ML14336A243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment 2 to Enclosure 1 ofPLA-7169 Facility Operating License No. NPF-22, PPL Susquehanna Unit 2 Mark-Up  EMF-2209(P),
{{#Wiki_filter:Attachment 2 to Enclosure 1 ofPLA-7169 Facility Operating License No. NPF-22, PPL Susquehanna Unit 2 Mark-Up  EMF-2209(P), Revision 2, Addendum 1 is published and PPL verifies that the additive constants from the approved report have been incorporated in the cycle specific analyses.
Revision 2, Addendum 1 is published and PPL verifies that the additive constants from the approved report have been incorporated in the cycle specific analyses.
D. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
D. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical  
The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility," and was submitted October 8, 2004. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved*
: security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled:  
"Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility,"
and was submitted October 8, 2004. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved*
cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PPL Susquehanna, LLC CSP was approved by License Amendment E. DELETED F. PPL Susquehanna, LLC shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. G. The information in the Updated Final Safety Analysis Report (UFSAR) supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be incorporated into the UFSAR no later than the next scheduled update required by 10 CFR 50.71(e) following the issuance of this renewed operating license.
The PPL Susquehanna, LLC CSP was approved by License Amendment E. DELETED F. PPL Susquehanna, LLC shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. G. The information in the Updated Final Safety Analysis Report (UFSAR) supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be incorporated into the UFSAR no later than the next scheduled update required by 10 CFR 50.71(e) following the issuance of this renewed operating license. Until this update is complete, PPL Susquehanna, LLC may not make changes to the information in the supplement.
Until this update is complete, PPL Susquehanna, LLC may not make changes to the information in the supplement.
Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59. H. The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), describes certain *future activities to. be completed prior to and/or during the period of extended operation.
Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59. H. The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), describes certain *future activities to. be completed prior to and/or during the period of extended operation.
The licensee shall complete these activities in accordance with Appendix A of NUREG-1931, "Safety Evaluation Report Related to the Susquehanna Steam Electric  
The licensee shall complete these activities in accordance with Appendix A of NUREG-1931, "Safety Evaluation Report Related to the Susquehanna Steam Electric Station, Units 1 and 2," dated November, 2009. The licensee shalf notify the NRC in writing when activities to be completed prior to the period of extended operation are complete and can be verified by NRC inspection.
: Station, Units 1 and 2," dated November, 2009. The licensee shalf notify the NRC in writing when activities to be completed prior to the period of extended operation are complete and can be verified by NRC inspection.
I. All capsules in the reactor vessel that are removed and tested must meet the requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the staff prior to implementation.
I. All capsules in the reactor vessel that are removed and tested must meet the requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule.
Any changes to the capsule withdrawal  
: schedule, including spare capsules, must be approved by the staff prior to implementation.
All capsules placed in storage must be maintained for future insertion.
All capsules placed in storage must be maintained for future insertion.
Any changes to storage requirements must be approved by the staff, as required by 10 CFR Part 50, Appendix H. Renewed Operating License No. NPF-22 (;;g) Amendment No . .za9' I Corrected by letter dated July 28, 2011}}
Any changes to storage requirements must be approved by the staff, as required by 10 CFR Part 50, Appendix H. Renewed Operating License No. NPF-22 (;;g) Amendment No . .za9' I Corrected by letter dated July 28, 2011}}

Latest revision as of 10:49, 9 July 2018

Attachment 2 to Enclosure 1 of PLA-7169 Facility Operating License No. NPF-22, PPL Susquehanna Unit 2 Mark-Up
ML14336A243
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/02/2014
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14336A239 List:
References
PLA-7169
Download: ML14336A243 (2)


Text

Attachment 2 to Enclosure 1 ofPLA-7169 Facility Operating License No. NPF-22, PPL Susquehanna Unit 2 Mark-Up EMF-2209(P), Revision 2, Addendum 1 is published and PPL verifies that the additive constants from the approved report have been incorporated in the cycle specific analyses.

D. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility," and was submitted October 8, 2004. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved*

cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The PPL Susquehanna, LLC CSP was approved by License Amendment E. DELETED F. PPL Susquehanna, LLC shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. G. The information in the Updated Final Safety Analysis Report (UFSAR) supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be incorporated into the UFSAR no later than the next scheduled update required by 10 CFR 50.71(e) following the issuance of this renewed operating license. Until this update is complete, PPL Susquehanna, LLC may not make changes to the information in the supplement.

Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59. H. The UFSAR supplement, as revised, submitted pursuant to 10 CFR 54.21 (d), describes certain *future activities to. be completed prior to and/or during the period of extended operation.

The licensee shall complete these activities in accordance with Appendix A of NUREG-1931, "Safety Evaluation Report Related to the Susquehanna Steam Electric Station, Units 1 and 2," dated November, 2009. The licensee shalf notify the NRC in writing when activities to be completed prior to the period of extended operation are complete and can be verified by NRC inspection.

I. All capsules in the reactor vessel that are removed and tested must meet the requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the staff prior to implementation.

All capsules placed in storage must be maintained for future insertion.

Any changes to storage requirements must be approved by the staff, as required by 10 CFR Part 50, Appendix H. Renewed Operating License No. NPF-22 (;;g) Amendment No . .za9' I Corrected by letter dated July 28, 2011