Pages that link to "RIS 2001-01"
Jump to navigation
Jump to search
The following pages link to RIS 2001-01:
Displayed 50 items.
- RIS 2005-31, Official Exhibit - Mandatory Hearing - AES000056-MA-BD01 - NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms & Entities Subject to NRC Regula (← links)
- RIS 2005-31, Official Exhibit - Mandatory Hearing - NRC000086-MA-BD01 - NRC Reg Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Info Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the (← links)
- RIS 2005-31, 2005/12/22-Appliicant Prefiled Exhibit Aes000056, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, & Entities Subject to NRC Regulation of (← links)
- RIS 2005-31, 2005/12/22-NRC Prefiled Exhibit Nrc000086, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the U (← links)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other Than Private Residences. (← links)
- RIS 2011-02, Withdrawn NRC Regulatory Issue Summary 2011-02 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 (← links)
- RIS 2006-13, 2006/07/31-Intervenor-Exhibit 10-Information On The Changes Made To The Reactor Oversight Process To More Fully Address Safety Culture, Regulatory Issue Summary 2006-13, U.S. NRC (← links)
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break (← links)
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) (← links)
- RIS 2011-08, Fatigue Management During Hurricane Conditions 10 CFR Part 26, Subpart I. (← links)
- RIS 2010-04, Monitoring the Status of Regulated Activities During a Pandemic (← links)
- RIS 2010-03, Withdrawn NRC Regulatory Issue Summary 2010-03 Licensing Submittal Information for Small and Modular Reactor Designs (← links)
- RIS 2007-16, U.S. Nuclear Regulatory Commission Regulatory Issue Summary of 2007-16. Revision 1: Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses (← links)
- RIS 2010-02, Enclosulist of Recently Issued Office of Federal and State Materials and Environmental Management Programs Generic Communications (← links)
- RIS 2010-02, The Global Threat Reduction Initiative (GRTI) Federally Funded Voulentary Security Enhancements for High Risk Radiological Material (← links)
- RIS 2010-01, Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 2012 (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2010-05, Applicability of 10 CFR Part 21 Requirements to Applicants for Standard Design Certifications (← links)
- RIS 2009-10, Communications Between the NRC and Reactor Licensees During Emergencies and Significant Events (← links)
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material (← links)
- RIS 2009-02, Rev 1, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors (← links)
- RIS 2009-08, Process for Test Controls Associated with Performing Initial Validity Tests and Drug Tests Described in 10 CFR Part 26, Subpart F (← links)
- RIS 2009-14, Licensing Approach for In-Situ Recovery Facility Application Scenarios (← links)
- RIS 2007-21, Rev. 1, Adherence to Licensed Power Limits (← links)
- RIS 2009-02, Use of Containment Atmosphere Gaseous Radioactivity Monitors As Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors (← links)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... (← links)
- RIS 2008-30, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2001-07, Rev. 1 10 CFR 50.75 Reporting and Recordkeeping for Decommissioning Planning (← links)
- RIS 2000-08, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2008-28, Endorsement of Nuclear Energy Institute Guidance for Reactor Vessel Head Heavy Load Lifts (← links)
- RIS 2009-09, Withdrawn NRC Regulatory Issue Summary 2009-09: Use of Multiple Dosimetry and Compartment Factors in Determining Effective Dose Equivalent from External Radiation Exposures (← links)
- RIS 2008-24, Security Responsibilities of Service Providers and Client Licensees (← links)
- RIS 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites (← links)
- RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds (← links)
- RIS 2008-19, Lessons-Learned from Recent 10 CFR Part 70 License-Transfer Application Reviews (← links)
- RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) (← links)
- RIS 2008-22, Notification of Licensees Regarding Aircraft Threats (← links)
- RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures. (← links)
- RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2008-12, Enclosure 4: List of Recently Issued FSME Generic Communications (← links)
- RIS 2008-10, Fatigue Analysis of Nuclear Power Plant Components (← links)
- RIS 2003-08, Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2005-26, Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors (← links)
- RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure (← links)
- RIS 2005-02, Draft NRC Regulatory Issue Summary 2005-02, Revision 1: Clarifying the Process for Making Emergency Plan Changes (← links)
- RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process (← links)
- RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification (← links)
- RIS 2007-24, NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery. (← links)
- RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 (← links)