ENS 57912: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 23: | Line 23: | ||
The plant is currently in a 24-hour technical specification action statement (3.6.5.2) for Unit 2. Unit 3 is not impacted and continues to operate at 100 percent power. | The plant is currently in a 24-hour technical specification action statement (3.6.5.2) for Unit 2. Unit 3 is not impacted and continues to operate at 100 percent power. | ||
The Resident Inspector has been notified. | The Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250912en.html#en57912 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 | ||
Revision as of 06:20, 12 September 2025
| Where | |
|---|---|
| Millstone Connecticut (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
| Time - Person (Reporting Time:+2.55 h0.106 days <br />0.0152 weeks <br />0.00349 months <br />) | |
| Opened: | Josh Lindsey 05:23 Sep 10, 2025 |
| NRC Officer: | Eric Simpson |
| Last Updated: | Sep 10, 2025 |
| 57912 - NRC Website
| |