Pages that link to "DCL-22-035, Core Operating Limits Report for Unit 1 Cycle 24"
Jump to navigation
Jump to search
The following pages link to DCL-22-035, Core Operating Limits Report for Unit 1 Cycle 24:
Displayed 50 items.
- DCL-09-015, Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant - 2009 Annual Statement of Insurance (← links)
- DCL-18-070, Diablo Canyon, Units 1 and 2, Transmittal of Technical Specification Bases, Revision 11 (← links)
- DCL-07-093, Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank (← links)
- DCL-06-131, Special Report 06-04: Results of Steam Generator Tube Eddy Current Inspections During Unit 1 Thirteenth Refueling Outage (← links)
- DCL-06-100, Special Report 06-02 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon Power Plant Unit 2 Thirteenth Refueling Outage (← links)
- DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage (← links)
- DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon (← links)
- DCL-05-154, Requests NRC Authorization for 10 CFR 50.55a Request No. NDE-SGW for Diablo Canyon Unit 2 for Duration of Unit 2 Second Inspection Interval (← links)
- DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight (← links)
- DCL-16-077, Pacific Gas and Electric Company'S Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) for Diablo Canyon Power Plant U (← links)
- DCL-16-066, LTR-16-0333 Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer, Pacific Gas and Electric Company, Letter Request to Suspend NRC Review of Diablo Canyon Power Plant License Renewal Application (← links)
- DCL-15-098, Pacific Gas and Electric Company'S Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) (← links)
- DCL-14-014, Pacific Gas and Electric Company'S Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-1 (← links)
- DCL-12-061, Pacific Gas and Electric Company'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Emergency Preparedness Aspects of Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ic (← links)
- DCL-12-060, Pacific Gas and Electric Company'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident (← links)
- DCL-11-022, Pacific Gas and Electric Company Supplements a Response to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application (← links)
- DCL-10-167, Response to NRC Letter Dated December 20, 2010, Request for Additional Information (Set 36) for the Diablo Canyon License Renewal Application (← links)
- DCL-10-163, Canyon, Units 1 & 2 - Response to Telephone Conference Call Held Nov. 18, 2010, Between U.S. Nuclear Regulatory Commission and Pacific Gas & Electric Co. Concerning Responses to Requests for Additional Information Related to License Renew (← links)
- DCL-10-131, Response to NRC Letter Dated September 23, 2010, Request for Additional Information (Set 25) for the Diablo Canyon License Renewal Application (← links)
- DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 (← links)
- DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 (← links)
- DCL-18-048, Owner'S Activity Report for Unit 2 Twentieth Refueling Outage (← links)
- DCL-18-021, Core Operating Limits Report for Unit 2 Cycle 21 (← links)
- DCL-17-081, Owner'S Activity Report for Unit 1 Twentieth Refueling Outage (← links)
- DCL-17-072, Core Operating Limits Report for Cycle 21 (← links)
- DCL-17-060, Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (← links)
- DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint (← links)
- DCL-16-086, Owner'S Activity Report for Unit 2 Nineteenth Refueling Outage (← links)
- DCL-16-056, One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage (← links)
- DCL-16-018, Owner'S Activity Report for Nineteenth Refueling Outage (← links)
- DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- DCL-15-144, Core Operating Limits Report for Cycle 20 (← links)
- DCL-15-118, Response to NRC Request for Additional Information Regarding Relief Request FLIG-U1 (← links)
- DCL-15-116, Submittal of 10 CFR 50.55a Request FLIG-U1, Request for Extension of Third Lnservice Inspection Interval for Performing Reactor Vessel Stud Hole Ligament Examinations (← links)
- DCL-15-062, Expected Submittal Date for Licensee Event Report 2015-001-01 (← links)
- DCL-15-020, Owner'S Activity Report for Unit 2 Eighteenth Refueling Outage (← links)
- DCL-15-014, Expected Submittal Date for Licensee Event Report 2014-002-01 (← links)
- DCL-14-111, American Society of Mechanical Engineers Section Xl Lnservice Inspection Program Relief Request NDE-RCS-SE-2R19 - Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer (← links)
- DCL-14-086, Relief Request SWOL-REP-1 U2: Submittal of Westinghouse Letter, LTR-RC-14-45, Proprietary Information Clarification Request Response. (← links)
- DCL-14-078, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-14-068, Response to NRC Request for Additional Information Regarding Relief Request SWOL-REP-1 U2 (← links)
- DCL-14-053, Owner'S Activity Report for Eighteenth Refueling Outage (← links)
- DCL-14-041, Response Update to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic (← links)
- DCL-14-024, Core Operating Limits Report for Cycle 19 (← links)
- DCL-13-078, Response to NRC Request for Additional Information Regarding Request for Relief NDE-RCS-SE-1R18 to Allow Use of Alternative Depth Sizing Criteria (← links)
- DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage (← links)
- DCL-13-054, Response Amendment to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic (← links)
- DCL-13-030, Core Operating Limits Report for Unit 2 Cycle 18 (← links)
- DCL-12-118, Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 1. Part 1 of 2 (← links)