{{#Wiki_filter:TXU
{{#Wiki_filter:*1 Ab TXU Power TXU Power Comanche Peak Sleam Ekctric Station P. 0. Box 1002 (E1i)
            *1 Ab Power TXU Power           Mike Blevins Comanche Peak Sleam Senior Vice President &
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsbtxucom Mike Blevins Senior Vice President &
Ekctric Station     Chief Nuclear Officer P. 0. Box 1002 (E1i)
Chief Nuclear Officer Ref: GL 2006-01 CPSES-200600283 Log #TXX-06027 February 16, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Glen Rose, TX 76043                                                                                       Ref: GL 2006-01 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsbtxucom CPSES-200600283 Log #TXX-06027 February 16, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Line 30: Line 29:
This communication contains no new or revised licensing basis commitments.
This communication contains no new or revised licensing basis commitments.
Should you have any questions, please contact Mr. Bob Kidwell at (254) 897-5310.
Should you have any questions, please contact Mr. Bob Kidwell at (254) 897-5310.
A member of the STARS Strategic Teaming and Resource Sharing) Alliance A 4I Q" Callaway
A 4I Q" A member of the STARS Strategic Teaming and Resource Sharing) Alliance Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
Line 38: Line 37:


U '
U '
* TXX-06027 Page 2 of 2 I state under penalty of perjury that the foregoing is true and correct.
TXX-06027 Page 2 of 2 I state under penalty of perjury that the foregoing is true and correct.
Executed on 16 February, 2006 Sincerely, TXU Generation Company LP By:     TXU Generation Management Company LLC Its General Partner Mike Blevins By:     Hi       Gjl2K7Q1 Fred W. Madden Director, Regulatory Affairs RJK c -     B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES}}
Executed on 16 February, 2006 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By: Hi Gjl2K7Q1 Fred W. Madden Director, Regulatory Affairs RJK c -
B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES}}

Latest revision as of 11:28, 15 January 2025

30-Day Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications
ML060530381
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/16/2006
From: Blevins M, Madden F
TXU Generation Co, LP, TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200600283, GL-06-001, TXX-06027
Download: ML060530381 (2)


Text

  • 1 Ab TXU Power TXU Power Comanche Peak Sleam Ekctric Station P. 0. Box 1002 (E1i)

Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsbtxucom Mike Blevins Senior Vice President &

Chief Nuclear Officer Ref: GL 2006-01 CPSES-200600283 Log #TXX-06027 February 16, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 30-DAY RESPONSE TO NRC GENERIC LETTER 2006-01, "STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS" REF: TXU Power letter, logged TXX-05182, from Mike Blevins to the U. S. Nuclear Regulatory Commission, dated December 16, 2005.

Gentlemen:

By means of the above referenced. letter, TXU Generation Company LP (TXU Power) submitted License Amendment Request (LAR) 2004-010; "Application For Technical Specification Improvement Regarding Steam Generator Tube Integrity."

This LAR proposed a revised Steun Generator Technical Specification consistent with NRC-approved Revision 4 to Technical Specification Task Force (TSTF)

Standard Technical Specification Change Traveler, TSTF-449, "Steam Generator Tube Integrity."

This communication contains no new or revised licensing basis commitments.

Should you have any questions, please contact Mr. Bob Kidwell at (254) 897-5310.

A 4I Q" A member of the STARS Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

U '

TXX-06027 Page 2 of 2 I state under penalty of perjury that the foregoing is true and correct.

Executed on 16 February, 2006 Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC Its General Partner Mike Blevins By: Hi Gjl2K7Q1 Fred W. Madden Director, Regulatory Affairs RJK c -

B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES