| title = Part 21 - General Electric Time Delay Relay Failure
| title = Part 21 - General Electric Time Delay Relay Failure
| event text = The following is a summary of the information provided by the licensee via email:
| event text = The following is a summary of the information provided by the licensee via email:
This is a report made in accordance with 10 CFR Part 21.21 on a failure of a Curtiss Wright (CW) supplied General Electric (GE) time delay relay.
This is a report made in accordance with 10 CFR Part 21.21 on a failure of a Curtiss Wright (CW) supplied General Electric (GE) time delay relay.
On 12/10/24, Constellation notified CW about the failure of the relay. Constellation stated the relay failed a planned maintenance test. The induction disc was unable to complete the full travel towards the under-voltage trip due to obstruction from the stationary contact, which slipped down along the shaft upon which it was mounted, and made contact with the induction disc.  
On 12/10/24, Constellation notified CW about the failure of the relay. Constellation stated the relay failed a planned maintenance test. The induction disc was unable to complete the full travel towards the under-voltage trip due to obstruction from the stationary contact, which slipped down along the shaft upon which it was mounted, and made contact with the induction disc.  
On 2/13/25, CW received the failed, CW supplied GE time delay relay from Constellation.
On 2/13/25, CW received the failed CW supplied GE time delay relay from Constellation.
Further research discovered that LaSalle had a similar failure in 2002, but there have not been any other reported failures in the nuclear industry until this one.
Further research discovered that LaSalle had a similar failure in 2002, but there have not been any other reported failures in the nuclear industry until this one.
On 4/07/25, Revision 2 of the failure analysis written by Constellation Power Labs stated similar results as those of 12/10/24. The bracket, even when fully tightened, could not hold its position on the shaft. The root cause of the failure could not be determined.
On 4/07/25, Revision 2 of the failure analysis written by Constellation Power Labs stated similar results as those of 12/10/24. The bracket, even when fully tightened, could not hold its position on the shaft. The root cause of the failure could not be determined.
Line 38: Line 38:
Curtiss-Wright
Curtiss-Wright
4600 East Tech Drive, Cincinnati, OH 45245
4600 East Tech Drive, Cincinnati, OH 45245
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250409en.html#en57654
* * * UPDATE ON 04/09/25 AT 0818 EDT FROM MARK PAPKE TO JOSUE RAMIREZ * * *
Curtiss Wright (CW) provided a copy of the undervoltage relay failure analysis Revision 2 written by Constellation Power Labs to the Nuclear Regulatory Commission. The report included conclusions, observations, and a test plan.
In addition, CW sent out a test procedure to the customer. CW has indicated that customers should perform a routine maintenance check on the contact/clamp.
Affected facilities: Constellation Fleet
Notified R1DO (Schussler), R2DO (Franke), R3DO (Hills), R4DO (Vossmar), and Part 21 group (Email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250410en.html#en57654
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 06:20, 10 April 2025

ENS 57654 +/-
Where
Curtiss Wright Flow Control Co.
Cincinnati, Ohio (NRC Region 3)
Organization: Curtiss Wright Flow Control Co.
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+35.75 h1.49 days <br />0.213 weeks <br />0.049 months <br />)
Opened: Mark Papke
15:45 Apr 8, 2025
NRC Officer: Robert A. Thompson
Last Updated: Apr 9, 2025