{{#Wiki_filter:DRAFT DRAFT REQUEST FOR ADDITIONAL INFORMATION PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated May 28, 2013, 1 First Energy Nuclear Operating Company (FENOC, the licensee) submitted a request to revise the reactor vessel (RV) surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and BVPS-2). In order to complete its review, the staff requires additional information. | |||
Appendix H to 10 CFR Part 50 states, "Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in § 50.4, within one year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation." Electric Power Research Institute's "Materials Reliability Program: | |||
Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326)" | |||
dated December 2011, 2 states that BVPS-1 Capsule X "is planned to be withdrawn at a fluence of 5.01 x 10 19 n/cm2 in 2013". | |||
RAI #1: | |||
Provide the withdrawal date for BVPS-1 Capsule X. | |||
1 Agencywide Documents Access Management System (ADAMS) Accession No. ML13151A058 2 ADAMS Accession Nos. ML12040A314 and ML12040A315}} | |||
Revision as of 12:13, 3 July 2018
| ML13338A535 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/04/2013 |
| From: | Whited J A Plant Licensing Branch 1 |
| To: | |
| Whited J A | |
| References | |
| Download: ML13338A535 (1) | |
Text
DRAFT DRAFT REQUEST FOR ADDITIONAL INFORMATION PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULES FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated May 28, 2013, 1 First Energy Nuclear Operating Company (FENOC, the licensee) submitted a request to revise the reactor vessel (RV) surveillance capsule withdrawal schedules for the Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and BVPS-2). In order to complete its review, the staff requires additional information.
Appendix H to 10 CFR Part 50 states, "Each capsule withdrawal and the test results must be the subject of a summary technical report to be submitted, as specified in § 50.4, within one year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation." Electric Power Research Institute's "Materials Reliability Program:
Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326)"
dated December 2011, 2 states that BVPS-1 Capsule X "is planned to be withdrawn at a fluence of 5.01 x 10 19 n/cm2 in 2013".
RAI #1:
Provide the withdrawal date for BVPS-1 Capsule X.
1 Agencywide Documents Access Management System (ADAMS) Accession No. ML13151A058 2 ADAMS Accession Nos. ML12040A314 and ML12040A315