Pages that link to "Category:Regulatory Issue Summary"
Jump to navigation
Jump to search
The following pages link to Category:Regulatory Issue Summary:
Displayed 50 items.
- RIS 2014-06, Consideration of Current Operating Issues and Licensing Actions in License Renewal (← links)
- RIS 2013-12, Notice of Issuance of Enforcement Guidance Memo-Interim Guidance for Dispositioning Violations Involving 10 CFR 35.60 & 10 CFR 35.63 for the Calibration of Instrumentation to Measure the Activity of Rb-82 and the Determ. of Rb-82 Pt Dosa (← links)
- RIS 2013-06, Withdrawn NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2013-11, Fuel Assembly Resolution of Top Nozzle Stress Corrosion Cracking Handling for Dry Cask Spent Fuel Storage and Transportation (← links)
- RIS 2013-03, Pre-Application Communication and Scheduling for Medical Radioisotope Production Facilities Intending to Produce Molybdenum-99 (← links)
- RIS 2013-08, Withdrawn RIS 2013-08, Process for Scheduling Acceptance Reviews of New Reactor Licensing and Design Certification Applications and Process for Determining Budget Needs for Fiscal Year 2016 (← links)
- RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability (← links)
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages (← links)
- RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark (← links)
- RIS 2012-12, Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2013-10, Permanent Implant Brachytherapy Medical Event Reporting Under 10 CFR Part 35 (← links)
- RIS 2005-01, Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance (← links)
- RIS 2012-08, Nuclear Regulatory Commission Regulatory Issue Summary 2012-08: Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52 (← links)
- RIS 2004-13, Entergy Pre-Filed Evidentiary Hearing Exhibit Ent000290, NRC Regulatory Issue Summary 2004-13 Consideration Of Sheltering In Licensee'S Range Of Protective Action Recommendations (← links)
- RIS 2012-04, Notice of Revision to the Criteria for Identifying Materials Licensees for Discussion at the Agency Action Review Meeting (← links)
- RIS 2011-12, Rev. 1 - Adequacy of Station Electric Distribution System Voltages (Track Changes) (← links)
- RIS 2011-07, New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit Nys000310, NRC Regulatory Issue Summary 2011-07 License Renewal Submittal Information for Pressurized Water Reactor Internals Aging Management (← links)
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program (← links)
- RIS 2011-12, Response to Public Comments on Docket Id NRC-2011-0013-NRC Regulatory Issue Summary 2011-12, Revision 1, Adequacy of Station Electric Distribution System Voltages (← links)
- RIS 2011-13, Follow Up to Generic Letter 96-05 for Evaluation of Class D Valves Under Joint Owners Group Motor-Operated Valve Periodic Verification Program (← links)
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency With The Generic Aging Lessons Learned Report (← links)
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel (← links)
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites (← links)
- RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater Than 100 Grams (← links)
- RIS 2011-09, Available Resources Associated With Extended Storage Of Low-Level Radioactive Waste (← links)
- RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software (← links)
- RIS 2011-10, Request For Licensees To Consider The Nrc'S Public Website For Significant Enforcement Actions When Evaluating Individuals For Employment (← links)
- RIS 2011-06, Pre-Application Communication and Voluntary Submittal of Schedule for Future Molybdenum-99 Facility Licensing Actions for NRC Review (← links)
- RIS 2011-02, Tab 4 - Regulatory Issue Summary - 2011-02 (← links)
- RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown (← links)
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations (← links)
- RIS 2012-06, NRC Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities (← links)
- RIS 2005-31, Official Exhibit - Mandatory Hearing - AES000056-MA-BD01 - NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms & Entities Subject to NRC Regula (← links)
- RIS 2005-31, Official Exhibit - Mandatory Hearing - NRC000086-MA-BD01 - NRC Reg Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Info Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the (← links)
- RIS 2005-31, 2005/12/22-Appliicant Prefiled Exhibit Aes000056, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, & Entities Subject to NRC Regulation of (← links)
- RIS 2005-31, 2005/12/22-NRC Prefiled Exhibit Nrc000086, NRC Regulatory Issue Summary 2005-31, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the U (← links)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other Than Private Residences. (← links)
- RIS 2011-02, Withdrawn NRC Regulatory Issue Summary 2011-02 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 (← links)
- RIS 2006-13, 2006/07/31-Intervenor-Exhibit 10-Information On The Changes Made To The Reactor Oversight Process To More Fully Address Safety Culture, Regulatory Issue Summary 2006-13, U.S. NRC (← links)
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break (← links)
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) (← links)
- RIS 2010-04, Monitoring the Status of Regulated Activities During a Pandemic (← links)
- RIS 2010-03, Withdrawn NRC Regulatory Issue Summary 2010-03 Licensing Submittal Information for Small and Modular Reactor Designs (← links)
- RIS 2007-16, U.S. Nuclear Regulatory Commission Regulatory Issue Summary of 2007-16. Revision 1: Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses (← links)
- RIS 2010-02, Enclosulist of Recently Issued Office of Federal and State Materials and Environmental Management Programs Generic Communications (← links)
- RIS 2010-02, The Global Threat Reduction Initiative (GRTI) Federally Funded Voulentary Security Enhancements for High Risk Radiological Material (← links)
- RIS 2010-01, Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 2012 (← links)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities (← links)
- RIS 2010-05, Applicability of 10 CFR Part 21 Requirements to Applicants for Standard Design Certifications (← links)