{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261April 20, 2015United States Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001Serial No.SPS LIC/CGLDocket No.License No.14-508ARO50-281DPR-37VIRGINIA ELECTRIC AND POWER COMPANYSURRY POWER STATION UNIT 2RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION2014 STEAM GENERATOR INSERVICE INSPECTION REPORTBy letter dated October 16, 2014 (Serial No. 14-508), Virginia Electric and PowerCompany (Dominion) submitted information summarizing the results of steam generator(SG) tube inspections performed at Surry Power Station Unit 2 during the Spring 2014refueling outage. On March 25, 2015, the NRC requested additional information relatedto the SG inspections. The NRC's questions and Dominion's responses are provided inthe attachment to this letter.If you have any questions or require additional information, please contactMs. Candee Lovett at (757) 365-2178.Very truly yours,N. L. LaneSite Vice PresidentSurry Power StationAttachment -Response to NRC Request for Additional Information RegardingSpring 2014 Steam Generator Inservice Inspection Report -SurryPower Station Unit 2Commitments made in this letter: NoneAoq-?tj C/-- | |||
Serial No.: 14-508ADocket No.: 50-281Page 2 of 2cc: U.S. Nuclear Regulatory CommissionRegion IIMarquis One Tower245 Peachtree Center Ave., NESuite 1200Atlanta, Georgia 30303Ms. K. R. Cotton-Gross -SurryNRC Project ManagerU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852Dr. V. Sreenivas -North AnnaNRC Project ManagerU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852NRC Senior Resident InspectorSurry Power StationMr. R. A. SmithAuthorized Nuclear InspectorSurry Power Station Serial No.: 14-508ADocket No.: 50-281ATTACHMENTResponse to NRC Request for Additional Information RegardingSpring 2014 Steam Generator Inservice Inspection ReportSurrv Power Station Unit 2Virginia Electric and Power Company(Dominion) | |||
Serial No.: 14-508ADocket No.: 50-281AttachmentRESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONREGARDING SURRY UNIT 2SPRING 2014 STEAM GENERATOR TUBE INSPECTIONSBy letter dated October 16, 2014 (Agencywide Documents Access and ManagementSystem Accession No. ML14294A449), Virginia Electric and Power Company(Dominion) submitted steam generator tube inspection results from the Spring 2014inspections at Surry Power Station, Unit 2. In order to complete its review, the NRCstaff requests the following additional information. The Dominion responses areprovided below.1. Please clarify the statement that "no anomalous conditions" associated withthe primary channel head inspections were observed. Please clarify whetherany degradation was observed.Response: No degradation or any other condition adverse to quality was observedduring the primary channel head inspections.2. Please clarify the statement that "no adverse conditions" were noted duringthe secondary side internals inspection. Please clarify whether anydegradation was observed.Response: No degradation or any other condition adverse to quality was observedduring the secondary side internals inspections.3. In Table 1, please clarify that 100% of the tubes in steam generators B and Cwere inspected full-length with a bobbin coil except for the U-bend region ofthe tubes in rows 1 and 2.Response: 100% of the tubes in steam generators B and C were inspectedfull-length with a bobbin coil except for the U-bend region of the tubes in rows 1and 2.4. Please discuss the purpose of the array probe examinations.Response: The array probe examinations are used for detection of indications orloose parts at the top of the tube sheet region of the tube.Page 1 of 1}} | |||
Revision as of 21:35, 11 June 2018
| ML15126A042 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/20/2015 |
| From: | Lane N L Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 14-508A | |
| Download: ML15126A042 (4) | |
Text
VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261April 20, 2015United States Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001Serial No.SPS LIC/CGLDocket No.License No.14-508ARO50-281DPR-37VIRGINIA ELECTRIC AND POWER COMPANYSURRY POWER STATION UNIT 2RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION2014 STEAM GENERATOR INSERVICE INSPECTION REPORTBy letter dated October 16, 2014 (Serial No.14-508), Virginia Electric and PowerCompany (Dominion) submitted information summarizing the results of steam generator(SG) tube inspections performed at Surry Power Station Unit 2 during the Spring 2014refueling outage. On March 25, 2015, the NRC requested additional information relatedto the SG inspections. The NRC's questions and Dominion's responses are provided inthe attachment to this letter.If you have any questions or require additional information, please contactMs. Candee Lovett at (757) 365-2178.Very truly yours,N. L. LaneSite Vice PresidentSurry Power StationAttachment -Response to NRC Request for Additional Information RegardingSpring 2014 Steam Generator Inservice Inspection Report -SurryPower Station Unit 2Commitments made in this letter: NoneAoq-?tj C/--
Serial No.: 14-508ADocket No.: 50-281Page 2 of 2cc: U.S. Nuclear Regulatory CommissionRegion IIMarquis One Tower245 Peachtree Center Ave., NESuite 1200Atlanta, Georgia 30303Ms. K. R. Cotton-Gross -SurryNRC Project ManagerU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852Dr. V. Sreenivas -North AnnaNRC Project ManagerU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 0 8G-9A11555 Rockville PikeRockville, Maryland 20852NRC Senior Resident InspectorSurry Power StationMr. R. A. SmithAuthorized Nuclear InspectorSurry Power Station Serial No.: 14-508ADocket No.: 50-281ATTACHMENTResponse to NRC Request for Additional Information RegardingSpring 2014 Steam Generator Inservice Inspection ReportSurrv Power Station Unit 2Virginia Electric and Power Company(Dominion)
Serial No.: 14-508ADocket No.: 50-281AttachmentRESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONREGARDING SURRY UNIT 2SPRING 2014 STEAM GENERATOR TUBE INSPECTIONSBy letter dated October 16, 2014 (Agencywide Documents Access and ManagementSystem Accession No. ML14294A449), Virginia Electric and Power Company(Dominion) submitted steam generator tube inspection results from the Spring 2014inspections at Surry Power Station, Unit 2. In order to complete its review, the NRCstaff requests the following additional information. The Dominion responses areprovided below.1. Please clarify the statement that "no anomalous conditions" associated withthe primary channel head inspections were observed. Please clarify whetherany degradation was observed.Response: No degradation or any other condition adverse to quality was observedduring the primary channel head inspections.2. Please clarify the statement that "no adverse conditions" were noted duringthe secondary side internals inspection. Please clarify whether anydegradation was observed.Response: No degradation or any other condition adverse to quality was observedduring the secondary side internals inspections.3. In Table 1, please clarify that 100% of the tubes in steam generators B and Cwere inspected full-length with a bobbin coil except for the U-bend region ofthe tubes in rows 1 and 2.Response: 100% of the tubes in steam generators B and C were inspectedfull-length with a bobbin coil except for the U-bend region of the tubes in rows 1and 2.4. Please discuss the purpose of the array probe examinations.Response: The array probe examinations are used for detection of indications orloose parts at the top of the tube sheet region of the tube.Page 1 of 1