ML022630109
| ML022630109 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/16/2002 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| FOIA/PA-2002-0371 | |
| Download: ML022630109 (6) | |
Text
0 0
V.C. SUMMER NUCLEAR STATION NRC JOB PERFORMANCE MEASURE JPS-091 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
Revision No. 0
0 PAGE 0 hIiI RESPOND TO CORE POWER COMPUTER ALARM (NRC)
I
',~
TRAINEE EVALUATOR II II II EVALUATOR SIGNATURE DATE II II Ii EVALUATION METHOD:
OBSERVE & DISCUSS Ii EVALUATION LOCATION:
SIMULATOR II II ESTIMATED TIME:
10.0 MINUTES TIME STARTED:
II II 0CFR55.
II II II TIME CRITICAL:
No FAULTED JPM:
No If II II I TRAINEE PERFORMANCE:
SATISFACTORY
____UNSATISFACTORY
____II
,I II III READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES.
I WILL DESCRIBE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK.
BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES.
WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
ii II II I' II II II ii INITIAL CONDITIONS:
- 1. The plant is in Mode 1.
TOOLS AND EQUIPMENT NEEDED:
NONE REFERENCED DOCUMENTS:
REV DATE
- 1.
OAP*107.2 OPERATION AT THE LICENSED LIMIT TASK STANDARDS:
- 1.
The NROATC determines that the alarm (U9003) is not valid (the result of a feedwater transient).
- 2.
The NROATC tells the CRS that they must make a station log entry for this transient.
ii II II II II Ii II Ii I1 09/22/97
.l
W O
PAGE 1 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
I -
I INITIATING CUES:
- 1. Respond to IPCS alarms.
TERMIINATING CUES:
- 1. The NROATC describes actions required for high core power alarm on IPCS.
SAFETY CONSIDERATIONS:
NONE
J P
JOB PERFORMANCE MEASURE CHECKLIST (S)
DENOTES SEQUENCED ELEMENT
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
STEP S*1.
Verify alarm is valid by monitoring the five-minute rolling average (U9003-5M).
STANDARD Determines the alarm is not valid by verifying U9003-SM is less than 2929 MWt.
COMMENTS:
INOTE 2:
If student determines that the alarm is NOT valid but does not give any log entry requirements, the examiner should prompt the student:
"Are there any actions the CRS/crew must take for this alarm?"
I---
STEP S-2.
Informs CRS that a station log entry is required for the alarm STANDARD Determines the alarm is due to a feedwater transient.
Informs CRS that a station log entry is required COMMENTS:
Examiner Stops JPM At This Point TIME STOPPED.
GENERAL COMMENT
S:
PAGE 2 SAT. UNSAT.
JOB PERFORMANCE MEASURE CHECKLIST (S)
DENOTES SEQUENCED ELEMENT
(*)
DENOTES CRITICAL ELEMENT PERFORMANCE CHECKLIST:
PAGE 3 SAT. UNSAT.
PAGE 4 RESPOND TO CORE POWER COMPUTER ALARM (NRC)
NRC KA