Pages that link to "JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement"
Jump to navigation
Jump to search
The following pages link to JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement:
Displayed 50 items.
- JAFP-10-0084, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- JAFP-10-0056, James A. FitzPatrick - Transmittal of 2009 Annual Radiological Environmental Operating Report (← links)
- JAFP-10-0008, Response to Request for Additional Information Regarding Generic Letter 2008-01 for the James A. FitzPatrick Nuclear Power Plant (← links)
- JAFP-09-0128, Entergy Nuclear Operations, Inc. - Request for Approval of the James A. FitzPatrick Cyber Security Plan (← links)
- JAFP-09-0108, Submittal of NRC Form 536, Operator Licensing Examination Data (← links)
- JAFP-09-0107, James a FitzPatrick, Independent Spent Fuel Storage Installation (ISFSI) - Registration Information of Spent Fuel Cask Use (← links)
- JAFP-09-0086, Application for Amendment for James A. FitzPatrick Nuclear Power Plant to Modify the Technical Specifications Requirements for Testing of the Shutdown Cooling System Isolation, Reactor Pressure - High Function (← links)
- ML091550723 (← links)
- JAFP-09-0025, James A. Fitzpatrick - Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 Requirements Based on Manual Actions (← links)
- JAFP-08-0131, James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld Overlay (← links)
- JAFP-08-0128, James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay (← links)
- ML081690094 (← links)
- JAFP-08-0037, J. A. FitzPatrick - Annual Radiological Effluent Release Report for the Period of January 1, 2007 Through December 31, 2007 (← links)
- ML081010259 (← links)
- JAFP-07-0088, James A. FitzPatrick, Application for Amendment to Technical Specifications Regarding Control Room Envelope Habitability, Consistent with TSTF-448 Revision 3 (← links)
- JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) (← links)
- ML070440127 (← links)
- JAFP-06-0179, JAFNPP - Site Audit Requests - (24) November and December 2006 Monthly Discharge Monitoring Reports (← links)
- JAFP-06-0041, JAFNPP - Site Audit Requests - Jan 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0054, JAFNPP - Site Audit Requests - Feb 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0061, JAFNPP - Site Audit Requests - Mar 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0083, JAFNPP - Site Audit Requests - Apr 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0115, JAFNPP - Site Audit Requests - Jun 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0144, JAFNPP - Site Audit Requests - Aug 2006 SPDES Discharge Monitoring Reports (← links)
- JAFP-06-0130, JAFNPP - Site Audit Requests - Jul 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0154, JAFNPP - Site Audit Requests - Sept 2006 SPDES Discharge Monitoring Report (← links)
- JAFP-06-0164, JAFNPP - Site Audit Request - Oct 2006 SPDES Discharge Monitoring Report (← links)
- ML063480596 (← links)
- ML062500247 (← links)
- ML062160557 (← links)
- ML062160556 (← links)
- ML062160553 (← links)
- ML062160494 (← links)
- ML021970092 (← links)
- JAFP-02-0098, Part 7 of 7, James A. FitzPatrick Nuclear Power Plant - Revision J to Proposed Technical Specification Change (License Amendment) Conversion to Improved Standard Technical Specifications, Bases (← links)
- ML18292A528 (← links)
- JAFP-16-0148, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation (← links)
- JAFP-16-0060, James a Fitzpatrick - Extension to Commitments Made in Response to March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3, Emergency Communication and Staffing Assessments (← links)
- JAFP-15-0073, J.A. Fitzpatrick - Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 (← links)
- JAFP-15-0036, J.A. Fitzpatrick Flood Hazard Reevaluation Report - Response to NRC Request for Information Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fuskushima Dai- (← links)
- JAFP-15-0007, Seismic Walkdown Report Update - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid (← links)
- JAFP-13-0150, JAFP-13-0150, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements (← links)
- JAFP-12-0037, Entergy Nuclear Operations, Incorporateds Answer to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- JAFP-12-0036, Entergy Nuclear Operations, Incorporateds - Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) (← links)
- JAFP-11-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program in Accordance with TSTF-425, Revision 3, James A. F (← links)
- JAFP-07-0092, Response to Request for Additional Information Regarding Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (← links)
- ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions (← links)