NG-04-0656, Updated Security Plan: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Ni Committed to Nuclear Excellence | {{#Wiki_filter:Ni Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC SAFEGUARDS INFORMATION October 18, 2004 NG-04-0656 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Director of Nuclear Security, Office of Nuclear Security and Incident Response Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Updated Security Plan On September 30, 2004, Duane Arnold Energy Center (DAEC) submitted a revised Security Plan in response to the NRC's Order dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat. Subsequent to that submittal, DAEC has become aware of additional needed changes, through conversations with members of your Staff. No other changes have been made beyond those discussed with your Staff. | ||
Nuclear Management Company, LLC hereby submits the enclosed updated Security Plan to replace the previously submitted version in its entirety. | Nuclear Management Company, LLC hereby submits the enclosed updated Security Plan to replace the previously submitted version in its entirety. | ||
NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED." | NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED." | ||
SAFEGUARDS INFORMATION 3277 DAEC Road | SAFEGUARDS INFORMATION 3277 DAEC Road | ||
* Palo, Iowa 52324-9785 Telephone: 319.851.7611 f | * Palo, Iowa 52324-9785 Telephone: 319.851.7611 f, kos | ||
Document Control Desk Page 2 SAFEGUARDS INFORMATION This letter makes no new commitments or revisions to existing commitments. | Document Control Desk Page 2 SAFEGUARDS INFORMATION This letter makes no new commitments or revisions to existing commitments. | ||
In accordance with 10 CFR § 2.202(b), the following affirmation is provided: | In accordance with 10 CFR § 2.202(b), the following affirmation is provided: | ||
I declare under penalty of perjury that the foregoing is true and correct. | I declare under penalty of perjury that the foregoing is true and correct. | ||
Executed on October 18, 2004 Mark A. Peifer Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC CC: | Executed on October 18, 2004 Mark A. Peifer Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC CC: | ||
Regional Administrator, USNRC, Region III NRR Project Manager NRC Resident Inspector (w/o Enclosure) | |||
Enclosure SAFEGUARDS INFORMATION}} | Enclosure SAFEGUARDS INFORMATION}} | ||
Latest revision as of 00:38, 16 January 2025
| ML042950028 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 10/18/2004 |
| From: | Peifer M Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| NG-04-0656 | |
| Download: ML042950028 (2) | |
Text
Ni Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC SAFEGUARDS INFORMATION October 18, 2004 NG-04-0656 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Director of Nuclear Security, Office of Nuclear Security and Incident Response Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Updated Security Plan On September 30, 2004, Duane Arnold Energy Center (DAEC) submitted a revised Security Plan in response to the NRC's Order dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat. Subsequent to that submittal, DAEC has become aware of additional needed changes, through conversations with members of your Staff. No other changes have been made beyond those discussed with your Staff.
Nuclear Management Company, LLC hereby submits the enclosed updated Security Plan to replace the previously submitted version in its entirety.
NOTE: THE ATTACHMENTS TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION 3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611 f, kos
Document Control Desk Page 2 SAFEGUARDS INFORMATION This letter makes no new commitments or revisions to existing commitments.
In accordance with 10 CFR § 2.202(b), the following affirmation is provided:
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 18, 2004 Mark A. Peifer Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC CC:
Regional Administrator, USNRC, Region III NRR Project Manager NRC Resident Inspector (w/o Enclosure)
Enclosure SAFEGUARDS INFORMATION