ML022630109: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:0                   0 V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-091 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
{{#Wiki_filter:0 0
V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-091 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
Revision No. 0
Revision No. 0


0             PAGE 0 hIiI RESPOND TO CORE POWER COMPUTER ALARM       (NRC)                                                 I
0 PAGE 0 hIiI RESPOND TO CORE POWER COMPUTER ALARM (NRC)
' ,~
I  
TRAINEE                                   EVALUATOR                                             II II II II    EVALUATOR SIGNATURE                                                   DATE   _        _
',~
II Ii   EVALUATION METHOD:       OBSERVE & DISCUSS Ii II    EVALUATION LOCATION:     SIMULATOR                                                             II II   ESTIMATED TIME:           10.0 MINUTES                       TIME STARTED:         _  _
TRAINEE EVALUATOR II II II EVALUATOR SIGNATURE DATE II II Ii EVALUATION METHOD:
II II     0CFR55.                                                                                       II II TIME CRITICAL:   No             FAULTED JPM:         No                                       If SATISFACTORY                                                          II II I TRAINEE PERFORMANCE:                       ____UNSATISFACTORY                 ____II II
OBSERVE & DISCUSS Ii EVALUATION LOCATION:
,I III
SIMULATOR II II ESTIMATED TIME:
                                                                                                        .l ii    READ TO OPERATOR:
10.0 MINUTES TIME STARTED:
iiII AS DIRECTED IN THE      II II    WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS II    INITIATING CUES. I WILL DESCRIBE GENERAL           CONDITIONS     UNDER WHICH THIS TASK       I' TOOLS  WITH WHICH    TO PERFORM THIS II II    IS TO BE PERFORMED AND PROVIDE THE     NECESSARY II    TASK. BEFORE STARTING, I WILL EXPLAIN         THE     INITIAL   CONDITIONS,     WHICH STEPS     II Ii    TO SIMULATE OR DISCUSS, AND     PROVIDE INITIATING         CUES.                               II II    WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS                 ii BE SATISFIED.
II II 0CFR55.
Ii    JOB PERFORMANCE MEASURE    WILL I1 INITIAL CONDITIONS:
II II II TIME CRITICAL:
: 1. The plant is   in Mode 1.
No FAULTED JPM:
No If II II I TRAINEE PERFORMANCE:
SATISFACTORY
____UNSATISFACTORY
____II  
,I II III READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.
I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.
BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.
WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
ii II II I' II II II ii INITIAL CONDITIONS:
: 1. The plant is in Mode 1.
TOOLS AND EQUIPMENT NEEDED:
TOOLS AND EQUIPMENT NEEDED:
NONE REFERENCED DOCUMENTS:                                                   REV DATE OPERATION AT THE LICENSED LIMIT                    09/22/97
NONE REFERENCED DOCUMENTS:
: 1.       OAP*107.2 TASK STANDARDS:
REV DATE
: 1. The NROATC determines that the alarm (U9003) is not valid (the result   of a feedwater transient).
: 1.
: 2. The NROATC tells   the CRS that they must make a station   log entry for this transient.
OAP*107.2 OPERATION AT THE LICENSED LIMIT TASK STANDARDS:
: 1.
The NROATC determines that the alarm (U9003) is not valid (the result of a feedwater transient).
: 2.
The NROATC tells the CRS that they must make a station log entry for this transient.
ii II II II II Ii II Ii I1 09/22/97
.l


W                               O   PAGE 1 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
W O
I-                                             I INITIATING CUES:
PAGE 1 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
I -
I INITIATING CUES:
: 1. Respond to IPCS alarms.
: 1. Respond to IPCS alarms.
TERMIINATING CUES:
TERMIINATING CUES:
power
: 1. The NROATC describes actions required for high core power alarm on IPCS.
: 1. The NROATC describes actions required for high core alarm on IPCS.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
NONE
NONE


J                                       P JOB PERFORMANCE MEASURE CHECKLIST                           PAGE 2 (S) DENOTES SEQUENCED ELEMENT
J P
(*)   DENOTES CRITICAL ELEMENT SAT. UNSAT.
JOB PERFORMANCE MEASURE CHECKLIST (S)
PERFORMANCE CHECKLIST:
DENOTES SEQUENCED ELEMENT
STEP                                   STANDARD Verify alarm is valid by             Determines the alarm is not valid by S*1.
(*)
verifying U9003-SM is less than 2929 monitoring the five-minute            MWt.
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
rolling average (U9003-5M).
STEP S*1.
Verify alarm is valid by monitoring the five-minute rolling average (U9003-5M).
STANDARD Determines the alarm is not valid by verifying U9003-SM is less than 2929 MWt.
COMMENTS:
COMMENTS:
INOTE 2:   If student determines that the alarm is NOT valid but does not give any log entry requirements, the examiner should prompt the student:
INOTE 2:
actions the CRS/crew must take for this alarm?"
If student determines that the alarm is NOT valid but does not give any log entry requirements, the examiner should prompt the student:  
            "Are there any I---
"Are there any actions the CRS/crew must take for this alarm?"
STEP                                   STANDARD Determines the alarm is due to a S-2. Informs CRS that a station log                             Informs CRS that a feedwater transient.
I---
entry is required for the station log entry is required alarm COMMENTS:
STEP S-2.
Examiner Stops JPM At This Point TIME STOPPED.
Informs CRS that a station log entry is required for the alarm STANDARD Determines the alarm is due to a feedwater transient.
Informs CRS that a station log entry is required COMMENTS:
Examiner Stops JPM At This Point TIME STOPPED.  


==GENERAL COMMENT==
==GENERAL COMMENT==
S:
S:
PAGE 2 SAT. UNSAT.


JOB PERFORMANCE MEASURE CHECKLIST     PAGE 3 (S) DENOTES SEQUENCED ELEMENT
JOB PERFORMANCE MEASURE CHECKLIST (S)
(*) DENOTES CRITICAL ELEMENT SAT. UNSAT.
DENOTES SEQUENCED ELEMENT
PERFORMANCE CHECKLIST:
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
PAGE 3 SAT. UNSAT.


PAGE 4 RESPOND TO CORE POWER COMPUTER ALARM (NRC)                   II NRC KA  
PAGE 4 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
NRC KA  


==REFERENCES:==
==REFERENCES:==
 
KA NUMBER NONE II IMPORTANCE FACTOR RO SRO}}
KA NUMBER                               IMPORTANCE FACTOR RO         SRO NONE}}

Latest revision as of 15:50, 16 January 2025

NRC Job Performance MeasuJJP-091; Respond to Core Power Computer Alarm
ML022630109
Person / Time
Site: Summer 
Issue date: 09/16/2002
From:
NRC/RGN-II
To:
References
FOIA/PA-2002-0371
Download: ML022630109 (6)


Text

0 0

V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-091 RESPOND TO CORE POWER COMPUTER ALARM (NRC)

Revision No. 0

0 PAGE 0 hIiI RESPOND TO CORE POWER COMPUTER ALARM (NRC)

I

',~

TRAINEE EVALUATOR II II II EVALUATOR SIGNATURE DATE II II Ii EVALUATION METHOD:

OBSERVE & DISCUSS Ii EVALUATION LOCATION:

SIMULATOR II II ESTIMATED TIME:

10.0 MINUTES TIME STARTED:

II II 0CFR55.

II II II TIME CRITICAL:

No FAULTED JPM:

No If II II I TRAINEE PERFORMANCE:

SATISFACTORY

____UNSATISFACTORY

____II

,I II III READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.

I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.

BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.

WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

ii II II I' II II II ii INITIAL CONDITIONS:

1. The plant is in Mode 1.

TOOLS AND EQUIPMENT NEEDED:

NONE REFERENCED DOCUMENTS:

REV DATE

1.

OAP*107.2 OPERATION AT THE LICENSED LIMIT TASK STANDARDS:

1.

The NROATC determines that the alarm (U9003) is not valid (the result of a feedwater transient).

2.

The NROATC tells the CRS that they must make a station log entry for this transient.

ii II II II II Ii II Ii I1 09/22/97

.l

W O

PAGE 1 RESPOND TO CORE POWER COMPUTER ALARM (NRC)

I -

I INITIATING CUES:

1. Respond to IPCS alarms.

TERMIINATING CUES:

1. The NROATC describes actions required for high core power alarm on IPCS.

SAFETY CONSIDERATIONS:

NONE

J P

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

STEP S*1.

Verify alarm is valid by monitoring the five-minute rolling average (U9003-5M).

STANDARD Determines the alarm is not valid by verifying U9003-SM is less than 2929 MWt.

COMMENTS:

INOTE 2:

If student determines that the alarm is NOT valid but does not give any log entry requirements, the examiner should prompt the student:

"Are there any actions the CRS/crew must take for this alarm?"

I---

STEP S-2.

Informs CRS that a station log entry is required for the alarm STANDARD Determines the alarm is due to a feedwater transient.

Informs CRS that a station log entry is required COMMENTS:

Examiner Stops JPM At This Point TIME STOPPED.

GENERAL COMMENT

S:

PAGE 2 SAT. UNSAT.

JOB PERFORMANCE MEASURE CHECKLIST (S)

DENOTES SEQUENCED ELEMENT

(*)

DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:

PAGE 3 SAT. UNSAT.

PAGE 4 RESPOND TO CORE POWER COMPUTER ALARM (NRC)

NRC KA

REFERENCES:

KA NUMBER NONE II IMPORTANCE FACTOR RO SRO