Pages that link to "PNO-I-87-049B, on 870612,NRC Informed That Confirmed Positive Drug Test Results Received on 10 Employees.One Employee Fired,One Reassigned & Eight Suspended.Positive Results for Licensed Operators or Mgt Personnel Not Received"
Jump to navigation
Jump to search
The following pages link to PNO-I-87-049B, on 870612,NRC Informed That Confirmed Positive Drug Test Results Received on 10 Employees.One Employee Fired,One Reassigned & Eight Suspended.Positive Results for Licensed Operators or Mgt Personnel Not Received:
Displayed 9 items.
- PNO-I-88-084A, on 880829,resident Inspectors Informed of Results of Drug Testing on Licensee Reactor Operator Involved in Altercation Described in PNO-I-88-084.Licensee Terminated Employee on Basis of Positive Test Results (← links)
- PNO-I-86-009A, on 860204,plant Restarted Following Outage to Replace Turbine Extraction Steam Bellows Inside Main Condenser (← links)
- PNO-I-85-066A, on 850911,licensee Implemented Maint/Test Procedure to Identify Cause of 850907 Fire in CRD Power Distribution Panels.Fire Caused by Overload of Rods on Auxiliary Power Supply,Causing Excessive Dc Current (← links)
- PNO-I-85-067A, on 850924-25,failed Reactor Protection Sys Breaker Removed & Examined.Failure Caused by Mechanical Binding within Breaker Closure Assembly.Investigation Continuing (← links)
- ML20062J337 (← links)
- ML20062G865 (← links)
- ML20058E265 (← links)
- ML20058D836 (← links)
- ML20054H922 (← links)