ML113340410: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 14: | Line 14: | ||
| page count = 17 | | page count = 17 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301, Rev. 9, Supp. 1 Administrative Topics Outline Form ES-301-1 Page 1 of 1 K:\scandocs\Operator Licensing | |||
\Capehart\Crystal River 2011 | |||
-301\Draft Exam | |||
\Form ES-301-1 (JPM Admin Outline) NRC 2011 Rev 0.docx ES-301 Facility: Crystal River Unit #3 Date of Exam: | |||
0 9/12/11 thru 09/29/11 Examination Level: | |||
RO SRO Operating Test Number: | |||
1 (NRC) Administrative Topic (See Note) | |||
Type Code* Describe activity to be performed Conduct of Operations M , R RO & SRO - (CO1) - Perform an RCS boron change calculation. | |||
K/A - G2.1.37 RO 4.3 SRO 4.6 OP-304 Conduct of Operations D , R RO & SRO - (CO2) - Calculate SDM with a misaligned rod. K/A - G2.1.7 RO 4.4 SRO 4.7 SRO Only - After completing the SDM calculation determine required ITS actions, if any. | |||
K/A - G2.2.40 SRO 4.7 | |||
SP-421 Equipment Control M , R RO & SRO - (EC1) - Perform a QPTR calculation. | |||
K/A - G2.2.12 RO 3.7 SRO 4.1 SRO Only - After completing the QPTR calculation determine required ITS actions, if any. | |||
K/A - G2.2.40 SRO 4.7 SP-303 Radiation Control D, R RO & SRO - (RC1) - Determine stay times using survey maps. K/A - G2.3.4 RO 3.2 SRO 3.7 | |||
DOS-NGGC-0004 Emergency Procedures | |||
/ Plan D, P , R SRO Only - (EP1) - Determine Emergency Action Level and Protective Action Recommendations | |||
. K/A - 2.4.41 SRO 4.6 K/A - 2.4.44 SRO 4.4 EM-202 Note: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required. | |||
* Type Codes & Criteria: | |||
(C)ontrol room, (S)imulator or Class(R)oom (D)irect from bank ( < 3 for ROs; | |||
< 4 for SROs & RO retakes) | |||
(N)ew or (M)odified from bank ( > 1) (P)revious 2 exams ( <1; randomly selected) | |||
ES-301, Rev. 9, Supp. 1 Control Room / In | |||
-Plant Systems Outline Form ES-301-2 Page 1 of 1 K:\scandocs\Operator Licensing | |||
\Capehart\Crystal River 2011 | |||
-301\Draft Exam | |||
\Form ES-301-2 (JPM MCR | |||
-Plant Outline) NRC 2011 Rev 3.docx ES-301 Facility: Crystal River Unit #3 Date of Exam: | |||
0 9/12/11 thru 09/2 3/11 Exam Level: | |||
RO SRO-I SRO-U Operating Test Number: | |||
1 (NRC) Control Room systems | |||
@ (8 for RO; 7 for SRO | |||
-I; 2 or 3 for SRO | |||
-U, including 1 ESF | |||
) System / JPM Title Type Code* Safety Function a. CRDS - Perform actions of AP | |||
-504 K/A - 001A4.15 RO 3.1 SRO 3.1 (AP-504) [RO] D, S 1 b. ESFAS - Respond to an ES Actuation [SRO-U] K/A - BW/E03EA1.1 RO 4.1 SRO 3.8 (EOP-3) [RO , SRO-I] A, EN, N , S 4 Primary c. PPCS - Respond to a stuck open PZR spray valve K/A - 0 10A4.01 RO 3.7 SRO 3.5 (AP-520) [RO, SRO-I] A, D, L, P, S 3 d. EFW - Establish Auxiliary Feedwater flow K/A - 061G2.1.20 RO 4.6 SRO 4.6 (EOP-04) [RO , SRO-I] N , S 4 Secondary e. CSS - Initiate Reactor Building Spray | |||
[SRO-U] K/A - 026A3.01 RO 4.3 SRO 4.5 (EM-225C) [RO , SRO-I] A , L , M , S 5 f. EDG - Synchronize Off | |||
-Site Power with EDG-1A K/A - 064A4.09 RO 3.2 SRO 3.3 (AP-770) [RO , SRO-I] D, S 6 g. CWS - Start CWP-1C While at Power | |||
[SRO-U K/A - 075G2.1.31 RO 4.2 SRO 3.9 (OP-604) [RO, SRO-I] A, D, P, S 8 h. WGS - Respond to a Waste Gas Header leak K/A - 060AA2.05 RO 3.7 SRO 4.2 (AP-250) [RO, SRO-I] A, D, S 9 SPARE MU - Restart a MUP following an RCS leak isolation K/A - 002A2.01 RO 4.3 SRO 4.4 (AP | |||
-520) D, S 2 In-Plant Systems | |||
* (3 for RO; 3 for SRO | |||
-I; 3 or 2 for SRO | |||
-U) i. ECCS - Respond to a CFT Low Pressure condition | |||
[SRO-U] K/A - 006A1.13 RO 3.5 SRO 3.7 (AP-404) [RO , SRO-I] D, E, L, R 3 j. HRPS - Place a Hydrogen Analyzer in Service K/A - 028A4.03 RO 3.1 SRO 3.3 (EOP-14) [RO, SRO-I] A, D , E, L 5 k. WGDS - Perform a Waste Gas Release to the RB | |||
[SRO-U] K/A - 0 71G2.3.11 RO 3.8 SRO 4.3 (OP-412A) [RO, SRO-I] D , R 9 SPARE FS/OTSG - Transfer excess secondary inventory to FST K/A - 038EK3.06 RO 4.2 SRO 4.5 (EOP | |||
-14, Enc. 9) | |||
D, E 8 | |||
* All RO and SRO | |||
-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO | |||
-U systems must serve different safety functions; in | |||
-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO | |||
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in | |||
-plant (EN)gineered safety feature (L)ow Power | |||
/ Shutdown (N)ew or (M)odified from bank including 1 (A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 (control room system) | |||
- / - / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 (randomly selected) | |||
< 3 / < 3 / < 2 > 1 / > 1 / > 1 ES-301, Rev. 9, Supp. 1 Control Room / In | |||
-Plant Systems Outline Form ES-301-2 Page 2 of 2 K:\scandocs\Operator Licensing | |||
\Capehart\Crystal River 2011 | |||
-301\Draft Exam | |||
\Form ES-301-2 (JPM MCR | |||
-Plant Outline) NRC 2011 Rev 3.docx ES-301}} | |||
Revision as of 09:48, 31 July 2018
| ML113340410 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/28/2011 |
| From: | NRC/RGN-II/DRS/OLB |
| To: | Progress Energy Florida |
| References | |
| 50-302/11-301 | |
| Download: ML113340410 (17) | |
Text
ES-301, Rev. 9, Supp. 1 Administrative Topics Outline Form ES-301-1 Page 1 of 1 K:\scandocs\Operator Licensing
\Capehart\Crystal River 2011
-301\Draft Exam
\Form ES-301-1 (JPM Admin Outline) NRC 2011 Rev 0.docx ES-301 Facility: Crystal River Unit #3 Date of Exam:
0 9/12/11 thru 09/29/11 Examination Level:
1 (NRC) Administrative Topic (See Note)
Type Code* Describe activity to be performed Conduct of Operations M , R RO & SRO - (CO1) - Perform an RCS boron change calculation.
K/A - G2.1.37 RO 4.3 SRO 4.6 OP-304 Conduct of Operations D , R RO & SRO - (CO2) - Calculate SDM with a misaligned rod. K/A - G2.1.7 RO 4.4 SRO 4.7 SRO Only - After completing the SDM calculation determine required ITS actions, if any.
K/A - G2.2.40 SRO 4.7
SP-421 Equipment Control M , R RO & SRO - (EC1) - Perform a QPTR calculation.
K/A - G2.2.12 RO 3.7 SRO 4.1 SRO Only - After completing the QPTR calculation determine required ITS actions, if any.
K/A - G2.2.40 SRO 4.7 SP-303 Radiation Control D, R RO & SRO - (RC1) - Determine stay times using survey maps. K/A - G2.3.4 RO 3.2 SRO 3.7
DOS-NGGC-0004 Emergency Procedures
/ Plan D, P , R SRO Only - (EP1) - Determine Emergency Action Level and Protective Action Recommendations
. K/A - 2.4.41 SRO 4.6 K/A - 2.4.44 SRO 4.4 EM-202 Note: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator or Class(R)oom (D)irect from bank ( < 3 for ROs;
(N)ew or (M)odified from bank ( > 1) (P)revious 2 exams ( <1; randomly selected)
ES-301, Rev. 9, Supp. 1 Control Room / In
-Plant Systems Outline Form ES-301-2 Page 1 of 1 K:\scandocs\Operator Licensing
\Capehart\Crystal River 2011
-301\Draft Exam
-Plant Outline) NRC 2011 Rev 3.docx ES-301 Facility: Crystal River Unit #3 Date of Exam:
0 9/12/11 thru 09/2 3/11 Exam Level:
RO SRO-I SRO-U Operating Test Number:
1 (NRC) Control Room systems
-I; 2 or 3 for SRO
-U, including 1 ESF
) System / JPM Title Type Code* Safety Function a. CRDS - Perform actions of AP
-504 K/A - 001A4.15 RO 3.1 SRO 3.1 (AP-504) [RO] D, S 1 b. ESFAS - Respond to an ES Actuation [SRO-U] K/A - BW/E03EA1.1 RO 4.1 SRO 3.8 (EOP-3) [RO , SRO-I] A, EN, N , S 4 Primary c. PPCS - Respond to a stuck open PZR spray valve K/A - 0 10A4.01 RO 3.7 SRO 3.5 (AP-520) [RO, SRO-I] A, D, L, P, S 3 d. EFW - Establish Auxiliary Feedwater flow K/A - 061G2.1.20 RO 4.6 SRO 4.6 (EOP-04) [RO , SRO-I] N , S 4 Secondary e. CSS - Initiate Reactor Building Spray
[SRO-U] K/A - 026A3.01 RO 4.3 SRO 4.5 (EM-225C) [RO , SRO-I] A , L , M , S 5 f. EDG - Synchronize Off
-Site Power with EDG-1A K/A - 064A4.09 RO 3.2 SRO 3.3 (AP-770) [RO , SRO-I] D, S 6 g. CWS - Start CWP-1C While at Power
[SRO-U K/A - 075G2.1.31 RO 4.2 SRO 3.9 (OP-604) [RO, SRO-I] A, D, P, S 8 h. WGS - Respond to a Waste Gas Header leak K/A - 060AA2.05 RO 3.7 SRO 4.2 (AP-250) [RO, SRO-I] A, D, S 9 SPARE MU - Restart a MUP following an RCS leak isolation K/A - 002A2.01 RO 4.3 SRO 4.4 (AP
-520) D, S 2 In-Plant Systems
-I; 3 or 2 for SRO
-U) i. ECCS - Respond to a CFT Low Pressure condition
[SRO-U] K/A - 006A1.13 RO 3.5 SRO 3.7 (AP-404) [RO , SRO-I] D, E, L, R 3 j. HRPS - Place a Hydrogen Analyzer in Service K/A - 028A4.03 RO 3.1 SRO 3.3 (EOP-14) [RO, SRO-I] A, D , E, L 5 k. WGDS - Perform a Waste Gas Release to the RB
[SRO-U] K/A - 0 71G2.3.11 RO 3.8 SRO 4.3 (OP-412A) [RO, SRO-I] D , R 9 SPARE FS/OTSG - Transfer excess secondary inventory to FST K/A - 038EK3.06 RO 4.2 SRO 4.5 (EOP
-14, Enc. 9)
D, E 8
-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow Power
/ Shutdown (N)ew or (M)odified from bank including 1 (A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 (control room system)
- / - / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 (randomly selected)
< 3 / < 3 / < 2 > 1 / > 1 / > 1 ES-301, Rev. 9, Supp. 1 Control Room / In
-Plant Systems Outline Form ES-301-2 Page 2 of 2 K:\scandocs\Operator Licensing
\Capehart\Crystal River 2011
-301\Draft Exam