarding Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-15-0122, Withdrawal of Application for Alternative Examination Requirements for James A. FitzPatrick Nuclear Power Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 (← links)
- JAFP-12-0032, Response to Request for Additional Information Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers (← links)
- JAFP-07-0102, Response to Request for Additional Information Regarding the James A. FitzPatrick Nuclear Power Plant Fourth Inservice Inspection Interval Inspection Program Plan Relief Request RR-6 (← links)
- JAFP-07-0015, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (← links)
- JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 (← links)
- JAFP-19-0011, Plan - Physical Security Plan, Revision 20 (← links)
- JAFP-19-0009, End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval (← links)
- JAFP-19-0004, Inservice Inspection Summary Report Cycle 23 (← links)
- JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan (← links)
- JAFP-18-0106, License Amendment Request: Proposed Change to the Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters from Technical Specifications (← links)
- JAFP-18-0097, Submittal of Core Operating Limits Report Cycle 24 (← links)
- JAFP-18-0093, License Amendment Request - Reactivity Anomalies Surveillance (← links)
- JAFP-18-0082, Update to Electronic Transmission of Safeguards Information (← links)
- JAFP-18-0050, Report of Full Compliance with Phase 1 & Phase 2 of 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-18-0055, Commitment Schedule to Implement NEI Initiative on Open Phase Condition (← links)
- JAFP-18-0069, Submittal of 10 CFR 50.46 Annual Report (← links)
- JAFP-18-0076, End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval (← links)
- JAFP-18-0068, Response to Request for Additional Information: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors (← links)
- JAFP-18-0043, 2017 Annual Radiological Environmental Operating Report (← links)
- JAFP-18-0039, 2017 Annual Radioactive Effluent Release Report (← links)
- JAFP-18-0038, Response to Request for Additional Information Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- JAFP-18-0014, Response to Request for Additional Information on Submittal of Relief Request JAF-15R-05 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) (← links)
- JAFP-18-0012, Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- JAFP-17-0116, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Of. (← links)
- JAFP-17-0103, Pressure and Temperature Limits Report, Rev. 1 (40 Effective Full-Power Years) (← links)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- JAFP-17-0074, License Amendment Request - Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings (← links)