ML042960419: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:uay1a LoveieSS   - Mie: t-urs                                                                                       ae i i \
{{#Wiki_filter:uay1a LoveieSS - Mie: t-urs ae i raie_1 i  
raie_1 I
\\I From:
From:             David Loveless To:                 Don Marksberry Date:             Thu, Jul 1, 2004 1:20 PM
David Loveless To:
Don Marksberry Date:
Thu, Jul 1, 2004 1:20 PM


==Subject:==
==Subject:==
Re: EOPs 40EP-9EO07, "Loss of Offsite Power/Loss of Forced Circulation," Revision 10 The copy I have has no place for a date.
Re: EOPs 40EP-9EO07, "Loss of Offsite Power/Loss of Forced Circulation," Revision 10 The copy I have has no place for a date.
            >>> Don Marksberry 07/01/04 12:04PM >>>
>>> Don Marksberry 07/01/04 12:04PM >>>
David, Just the title and date is all I need for the ASP report.
David, Just the title and date is all I need for the ASP report.
Thanks.
Thanks.
            >>> David Loveless 07/01/04 12:16PM >>>
>>> David Loveless 07/01/04 12:16PM >>>
Don, EOP 9, does direct the operators to start the GTGs and load them. I can send you a portion of the procedure, but I need your fax number again.
: Don, EOP 9, does direct the operators to start the GTGs and load them. I can send you a portion of the procedure, but I need your fax number again.
David
David
            >>> Don Marksberry 07/01/04 08:48AM >>>
>>> Don Marksberry 07/01/04 08:48AM >>>
David, Do the EOPs instruct the operators to ensure or request that GTG are started and loaded given an LOOP? I want to make sure that recovery of power is a single action and not two independent actions (i.e., GTG/swtichyard operators and control room operators). If it's in the EOPs, then a single XHE is sufficient.
: David, Do the EOPs instruct the operators to ensure or request that GTG are started and loaded given an LOOP? I want to make sure that recovery of power is a single action and not two independent actions (i.e., GTG/swtichyard operators and control room operators). If it's in the EOPs, then a single XHE is sufficient.
Do you have the EOPs handy that you could e-mail or send a copy to me?
Do you have the EOPs handy that you could e-mail or send a copy to me?
2HD}}
2HD}}

Latest revision as of 00:30, 16 January 2025

E-mail from David Loveless to Don Marksberry, Subject: EOPs
ML042960419
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/01/2004
From: David Loveless
NRC Region 4
To: Marksberry D
Office of Nuclear Regulatory Research
References
FOIA/PA-2004-0307
Download: ML042960419 (1)


Text

uay1a LoveieSS - Mie: t-urs ae i raie_1 i

\\I From:

David Loveless To:

Don Marksberry Date:

Thu, Jul 1, 2004 1:20 PM

Subject:

Re: EOPs 40EP-9EO07, "Loss of Offsite Power/Loss of Forced Circulation," Revision 10 The copy I have has no place for a date.

>>> Don Marksberry 07/01/04 12:04PM >>>

David, Just the title and date is all I need for the ASP report.

Thanks.

>>> David Loveless 07/01/04 12:16PM >>>

Don, EOP 9, does direct the operators to start the GTGs and load them. I can send you a portion of the procedure, but I need your fax number again.

David

>>> Don Marksberry 07/01/04 08:48AM >>>

David, Do the EOPs instruct the operators to ensure or request that GTG are started and loaded given an LOOP? I want to make sure that recovery of power is a single action and not two independent actions (i.e., GTG/swtichyard operators and control room operators). If it's in the EOPs, then a single XHE is sufficient.

Do you have the EOPs handy that you could e-mail or send a copy to me?

2HD