{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 10, 2003 United States Nuclear Regulatory Commission               Serial No. 03-515 Attention: Document Control Desk                         NAPS/JRP Washington, D. C. 20555                                   Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 10, 2003 United States Nuclear Regulatory Commission Serial No.
03-515 Attention: Document Control Desk NAPS/JRP Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, D. A. HeacoW Site Vice President Enclosure Commitments made in this letter: None.
Very truly yours, D. A. HeacoW Site Vice President Enclosure Commitments made in this letter: None.
cc:     U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station
cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station


VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 2003 Approved:                               -9c1-03 Site Vice President Date
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 2003 Approved:
Site Vice President
-9c1-03 Date


OPERATING DATA REPORT Docket No.:   50-338 Date: 10/10/03
OPERATING DATA REPORT Docket No.:
50-338 Date:
10/10/03


==Contact:==
==Contact:==
D.A. Heacock Telephone:   (540) 894-2101 1Unit Name:.North                                                       Anna Unit 1
D. A. Heacock Telephone:
: 1. UntN m :......................................................... N rhA naU i
(540) 894-2101 1Unit Name:.North Anna Unit 1
: 2. Reporting Period: ..................................                 September, 2003
: 1.
: 3. Ucensed Thermal Power (MWt): .........................                 2,893
UntN m :.........................................................
: 4. Nameplate Rating (Gross MWe): ........................                   979.74
N rhA naU i
: 5. Design Electrical Rating (Net MWe): ...................                 907
: 2.
: 6. Maximum Dependable Capacity (Gross MWe): ...                             971
Reporting Period:..................................
: 7. Maximum Dependable Capacity (Net MWe): .......                           925
September, 2003
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 3.
Ucensed Thermal Power (MWt):.........................
2,893
: 4.
Nameplate Rating (Gross MWe):........................
979.74
: 5.
Design Electrical Rating (Net MWe):...................
907
: 6.
Maximum Dependable Capacity (Gross MWe):...
971
: 7.
Maximum Dependable Capacity (Net MWe):.......
925
: 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
N/A
: 9. Power Level To Which Restricted, If Any (Net MWe): N/A
: 9.
: 10. Reasons For Restrictions, If Any:               N/A This Month   Year-To-Date       Cumulative
Power Level To Which Restricted, If Any (Net MWe): N/A
: 11. Hours In Reporting Period                                                   720.0         6,551.0         221,555.0
: 10.
: 12. Hours Reactor Was Critical                                                   720.0         5,031.6         180,087.4
Reasons For Restrictions, If Any:
: 13. Reactor Reserve Shutdown Hours                                                 0.0         306.9           7,582.1
N/A This Month Year-To-Date Cumulative
: 14. Hours Generator On-Une                                                       720.0         4,992.3         176,781.6
: 11.
: 15. Unit Reserve Shutdown Hours                                                     0.0           0.0               0.0
Hours In Reporting Period 720.0 6,551.0 221,555.0
: 16. Gross Thermal Energy Generated (MWH)                                   2,081,238.8   13,905,062.2     482,616,122.5
: 12. Hours Reactor Was Critical 720.0 5,031.6 180,087.4
: 17. Gross Electrical Energy Generated (MWH)                                 703,966.0   4,698,005.0     196,631,620.0
: 13.
: 18. Net Electrical Energy Generated (MWH)                                   669,315.0   4,459,703.0     151,443,605.0
Reactor Reserve Shutdown Hours 0.0 306.9 7,582.1
: 19. Unit Service Factor                                                       100.0%h         76.2%             79.8%
: 14.
: 20. Unit Availability Factor                                                 100.0/0         76.2%             79.8%
Hours Generator On-Une 720.0 4,992.3 176,781.6
: 21. Unit Capacity Factor (Using MDC Net)                                     100.5%           73.6%             76.2%
: 15.
: 22. Unit Capacity Factor (Using DER Net)                                     102.5%           75.1%             75.4%
Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 23. Unit Forced Outage Rate                                                     0.0%h           4.8%               6.4%
: 16.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
Gross Thermal Energy Generated (MWH) 2,081,238.8 13,905,062.2 482,616,122.5
: 17.
Gross Electrical Energy Generated (MWH) 703,966.0 4,698,005.0 196,631,620.0
: 18.
Net Electrical Energy Generated (MWH) 669,315.0 4,459,703.0 151,443,605.0
: 19.
Unit Service Factor 100.0%h 76.2%
79.8%
: 20.
Unit Availability Factor 100.0/0 76.2%
79.8%
: 21.
Unit Capacity Factor (Using MDC Net) 100.5%
73.6%
76.2%
: 22.
Unit Capacity Factor (Using DER Net) 102.5%
75.1%
75.4%
: 23.
Unit Forced Outage Rate 0.0%h 4.8%
6.4%
: 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
: 25.
If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST           ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DALY UNIT POWER LEVEL Docket No.:   50-338 Unit Name:     North Anna Unit 1 Date:   10/10/03
AVERAGE DALY UNIT POWER LEVEL Docket No.: 50-338 Unit Name:
North Anna Unit 1 Date:
10/10/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 MoNTH:     September, 2003 Average Daily Power Level                       Average Daily Power Level Day                  (MWe - Net)                 Day                 (MWe - Net) 1                      926                      17                      930 2                      927                      18                      931 3                      927                      19                      931 4                        926                      20                      931 5                        927                      21                      931 6                      929                      22                      931 7                      929                      23                      931 8                      928                      24                      932 9                      929                      25                      931 10                      930                      26                      931 11                      930                      27                      931 12                      929                      28                      931 13                      927                      29                      932 14                      930                      30                      932 15                      930 16                      930 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
D. A. Heacock Telephone:
(540) 894-2101 MoNTH:
September, 2003 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 926 927 927 926 927 929 929 928 929 930 930 929 927 930 930 930 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 930 931 931 931 931 931 931 932 931 931 931 931 932 932 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


Docket No.: 50-338 Unit Name:   North Anna Unit 1 Date: 10/10/03
Docket No.: 50-338 Unit Name:
North Anna Unit 1 Date:
10/10/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: September, 2003
D. A. Heacock Telephone:
(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: September, 2003


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted In significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted In significant non-load related incidents.
Date                 Time                   __
Date Time September 1, 2003 0000 Began the month in Mode 1, 1000/o power, 971 MWe.
September 1, 2003               0000           Began the month in Mode 1, 1000/o power, 971 MWe.
September 12,2003 2305 Commence ramp-down to approx. 91% power to perform September 13, 2003 0017 0200 2400 Turbine Valve Freedom Test.Currently 100%, 978 MWe.
September 12,2003               2305           Commence ramp-down to approx. 91% power to perform Turbine Valve Freedom Test . Currently 100%, 978 MWe.
Holding @ 91% power, 890 MWe. Turbine Valve Freedom Test completed SAT. Commence ramp back to 100%h.
September 13, 2003              0017          Holding @91% power, 890 MWe. Turbine Valve Freedom Test completed SAT. Commence ramp back to 100%h.
Unit @ 100% power, 977 MWe.
0200          Unit @ 100% power, 977 MWe.
Ended the month In Mode 1, 100% power, 980 MWe.
September 30,2003                2400          Ended the month InMode 1, 100% power, 980 MWe.
September 30,2003


Docket No.:   50-338 Unit Name:   North Anna Unit 1 Date: 10/10/03
Docket No.: 50-338 Unit Name:
North Anna Unit 1 Date:
10/10/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)
D. A. Heacock Telephone:
REPORT MONTH: September, 2003 (1)               (2)       (3)               (4)           (5)
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)
Method Report                         Duration               of     LER   System   Component Cause &
REPORT MONTH: September, 2003 (1)
No.           Date     Type     Hours   Reason   Shutting   No. Code         Code     Corrective Action Down                                     to Prevent Reactor                                   Recurrence No entries for this period (1)                           (2)                                                (3)
(2)
F: Forzed                    REASON:                                            METHOD:
(3)
S: Scheduled                A - Equipment Failure (Explain)                   1 - Manual B - Maintenance or Test                           2 - Manual Scram C - Refueling                                     3 - Automatic Scram D - Regulatory Restriction                         4 - Continuations E - Operator Training & Ucensing Examination       5 - Load Reduction F - Administrative                                 9 - Other G - Operational Error H - Other (Explain)
(4)
(4)                                                                                (5)
(5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                   Exhibit H - Same Source for Ucensee Event Report (LER) File (NUREG 0161)
Method Report Duration of LER System Component Cause &
No.
Date Type Hours Reason Shutting No.
Code Code Corrective Action Down to Prevent Reactor Recurrence No entries for this period (1)
F:
Forzed S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error H -
Other (Explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit H - Same Source


OPERATING DATA REPORT Docket No.:   50-339 Date:     10/1003
OPERATING DATA REPORT Docket No.:
50-339 Date:
10/1003


==Contact:==
==Contact:==
D. A. Heacock Telephone:     (540) 894-2101
D. A. Heacock Telephone:
: 1. Unit Name: ..........             ........................ North Anna Unit 2
(540) 894-2101
: 2. Reporting Period: ..................................       September, 2003
: 1.
: 3. Ucensed Thermal Power (MWt): .........................       2,893
Unit Name:..........
: 4. Nameplate Rating (Gross MWe): ........................         979
North Anna Unit 2
: 5. Design Electrical Rating (Net MWe): ...................         907
: 2.
: 6. Maximum Dependable Capacity (Gross MWe): ...                   963
Reporting Period:..................................
: 7. Maximum Dependable Capacity (Net MWe): .......                 917
September, 2003
: 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: NIA
: 3.
: 9. Power Level To Which Restricted, If Any (Net MWe):             N/A
Ucensed Thermal Power (MWt):.........................
: 10. Reasons For Restrictions, If Any:               N/A This Month       Year-To-Date         Cumulative
2,893
: 11. Hours in Reporting Period                                             720.0           6,551.0           199,823.0
: 4.
: 12. Hours Reactor Was Critical                                             720.0           5,823.1           169,273.8
Nameplate Rating (Gross MWe):........................
: 13. Reactor Reserve Shutdown Hours                                           0.0               44.6             7,547.0
979
: 14. Hours Generator On-Une                                                 720.0           5,742.1           167,858.5
: 5.
: 15. Unit Reserve Shutdown Hours                                               0.0                 0.0                 0.0
Design Electrical Rating (Net MWe):...................
: 16. Gross Thermal Energy Generated (MWH)                           2,067,931.0       16,485,420.5         464,340,569.8
907
: 17. Gross Electrical Energy Generated (MW H)                         691,068.0         5,493,790.0       152,504,466.0
: 6.
: 18. Net Electrical Energy Generated (MWH)                             656,695.0       5,223,828.0       145,527,397.0
Maximum Dependable Capacity (Gross MWe):...
: 19. Unit Service Factor                                                 100.0%               87.7%o             84.0%
963
: 20. Unit Availability Factor                                             100.0%h             87.7%h             84.0%
: 7.
: 21. Unit Capacity Factor (Using MDC Net)                                 99.5%               87.0%h             80.8%
Maximum Dependable Capacity (Net MWe):.......
: 22. Unit Capacity Factor (Using DER Net)                                 100.6%               87.9%               80.3%
917
: 23. Unit Forced Outage Rate                                               0.0%h               0.4%                 3.9%
: 8.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: NIA
: 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
: 10.
Reasons For Restrictions, If Any:
N/A This Month Year-To-Date Cumulative
: 11.
Hours in Reporting Period 720.0 6,551.0 199,823.0
: 12.
Hours Reactor Was Critical 720.0 5,823.1 169,273.8
: 13.
Reactor Reserve Shutdown Hours 0.0 44.6 7,547.0
: 14.
Hours Generator On-Une 720.0 5,742.1 167,858.5
: 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16.
Gross Thermal Energy Generated (MWH) 2,067,931.0 16,485,420.5 464,340,569.8
: 17.
Gross Electrical Energy Generated (MW H) 691,068.0 5,493,790.0 152,504,466.0
: 18.
Net Electrical Energy Generated (MWH) 656,695.0 5,223,828.0 145,527,397.0
: 19.
Unit Service Factor 100.0%
87.7%o 84.0%
: 20.
Unit Availability Factor 100.0%h 87.7%h 84.0%
: 21.
Unit Capacity Factor (Using MDC Net) 99.5%
87.0%h 80.8%
: 22.
Unit Capacity Factor (Using DER Net) 100.6%
87.9%
80.3%
: 23.
Unit Forced Outage Rate 0.0%h 0.4%
3.9%
: 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
: 25.
If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST                 ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-339 Unit Name:   North Anna Unit 2 Date: 10/10/03
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name:
North Anna Unit 2 Date:
10/10/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 MONTH:     September, 2003 Average Daily Power Level                         Average Daily Power Level Day                  (MWe - Net)                 Day                 (MWe- Net) 1                        914                      17                      919 2                        915                      18                      919 3                        916                      19                      742 4                        915                    20                        916 5                        912                    21                        918 6                        914                    22                        919 7                        917                    23                        920 8                        917                    24                        920 9                        918                    25                        920 10                        918                    26                        919 11                        918                    27                        919 12                        919                     28                        919 13                        919                    29                        921 14                      918                      30                        922 15                      919 16                      919 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.
D. A. Heacock Telephone:
(540) 894-2101 MONTH:
September, 2003 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 914 915 916 915 912 914 917 917 918 918 918 919 919 918 919 919 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe-Net) 919 919 742 916 918 919 920 920 920 919 919 919 921 922 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.


Docket No.:   50-339 Unit Name:     North Anna Unit 2 Date:         10110103
Docket No.:
Unit Name:
Date:


==Contact:==
==Contact:==
D. A. Heacock Telephone:    (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: September, 2003
Telephone:
50-339 North Anna Unit 2 10110103 D. A. Heacock (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: September, 2003


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Date                   Time              Data September 1,2003             0000         Began the month In Mode 1, 100% power, 960 MWe.
Date September September 1,2003 5,2003 September 6,2003 September 18,2003 September 19,2003 September 20,2003 September 30, 2003 Time 0000 2254 2337 0022 0240 2239 0802 0817 1056 0000 2400 Data Began the month In Mode 1, 100% power, 960 MWe.
September 5,2003            2254          Commence ramp to approx. 91% to perform Turbine Valve Freedom Test.
Commence ramp to approx. 91% to perform Turbine Valve Freedom Test.
2337          Unit @91% power, 874 VWe.
Unit @ 91% power, 874 VWe.
September 6,2003            0022          Turbine Valve Freedom Test completed SAT. Commence ramp to 100% power.
Turbine Valve Freedom Test completed SAT. Commence ramp to 100% power.
0240          Unit 0 100% power, 960 MWe.
Unit 0 100% power, 960 MWe.
September 18,2003            2239          Commence ramp-down per system request for a 300MW load-follow IAW OP-22 (Grid instability caused by Hurricane Isabel).
Commence ramp-down per system request for a 300MW load-follow IAW OP-22 (Grid instability caused by Hurricane Isabel).
Currently 100%, 967 MWe.
Currently 100%, 967 MWe.
September 19,2003            0802          System Operator requested further power reduction.
System Operator requested further power reduction.
0817          Ramp held 0 62%, 600 MWe.
Ramp held 0 62%, 600 MWe.
1056          Commence ramp to 100%. Currently 62% power, 600 MWe.
Commence ramp to 100%. Currently 62% power, 600 MWe.
September 20,2003          0000          Unit stable @ 100% power, 960 MWe.
Unit stable @ 100% power, 960 MWe.
September 30, 2003          2400          Ended the Month in Mode 1, 100% power, 970 MWe.
Ended the Month in Mode 1, 100% power, 970 MWe.


Docket No.:   50-339 Unit Name:   North Anna Unit 2 Date: 10/10/03
Docket No.:
50-339 Unit Name:
North Anna Unit 2 Date:
10/10/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)
D. A. Heacock Telephone:
REPORT MONTH: September, 2003 (1)                 (2)       (3)               (4)         (5)
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)
Method of Report                         Duration             Shutting   LER   System   Component     Cause & Corrective No         Date     Type     Hours     Reason     Down       No. Code       Code     Action to Prevent Reactor                                   Recurrence 030918       F       0           H         9                                     Unit ramped-down to 600 MW per request of System Operator due to grid instability caused by Hurricane Isabel.
REPORT MONTH: September, 2003 (1)
(1)                           (2)                                                (3)
(2)
F: Forced                    REASON:                                          METHOD:
(3)
S: Scheduled                A - Equipment Failure (Explain)                   1 - Manual B - Maintenance or Test                           2 - Manual Scram C - Refueling                                     3 - Automatic Scram D - Regulatory Restriction                       4 - Continuations E - Operator Training & Ucensing Examination     5 - Load Reduction F - Administrative                               9 - Other G - Operational Error H - Other (explain)
(4)
(4)                                                                              (5)
(5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                 Exhibit H - Same Source for Ucensee Event Report (LER) File (NUREG 0161)
Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.
Code Code Action to Prevent Reactor Recurrence 030918 F
0 H
9 Unit ramped-down to 600 MW per request of System Operator due to grid instability caused by Hurricane Isabel.
(1)
F:
Forced S: Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error H -
Other (explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit H - Same Source


Docket No.: 50-339 Unit Name:   North Anna Unit 2 Date: 10/10/03
Docket No.:
Unit Name:
Date:


==Contact:==
==Contact:==
D. A. Heacock Telephone:  (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAW 20%)
Telephone:
REPORT MoNTH:     September, 2003 (1)                 (2)       (3)                 (4)         (5)
50-339 North Anna Unit 2 10/10/03 D. A. Heacock (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAW 20%)
Method of Report                           Duration             Shutting   LER     System   Component Cause & Corrective No           Date     Type     Hours     Reason     Down       No.       Code       Code       Action to Prevent Reactor                                     Recurrence 030918       F       0         H         9                                         Unit ramped-down to 600 MW per request of System Operator due to grid Instability caused by Hurricane Isabel.
REPORT MoNTH: September, 2003 (1)
(1)                           (2)                                                  (3)
(2)
F: Forced                    REASON:                                            METHOD:
(3)
5: Scheduled                A -   Equipment Failure (Explain)                   1  -  Manual B -   Maintenance or Test                           2  -  Manual Scram C -   Refueling                                     3  -  Automatic Scram D - Regulatory Restriction                         4  -  Continuations E - Operator Training & Ucensing Examination       5  -  Load Reduction F -   Administrative                               9  -  Other G -   Operational Error H -   Other (explain)
(4)
(4)                                                                                (5)
(5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                   Exhibit H - Same Source for Ucensee Event Report (LER) File (NUREG 0161)}}
Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.
Code Code Action to Prevent Reactor Recurrence 030918 F
0 H
9 Unit ramped-down to 600 MW per request of System Operator due to grid Instability caused by Hurricane Isabel.
(1)
F:
Forced 5:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error H -
Other (explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit H - Same Source}}

Latest revision as of 07:10, 16 January 2025

September 2003 Monthly Operating Report for North Anna, Units 1 & 2
ML032890502
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/10/2003
From: Heacock D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-515
Download: ML032890502 (11)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 10, 2003 United States Nuclear Regulatory Commission Serial No.03-515 Attention: Document Control Desk NAPS/JRP Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.

Very truly yours, D. A. HeacoW Site Vice President Enclosure Commitments made in this letter: None.

cc:

U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 2003 Approved:

Site Vice President

-9c1-03 Date

OPERATING DATA REPORT Docket No.:

50-338 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 1Unit Name:.North Anna Unit 1

1.

UntN m :.........................................................

N rhA naU i

2.

Reporting Period:..................................

September, 2003

3.

Ucensed Thermal Power (MWt):.........................

2,893

4.

Nameplate Rating (Gross MWe):........................

979.74

5.

Design Electrical Rating (Net MWe):...................

907

6.

Maximum Dependable Capacity (Gross MWe):...

971

7.

Maximum Dependable Capacity (Net MWe):.......

925

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9.

Power Level To Which Restricted, If Any (Net MWe): N/A

10.

Reasons For Restrictions, If Any:

N/A This Month Year-To-Date Cumulative

11.

Hours In Reporting Period 720.0 6,551.0 221,555.0

12. Hours Reactor Was Critical 720.0 5,031.6 180,087.4
13.

Reactor Reserve Shutdown Hours 0.0 306.9 7,582.1

14.

Hours Generator On-Une 720.0 4,992.3 176,781.6

15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

16.

Gross Thermal Energy Generated (MWH) 2,081,238.8 13,905,062.2 482,616,122.5

17.

Gross Electrical Energy Generated (MWH) 703,966.0 4,698,005.0 196,631,620.0

18.

Net Electrical Energy Generated (MWH) 669,315.0 4,459,703.0 151,443,605.0

19.

Unit Service Factor 100.0%h 76.2%

79.8%

20.

Unit Availability Factor 100.0/0 76.2%

79.8%

21.

Unit Capacity Factor (Using MDC Net) 100.5%

73.6%

76.2%

22.

Unit Capacity Factor (Using DER Net) 102.5%

75.1%

75.4%

23.

Unit Forced Outage Rate 0.0%h 4.8%

6.4%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

25.

If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DALY UNIT POWER LEVEL Docket No.: 50-338 Unit Name:

North Anna Unit 1 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 MoNTH:

September, 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 926 927 927 926 927 929 929 928 929 930 930 929 927 930 930 930 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe - Net) 930 931 931 931 931 931 931 932 931 931 931 931 932 932 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Docket No.: 50-338 Unit Name:

North Anna Unit 1 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: September, 2003

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted In significant non-load related incidents.

Date Time September 1, 2003 0000 Began the month in Mode 1, 1000/o power, 971 MWe.

September 12,2003 2305 Commence ramp-down to approx. 91% power to perform September 13, 2003 0017 0200 2400 Turbine Valve Freedom Test.Currently 100%, 978 MWe.

Holding @ 91% power, 890 MWe. Turbine Valve Freedom Test completed SAT. Commence ramp back to 100%h.

Unit @ 100% power, 977 MWe.

Ended the month In Mode 1, 100% power, 980 MWe.

September 30,2003

Docket No.: 50-338 Unit Name:

North Anna Unit 1 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)

REPORT MONTH: September, 2003 (1)

(2)

(3)

(4)

(5)

Method Report Duration of LER System Component Cause &

No.

Date Type Hours Reason Shutting No.

Code Code Corrective Action Down to Prevent Reactor Recurrence No entries for this period (1)

F:

Forzed S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error H -

Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Continuations 5 -

Load Reduction 9 -

Other (4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit H - Same Source

OPERATING DATA REPORT Docket No.:

50-339 Date:

10/1003

Contact:

D. A. Heacock Telephone:

(540) 894-2101

1.

Unit Name:..........

North Anna Unit 2

2.

Reporting Period:..................................

September, 2003

3.

Ucensed Thermal Power (MWt):.........................

2,893

4.

Nameplate Rating (Gross MWe):........................

979

5.

Design Electrical Rating (Net MWe):...................

907

6.

Maximum Dependable Capacity (Gross MWe):...

963

7.

Maximum Dependable Capacity (Net MWe):.......

917

8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: NIA

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10.

Reasons For Restrictions, If Any:

N/A This Month Year-To-Date Cumulative

11.

Hours in Reporting Period 720.0 6,551.0 199,823.0

12.

Hours Reactor Was Critical 720.0 5,823.1 169,273.8

13.

Reactor Reserve Shutdown Hours 0.0 44.6 7,547.0

14.

Hours Generator On-Une 720.0 5,742.1 167,858.5

15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

16.

Gross Thermal Energy Generated (MWH) 2,067,931.0 16,485,420.5 464,340,569.8

17.

Gross Electrical Energy Generated (MW H) 691,068.0 5,493,790.0 152,504,466.0

18.

Net Electrical Energy Generated (MWH) 656,695.0 5,223,828.0 145,527,397.0

19.

Unit Service Factor 100.0%

87.7%o 84.0%

20.

Unit Availability Factor 100.0%h 87.7%h 84.0%

21.

Unit Capacity Factor (Using MDC Net) 99.5%

87.0%h 80.8%

22.

Unit Capacity Factor (Using DER Net) 100.6%

87.9%

80.3%

23.

Unit Forced Outage Rate 0.0%h 0.4%

3.9%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

25.

If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name:

North Anna Unit 2 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 MONTH:

September, 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 914 915 916 915 912 914 917 917 918 918 918 919 919 918 919 919 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Average Daily Power Level (MWe-Net) 919 919 742 916 918 919 920 920 920 919 919 919 921 922 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day In the reporting month. Compute to the nearest whole megawatt.

Docket No.:

Unit Name:

Date:

Contact:

Telephone:

50-339 North Anna Unit 2 10110103 D. A. Heacock (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: September, 2003

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.

Date September September 1,2003 5,2003 September 6,2003 September 18,2003 September 19,2003 September 20,2003 September 30, 2003 Time 0000 2254 2337 0022 0240 2239 0802 0817 1056 0000 2400 Data Began the month In Mode 1, 100% power, 960 MWe.

Commence ramp to approx. 91% to perform Turbine Valve Freedom Test.

Unit @ 91% power, 874 VWe.

Turbine Valve Freedom Test completed SAT. Commence ramp to 100% power.

Unit 0 100% power, 960 MWe.

Commence ramp-down per system request for a 300MW load-follow IAW OP-22 (Grid instability caused by Hurricane Isabel).

Currently 100%, 967 MWe.

System Operator requested further power reduction.

Ramp held 0 62%, 600 MWe.

Commence ramp to 100%. Currently 62% power, 600 MWe.

Unit stable @ 100% power, 960 MWe.

Ended the Month in Mode 1, 100% power, 970 MWe.

Docket No.:

50-339 Unit Name:

North Anna Unit 2 Date:

10/10/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EauAL To OR GREATER THAN 20%)

REPORT MONTH: September, 2003 (1)

(2)

(3)

(4)

(5)

Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.

Code Code Action to Prevent Reactor Recurrence 030918 F

0 H

9 Unit ramped-down to 600 MW per request of System Operator due to grid instability caused by Hurricane Isabel.

(1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error H -

Other (explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Continuations 5 -

Load Reduction 9 -

Other (4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit H - Same Source

Docket No.:

Unit Name:

Date:

Contact:

Telephone:

50-339 North Anna Unit 2 10/10/03 D. A. Heacock (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAW 20%)

REPORT MoNTH: September, 2003 (1)

(2)

(3)

(4)

(5)

Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.

Code Code Action to Prevent Reactor Recurrence 030918 F

0 H

9 Unit ramped-down to 600 MW per request of System Operator due to grid Instability caused by Hurricane Isabel.

(1)

F:

Forced 5:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error H -

Other (explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Continuations 5 -

Load Reduction 9 -

Other (4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit H - Same Source