ML15126A042: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261April 20, 2015United States Nuclear Regulatory Commission Attention:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 20, 2015 United States Nuclear Regulatory Commission Attention:
Document Control DeskWashington, DC 20555-0001 Serial No.SPS LIC/CGLDocket No.License No.14-508ARO50-281DPR-37VIRGINIA ELECTRIC AND POWER COMPANYSURRY POWER STATION UNIT 2RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 2014 STEAM GENERATOR INSERVICE INSPECTION REPORTBy letter dated October 16, 2014 (Serial No. 14-508),
Document Control Desk Washington, DC 20555-0001 Serial No.SPS LIC/CGL Docket No.License No.14-508A RO 50-281 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 2014 STEAM GENERATOR INSERVICE INSPECTION REPORT By letter dated October 16, 2014 (Serial No. 14-508), Virginia Electric and Power Company (Dominion) submitted information summarizing the results of steam generator (SG) tube inspections performed at Surry Power Station Unit 2 during the Spring 2014 refueling outage. On March 25, 2015, the NRC requested additional information related to the SG inspections.
Virginia Electric and PowerCompany (Dominion) submitted information summarizing the results of steam generator (SG) tube inspections performed at Surry Power Station Unit 2 during the Spring 2014refueling outage. On March 25, 2015, the NRC requested additional information relatedto the SG inspections.
The NRC's questions and Dominion's responses are provided in the attachment to this letter.If you have any questions or require additional information, please contact Ms. Candee Lovett at (757) 365-2178.Very truly yours, N. L. Lane Site Vice President Surry Power Station Attachment
The NRC's questions and Dominion's responses are provided inthe attachment to this letter.If you have any questions or require additional information, please contactMs. Candee Lovett at (757) 365-2178.
-Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection Report -Surry Power Station Unit 2 Commitments made in this letter: None Aoq-?tj C/--
Very truly yours,N. L. LaneSite Vice President Surry Power StationAttachment
Serial No.: 14-508A Docket No.: 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303 Ms. K. R. Cotton-Gross  
-Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection Report -SurryPower Station Unit 2Commitments made in this letter: NoneAoq-?tj C/--
-Surry NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 Dr. V. Sreenivas  
Serial No.: 14-508ADocket No.: 50-281Page 2 of 2cc: U.S. Nuclear Regulatory Commission Region IIMarquis One Tower245 Peachtree Center Ave., NESuite 1200Atlanta, Georgia 30303Ms. K. R. Cotton-Gross  
-North Anna NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station Serial No.: 14-508A Docket No.: 50-281 ATTACHMENT Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection Report Surrv Power Station Unit 2 Virginia Electric and Power Company (Dominion)
-SurryNRC Project ManagerU. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852Dr. V. Sreenivas  
Serial No.: 14-508A Docket No.: 50-281 Attachment RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING SURRY UNIT 2 SPRING 2014 STEAM GENERATOR TUBE INSPECTIONS By letter dated October 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14294A449), Virginia Electric and Power Company (Dominion) submitted steam generator tube inspection results from the Spring 2014 inspections at Surry Power Station, Unit 2. In order to complete its review, the NRC staff requests the following additional information.
-North AnnaNRC Project ManagerU. S. Nuclear Regulatory Commission One White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852NRC Senior Resident Inspector Surry Power StationMr. R. A. SmithAuthorized Nuclear Inspector Surry Power Station Serial No.: 14-508ADocket No.: 50-281ATTACHMENT Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection ReportSurrv Power Station Unit 2Virginia Electric and Power Company(Dominion)
The Dominion responses are provided below.1. Please clarify the statement that "no anomalous conditions" associated with the primary channel head inspections were observed.
Serial No.: 14-508ADocket No.: 50-281Attachment RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING SURRY UNIT 2SPRING 2014 STEAM GENERATOR TUBE INSPECTIONS By letter dated October 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14294A449),
Please clarify whether any degradation was observed.Response:
Virginia Electric and Power Company(Dominion) submitted steam generator tube inspection results from the Spring 2014inspections at Surry Power Station, Unit 2. In order to complete its review, the NRCstaff requests the following additional information.
No degradation or any other condition adverse to quality was observed during the primary channel head inspections.
The Dominion responses areprovided below.1. Please clarify the statement that "no anomalous conditions" associated withthe primary channel head inspections were observed.
: 2. Please clarify the statement that "no adverse conditions" were noted during the secondary side internals inspection.
Please clarify whetherany degradation was observed.
Please clarify whether any degradation was observed.Response:
No degradation or any other condition adverse to quality was observed during the secondary side internals inspections.
: 3. In Table 1, please clarify that 100% of the tubes in steam generators B and C were inspected full-length with a bobbin coil except for the U-bend region of the tubes in rows 1 and 2.Response:
100% of the tubes in steam generators B and C were inspected full-length with a bobbin coil except for the U-bend region of the tubes in rows 1 and 2.4. Please discuss the purpose of the array probe examinations.
Response:
Response:
No degradation or any other condition adverse to quality was observedduring the primary channel head inspections.
The array probe examinations are used for detection of indications or loose parts at the top of the tube sheet region of the tube.Page 1 of 1}}
: 2. Please clarify the statement that "no adverse conditions" were noted duringthe secondary side internals inspection.
Please clarify whether anydegradation was observed.
Response:
No degradation or any other condition adverse to quality was observedduring the secondary side internals inspections.
: 3. In Table 1, please clarify that 100% of the tubes in steam generators B and Cwere inspected full-length with a bobbin coil except for the U-bend region ofthe tubes in rows 1 and 2.Response:
100% of the tubes in steam generators B and C were inspected full-length with a bobbin coil except for the U-bend region of the tubes in rows 1and 2.4. Please discuss the purpose of the array probe examinations.
Response:
The array probe examinations are used for detection of indications orloose parts at the top of the tube sheet region of the tube.Page 1 of 1}}

Revision as of 03:36, 9 July 2018

Surry, Unit 2 - Response to Request for Additional Information 2014 Steam Generator Inservice Inspection Report
ML15126A042
Person / Time
Site: Surry 
Issue date: 04/20/2015
From: Lane N L
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
14-508A
Download: ML15126A042 (4)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 20, 2015 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555-0001 Serial No.SPS LIC/CGL Docket No.License No.14-508A RO 50-281 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 2014 STEAM GENERATOR INSERVICE INSPECTION REPORT By letter dated October 16, 2014 (Serial No.14-508), Virginia Electric and Power Company (Dominion) submitted information summarizing the results of steam generator (SG) tube inspections performed at Surry Power Station Unit 2 during the Spring 2014 refueling outage. On March 25, 2015, the NRC requested additional information related to the SG inspections.

The NRC's questions and Dominion's responses are provided in the attachment to this letter.If you have any questions or require additional information, please contact Ms. Candee Lovett at (757) 365-2178.Very truly yours, N. L. Lane Site Vice President Surry Power Station Attachment

-Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection Report -Surry Power Station Unit 2 Commitments made in this letter: None Aoq-?tj C/--

Serial No.: 14-508A Docket No.: 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303 Ms. K. R. Cotton-Gross

-Surry NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 Dr. V. Sreenivas

-North Anna NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station Serial No.: 14-508A Docket No.: 50-281 ATTACHMENT Response to NRC Request for Additional Information Regarding Spring 2014 Steam Generator Inservice Inspection Report Surrv Power Station Unit 2 Virginia Electric and Power Company (Dominion)

Serial No.: 14-508A Docket No.: 50-281 Attachment RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING SURRY UNIT 2 SPRING 2014 STEAM GENERATOR TUBE INSPECTIONS By letter dated October 16, 2014 (Agencywide Documents Access and Management System Accession No. ML14294A449), Virginia Electric and Power Company (Dominion) submitted steam generator tube inspection results from the Spring 2014 inspections at Surry Power Station, Unit 2. In order to complete its review, the NRC staff requests the following additional information.

The Dominion responses are provided below.1. Please clarify the statement that "no anomalous conditions" associated with the primary channel head inspections were observed.

Please clarify whether any degradation was observed.Response:

No degradation or any other condition adverse to quality was observed during the primary channel head inspections.

2. Please clarify the statement that "no adverse conditions" were noted during the secondary side internals inspection.

Please clarify whether any degradation was observed.Response:

No degradation or any other condition adverse to quality was observed during the secondary side internals inspections.

3. In Table 1, please clarify that 100% of the tubes in steam generators B and C were inspected full-length with a bobbin coil except for the U-bend region of the tubes in rows 1 and 2.Response:

100% of the tubes in steam generators B and C were inspected full-length with a bobbin coil except for the U-bend region of the tubes in rows 1 and 2.4. Please discuss the purpose of the array probe examinations.

Response:

The array probe examinations are used for detection of indications or loose parts at the top of the tube sheet region of the tube.Page 1 of 1