MONTHYEARTSTF-24-02, Technical Specifications Task Force - Transmittal of TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement2024-03-15015 March 2024 Title: Technical Specifications Task Force - Transmittal of TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement ML24114A2652024-04-24024 April 2024 Title: TSTF-597 Acceptance Review Letter TSTF-24-09, Technical Specifications Bases Change for TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement2024-09-16016 September 2024 Title: Technical Specifications Bases Change for TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement ML24268A1982024-12-0909 December 2024 Title: Draft Traveler SE of TSTF-597, Rev 0, Eliminate LCO 3.0.3 Mode 2 Requirement ML24358A2282024-12-26026 December 2024 Title: Final Traveler SE of TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement ML24358A2262024-12-26026 December 2024 Title: TSTF-597 Cover Letter for Final Traveler SE ML24358A2242024-12-26026 December 2024 Title: Final SEs of TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement TSTF-25-03, TSTF Response to NRC Second Request for Additional Information on TSTF-600, Revision 1, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency2025-03-24024 March 2025 Title: TSTF Response to NRC Second Request for Additional Information on TSTF-600, Revision 1, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML25125A2262025-06-13013 June 2025 Title: Draft Traveler SE of TSTF-600, Revision 2, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency 2024-04-24
[table view] |