ML14023A876: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:             January 22, 2014  Mr. Edward D. Halpin  
{{#Wiki_filter:January 22, 2014  
   Mr. Edward D. Halpin  
Senior Vice President and  
Senior Vice President and  
   Chief Nuclear Officer  
   Chief Nuclear Officer  
Pacific Gas and Electric Company  
Pacific Gas and Electric Company  
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA  93424  
 
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6  
Avila Beach, CA  93424  
 
SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2014301; 05000323/2014301 
   
   
SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2014301; 05000323/2014301 
Dear Mr. Halpin:  
Dear Mr. Halpin:  
   
   
In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC  
In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC  
Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Diablo Canyon Nuclear Power Plant, Units 1 and 2, during the week of August 11, 2014.  
Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Di
ablo Canyon Nuclear Power Plant, Units 1 and 2, during the week of August 11, 2014.  
 
   
   
As agreed during the telephone conversation, your staff will prepare the examinations based on  
As agreed during the telephone conversation, your staff will prepare the examinations based on  
the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The NRC's regional office will  
the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The NRC's regional office will  
discuss with your staff any changes that might be necessary before the examinations are  
discuss with your staff any changes that might be necessary before the examinations are  
administered.   
administered.   
  To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 23, 2014.  The written examinations, operating tests, and supporting reference  
  To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 23, 2014.  The written examinations, operating tests, and supporting reference  
materials identified in Attachment 3 to ES-201 will be due by June 20, 2014.  Pursuant to  
materials identified in Attachment 3 to ES-201 will be due by June 20, 2014.  Pursuant to  
Line 39: Line 50:
marked.  Any delay in receiving the required examinations and reference materials, or the  
marked.  Any delay in receiving the required examinations and reference materials, or the  
submittal of inadequate or incomplete materials, may cause the examinations to be  
submittal of inadequate or incomplete materials, may cause the examinations to be  
rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of July 14, 2014.   
rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of July 14, 2014.  
   
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511  
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511  
E. Halpin - 2 -  to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  
E. Halpin - 2 -  
temperatures, and levels) generated during the dynamic operating tests until the examination results are final.   
  to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,  
temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
   
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
   
   
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.   
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and  
(OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not  
received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
   
This letter contains information collections that are subject to the  
Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and  
reviewing the collection of information.  Send comments regarding this burden estimate or any  
reviewing the collection of information.  Send comments regarding this burden estimate or any  
other aspect of these information collections, including suggestions for reducing the burden, to  
other aspect of these information collections, including suggestions for reducing the burden, to  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.   
Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV
.   
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
information collection, unless it displays a currently valid OMB control number.  
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  Thank you for your cooperation in this matter.  Mr. Fortier has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-
 
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html
.  Thank you for your cooperation in this matter.  Mr. Fortier has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-
 
1159.  
1159.  
       Sincerely,   /RA/        Vincent Gaddy, Chief Operations Branch      Division of Reactor Safety   
       Sincerely,
  /RA/        Vincent Gaddy, Chief  
Operations Branch      Division of Reactor Safety  
   
Dockets:  50-275; 50-323  
Dockets:  50-275; 50-323  
Licenses:  DPR-80; DPR-82   
Licenses:  DPR-80; DPR-82   
E. Halpin - 3 -  R:\_REACTORS\_DC\2014\DC 2014301 Exam Notify Ltr-cds.docx
ADAMS ACCESSION NUMBER:  ML14023A876 SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials CDS Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials CDS SOE:OB C:OB    CSteely VGaddy    /RA/ /RA/    1/22/14 1/22/14    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax 


  ML14023A876 SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials CDS Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials CDS SOE:OB C:OB    CSteely VGaddy    /RA/ /RA/    1/22/14 1/22/14
}}
}}

Revision as of 02:26, 3 July 2018

Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Notification of NRC Initial Operator Licensing Examination 05000275/2014301; 05000323/2014301
ML14023A876
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/22/2014
From: Vincent Gaddy
Division of Reactor Safety IV
To: Halpin E D
Pacific Gas & Electric Co
References
IR-14-301
Download: ML14023A876 (3)


See also: IR 05000275/2014301

Text

January 22, 2014

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2014301; 05000323/2014301

Dear Mr. Halpin:

In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC

Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Di

ablo Canyon Nuclear Power Plant, Units 1 and 2, during the week of August 11, 2014.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 23, 2014. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 20, 2014. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. In addition, your support for on-site validation of the examinations is required during the week of July 14, 2014.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

E. Halpin - 2 -

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications

(OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the

Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV

.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html

. Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-

1159.

Sincerely,

/RA/ Vincent Gaddy, Chief

Operations Branch Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

ML14023A876 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials CDS Publicly Avail Yes No Sensitive Yes No Sens. Type Initials CDS SOE:OB C:OB CSteely VGaddy /RA/ /RA/ 1/22/14 1/22/14