| {{Adams
| | #REDIRECT [[05000423/LER-1997-012]] |
| | number = ML20210K420
| |
| | issue date = 08/12/1997
| |
| | title = Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00
| |
| | author name = Hicks G
| |
| | author affiliation = NORTHEAST NUCLEAR ENERGY CO.
| |
| | addressee name =
| |
| | addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| |
| | docket = 05000423
| |
| | license number =
| |
| | contact person =
| |
| | document report number = B16691, NUDOCS 9708190252
| |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| |
| | page count = 4
| |
| }}
| |
| {{LER
| |
| | Title = Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00
| |
| | Plant =
| |
| | Reporting criterion =
| |
| | Power level =
| |
| | Mode =
| |
| | Docket = 05000423
| |
| | LER year = 1997
| |
| | LER number = 12
| |
| | LER revision = 0
| |
| | Event date =
| |
| | Report date =
| |
| | ENS =
| |
| | abstract =
| |
| }}
| |
| | |
| =text=
| |
| {{#Wiki_filter:<. : ;. ~
| |
| ' _ y_ygg IWpc i erry Rd. (Itoute if,6), Waterfont, Cr 06385 Nuclear Energy mioon, Noa,., r., si.ii...
| |
| Northca t Nudcar EnerFy cmopany.
| |
| P.O. Iba 128 Waterfoni, Cr 06385 0128
| |
| - (860) 447 1791 Fax (860) 444-4277
| |
| & Northeast Utilitic Sydem Docket No. 50-423 B16691 Auaust 12.1997 U. S. Nuclear Regulatory Commission L
| |
| Attention: Document Control Desk -
| |
| L
| |
| . Washington, DC 20555-l
| |
| )
| |
| Millstone Nuclear Power Station, Unit No. 3 Commitment Revision-LER 97-021-00 o
| |
| Exoansion Joint Tie Rod Assemblies The purpose of this letter is to revise the commitments that were previously submitted to the NRC in LER 97-021-00, " Defective Desian of RSS Expansion Joint Tie Rod Assembiv. These commitmentsincluded; 1) The required physical modifications to the eight expansion joints within the RSS will be completed prior to August 13,1997 and no later than prior to entry into mode 4; and the expansion joints provided by Temp Flex division of Johnson Controls will be'identifed and reviewed to verify that they meet design requirements prior to August 13,1997 and -
| |
| no later than prior to entry into mode 4,
| |
| . At this time, all tied expansion joints at Millstone Unit 3 have been identified.
| |
| Modeling and' qualification of these joints is currently being evaluated by a qualified vendor to determine the design adequacy. Physical modifications where needed to
| |
| . correct any deficiencies identified will be completed prior to entry into mode 4.
| |
| :- The revised commitments are provided in Attachment 1.- The remaining commitments in our letter of March 19,1997 are unchanged.
| |
| :- Should you_ have any questions regarding this matter, please contact Mr. D. A. Smith L at (860) 437-5840.-
| |
| NORTHEAST NUCL R ENERGY COMPANY
| |
| {N V~
| |
| G. D.
| |
| s-
| |
| :- 190094 ir or - Milistone Unit No. 3 ll khkk 9708190252 970812 O PDR.ADOCK 05000423
| |
| :- S
| |
| .PDR M.
| |
| | |
| ' U.S. Nucl::Cr R::gul~ tory Commission B16691\\ Page 2
| |
| ' cc:
| |
| H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects
| |
| | |
| J.
| |
| I Docket Nol 50-423 B16691 4
| |
| i E
| |
| 7-4 i
| |
| 4 d
| |
| 5 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments
| |
| . In Response To (LER 97-021-00) i -
| |
| 4 -i f.-.
| |
| t v
| |
| 4 3
| |
| i 4
| |
| August 1997 i.-
| |
| i J
| |
| s
| |
| ~_
| |
| .c..,
| |
| _-,y
| |
| ,w*
| |
| | |
| ' U.S. Nuclscr Rrgul tory Commission B16691 \\ Attachment 1 \\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questione regarding this document or any associated regulatory commitments.
| |
| Number
| |
| | |
| ==Commitment==
| |
| Due B16263-01 The required physical modifications to the Prior to entry into eight (8) expansion joints within the RSS will mode 4.
| |
| be completed.
| |
| B16263 Expansion joints provided by Temp Flex Prior to entry into division of Johnson Controls will be identified mode 4, and reviewed to verify that they meet design requirements.
| |
| :- i i
| |
| i
| |
| }}
| |
| | |