Pages that link to "CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)"
Jump to navigation
Jump to search
The following pages link to CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03):
Displayed 50 items.
- ML12226A561 (← links)
- ML12159A503 (← links)
- ML12146A385 (← links)
- ML11273A169 (← links)
- ML11195A117 (← links)
- ML11129A188 (← links)
- ML11116A210 (← links)
- NL-18-021, Supplement to Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plants, Units 1 and 2 License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 2.4, Qptr, and TS 3.3.1, 'Reactor Trip System (RTS) . (← links)
- NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (← links)
- NL-17-008, Sequoyah and Watts Bar - License Amendment Request to Modify Technical Specification (TS) Surveillance Requirement 3.2.4, Qptr, and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Condition D (SQN-TS-17-02 and WBN-TS-17-014) (← links)
- ML102040514 (← links)
- ML093290181 (← links)
- ML093160084 (← links)
- ML092950340 (← links)
- ML091530346 (← links)
- ML091190159 (← links)
- ML091120193 (← links)
- ML083180805 (← links)
- ML083030432 (← links)
- ML082840761 (← links)
- ML082420321 (← links)
- ML082401347 (← links)
- ML081080337 (← links)
- ML081070126 (← links)
- ML072620352 (← links)
- ML072290326 (← links)
- ML072140332 (← links)
- ML071080240 (← links)
- ML062090244 (← links)
- ML061990487 (← links)
- ML061500426 (← links)
- ML060600405 (← links)
- ML060600360 (← links)
- ML060030451 (← links)
- CNL-18-122, Status Regarding the Improved Flood Mitigation System Project (← links)
- CNL-18-114, Withdraw of Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to Tennessee Valley Authority (← links)
- CNL-18-107, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 (← links)
- CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 (← links)
- CNL-18-063, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes EPIP-23, Revision 25, Radioactive Material Transportation Incidents. (← links)
- CNL-18-035, Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to TVA (← links)
- CNL-18-047, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-014, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-17-141, Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status (← links)
- CNL-17-154, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 (← links)
- CNL-17-153, Results of the Review of Previous TVA Confirmatory Orders as Required by NRC Confirmatory Order EA-17-022 (← links)
- CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste (← links)
- CNL-17-120, Status Regarding the Improved Flood Mitigation System Project (← links)
- CNL-17-105, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)