Pages that link to "ASME Code Case N-509"
Jump to navigation
Jump to search
The following pages link to ASME Code Case N-509:
Displayed 50 items.
- ML20196J153 (← links)
- ML20207H329 (← links)
- ML20207E763 (← links)
- IR 05000458/1999006 (← links)
- NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative (← links)
- ML20212E081 (← links)
- ML20238F822 (← links)
- ML20237E117 (← links)
- ML20237D126 (← links)
- ML20237C436 (← links)
- ML20236Y548 (← links)
- NRC-98-0093, Provides Detailed Response to Request for Addl Info Re Relief Request Update for First 10-yr ISI NDE Program (← links)
- ML20236W186 (← links)
- ML20236U695 (← links)
- ML20217Q966 (← links)
- ML20217K462 (← links)
- ML20217J531 (← links)
- ML20217J522 (← links)
- ML20217H718 (← links)
- ML20217B883 (← links)
- ML20217B843 (← links)
- NRC-98-0060, Forwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 1998 (← links)
- NRC-98-0116, Forwards Revised Relief Requests RR-A21 & RR-A22,including Clarification of Requirements for Alternative Visual Exam as Requested During 980615 Conference Call.Relief Request RR-A1 Withdrawn Until RF-06 Refueling & Insp Outage (← links)
- BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval (← links)
- L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns (← links)
- ML20210P111 (← links)
- ML20209H409 (← links)
- ML20209H395 (← links)
- L-99-002, Requests NRC Appproval of Enclosed Relief Requests RR-31 Through RR-39 for Farley Nuclear Plant,Units 1 & 2 Isi. Approval Requested by 991231 (← links)
- RBG-44405, Forwards Two Owners Activity Rept Forms (OAR-1) for Plant, Reflecting ASME Section XI Program Activities Occurring During Third Insp Period of First Ten Year Program Interval (Cycles 6 & 7) Which Ended 971201 (← links)
- L-96-026, Tech Evaluation Rept on Second 10 Year Inservice Insp Program Plan:Wolf Creek Nuclear Operating Corp (← links)
- 3F1198-04, Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813 (← links)
- JPN-98-042, Provides Response to Request for Addl Info Re Inservice Insp Program Relief Requests.Commitments Made by Util in Ltr Listed on Attachment II (← links)
- JPN-97-023, Forwards Rev 1 to ISI Summary Rept for Refueling Outage RO12 at JAFNPP & JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval Closeout (← links)
- NG-97-1081, Forwards Revised Relief Requests NDE-R018,PR-001,PR-002 & PR-005 & Addl Info in Response to RAI Re Third 10-yr Interval ISI Program & Associated Requests for Relief (← links)
- L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 (← links)
- 3F0397-13, Forwards Relief Request 97-001-II Which Is Being Submitted Per 10CFR50.55a(3)(i) in Order to Obtain Approval for Using ASME Code Case N-509.Requests That Relief Be Granted by 970526 in Order to Implement Alternate Requirements (← links)
- BSEP-97-0034, Requests Approval for Plant to Use Alternative to ASME B&PV Code Requirements for Exam of Class 1,2 & 3 Integrally Welded Attachments (← links)
- L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 (← links)
- HL-5635, Forwards Revs to Third 10-yr Interval Inservice Insp Program,Including Program Introduction,Revised Relief Requests & NUREG-0313 Summary (← links)
- NG-96-1807, Responds to RAI on Third 10-yr Interval ISI Program Plan & Associated Requests for Relief (← links)
- U-602638, Forwards Revised Relief Request Re Performance of NDE of Welds & Components for First 120-month ISI Interval (← links)
- U-602566, Forwards Requests for Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition Through Winter 1981 Addenda,W/Re Performance of non-destructive Exam of Welds (← links)
- RBG-42006, Requests Relief from Insp Requirements in Table IWB/C-2412-1 of ASME Section XI Per 10CFR50.55a(g)(6) & Approval Per 10CFR50.55a(a)(3) for Use of Code Case N-509 (← links)
- L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 (← links)
- RBG-42289, Submits Info in Response to follow-up Questions Re Plant Request for Use of ASME Code Case N-509.Detailed List of Integrally Welded Attachments to Assist in NRC Review, Attached,Per Request (← links)
- RBG-42200, Responds to follow-up Questions from NRR Re Util 950925 Request for Use of ASME Code Case N-509 (← links)
- RC-95-0107, Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requiremen (← links)
- L-95-005, Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan (← links)
- LIC-95-0120, Forwards Response to Anomalies Noted in SER for Third 10-yr Interval IST Program for Fcs,Ist Selection Philosophy & Rev 2 to ISI Program Plan for 1993-2003 Interval (← links)