{{#Wiki_filter:!           SOUTHERN CALIFORNIA                                                   A. Edward Scherer EDISONR                                                               Manager of Nuclear Regulatory Affairs An EDISOBE' INTFl?   70N'AL @ Company October 14, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
{{#Wiki_filter:!
SOUTHERN CALIFORNIA EDISONR An EDISOBE' INTFl?
70N'AL @ Company A. Edward Scherer Manager of Nuclear Regulatory Affairs October 14, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Line 21: Line 23:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for August 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for August 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
Sincerely, Attachments 1 & 2 cc:       B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128
Sincerely, Attachments 1 & 2 cc:
                                                                                                      <<A 949-368-7501 Fax 949-368-7575
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575
<<A Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 2


Attachment 1 Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:
 
Unit Name:
MONTHLY OPERATING REPORT                   Docket No:        50-361 SAN ONOFRE NUCLEAR GENERATING STATION               Unit Name:         SONGS - 2 UNIT 2                        Date:              October 14, 2004 September 2004                    Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe)                                     l       1070 2 lMaximum Dependable Capacity (Net MWe)                                   l       1070 This Month     Yr-to-Date     Cumulative 3   Number of Hours in Period                       720         6,575           185,160 4   Number of Hours Reactor Was Critical*           720         5,278           151,050 5   Hours Generator On-line*                       720         5,147           149,077 6   Unit Reserve Shutdown Hours*                     0             0               0 7   Net Electrical Energy Generated (MWh)*       805,501       5,706,016     159,821,972
Date:
Completed by:
Telephone:
50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe) l 1070 2 lMaximum Dependable Capacity (Net MWe) l 1070 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 6,575 185,160 4
Number of Hours Reactor Was Critical*
720 5,278 151,050 5
Hours Generator On-line*
720 5,147 149,077 6
Unit Reserve Shutdown Hours*
0 0
0 7
Net Electrical Energy Generated (MWh)*
805,501 5,706,016 159,821,972
*Rounded
*Rounded


MONTHLY OPERATING REPORT                               Docket No:    50-361 SAN ONOFRE NUCLEAR GENERATING STATION                             Unit Name:     SONGS - 2 UNIT 2                            Date:          October 14, 2004 September 2004                            Completed by:  C. E. Williams Telephone:    (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number                                                                         NIA Date (YY/MM/DD)                                                                 N/A Type (1)                                                                       N/A Duration (Hours)*                                                               N/A Reason (2)                                                                     N/A Method of Shutting Down the Reactor (3)                                         N/A Cause/Corrective Actions/Comments                                               N/A (Include LER number, if any)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:
* Rounded (1) F-Forced S-Scheduled (2) Reason:     A-Equipment Failure (Explain)
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number NIA Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)*
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
* Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-AdministratIve G-Operational Error (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-AdministratIve G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
(3) Method:     1-Manual 2-Manual TriplScram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
(3) Method:
1 -Manual 2-Manual TriplScram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)


MONTHLY OPERATING REPORT                           Docket No:        50-361 SAN ONOFRE NUCLEAR GENERATING STATION                     Unit Name:         SONGS - 2 UNIT 2                              Date:              October 14, 2004 September 2004                            Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 4 of 4
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 4 of 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH Date     Time 09/01/04 09/30/04 0000 2400 Unit in Mode 1.
OF OPERATING EXPERIENCE FOR THE MONTH Date 09/01/04 09/30/04 Time 0000 Unit in Mode 1.
Unit in Mode 1.
2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
H Note: There were no challenges to the pressurizer safety valves during the month.
H
Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 3
 
Attachment 2 Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 3


MONTHLY OPERATING REPORT                   Docket No:        50-362 SAN ONOFRE NUCLEAR GENERATING STATION               Unit Name:         SONGS- 3 UNIT 3                      Date:              October 14, 2004 September 2004                    Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT l 1 l Design Electrical Rating (Net MWe)                                     l       1080 12 Maximum Dependable Capacitv (Net MWe)                                           1080 This Month     Yr-to-Date     Cumulative 3   Number of Hours in Period                     720         6,575         179,711 4   Number of Hours Reactor Was Critical*         636         6,285         149,633 5   Hours Generator On-line*                       636         6,264         147,484 6   Unit Reserve Shutdown Hours*                   0             0               0 7 , Net Electrical Energy Generated (MWh)*     691,506       6,950,238 , 156,482,449
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS-3 October 14, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT l 1 l Design Electrical Rating (Net MWe) l 1080 1 2 Maximum Dependable Capacitv (Net MWe) 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 6,575 179,711 4
Number of Hours Reactor Was Critical*
636 6,285 149,633 5
Hours Generator On-line*
636 6,264 147,484 6
Unit Reserve Shutdown Hours*
0 0
0 7, Net Electrical Energy Generated (MWh)*
691,506 6,950,238, 156,482,449
*Rounded
*Rounded


MONTHLY OPERATING REPORT                               Docket No:        50-362 SAN ONOFRE NUCLEAR GENERATING STATION                             Unit Name:         SONGS - 3 UNIT 3                            Date:              October 14, 2004 September 2004                            Completed by:      C. E. Williams Telephone:          (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number                                                                     2004-003 Date (YY/MM/DD)                                                             04/09/27 Type (1)                                                                         S Duration (Hours)*                                                               84 Reason (2)                                                                       C Method of Shutting Down the Reactor (3)                                         1 Cause/Corrective Actions/Comments                                             N/A (Include LER number, if any)__                                                         _        _
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:
* Rounded (1) F-Forced S-Scheduled (2) Reason:     A-Equipment Failure (Explain)
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 October 14, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number 2004-003 Date (YY/MM/DD) 04/09/27 Type (1)
S Duration (Hours)*
84 Reason (2)
C Method of Shutting Down the Reactor (3) 1 Cause/Corrective Actions/Comments N/A (Include LER number, if any)__
* Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatlonal Error (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatlonal Error (Explain)
H-Other (Explain)
H-Other (Explain)
(3) Method:     1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)


MONTHLY OPERATING REPORT                           Docket No:        50-362 SAN ONOFRE NUCLEAR GENERATING STATION                     Unit Name:       SONGS - 3 UNIT 3                              Date:            October 14, 2004 September 2004                            Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 4 of 4
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 October 14, 2004 C. E. Williams (949) 368-6707 Page 4 of 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH Date     Time 09/01/04     0000   Unit in Mode 1.
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 09/01/04 0000 Unit in Mode 1.
09/27/04   0800     Unit began downpower for scheduled refueling outage.
09/27/04 0800 Unit began downpower for scheduled refueling outage.
09/27/04     1200   Operators trip reactor from approximately 12% power. Unit enters Mode 3.
09/27/04 1200 Operators trip reactor from approximately 12% power. Unit enters Mode 3.
09/27/04     1710   Unit enters Mode 4.
09/27/04 1710 Unit enters Mode 4.
09/28/04     0356   Unit enters Mode 5.
09/28/04 0356 Unit enters Mode 5.
09/30/04     2400   Unit in Mode 5.
09/30/04 2400 Unit in Mode 5.
Note: There were no challenges to the pressurizer safety valves during the month.}}
Note: There were no challenges to the pressurizer safety valves during the month.}}

Latest revision as of 00:42, 16 January 2025

September 2004 Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3
ML042920119
Person / Time
Site: San Onofre  
Issue date: 10/14/2004
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042920119 (9)


Text

!

SOUTHERN CALIFORNIA EDISONR An EDISOBE' INTFl?

70N'AL @ Company A. Edward Scherer Manager of Nuclear Regulatory Affairs October 14, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for September 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for August 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.

Sincerely, Attachments 1 & 2 cc:

B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

<<A Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe) l 1070 2 lMaximum Dependable Capacity (Net MWe) l 1070 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 720 6,575 185,160 4

Number of Hours Reactor Was Critical*

720 5,278 151,050 5

Hours Generator On-line*

720 5,147 149,077 6

Unit Reserve Shutdown Hours*

0 0

0 7

Net Electrical Energy Generated (MWh)*

805,501 5,706,016 159,821,972

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number NIA Date (YY/MM/DD)

N/A Type (1)

N/A Duration (Hours)*

N/A Reason (2)

N/A Method of Shutting Down the Reactor (3)

N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)

  • Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-AdministratIve G-Operational Error (Explain)

H-Other (Explain)

(3) Method:

1 -Manual 2-Manual TriplScram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 October 14, 2004 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date 09/01/04 09/30/04 Time 0000 Unit in Mode 1.

2400 Unit in Mode 1.

H Note: There were no challenges to the pressurizer safety valves during the month.

Monthly Operating Report, September 2004 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS-3 October 14, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT l 1 l Design Electrical Rating (Net MWe) l 1080 1 2 Maximum Dependable Capacitv (Net MWe) 1080 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 720 6,575 179,711 4

Number of Hours Reactor Was Critical*

636 6,285 149,633 5

Hours Generator On-line*

636 6,264 147,484 6

Unit Reserve Shutdown Hours*

0 0

0 7, Net Electrical Energy Generated (MWh)*

691,506 6,950,238, 156,482,449

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 October 14, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number 2004-003 Date (YY/MM/DD) 04/09/27 Type (1)

S Duration (Hours)*

84 Reason (2)

C Method of Shutting Down the Reactor (3) 1 Cause/Corrective Actions/Comments N/A (Include LER number, if any)__

  • Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatlonal Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 October 14, 2004 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 09/01/04 0000 Unit in Mode 1.

09/27/04 0800 Unit began downpower for scheduled refueling outage.

09/27/04 1200 Operators trip reactor from approximately 12% power. Unit enters Mode 3.

09/27/04 1710 Unit enters Mode 4.

09/28/04 0356 Unit enters Mode 5.

09/30/04 2400 Unit in Mode 5.

Note: There were no challenges to the pressurizer safety valves during the month.