{{#Wiki_filter:J. Barnie Beasley, Jr., PE. Southern Nuclear Vice President             Operating Company, Inc.
{{#Wiki_filter:J. Barnie Beasley, Jr., PE.
Vogtle Project             40 Inverness Center Parkway P0 Box 1295 Birmingham, Alabama '5201 Tel 205.992.7110 Fax 205.992.0403 July 15,         2002                                                         COMPANY Energy to Serve Your World"'
Southern Nuclear Vice President Operating Company, Inc.
LCV- 1593-F Docket Nos.         50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
Vogtle Project 40 Inverness Center Parkway P0 Box 1295 Birmingham, Alabama '5201 Tel 205.992.7110 Fax 205.992.0403 July 15, 2002 COMPANY Energy to Serve Your World"'
LCV-1593-F Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JUNE 2002 Enclosed are the June 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JUNE 2002 Enclosed are the June 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, easley, Jr JBB/JLL Enclosures El- VEGP Unit 1 Monthly Operating Report - June 2002 E2- VEGP Unit 2 Monthly Operating Report - June 2002 cc:     Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle
Sincerely, easley, Jr JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - June 2002 E2-VEGP Unit 2 Monthly Operating Report - June 2002 cc:
Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle


ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT                           Page E1-2
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2


OPERATING DATA REPORT Docket No.:            50-424 Unit Name:              VEGP UNIT 1 Date:                  July 1, 2002 Completed By:          Andrew R. Cato Telephone:              (706) 826-3823 Operating Status
OPERATING DATA REPORT 50-424 VEGP UNIT 1 July 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status
: 1. Reporting Period:                                       June - 2002
: 1. Reporting Period:
: 2. Design Electrical Rating (Net MWe):                       1169
: 2. Design Electrical Rating (Net MWe):
: 3. Maximum Dependable Capacity (Net MWe):                     1148 This Month            Year-To-Date            Cumulative
: 3. Maximum Dependable Capacity (Net MWe):
: 4. Number Of Hours Reactor Was Critical:                           720.0                3295.0              117,904.5
: 4. Number Of Hours Reactor Was Critical:
: 5. Hours Generator On Line:                                         720.0                3233.1              116,385.7
: 5. Hours Generator On Line:
: 6. Unit Reserve Shutdown Hours:                                       0.0                    0.0                  0.0
: 6. Unit Reserve Shutdown Hours:
: 7. Net Electrical Energy Generated (MWHe):                       842,747             3,744,579           130,190,645 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date             Tag No.       Event Description N/A               N/A       N/A E1-1
: 7. Net Electrical Energy Generated (MWHe):
June - 2002 1169 1148 This Month 720.0 720.0 0.0 842,747 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E1-1 Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
Year-To-Date 3295.0 3233.1 0.0 3,744,579 Cumulative 117,904.5 116,385.7 0.0 130,190,645 Date Tag No.
Event Description N/A N/A N/A


UNIT SHUTDOWNS Docket No.:             50-424 Unit Name:              VEGP UNIT 1 Date:                  July 1, 2002 Completed By:          Andrew R. Cato Telephone:              (706) 826-3823 Reporting Period:                      June - 2002 Type                                             Method of       Cause/
UNIT SHUTDOWNS Docket No.:
F: Forced           Duration                           Shutting       Corrective Actions No.             Date           S: Scheduled       (Hours)       Reason (1)         Down (2)         Comments N/A             N/A                   N/A             N/A             N/A               N/A               N/A (1) REASON:                                                                         (2) METHOD:
Unit Name:
A - Equipment Failure (Explain)     E - Operator Training/License Examination     1. Manual               4. Continuation B - Maintenance or Test             F - Administrative                             2. Manual Trip/Scram   5. Other C - Refueling                       G - Operational Error (Explain)               3. Automatic Trip/Scram D - Regulatory Restriction           H - Other (Explain)
Date:
Completed By:
Telephone:
Reporting Period:
50-424 VEGP UNIT 1 July 1, 2002 Andrew R. Cato (706) 826-3823 June - 2002 Type Method of Cause/
F: Forced Duration Shutting Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
: 1. Manual
: 4. Continuation B - Maintenance or Test F - Administrative
: 2. Manual Trip/Scram
: 5. Other C - Refueling G - Operational Error (Explain)
: 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE:
EVENT CAUSE:
CORRECTIVE ACTION:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
CRITICAL PATH WAS:
NARRATIVE REPORT June 01, 2002 00:00 Unit 1 at 100% power with no significant operating problems.
NARRATIVE REPORT June 01, 2002 00:00 Unit 1 at 100% power with no significant operating problems.
June 14, 2002 10:38 Unit 1 initated planned derate to 90% power for Heater Drain Pump work.
June 14, 2002 10:38 Unit 1 initated planned derate to 90% power for Heater Drain Pump work.
June 14, 2002 18:00 Unit 1 returned to 100% power following completion of Heater Drain Pump work.
June 14, 2002 18:00 Unit 1 returned to 100% power following completion of Heater Drain Pump work.
June 30, 2002 23:59 Unit 1 at 100% power with no significant operating problems.
June 30, 2002 23:59 Unit 1 at 100% power with no significant operating problems.
E11-2
E11-2


ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT                           Page E2-2
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2


OPERATING DATA REPORT Docket No.:           50-425 Unit Name:            VEGP UNIT 2 Date:                  July 1, 2002 Completed By:          Andrew R. Cato Telephone:            (706) 826-3823 Operating Status
OPERATING DATA REPORT Docket No.:
: 1. Reporting Period:                                     June - 2002
Unit Name:
: 2. Design Electrical Rating (Net MWe):                       1169
Date:
: 3. Maximum Dependable Capacity (Net MWe):                     1149 This Month          Year-To-Date            Cumulative
Completed By:
: 4. Number Of Hours Reactor Was Critical:                           720.0                4343.0            105,396.8
Telephone:
: 5. Hours Generator On Line:                                       720.0                4343.0            104,583.7
50-425 VEGP UNIT 2 July 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status
: 6. Unit Reserve Shutdown Hours:                                       0.0                    0.0                  0.0
: 1. Reporting Period:
: 7. Net Electrical Energy Generated (MWHe):                       837,553             5,113,287           117,905,753 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date             Tag No.       Event Description N/A               N/A       N/A E2-1
: 2. Design Electrical Rating (Net MWe):
: 3. Maximum Dependable Capacity (Net MWe):
: 4. Number Of Hours Reactor Was Critical:
: 5. Hours Generator On Line:
: 6. Unit Reserve Shutdown Hours:
: 7. Net Electrical Energy Generated (MWHe):
June - 2002 1169 1149 This Month 720.0 720.0 0.0 837,553 Year-To-Date 4343.0 4343.0 0.0 5,113,287 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 105,396.8 104,583.7 0.0 117,905,753 Date Tag No.
Event Description N/A N/A N/A


UNIT SHUTDOWNS Docket No.:             50-425 Unit Name:              VEGP UNIT 2 Date:                  July 1,2002 Completed By:          Andrew R. Cato Telephone:              (706) 826-3823 Reporting Period:                  June -2002 Type                                               Method of       Cause/
UNIT SHUTDOWNS Docket No.:
F: Forced           Duration                             Shutting       Corrective Actions No.             Date       S: Scheduled       (Hours)       Reason (1)           Down (2)       Comments N/A             N/A               N/A             N/A             N/A                   N/A             N/A (1) REASON:                                                                     (2) METHOD:
Unit Name:
A - Equipment Failure (Explain) E - Operator Training/License Examination       1. Manual               4. Continuation B - Maintenance or Test         F - Administrative                             2. Manual Trip/Scram   5. Other C - Refueling                   G - Operational Error (Explain)                 3. Automatic Trip/Scram D - Regulatory Restriction       H - Other (Explain)
Date:
Completed By:
Telephone:
Reporting Period:
50-425 VEGP UNIT 2 July 1,2002 Andrew R. Cato (706) 826-3823 June -2002 Type Method of Cause/
F: Forced Duration Shutting Corrective Actions No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
: 1. Manual
: 4. Continuation B - Maintenance or Test F - Administrative
: 2. Manual Trip/Scram
: 5. Other C - Refueling G - Operational Error (Explain)
: 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS:
CAUSE/CORRECTIVE ACTION/COMMENTS:
EVENT CAUSE:
EVENT CAUSE:

Latest revision as of 17:26, 16 January 2025

June 2002 Monthly Operating Report for Vogtle Electric Generating Plant
ML022050007
Person / Time
Site: Vogtle  
Issue date: 07/15/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-F
Download: ML022050007 (7)


Text

J. Barnie Beasley, Jr., PE.

Southern Nuclear Vice President Operating Company, Inc.

Vogtle Project 40 Inverness Center Parkway P0 Box 1295 Birmingham, Alabama '5201 Tel 205.992.7110 Fax 205.992.0403 July 15, 2002 COMPANY Energy to Serve Your World"'

LCV-1593-F Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - JUNE 2002 Enclosed are the June 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, easley, Jr JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - June 2002 E2-VEGP Unit 2 Monthly Operating Report - June 2002 cc:

Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2

OPERATING DATA REPORT 50-424 VEGP UNIT 1 July 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

June - 2002 1169 1148 This Month 720.0 720.0 0.0 842,747 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E1-1 Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Year-To-Date 3295.0 3233.1 0.0 3,744,579 Cumulative 117,904.5 116,385.7 0.0 130,190,645 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-424 VEGP UNIT 1 July 1, 2002 Andrew R. Cato (706) 826-3823 June - 2002 Type Method of Cause/

F: Forced Duration Shutting Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT June 01, 2002 00:00 Unit 1 at 100% power with no significant operating problems.

June 14, 2002 10:38 Unit 1 initated planned derate to 90% power for Heater Drain Pump work.

June 14, 2002 18:00 Unit 1 returned to 100% power following completion of Heater Drain Pump work.

June 30, 2002 23:59 Unit 1 at 100% power with no significant operating problems.

E11-2

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JUNE 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATING DATA REPORT Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 July 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

June - 2002 1169 1149 This Month 720.0 720.0 0.0 837,553 Year-To-Date 4343.0 4343.0 0.0 5,113,287 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 105,396.8 104,583.7 0.0 117,905,753 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-425 VEGP UNIT 2 July 1,2002 Andrew R. Cato (706) 826-3823 June -2002 Type Method of Cause/

F: Forced Duration Shutting Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT June 01, 2002 00:00 Unit 2 at 100% power with no significant operating problems.

June 30, 2002 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2