ML042860180: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMAT 1ON Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 Mike D. Skaggs Vice President. Browns Ferry Nuclear Plant EA-03-086 10 CFR 2.202 U.S. Nuclear Regulatory Commission ATTN:         Document Control Desk Washington, D. C. 20555 Gentlemen:
{{#Wiki_filter:SAFEGUARDS I NFORMAT 1 ON Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 Mike D. Skaggs Vice President. Browns Ferry Nuclear Plant EA-03-086 10 CFR 2.202 U.S. Nuclear Regulatory Commission ATTN:
In the Matter of                                               )                     Docket No.50-259 Tennessee Valley Authority                                     )                                   50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 -
Document Control Desk Washington, D. C. 20555 Gentlemen:
SUPPLEMENTAL REVISION TO THE FINAL PROPOSED PHYSICAL SECURITY PLANS, REVISION 0 The purpose of this letter is to provide a supplemental revision to the Final Proposed Physical Security Plan, Revision 0, dated September 10, 2004, that also includes the Training and Qualification Plan and the Safeguards Contingency Plan. This supplemental PSP addresses a NRC request for BFN to include NEI and NRC agreed upon final language to the NEI PSP template. This request is based on a telephone communication on September 20, 2004, and two written requests, dated August 23, 2004 and September 21, 2004.
In the Matter of  
This response contains Safeguards Information as defined in 10 CFR 73.21.                 TVA, therefore, requests that the Enclosure be withheld from public disclosure.
)
There are no Regulatory commitments identified in this submittal.             If you have any questions about these responses, please contact J. M. Ogle at (256) 729-2929.
Docket No.50-259 Tennessee Valley Authority  
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 -
SUPPLEMENTAL REVISION TO THE FINAL PROPOSED PHYSICAL SECURITY PLANS, REVISION 0 The purpose of this letter is to provide a supplemental revision to the Final Proposed Physical Security Plan, Revision 0, dated September 10, 2004, that also includes the Training and Qualification Plan and the Safeguards Contingency Plan.
This supplemental PSP addresses a NRC request for BFN to include NEI and NRC agreed upon final language to the NEI PSP template.
This request is based on a telephone communication on September 20, 2004, and two written requests, dated August 23, 2004 and September 21, 2004.
This response contains Safeguards Information as defined in 10 CFR 73.21.
TVA, therefore, requests that the Enclosure be withheld from public disclosure.
There are no Regulatory commitments identified in this submittal.
If you have any questions about these responses, please contact J. M. Ogle at (256) 729-2929.
l WHEN SEPARATED FROM THE ATTACHED.
l WHEN SEPARATED FROM THE ATTACHED.
THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION                                             pc Pwed n reydW aw                                                                                       /
THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION pc Pwed n reydW aw  
/


SAFEGUARDS INFORMATiON U.S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 6th day of October 2004.
SAFEGUARDS INFORMATiON U.S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 6th day of October 2004.
Sincerely, M. D. Skaggs Enclosure cc (without Enclosure):
Sincerely, M. D. Skaggs Enclosure cc (without Enclosure):
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
Line 32: Line 43:
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 WHEN SEPARATED FROM THE ATTACHE; THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 WHEN SEPARATED FROM THE ATTACHE; THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION


SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 3 TEA:JEW Enclosure Cc:   (without Enclosure)
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 3 TEA:JEW Enclosure Cc:
A. S. Bhatnagar, LP 6A-C M. J. Burzynski, BR 4X-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. F. Marks, PAB 1C-BFN R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA - K S:\BAB\SUBMIT\EA-03-086 SUPPLEMENTAL TO FINAL PSP.JEW 10062004 I
(without Enclosure)
SAFEGUARDS INFORMATION L WHEN SEPARATED FROM THE ATTACH' THIS PAGE IS DECONTROLLED
A. S. Bhatnagar, LP 6A-C M. J. Burzynski, BR 4X-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. F. Marks, PAB 1C-BFN R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA - K S:\\BAB\\SUBMIT\\EA-03-086 SUPPLEMENTAL TO FINAL PSP.JEW 10062004 IL WHEN SEPARATED FROM THE ATTACH' THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION


SAFEGQARDS INFORMATION ENCLOSURE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2,   and 3 SUPPLEMENTAL TO FINAL PHYSICAL SECURITY PLAN WHEN SEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION}}
SAFEGQARDS INFORMATION ENCLOSURE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, and 3 SUPPLEMENTAL TO FINAL PHYSICAL SECURITY PLAN WHEN SEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION}}

Latest revision as of 01:48, 16 January 2025

Supplemental Revision to the Final Proposed Physical Security Plans, Revision 0
ML042860180
Person / Time
Site: Browns Ferry  
Issue date: 10/06/2004
From: Skaggs M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086
Download: ML042860180 (4)


Text

SAFEGUARDS I NFORMAT 1 ON Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 Mike D. Skaggs Vice President. Browns Ferry Nuclear Plant EA-03-086 10 CFR 2.202 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In the Matter of

)

Docket No.50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 -

SUPPLEMENTAL REVISION TO THE FINAL PROPOSED PHYSICAL SECURITY PLANS, REVISION 0 The purpose of this letter is to provide a supplemental revision to the Final Proposed Physical Security Plan, Revision 0, dated September 10, 2004, that also includes the Training and Qualification Plan and the Safeguards Contingency Plan.

This supplemental PSP addresses a NRC request for BFN to include NEI and NRC agreed upon final language to the NEI PSP template.

This request is based on a telephone communication on September 20, 2004, and two written requests, dated August 23, 2004 and September 21, 2004.

This response contains Safeguards Information as defined in 10 CFR 73.21.

TVA, therefore, requests that the Enclosure be withheld from public disclosure.

There are no Regulatory commitments identified in this submittal.

If you have any questions about these responses, please contact J. M. Ogle at (256) 729-2929.

l WHEN SEPARATED FROM THE ATTACHED.

THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION pc Pwed n reydW aw

/

SAFEGUARDS INFORMATiON U.S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 6th day of October 2004.

Sincerely, M. D. Skaggs Enclosure cc (without Enclosure):

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 WHEN SEPARATED FROM THE ATTACHE; THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 3 TEA:JEW Enclosure Cc:

(without Enclosure)

A. S. Bhatnagar, LP 6A-C M. J. Burzynski, BR 4X-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. F. Marks, PAB 1C-BFN R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA - K S:\\BAB\\SUBMIT\\EA-03-086 SUPPLEMENTAL TO FINAL PSP.JEW 10062004 IL WHEN SEPARATED FROM THE ATTACH' THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION

SAFEGQARDS INFORMATION ENCLOSURE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, and 3 SUPPLEMENTAL TO FINAL PHYSICAL SECURITY PLAN WHEN SEPARATED FROM THE ATTACHED, THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION