ML25065A071: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 2: Line 2:
| number = ML25065A071
| number = ML25065A071
| issue date = 03/06/2025
| issue date = 03/06/2025
| title = Nuclear Generating Plant Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection Inspection Report 05000263/2025010
| title = Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection Inspection Report 05000263/2025010
| author name = Corujo-Sandin J
| author name = Corujo-Sandin J
| author affiliation = NRC/RGN-III/DORS/EB1
| author affiliation = NRC/RGN-III/DORS/EB1
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[see also::IR 05000263/2025010]]


=Text=
=Text=
{{#Wiki_filter:Shawn Hafen Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
{{#Wiki_filter:Shawn Hafen
 
Site Vice President
==SUBJECT:==
Monticello Nuclear Generating Plant
MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR INFORMATION FOR THE NRC QUADRENNIAL COMPREHENSIVE ENGINEERING TEAM INSPECTION: INSPECTION REPORT 05000263/2025010
Northern States Power Company, Minnesota
 
2807 West County Road 75
==Dear Shawn Hafen:==
Monticello, MN 55362-9637
On August 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a quadrennial baseline Comprehensive Engineering Team Inspection (CETI) at Monticello Nuclear Generating Plant. This inspection will be performed in accordance with NRC Inspection Procedure 71111.21M.
SUBJECT:
The CETI focuses on the design, maintenance, and operation of risk significant components with low margin, or associated with an accident scenario, or a specific system. The inspection also monitors the implementation of changes to structures, systems, and components as modifications to one system may also affect the design bases and functioning of interfacing systems as well as introduce the potential for common cause failures. The Components, Modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences to be reviewed during this baseline inspection will be identified as part of the preparation for the inspection and finalized during the first onsite inspection week. Additionally, the inspection team may request scenarios to be performed on the simulator. This request would require support from your simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second onsite week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR  
The inspection will include 2 weeks onsite. The inspection team will consist of seven NRC inspectors who will focus on engineering/maintenance/operations of the selected components modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences. The current inspection schedule is as follows:
INFORMATION FOR THE NRC QUADRENNIAL COMPREHENSIVE  
ENGINEERING TEAM INSPECTION: INSPECTION REPORT  
05000263/2025010
Dear Shawn Hafen:
On August 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a quadrennial  
baseline Comprehensive Engineering Team Inspection (CETI) at Monticello Nuclear Generating  
Plant. This inspection will be performed in accordance with NRC Inspection Procedure  
71111.21M.
The CETI focuses on the design, maintenance, and operation of risk significant components  
with low margin, or associated with an accident scenario, or a specific system. The inspection  
also monitors the implementation of changes to structures, systems, and components as  
modifications to one system may also affect the design bases and functioning of interfacing  
systems as well as introduce the potential for common cause failures. The Components,  
Modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences to be reviewed  
during this baseline inspection will be identified as part of the preparation for the inspection and  
finalized during the first onsite inspection week. Additionally, the inspection team may request  
scenarios to be performed on the simulator. This request would require support from your  
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which  
would most likely occur during the second onsite week. The team will work closely with your  
staff early on during the inspection process to ensure this activity can be accomplished with  
minimal impact.
The inspection will include 2 weeks onsite. The inspection team will consist of seven NRC  
inspectors who will focus on engineering/maintenance/operations of the selected components  
modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences. The current  
inspection schedule is as follows:
*
Preparation week:
Preparation week:
August 18 - 22, 2025 Onsite weeks:
August 18 - 22, 2025  
August 25 - 29, 2025 and September 8 - 12, 2025 March 6, 2025
*
Onsite weeks:
August 25 - 29, 2025 and September 8 - 12, 2025
March 6, 2025


S. Hafen 2
S. Hafen
Experience with previous baseline design/modification inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection.
2
It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The inspection information request has been divided into four groups, with their respective due dates:
Experience with previous baseline design/modification inspections of similar depth and length  
April 11, 2025 - The first group lists information necessary for our initial risk-informed scoping activities and preliminary sample selections.
has shown that this type of inspection is extremely resource intensive, both for the NRC  
July 8, 2025 - The lead inspector will communicate the preliminary samples selected. This will include Components, Modifications, 50.59 Evaluations, and 50.59 Screenings.
inspectors and the licensee staff. In order to minimize the inspection impact on the site and  
August 11, 2025 - The second group of documents requested are those items needed to support our in-office preparation activities. During the in-office preparation activities, the team may identify additional information needed to support the inspection.
to ensure a productive inspection for both parties, we have enclosed a request for information  
August 25, 2025 - The third group includes the additional information identified during the in-office preparation as well as plant-specific reference material. This information should be available to the team onsite.
needed for the inspection.
After August 25, 2025 - The Fourth Group includes supporting information to be provided throughout the inspection. Specifically, corrective action documents and questions developed during the inspection are requested to be provided as the documents are generated.
It is important that all of these documents are up-to-date and complete in order to minimize the  
number of additional documents requested during the preparation and/or the onsite portions of  
the inspection. Insofar as possible, this information should be provided electronically to the lead  
inspector. The inspection information request has been divided into four groups, with their  
respective due dates:
*
April 11, 2025 - The first group lists information necessary for our initial  
risk-informed scoping activities and preliminary sample selections.
*
July 8, 2025 - The lead inspector will communicate the preliminary samples  
selected. This will include Components, Modifications, 50.59 Evaluations, and  
50.59 Screenings.
*
August 11, 2025 - The second group of documents requested are those items  
needed to support our in-office preparation activities. During the in-office preparation  
activities, the team may identify additional information needed to support the  
inspection.
*
August 25, 2025 - The third group includes the additional information identified during  
the in-office preparation as well as plant-specific reference material. This information  
should be available to the team onsite.
*
After August 25, 2025 - The Fourth Group includes supporting information to be  
provided throughout the inspection. Specifically, corrective action documents and  
questions developed during the inspection are requested to be provided as the  
documents are generated.
In addition, the enclosure includes inspection logistics requests for August 4, 2025.
In addition, the enclosure includes inspection logistics requests for August 4, 2025.
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing contact for this inspection is Carrie Seipp of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9741 or via email at Jorge.Corujo-Sandin@nrc.gov.
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing  
contact for this inspection is Carrie Seipp of your organization. If there are any questions about  
the inspection or the material requested in the enclosure, please contact the lead inspector at  
630-829-9741 or via email at Jorge.Corujo-Sandin@nrc.gov.


S. Hafen 3
S. Hafen
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
3
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter does not contain new or amended information collection requirements subject  
Sincerely, Jorge Corujo-Sandin Senior Reactor Engineer Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000263 License Nos. DPR-22
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Jorge Corujo-Sandin
Senior Reactor Engineer
Engineering Branch 1
Division of Operating Reactor Safety
Docket Nos. 05000263
License Nos. DPR-22
Enclosure:
COMPREHENSIVE ENGINEERING TEAM
  INSPECTION REQUEST FOR
  INFORMATION
cc: Distribution via LISTSERV
Signed by Corujo-Sandin, Jorge
on 03/06/25


==Enclosure:==
COMPREHENSIVE ENGINEERING TEAM INSPECTION REQUEST FOR INFORMATION cc: Distribution via LISTSERV Signed by Corujo-Sandin, Jorge on 03/06/25


ML25065A071
ML25065A071


SUNSI Review
SUNSI Review
Line 58: Line 135:
Publicly Available
Publicly Available


Non-Publicly Available OFFICE RIII NAME JCorujo-Sandin:gmp DATE 03/06/2025
Non-Publicly Available
OFFICE
RIII
NAME
JCorujo-Sandin:gmp
DATE
03/06/2025


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST Enclosure COMPREHENSIVE ENGINEERING TEAM INSPECTION REQUEST FOR INFORMATION I.
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
ADMINISTRATIVE INSPECTION INFORMATION Inspection Report Number:
Enclosure
05000263/2025010 Onsite Inspection Dates:
COMPREHENSIVE ENGINEERING TEAM INSPECTION  
August 25 - 29, 2025 and September 8 - 12, 2025 Inspection Procedure:
REQUEST FOR INFORMATION
IP 71111.21M, Comprehensive Engineering Team Inspection Lead Inspector:
I.
Jorge Corujo-Sandin, Senior Reactor Inspector RIII/DORS 630-829-9741 Jorge.Corujo-Sandin@nrc.gov Teammates:
ADMINISTRATIVE INSPECTION INFORMATION
The Team Lead will reach out once these have been assigned and provide their appropriate contact information. However, the inspection team will be comprised of a total of seven inspectors.
Inspection Report Number:
05000263/2025010
Onsite Inspection Dates:
August 25 - 29, 2025 and September 8 - 12, 2025
Inspection Procedure:
IP 71111.21M, Comprehensive Engineering Team Inspection
Lead Inspector:
Jorge Corujo-Sandin, Senior Reactor Inspector  
RIII/DORS
630-829-9741
Jorge.Corujo-Sandin@nrc.gov
Teammates:
The Team Lead will reach out once these have been assigned  
and provide their appropriate contact information. However, the  
inspection team will be comprised of a total of seven inspectors.
II.
II.
LOGISTICS INFORMATION REQUESTS Email the following inspection logistics to the lead inspector by August 4, 2025, or sooner:
LOGISTICS INFORMATION REQUESTS
Email the following inspection logistics to the lead inspector by August 4, 2025, or sooner:
1.
1.
Entrance meeting and exit meeting time and location. Please specify if located inside/outside the Protected Area. The Team Lead can provide further guidance.
Entrance meeting and exit meeting time and location. Please specify if located  
inside/outside the Protected Area. The Team Lead can provide further guidance.
2.
2.
Room number/name and location of the room to be used by the inspection team while onsite. Please specify if the room is located inside/outside the Protected Area.
Room number/name and location of the room to be used by the inspection team  
If available, provide a smaller breakout room nearby for interviews, etc.
while onsite. Please specify if the room is located inside/outside the Protected Area.  
If available, provide a smaller breakout room nearby for interviews, etc.  
3.
3.
Current management and engineering organizational chart.
Current management and engineering organizational chart.
4.
4.
Response team contact information (names and phone numbers) and team roles (e.g., management sponsor, lead, inspector counterpart).
Response team contact information (names and phone numbers) and team roles  
(e.g., management sponsor, lead, inspector counterpart).
5.
5.
Any potential resource conflicts during the inspection (e.g., emergency drills, all-staff meetings, etc.).
Any potential resource conflicts during the inspection (e.g., emergency drills,
all-staff meetings, etc.).
6.
6.
Available times, during the Monday and/or Tuesday of the second onsite week, to use the simulator to run scenarios. An operations crew to support this effort will also be required.
Available times, during the Monday and/or Tuesday of the second onsite week, to  
use the simulator to run scenarios. An operations crew to support this effort will also  
be required.
7.
7.
Any on-site parking instructions and/or limitations.
Any on-site parking instructions and/or limitations.
Line 87: Line 191:
Availability to obtain lunch on-site (e.g., is a cafeteria available, etc.).
Availability to obtain lunch on-site (e.g., is a cafeteria available, etc.).
9.
9.
Please clarify footwear requirements for general in plant walkdowns. Specifically, if safety shoes are required, or if serviceable shoes are acceptable.  
Please clarify footwear requirements for general in plant walkdowns. Specifically, if  
safety shoes are required, or if serviceable shoes are acceptable.


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 2
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
III. INSPECTION INFORMATION REQUEST Contact the lead inspector as soon as possible if you have any questions regarding this information request. Provide the information electronically in PDF files, Excel, or other searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile, Box, etc.). Specific Excel formats for various enclosure items may be requested to assist in inspection sample selection. If you do not have access to any of these services or similar, we can provide you access to Box, which can be used to upload, download, and share documents. The files should contain descriptive names and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light-water reactor technology.
2
III. INSPECTION INFORMATION REQUEST
Contact the lead inspector as soon as possible if you have any questions regarding this  
information request. Provide the information electronically in PDF files, Excel, or other  
searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile, Box,  
etc.). Specific Excel formats for various enclosure items may be requested to assist in  
inspection sample selection. If you do not have access to any of these services or similar,  
we can provide you access to Box, which can be used to upload, download, and share  
documents. The files should contain descriptive names and be indexed and hyperlinked to  
facilitate ease of use. Information in lists should contain enough information to be easily  
understood by someone who has knowledge of light-water reactor technology.
1.
1.
Information Requested to Support Risk Informed Selections The following information is requested by April 11, 2025, or sooner, to facilitate the initial risk scoping required and to support the initial sample selections.
Information Requested to Support Risk Informed Selections
The following information is requested by April 11, 2025, or sooner, to facilitate the  
initial risk scoping required and to support the initial sample selections.
1.1.
1.1.
Risk-Ranking of the top 250 components from your site-specific probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include values for Risk Achievement Worth, Risk-Reduction Worth, and Fussell-Vesely. Please provide the ranking in an Excel spreadsheet that contains the importance measures and the description of the basic event (e.g., not just the basic event designator).
Risk-Ranking of the top 250 components from your site-specific probabilistic  
safety analysis (PSA) sorted by Birnbaum Worth. Include values for Risk  
Achievement Worth, Risk-Reduction Worth, and Fussell-Vesely. Please provide  
the ranking in an Excel spreadsheet that contains the importance measures  
and the description of the basic event (e.g., not just the basic event  
designator).
1.2.
1.2.
Provide a list of the top 250 cut-sets from your PSA. Provide the descriptions of the basic events in the list of cut-sets. (Provide in Excel format.)
Provide a list of the top 250 cut-sets from your PSA. Provide the descriptions of  
the basic events in the list of cut-sets. (Provide in Excel format.)
1.3.
1.3.
Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that contributes more than 5 percent to the baseline plant core damage frequency.
Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that  
contributes more than 5 percent to the baseline plant core damage frequency.  
(Provide in Excel format.)
(Provide in Excel format.)
1.4.
1.4.
Copies of PSA system notebooks, Human Error Reliability Analysis Notebook, Internal Flood scenario notebook and latest internal event PSA summary document.
Copies of PSA system notebooks, Human Error Reliability Analysis Notebook,  
Internal Flood scenario notebook and latest internal event PSA summary  
document.
1.5.
1.5.
List of systems, system numbers/designators, and corresponding system names.
List of systems, system numbers/designators, and corresponding system  
names.
1.6.
1.6.
List of high-risk Maintenance Rule systems/components based on engineering or expert panel judgment (i.e., those systems/components not identified high-risk in the PSA).
List of high-risk Maintenance Rule systems/components based on engineering  
or expert panel judgment (i.e., those systems/components not identified  
high-risk in the PSA).
1.7.
1.7.
Electronic copies of simplified plant drawings (if available). Note: these may be uncontrolled documents such as big notes, training diagrams, etc.
Electronic copies of simplified plant drawings (if available). Note: these may be  
uncontrolled documents such as big notes, training diagrams, etc.


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 3
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
3
1.8.
1.8.
Electronic copies of updated final safety analysis report (UFSAR), Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.
Electronic copies of updated final safety analysis report (UFSAR), Technical  
Specifications, Technical Specifications Bases, and Technical Requirements  
Manual.
1.9.
1.9.
Provide copies of the emergency operating procedures and abnormal operating procedures.
Provide copies of the emergency operating procedures and abnormal operating  
1.10. Provide the in-service testing (IST) program document. Include the IST Program Basis document, or equivalent (if any).
procedures.
1.11. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates.
1.10. Provide the in-service testing (IST) program document. Include the IST Program  
1.12. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last 4 years.
Basis document, or equivalent (if any).
1.13. Information of any common cause failure of components experienced in the last 4 years at your facility.
1.11. Copies of procedures addressing the following: modifications, design changes,  
1.14. List of Causal Evaluations (e.g., Apparent Cause Evaluations, Root Cause Evaluations, etc.) associated with component failures or design issues initiated/completed in the last 4 years.
set point changes, equivalency evaluations or suitability analyses,  
post-modification testing, 10 CFR 50.59 evaluations and screenings, and  
UFSAR updates.
1.12. Structures, systems, and components (SSCs) in the Maintenance Rule  
(a)(1) category for the last 4 years.
1.13. Information of any common cause failure of components experienced in the  
last 4 years at your facility.
1.14. List of Causal Evaluations (e.g., Apparent Cause Evaluations, Root Cause  
Evaluations, etc.) associated with component failures or design issues  
initiated/completed in the last 4 years.
1.15. List of open operability evaluations.
1.15. List of open operability evaluations.
1.16. Procedures addressing time critical and/or risk significant operator actions. If not part of the procedure, include a list of all time critical and/or risk significant operator actions. Identify those actions that do not have job performance measures.
1.16. Procedures addressing time critical and/or risk significant operator actions. If  
1.17. List of permanent plant modifications to SSCs that are field work complete.
not part of the procedure, include a list of all time critical and/or risk significant  
Do not include canceled or still in process modifications. For the purpose of this inspection, permanent plant modifications include permanent:
operator actions. Identify those actions that do not have job performance  
1.17.1 Plant changes, design changes, set point changes, completed in the last 4 years; 1.17.2 Equivalency evaluations, and suitability analyses completed in the last 4 years; 1.17.3 Procedure changes for Emergency Operating Procedures (EOPs),
measures.  
Abnormal Operating Procedures (AOPs), surveillances, and test procedures in the last 4 years; and 1.17.4 Calculation changes that have been issued for use in the last 4 years.
1.17. List of permanent plant modifications to SSCs that are field work complete.  
Do not include canceled or still in process modifications. For the purpose of this  
inspection, permanent plant modifications include permanent:
1.17.1 Plant changes, design changes, set point changes, completed in the last  
4 years;
1.17.2 Equivalency evaluations, and suitability analyses completed in the  
last 4 years;
1.17.3 Procedure changes for Emergency Operating Procedures (EOPs),  
Abnormal Operating Procedures (AOPs), surveillances, and test  
procedures in the last 4 years; and
1.17.4 Calculation changes that have been issued for use in the last 4 years.


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 4
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
1.18. A list of corrective action documents (open and closed) in the last 4 years that address permanent plant modifications issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification implementation.
4
1.19. List of all 10 CFR 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications),
1.18. A list of corrective action documents (open and closed) in the last 4 years that  
(d) non-routine operating configurations, or (e) departures in methods of analyses. The list should NOT include any evaluations which concluded a license amendment was required. Include evaluations performed over the last 4 years. This list should include 50.59 evaluations for the following:
address permanent plant modifications issues, concerns, or processes. These  
1.19.1 Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4);
documents should also include the corrective action documents associated  
1.19.2 Modifications that are field work complete; and 1.19.3 Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
with the modification implementation.
1.20. A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving (i.e., just a 50.59 Screening) in the last 4 years: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.
1.19. List of all 10 CFR 50.59 completed evaluations involving (a) calculations,  
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(b) procedure revisions, (c) changes to the facility (modifications),  
1.21. A list of any modifications, procedure revisions, or the UFSAR changes where it was determined that 10 CFR 50.59 did not apply (in the last 4 years).
(d) non-routine operating configurations, or (e) departures in methods of  
1.22. A list of corrective action documents (open and closed) that address 10 CFR 50.59 issues, concerns, or processes. These documents should also include the associated corrective action documents and the 50.59 change implementation (in the last 4 years).
analyses. The list should NOT include any evaluations which concluded a  
The list should contain the number, title, and revision (or date) of each document, the affected system and corresponding documentation (if applicable).
license amendment was required. Include evaluations performed over the last  
4 years. This list should include 50.59 evaluations for the following:
1.19.1 Changes that have been made under the provisions of 10 CFR 50.59  
that have been updated in accordance with 10 CFR 50.71(e)(4);
1.19.2 Modifications that are field work complete; and
1.19.3 Changes to calculations (or initiation of new calculations) that have  
been issued. The list should contain the number and title of each  
document, a brief description of the change, and the corresponding  
number and type of the affected document (i.e., the modification or  
procedure to which the evaluation applies).
1.20. A list of all 10 CFR 50.59 changes that have been screened out as not  
requiring a full evaluation involving (i.e., just a 50.59 Screening) in the last  
4 years: (a) calculations; (b) procedure revisions; (c) changes to the facility  
(modifications); (d) non-routine operating configurations; or (e) departures in  
methods of analyses.
The list should contain the number and title of each document, a brief  
description of the change, and the corresponding number and type of the  
affected document (i.e., the modification or procedure to which the evaluation  
applies).
1.21. A list of any modifications, procedure revisions, or the UFSAR changes where  
it was determined that 10 CFR 50.59 did not apply (in the last 4 years).
1.22. A list of corrective action documents (open and closed) that address  
10 CFR 50.59 issues, concerns, or processes. These documents should also  
include the associated corrective action documents and the 50.59 change  
implementation (in the last 4 years).
The list should contain the number, title, and revision (or date) of each  
document, the affected system and corresponding documentation (if  
applicable).


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 5
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
1.23. Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.
5
1.23. Copy of the UFSAR change log or a synopsis of the changes. This should  
include all of the changes made to the UFSAR that were incorporated in the  
last 10 CFR 50.71(e)(4) submittal.
2.
2.
Information Requested for the Preliminary Selected Samples to be Available by August 11, 2025.
Information Requested for the Preliminary Selected Samples to be Available by  
This information should be separated for each selected sample, especially if provided electronically (e.g., folder with component or modification name that includes calculations, condition reports, maintenance history, etc.).
August 11, 2025.
This information should be separated for each selected sample, especially if  
provided electronically (e.g., folder with component or modification name that  
includes calculations, condition reports, maintenance history, etc.).
2.1.
2.1.
Corrective Action Program procedures, including the operability/functionality determination procedure.
Corrective Action Program procedures, including the operability/functionality  
determination procedure.
2.2.
2.2.
Quality Assurance Program document/procedure.
Quality Assurance Program document/procedure.
2.3.
2.3.
A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
A copy of any internal/external self-assessments and associated corrective  
action documents generated in preparation for the inspection.
2.4.
2.4.
A copy of engineering/operations related audits completed in the last 2 years.
A copy of engineering/operations related audits completed in the last 2 years.
For the selected Components:
For the selected Components:
2.5.
2.5.
System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans associated with each of the selected components.
System Health Reports, System Descriptions, Design Basis Documents, and/or  
Training Lesson Plans associated with each of the selected components.
2.6.
2.6.
List of condition reports (corrective action documents) associated with each of the selected components for the last 4 years (Excel format preferred).
List of condition reports (corrective action documents) associated with each  
of the selected components for the last 4 years (Excel format preferred).
2.7.
2.7.
For each selected component list of the maintenance history (corrective, preventive, and elective) over the last 10 years. Identify frequency of preventive maintenance activities.
For each selected component list of the maintenance history (corrective,  
preventive, and elective) over the last 10 years. Identify frequency of preventive  
maintenance activities.
2.8.
2.8.
Aging Management Program documents applicable to each selected component.
Aging Management Program documents applicable to each selected  
component.
2.9.
2.9.
Provide an all-inclusive list of calculation revisions in effect associated with each of the selected components. Include document number, title, and revision number.
Provide an all-inclusive list of calculation revisions in effect associated with  
2.10. Copies of calculations associated with each of the selected components, excluding data files. If the number of applicable responses under this request, for a specific component, is excessive (e.g., more than 10 calculations), you may reach out to the Team Lead to for an alternative. [Pipe stress calculations excluded from this request.]
each of the selected components. Include document number, title, and  
revision number.
2.10. Copies of calculations associated with each of the selected components,  
excluding data files. If the number of applicable responses under this request,  
for a specific component, is excessive (e.g., more than 10 calculations), you  
may reach out to the Team Lead to for an alternative. [Pipe stress calculations  
excluded from this request.]
2.11. Electronic copies of electrical drawings (ac and dc) and key diagrams.
2.11. Electronic copies of electrical drawings (ac and dc) and key diagrams.
2.12. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).
2.12. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).
2.13. Copies of operability evaluations (open/closed for last 4 years) associated  
2.13. Copies of operability evaluations (open/closed for last 4 years) associated  


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 6
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
with each of the selected components and plans for restoring operability, if applicable.
6
2.14. Copies of operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.
with each of the selected components and plans for restoring operability,  
2.15. Copies of any open temporary modifications associated with each of the selected components, if applicable.
if applicable.
2.16. Trend data on the selected electrical/mechanical components performance for last 4 years. (For example, pumps performance including in-service testing, other vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate results, diagnostic trend data, etc.)
2.14. Copies of operator work-around evaluations associated with each of the  
2.17. Provide copies of the normal and alarm response procedures associated with the selected components and selected scenarios (if any).
selected components and plans for resolution, if applicable.
2.18. If available electronically, provide the vendor manual. Otherwise refer to section 5 of this RFI.
2.15. Copies of any open temporary modifications associated with each of the  
2.19. Completed tests and surveillances for each selected component performed during the last 3 years. For those tests and surveillances performed at a periodicity of greater than 3 years, provide the latest two performed. Include the associated acceptance criteria basis calculations. For those specific tests or surveillances performed at a periodicity resulting in excessive responses to this request, you may reach out to the Team Lead for an alternative.
selected components, if applicable.
2.16. Trend data on the selected electrical/mechanical components performance for  
last 4 years. (For example, pumps performance including in-service testing,  
other vibration monitoring, oil sample results, etc., for valves: stroke time and  
leak rate results, diagnostic trend data, etc.)
2.17. Provide copies of the normal and alarm response procedures associated with  
the selected components and selected scenarios (if any).
2.18. If available electronically, provide the vendor manual. Otherwise refer to  
section 5 of this RFI.
2.19. Completed tests and surveillances for each selected component performed  
during the last 3 years. For those tests and surveillances performed at a  
periodicity of greater than 3 years, provide the latest two performed. Include the  
associated acceptance criteria basis calculations. For those specific tests or  
surveillances performed at a periodicity resulting in excessive responses to this  
request, you may reach out to the Team Lead for an alternative.
For the selected Modifications, 50.59 Evaluations and 50.59 Screenings:
For the selected Modifications, 50.59 Evaluations and 50.59 Screenings:
2.20. For each of the selected modifications, provide the engineering change package. Include any associated 50.59 Screening and/or 50.59 Evaluation.
2.20. For each of the selected modifications, provide the engineering change  
package. Include any associated 50.59 Screening and/or 50.59 Evaluation.
2.21. Provide a copy of each selected 50.59 Evaluation.
2.21. Provide a copy of each selected 50.59 Evaluation.
2.22. Provide copies of the selected 50.59 Screenings.
2.22. Provide copies of the selected 50.59 Screenings.
2.23. The selected Modifications, 50.59 Evaluations and 50.59 Screenings will be further filtered by the inspectors until the final samples are selected. Once these are selected (during the preparation week and the first onsite week) the site should be prepared to provide other supporting documents for the selected item. Examples of supporting documents include:
2.23. The selected Modifications, 50.59 Evaluations and 50.59 Screenings will be  
Design drawings supporting the change Procedures, calculations, etc. affected by the change Post-modification test packages UFSAR changes generated (e.g., marked off pages)
further filtered by the inspectors until the final samples are selected. Once  
these are selected (during the preparation week and the first onsite week) the  
site should be prepared to provide other supporting documents for the selected  
item. Examples of supporting documents include:
*
Design drawings supporting the change
*
Procedures, calculations, etc. affected by the change
*
Post-modification test packages
*
UFSAR changes generated (e.g., marked off pages)


COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST 7
COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST
7
3.
3.
Additional Information to be Provided on August 25, 2025, When the Team is Onsite 3.1.
Additional Information to be Provided on August 25, 2025, When the Team is  
During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.
Onsite
3.1.
During the in-office preparation activities, the team will be making final  
selections and may identify additional information needed to support the  
inspection.
3.2.
3.2.
Schedule of any testing/maintenance activities to be conducted on the selected components during the two onsite inspection weeks.
Schedule of any testing/maintenance activities to be conducted on the  
selected components during the two onsite inspection weeks.
4.
4.
Information Requested to be Provided Throughout the Inspection 4.1.
Information Requested to be Provided Throughout the Inspection
Any corrective action documents generated as a result of the teams questions during this inspection as the documents are generated.
4.1.
Any corrective action documents generated as a result of the teams questions  
during this inspection as the documents are generated.
4.2.
4.2.
List of questions and/or document requests submitted by the team and their status (e.g., open, closed) sorted by inspector. Provide daily by 2:00 p.m., plant local time, to each inspector. It is recommended to provide the team leader with a master list sorted by inspector and each inspector with a list containing only the items originated by that inspector.
List of questions and/or document requests submitted by the team and their  
status (e.g., open, closed) sorted by inspector. Provide daily by 2:00 p.m., plant  
local time, to each inspector. It is recommended to provide the team leader with  
a master list sorted by inspector and each inspector with a list containing only  
the items originated by that inspector.
4.3.
4.3.
If available in hard copy form, one complete set of P&IDs and simplified drawings (e.g., training schematics). If any of these documents is not available in hard copy form, contact the lead inspector.
If available in hard copy form, one complete set of P&IDs and simplified  
drawings (e.g., training schematics). If any of these documents is not available  
in hard copy form, contact the lead inspector.
4.4.
4.4.
Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
Please ensure that other supporting documents for the selected items have been  
4.4.1 Individual Plant Examination/Probabilistic Risk Assessment report; 4.4.2 Procurement documents for components and modifications selected (verify retrievable);
located and are readily retrievable as the inspection team will likely be requesting  
4.4.3 Plant procedures (normal, abnormal, emergency, surveillance, etc.);
these documents during the inspection. Examples of supporting documents are:
4.4.4 Vendor manuals; 4.4.5 Historical revisions of the Final Safety Analysis Report (FSAR),
4.4.1
including the Original FSAR and Original Safety Evaluation Report; and 4.4.6 Copy of electrical drawings, key diagrams, and isometrics (paper copies).
Individual Plant Examination/Probabilistic Risk Assessment report;
If you have questions regarding the information requested, please contact the lead inspector.}}
4.4.2
Procurement documents for components and modifications selected  
(verify retrievable);
4.4.3
Plant procedures (normal, abnormal, emergency, surveillance, etc.);
4.4.4
Vendor manuals;
4.4.5
Historical revisions of the Final Safety Analysis Report (FSAR),  
including the Original FSAR and Original Safety Evaluation Report; and
4.4.6
Copy of electrical drawings, key diagrams, and isometrics  
(paper copies).
If you have questions regarding the information requested, please contact the lead inspector.
}}

Latest revision as of 02:58, 21 February 2026

Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection Inspection Report 05000263/2025010
ML25065A071
Person / Time
Site: Monticello 
Issue date: 03/06/2025
From: Jorge Corujo-Sandin
NRC/RGN-III/DORS/EB1
To: Hafen S
Northern States Power Company, Minnesota
References
IR 2025010
Download: ML25065A071 (1)


See also: IR 05000263/2025010

Text

Shawn Hafen

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR

INFORMATION FOR THE NRC QUADRENNIAL COMPREHENSIVE

ENGINEERING TEAM INSPECTION: INSPECTION REPORT

05000263/2025010

Dear Shawn Hafen:

On August 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a quadrennial

baseline Comprehensive Engineering Team Inspection (CETI) at Monticello Nuclear Generating

Plant. This inspection will be performed in accordance with NRC Inspection Procedure

71111.21M.

The CETI focuses on the design, maintenance, and operation of risk significant components

with low margin, or associated with an accident scenario, or a specific system. The inspection

also monitors the implementation of changes to structures, systems, and components as

modifications to one system may also affect the design bases and functioning of interfacing

systems as well as introduce the potential for common cause failures. The Components,

Modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences to be reviewed

during this baseline inspection will be identified as part of the preparation for the inspection and

finalized during the first onsite inspection week. Additionally, the inspection team may request

scenarios to be performed on the simulator. This request would require support from your

simulator staff to validate scenarios, simulator time, and a crew to perform the actions which

would most likely occur during the second onsite week. The team will work closely with your

staff early on during the inspection process to ensure this activity can be accomplished with

minimal impact.

The inspection will include 2 weeks onsite. The inspection team will consist of seven NRC

inspectors who will focus on engineering/maintenance/operations of the selected components

modifications, 50.59 Evaluations, 50.59 Screenings, and Operating Experiences. The current

inspection schedule is as follows:

Preparation week:

August 18 - 22, 2025

Onsite weeks:

August 25 - 29, 2025 and September 8 - 12, 2025

March 6, 2025

S. Hafen

2

Experience with previous baseline design/modification inspections of similar depth and length

has shown that this type of inspection is extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and

to ensure a productive inspection for both parties, we have enclosed a request for information

needed for the inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The inspection information request has been divided into four groups, with their

respective due dates:

April 11, 2025 - The first group lists information necessary for our initial

risk-informed scoping activities and preliminary sample selections.

July 8, 2025 - The lead inspector will communicate the preliminary samples

selected. This will include Components, Modifications, 50.59 Evaluations, and

50.59 Screenings.

August 11, 2025 - The second group of documents requested are those items

needed to support our in-office preparation activities. During the in-office preparation

activities, the team may identify additional information needed to support the

inspection.

August 25, 2025 - The third group includes the additional information identified during

the in-office preparation as well as plant-specific reference material. This information

should be available to the team onsite.

After August 25, 2025 - The Fourth Group includes supporting information to be

provided throughout the inspection. Specifically, corrective action documents and

questions developed during the inspection are requested to be provided as the

documents are generated.

In addition, the enclosure includes inspection logistics requests for August 4, 2025.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Carrie Seipp of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9741 or via email at Jorge.Corujo-Sandin@nrc.gov.

S. Hafen

3

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Jorge Corujo-Sandin

Senior Reactor Engineer

Engineering Branch 1

Division of Operating Reactor Safety

Docket Nos. 05000263

License Nos. DPR-22

Enclosure:

COMPREHENSIVE ENGINEERING TEAM

INSPECTION REQUEST FOR

INFORMATION

cc: Distribution via LISTSERV

Signed by Corujo-Sandin, Jorge

on 03/06/25

ML25065A071

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

JCorujo-Sandin:gmp

DATE

03/06/2025

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

Enclosure

COMPREHENSIVE ENGINEERING TEAM INSPECTION

REQUEST FOR INFORMATION

I.

ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number:

05000263/2025010

Onsite Inspection Dates:

August 25 - 29, 2025 and September 8 - 12, 2025

Inspection Procedure:

IP 71111.21M, Comprehensive Engineering Team Inspection

Lead Inspector:

Jorge Corujo-Sandin, Senior Reactor Inspector

RIII/DORS

630-829-9741

Jorge.Corujo-Sandin@nrc.gov

Teammates:

The Team Lead will reach out once these have been assigned

and provide their appropriate contact information. However, the

inspection team will be comprised of a total of seven inspectors.

II.

LOGISTICS INFORMATION REQUESTS

Email the following inspection logistics to the lead inspector by August 4, 2025, or sooner:

1.

Entrance meeting and exit meeting time and location. Please specify if located

inside/outside the Protected Area. The Team Lead can provide further guidance.

2.

Room number/name and location of the room to be used by the inspection team

while onsite. Please specify if the room is located inside/outside the Protected Area.

If available, provide a smaller breakout room nearby for interviews, etc.

3.

Current management and engineering organizational chart.

4.

Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart).

5.

Any potential resource conflicts during the inspection (e.g., emergency drills,

all-staff meetings, etc.).

6.

Available times, during the Monday and/or Tuesday of the second onsite week, to

use the simulator to run scenarios. An operations crew to support this effort will also

be required.

7.

Any on-site parking instructions and/or limitations.

8.

Availability to obtain lunch on-site (e.g., is a cafeteria available, etc.).

9.

Please clarify footwear requirements for general in plant walkdowns. Specifically, if

safety shoes are required, or if serviceable shoes are acceptable.

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

2

III. INSPECTION INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in PDF files, Excel, or other

searchable formats, preferably via an electronic sharing service (CERTREC, ShareFile, Box,

etc.). Specific Excel formats for various enclosure items may be requested to assist in

inspection sample selection. If you do not have access to any of these services or similar,

we can provide you access to Box, which can be used to upload, download, and share

documents. The files should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light-water reactor technology.

1.

Information Requested to Support Risk Informed Selections

The following information is requested by April 11, 2025, or sooner, to facilitate the

initial risk scoping required and to support the initial sample selections.

1.1.

Risk-Ranking of the top 250 components from your site-specific probabilistic

safety analysis (PSA) sorted by Birnbaum Worth. Include values for Risk

Achievement Worth, Risk-Reduction Worth, and Fussell-Vesely. Please provide

the ranking in an Excel spreadsheet that contains the importance measures

and the description of the basic event (e.g., not just the basic event

designator).

1.2.

Provide a list of the top 250 cut-sets from your PSA. Provide the descriptions of

the basic events in the list of cut-sets. (Provide in Excel format.)

1.3.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency.

(Provide in Excel format.)

1.4.

Copies of PSA system notebooks, Human Error Reliability Analysis Notebook,

Internal Flood scenario notebook and latest internal event PSA summary

document.

1.5.

List of systems, system numbers/designators, and corresponding system

names.

1.6.

List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified

high-risk in the PSA).

1.7.

Electronic copies of simplified plant drawings (if available). Note: these may be

uncontrolled documents such as big notes, training diagrams, etc.

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

3

1.8.

Electronic copies of updated final safety analysis report (UFSAR), Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

1.9.

Provide copies of the emergency operating procedures and abnormal operating

procedures.

1.10. Provide the in-service testing (IST) program document. Include the IST Program

Basis document, or equivalent (if any).

1.11. Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses,

post-modification testing, 10 CFR 50.59 evaluations and screenings, and

UFSAR updates.

1.12. Structures, systems, and components (SSCs) in the Maintenance Rule

(a)(1) category for the last 4 years.

1.13. Information of any common cause failure of components experienced in the

last 4 years at your facility.

1.14. List of Causal Evaluations (e.g., Apparent Cause Evaluations, Root Cause

Evaluations, etc.) associated with component failures or design issues

initiated/completed in the last 4 years.

1.15. List of open operability evaluations.

1.16. Procedures addressing time critical and/or risk significant operator actions. If

not part of the procedure, include a list of all time critical and/or risk significant

operator actions. Identify those actions that do not have job performance

measures.

1.17. List of permanent plant modifications to SSCs that are field work complete.

Do not include canceled or still in process modifications. For the purpose of this

inspection, permanent plant modifications include permanent:

1.17.1 Plant changes, design changes, set point changes, completed in the last

4 years;

1.17.2 Equivalency evaluations, and suitability analyses completed in the

last 4 years;

1.17.3 Procedure changes for Emergency Operating Procedures (EOPs),

Abnormal Operating Procedures (AOPs), surveillances, and test

procedures in the last 4 years; and

1.17.4 Calculation changes that have been issued for use in the last 4 years.

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

4

1.18. A list of corrective action documents (open and closed) in the last 4 years that

address permanent plant modifications issues, concerns, or processes. These

documents should also include the corrective action documents associated

with the modification implementation.

1.19. List of all 10 CFR 50.59 completed evaluations involving (a) calculations,

(b) procedure revisions, (c) changes to the facility (modifications),

(d) non-routine operating configurations, or (e) departures in methods of

analyses. The list should NOT include any evaluations which concluded a

license amendment was required. Include evaluations performed over the last

4 years. This list should include 50.59 evaluations for the following:

1.19.1 Changes that have been made under the provisions of 10 CFR 50.59

that have been updated in accordance with 10 CFR 50.71(e)(4);

1.19.2 Modifications that are field work complete; and

1.19.3 Changes to calculations (or initiation of new calculations) that have

been issued. The list should contain the number and title of each

document, a brief description of the change, and the corresponding

number and type of the affected document (i.e., the modification or

procedure to which the evaluation applies).

1.20. A list of all 10 CFR 50.59 changes that have been screened out as not

requiring a full evaluation involving (i.e., just a 50.59 Screening) in the last

4 years: (a) calculations; (b) procedure revisions; (c) changes to the facility

(modifications); (d) non-routine operating configurations; or (e) departures in

methods of analyses.

The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies).

1.21. A list of any modifications, procedure revisions, or the UFSAR changes where

it was determined that 10 CFR 50.59 did not apply (in the last 4 years).

1.22. A list of corrective action documents (open and closed) that address

10 CFR 50.59 issues, concerns, or processes. These documents should also

include the associated corrective action documents and the 50.59 change

implementation (in the last 4 years).

The list should contain the number, title, and revision (or date) of each

document, the affected system and corresponding documentation (if

applicable).

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

5

1.23. Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the

last 10 CFR 50.71(e)(4) submittal.

2.

Information Requested for the Preliminary Selected Samples to be Available by

August 11, 2025.

This information should be separated for each selected sample, especially if

provided electronically (e.g., folder with component or modification name that

includes calculations, condition reports, maintenance history, etc.).

2.1.

Corrective Action Program procedures, including the operability/functionality

determination procedure.

2.2.

Quality Assurance Program document/procedure.

2.3.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

2.4.

A copy of engineering/operations related audits completed in the last 2 years.

For the selected Components:

2.5.

System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

2.6.

List of condition reports (corrective action documents) associated with each

of the selected components for the last 4 years (Excel format preferred).

2.7.

For each selected component list of the maintenance history (corrective,

preventive, and elective) over the last 10 years. Identify frequency of preventive

maintenance activities.

2.8.

Aging Management Program documents applicable to each selected

component.

2.9.

Provide an all-inclusive list of calculation revisions in effect associated with

each of the selected components. Include document number, title, and

revision number.

2.10. Copies of calculations associated with each of the selected components,

excluding data files. If the number of applicable responses under this request,

for a specific component, is excessive (e.g., more than 10 calculations), you

may reach out to the Team Lead to for an alternative. [Pipe stress calculations

excluded from this request.]

2.11. Electronic copies of electrical drawings (ac and dc) and key diagrams.

2.12. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).

2.13. Copies of operability evaluations (open/closed for last 4 years) associated

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

6

with each of the selected components and plans for restoring operability,

if applicable.

2.14. Copies of operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

2.15. Copies of any open temporary modifications associated with each of the

selected components, if applicable.

2.16. Trend data on the selected electrical/mechanical components performance for

last 4 years. (For example, pumps performance including in-service testing,

other vibration monitoring, oil sample results, etc., for valves: stroke time and

leak rate results, diagnostic trend data, etc.)

2.17. Provide copies of the normal and alarm response procedures associated with

the selected components and selected scenarios (if any).

2.18. If available electronically, provide the vendor manual. Otherwise refer to

section 5 of this RFI.

2.19. Completed tests and surveillances for each selected component performed

during the last 3 years. For those tests and surveillances performed at a

periodicity of greater than 3 years, provide the latest two performed. Include the

associated acceptance criteria basis calculations. For those specific tests or

surveillances performed at a periodicity resulting in excessive responses to this

request, you may reach out to the Team Lead for an alternative.

For the selected Modifications, 50.59 Evaluations and 50.59 Screenings:

2.20. For each of the selected modifications, provide the engineering change

package. Include any associated 50.59 Screening and/or 50.59 Evaluation.

2.21. Provide a copy of each selected 50.59 Evaluation.

2.22. Provide copies of the selected 50.59 Screenings.

2.23. The selected Modifications, 50.59 Evaluations and 50.59 Screenings will be

further filtered by the inspectors until the final samples are selected. Once

these are selected (during the preparation week and the first onsite week) the

site should be prepared to provide other supporting documents for the selected

item. Examples of supporting documents include:

Design drawings supporting the change

Procedures, calculations, etc. affected by the change

Post-modification test packages

UFSAR changes generated (e.g., marked off pages)

COMPREHENSIVE ENGINEERING TEAM INSPECTION DOCUMENT REQUEST

7

3.

Additional Information to be Provided on August 25, 2025, When the Team is

Onsite

3.1.

During the in-office preparation activities, the team will be making final

selections and may identify additional information needed to support the

inspection.

3.2.

Schedule of any testing/maintenance activities to be conducted on the

selected components during the two onsite inspection weeks.

4.

Information Requested to be Provided Throughout the Inspection

4.1.

Any corrective action documents generated as a result of the teams questions

during this inspection as the documents are generated.

4.2.

List of questions and/or document requests submitted by the team and their

status (e.g., open, closed) sorted by inspector. Provide daily by 2:00 p.m., plant

local time, to each inspector. It is recommended to provide the team leader with

a master list sorted by inspector and each inspector with a list containing only

the items originated by that inspector.

4.3.

If available in hard copy form, one complete set of P&IDs and simplified

drawings (e.g., training schematics). If any of these documents is not available

in hard copy form, contact the lead inspector.

4.4.

Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

4.4.1

Individual Plant Examination/Probabilistic Risk Assessment report;

4.4.2

Procurement documents for components and modifications selected

(verify retrievable);

4.4.3

Plant procedures (normal, abnormal, emergency, surveillance, etc.);

4.4.4

Vendor manuals;

4.4.5

Historical revisions of the Final Safety Analysis Report (FSAR),

including the Original FSAR and Original Safety Evaluation Report; and

4.4.6

Copy of electrical drawings, key diagrams, and isometrics

(paper copies).

If you have questions regarding the information requested, please contact the lead inspector.