ML100950468: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION ENCLOSURE(S) CONTAIN(S) | {{#Wiki_filter:SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION ENCLOSURE(S) CONTAIN(S) | ||
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTRO:_LED 10 CFR 50.54(p) | SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTRO:_LED 10 CFR 50.54(p) | ||
A | A subsidiary of Pinnack West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06158-DCMJDFH March 25, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 | ||
==Subject:== | ==Subject:== | ||
| Line 25: | Line 25: | ||
==Dear Sirs:== | ==Dear Sirs:== | ||
Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS)I ihereby submits Revision 12 of the Palo Verde Nuclear Generating Station Security Plan, Trijning and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel,Storage Installation Security Program (hereafter the Plan). This Plan implements Nuclear Energy Institute (NEI) 03-12, "Template for the Security Plan and Training Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program], Revision 6, dated April 2009. | |||
Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) | |||
APS applied for an exemption from the schedule requirement of 10 CFR Part 73, Physical Protection of Plants and Materials, paragraph 73.55(a)(1) for PVNGS Units 1, 2, and 3, pursuant to 10 CFR 73.5. On March 23, 2010, the Nuclear FRegulatory, Commission (NRC) approved the APS exemption request. The exemption is included in Revision 12 of the Plan. | APS applied for an exemption from the schedule requirement of 10 CFR Part 73, Physical Protection of Plants and Materials, paragraph 73.55(a)(1) for PVNGS Units 1, 2, and 3, pursuant to 10 CFR 73.5. On March 23, 2010, the Nuclear FRegulatory, Commission (NRC) approved the APS exemption request. The exemption is included in Revision 12 of the Plan. | ||
A member of the STARS (Strategic Teaming and Resource Sh .ring) Alliance Callaway . Comanche Peak | A member of the STARS (Strategic Teaming and Resource Sh.ring) Alliance Callaway. Comanche Peak | ||
* Diablo Canyon . Palo Verde | * Diablo Canyon. Palo Verde | ||
* San Onofre | * San Onofre | ||
* South Texas | * South Texas | ||
| Line 43: | Line 42: | ||
==Enclosures:== | ==Enclosures:== | ||
: 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 12 | : 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 12 | ||
: 2) 10 CFR 50.54(p) Table of Changes cc: | : 2) 10 CFR 50.54(p) Table of Changes cc: | ||
E. E. Collins. | cover letter only: | ||
E. E. Collins. | |||
J. R. Halt L. K. Gibson P. R. Frechette R. I. Treadway Region IV Administrator PVNGS Project Manager NRC NRR Project Manager Sr. Physical Security Inspector, RIV/DRS/PSB Sr. Resident Inspector ENCLOSURE(S) CONTAIN(S) | |||
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLI-D SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION}} | SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLI-D SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION}} | ||
Latest revision as of 05:45, 14 January 2025
| ML100950468 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/25/2010 |
| From: | Mims D Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| 102-06158-DCM/DFH | |
| Download: ML100950468 (2) | |
Text
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTRO:_LED 10 CFR 50.54(p)
A subsidiary of Pinnack West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06158-DCMJDFH March 25, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and '2-44 License No. NPF-41; NPF-51; NPF-74 PVNGS Security Plan, Training and Qualificiition Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revlsion'12
Dear Sirs:
Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS)I ihereby submits Revision 12 of the Palo Verde Nuclear Generating Station Security Plan, Trijning and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel,Storage Installation Security Program (hereafter the Plan). This Plan implements Nuclear Energy Institute (NEI) 03-12, "Template for the Security Plan and Training Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program], Revision 6, dated April 2009.
APS applied for an exemption from the schedule requirement of 10 CFR Part 73, Physical Protection of Plants and Materials, paragraph 73.55(a)(1) for PVNGS Units 1, 2, and 3, pursuant to 10 CFR 73.5. On March 23, 2010, the Nuclear FRegulatory, Commission (NRC) approved the APS exemption request. The exemption is included in Revision 12 of the Plan.
A member of the STARS (Strategic Teaming and Resource Sh.ring) Alliance Callaway. Comanche Peak
- Diablo Canyon. Palo Verde
- San Onofre
- South Texas
- Wolf Creek ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION ENCLOSURE(S)4 CONTAIN(S)
SAFEGUARDS tNFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLIED U.S. Nuclear Regulatory Commission PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 12 Page 2 APS has evaluated the Plan changes in accordance with 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in the effectiveness of the Plan.
6 No commitments are being made to the NRCGby this letter.
The material enclosed herewith &bntains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energ+ Act of 1954, as; amended. Should you have questions concerning this matter, please contact Chades H. Coles, Department Leader, Security Operations at 623-393-2736.
Sincerely, DCM/TNW/MNW/DFH
Enclosures:
- 1) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 12
- 2) 10 CFR 50.54(p) Table of Changes cc:
cover letter only:
E. E. Collins.
J. R. Halt L. K. Gibson P. R. Frechette R. I. Treadway Region IV Administrator PVNGS Project Manager NRC NRR Project Manager Sr. Physical Security Inspector, RIV/DRS/PSB Sr. Resident Inspector ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLI-D SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION