CY-98-061, Forwards MOR for Mar 1998 for Haddam Neck Plant.Encl Will Be Plants Last MOR Submittal Due to NRC Approval of License Amend Deleting TS 6.9.1.8 Which Required Submission of MOR: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML20216K167 | |||
| issue date = 04/14/1998 | |||
| title = Forwards MOR for Mar 1998 for Haddam Neck Plant.Encl Will Be Plants Last MOR Submittal Due to NRC Approval of License Amend Deleting TS 6.9.1.8 Which Required Submission of MOR | |||
| author name = Bouchard G | |||
| author affiliation = CONNECTICUT YANKEE ATOMIC POWER CO. | |||
| addressee name = | |||
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) | |||
| docket = 05000213 | |||
| license number = | |||
| contact person = | |||
| document report number = CY-98-061, CY-98-61, NUDOCS 9804220121 | |||
| package number = ML20216K173 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | |||
| page count = 2 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:[' | |||
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPTON, CT 06424-3099 l | |||
April 14,1998 Docket No. 50-213 CY-98-061 Re: Technical Soecification 6.9.1.8 I | |||
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Haddam Neck Plant Monthlv Ooerating Reoort - March 1998 The purpose of this letter is for Connecticut Yankee Atomic Power Company (CYAPCO) to provide, in accordance with the requirements of Technical Specification 6.9.1.8, the Haddam Neck Plant's Monthly Operating Report 98-03, for the period covering March 1,1998, to March 31,1998. | |||
The NRC has recently approvedm a license amendment which revised the administrative controls section of the Haddam Neck Plant's Technical Specifications. | |||
This revision has deleted Technical Specification Section 6.9.1.8, which required the submission of a monthly operating report. Therefore, this submittal will be the last monthly operating report for the Haddam Neck Plant. | |||
-n U", | |||
.a l | |||
(1) | |||
NRC letter from T. L. Fredrichs, to R. A. Mellor, " Issuance of Amendment No.192, Facility Operating License No. DPR Haddam Neck (TAC Nos. | |||
M98997 & M98998)," dated March 27,1998. | |||
j 1028-3 REV 2-91 9804220121 980414 | |||
' th PDR ADOCK 05000213 i'. | |||
R FDR | |||
8 l | |||
U. S. Nuclear R::gulatory Commission CY-98-061/Page 2 If there are any questions regarding this submittal, please contact 1 | |||
Mr. G. P. van Noordennen at (860) 267-3938. | |||
Very truly yours, l | |||
CONNECTICUT YANKEE ATOMIC POWER COMPANY For: | |||
R. A. Mellor l | |||
Vice President Operations and Decommissioning By: | |||
G. Hlouchdrd Unit Director l | |||
cc: | |||
H. J. Miller, NRC Region I Administrator T. L. Fredrichs, NRC Project Manager, Haddam Neck Plant W. J. Raymond, NRC Senior Resident inspector, Haddam Neck Plant D. Galloway, Acting Director, CT DEP Monitoring and Radiation Division l | |||
l l | |||
:}} | |||
Latest revision as of 05:02, 23 May 2025
| ML20216K167 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/14/1998 |
| From: | Bouchard G CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20216K173 | List: |
| References | |
| CY-98-061, CY-98-61, NUDOCS 9804220121 | |
| Download: ML20216K167 (2) | |
Text
['
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPTON, CT 06424-3099 l
April 14,1998 Docket No. 50-213 CY-98-061 Re: Technical Soecification 6.9.1.8 I
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Haddam Neck Plant Monthlv Ooerating Reoort - March 1998 The purpose of this letter is for Connecticut Yankee Atomic Power Company (CYAPCO) to provide, in accordance with the requirements of Technical Specification 6.9.1.8, the Haddam Neck Plant's Monthly Operating Report 98-03, for the period covering March 1,1998, to March 31,1998.
The NRC has recently approvedm a license amendment which revised the administrative controls section of the Haddam Neck Plant's Technical Specifications.
This revision has deleted Technical Specification Section 6.9.1.8, which required the submission of a monthly operating report. Therefore, this submittal will be the last monthly operating report for the Haddam Neck Plant.
-n U",
.a l
(1)
NRC letter from T. L. Fredrichs, to R. A. Mellor, " Issuance of Amendment No.192, Facility Operating License No. DPR Haddam Neck (TAC Nos.
M98997 & M98998)," dated March 27,1998.
j 1028-3 REV 2-91 9804220121 980414
' th PDR ADOCK 05000213 i'.
R FDR
8 l
U. S. Nuclear R::gulatory Commission CY-98-061/Page 2 If there are any questions regarding this submittal, please contact 1
Mr. G. P. van Noordennen at (860) 267-3938.
Very truly yours, l
CONNECTICUT YANKEE ATOMIC POWER COMPANY For:
R. A. Mellor l
Vice President Operations and Decommissioning By:
G. Hlouchdrd Unit Director l
cc:
H. J. Miller, NRC Region I Administrator T. L. Fredrichs, NRC Project Manager, Haddam Neck Plant W. J. Raymond, NRC Senior Resident inspector, Haddam Neck Plant D. Galloway, Acting Director, CT DEP Monitoring and Radiation Division l
l l