Pages that link to "ML20078L883"
Jump to navigation
Jump to search
The following pages link to ML20078L883:
Displayed 39 items.
- U-601239, Application for Amend to License NPF-62,revising Tech Spec to Support Cycle 2 in Max Extended Operating Domain & W/ Reduced Feedwater Temps.Supporting Documentation Encl.Fee paid.NEDC-31546P Withheld (← links)
- U-601170, Application for Amend to License NPF-62,revising Tech Specs 3.0.4,4.0.3 & 4.0.4 & Tech Spec Bases 3.0 & 4.0 & Deleting Tech Specs Statements Which Presently Take Exception to Spec 3.04.Fee Paid (← links)
- U-602796, Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition (← links)
- U-602657, Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items (← links)
- U-602675, Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership (← links)
- U-602624, Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 (← links)
- U-602587, Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable (← links)
- U-602565, Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B (← links)
- U-602569, Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met (← links)
- U-602522, Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months (← links)
- U-602551, Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv (← links)
- U-602554, Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function (← links)
- U-602508, Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys (← links)
- U-602520, Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules (← links)
- U-602499, Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys (← links)
- U-602463, Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program (← links)
- U-601858, Application for Amend to License NPF-62,changing Tech Specs 6.2.3.2, Composition, Subsection 6.2.3, Independent Safety Engineering Group to Provide Second Set of Acceptable Qualifications,Per NUREG-0737 (← links)
- U-602454, Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary (← links)
- U-602406, Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys (← links)
- U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 (← links)
- U-602376, Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements (← links)
- U-602364, Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 (← links)
- JSP-072-93, Application for Amend to License NPF-62,changing TS 3/4.6.1.2 Re Primary Containment Leakage to Reflect NRC Approval of Proposed Partial Exemptions from 10CFR50,App J Re Containment Integrated Leakage Rate Testing (← links)
- JSP-065-93, Application for Amend to License NPF-62,revising TS 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation to Revise Frequency for Measuring Breaker Arc Suppression Time (← links)
- JSP-066-93, Application for Amend to License NPF-62,revising TS 5.3.1, Fuel Assemblies & 5.3.2, CR Assemblies to Utilize Wording in Suppl 1 to GL 90-02, Alternative Requirements for Fuel Assemblies in Design Features Section of Ts (← links)
- JSP-613-92, Application for Amend to License NPF-62,changing TS 3/4.4.4, Chemistry to Add Requirement to Perform Evaluation Prior to Plant Restart of Impact on RCS of Chemistry Parameters Exceeding Limit During Plant Shutdown Conditions (← links)
- JSP-615-92, Application for Amend to License NPF-62,changing TS 3/4.7.1.1, Shutdown Svc Water Sys (Loops A,B & C) & TS 3/4.7.2, CR Ventilation Sys, to Allow Tensioning & Detensioning Reactor Pressure Vessel Head (← links)
- JSP-095-92, Application for Amend to License NPF-62,revising TS 6.3, Unit Staff Qualifications, to Delete Inappropriate Exception to ANSI Std in TS 6.3.1 Re Qualification Requirements for Director - Plant Radiation Protection (← links)
- JSP-078-92, Application for Amend to License NPF-62,changing TSs to Delete Component Lists,As Recommended in Generic Ltr 91-08 & Deleting Reactor Vessel Specimen Withdrawal Schedule,As Recommended by Generic Ltr 91-01 (← links)
- JSP-609-91, Application for Amend to License NPF-62,changing Tech Specs to Incorporate reliability-based Improvements to Instrumentation Action Statements & Surveillance Test Intervals Per BWR Owners Group Topical Repts (← links)
- JSP-541-91, Application for Amend to License NPF-62,changing Tech Spec 3/4.3.6, Control Rod Block Instrumentation to Revise Nominal Trip Setpoint (← links)
- JSP-959-90, Application for Amend to License NPF-62,changing Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation (← links)
- U-602297, Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys (← links)
- U-602303, Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys (← links)
- U-602272, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period (← links)
- JSP-079-94, Application for Amend to License NPF-62,revising TS 3/4.4.3.1, RCS Leakage-Leakage Detection Sys, in Response to Inoperability of Drywell Floor Drain Sump Flow Rate Monitoring Instrumentation (← links)
- JSP-504-93, Application for Amend to License NPF-62,changing Tech Spec 3/4.8.2.1, DC Sources-Operating (← links)
- JSP-719-90, Application for Amend to License DPF-62,revising Tech Spec 3/4.6.5, Drywell Post-LOCA Vacuum Relief Valves (← links)
- U-602192, Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves (← links)