Pages that link to "Jump W"
← Jump W
Jump to navigation
Jump to search
The following pages link to Jump W:
Displayed 50 items.
- ST-HL-AE-4146, Comment Supporting Draft Reg Guide DG-1021, Selection, Design,Qualification,Testing & Reliability of EDG Units Used as Class 1E Onsite Electric Power Sys at Nuclear Power Plants (← links)
- ST-HL-AE-4140, Forwards Response to Followup Item in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions: Actuators Not Specifically Covered by Either up-rating Program Will Be Reset Per Original Limitorque Rating (← links)
- ST-HL-AE-4127, Responds to Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Corrective Actions:Training of All Personnel Involved in Offsite Notification Message Preparation Will Emphasize Need to Review Message for Accuracy (← links)
- ST-HL-AE-4142, Special Rept:On 920610,SDG 22 Tripped When Released from Emergency Mode.Caused by Regulator Valve Not Providing Sufficient Air Pressure.Troubleshooting & Repair on Annunciator Alarm Panel Performed (← links)
- ST-HL-AE-4148, Monthly Operating Repts for June 1992 for South Texas Project,Units 1 & 2 (← links)
- ST-HL-AE-4137, Supplement to Special Rept Re Sdg Valid Failure on 901126. Caused by Less than Adequate Design of Delivery Valve Holder Which Is Prone to cracking.Cooper-Bessemer Owners Group Recommendations for Resolving Problem to Be Implemented (← links)
- ST-HL-AE-4119, Updates Status of ERDS Implementation Plan.Necessary Revs to Emergency Plan Approved & Issued W/Effective Date of 920605. Implementation of ERDS Completed (← links)
- ST-HL-AE-4130, Responds to NRC Re Violations Noted in Insp Repts 50-498/92-02 & 50-499/92-03.Corrective Actions:Security Shift Briefings Conducted & Bulletin Issued (← links)
- ST-HL-AE-4143, Responds to Unresolved Item Noted in Insp Repts 50-498/92-10 & 50-499/92-10.Corrective actions:off-hours Augmentation Drill Conducted on 920617 & Personnel Reported to Facility within 1 H of Notification Except for Offsite Field Team (← links)
- ST-HL-AE-4133, Revises Commitment in 920311 Response to Emergency Preparedness Exercise Weaknesses Noted in Insp Repts 50-498/90-10 & 50-499/90-10.Use of Digital Dosimeters Will Not Reduce Effectiveness of Dose Monitoring (← links)
- ST-HL-AE-4135, Responds to Confirmation Issue 1 of Confirmatory Item 28 Re SG Tube Rupture Analysis - Operator Response Times. Appropriate Scenarios Added to Licensed Operator Training Matl to Request Response Times (← links)
- ST-HL-AE-4129, Responds to Violations Noted in Insp Rept 50-498/92-08. Corrective Actions:Four Power Supplies Added to Equipment Clearance Order & Tagged to Ensure Proper Control of Supplies & Review of Temporary Mods Conducted (← links)
- ST-HL-AE-4180, Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1992 (← links)
- ST-HL-AE-4184, Forwards Rev 15 to South Tx Project Security Personnel Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- ST-HL-AE-4185, Requests Temporary Waiver of Compliance from TS 3.7.8 & 3.3.2 to Maintain Three Independent Exhaust Booster Fans & Three Independent Main Exhaust Fans Operable So Repairs to Exhaust Booster Fan 21C Can Be Completed (← links)
- ST-HL-AE-4170, Monthly Operating Repts for Jul 1992 for South Texas Project Electric Generating Station,Units 1 & 2 (← links)
- ST-HL-AE-4177, Suppls 920710 Response to Exercise Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Date to Determine Revised Needs for round-the-clock Emergency Medical Care at Facilities Extended from 920805 to 920915 (← links)
- ST-HL-AE-4164, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-01 & 50-499/92-01.Corrective Actions: Responsibility for Safeguards Info Program Transferred & Safeguards Info Training Will Be Enhanced (← links)
- ST-HL-AE-4162, Comment Supporting Proposed Rules 10CFR20 & 50 Re Reducing Regulatory Burden on Nuclear Licenses (← links)
- ST-HL-AE-4166, Special Rept:On 920630,CR Annunciator Lamp 22M01 Window F-1, Isolation Valve Cubicle Temp High Alarmed.Caused by Train D Cubicle Temp.Investigation Into Root Cause Ongoing (← links)
- ST-HL-AE-4106, Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- ST-HL-AE-4058, Responds to Questions from 920313 Meeting W/Nrc Re DG Reliability & Status of Essential Cooling Water Sys at Plant (← links)
- ST-HL-AE-4111, Forwards WCAP-13252, Evaluation of PTS for South Texas Unit 1. Rt PTS Values Remain Below NRC Screening Values for PTS Using Projected Pressure Vessel Fluence Values for End of Life 32 EFPYs (← links)
- ST-HL-AE-4079, Requests Permission to Perform Short Duration Integrated Leak Rate Tests to Satisfy Requirements of TS 4.6.1.2.a & 10CFR50,App J.Test Duration Using Mass Point Method Will Remain at Least 24 H (← links)
- ST-HL-AE-4117, Monthly Operating Repts for May 1992 for South Texas Project Electric Generating Station Units 1 & 2 (← links)
- ST-HL-AE-4103, Advises That Aw Harrison Will Represent Util at 920623 & 24 NRC Current Licensing Basis Workshop.Recommended Topics for Discussion Listed (← links)
- ST-HL-AE-4087, Special Rept:On 920409,channels a & C of Reactor Vessel Water Level Indication Sys (Rvwlis) Inoperable.Caused by Type of Copper Wiring Used in Circuit.Rvwlis Probes for Channels a & C Replaced (← links)
- ST-HL-AE-4094, Special Rept:On 920408,SDG 21 Tripped When Released from Emergency Mode.Cause Has Not Been Determined.Further Analysis & Investigation Performed on Sdg 21.Supplemental Rept Will Be Submitted by 920730 (← links)
- ST-HL-AE-4091, Monthly Operating Repts for Apr 1992 for South Texas Project Units 1 & 2 (← links)
- ST-HL-AE-4097, Responds to Violations Noted in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions:Purchase Orders Issued to Obtain Both Kalsi & Westinghouse MOV Actuator Uprating Program Test Results (← links)
- ST-HL-AE-3942, Partially Deleted Ltr Re Phase II Security Measures During Remodeling of Maint Operations Facility to Begin on 911215 (← links)
- ST-HL-AE-4089, Informs That Encl Ltrs & 13,respectively Re Security Measures Associated W/Temporary Const & Util Response to Notice of Violation 91-21,determined to Contain Safeguards Info Per 10CFR73.21(b) (← links)
- ST-HL-AE-4072, Annual Environ Operating Rept for South Texas Project Electric Generating Station Jan-Dec 1991 (← links)
- ST-HL-AE-4065, Special Rept:On 911206,emergency Mode Sdg 23 Tripped W/No Test Mode Trips Indicated.Caused by Foreign Matl Under Seat of Check Valves Allowing Decrease in Air Pressure. Troubleshooting for Sdg 23 & 24 Has Been Completed (← links)
- ST-HL-AE-4073, Annual Radiological Environ Operating Rept 1991 (← links)
- ST-HL-AE-4078, Responds to Weaknesses Noted in Insp Repts 50-498/92-04 & 50-499/92-04.Corrective Actions:Document Change Notice MD-2329 Issued to Update Vendor Drawing & Clarifying Memo Issued Re Loose Sway Strut (← links)
- ST-HL-AE-4086, Advises That Util Plans to Discontinue Nuclear Security Internal Assessment Programs,Described in App F of Util .Elimination of Redundant Program Will Enable Util to Allocate Resources More Effectively (← links)
- ST-HL-AE-4064, Special Rept:Discovered That Tendon Filler Grease Voids Exceeded Surveillance Requirement 4.6.1.6.1.d.2 Max of 5% Net Duct Vol.Caused by Spaces in Tendon Bubble.Adequate Grease Protection Exists for Tendons (← links)
- ST-HL-AE-4056, Forwards 2RE02 Inservice Insp Summary Rept for Repairs & Replacements,Addendum-1,South Texas Project Electric Generating Station,Unit 2 (← links)
- ST-HL-AE-4045, Forwards Rev 14 to Security Personnel Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- ST-HL-AE-3967, Forwards Rev 18 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- ST-HL-AE-4048, Lists Property Insurance Coverage in Force at Facilities (← links)
- ST-HL-AE-4036, Monthly Operating Repts for Feb 1992 for South Texas Project Units 1 & 2 (← links)
- ST-HL-AE-4020, Annual Personnel Exposure Repts for 1991 for South Texas Project (← links)
- ST-HL-AE-4013, Forwards 1992 Graded Emergency Preparedness Exercise Scenario (← links)
- ST-HL-AE-4004, Responds to NRC Re Violations Noted in Insp Rept 50-499/91-30.Corrective Actions:Local Leak Rate Testing Surveillance Procedures for RCP Oil Supply & Return Lines Will Be Revised to Provide Signoff Step (← links)
- ST-HL-AE-3992, Forwards Semiannual fitness-for-duty Program Performance Rept for Jul-Dec 1991 (← links)
- ST-HL-AE-3940, Requests That Due Date for Responses to Violations Noted in Insp Repts 50-498/91-21 & 50-499/91-21 Be Extended from 911205 to 19 to Allow Completion of Unit 2 Refueling Outage (← links)
- ST-HL-AE-3998, Forwards South Texas Project Electric Generating Station Unit 2 Reactor Containment Bldg Integrated Leakage Rate Test Rept for 24 H Test Conducted on 910922-23 (← links)
- ST-HL-AE-3996, Proposes Change in Min Staffing of Emergency Response Organization,Revising Min Staffing Contained in Emergency Plan for Radiation Protection Technicians in Area of Radiological Accident Assessment,Per NUREG-0654 (← links)