ML060870166: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 12: Line 12:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:Committed to                                                               Palisades Nuclear Plant Operated by Nuclear Management Company, LLC March 21,2006                                                                      10 CFR 54 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Update of the Application for Renewed Operating License for the Palisades Nuclear Plant In a letter dated March 22,2005, Nuclear Management Company (NMC) submitted an Application for Renewed Operating License for the Palisades Nuclear Plant (LRA).
{{#Wiki_filter:Committed to March 21,2006 Palisades Nuclear Plant Operated by Nuclear Management Company, LLC 10 CFR 54 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Update of the Application for Renewed Operating License for the Palisades Nuclear Plant In a {{letter dated|date=March 22, 2005|text=letter dated March 22,2005}}, Nuclear Management Company (NMC) submitted an Application for Renewed Operating License for the Palisades Nuclear Plant (LRA).
Subsequent to submittal of an LRA, 10CFR54.21(b) requires that the application be updated annually to reflect changes to the Current Licensing Basis (CLB), since the time of submittal, that materially affect the LRA contents, including the Final Safety Analysis Report (FSAR) supplement.
Subsequent to submittal of an LRA, 10CFR54.21(b) requires that the application be updated annually to reflect changes to the Current Licensing Basis (CLB), since the time of submittal, that materially affect the LRA contents, including the Final Safety Analysis Report (FSAR) supplement.
NMC has completed a review of pertinent documentation. No changes to the CLB were identified that materially affect the LRA, including the FSAR Supplement. In addition, no changes were identified that would require an update to the Environmental Report submitted in conjunction with the LRA.
NMC has completed a review of pertinent documentation. No changes to the CLB were identified that materially affect the LRA, including the FSAR Supplement. In addition, no changes were identified that would require an update to the Environmental Report submitted in conjunction with the LRA.
Line 21: Line 23:
Summary of Commitments This letter contains no new commitments or revisions to existing commitments.
Summary of Commitments This letter contains no new commitments or revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 21, 2006.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 21, 2006.
Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC
Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC  


Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC License Renewal Project Manager, Palisades, USNRC}}
Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC License Renewal Project Manager, Palisades, USNRC}}

Latest revision as of 11:34, 15 January 2025

Annual Update of the Application for Renewed Operating License for the Palisades Nuclear Plant
ML060870166
Person / Time
Site: Palisades 
Issue date: 03/21/2006
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060870166 (2)


Text

Committed to March 21,2006 Palisades Nuclear Plant Operated by Nuclear Management Company, LLC 10 CFR 54 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Annual Update of the Application for Renewed Operating License for the Palisades Nuclear Plant In a letter dated March 22,2005, Nuclear Management Company (NMC) submitted an Application for Renewed Operating License for the Palisades Nuclear Plant (LRA).

Subsequent to submittal of an LRA, 10CFR54.21(b) requires that the application be updated annually to reflect changes to the Current Licensing Basis (CLB), since the time of submittal, that materially affect the LRA contents, including the Final Safety Analysis Report (FSAR) supplement.

NMC has completed a review of pertinent documentation. No changes to the CLB were identified that materially affect the LRA, including the FSAR Supplement. In addition, no changes were identified that would require an update to the Environmental Report submitted in conjunction with the LRA.

Please contact Mr. Robert Vincent, License Renewal Project Manager, at 269-764-2559, if you require additional information.

Summary of Commitments This letter contains no new commitments or revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 21, 2006.

Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC

Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC License Renewal Project Manager, Palisades, USNRC