ML121000530: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 37: Line 37:
Clinton Power Station After Action Report/
Clinton Power Station After Action Report/
Improvement Plan Exercise Date - November 02, 2011 Radiological Emergency Preparedness (REP) Program
Improvement Plan Exercise Date - November 02, 2011 Radiological Emergency Preparedness (REP) Program
*IFEMA                     Published February01, 2012
*IFEMA Published February 01, 2012


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                       Clinton Power Station Clinton Power Station After Action Report/Improvement Plan Published February01, 2012 Contents Executive Summary                                                                                               5 Section 1: Exercise Overview                                                                                 10 1.1 Exercise Details                                                                     10 1.2 Exercise Plaining Team Leadership                                                   10 1.3 Participating Organizations                                                         12 Section 2: Exercise Design.Summary                                                                           15 2.1 Exercise Purpose-and Design                                                           15 2.2 Exercise'Objectives, Capabilities and Activities                                     15 2.3 Scenario Summary                                                                     16 Section 3: Analysis of Capabilities                                                                           17 3.1 Exercise Evaluation and Results                                                       17 3.2 Summary Results of Exercise Evaluation                           -                  18 3.3 Criteria Evaluation Summaries'                                                       24 3.3.1 Illinois Jurisdictions                                                         24
After Action Report/Improvement Plan Clinton Power Station Clinton Power Station After Action Report/Improvement Plan Published February 01, 2012 Contents Executive Summary 5
                /         3.3.1.1 State of illinois Initial Warning.Point                                   24 3.3.1.2 State of Illinois - State of.Illinois Response Center                     24 3.3.1.3 State of Illinois - Public Inquiry Phone Bank                             27 3.3.1.4 State of Illinois Radiological Emergency
Section 1: Exercise Overview 10 1.1 Exercise Details 10 1.2 Exercise Plaining Team Leadership 10 1.3 Participating Organizations 12 Section 2: Exercise Design.Summary 15 2.1 Exercise Purpose-and Design 15 2.2 Exercise'Objectives, Capabilities and Activities 15 2.3 Scenario Summary 16 Section 3: Analysis of Capabilities 17 3.1 Exercise Evaluation and Results 17 3.2 Summary Results of Exercise Evaluation 18 3.3 Criteria Evaluation Summaries' 24 3.3.1 Illinois Jurisdictions 24
                                                        -                                                  .28 Assessment Center 3.3.1.5 State of Illinois Unified Area Command                                     28 3.3.1.6 State of Illinois - Emergency Operations Facility                         29 3.3.1.7 State of Illinois - Joint Information Center                               29 3.3.1.8 State of Illinois - Radiological Assessment Field                         30 Team 3.3.1.9 State of Illinois- Joint Information Center/Media                         30 Briefing Center 3.3.1.10 State of Illinois - Mobile Laboratory                                     31 11
/
 
3.3.1.1 State of illinois Initial Warning.Point 24 3.3.1.2 State of Illinois - State of.Illinois Response Center 24 3.3.1.3 State of Illinois - Public Inquiry Phone Bank 27 3.3.1.4 State of Illinois - Radiological Emergency  
                                                      -.-        , .. :..Und~issifled.                 ,
.28 Assessment Center 3.3.1.5 State of Illinois Unified Area Command 28 3.3.1.6 State of Illinois - Emergency Operations Facility 29 3.3.1.7 State of Illinois - Joint Information Center 29 3.3.1.8 State of Illinois - Radiological Assessment Field 30 Team 3.3.1.9 State of Illinois-Joint Information Center/Media 30 Briefing Center 3.3.1.10 State of Illinois - Mobile Laboratory 31 1 1
Radiological *erýgency Prepareess Program (REP)                               :
:..Und~issifled.
ActionReport/lmprovement "After              Plan                                                                                   . ""      linton 1,',-',. Power Station 3.3.1.11 State of Illinois Field Moinitoing Team                                   -1                                           ,32 3.3.1.12 Stateof Illinois - Field Monitofing.,Team                                   - 2'         ..                              32 3.3.1.13 iState of.Illinois.-Dewitt County Emergency                                           .                                  33 Operations Center - Illinois State Radiological Advisor             "
Radiological *erýgency Prepareess Program (REP)  
                            .3.3.1.14 State: of Illinois -DewittCounty Emergency                                                                               33
"After ActionReport/lmprovement Plan 1,',-',.
                                          . perationsCenter Illinois State-Liaisoni 3.3.1.15 State of Illinois - Macon County Emergency                                                                                         I3 Operations Center - Illinois StateLiaison 3.3. 1.16 State of Illinois - McLean County. Emergency:                                                   -              ''34
linton Power Station 3.3.1.11 State of Illinois Field Moinitoing Team -1 32 3.3.1.12 Stateof Illinois - Field Monitofing.,Team - 2' 32 3.3.1.13 iState of.Illinois.- Dewitt County Emergency 33 Operations Center - Illinois State Radiological Advisor  
                                          *Qiefations Center-'Illinois State :Laisn>,
.3.3.1.14 State: of Illinois -DewittCounty Emergency 33
3.3.1.17 State of-Illinoi"_9Piatt County Emergency                                                       ,  -                    34 Operations. cent*rf--Illiniti                 State Liison                       ''                      "s 3.3'.11.18 S-tate'of Illinois -,Illinois Stat-ePolike District' 10:                                                               34 '
. perationsCenter - Illinois State-Liaisoni 3.3.1.15 State of Illinois - Macon County Emergency I3 Operations Center - Illinois StateLiaison 3.3. 1.16 State of Illinois - McLean County. Emergency:  
Headquarters 'Doisimetr CnrlOfficer Briefing 3:3.1.19. State of Illinois - I
''34
                                                'Headquarte~
*Qiefations Center-'Illinois State :Laisn>,
6is -State Pol1iceDistricto raffic and Acce*ss Control Post
3.3.1.17 State of-Illinoi"_9Piatt County Emergency 34 Operations. cent*rf--Illiniti State Liison "s
                                                                                                                      '10    "    '
3.3'.11.18 S-tate'of Illinois -,Illinois Stat-ePolike District' 10:
i    -1 35 U
34 Headquarters 'Doisimetr CnrlOfficer Briefing i
3.3.1.20 State ofIllinois-'St. Mary's Hospital, Medical                                                                       '-. 35
-1 3:3.1.19. State of Illinois - I 6is -State Pol1iceDistricto
                                          ,'ervice     -   ransportation               'I
'10 35 U
:.:i . '   : -  -  .  . 3:   '.1 ,   ýS at, .        .  ..        St.
'Headquarte~
                                                                        ?..:Joi-Mary's
raffic and Acce*ss Con trol Post 3.3.1.20 State ofIllinois-' St. Mary's Hospital, Medical  
                                                                          'L iio 'xr". Hosit-s ""}"Il , ,U p :ft i :qr' it } :     .,or.
'-. 35
on A              "    "*          3 6-lServi       c           -                                . Me                                                   36
,'ervice -
?(_''.:*:*i
ransportation  
:*,: }."3.0     .:;33 1,222 State[ of IliniiiosEvaue/      1l*.iihfois'st-at*
'I St. -Mary's Hosit-
egencyU~ii Worker tivsity/HoIeton -,: ,".,.-                         . 36 ":.5 ..-...
:.:i '
31.231 2State,ofIllinois*                       lino*is stateUniverityHorton.       H                                             37
3:  
            * "'            .3.3.12'tjflmis
'.1,  
* 5* 'Field HouiSe Eva}g                  llniSte eer EmergenyokUnverSity/Hi.
ýS at,.
Workert1if~!id"      n3 Decontamination oSf Equipme~nt :                           --i£::, ".             :I Field HouseEvacueeRegistration                                     ,          .
?..:Joi  
3.3.1.26 Stateolf Illinois-                       n                                                                               38 "FieldHouse'-CongregaiteCii~'.                     Cefkte'r       "              -
'L  
3.3.2 R~~iskJu!~r'isi tiosb'                                                         :                                              39       I 3.3.2.1
'xr". ""}"Il iio s
                                    .D 9         itt.Cbo' t -i itia'lWaringit                 Pint":-                                                       39 3..32.2 Dewitt County               -IEmergency           Operations Center                                                   40 3.3.2.3 Dewitt County - Emergency. Operations Center                                       -4 Traffic and Access Control Post
:ft
                                                                              .2 I
,,U p i
:qr' it } :  
.,or.
A on 3 6-lServi c
Me 36 Evaue/
egency Worker
? ''.:*:*i
(_ :*,: }."3.
3 0
1,
:;3 222 State[ of Iliniiios 1l*.iihfois'st-at* U~ii tiv sity/HoIeton -,:,".,.-  
. 36 ":.5..-...
31.231 2State,ofIllinois*
lino*is stateUniverityHorton.
37 H
5* 'Field HouiSe Eva}g eer Emergenyok Workert1if~!id"
.3.3.12'tjflmis llniSte UnverSity/Hi. n3 Decontamination oSf Equipme~nt :  
--i£::, ".
:I Field HouseEvacueeRegistration 3.3.1.26 Stateolf Illinois-38 n
" FieldHouse'-CongregaiteCii~'.
Cefkte' r 3.3.2 R~~iskJu!~r'isi tiosb' 39 I
3.3.2.1  
.D 9 itt.Cbo' t -i itia'lWaringit Pint":-
39 3..32.2 Dewitt County -IEmergency Operations Center 40 3.3.2.3 Dewitt County - Emergency. Operations Center -4 Traffic and Access Control Post
.2 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                     Clinton Power Station 3.3.2.4 Dewitt County - Clinton Police Department - Traffic                     42 and Access Control Post 3.3.2.5 Dewitt County - Clinton Police Department - Traffic                     43 and Access Control Post - Dosimetry Briefing 3.3.2.6 Dewitt County - EAS WJBC (1230), WBNQ                                   43 (101.5), WBWN (104.1) 3.3.2.7 Dewitt County - Clinton School District 15 -                           44 Evacuation School 3.3.2.8 Macon County - Initial Warning Point                                   44 3.3.2.9 Macon County - Emergency Operations Center.                             45 3.3.2.10 Macon County' Emergency Operations Center -                               45 Traffic and Access Control Post 3.3.2.11 McLean County - Initial Warning Point                                   46 3.3.2. 12 McLean County - Emergency Operations Center                             46 3.3.2.13 McLean County - Emergency Operations Center -                           47 Traffic and Access Control Post 3.3.2.14 Piatt County - Initial Warning Point                                     48 3.3.2.15 Piatt County - Emergency Operations Center                               48 3.3.2.16 Piatt County - Emergency Operations Center -                             49 Traffic and Access Control Post Section 4: Conclusion                                                                                       50 Appendix A: Improvement Plan                                                                               52 Appendix B: Exercise Timeline                                                                               53 Appendix C: Exercise Evaluators and Team Leaders                                                           56 Appendix D: Exercise Plan                                                                                   59 Appendix E: Scenario Details                                                                             ,85 3
After Action Report/Improvement Plan Clinton Power Station 3.3.2.4 Dewitt County - Clinton Police Department - Traffic 42 and Access Control Post 3.3.2.5 Dewitt County - Clinton Police Department - Traffic 43 and Access Control Post - Dosimetry Briefing 3.3.2.6 Dewitt County - EAS WJBC (1230), WBNQ 43 (101.5), WBWN (104.1) 3.3.2.7 Dewitt County - Clinton School District 15 -
44 Evacuation School 3.3.2.8 Macon County - Initial Warning Point 44 3.3.2.9 Macon County - Emergency Operations Center.
45 3.3.2.10 Macon County' Emergency Operations Center -
45 Traffic and Access Control Post 3.3.2.11 McLean County - Initial Warning Point 46 3.3.2. 12 McLean County - Emergency Operations Center 46 3.3.2.13 McLean County - Emergency Operations Center -
47 Traffic and Access Control Post 3.3.2.14 Piatt County - Initial Warning Point 48 3.3.2.15 Piatt County - Emergency Operations Center 48 3.3.2.16 Piatt County - Emergency Operations Center -
49 Traffic and Access Control Post Section 4: Conclusion 50 Appendix A: Improvement Plan 52 Appendix B: Exercise Timeline 53 Appendix C: Exercise Evaluators and Team Leaders 56 Appendix D: Exercise Plan 59 Appendix E: Scenario Details  
,85 3


                                                          -Unclassified Radiological Emergency Preparednress Program (REP)
-Unclassified Radiological Emergency Preparednress Program (REP)
After Action Report/Improvement Plan                                                           Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
                              'A   -?
'A  
This page is intentionallyblank 7'4 4               ! * - .
-?
This page is intentionallyblank 7'4 4  


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station EXECUTIVE  
After Action Report/Improvement Plan Clinton Power Station EXECUTIVE  


==SUMMARY==
==SUMMARY==
On November 2, 2011, a Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise was evaluated by the U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA) for the 10-mile Emergency Planning Zone (EPZ) around the Clinton Power Station (CPS). The purpose of the exercise was to assess the capabilities of the State and local preparedness in responding to a radiological emergency.
On November 2, 2011, a Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise was evaluated by the U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA) for the 10-mile Emergency Planning Zone (EPZ) around the Clinton Power Station (CPS). The purpose of the exercise was to assess the capabilities of the State and local preparedness in responding to a radiological emergency.
This exercise was held in accordance with DHS/FEMA's policies and guidance concerning the exercise of State and local Radiological Emergency Response Plans (RERPs) and procedures.
This exercise was held in accordance with DHS/FEMA's policies and guidance concerning the exercise of State and local Radiological Emergency Response Plans (RERPs) and procedures.
Line 93: Line 123:
Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities.
Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities.
Cooperation and teamwork on the part of all the participants were evident during this exercise.
Cooperation and teamwork on the part of all the participants were evident during this exercise.
This Final After Action Report (AAR)/Improvement Plan (IP) contains the evaluation of the biennial exercise and the evaluation of the following out-of-sequence interviews and activities; "Illinois State Police (ISP) District 10 Headquarters Dosimetry Control Officers (DCO) Briefing; "ISP Traffic and Access Control Post (TACP) at the ISP District 10 Headquarters;
This Final After Action Report (AAR)/Improvement Plan (IP) contains the evaluation of the biennial exercise and the evaluation of the following out-of-sequence interviews and activities;
" Illinois State Police (ISP) District 10 Headquarters Dosimetry Control Officers (DCO) Briefing;
" ISP Traffic and Access Control Post (TACP) at the ISP District 10 Headquarters;
* Medical Services Transportation and Hospital (MS-i) evaluation at St Mary's Hospital;
* Medical Services Transportation and Hospital (MS-i) evaluation at St Mary's Hospital;
*Protective Actions for Schools (EV-2) for the Clinton School District 15;
* Protective Actions for Schools (EV-2) for the Clinton School District 15;
*Monitoring and Decontamination of evacuees and emergency workers; "Monitoring and Decontamination of emergency worker's equipment; "Public Registration and Congregate Care; "Clinton Police Department DCO Briefing; "Clinton Police Department TACP.
* Monitoring and Decontamination of evacuees and emergency workers;
" Monitoring and Decontamination of emergency worker's equipment;
" Public Registration and Congregate Care;
" Clinton Police Department DCO Briefing;
" Clinton Police Department TACP.
5
5


Unclassified Radiological Emergency Prep'airedness Program (REP)
Unclassified Radiological Emergency Prep'airedness Program (REP)
After Action ReporL/improvement Plan                                                                     ... Clinton Power Station Except where noted in this'repori, the State rand local oxganizaiions dermonstrated knowledge of and adequately implemented their emergency response plans and procedures.
After Action ReporL/improvement Plan Clinton Power Station Except where noted in this'repori, the State rand local oxganizaiions dermonstrated knowledge of and adequately implemented their emergency response plans and procedures.
INTRODUCTION - EXERCISE BASIS                                 ..            .
INTRODUCTION - EXERCISE BASIS On Deceberib7, 1979, the Prsiddeht directed FEMA to assume the leadresponsibility for all offsite nuclear m
On Deceberib7, 1979, the Prsiddeht directed FEMA to assume the leadresponsibility for all offsite nuclear planng   m      and response. the-DHs/EMA's           EtoA actities are cnfictcd p ursuiFit Title .44 of the Code of Fedefal :Regulafins'(CfFR) Parts 350 "Rev6ieik'and' Approva', no*' S""state Local Radiolog cal E rgehy*yF~mr*,nc        PPlns        Prepa.redness3/4-,35 "Raidog"
planng and response. the-DHs/EMA's actities are cnfictcd p ursuiFit EtoA Title.44 of the Code of Fedefal :Regulafins'(CfFR) Parts 350 "Rev6ieik 'and' Approva' o*' S""state and Local Radiolog cal E rgehy* y P d. and Prepa.redness3/4 -,35 a1 mloe n
: d. and Preare-iess,                               - *, a ---
I ilni F~mr*,nc Plns Preare-iess, "Raidog" a Ernr"e Planning and Preparedness" and 352 "Commercial NuclearT Power Plants: Emergency Preparedness Pleig  
a1 mloe      ...
.gu on are, au I~
Ernr"e and ilni
Planning (Comnmionly referred to as 44 CFR 350 thiough 352). Thes' r' lati.n'` ae a key element in the REP Program that wass established following theThreeMile Island.Nudlear Station accident in March,1979.
                                                                                                                        .Planning       I and Preparedness" and 352 "Commercial NuclearT Power Plants: Emergency Preparedness Pleig Planning (Comnmionly referred to as 44 CFR 350 thiough 352). Thes' r' lati.n'` ae a key
FEMARegulation'44,,,  
                                        .gu on are,au                  I~
,R,,v
element in the REP Program that wass established following theThreeMile Island.Nudlear Station accident in March,1979.                                                                                               -
'350 establishes the policies and.procediuies for DiS/FEiA'§ iitial and continued approvglrnof State. and lc g  
                  ,R,,v FEMARegulation'44,,,         ,       '350 establishes the policies and .procediuies for DiS/FEiA'§ iitial and continued approvglrnof State. and lc g                                                     -em-ergency planning and preparedness Tor commercial nuclear power plants. This approval is cOntingent;,in part, on State and local governments' participation n jpint exetcises                           uith licensees' -
-e m-ergency planning and preparedness Tor commercial nuclear power plants. This approval is cOntingent;,in part, on State and local governments' participation n jpint exetcises uith licensees' -
DHS/FEMA s responsibilities in radiloogical emergency -planningfor fixed nuclear facilities
DHS/FEMA s responsibilities in radiloogical emergency -planning for fixed nuclear facilities
-include         folwng "the 1             .-
-include "the 1 folwng 0.,
0.,
* angth ladmofs~e~megec-planin'g'and rathe-`reiwewand evaluat'n of RERPs and proce ures developed by state and local governments,'
* angthladmofs~e~megec-planin'g'and rathe-`reiwewand evaluat'n of RERPs and                                                 ..
D.Determining whether such plans and procedures can be.mplemented.  
proce ures developed by state and local governments,'
"the basis ofobservatin and evaluation of exercises of the plans and pr6cedures conductedby State and local 2
D.Determining whether such plans and procedures can be.mplemented.                                   "thebasis ofobservatin and evaluation of exercises of the plans and pr6cedures 2conductedby State and local                                                     I governments;,         " " .......                                            .      ..
II governments;,
he Uceri(gulat                   mis   £(NfC) piirsuanto II Responding to requests by the U.S.Nuclear Regulatory.'Comission                                                       to the Memorandum of Understanding bieteen the NRC and FEMA dated Jtihe 17,- 1993, (Federal Register, Vol. 58, No. 176, September 14, 1993); and                             -                    .
II he Uce ri(gulat mis  
* Coordinating the activities of Federal agencies with responsibilities in the radiological                                             3 6                                                                     3
£(NfC) piirsuanto Responding to requests by the U.S.Nuclear Regulatory.'Comission to the Memorandum of Understanding bieteen the NRC and FEMA dated Jtihe 17,- 1993, (Federal Register, Vol. 58, No. 176, September 14, 1993); and
* Coordinating the activities of Federal agencies with responsibilities in the radiological 3
6 3


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station emergency planning process:
After Action Report/Improvement Plan Clinton Power Station emergency planning process:
- U.S. Department of Agriculture;
- U.S. Department of Agriculture;
- U.S. Department of Commerce;
- U.S. Department of Commerce;
- U.S. Department of Energy;
- U.S. Department of Energy;
- U.S. Department of Health and Human Services;
- U.S. Department of Health and Human Services;
Line 135: Line 173:
The findings presented in this AAR/IP are based on the evaluations of the Federal evaluation team, with final determinations madeby the DHS/FEMA Region V RAC Chairperson, and approved by the DHS/FEMA Headquarters.
The findings presented in this AAR/IP are based on the evaluations of the Federal evaluation team, with final determinations madeby the DHS/FEMA Region V RAC Chairperson, and approved by the DHS/FEMA Headquarters.
The criteria utilized in the FEMA evaluation process are contained in:,
The criteria utilized in the FEMA evaluation process are contained in:,
* NUREG-0654/FEMA-REP- 1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980; 7,
* NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980; 7,


Unclassified Radiological Emergency Preparedness Program (RE.P)
Unclassified Radiological Emergency Preparedness Program (RE.P)
After Action Report/Improvement Plan                                                         . ClintonPower Station FEMA-REP- 14, "Radiological Emergency Preparedness Exercise Manual," September 1991; and                                                                                       . - .: ,
After Action Report/Improvement Plan ClintonPower Station FEMA-REP-14, "Radiological Emergency Preparedness Exercise Manual," September 1991; and
* FEMA "Radiological Emergency Preparedness: Exercise Evaluation Methodology; Notice" as
* FEMA "Radiological Emergency Preparedness: Exercise Evaluation Methodology; Notice" as
.published in the Federal Register Notice, Vol: 67, No.-80, dated-April 25,ý2002..
.published in the Federal Register Notice, Vol: 67, No.-80, dated-April 25,ý2002..
Section. 1 of this report, entitled "Exercise Overview," presents information pertaining to the team that planned and coordinated the exercise. This section also provides a.listing of all participating jurisdictions and functional entities that were evaluated.,
Section. 1 of this report, entitled "Exercise Overview," presents information pertaining to the team that planned a nd coordinated the exercise. This section also provides a.listing of all participating jurisdictions and functional entities that were evaluated.,
Section 2 of this report, entitled "Exercise Design Summary," contains the-purpose and'design of the exercise and presents basic information and data rele'ant to the exercise scenario.
Section 2 of this report, entitled "Exercise Design Summary," contains the-purpose and'design of the exercise and presents basic information and data rele'ant to the exercise scenario.
Section'3 of this report, entitled "Analysis of Capabilities,". presents detailed information on the
Section'3 of this report, entitled "Analysis of Capabilities,". presents detailed information on the
*demonstration of 'ppiicabie exercise ýcriteria at eaach iusdiction or functional, entity evaluated in                   3 a jurisdiction4based; issiies-onIlyformrt. -This section also contains:,(1)idescriptions ofal             ai Deficiencies, Areas Requiring Corrective Acti6fi,(-ACAs)ý and Plan Issu.es if any; assessed, during this exercise, recommended corrective actions, an*t the State and local governments'                             I
*demonstration of 'ppiicabie exercise ýcriteria at eaach iusdiction or functional, entity evaluated in 3
a jurisdiction4based; issiies-onIlyformrt. -This section also contains:,(1)idescriptions ofal ai Deficiencies, Areas Requiring Corrective Acti6fi,(-ACAs)ý and Plan Issu.es if any; assessed, during this exercise, recommended corrective actions, an*t the State and local governments' I
:.schedule of correctiv.e a tions, if applicabIe, for each idefntifiedexe*rcise issue; and (Q).
:.schedule of correctiv.e a tions, if applicabIe, for each idefntifiedexe*rcise issue; and (Q).
edscriptions ofuresolvedARCAss' sssd during previo*,s xercises an.d the status. of th&..
edscriptions ofuresolvedARCAss' sssd during previo*,s xercises an.d the status. of th&..
OROs' .ffbrts to.resolve'them..                  -.    ,                -      .
OROs'.ffbrts to.resolve'them..
Section 4 of this report, entitled ".Conclusion," presents. the DHS/FEMA summary of overall exercise conduct and results as evaluated, against the'requirements of 4,4.CFR 350.
Section 4 of this report, entitled ".Conclusion," presents. the DHS/FEMA summary of overall exercise conduct and results as evaluated, against the'requirements of 4,4.CFR 350..
EMERGENCY PLANNING ZONE (EPZ). DESCRIPTION,:,                                           ,.
EMERGENCY PLANNING ZONE (EPZ). DESCRIPTION,:,
The CPS is located approximately seven miles northeast of the City of Clinton in Harp Township, within DeWitt County, Illinois. DeWitt County is located near the geographical-center of the State of Illinois. The topography of the area is predominantly rolling prairies.
The CPS is located approximately seven miles northeast of the City of Clinton in Harp Township, within DeWitt County, Illinois. DeWitt County is located near the geographical-center of the State of Illinois. The topography of the area is predominantly rolling prairies.
The I0-mile EPZ.contains a total population of 12,702 (20.10 census) within the risk county of DeWitt, and the support counties of Macon, McLean and Piatt. Nearly two-thirds of the total 10-8
The I 0-mile EPZ.contains a total population of 12,702 (20.10 census) within the risk county of DeWitt, and the support counties of Macon, McLean and Piatt. Nearly two-thirds of the total 10-8


Unclassified Radiological E'mergency Preparedness Program (REP)
Unclassified Radiological E'mergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station mile EPZ population (8,576) resides in the communities of Clinton, Weldon, Wapella and DeWitt. The land use within the 10-mile EPZ is predominantly agricultural, with cash grain crops of corn and soybeans. The closest industries are located in the community of Clinton.
After Action Report/Improvement Plan Clinton Power Station mile EPZ population (8,576) resides in the communities of Clinton, Weldon, Wapella and DeWitt. The land use within the 10-mile EPZ is predominantly agricultural, with cash grain crops of corn and soybeans. The closest industries are located in the community of Clinton.
Recreational, facilities outside the municipalities include the Clinton Lake State Recreation Area and the Weldon Springs State Park. The park encompasses approximately 370 acres and contains a 28-acre lake with camping, fishing, and picnicking facilities. Weldon Springs is one of the two sizeable lakes within 10 miles of the site. Clinton Lake is a 4,895 acre man-made, cooling lake within the CPS property lines. Recreational facilities accommodate camping, boating, hunting, fishing and hiking.
Recreational, facilities outside the municipalities include the Clinton Lake State Recreation Area and the Weldon Springs State Park. The park encompasses approximately 370 acres and contains a 28-acre lake with camping, fishing, and picnicking facilities. Weldon Springs is one of the two sizeable lakes within 10 miles of the site. Clinton Lake is a 4,895 acre man-made, cooling lake within the CPS property lines. Recreational facilities accommodate camping, boating, hunting, fishing and hiking.
The nearest major highways are State Highways 54,. 10, and 48, all of which intersect the plant location. Other major thoroughfares are U.S. Highway 51, located about six miles west of the plant and Interstate Highway 74, located about 11 miles northeast of the plant. The nearest railroad is the Illinois Central Gulf Railroad (ICG), which crosses the site east to west and comes Within about three-fourths of a mile to the north of the reactor centerline. Another ICG track is located approximately three and a half miles south of the CPS.
The nearest major highways are State Highways 54,. 10, and 48, all of which intersect the plant location. Other major thoroughfares are U.S. Highway 51, located about six miles west of the plant and Interstate Highway 74, located about 11 miles northeast of the plant. The nearest railroad is the Illinois Central Gulf Railroad (ICG), which crosses the site east to west and comes Within about three-fourths of a mile to the north of the reactor centerline. Another ICG track is located approximately three and a half miles south of the CPS.
9                                               -J
9  
-J


Unclassified
Unclassified
* Radiological Emergency. Preparedness Program.(REP)
* Radiological Emergency. Preparedness Program.(REP)
After Action Report/Improvement Plan                                                                   -Clinton Power Station
After Action Report/Improvement Plan  
                                                                                                                              !I SECTION 1:' EXERCISE OVERVIEW, 1.1 Exercise Details.
-Clinton Power Station
!I SECTION 1:' EXERCISE OVERVIEW, 1.1 Exercise Details.
Exercise.Name
Exercise.Name
                      -,, . *...~~~~~~~~~~~~.*.;. '..*....... i.....-...'i;.'".;..           '' '.,*,
&Qlinton Power Station
        &QlintonPower Station
-,,. * ~~~~~~~~~~~~.*.
      '. Type of.Exercise Plume Exercise Date November 02, 2011                                                                                                   1 Program ofHome'land Securit /FEMA Radiological Emergen&y Preparedess e mnt                                                                                                  3 Programn-                                                                               "
i.....-...'i;.'".;..  
Seen ario.Type Radiological Emergency 1.2 Exercise Planning Team Leadership                                                 "-
'. Type of.Exercise Plume Exercise Date November 02, 2011 1
William King ExefcisetRAC Chairperson DHS/FEMA Radiological Assistance Committee, Chairman 536 South Clark Street Chicago, Illinois, 60605 312-408-:5575 Wiiliam.King@dhs.gov Dwaine Warren Exercise Director DHS/FEMA Supervisory REP Team Leader                                                                                         3 536 South Clark Street 1*0                                                       I I
Program e mnt ofHome'land Securit /FEMA Radiological Emergen&y Preparedess 3
Programn-Seen ario.Type Radiological Emergency 1.2 Exercise Planning Team Leadership William King ExefcisetRAC Chairperson DHS/FEMA Radiological Assistance Committee, Chairman 536 South Clark Street Chicago, Illinois, 60605 312-408-:5575 Wiiliam.King@dhs.gov Dwaine Warren Exercise Director DHS/FEMA Supervisory REP Team Leader 3
536 South Clark Street 1*0 I
I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station Chicago, Illinois, 60605 312-408-5342 Dwaine.Warren@dhs.gov Gary Naskrent Alternate Exercise Director DHS/FEMA Supervisory REP Team Leader 536 South Clark Street Chicago, Illinois, 60605 312-408-5214 Gary.Naskrent@dhs.gov Todd Gemskie Clinton Site Specialist/Exercise Coordination DHS/FEMA Technical Hazards Program Specialist 536 South Clark Street Chicago, Illinois, 60605 312-408-4443 Todd.Gemskie@dhs.gov William Conway State Lead Controller Illinois Emergency Management Agency Manager,. REP Section 1035 Outer Park Drive (1st floor)
After Action Report/Improvement Plan Clinton Power Station Chicago, Illinois, 60605 312-408-5342 Dwaine.Warren@dhs.gov Gary Naskrent Alternate Exercise Director DHS/FEMA Supervisory REP Team Leader 536 South Clark Street Chicago, Illinois, 60605 312-408-5214 Gary.Naskrent@dhs.gov Todd Gemskie Clinton Site Specialist/Exercise Coordination DHS/FEMA Technical Hazards Program Specialist 536 South Clark Street Chicago, Illinois, 60605 312-408-4443 Todd.Gemskie@dhs.gov William Conway State Lead Controller Illinois Emergency Management Agency Manager,. REP Section 1035 Outer Park Drive (1st floor)
Springfield, Illinois, 62704 217-785-9886 William.Conway@Illinois.gov Jerry DeYoung Lead Offsite Controller 11
Springfield, Illinois, 62704 217-785-9886 William.Conway@Illinois.gov Jerry DeYoung Lead Offsite Controller 11


R .   *Unclassified Radiological Emergency Preparedriess Program (REP)
I R.
Clinton Power Station I
*Unclassified Radiological Emergency Preparedriess Program (REP)
_,After.Action Report/Improvement Plan Exelon Offsite Programs 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4666 gerald.deyoung@exeloncorp.com Mike Muth Lead Offsite Planner Exelon I
_,After.Action Report/Improvement Plan Clinton Power Station Exelon Offsite Programs 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4666 gerald.deyoung@exeloncorp.com Mike Muth Lead Offsite Planner Exelon Offsite Programs 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4674 mike.muth@exeloncorp.com Randy Mika Lead Exercise Scenario Developer Exelon Corporate Drill and Exercise Coordinatc 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4662 randy.mike@exeloncorp.com r
Offsite Programs 4300 Winfield Road I
I I
Warrenville, Illinois, 60555 630-657-4674                                                                                       I mike.muth@exeloncorp.com I
I I
Randy Mika Lead Exercise Scenario Developer r
I i
I Exelon Corporate Drill and Exercise Coordinatc 4300 Winfield Road i
I I
Warrenville, Illinois, 60555 630-657-4662 I
I I
randy.mike@exeloncorp.com I
13 Participating Organizations,
13 P articipating Organizations ,
Agencies and organizations of the following jurisdictions participated in the Clinton Power Station exercise:
Agencies and organizations of the following jurisdictions participated in the Clinton I
State Jurisdictions Mutual Aid Box Alarm System (MABAS) 7 Illinois State Police Illinois National Guard 12
Power Station exercise:
State Jurisdictions I
Mutual Aid Box Alarm System (MABAS)                           7 Illinois State Police Illinois National Guard 12


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                     Clinton Power Station Illinois Environmental Protection Agency Illinois Emergency Management Agency Illinois Department onAging Illinois Department of Transportation Illinois Department of Public Health Illinois Department.of Natural Resources,                         .
After Action Report/Improvement Plan Clinton Power Station Illinois Environmental Protection Agency Illinois Emergency Management Agency Illinois Department onAging Illinois Department of Transportation Illinois Department of Public Health Illinois Department.of Natural Resources, Illinois Department of Agriculture Illinois Central Management System Exelon Nuclear Risk Jurisdictions American Red Cross ARES/RACES Volunteer Chief of Police City of Decatur Mayor Clinton Police Department Decatur Fire Department Decatur Medical Hospital DeWitt - Piatt Bi-County Health Department DeWitt County Coroner DeWitt County Sheriffs Office Central Communications (CEN COM)
Illinois Department of Agriculture Illinois Central Management System Exelon Nuclear Risk Jurisdictions American Red Cross ARES/RACES Volunteer Chief of Police City of Decatur Mayor Clinton Police Department Decatur Fire Department Decatur Medical Hospital DeWitt - Piatt Bi-County Health Department DeWitt County Coroner DeWitt County Sheriffs Office Central Communications (CEN COM)
Exelon Nuclear IEMA State Liaison Regent Communications - Bloomington [WBNQ (101.5), WBWN (104.1), WJBC (1230)]
Exelon Nuclear IEMA State Liaison Regent Communications - Bloomington [WBNQ (101.5), WBWN (104.1), WJBC (1230)]
St. Mary's Hospital Wapella Mayor Weldon Mayor Support Jurisdictions Illinois Emergency Management Agency Liaisons Macon County Board Chairperson Macon County Highway Macon County Mental Health Macon County Public Health Macon County Sherriffs Office 13
St. Mary's Hospital Wapella Mayor Weldon Mayor Support Jurisdictions Illinois Emergency Management Agency Liaisons Macon County Board Chairperson Macon County Highway Macon County Mental Health Macon County Public Health Macon County Sherriffs Office 13


                                      *. R ,.                Unclassified .
I R
                                          *RadioJogical EmergencyPreparednres Program. (REP)
Unclassified.
I
*RadioJogical EmergencyPreparednres Program. (REP)
. After Action Report/Improvement Plan                                         '                *Clinton Power Station
. After Action Report/Improvement Plan
                  .Macon County Sherriffs Telecommunrications Specialist.
* Clinton Power Station
I McLean County Administrator-Mclean County Emergency Management Agency McLean County Health Department McLean County METCOM I
.Macon County Sherriffs Telecommunrications Specialist.
McLean County Sheriffs Office.:
McLean County Administrator-Mclean County Emergency Management Agency McLean County Health Department McLean County METCOM McLean County Sheriffs Office.:
Piatt County Commissioner`                     ,
Piatt County Commissioner `  
                                                                              .. /
.. /
I Piatt County Emergency Management Agency Coordinator.
Piatt County Emergency Management Agency Coordinator.
Piatt County EOC Administrative Staff                                                             I Piatt County Highway Engineer Piatt County Public nformation Officer Piatt County Sheriff-I Piatt County. Sheriffs Deputy/Security and TACP I
Piatt County EOC Administrative Staff Piatt County Highway Engineer Piatt County Public nformation Officer Piatt County Sheriff-Piatt County. Sheriffs Deputy/Security and TACP I
I I
I I
1 I
1 I
I I
I I
I I
I I
14                                                    1 I
I 1
I 14


Unclassified ,
Unclassified,
Radiological Emergency Preparedness Program (REP)
Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station SECTION 2: EXERCISE DESIGN  
After Action Report/Improvement Plan Clinton Power Station SECTION 2: EXERCISE DESIGN  


==SUMMARY==
==SUMMARY==
2.1 Exercise Purpose and Design.
2.1 Exercise Purpose and Design.
The DHS/FEMA Region V Office evaluated the CPS REP Full Participation Plume Exposure Pathway Exercise conducted on November 2, 201 1, to assess the capabilities of local emergency preparedness organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the CPS. The purpose of this report is to present the results and findings on the performance of the OROs during a simulated radiological emergency.
The DHS/FEMA Region V Office evaluated the CPS REP Full Participation Plume Exposure Pathway Exercise conducted on November 2, 201 1, to assess the capabilities of local emergency preparedness organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the CPS. The purpose of this report is to present the results and findings on the performance of the OROs during a simulated radiological emergency.
Line 223: Line 265:
* ORO demonstration of effective Emergency Operations Management;
* ORO demonstration of effective Emergency Operations Management;
* ORO demonstration of effective Protective Action Decision Making;
* ORO demonstration of effective Protective Action Decision Making;
* ORO demonstration of effective Protective Action Implementation; "ORO demonstration of effective Field Measurement and Analysis;
* ORO demonstration of effective Protective Action Implementation;
* ORO demonstration of effective Emergency Notification and Public Information; "ORO demonstration of effective Support Operations and Facilities.
" ORO demonstration of effective Field Measurement and Analysis;
* ORO demonstration of effective Emergency Notification and Public Information;
" ORO demonstration of effective Support Operations and Facilities.
15
15


                                                            ""Unclassified       .
""Unclassified Aftr
Aftr                    " "Radiological             Emergenicy Preparedness Program (REP)                                 l   o   S After ActiorRePOrt/hmprovement Plan,                                                           ..    ,    .*    ,Clinton     Power Station 2.3- Scenario Summary                                             ..                                            ..
" "Radiological Emergenicy Preparedness Program (REP) l o
Appendix F "Scenario Details," contains a summafof th&Exe-rcise.Scenarib, aSi, inlated",
S After ActiorRePOrt/hmprovement Plan,  
sequence of events that was used as the basis for invoking emergency response actions by OROs                                                 I during the CPS REP Full Participation Piuimie Exposuri Pathway 6ixefciseon Noovember 2'.2011.
,Clinton Power Station 2.3-Scenario Summary Appendix F "Scenario Details," contains a summafof th& Exe-rcise.Scenarib, aSi, inlated",
Resulsi of a technical review of the scenario; submitted bythe State of Illinois                               1and Exenlon' W t Nuclear"on     September 1, 201 1, indicated that the'scenifri wasadequate tosupp*6rt demonstration of DHS/FEMA requrementsas well ascriteria selected by the OROs prvided in3 the State's September 17, 2011, extent-of-play submission. The DHS/FEMA Region 'V accepted this:exercise scenario on September 29, 2011..                               w<
sequence of events that was used as the basis for invoking emergency response actions by OROs I
.During the exercise, in addition to information and data provided throuagh the CPS onsite scenai       contllersfrom             eState of Ihnos prdedinject messages" containing scenario                                             1 events and/or relevant data to those persons or locations                       fho w!ould fiormiall-yreceive notification of such events. These inject messages were the method used for invoking-additional specific-response actio0ns byOROs,.-                     .
during the CPS REP Full Participation Piuimie Exposuri Pathway 6ixefciseon Noovember 2'.2011.
Resulsi of a technical review of the scenario; submitted bythe State of Illinois 1and Exenlon' W tNuclear" on September 1, 201 1, indicated that the'scenifri wasadequate tosupp*6rt demonstration of DHS/FEMA requrementsas well ascriteria selected by the OROs prvided in3 the State's September 17, 2011, extent-of-play submission. The DHS/FEMA Region 'V accepted this:exercise scenario on September 29, 2011..
w<
.During the exercise, in addition to information and data provided throuagh the CPS onsite scenai contllersfrom eState of Ihnos prdedinject messages" containing scenario 1
events and/or relevant data to those persons or locations fho w!ould fiormiall-yreceive notification of such events. These inject messages were the method used for invoking-additional specific-response actio0ns byOROs,.-
I
I
                                                ""  .,    ?                         ".'    "I                                 ,
?  
"I I
,I v..
I
I
                                                                                          .. .. ,        ..                      v..
_163 I
                            * *        ,I                                                            '"."
I I
_163


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the November 2, 2011, REP Full Participation Plume Exposure Pathway Exercise conducted to test the offsite emergency response capabilities of State and local governments in the 10-mile EPZ surrounding the CPS.
After Action Report/Improvement Plan Clinton Power Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the November 2, 2011, REP Full Participation Plume Exposure Pathway Exercise conducted to test the offsite emergency response capabilities of State and local governments in the 10-mile EPZ surrounding the CPS.
Each jurisdiction and functional entity was evaluated based on its demonstration of exercise criteria delineated in Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002. Detailed information on the exercise criteria and the extent-of-play agreements used in this exercise are found in Appendix E "Exercise Plan" of this report.
Each jurisdiction and functional entity was evaluated based on its demonstration of exercise criteria delineated in Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002. Detailed information on the exercise criteria and the extent-of-play agreements used in this exercise are found in Appendix E "Exercise Plan" of this report.
Presented below are definitions of the terms used in this report relative to the criteria demonstration status:
Presented below are definitions of the terms used in this report relative to the criteria demonstration status:
Line 248: Line 295:
* D - Deficiency: An observed or identified inadequacy of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant.
* D - Deficiency: An observed or identified inadequacy of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant.
* A - Area Requiring Corrective Action - An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety. Listing of the demonstrated exercise criteria under which one or more ARCAs was/were assessed during the current exercise or ARCAs assessed during prior exercises remain unresolved. Included is a description of any ARCAs assessed during this exercise and the recommended corrective action to be demonstrated before or during the next-biennial exercise.
* A - Area Requiring Corrective Action - An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety. Listing of the demonstrated exercise criteria under which one or more ARCAs was/were assessed during the current exercise or ARCAs assessed during prior exercises remain unresolved. Included is a description of any ARCAs assessed during this exercise and the recommended corrective action to be demonstrated before or during the next-biennial exercise.
- P - Plan Issue - An observed or identified inadequacy in the ORO's emergency plan or
- P - Plan Issue - An observed or identified inadequacy in the ORO's emergency plan or
                                                            .17
.17


After Action. Report/improvement Plan Unclassified Radiological Emergency Prepar~dness Progriam (REP)
Unclassified Radiological Emergency Prepar~dness Progriam (REP)
                                                                                                          .. ,,,-.Clinton Power Station I
After Action. Report/improvement Plan I
implementing procedures, rather than in the ORO's performance.
..,,,-.Clinton Power Station implementing procedures, rather than in the ORO's performance.
  * -Not Demonstrated - Exercise criteria thai were dt demonsatedas s.hediuldd4uing this I
* N -Not Demonstrated - Exercise criteria thai were dt demonsatedas s.hediuld d4uing this exercise and the reason(s) they were not demonstrated.
N exercise and the reason(s) they were not demonstrated.                                                                                 I
* Prior ARCAs - Resolved - Descriptionsbof ARCAs assessed during previohs exerciseslthatwere resolved and the corrective actions demonstiated,: in'this exercise. - '
*Prior ARCAs - Resolved - Descriptionsbof ARCAs assessed during previohs exerciseslthatwere resolved and the corrective actions demonstiated,: in'this exercise. -
J
                                                  .t-       J I
.t-  
                                                                = -.                      --
=
*Prior ARCAS - Unresolved - Descriptions of ARCAs assessed during prior exercises that Were                                             I not resolved in this exercise. Included is the reason the ARCA remains unresolved and:.
* Prior ARCAS - Unresolved - Descriptions of ARCAs assessed during prior exercises that Were not resolved in this exercise. Included is the reason the ARCA remains unresolved and:.
recommended corrective Actions to be demonstrated.before'or during the next exercise..'-                                               I 3.2 Summary Results of Exercise'Evaluati'on......                                                                           -
recommended corrective Actions to be demonstrated.before'or during the next exercise..'-
The matrix presented in.Table"3.1, ,on the following pages,:presents the 'status of all exercise.
3.2 Summary Results of Exercise'Evaluati'on......
I criteria'from Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002, which were'.,::                                           I scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Th6 criferion status box is bla"ikif itwas hot schedul&&f6r derionst-.tio.I- . . "                              .
The matrix presented in.Table" 3.1,,on the following pages,:presents the 'status of all exercise.
I this subsection pirvides information o9n the evaluatiornif each'participating ju'r*i'sic*ation.
criteria'from Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002, which were'.,::
f..":ctioiia entity in a;                             .:.
scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Th6 criferion status box is bla"ikif itwas hot schedul&&f6r derionst-.tio.I-this subsection pirvides information o9n the evaluatiornif each'participating ju'r*i'sic*ation.
I The D           EMAhasdeveloped ,a stafidardized isystem forifumbening' exercise issues. This                                         I system'As~used to achieve consistency in numbeing exercise issu'es 'among DHS/FEMAkRegins aisie;=sp'e'ific'!exercise reports wihne'. 'Regjii!n>J,,,t-al ~so xe rc ise i ssue s on a nati onw id1ba s i "
f..":ctioiia entity in a; The D EMAhasdeveloped,a stafidardized isystem for ifumbening' exercise issues. This system'As~used to achieve consistency in numbeing exercise issu'es 'among DHS/FEMAkRegins aisie;=sp'e'ific'!exercise reports wihne'. 'Regjii!n>J,,,t-al  
:e                                                                          r,
~so  
                                                                                    '&#xfd;u"s~ed t'o exfeditd trac~king of
'&#xfd;u"s~ed t'o exfeditd trac~king of
                                                                                          " ,.- : - ,'        -,. ,"*.--              I The identifying number of Deficiencies, ARCAs, and Plan Issues includes the following I
:e x e r c i s e i s s u e s o n a n a t i o n w i d1ba s i "
elements, withfeach element separated by. a hyphen ()                             ,. j             -
r, The identifying number of Deficiencies, ARCAs, and Plan Issues includes the following elements, withfeach element separated by. a hyphen ()
I
j
* Plant Site Identifier A two-digit number, corresponding t6 the Utility Billable Plant Site Code (13 for Clinton ,Pow         er:Station) .: -,             . .          .                                                            I
* Plant Site Identifier A two-digit number, corresponding t6 the Utility Billable Plant Site Code (13 for Clinton,Pow er:Station).: -,
* Exercise Year - The -lasttwo digits of the year the exercise was conducted.                                                           I
* Exercise Year - The -last two digits of the year the exercise was conducted.
                                                              ,18 I
II I
I I
I I
I I
I I
I I
I I
,18 I
i
i


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                         Clinton Power Station Criterion Number - An alpha and two-digit number corresponding to the criteria numbers in the six Exercise Evaluation Areas described in Federal Register Notice, Vol. 67, No. 80, dated April 25, 2002, which amends FEMA-REP 14, Radiological Emergency Preparedness Exercise Manual.
After Action Report/Improvement Plan Clinton Power Station Criterion Number - An alpha and two-digit number corresponding to the criteria numbers in the six Exercise Evaluation Areas described in Federal Register Notice, Vol. 67, No. 80, dated April 25, 2002, which amends FEMA-REP 14, Radiological Emergency Preparedness Exercise Manual.
" Issue Classification Identifier - (D = Deficiency, A                 ARCA, P = PlantIssue).
" Issue Classification Identifier - (D = Deficiency, A ARCA, P = PlantIssue).
" Exercise Identification Number - A separate two or three-digit indexing number assigned to each issue identified in.the exercise.-
" Exercise Identification Number - A separate two or three-digit indexing number assigned to each issue identified in.the exercise.-
19
19


I After Action Report/Improvement Plan Unclassified Radiologica! Emergency Preparedniess-Program (REP)
U Unclassified Radiologica! Emergency Preparedniess-Program (REP)
                                                                                                                    - Clinton Power Station U
- Clinton Power Station I After Action Report/Improvement Plan
                              .Table3.1 - Surmary of Exercise Evaluation,(4 pages),.                                                         I
.Table3.1 - Surmary of Exercise Evaluation,(4 pages),.
                            ~DATE:2O11-Ii1 0-2 ,'Z,-
~DATE:2O11-Ii1 0-2  
SITE: Clinton Power Station, IL. .
,'Z,-
M. Met, A: ARCA, D: Deficiency, -P: Plan Issue, N: Not .                                             , ,      ,
SITE: Clinton Power Station, IL.
I Demonstrated M M M M' M MIM M               dmM 2 I
M. Met, A: ARCA, D: Deficiency, -P: Plan Issue, N: Not.
Mobilizatio.n                    -al Facilities     .
Demonstrated Mobilizatio.n
-al M M M M' M MIM M dm M 2 Facilities l
Direction and Control.
Direction and Control.
Communications Equipment t
cl A
l cl ld M
M M M M M Communications Equipment M....
A M....M' M M M M M M M      M M        M M I
ld M M' t
EquT p &'Supplies to support operations ProtectiveAction Decisicii  Makiniig EmergencyWorker Exposure Control "leI 2al M M M M M . M M M         KM I
M M M M M M EquT p &'Supplies to support operations "leI M M M M M M K M ProtectiveAction Decisicii Makiniig EmergencyWorker Exposure Control 2al M.
Radiological Assessment and PARs Decisi6hs for the Plume Phase - PADs PADs'for protection of special populations                 "
M Radiological Assessment and PARs 2bl M
2bl 2b2 2c0 M
M Decisi6hs for the Plume Phase - PADs 2b2 M
M M
M, M PADs'for protection of special populations 2c0 M
M M, M M
M Rad Assessment and Decision making for Ingestion Pathway -
I Rad Assessment and Decision making for Ingestion Pathway -                                   2dI Rad Assess/Decision making concerning Relocation, Reentry,.and Return                     .2el           "
2dI Rad Assess/Decision making concerning Relocation, Reentry,.and Return  
I Iinplementation.of emergency worker exposure control,                                       3al                     I   IM      MI M Impfementation of KI decisin io.             _.
.2el Iinplementation.of emergency worker exposure control, 3al I
Implementation of protective actions for special populhtions -EOCs Implementation of protective actions for Sch'ools 3bl 3cl 3c2 M          M I
I M MI M Impfementation of KI decisin io.
Implementation of traffic and'access control Inipediments io evacuation are idenftifijl and iesolved -'.
3bl M
Implementaion 6fofingestion t6athwy9decisiohs - availahlitiuse of info                   .
M Implementation of protective actions for special populhtions -EOCs 3cl Implementation of protective actions for Sch'ools 3c2 Implementation of traffic and'access control 3d]
3d]
M Inipediments io evacuation are idenftifijl and iesolved -'.
3d2 3el M
3d2 M
M                          I Materiaisfor'Ingestion PathwaViPADs :are available&.2:
Implementaion 6fofingestion t6athwy9decisiohs - availahlitiuse of info  
Irmple&#xfd;ientati6n of relo a       riin:-entiy, and returmndecisionis, Adeqluate Equipmentfor Plume Phase Field Measurements
. 3el Materiaisfor'Ingestion PathwaViPADs :are available&.2:  
                                                                                      " . 3e2.
". 3e2.
3fl' 4al                                       M I
Irmple&#xfd;ientati6n of relo a riin:-entiy, and returmndecisionis, 3fl' Adeqluate Equipmentfor Plume Phase Field Measurements 4al M
Field Tearns bbtatin sufficient info -mation.
Field Tearns bbtatin sufficient info -mation.
Field Teais Mafiage Sample Collection"Approprnitel             -      .
4a2 M
4a2 4a3 M
Field Teais Mafiage Sample Collection"Approprnitel 4a3 M.
M.
Post plume.phase-field measurements ahd samripling 4b1l Laboratory operations  
I Post plume.phase-field measurements ahd samripling                             .  .        4b1l Laboratory operations :.                        .
.4c1 M
Aciivation of the prompt alert ahd notification system             ..  .
Aciivation of the prompt alert ahd notification system Sal M
                                                                                        .4c1 Sal   M M
Activation of the prompt alert and notification systemn-Fast Breaker 5a2 Activation of the prompt alert and'notification system - Exception areas 5a3 Emergency information and instructions for-the public and the media b
I Activation of the prompt alert and notification systemn- Fast Breaker Activation of the prompt alert and'notification system - Exception areas Emergency information and instructions for-the public and the media 5a2 5a3 51b    M M M' M         M       M U
51 M M M' M M
Mon/Decon of evacuees and EWs and registration of evacuees Mon/Decon of EW worker equipment 6al.
M Mon/Decon of evacuees and EWs and registration of evacuees 6al.
6b F I
Mon/Decon of EW worker equipment 6b F Temporary care of evacuees 6cl Transportation and treatment of contaminated injured individuals 6d1 I
Temporary care of evacuees                                                                   6cl Transportation and treatment of contaminated injured individuals                             6d1 I
I I
1 20 I
I I
I
I I
I I
I I
I U
I I
20 1
I I


                                                        -  Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                   Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 2/4)
After Action Report/Improvement Plan Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 2/4)
                                                                                                                      -0 DATE: 2011-11-02 SITE: Clinton Power Station,IL       LY M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not                                       U Demonstrated                                       "        U U U U 4     l  ri F&#xfd;   4
-0 DATE: 2011-11-02 SITE: Clinton Power Station,IL LY M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not U
'Emergency Oputions Managqement     ''7 Mobilization                                                                       lal M Facilities                                                                         Ibi Direction and Control                                                             lc     .... M M M M Communieations Equipment                                                         Idl M             I     M_   M M M Equip& Supplies to support operations                                             lel M   _M               M M M M Trote~ctve Action Decis ionMak in g Emergency Worker Exposure Control                                                 2al     M                           "
Demonstrated U U U U 4
Radiological Assessment and P ARs                                                 2bl Decisions for the Plume Phase - PADs                                               2b2     MI PADs for protection of special populations                                       2cl     MI Rad Assessment and Decision making for Ingestion Pathway                         2d1 Rad Assess/Decision making concerning Relocation, Reentry, and Return             2el Protective Action implementation:2.,
ri F&#xfd; 4
Implementation of emergency worker exposure control                               3a] M M             M M         M Implementation of KI decision                                                     3b] M               M M Implementation of protective actions for'special populations - EOCs               3cd Implementation of protective actions for Schools                                 3c2 Implementation of traffic and access control,                                     3d                         M   __  .
l
Impediments to evacuation are identified and resolved                             3d2 Implementation of ingestion pathway decisions - availability/use of info         3el.
'Emergency Oputions Managqement ''7 Mobilization lal M
Materials for Ingestion Pathway PADs are available                               3e2 Implementation of relocation, re-entry, and return decisions                     3fl Adequate Equipment for Plume Phase Field Measurements                             4al M Field Teams obtain sufficient information                                         4a2 Field Teams Manage Sample Collection Appropriately                               4a3 M                               ,__
Facilities Ibi Direction and Control lc  
Post plume phase field measurements and sampling                                 4b]
.... M M M M Communieations Equipment Idl M I
Laboratory operations a                                                           4cl Activation of the prompt alert and notification system     . '                    5al     M M Activation of the pr6mpt alert and notification system - Fast Breaker             5a2 Activation of the prompt alert and notification system - Exception areas-         5a3.
M_
Emergency information and instructions for the public and the media               5b]     M M
M M M Equip& Supplies to support operations lel M
'Support 0 &rations/Ficilities         ~v~.i Mon/Decon of evacuees and EWs and registration of evacuees                       6a 1                                   M Mon/Decon of EW worker equipment                                                 6bl Temporary care of evacuees                                                       6c 1 Transportation and treatment of contaminated injured individuals                 6dl                           M M 21
_M M M M M Trote~ctve Action Decis ionMak in g Emergency Worker Exposure Control 2al M
Radiological Assessment and P ARs 2bl Decisions for the Plume Phase - PADs 2b2 M I PADs for protection of special populations 2cl M I Rad Assessment and Decision making for Ingestion Pathway 2d1 Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action implementation:2.,
Implementation of emergency worker exposure control 3a]
M M M M M
Implementation of KI decision 3b]
M M M Implementation of protective actions for'special populations - EOCs 3cd Implementation of protective actions for Schools 3c2 Implementation of traffic and access control, 3d M
Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3el.
Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions 3fl Adequate Equipment for Plume Phase Field Measurements 4al M
Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 M
Post plume phase field measurements and sampling 4b]
Laboratory operations a 4cl Activation of the prompt alert and notification system 5al M M Activation of the pr6mpt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas-5a3.
Emergency information and instructions for the public and the media 5b]
M M
'Support 0 &rations/Ficilities  
~v~.i Mon/Decon of evacuees and EWs and registration of evacuees 6a 1 M
Mon/Decon of EW worker equipment 6bl Temporary care of evacuees 6c 1 Transportation and treatment of contaminated injured individuals 6dl M M 21


After Action Reportlmprovemnent Plan
After Action Reportlmprovemnent Plan
                                                                          -      /;           j*unea~ssfied " .
/;
                                                            'Radiological Emergency;PrepDaredheis'Program tREP)
j*unea~ssfied  
'Radiological Emergency;PrepDaredheis'Program tREP)
C inton P6wer Station I
C inton P6wer Station I
                        -..:-.-Tabe-3.1               Summaryof                                   cio                -Eer               "(               u           age304)                             I
I 7,
                                                                                                                                                                            >'UU
-..:-.-Tabe-3.1 Summaryof  
-Eer cio
"(
u age304)
>'UU
:0DATE 211-11-02.
:0DATE 211-11-02.
:,SITE.Clinton Power Station, IL .
:,SITE.Clinton Power Station, IL.
M'Me tAARCA[ )Deficiency,:P: Plan Issue, N                                                                     bfNot .-
M'Me tAARCA[ )Deficiency,:P: Plan Issue, N bfNot.-
          *Demo-"
'<7,
        '<7,          "strafed"                     *'                                                  "'                                        '
*Demo-"  
Emergency Opp-ratioris Management.'                                                                                 ."                              ,
"strafed" Emergency Opp-ratioris Management.'
Mob'ilization Facilities   -
Mob'ilization a
Direction and Cotrol a
_P Facilities b
b 1l    M
Direction and Cotrol l
_P
1 M
                                                                                                                                                                    -'            M mCmunications Equipment"-.<- >-                                              ''. ..                                    ,'-'            Idi: MM                 MMMMM               MM V Eguip'& Supplies~td'suiplprt 0peratiO~nsK'::-:                   .        ...              *:.*      ...,: :                .+">*<         lel. M M                 M
M mCmunications Equipment"-.<-
* M: M:
Idi:
                                                                                                                                                                        "M                    M:
V MM MMMMM MM Eguip'& Supplies~td'suiplprt 0peratiO~nsK'::-:  
                                                                                                                                                                                                *M PriociveCAu~ied)iiaMakini".1                                                                   .F.'*.
.+">*<
Ernergency.WorkerExposure               Control                                                                                               a Radi01ogical.Assessment and PARs                                                                                                             2b" M
lel. M M "M
Decisions fof thePlurme Phase ,.PADs                                                                                                         2b2 M.
M
                                                                                                                                                                                                          /I PADs foirprtectin of specil populations-.                                                                                                   2c1 RadAssessnment ani Decsion maktng for Ingestion Pathway                                                                                     2d1 Rad Assess/Dec4isniomaking concemingRelocation.Reentry                                   c           andReturn                                  1       .                                              I Protectivc     tiin 1p1erie~iitition           ..  ,      . 7               77.
* M: M:  
M M1       M o
*M :
CInimplem entation of. 1decisMon`-6:.
M Priocive CAu~ied)iiaMakini".1  
worker expoiure control 7M
.F.'*.
                                                                                                                  -3b&#xfd; 3
Ernergency.WorkerExposure Control a
                                                                                                                                                        .MM                                 MM ,        :.I Implemeitatlon "ofprotective acthons' for Speial popiulations -,EOCs ,                                                                                                              ,
Radi01ogical.Assessment and PARs 2b" Decisions fof thePlurme Phase,.PADs 2b2 M
1mplemenam                       v&   drt ns!fo~r Sctio6ols - . ...
PADs foirprtectin of specil populations-.
ctiveat                                                            ...              ,...              . 3'c5 :! :;*- . :              -(: M , '2' . .
2c1 M.
Inmplementatin of traffic and-access control1 ....                                                                      ,.                  3d*                               M mm'     M .M Impediments to evacuatinare             identified         and   resolved
RadAssessnment ani Decsion maktng for Ingestion Pathway 2d1 Rad Assess/Dec4isniomaking concemingRelocation.Reentry andReturn c
* 3d2                               M
1 Protectivc tiin 1p1erie~iitition 7
                                                                                                                                                  *3" 7,
: 77.
Imilementaion of1igestion pathwaydecisions ava labilty/use of info,.
o worker expoiure control 3
Matenials~forIng'estion Pathway PADs                     are   available"       ....       <=:-:           :               a:r-"-
M M1 7M M
3e2:   *;; i*:**                                     -; :;. I_
CInimplem entation of. 1decisMon`-6:.  
  ,Implementatimnof relocaton&#xa2; re entry,-and-return decisins.
-3b&#xfd;  
for Plume Phase*Fild Measurements
.MM MM Implemeitatlon "of protective acthons' for Speial popiulations -,EOCs 1mplemenam v& drt ctiveat ns! fo~r Sctio6ols -
                                                                                                                        -:::        '-"'.-    3fl]*                             M''/-
. 3'c5  
::*:*i-,:::*,*;:*,-<***"*:c:v"       '>
-(: M  
m AdeFuite Equpment     -and<:A,4a"                                                                                                                   -'i '>"<:,'
, '2' Inmplementatin of traffic and-access control 1
Field T~cafsibbfa~in-nifficient n foimtioin-                                           44,a2 Fild-Teams-Maag6 Sample;     a           ollection-Appiropriately                                                                         4&#xfd;3 Post plumephase feiedmnesurements and samphng ...                                                                           ,.              4bl Laborator o'eatiots>':.'.                   .,.                                                                                              c E~ergn~y.Nifiniion and Puiblic Into "~.7                             ~                                       ~                                 7                   "1'n~<        <
3d*
Activation of th&#xfd;`prorp falert anid'notification system                                                                                     51MM Aciainof the piornpt'aliti and notifidatio~n -syst'~ ~as rakr                                                                       5a2
mm' M
  .Activation -ofthe' pronipt al'ert-and notifcation syst~Eeto are'as -                                                                       5a3 5b1                                M Emef~ge iy ihforinatioii and instructions for the pubic n-tenei Support Operatjions FaLc'iitics         i.
M
MonlDecon of eVacuees and EWs and registration of evacuees 7                77 6a1l                                                        I Mon/Decon of EW worker cquipment Temb~ority care of ev acuee                                       ,
.M Impediments to evacuatinare identified and resolved
                                                                                            '6c1
* 3d2 M
                                                                                                    ,6b]
Imilementaion of1 igestion pathwaydecisions ava labilty/use of info,.  
16d'     -'[-
*3" Matenials~forIng'estion Pathway PADs are available".... <=:-: :
I Transpqrtation and -treatment of contaminated injured individul 22.
a:r-"-
3e2: *;;
i*:**  
,Implementatimnof relocaton&#xa2; re entry,-and-return decisins.
3fl]*
M''/-
::*:*i-,:::*,*;:*,-<***"*:c:v" AdeFuite Equpment for Plume Phase*Fild Measurements
-and<:
A,4a"  
-'i '>"<:,'
Field T~cafsibbfa~in-nifficient n foimtioin-44,a2 Fild-Teams-Maag6 Sample; a
ollection-Appiropriately 4&#xfd;3 Post plumephase feiedmnesurements and samphng...
4bl Laborator o'eatiots>':.'.
c E~ergn~y.Nifiniion and Puiblic Into "~.7  
~  
~
7 "1'n~<
Activation of th&#xfd;`prorp falert anid'notification system 51MM Aciainof the piornpt'aliti and notifidatio~n -syst'~ ~as rakr 5a2
.Activation -of the' pronipt al'ert-and notifcation syst~Eeto are'as -
5a3 Emef~ge iy ihforinatioii and instructions for the pubic n-tenei 5b1 M
Support Operatjions FaLc'iitics
: i.
7 77 MonlDecon of eVacuees and EWs and registration of evacuees 6a1 l Mon/Decon of EW worker cquipment  
,6b]
Temb~ority care of ev acuee  
'6c1 Transpqrtation and -treatment of contaminated injured individul 16d'  
-'[-
/I I
I I
I I
m I
I I
I 22.


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                                 Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 4/4)
After Action Report/Improvement Plan Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 4/4)
DATE: 2011-11-02                                           >                          <<
DATE: 2011-11-02 SITE: Clinton Power Station, IL M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not t.
SITE: Clinton Power Station, IL                                               .'
Demonstrated Em ergecy Oerain~npnet Mobilization lal M M M M M M Facilities IbI Direction and Control ici C 1
M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not                               ,,                                      t.
_M M
Demonstrated                                                         <                    < <
M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M
Em ergecy Oerain~npnet Mobilization                                                                             lal         M M         M M           M M Facilities                                                                               IbI Direction and Control                                                                   ici C1          _M             M           M Communications Equipment                                                                 Idl M M M M M M M M M M Equip & Supplies to support operations                                                   lel M             MM        M M         M M Emergency Worker Exposure Control                                                       2al Radiological Assessment and PARs                                             ..          2b-     _2bl Decisions for the Plume Phase -PADs                                                     2b2 PADs for protection of special populations                                               2cl Rad Assessment and Decision making for Ingestion Pathway                                 2d] __"
M M M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2b-
Rad Assess/Decision making concerning Relocation, Reentry. and Return                   2el -
_2bl Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2cl Rad Assessment and Decision making for Ingestion Pathway 2d]
Implementation of emergency worker exposure control                                     3al M             M M       M M         M M Implementation of KI decision                                                           3bl M             MM M         M         MM Implementation of protective actions for special populations - EOCs                     3cl Implementation of protective actions for Schools                                         3c2 M Implementation of traffic and access control                                             3d1       I       M M       M M         M M Impediments to evacuation are identified and resolved                                   3d2               *M     :M         -  M Implementation of ingestion- pathway decisions - availability/use of info               3e 1                                       *I; Materials for Ingestion Pathway PADs are available               -                      3e2         _.              '_
Rad Assess/Decision making concerning Relocation, Reentry. and Return 2el -
Implementation of relocation. re-entry; and return decisions                             3fl                   ".
Implementation of emergency worker exposure control 3al M
Field Measurementad Aralsi                 A'9jK'2 Adequate Equipment for Plume Phase Field Measurements                                   4al   __
M M M M M M Implementation of KI decision 3bl M
Field Teams obtain sufficient information                                               4a2   __
MM M
Field Teams Manage Sample Collection Appropriately                                       4a3 Post plume phase field measurements and sampling                                         4bl           *_
M MM Implementation of protective actions for special populations - EOCs 3cl Implementation of protective actions for Schools 3c2 M
Laboratory operations                                                                   4c 1
Implementation of traffic and access control 3d1 I
'Emergenc Notificationi andiubiit~lnfo <9X               <.~">
M M M M M M Impediments to evacuation are identified and resolved 3d2  
Activation of the prompt alert and notification system                                   5a]
*M
Activation of the prompt alert and notification system - Fast Breaker                   5a2 Activation of the prompt alert and notification system - Exception areas                 5a3 Emergency information and instructions for the public and the media                     5bl S&#xfd;Ipport-0pcra~ii't/aiiis&#xfd;         .. 7.         925             <7;<         2.
:M M
Mon/Decon of evacuees andEWs and-registration of evacuees               -              6al Mon/Decon of EW worker equipment                                     -                6bf   '___"
Implementation of ingestion-pathway decisions - availability/use of info 3e 1  
Temporary care-of evacuees -                                                            6cl Transportation and treatment of contaminated injured individuais -6dl 23
*I; Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation. re-entry; and return decisions 3fl Field Measurement ad Aralsi A'9jK'2 Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl Laboratory operations 4c 1
'Emergenc Notificationi andiubiit~lnfo <9X  
<.~">
Activation of the prompt alert and notification system 5a]
Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system -Exception areas 5a3 Emergency information and instructions for the public and the media 5bl S&#xfd;Ipport-0pcra~ii't/aiiis&#xfd;  
.. 7.
925  
<7;<
2.
Mon/Decon of evacuees andEWs and-registration of evacuees 6al Mon/Decon of EW worker equipment 6bf Temporary care-of evacuees 6cl Transportation and treatment of contaminated injured individuais  
-6dl 23


Unclassified                                   -I Radiological Emergency Prepadriness Program.(REP)
Unclassified  
After Action Report/improvement Plan                                                                   ,      Clinton Power Station
-I Radiological Emergency Prepadriness Program.(REP)
.3.3       Criteria Evaluatin Sum                             iaries .     L 3.3.1 Illinois Jurisdictions' LlState of Ilhlnois, Intial n    Warning Point The Illinois Emergency           Managemenft Agency (IEMA) Co unications Center l ocated within the State-Emergency Operations Center-(SEOC) in Springfield,: Illinois, demonstrated the -Target U
After Action Report/improvement Plan Clinton Power Station
QCpability of emergency-O1eratin Ceter                         an           t The CommunickitionsC                 tetdr efeci     e m                   pe'aton         moilz'n                                                         u.-
.3.3 Criteria Evaluatin Sum iaries. L 3.3.1 Illinois Jurisdictions' LlState of Ilhlnois, n
.e       tlve procedures to     alert, notify, and   mobihze     emergency       personnel   and     activate     faclities 'in a*timely manner.' Dispatcheis were .familiar with their ntuclieai inci                     t notificati6   n.proce       ur-e -.
Intial Warning Point The Illinois Emergency Managemenft Agency (IEMA) Co unications Center l ocated within U
-There       are redundanit communication systems available at the, Communications Center, ahd b6thi
the State-Emergency Operations Center-(SEOC) in Springfield,: Illinois, demonstrated the -Target QCpability of emergency-O1eratin Ceter an t The CommunickitionsC tetdr efeci e
-prinmaryand *badk-up systems were used effectively during* this exercise. There was a system failue ini the Nuclear Accideht ien rting lSystem (NARS) telephone line Whilchcaused ttheluse                                       I i the co.ninercial teleshone line&sect; to notify theRisk County~fDeWit,.
m pe'aton moilz  
d In sumrtenau                     fTH/E\4ciei for,thi loaion is as follows!-I aMT:, L~a.l, A.d";',
'n u.-
b       REUIRIG CORRECTIVE ACTIONNn.
.e tlve procedures to alert, notify, and mobihze emergency personnel and activate faclities 'in a*timely manner.' Dispatcheis were.familiar with their ntuclieai inci t notificati6 n  
ARES c:DEFICIENCY:' None',                     --
.proce ur-e -.
        -d.&#xfd;PLAN'ISSUES: None-
-There are redundanit communication systems available at the, Communications Center, ahd b6thi
: b. .NOT DEMONSTRATED: None-.*%:                                 . -.
-prinmaryand *badk-up systems were used effectively during* this exercise. There was a system failue ini the Nuclear Accideht ien rting lSystem (NARS) telephone line Whilchcaused ttheluse I
        ' f. :PO ISSUES -' RESOVED: None' g     PRIOR ISSUES -.UNRESOLVED: None 3.3.1.22State of Illinoisi-       Staie o6f-lllnoisResponse- Cennter                                                               I The State of Illinois demonstrated the Target.Capability 6f Emergency Operations Center -
d i the co.ninercial teleshone line&sect; to notify theRisk County~fDeWit,.
Mainagment by activities including the use of effectiv&efoceduet alertonotify and mobilize etnerg ency personnel and'activate'facilities'in a timely* manner, -The State, of Illinois Response Center (SIRC) provided sufficient multi-agency c odiiin}ti6&nfoiran.incidentathth CPSb Ii-I promptly -activating and operatin&#xfd; foi:the' diration of the iincident. The SIRC was maa                               -    '
In sumrtenau fTH/E\\4ciei for, thi loaion is as follows!-I aMT:, L~a.l, A.d";',
efficiently and effectively completed a full activation, notification and staffed to an operational level. The SIRC Manager provided management, dirdctionaffd control using briefings. This allowed the staff of the SIRC to maintain a common operating picture and overall response to the .
b ARES REUIRIG CORRECTIVE ACTIONNn.
c:DEFICIENCY:' None',  
-d. &#xfd;PLAN'ISSUES: None-
: b..NOT DEMONSTRATED: None-.*%:  
' f. :PO ISSUES -' RESOVED: None' g
PRIOR ISSUES -. UNRESOLVED: None 3.3.1.22State of Illinoisi-Staie o6f-lllnoisResponse-Cennter I
The State of Illinois demonstrated the Target.Capability 6f Emergency Operations Center -
Mainagment by activities including the use of effectiv&efoceduet alerto notify and mobilize etnerg ency personnel and'activate'facilities'in a timely* manner, -The State, of Illinois Response Center (SIRC) provided sufficient multi-agency c odiiin}ti6&nfoiran.incidentathth CPSb Ii-I promptly -activating and operatin&#xfd; foi:the' diration of the iincident. The SIRC was maa efficiently and effectively completed a full activation, notification and staffed to an operational level. The SIRC Manager provided management, dirdctionaffd control using briefings. This allowed the staff of the SIRC to maintain a common operating picture and overall response to the.
event. The SIRC Manager coordinated with other jurisdictions including the State to make 24 I
event. The SIRC Manager coordinated with other jurisdictions including the State to make 24 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
*AfterAction Report/Improvement Plan                                                     Clinton Power Station decisions and ensure that appropriate actions were taken to protect the health and safety of the public..
*After Action Report/Improvement Plan Clinton Power Station decisions and ensure that appropriate actions were taken to protect the health and safety of the public..
An area of concern was that when the NARS telephone line had continued difficulties which started at the notification of an Alert Emergency Classification Level (ECL) in connecting with the primary Risk County of DeWitt, when the ECL of a General Emergency (GE) was communicated to the State, the delay and coordinated decision for more efficient method of rapid communication was not thoroughly discussed between the Communications Center Manager and the SIRC Manager.
An area of concern was that when the NARS telephone line had continued difficulties which started at the notification of an Alert Emergency Classification Level (ECL) in connecting with the primary Risk County of DeWitt, when the ECL of a General Emergency (GE) was communicated to the State, the delay and coordinated decision for more efficient method of rapid communication was not thoroughly discussed between the Communications Center Manager and the SIRC Manager.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
Line 432: Line 560:
: b. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1..
: b. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1..
ISSUE NO.: 13-11-1cl-A-0l CRITERION: Key personnel with functional roles for the ORO provide direction'and control to that part of the overall response effort for which they are responsible.
ISSUE NO.: 13-11-1cl-A-0l CRITERION: Key personnel with functional roles for the ORO provide direction'and control to that part of the overall response effort for which they are responsible.
CONDITION: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification~of an=ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used.to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective-Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours, and it was&#xfd; known that DeWitt County EOC was not on the call. DeWitt County EOC.
CONDITION: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification~of an=ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used. to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective-Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours, and it was&#xfd; known that DeWitt County EOC was not on the call. DeWitt County EOC.
received the PAR from the SIRC at 1129 hours. This was a delay&#xfd; of 10 minutes-for critical information that the DeWitt County decision-makers required* to protect the health and safety &#xfd;of the public.
received the PAR from the SIRC at 1129 hours. This was a delay&#xfd; of 10 minutes-for critical information that the DeWitt County decision-makers required* to protect the health and safety &#xfd;of the public.
The SIRC Manager.wasinformed that the NARS :was not functioning properly from the SEOCto-DeWitt County and that commercial lines had to be used to relay 25
The SIRC Manager.wasinformed that the NARS :was not functioning properly from the SEOCto-DeWitt County and that commercial lines had to be used to relay 25


ii Emergiency Radiological    ,Uncla -ssifie Prearedness Progra   ?(REP,)
ii  
After Action Reoirt/Imlbrovement Plan                                                                             tClintonaPowertation
,Uncla -ssifie Radiological Emergiency Prearedness Progra  
                    , .winoratonwhich extehdedthe time fr om achange n significant information to DeWitt County being made aware.Discussions betweie the Cotn'minications9C enter Director and the S!RC Manager did not result m an expedited method of infoiming
?(REP,)
                '.--DeWitt County of the.chages in ECLs-or issuance ofanyPARs.,-T-here-seeme-dto.
After Action Reoirt/Imlbrovement Plan tClintonaPowertation
                -'bea' lack ofurgency onthepar   .        .ofSIRCManagement that theNARS was not,                             -
,.winoraton which extehdedthe time fr om achange n significant information to DeWitt County being made aware.Discussions betweie the Cotn'minications9C enter Director and the S!RC Manager did not result m an expedited method of infoiming
wo:,w'orking and that on tlhe-CPS a*n*oi   u       nceethat there was a trlease -in progress with Ih                                                                    ~     '
'.--DeWitt County of the.chages in ECLs-or issuance ofanyPARs.,-T-here-seeme-dto.
-'be a' lack ofurgency onthepar.ofSIRCManagement that theNARS was not, wo:,w'orking and that on tlhe-CPS a*n*oi u
nceethat there was a trlease -in progress with I h
~
POSSIBLE CAUSE: Discussion between th&eCommunications.Center: Directotr and:,
POSSIBLE CAUSE: Discussion between th&eCommunications.Center: Directotr and:,
the SIRC.Mainge did no includ specific pointshoffthe NARS telephone sytem difficultie. &sect;&#xfd;ich as the DeWitt.Counbeing.affeted byv:-delayed n*tificationiof the ECL changes., "'lhereeas no further 6onsideration'6f expeditedcommurnications even after realizing that the NARSdiffulteS Wert iiuin ttheSAE-ECL and the,-
the SIRC.Mainge did no includ specific pointshoffthe NARS telephone sytem difficultie. &sect;&#xfd;ich as the DeWitt.Counbeing.affeted byv:-delayed n*tificationiof the ECL changes., "'lhereeas no further 6onsideration'6f expeditedcommurnications even I
I pos~sibilhty ofaGE ECL occurring. This would have al o6ed DeWitt County to be
after realizing that the NARSdiffulteS Wert iiuin ttheSAE-ECL and the,-
      " {notifiediprolpit             y forfif       ulati-onof thIat               -aGEd           EDand-the       .          .
pos~sibilhty ofaGE ECL occurring. This would have al o6ed DeWitt County to be 5
5 State,-provided PARs.-&#xfd;_&#xfd;&#xfd;
" {notifiediprolpit y forfif ulati-onof thIat  
                  .SIRCManagement must have ors                         have.kowthattheNARS notifcation..                  .*      .
-aGEd EDand-the State, -provided PARs.-&#xfd;_&#xfd;&#xfd;
                -sstem,wasnfi t operating :thealternatiVe-ipocegs was taking an inordin:ate afmoutof
.SIRCManagement must have ors have.kowthattheNARS notifcation..  
                          .SIRCManiigmenitshoiuld-hqve.directed :theComunications:,Centeir t'ontact I
-sstem, wasnfi t operating :thealternatiVe-ipocegs was taking an inordin:ate afmoutof I
                  -Dewitt County directlyrathierthanusig the roll call system .There seemed to*b                     .I lack 6,ffSIencR6n the paRt                                       that theeNARS was ijot v6ikingr iag--`ent
.SIRCManiigmenitshoiuld-hqve.directed :theComunications:,Centeir t'ontact
:andthat oi-the,,CPS diidunouncefmiint &#xfd;thaLt-there 'wa a'rrefrsq, i~jiprogress with asix-:
-Dewitt County directlyrathierthanusig the roll call system.There seemed to*b  
haul h   wind, ,'.                  s                         .v.Kr> .T' "REFERENCE-N                                                 A,;2 EFFECT: Protectie Acion Recomendtid'tfns omrithe State &#xfd;were.co0mmunicated                           .
.I lack 6,ffSIencR6n the paRt iag--`ent that theeNARS was ijot v6ikingr
:andthat oi-the,,CPS diidunouncefmiint &#xfd;thaLt-there 'wa a'r refrsq, i~jiprogress with asix-:
haul h
wind s  
.v.Kr>.T' "REFERENCE-N A,;2 EFFECT: Protectie Acion Recomendtid'tfns omr i the State &#xfd;were.co0mmunicated
: 1. minutes later, than they-cbul.:h-,b e;,,Prot btive Action.Decisions by the
: 1. minutes later, than they-cbul.:h-,b e;,,Prot btive Action.Decisions by the
            -   county were directly affected by he deqlavynco0timunicationof theeState PARs.                                         5 RECOMMENDATION: The Communication&sect;s.Center Manager neieds to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication. systems and its operational-bapabiljity. If there is a continued
- county were directly affected by he deqlavynco0timunicationof theeState PARs.
              'problem such asthe NARS system not operating properly, determine a prompt and 261
5 RECOMMENDATION: The Communication&sect;s.Center Manager neieds to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication. systems and its operational-bapabiljity. If there is a continued
'problem such asthe NARS system not operating properly, determine a prompt and 261


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                       Clinton Power Station efficient communication method to notify the risk county(ies) which may be outside the normal communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding priority.
After Action Report/Improvement Plan Clinton Power Station efficient communication method to notify the risk county(ies) which may be outside the normal communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding priority.
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
Line 466: Line 602:
CORRECTIVE ACTION DEMONSTRATED: The SIRC Manager directed a request to the Federal Aviation Agency (FAA) to restrict air space in the affected area surrounding CPS. At 1128 hours,a temporary flight restriction (TFR) was granted by the FAA for a 10-mile radius area five miles northeast of CPS for altitudes below 2,000 feet.
CORRECTIVE ACTION DEMONSTRATED: The SIRC Manager directed a request to the Federal Aviation Agency (FAA) to restrict air space in the affected area surrounding CPS. At 1128 hours,a temporary flight restriction (TFR) was granted by the FAA for a 10-mile radius area five miles northeast of CPS for altitudes below 2,000 feet.
These actions adequately clear ARCA 09-11-2b2-A-01, which stated "Neither the SIRC Manager, REAC Manager nor any other IEMA staff addressed the decision to restrict or allow aircraft to fly through the plume after radiological conditions changed."
These actions adequately clear ARCA 09-11-2b2-A-01, which stated "Neither the SIRC Manager, REAC Manager nor any other IEMA staff addressed the decision to restrict or allow aircraft to fly through the plume after radiological conditions changed."
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.3 State of Illinois - Public Inquiry Phone Bank In summary, the status of DHS/FEMA criteria for this location is as follows:
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.3 State of Illinois - Public Inquiry Phone Bank In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.a.1, L.e.i, 5.b.1.
: a. MET: 1.a.1, L.e.i, 5.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
Line 472: Line 609:
: d. PLAN ISSUES: None 27
: d. PLAN ISSUES: None 27


Unclassified Radiological Emergency Preparedness Program (REP) 3 After Action Report/Improvement Plan                                                   Clinton Power Station
Unclassified 3
Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Clinton Power Station
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED- None 3.3.1.4 State of Illinois - Radiological Emergency Assessment Center The Radiological Emergency Assessment Center (REAC) effectively demonstrated the Target Capability of Emergency Operations Center Management by promptly activating and providing multi-agency coordination throughout the REP Exercise at the CPS. The REAC Manager used a decision-making process that involved considerations of appropriate factors, including utility recommendations, plant status, release rate, dose projections, field measurements, weather conditions and knowledge of the area, and provided necessary coordination to make appropriate and timely PARs to the SIRC Manager which provided consistent PARs for the protection of the public.
: g.
PRIOR ISSUES - UNRESOLVED-None 3.3.1.4 State of Illinois - Radiological Emergency Assessment Center The Radiological Emergency Assessment Center (REAC) effectively demonstrated the Target Capability of Emergency Operations Center Management by promptly activating and providing multi-agency coordination throughout the REP Exercise at the CPS. The REAC Manager used a decision-making process that involved considerations of appropriate factors, including utility recommendations, plant status, release rate, dose projections, field measurements, weather conditions and knowledge of the area, and provided necessary coordination to make appropriate and timely PARs to the SIRC Manager which provided consistent PARs for the protection of the public.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.a.l, 1.c.l,l.d.l, i.e.1, 2.a.l., 2.b.1, 2.b.2, 2.c.1, 5.b.1.
: a. MET: 1.a.l, 1.c.l,l.d.l, i.e.1, 2.a.l., 2.b.1, 2.b.2, 2.c.1, 5.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED; None 3.3.1.5 State of Illinois - Unified Area Command The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to support Protective Action Decision-making throughout the REP Exercise at the.'CPS. The Unified Area Command (UAC) was well equipped with all necessary communications, equipment and supplies required for the capability of efficient communications with offsite organizations. A representative of the Illinois State Police (ISP) at the UAC activated the call-down procedures in advance of evacuation orders and stationed Troopers at appropriate Traffic and Access Control Posts. The coordination efforts between the ISP, Illinois Department of Transportation and County Sheriffs Departments allowed for the effective removal of traffic impediments that occurred during the evacuation process. Throughout the exercise, the Incident Commander (IC) had frequent briefings and 28
: g. PRIOR ISSUES - UNRESOLVED; None 3.3.1.5 State of Illinois - Unified Area Command The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to support Protective Action Decision-making throughout the REP Exercise at the.'CPS. The Unified Area Command (UAC) was well equipped with all necessary communications, equipment and supplies required for the capability of efficient communications with offsite organizations. A representative of the Illinois State Police (ISP) at the UAC activated the call-down procedures in advance of evacuation orders and stationed Troopers at appropriate Traffic and Access Control Posts. The coordination efforts between the ISP, Illinois Department of Transportation and County Sheriffs Departments allowed for the effective removal of traffic impediments that occurred during the evacuation process. Throughout the exercise, the Incident Commander (IC) had frequent briefings and 28


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                     Clinton Power Station discussions to resolve issues as they occurred. The IC was able to pass command to the Deputy IC without any loss of continuity to the operation process. The UAC staff interacted and communicated with each other and respective agencies effectively.
After Action Report/Improvement Plan Clinton Power Station discussions to resolve issues as they occurred. The IC was able to pass command to the Deputy IC without any loss of continuity to the operation process. The UAC staff interacted and communicated with each other and respective agencies effectively.
In summary, the status of DHS/FEMA criteria for this:location is as follows:
In summary, the status of DHS/FEMA criteria for this:location is as follows:
: a. MET: 1.a.1, l.c.1, 1.d.1, L.e.1, 2.b.2, 3.d.1, 3.d.2, 5.b.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: 1.a.1, l.c.1, 1.d.1, L.e.1, 2.b.2, 3.d.1, 3.d.2, 5.b.1.
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.6 State of Illinois - Emergency Operations Facility In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.a.1, l.c.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: g. PRIOR ISSUES - UNRESOLVED: None, 3.3.1.7 State of Illinois - Joint Information Center The Joint Information Center (JIC) demonstrated the Target Capability of Providing Emergency Public Information from the State through the County Public Information Officers(PIOs) at the JIC.
: f.
Effective procedureswere used to alert, notify, and mobilize personnel and activate the facility in a timely manner. Key personnel with leadership roles provided direction and control. Emergency information *andinstructions were presented to the- public . and the news       ,.
PRIOR ISSUES - RESOLVED: None
media in a... timely, manner.
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.6 State of Illinois - Emergency Operations Facility In summary, the status of DHS/FEMA criteria for this location is as follows:
: a.
MET: 1.a.1, l.c.1.
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c.
DEFICIENCY: None
: d.
PLAN ISSUES: None
: e.
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g.
PRIOR ISSUES - UNRESOLVED: None, 3.3.1.7 State of Illinois - Joint Information Center The Joint Information Center (JIC) demonstrated the Target Capability of Providing Emergency Public Information from the State through the County Public Information Officers(PIOs) at the JIC.
Effective procedureswere used to alert, notify, and mobilize personnel and activate the facility in a timely manner. Key personnel with leadership roles provided direction and control. Emergency information *and instructions were presented to the public and the news media in a timely, manner.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
29
29


                                                      -        . Unclassified Radiological Emergency Prepare'dess Program (REP)
Unclassified Radiological Emergency Prepare'dess Program (REP)
.After Action, Report/Improvement Plan                                             .  ...                                      .-    Clinton Power Station
.After Action, Report/Improvement Plan Clinton Power Station
        ,aMET:,i.a1,1,.cAi,
,aMET:,i.a1,1,.cAi, 1.d.1,-1.e.1, 5.:b:
            -.                            1.d.1,-1.e.1, 5.:b:
: b. -AREAS REQUIRING CORRECTIVE ACTION: None
: b. -AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None,,,-:
: c.
DEFICIENCY: None,,,-:
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None                                       :, ;- ,                      ''.j...                      ..      _        .
: e.
: f. PRIORISSUES- RESOLVED: None: -;.:,,.,'-
NOT DEMONSTRATED: None  
: g. PRIOR ISSUES- UNRESOLVED: None <                                                 :        ,>-          ""        .            ,
''.j...
3.3.1.8 State of Illinois -Radiological Assessment Field Team                                             .
: f. PRIORISSUES-RESOLVED: None: -;.:,,.,'-
The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to suppot Protective Action Decision-making throughout the REP Exercise at the CPS. The Radiological. Assessment Field Team (RAFT) was well equipped With all necessary, communications,; equipment, and supplies required for'the capability of efficient communications with offsite organizations. Throughout the exercise, the RAFT Commander had frequent briefings and discussions to resolve issues as-ihey occurred. 1The RAFT. stiffifiteracted and communicated with each other:and respective field I
: g.
monitoifig teams effectively.                   .      -        '.          :,                  "                  -  "
PRIOR ISSUES-UNRESOLVED: None <
In summary the status of DHS/FEMA critera for.this location is-as ,folloxws                                                       .-
3.3.1.8 State of Illinois -Radiological Assessment Field Team.
a.,, MET.:..-.a.1,.!.c.1, I'd.1, 1.e.6 , 3.a.1, 3,b.1,4a2..                                  .. .,                                  .
The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to suppot Protective Action Decision-making throughout the REP Exercise at the CPS. The Radiological. Assessment Field Team (RAFT) was well equipped With all necessary, communications,; equipment, and supplies required for'the capability of efficient communications with offsite organizations. Throughout the exercise, the RAFT Commander had frequent briefings and discussions to resolve issues as-ihey I
b., AREAS REQUIRING CORRECTIVE ACTION- None&#xfd;..                                                                  :              .
occurred. 1The RAFT. stiffifiteracted and communicated with each other:and respective field monitoifig teams effectively.
C., DEFICIENCY: None
In summary the status of DHS/FEMA critera for.this location is-as,folloxws a.,, M ET.:..-.a.1,.!.c.1, I'd.1, 1.e.6, 3.a.1, 3,b.1,4a2..
: d. PLAN, ISSUES:None                                                 ..    ..
b., AREAS REQUIRING CORRECTIVE ACTION-None&#xfd;..
3
C.,
: e. NOT DEMONSTRATED:.None                                           .:.:.                  .:-:,*.-                    ,        .
DEFICIENCY: None 3
: f. PRIOR ISSUES RESOLVED: None -                                                                "                                      ,
: d. PLAN, ISSUES:None
                                        ~. ..
: e.
                                      ~UNRESOLVED:         . i.e:                  .*'. ......* ..:-.. . ,, .........            .-      :.:.,,. , >
NOT DEMONSTRATED:.None
g.PRIOR( '5..;:- .*.     .....................
: f.
_ISSUES                            Noi Center .
PRIOR ISSUES - RESOLVED: None g.PRIOR(
3.3.1.9
_ISSUES UNRESOLVED: Noi
- 1' "    ,
'5..;:-.*. ~ ~...
State   of Illinois - Joint" Information &#xb6;Ceniter/Media
i.e:
              *. . .
3.3.1.9 State of Illinois - Joint Information Ceniter/Media Briefing Center.
* i "                                                    -      ~ - Briefing . . ..                            .
1' "
* i  
&#xb6;
~
The Joint Information Center (JIC)/Media Briefing Center.(MBC) demonstrated the Target.
The Joint Information Center (JIC)/Media Briefing Center.(MBC) demonstrated the Target.
Capability of Providing-Emergency Public Information fromrtthe State through the)Public ...
Capability of Providing-Emergency Public Information fromrtthe State through the)Public...
Information Officers at the JIC/MBC. Key personnel with leadership roles provided direction and control. Emergency information and instructions were presented to the public and the news' media in a timely manner.                                     -..                              .              -,I                   .
Information Officers at the JIC/MBC. Key personnel with leadership roles provided direction and control. Emergency information and instructions were presented to the public and the news' media in a timely manner.  
30                                                                                   I
-,I 30 I
                                                                                                            <                                                I
I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station In summary, the status of DHS/FEMA criteria for this location-is as follows:
After Action Report/Improvement Plan Clinton Power Station In summary, the status of DHS/FEMA criteria for this location-is as follows:
: a. MET: 5.b.1.
: a.
MET: 5.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.10 State of Illinois - Mobile Laboratory The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of the Mobile Laboratory (Mobile Lab) throughout the REP Exercise at CPS.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.10 State of Illinois - Mobile Laboratory The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of the Mobile Laboratory (Mobile Lab) throughout the REP Exercise at CPS.
Line 555: Line 714:
Sample integrity was maintained throughout the process by utilizing sample data forms.
Sample integrity was maintained throughout the process by utilizing sample data forms.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.a.1, 1.d.1, 1.e.1, 3.a.l, 4.c.1.
: a.
MET: 1.a.1, 1.d.1, 1.e.1, 3.a.l, 4.c.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None"
: c. DEFICIENCY: None"
: d. PLAN ISSUES: None e: NOT DEMONSTRATED: None
: d. PLAN ISSUES: None e: NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. 'PRIOR ISSUES - UNRESOLVED: None 31
: g. 'PRIOR ISSUES - UNRESOLVED: None 31


Unclassified.
Unclassified.
Radiological Emergency Preparedness Program (REP)
I Radiological Emergency Preparedness Program (REP)
I After Action Report/Improvement Plan                                                   Clinton Power Station 3.3.1.11 State of Illinois - Field Monitoring Team - 1 The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation exposure (cloud &
After Action Report/Improvement Plan Clinton Power Station 3.3.1.11 State of Illinois - Field Monitoring Team - 1 The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation exposure (cloud &
ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and                       .1 collected radioiodine and particulate samples.
ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and  
.1 collected radioiodine and particulate samples.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: L.a.1, l.d.1, L.e.1, 3.a.1, 3.b.l, 4.a.l, 4.a.3.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: L.a.1, l.d.1, L.e.1, 3.a.1, 3.b.l, 4.a.l, 4.a.3.
: c. DEFICIENCY: None
: b.
: d. PLAN ISSUES: None                           .
AREAS REQUIRING CORRECTIVE ACTION: None
: e. NOT DEMONSTRATED: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: e.
NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.12 State of Illinois - Field Monitoring Team - 2 The State.of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation. exposure (cloud &
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.12 State of Illinois - Field Monitoring Team - 2 The State.of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation. exposure (cloud &
ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and collected radioiodine and particulate samples.
ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and collected radioiodine and particulate samples.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: l.a.1, 1.d.1, I.e.:1, 3.a.1, 3.b..l, 4.a.l,4.a.3.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION::None
MET: l.a.1, 1.d.1, I.e.:1, 3.a.1, 3.b..l, 4.a.l,4.a.3.
: c. DEFICIENCY: None
: b.
: d. PLAN ISSUES: None
AREAS REQUIRING CORRECTIVE ACTION::None
: e. NOT DEMONSTRATED: None
: c.
: f. PRIOR ISSUES - RESOLVED: None
DEFICIENCY: None
: g. PRIOR ISSUES - UNRESOLVED: None                                                                     I 32
: d.
PLAN ISSUES: None
: e.
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None I
32


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station 3.3.1.13 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Radiological Advisor In summary, the status of DHS/FEMA criteria for this location is as follows:
After Action Report/Improvement Plan Clinton Power Station 3.3.1.13 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Radiological Advisor In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 2.a.1, 2.b.2, 2.c.1, 3.a.1, 5.a.1, 5.b.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: 2.a.1, 2.b.2, 2.c.1, 3.a.1, 5.a.1, 5.b.1.
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.14 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.14 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.c.1,5.a.1,5.b.1.
: a.
MET: 1.c.1,5.a.1,5.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
Line 599: Line 776:
: e. NOT DEMONSTRATED: None-
: e. NOT DEMONSTRATED: None-
: f. : PRIOR ISSUES - RESOLVED: None
: f. : PRIOR ISSUES - RESOLVED: None
      .g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.15,State of Illinois Macon County, Emergency Operations. Center,- Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is. as follows:
.g.
: a. MET: 1.c.1.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.15,State of Illinois Macon County, Emergency Operations. Center,- Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is. as follows:
: a.
MET: 1.c.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d.
PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f.
: g. PRIOR ISSUES - UNRESOLVED: None 33
PRIOR ISSUES - RESOLVED: None
: g.
PRIOR ISSUES - UNRESOLVED: None 33


Unclassified     -
Unclassified 1
Radiological Emergency Preparedness Program.(REP) 1 After Action Report/Improvement Plan                                                     Clinton Power Station 3.3.1.16 State of Illinois.- McLean County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
Radiological Emergency Preparedness Program.(REP)
: a. MET: 1.c.l.                                                       -
After Action Report/Improvement Plan Clinton Power Station 3.3.1.16 State of Illinois.- McLean County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.c.l.
: b. AREAS REQUIRING CORRECTIVE ACTION:. None
: b. AREAS REQUIRING CORRECTIVE ACTION:. None
: c. DEFICIENCY: None                                                                                     I
: c.
DEFICIENCY: None I
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.17 State of Illinois - Piatt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.17 State of Illinois - Piatt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: I.c.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: I.c.1.
: c. DEFICIENCY: None
: b.
: d. PLAN ISSUES: None
AREAS REQUIRING CORRECTIVE ACTION: None
: e. NOT DEMONSTRATED: None
: c.
: f. PRIOR ISSUES - RESOLVED: None
DEFICIENCY: None
: g. PRIOR ISSUES. - UNRESOLVED: None                                               ..
: d.
3.3.1.18 State of Illinois - Illinois State Police District 10 Headquarters - Dosimetry Control Officer Briefing                                                                                   .
PLAN ISSUES: None
The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Illinois State Police, District 10, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ.. Appropriate dosimetry, record-keeping documents, and information on how to manage each emergency workers dose was discussed by the Dosimetry Control Officer (DCO).
: e.
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g.
PRIOR ISSUES. - UNRESOLVED: None 3.3.1.18 State of Illinois - Illinois State Police District 10 Headquarters - Dosimetry Control Officer Briefing The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Illinois State Police, District 10, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ.. Appropriate dosimetry, record-keeping documents, and information on how to manage each emergency workers dose was discussed by the Dosimetry Control Officer (DCO).
Equipment requiring, calibration and testing was within proper dates. The DCO provided instructions on potassium iodide and instructions on when to ingest.
Equipment requiring, calibration and testing was within proper dates. The DCO provided instructions on potassium iodide and instructions on when to ingest.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
34                                                   I
34 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                             Clinton Power Station a.. MET: 1.d.,         1.e.1, 3.a.1,. 3.b.I.
After Action Report/Improvement Plan Clinton Power Station a.. MET: 1.d.,
: b. AREAS REQUIRING CORRECTIVE ACTION: None
1.e.1, 3.a.1,. 3.b.I.
: c. DEFICIENCY: None
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.19 State of Illinois - Illinois State Police District 10 Headquarters               - Traffic and Access Control Post The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the Illinois State Police, District 10, which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.19 State of Illinois - Illinois State Police District 10 Headquarters - Traffic and Access Control Post The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the Illinois State Police, District 10, which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.
During the interview, the Trooper demonstrated. knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.
During the interview, the Trooper demonstrated. knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.d. 1, L.e. 1, 3.a. 1, 3.b. 1, 3.d. 1.
: a.
MET: 1.d. 1, L.e. 1, 3.a. 1, 3.b. 1, 3.d. 1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None,
: b. AREAS REQUIRING CORRECTIVE ACTION: None,
: c. DEFICIENCY: None
: c.
: d. PLAN ISSUES: None
DEFICIENCY: None
: e. NOT DEMONSTRATED: None
: d.
: f. PRIOR ISSUES - RESOLVED: None
PLAN ISSUES: None
: e.
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.20 State of Illinois St. Mary's Hospital Medical Service - Transportation The State of Illinois and theRiverside Ambulance Service demonstrated the Target Capability that they have the appropriate space, adequate resources, and trained personnel to provide.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.20 State of Illinois St. Mary's Hospital Medical Service - Transportation The State of Illinois and theRiverside Ambulance Service demonstrated the Target Capability that they have the appropriate space, adequate resources, and trained personnel to provide.
transport, monitoring, decontamination, and medical services to contaminated injured individuals. Decatur Ambulance Service demonstrated the capability to-transport and provide 35
transport, monitoring, decontamination, and medical services to contaminated injured individuals. Decatur Ambulance Service demonstrated the capability to-transport and provide 35


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station initial medical care to a contaminated, injured individual.
After Action Report/Improvement Plan Clinton Power Station initial medical care to a contaminated, injured individual.
In summary, the status of DHS/FEMA criteria for this location isas follows:
In summary, the status of DHS/FEMA criteria for this location isas follows:
: a. MET: 1.d.1, 1.e.1, 6.d. 1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: 1.d.1, 1.e.1, 6.d. 1.
: c. DEFICIENCY: None
: b.
: d. PLAN ISSUES: None
AREAS REQUIRING CORRECTIVE ACTION: None
: e. NOT DEMONSTRATED: None
: c.
DEFICIENCY: None
: d.
PLAN ISSUES: None
: e.
NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None.
: f. PRIOR ISSUES - RESOLVED: None.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.21 State of Illinois - St. Mary's Hospital - Medical Service - Facility The State of Illinois (St. Mary's - Decatur) demonstrated the Target Capability that they have proper space, resources, and trained personnel to monitor decontaminate and provide medical services to contaminated injured individuals.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.21 State of Illinois - St. Mary's Hospital - Medical Service - Facility The State of Illinois (St. Mary's - Decatur) demonstrated the Target Capability that they have proper space, resources, and trained personnel to monitor decontaminate and provide medical services to contaminated injured individuals.
Line 673: Line 878:


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                       Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b.
: c. DEFICIENCY: None
AREAS REQUIRING CORRECTIVE ACTION: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.23 State of Illinois         - Illinois State University/Horton Field House -
: f.
PRIOR ISSUES - RESOLVED: None
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.23 State of Illinois - Illinois State University/Horton Field House -
Evacuee/Emergency Worker Decontamination The State of Illinois demonstrated the Target Capability for Evacuee and Emergency Worker Decontamination. The State established adequate facilities, resources, and trained personnel to provide decontamination of evacuees and emergency workers.
Evacuee/Emergency Worker Decontamination The State of Illinois demonstrated the Target Capability for Evacuee and Emergency Worker Decontamination. The State established adequate facilities, resources, and trained personnel to provide decontamination of evacuees and emergency workers.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: I.c.1, l.d.1, 1.e.1, 6.a.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: I.c.1, l.d.1, 1.e.1, 6.a.1.
: c. DEFICIENCY: None
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None.
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None.
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.24 State of Illinois - Illinois State University/Horton Field House - Emergency Worker Monitoring and Decontamination of Equipment The State of Illinois demonstrated the Target Capability for Emergency Worker Monitoring and Decontamination of Equipment and Vehicles. The State had adequate procedures and resources for accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.24 State of Illinois - Illinois State University/Horton Field House - Emergency Worker Monitoring and Decontamination of Equipment The State of Illinois demonstrated the Target Capability for Emergency Worker Monitoring and Decontamination of Equipment and Vehicles. The State had adequate procedures and resources for accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.
In summary, the status of DHS/FEMA criteria for this location is as follows;
In summary, the status of DHS/FEMA criteria for this location is as follows;
: a. MET: l.d.1, L.e.1, 6.b.1.
: a.
: b. AREAS REQUIRING CORRECTIVE. ACTION: None
MET: l.d.1, L.e.1, 6.b.1.
: c. DEFICIENCY: None 37
: b.
AREAS REQUIRING CORRECTIVE. ACTION: None
: c.
DEFICIENCY: None 37


After Action Report/Improvement Plan Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
Clinton Power Station   I
After Action Report/Improvement Plan Clinton Power Station I
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.25 State of Illinois - Illinois State University/Horton Field House - Evacuee Registration                                                                                                   3 The State of Illinois demonstrated the Target Capability for Evacuee Registration. The State had the capability to establish adequate facilities, resources, and trained personnel to provide monitoring and registration of evacuees.
: f.
PRIOR ISSUES - RESOLVED: None
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.1.25 State of Illinois - Illinois State University/Horton Field House - Evacuee Registration 3
The State of Illinois demonstrated the Target Capability for Evacuee Registration. The State had the capability to establish adequate facilities, resources, and trained personnel to provide monitoring and registration of evacuees.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: l.d.1, L.e.l,6.a.1.
: a. MET: l.d.1, L.e.l,6.a.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None                                                                         I
: f. PRIOR ISSUES - RESOLVED: None I
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.26 State of Illinois - Illinois State University/Horton Field House - Congregate Care Center The State of Illinois demonstrated the Target Capability of Congregate Care Center (CCC) at the Illinois State University/Horton Field House! As part of the CPS REP Exercise, the American                     3 Red Cross (ARC) demonstrated the capability to provide resources and trained personnel to evacuees. The ARC successfully demonstrated that the CCC has the resources to provide                           3 services and accommodations consistent with ARC planning guidelines.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.26 State of Illinois - Illinois State University/Horton Field House - Congregate Care Center The State of Illinois demonstrated the Target Capability of Congregate Care Center (CCC) at the Illinois State University/Horton Field House! As part of the CPS REP Exercise, the American 3
Red Cross (ARC) demonstrated the capability to provide resources and trained personnel to evacuees. The ARC successfully demonstrated that the CCC has the resources to provide 3
services and accommodations consistent with ARC planning guidelines.
In summary, the'status of DHS/FEMA criteria for this location is as follows:
In summary, the'status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.d.1, 1.e.l,6.c.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: 1.d.1, 1.e.l,6.c.1.
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None                                                                                       3 38                                                 3 I
: d.
PLAN ISSUES: None 3
38 3
I


Unclassified Radiological EmergencyPreparedness Program (REP)
Unclassified Radiological EmergencyPreparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIOR.ISSUES - UNRESOLVED: None 3.3.2 Risk Jurisdictions 3.3.2.1 Dewitt County - Initial Warning Point In summary, the status of DHS/FEMA criteria for this location is as follows:
: g. PRIOR.ISSUES - UNRESOLVED: None 3.3.2 Risk Jurisdictions 3.3.2.1 Dewitt County - Initial Warning Point In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: 1.d.1.
: a. MET: 1.d.1.
Line 724: Line 955:
: d. PLAN ISSUES: 1.a.l.
: d. PLAN ISSUES: 1.a.l.
ISSUE NO.: 13-1l-lal-P-02 CRITERION: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner.
ISSUE NO.: 13-1l-lal-P-02 CRITERION: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner.
CONDITION: The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex .2G Notification Lists.
CONDITION: The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex.2G Notification Lists.
POSSIBLE CAUSE: Annex 2G lists the Primary point of contact for initial notification to Macon County as the Telecommunications Specialist in the Macon County EOC, and the Alternate point of contact as the 24-hour Sheriff's Dispatch Center. However, the EOC is not staffed on a 24 hours basis, and after-hours contact with Macon County can only be made through the 24-hour Dispatch Center. The call at 0923 hours from DeWitt CEN COM made to the Macon County EOC was taken by the Macon County Assistant Emergency Management Director. The Macon County EOC had not yet been activated and staffed, and the Initial Warning Point' (Dispatch Center) was unaware of the initial notification of an Alert Emergency Classification Level (ECL).
POSSIBLE CAUSE: Annex 2G lists the Primary point of contact for initial notification to Macon County as the Telecommunications Specialist in the Macon County EOC, and the Alternate point of contact as the 24-hour Sheriff's Dispatch Center. However, the EOC is not staffed on a 24 hours basis, and after-hours contact with Macon County can only be made through the 24-hour Dispatch Center. The call at 0923 hours from DeWitt CEN COM made to the Macon County EOC was taken by the Macon County Assistant Emergency Management Director. The Macon County EOC had not yet been activated and staffed, and the Initial Warning Point' (Dispatch Center) was unaware of the initial notification of an Alert Emergency Classification Level (ECL).


Line 730: Line 961:
Annex 2G of the DeWitt County Plan, dated 11/11 EFFECT: While the notification, as made, had no adverse effect on the response, the 39
Annex 2G of the DeWitt County Plan, dated 11/11 EFFECT: While the notification, as made, had no adverse effect on the response, the 39


                                                              ,-Unclassified
                                          -"Radiological Emergency Preparedness Program .(REP)
I
I
  "'After Action Report/Improvement Plan                                                                 Cliriton Power Station nstaffed, and thhe Initial .Warning I
, -Unclassified
Macon County EOC had not yet been activatedand Point (Dispatch Center) was unaware of-the initial notificfation-.                                           I RECOMMENDATION: The Primary and Alternate points 0f.contact for Macon                                         I County should be reversed in.the DeWitt County Annex 2G N6tificajion ists:
-"Radiological Emergency Preparedness Program.(REP)
Clarification should be provided td fmiake the 24-hour station (Macoh County's Dispatch Center) the Primary notific'itjon p6int,for initial n6tificitlio ofo i nident I
"'After Action Report/Improvement Plan Cliriton Power Station Macon County EOC had not yet been activatedand nstaffed, and thhe Initial.Warning Point (Dispatch Center) was unaware of-the initial notificfation-.
at the CPS, and the EOC the Alternate notification point until such'time as'the EOC is sufficiently staffedto 'function as the~phi-arynotificitio'npomnt.- - -                    -              I
RECOMMENDATION: The Primary and Alternate points 0f.contact for Macon County should be reversed in. the DeWitt County Annex 2G N6tificajion ists:
: e. NOT DEMONSTRATED: None'                                                                                           I
Clarification should be provided td fmiake the 24-hour station (Macoh County's Dispatch Center) the Primary notific'itjon p6int, for initial n6tificitlio ofo i nident at the CPS, and the EOC the Alternate notification point until such'time as'the EOC is sufficiently staffedto 'function as the ~phi-arynotificitio'npomnt.- -
: f. PRIOR ISSUES RESOLVED: None
I I
: g. PRIOR'ISSUES - UNRESOLVED:.None 3.3.2.2 Dewitt County -'Emergency.Operations Center-U The DeWitCounty Emergenc".Operations:,C~nter,(EOC)demonstratedthe Tagei Capability of I
I I
,Emergency Operations Center Management by actiVities includingthe use6f effective' procedures to alert noti~fyad'mob'ilize emergency per'snnel and a~tivate facilities in-a timely;                               I manner: *The focus' lwaysiremailned onWthe'prinfiy*objetive4 iwhich is'rd&6tini-ithepublic
I I
'health and*-sfety of those .wholive and workinlocal comnmnities The Dewitt County Emergency Services. ani iatr                     '    y' (ESDAj C6ootdin'ator'full'y d'-fo~tfdtho~e:c'n I
e.
maki~ng processjolvmg appropriatefactors and necessary coordiation when makng                                             .
f.
I Co0rty)EOC' was sucessfullyid'e~monstrated by.,the'DeW~itt, County: Boa~r~dChairperson (CBC).
g.
' and the'ESDADrector.'.,                                           .
NOT DEMONSTRATED: None' PRIOR ISSUES - RESOLVED: None PRIOR'ISSUES - UNRESOLVED:.None 3.3.2.2 Dewitt County -'Emergency.Operations Center-The DeWitCounty Emergenc".Operations:,C~nter,(EOC)demonstratedthe Tagei Capability of
In summary, thie-status'of DHS/FEMA critea                 rfor this"1ocationisas follows:
,Emergency Operations Center Management by actiVities includingthe use6f effective' procedures to alert noti~fyad'mob'ilize emergency per'snnel and a~tivate facilities in-a timely; manner:
a., 'MET,'4i a14,A"d'l i'd 1;i.1e.1;"2.b. 2, .c 1*2-e.*1', 3 .it,3.b~ i 3.c.-1,           3.c.2;3.d.1, 3.d.2,
* The focus' lways iremailned onWthe'prinfiy*objetive4 iwhich is'rd&6tini-ithe public
                                                                -b    ."h&j                      ,        "t,~fN e.~ OC:. a succes
'health and*-sfety of those.wholive and work inlocal comnmnities The Dewitt County Emergency Services. ani iatr y'
: b. AREAS REQUIiRING CORRECTIVE ACTiON:.None.. .
(ESDAj C6ootdin'ator'full'y d'-fo~tfdtho~e:c'n maki~ng processjolvmg appropriatefactors and necessary coordiation when makng Co0rty)EOC' was sucessfullyid'e~monstrated by.,the'DeW~itt, County: Boa~r~dChairperson (CBC).
I
' and the'ESDADrector.'.,
: c. D S'd. PLAN ISSUES: None
In summary, thie-status'of DHS/FEMA critea rfor this"1ocationisas follows:
                                    ' None ie.n,.
a., 'M ET,'4i a14,A"d'l i'd 1;i.1e.1;"2.b. 2,.c 1 *2-e.*1', 3.it,3.b~ i 3.c.-1, 3.c.2;3.d.1, 3.d.2,
rated                                 o                                 I e.. NOT DEMONSTRATED: oe
: b. AREAS REQUIiRING CORRECTIVE ACTiON:.None..
: f. PRIOR ISSUES -RESOLVED: 1.cll.
: c.
7                             T I
D N
ie.n,.
' one S'd. PLAN ISSUES: None rated o
e.. NOT DEMONSTRATED:
oe e.~ OC:. a succes
-b."h&j "t,~fN
: f.
PRIOR ISSUES -RESOLVED: 1.cll.
7 T
U I
I I
I I
I I
40 I
40 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After. Action Report/Improvement Plan                                                     Clinton Power Station ISSUE NO.: 13-09-lcl-A-01 ISSUE: At 1229 hours, the CBC, ESDA Coordinator, and two IEMA representatives departed the EOC to attend a media briefing located down the hall away from the EOC. There was no one delegatedto provide direction and control during their absence, nor was anyone tasked with bringing important messages to them at the media briefing room if necessitated. At,1300 hours, the CBC, ESDA Coordinator, and two IEMA representatives returned to the EOC. During the time they were out of the EOC (31 minutes), State NARS Message No.4 arrived, stating that a wind direction change had occurred, and the State did not recommendthat Sub-area 2 be evacuated. Since the decision-makers were out of the room when this message arrived, and no delegate was present, the message sat on the desk and not*
After. Action Report/Improvement Plan Clinton Power Station ISSUE NO.: 13-09-lcl-A-01 ISSUE: At 1229 hours, the CBC, ESDA Coordinator, and two IEMA representatives departed the EOC to attend a media briefing located down the hall away from the EOC. There was no one delegatedto provide direction and control during their absence, nor was anyone tasked with bringing important messages to them at the media briefing room if necessitated. At,1300 hours, the CBC, ESDA Coordinator, and two IEMA representatives returned to the EOC. During the time they were out of the EOC (31 minutes), State NARS Message No.4 arrived, stating that a wind direction change had occurred, and the State did not recommendthat Sub-area 2 be evacuated. Since the decision-makers were out of the room when this message arrived, and no delegate was present, the message sat on the desk and not*
acknowledged. The Mayor of Clinton noticed the message approximately 10 minutes after the form arrived, and informed the Clinton. Police Chief of the message, and that evacuation of Sub-area No.2 was not recommended. No other discussion concerning the wind direction change and its affect on Sub-area No.2 was identified or addressed as a concern, even when the decision-makers returned from the media briefing.
acknowledged. The Mayor of Clinton noticed the message approximately 10 minutes after the form arrived, and informed the Clinton. Police Chief of the message, and that evacuation of Sub-area No.2 was not recommended. No other discussion concerning the wind direction change and its affect on Sub-area No.2 was identified or addressed as a concern, even when the decision-makers returned from the media briefing.
CORRECTIVE ACTION DEMONSTRATED: Despite total failure of the NARS phone system, various problems with facsimile machine connectivity and multiple, simultaneous controller inject messages, the mutual collaboration:and support between DeWitt County's senior leaders allowed the command staff to maintain.
CORRECTIVE ACTION DEMONSTRATED: Despite total failure of the NARS phone system, various problems with facsimile machine connectivity and multiple, simultaneous controller inject messages, the mutual collaboration:and support between DeWitt County's senior leaders allowed the command staff to maintain.
overall situational awareness, effectively manage the efforts. of the DeWitt County EOC staff and coordinate emergency response operations with the State and supporting counties.
overall situational awareness, effectively manage the efforts. of the DeWitt County EOC staff and coordinate emergency response operations with the State and supporting counties.
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.3 Dewitt County - Emergency Operations Center - Traffic and Access Control Post The DeWitt County EOC demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the DeWitt County Sheriff's Deputy, ,which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.2.3 Dewitt County - Emergency Operations Center - Traffic and Access Control Post The DeWitt County EOC demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the DeWitt County Sheriff's Deputy,,which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.
During the interview, the Deputy demonstrated knowledge of the provisions of the Emergency 41
During the interview, the Deputy demonstrated knowledge of the provisions of the Emergency 41


iloia
.~~~~
                                                .~~~~           Unlsi R      ,e EegnyP~rep~ar~ednes&#xfd;sPrra     (R A ion R   *eport/mpr oement Plan                                                                     'A             Clinton Po.er tSiaion Operation Plan rel'atedio         ihevestalishment: 6o TACs in addiion tothe useof thie appropriate                                               .
R iloia Unlsi  
Sdosimetr-yprocedures, docuhmentatioiinand-counicatio'inifeq'uip'metincudefigfi'abl                                     -            rd-di-s,..
,e EegnyP~rep~ar~ednes&#xfd;sPrra (R
cell -phones anid mobile data terminalS.Thisincluded th.e proiion of                                                           the tdosimetryand ability-to m~n~e erergncv wor-ker radiological, ex                       qj icuigtedcsih                         o~np~et11 q-
A ion R  
" ,Insummary; thie           a~tu.f DHS/FEMA.driteia 'for tss. lo.iti:onis as-followxs qI S.*b. AREAS,:
*eport/mpr oement Plan  
:.'REQUIRINGCOR.RECTIVE ACTION. None S DEFICI:ENC Y: N                               E . .N.                       ,        a,                         ,..
'A Clinton Po.er tSiaion Operation Plan rel'atedio ihevestalishment: 6o TACs in addiion tothe useof thie appropriate S dosimetr-yprocedures, docuhmentatioiinand-counicatio'inifeq'uip'metincudefigfi'abl rd-di-s, cell -phones anid mobile data terminalS.Thisincluded th.e proiion of tdosimetryand the ability-to m~n~e erergncv wor-ker radiological, ex qj icuigtedcsih o~np~et11 q-
: d. PLAN ISSUES:.No.                                  .
",In summary; thie a~tu.f DHS/FEMA.driteia 'for tss. lo.iti:onis as-followxs qI S.*b.
n NTD ON .
AREAS,:
N                                  .STRATEDE_.
:.'REQUIRINGCOR.RECTIVE ACTION. None S
f R-IOR ISSUES. - ,RESOLE None                                                               4 g RIOR ISSUES - UNRESOLVIED: None 13;3.         Dewitt County - Clinton Police Departmen                           Traffic and Access Control Pos 2An tecpblttoipment                        Trafi an AcesCnrosts'(TCs*ihi h 0ml i.,L!dncluded".1<
DEFICI:ENC Y: N E..N.
the._,:..,..
a,
dit         ibutioof dosimetry emergency worker radiological, ex)posure maaemn                       :                              Ul E         Dnhe PoliciDw   intnto tlOfrdemonstrated               t         ihe,           bthof.the.prvisiono EmeedgecTt1pr,       Rons Plangrelatedtoth establs.hm             t       ntof APs aD                           io         u EP:.
: d. PLAN ISSUES:.No.
Di*>                   rv 1 w                                                           of                 ns of"t porta caability rdiostrlmution e                             mobiletdat eergnals              Ths      il            ed the pxovsi -toeI0-'of dosmetr and'the
n N NTD ON.
  - erg5. NOT: D
.STRATEDE_.
: f.         yPRIOr gplPRIO, R ISSE portbleadi to imlilengenteTn~fre,ancy a
f R-IOR ISSUES. -,RESOLE None 4
QtRATED. N iosUES      Ro worker URESoLViED:None and e      d        ne.
g RIOR ISSUES - UNRESOLVIED: None 13;3.
                        ,&#xfd;c~l & es nd obile. data :t~ermnals.:*-Ths s
Dewitt County - Clinton Police Departmen Traffic and Access Control Pos i.,L!dncluded the._,:..,..  
s Codntrogl'eposure(Tin~s)dintheeisin
".1< dit ibutio of dosimetry emergency worker radiological, ex)posure maaemn Ul 2An tecpblttoipment Trafi an AcesCnrosts'(TCs*ihi h
                                                                                  ,a,,:*te~rviin'o ion
0ml E
                                                                                                      ,          .        ...        t e oiner
Dnhe intnto PoliciDw tlOfrdemonstrated t
                                                                                                                                                    .. "Ia Insumry,&#xfd; the statu of DUFEMA        e          -deontera~frthis loatongs            is, fhpollsows,.
: ihe, of.the.prvisiono bth EmeedgecTt1pr, Rons Plang relatedtoth establs.hm t
In summar           theatstel
ntof APs aD io u
                          .managuso f emren           6writeri aflot hloglcal             i-i.,epsr~ udf*@;*~ii~ t                       ::.      i".
porta e rdiostrlmution mobiletdat eergnals Ths il ed the pxovsi of dosmetr and'the caability to imlilengenteTn~fre,ancy worker s Codntrog l' eposure(Tin~s)dintheeisin
13 3  I,                  4;.2"L
-toeI0-'
      -,..b.AREAS REQUIRING                         E     TIVACTIONNone-                                        .-
EP:.
: c. .DEFICIEN CY : N one .                     -. -. ' . .          . .:*: : --. "                  ... .:       " .        :    .
Di*>
: e. NOT DEMONSTRATED:N n .!.~ ~ .4.)...;"
rv 1 w of ns of"t Insumry,&#xfd; the statu of e
e,.:                                                                              -,/"(-.;&#xa2;.;.i,.ii - .;;!*...4..i.
DUFEMA -deontera~frthis loaton is, gs fhpollsows,.
f.. P:RIOR ISSUIES -RESOLVED:None-, -. ,                           ,",,,.          , .7;,:--_           .).-if.-d             -!    '
- erg5. NOT D QtRATED. N s
: g. .P RI O R ISSU E S -U N RE SO L VE D : N o n e ..,: ,*                  -:. >:i / " *          ,;    .-, : , ,. ! .* .>*
: f.
yPRIOr a iosUES e
d Ro ne.
t
: gplPRIO, R ISSE e
URESoLViED:None and Ia ion portbleadi
,&#xfd;c~l & es nd obile. data :t~ermnals.:*- Ths  
,a,,:*te~rviin'o oiner In summar the stel at uso f
.manag emren 6writeri aflot hloglcal i-i.,epsr~ udf*@;*~ii~ t i".
4;.2"L 13 3 I,
-,..b. AREAS REQUIRING E
TIVACTIONNone-
: c..D EFICIEN CY : N one.
e,.:
: e. NOT DEMONSTRATED:N n.!.~ ~.4.)...;"  
-,/"(-.;&#xa2;.;.i,.ii -
.;;!*...4..i.
f..
P:RIOR ISSUIES -RESOLVED:None-, -.,  
,.7;,:--_  
.).-if.-d g..P R I O R I S S U E S -U N R E S O L V E D : N o n e.., : *,  
-:. >: i / "
* 42
* 42


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station 3.3.2.5 Dewitt County., Clinton Police Department -Traffic and Access Control Post -
After Action Report/Improvement Plan Clinton Power Station 3.3.2.5 Dewitt County., Clinton Police Department -Traffic and Access Control Post -
Dosimetry Briefing.
Dosimetry Briefing.
The Clinton Police Department demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Clinton Poljce Department Officer, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ. Appropriate dosimetry, record-keeping documents, and information on-how to manage each emergency worker's dose was discussed by the Dosimetry Control Qfficer (DCO).
The Clinton Police Department demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Clinton Poljce Department Officer, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ. Appropriate dosimetry, record-keeping documents, and information on-how to manage each emergency worker's dose was discussed by the Dosimetry Control Qfficer (DCO).
Equipment requiring calibration and testing was within proper dates. The DCO provided instructions on potassium iodide (KI)and instructions on when to ingest KI.
Equipment requiring calibration and testing was within proper dates. The DCO provided instructions on potassium iodide (KI)and instructions on when to ingest KI.
In summary, the status of DHS/FEMA criteria for this location is as follows: .
In summary, the status of DHS/FEMA criteria for this location is as follows:.
: a. MET: 1.d.1, L.e.1, 3.a.1, 3.b.1.
: a.
MET: 1.d.1, L.e.1, 3.a.1, 3.b.1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None;
: d. PLAN ISSUES: None;
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES - RESOLVED: None
NOT DEMONSTRATED: None
: f.
PRIOR ISSUES - RESOLVED: None
: g. PRIORJISSUES - UNRESOLVED: None.
: g. PRIORJISSUES - UNRESOLVED: None.
3.3.2.6 Dewitt County - EAS WJBC (1230); WBNQ (101.5), WBWN (104.1)
3.3.2.6 Dewitt County - EAS WJBC (1230); WBNQ (101.5), WBWN (104.1)
DeWitt County demonstrated the Target Capability of Emergency Public Information and Warning associated with primary alerting and notification of the, public was completed in a timely manner. Following the decision by County emergency management officials to notify the public of an emergency situation at the CPS, Radio Stations WBNQ (105.0 FM), WBWN (104.1 FM) and WJBC (1230 AM) personnel demonstrated a thorough understanding &#xfd;of their equipment, the EAS process and executed their duties in a timely and professional manner.
DeWitt County demonstrated the Target Capability of Emergency Public Information and Warning associated with primary alerting and notification of the, public was completed in a timely manner. Following the decision by County emergency management officials to notify the public of an emergency situation at the CPS, Radio Stations WBNQ (105.0 FM), WBWN (104.1 FM) and WJBC (1230 AM) personnel demonstrated a thorough understanding &#xfd;of their equipment, the EAS process and executed their duties in a timely and professional manner.
In summary, the status of DHS/FEMA criteria for this location is as follows:,:,
In summary, the status of DHS/FEMA criteria for this location is as follows:,:,
: a. MET: 1.d.l,5.a.l1.
: a.
MET: 1.d.l,5.a.l1.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None 43
: d. PLAN ISSUES: None 43


0Radiol gic4!
                                                          -.. ~.,.Undasifed Porm RP I
_,After;Ation Report/Imrpfovemient Plani                                                                    . , i: - PoW    Stn s artion:
NQ  EONSTRA-T-ED: Nne                                      4;~                                        'f,-
I
I
: f. -PRI1OR ISSUES           -RESOLVED:
-.. ~.,.Undasifed 0Radiol gic4!
g.-PRIOR ISSUES - UNRESOLVED: None, No'ne I
Porm RP
3.3.2 7;DeWitt County -. Clinton School District15 Evacuaio                                   Schcool' I
_,After;Ation Report/Imrpfovemient Plani
  ;DeWittCounty demonstrated the Target Ca                           .abiotf Citizen)BvacUatioin adShelter*in-Place, for. school .childien. TheClinton Conuty Unit Schoo Dvistrct #1l{&presentatv e describeds I
., i: -
plaiis and proceduresto safely evacuate stuents from theCPS EPS.anid reunite 4the withhir.i families2* Thekschool district&demonstratedsguffic*eiietperso el&#xfd;,*ciuent-contacti*nfo                               iirmation,.
Stn PoW ar s tion:
I emergency worker                         and conunuicationsrcapalnliieO                 totiffamilies idosimetry,  and guardin.
NQ EONSTRA-T-ED: Nne 4;~
regarding how to reunite with evacuadted students                                                                                           I In-sumary, the staus of DHS/FEMA citeria for this location is as follows
'f,-
      .a. MET l'd 1lxl.e1',3.a!L3;                     i,:x2 I
: f.  
b.&#xfd;. AREAS REQUIRING CORRECTIVE ACTION: None                                                 ,,,,
-PRI1OR ISSUES -RESOLVED:
                                                                                                                                        .I :'
No'ne I
c DEFICIENdY: None
I g.-PRIOR ISSUES - UNRESOLVED: None, 3.3.2 7;DeWitt County -. Clinton School District15 Evacuaio Schcool'
: d. PLAN ISSUES: None                                                                                                             ''>*I:!
;DeWittCounty demonstrated the Target Ca  
e      NOT DEMONSTRATED: None
.abi otf Citizen)BvacUatioin adShelter*in-Place, for. school.childien. TheClinton Conuty Unit Schoo Dvistrct #1l{&presentatv e describeds plaiis and proceduresto safely evacuate stuents from theCPS EPS.anid reunite 4the withhir.i families2* Thekschool district&demonstratedsguffic*eiietperso el&#xfd;,*ciuent-contacti*nfo iirmation, emergency worker idosimetry, and conunuicationsrcapalnliieO totiffamilies and guardin.
: f. PRIORISS;UES           RESOLVEDNone g-. PRIOR ISSUES - UNRESOLVED:None
regarding how to reunite with evacuadted students I
,.3.3.2.8 Mlacon County Initial Warnlinlg &#xfd;Point .
I I
                                                                                                                                        .;; I?
I I
                                                                                                                                        ....-=li Mac00nCi*i dpemonstra*ed" the Target -                               ity of a.....tial Warning Point (TWP) i               dluditg the useof effective Drocedures to alert notify and mobiliz*e emergency personnel a&#xfd;nd activ'aete' :,
In-sumary, the staus of DHS/FEMA citeria for this location is as follows
* I-S
.a. MET l'd 1lxl.e1',3.a!L3; i,:x2 b.&#xfd;. AREAS REQUIRING CORRECTIVE ACTION: None c DEFICIENdY: None
    &#xfd;aI~ities &#xfd;in'a timely. manner a'Dispa~thers. ee fmlarwt thi nuclea icidetnotifcto                                                     I.,
: d. PLAN ISSUES: None e
o d redurs.se.'Thre.. are re~dul,4                   lctl ofsystems....ilablePat4the:'.,?and both irimay.
NOT DEMONSTRATED: None
and       t m.-
: f.
s:tmswee bapexerclsek I.,
PRIORISS;UES RESOLVEDNone g-.
sdff-t 1d                     ,, .'
PRIOR ISSUES - UNRESOLVED:None
Iiisummary, the status ofDHS/FEMAcriteria for?:his.i6.ation isas follows:
,.3.3.2.8 Mlacon County Initial Warnlinlg &#xfd;Point.
: a. -MET:iI.a0I.,l.dl                     ..                                                  .1.    .      .
Mac00nCi*i dpemonstra*ed" the Target -
ity of a.....tial Warning Point (TWP) i dluditg the useof effective Drocedures to alert notify and mobiliz*e emergency personnel a&#xfd;nd activ'aete' :,
&#xfd;aI~ities &#xfd;in'a timely. manner a'Dispa~thers. ee fmlarwt thi nuclea icidetnotifcto d
o redurs.se.'Thre.. are re~dul,4 lctl ofsystems....ilablePat4the:'.,?and both irimay.
and bapexerclsek tm.-
s:tmswee sd ff-t 1d Iiisummary, the status ofDHS/FEMAcriteria for?:his.i6.ation isas follows:
: a. -MET:iI.a0I.,l.dl  
.1.
: b. AREAS REQUIRING CORRECTIVE AcTION:.None:
: b. AREAS REQUIRING CORRECTIVE AcTION:.None:
: c. DEFICIENCY: None
: c.
DEFICIENCY: None
: d. PLAN ISSUES: None-,
: d. PLAN ISSUES: None-,
I
.I :'
                                                                  .44                                                                       I I
I:
I?
-=li
* I-I.,
I.,
.44 I
I I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None g,   PRIOR ISSUES - UNRESOLVED: None 3.3.2.9 Macon County - Emergency Operations Center The Macon County Emergency Operations'Center (EOC) demonstrated the Target Capability of Emergency Operations Center Management including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely mann3er. Macon County,provided sufficient multi-agency coordination for an incident at the CPS by promptly activating and operating for the duration of the incident. The EOC was managed* efficiently and effectively. The EOC completed all notifications and was staffed to an operational level. The EOC manager provided solid management, direction and control using briefings. This allowed the staff of the EOC ,to maintain a common operating. picture and overall response to the event.
: f.
PRIOR ISSUES - RESOLVED: None g,
PRIOR ISSUES - UNRESOLVED: None 3.3.2.9 Macon County - Emergency Operations Center The Macon County Emergency Operations'Center (EOC) demonstrated the Target Capability of Emergency Operations Center Management including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely mann3er. Macon County, provided sufficient multi-agency coordination for an incident at the CPS by promptly activating and operating for the duration of the incident. The EOC was managed* efficiently and effectively. The EOC completed all notifications and was staffed to an operational level. The EOC manager provided solid management, direction and control using briefings. This allowed the staff of the EOC,to maintain a common operating. picture and overall response to the event.
The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect. the health and safety of the public.
The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect. the health and safety of the public.
In summary, the status of DHS/FEMA criteria for this location is as follows:,
In summary, the status of DHS/FEMA criteria for this location is as follows:,
: a. MET: 1.a.1, 1.c.1, l.d.1, L.e.l 3.a.1, 3.b.1, 3.d.1, 3.d.2.
: a.
MET: 1.a.1, 1.c.1, l.d.1, L.e.l 3.a.1, 3.b.1, 3.d.1, 3.d.2.
b, AREAS REQUIRING CORRECTIVE ACTION: None
b, AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None d, PLAN ISSUES: None
: c. DEFICIENCY: None d,
PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None g,   PRIOR ISSUES - UNRESOLVED: None.
: f. PRIOR ISSUES - RESOLVED: None g,
3.3.2.10 Macon County - Emergency Operations Center Traffic and Access Control Post Macon County demonstrated the Target Capability of Emergency Public Safety. and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure, management, and the capabilityto implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.
PRIOR ISSUES - UNRESOLVED: None.
3.3.2.10 Macon County - Emergency Operations Center - Traffic and Access Control Post Macon County demonstrated the Target Capability of Emergency Public Safety. and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure, management, and the capabilityto implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.
45
45


                                                        "  "          =...qi'Uficlaissified
=...qi'Uficlaissified  
                                                  - RadiologicalEmergency Preparedness Program(REP)
- RadiologicalEmergency Preparedness Program(REP)
                                                                                                                                              --              -    .      "  .          I AftefA~ctirn.Repqrt/Improvement Plan           ."                                    '-.                                                          .. CInton Power Station In summary, the status ofDHS/FEMA criteria for thislocation is as follows
AftefA~ctirn.Repqrt/Improvement Plan CInton Power Station In summary, the status ofDHS/FEMA criteria for thislocation is as follows
: a. MET: L.d.1, L.e.1,3.a.1I3.b.1, 3.d.l:                           1-,                                                                                 -
: a.
b.
MET: L.d.1, L.e.1,3.a.1 I3.b.1, 3.d.l: 1-,
c.
: b.
AREAS REQUIRING CORRECTIVE ACTION:None DEFICIENCY: None                                       .i,                   -,8               ..  -'                                                                  I
AREAS REQUIRING CORRECTIVE ACTION:None
: d. PLAN ISSUES: None                                           ,..      -                --                                                                  ,
: c. DEFICIENCY: None  
        -6e. NOT DEMONSTR;ATED:Noiie`
.i,  
          .f. PRIOR ISSUES -RESOLVED- Nonfe                                                       -    '
-,8
g    -PRIORISSUES UNRESO.tVD:.Nonez. r,
: d. PLAN ISSUES: None  
                                                            --              "        .      33. :"      .            -      3 33     ,"          "      " ,. -
-6e. NOT DEMONSTR;ATED:Noiie`
3.3.2.11 Mc~eAn County&#xfd;-Initial, WarningPo&#xfd;i*t .*&#xfd;                                                                                              ;4                 .      .
.f. PRIOR ISSUES -RESOLVED-Nonfe g
: 3.     ~     .3       731t -                                                .                    -I           7 McLean Couty* *,emostrated&#xa2;d t*hejirgetCadpabilit6 of an Initial Warming Point ,(IW1) including 6the 6f effectivv&procediysato`aleit;,noti                                           ,r I
-PRIOR ISSUES UNRESO.tVD:.Nonez. r,
*facilit&#xfd;ii         a timey ffi               i,-ae:spatcher&s&#xfd;w~rfjiiihafwith t eirhnucear~incdentitatri..-
: 33.
*procedures. There arered udant communiatnsyItems                                                                     -availeabl!eatheItWP,a-ndbothprma                                   I and bacikup systemswere.used effecti.elY dng                                                 this exeise-i.e-                                                                   ,:!: I In summary, th.e staus :ofDHS/NFEMAcriteria for this l*cataionis as follows
3 3 3 3.3.2.11 Mc~eAn County&#xfd;-Initial, WarningPo&#xfd;i*t.*&#xfd; 4
                                                                                                                                                                                      .-,I.:
731t
: 3.  
~  
.3 7
-I McLean Couty* *,emostrated&#xa2;d t*hejirgetCadpabilit6 of an Initial Warming Point,(IW1) including 6the 6f effectivv&procediysato`aleit;,noti  
,r
*facilit&#xfd;ii a timey ffi i,-ae:spatcher&s&#xfd;w~rfjiiihafwith t eirhnucear~incdentitatri..-
*procedures. There arered udant communiatnsyItems  
-availeabl!eatheIt WP,a-ndbothprma and bacikup systemswere.used effecti.elY dng this exeise-i.e-In summary, th.e staus :ofDHS/NFEMAcriteria for this l*cataionis as follows d.'
Ji ANiSSUES:Nonei--i
!v,:*/&deg;i:*-;d*i:2
.i4;{i** -;
.d; I.;>4 -:;:'
-e.
NOT DEMONSTRATED:None
'U-"*:)?(&#xa2;t:
T;,5@;:p..2.....
f-.
PRIOR ISSUESI-RESOLVED: N---
g PR IO RI SSU ES on U N E
O V
D4N n
3.3.2.12 McLean Count~iy - Emergency Operatfions Centerl ii 5:*,:.
The:McLean C~unty Emergncy QJperations i~enter*(Eo2) demonstrat~ed the T~arget c~ap,~bilityi of.Emergency operaitions Ceniter Manag~remt:iincludifig the use of effective~pr6pedures it0 aiert, sttti Va-faiite notify'and mobilize emhergenp* personnieband4 ~ct,,faiiiie iff, tim~iely a~miei-,McI~ean.,
*CouitY~pro~vide~t{sfficientimiilti.-agency :cobrdlna~tionm for an i~nciden~t at the CPS' by promptly.-,
activating~and 6perating for'the durationofthe incdent. The E`C was.mafrg..effiietl and
'3
,V effectively. The.EOC completedall......i.insad.as stafied oa6eatna.lYl)he-notifications and w
to an
.pe-atE' parations enter EOC manager provided solid management, direction and control using briefings. This allowed I
I I
I
I
  .:    , d.'    Ji ANiSSUES:Nonei--i                            !v,:*/&deg;i:*-;d*i:2                                :  .i4;{i**      -;            .d; I.;>4 -:;:'              -
,: ! : I I.:
    -e.
I 46 I
f-.g NOT PRIOR PR DEMONSTRATED:None -
ISSUESI-IO RI  SSU  ES RESOLVED:
onU N      E    O      V    N---
D4N            n
                                                                                              'U-"*:)?(&#xa2;t:
                                                                                                                                .          T;,5@;:p..2.....
3.3.2.12 McLean Count~iy      sttti      - Emergency Operatfions Centerl                                            ii                  5:*,:.
Va-faiite The:McLean C~unty Emergncy QJperations i~enter*(Eo2) demonstrat~ed the T~arget c~ap,~bilityi
                                                                                            '3      .  .  ,V                                              ..  .
of.Emergency operaitions Ceniter Manag~remt:iincludifig the use of effective~pr6pedures it0 aiert, notify'and mobilize emhergenp*      .pe-atE'      personnieband4 notifications parations
                                                                                    ~ct,,faiiiie and        w enter iff, to tim~iely an a~miei-,McI~ean.,
*CouitY~pro~vide~t{sfficientimiilti.-agency :cobrdlna~tionm for an i~nciden~t at the CPS' by promptly .-,
activating~and 6perating for'the durationofthe incdent. The E`C was .mafrg.                                                                    _' .effiietl and effectively. The .EOC completedall......i.insad.as                                                            stafied oa6eatna.lYl)he-EOC manager provided solid management, direction and control using briefings. This allowed 46 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                     Clinton Power Station the staff of the EOC to maintain a common operating picture and overall response to the event.
After Action Report/Improvement Plan Clinton Power Station the staff of the EOC to maintain a common operating picture and overall response to the event.
The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect the health and safety of the public.
The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect the health and safety of the public.
In summary, the status of DHS/FEMA criteria for this location is as. follows:
In summary, the status of DHS/FEMA criteria for this location is as. follows:
: a. MET: 1.a.1, 1.c.1, 1.d.1, l.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.
: a. MET: 1.a.1, 1.c.1, 1.d.1, l.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.
: b. AREAS REQUIRING CORRECTIVE ACTION:. None                                     c
: b. AREAS REQUIRING CORRECTIVE ACTION:. None c
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None
: e.
: f. PRIOR ISSUES -.RESOLVED: None
NOT DEMONSTRATED: None
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.13 McLeanCounty. - Emergency. Operations Center - Traffic and Access Control Post McLean County demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.
: f.
PRIOR ISSUES -.RESOLVED: None
: g.
PRIOR ISSUES - UNRESOLVED: None 3.3.2.13 McLeanCounty. - Emergency. Operations Center - Traffic and Access Control Post McLean County demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.
In summary, the status of DHS/FEMA criteria for this location is as follows:
In summary, the status of DHS/FEMA criteria for this location is as follows:
: a. MET: L.d.l,l.e.1, 3.a.1, 3.b.l,3.d.1.
: a.
: b. AREAS REQUIRING CORRECTIVE ACTION: None
MET: L.d.l,l.e.1, 3.a.1, 3.b.l,3.d.1.
: b.
AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: None
: d. PLAN ISSUES: None
: e. NOT DEMONSTRATED: None'
: e. NOT DEMONSTRATED: None'
: f.   'PRIOR ISSUES% RESOLVED:               None
: f. 'PRIOR ISSUES% RESOLVED: None
: g. PRIOR ISSUES,- UNRESOLVED: None 47.
: g.
PRIOR ISSUES,- UNRESOLVED: None 47.


Emerec Preparednesis Program;(EP
*~ ailogical Emerec Preparednesis Program;(EP
                                                    *~ ailogical
..,;A,.&#xfd;fier:Action ;Repocrt/Imp~rovement Plan PoeSttn 3.3.21.14 iatt _Cout Inta~rng Pit p~  
.. ,;A,.&#xfd;fier:Action ;Repocrt/Imp~rovement Plan                                                                                     PoeSttn 3.3.21.14 iatt _Cout                     Inta~rng             Pit           p~         ~~
~~
Patt.County demonstrated the TargetCapability. of anjIitial Wrarning Pint(W)inldgth use Of effective proc-edures to. alert , notify anid mobil Iize emergency person nel and ac ,tivate
Patt.County demonstrated the TargetCapability. of anj Iitial Wrarning Pint(W)inldgth use Of effective proc-edures to. alert, notify anid mobil Iize emergency person nel and ac,tivate
  -facilities in a timely manner Pipt~                           e~~famJ wh einulea inciden notiication,
-facilities in a timely manner Pipt~
  *proe6durs. There are redundant..c6nicaii6*n i SYsteme                           sailableait theJWP, and b pmary
e~~famJ wh einulea inciden notiication,
  *and back-up :systems were used effeti ''I'"uiingdhis:exeicise                                           ,
*proe6durs. There are redundant.. c6nicaii6*n i
  'In summary, the status of DIHS/FEMA criteria for this-l'cition is as follows.
SYsteme sailableait theJWP, and b pmary
: a.     MET:- 1.a.l, 1.d.l.
* and back-up :systems were used effeti ''I'"uiingdhis:exeicise  
b.'     ARE!AS-REQUIRING CORRECTIVE -ACTIO `No'ne c.-     DEFICIENCY: None
'In summary, the status of DIHS/FEMA criteria for this-l'cition is as follows.
: d.     PLAN ISSUES: None
: a. MET:- 1.a.l, 1.d.l.
: e.     NTDEMONSTRATED:None,                                                           .
b.' ARE!AS-REQUIRING CORRECTIVE -ACTIO `No'ne c.- DEFICIENCY: None
: f.     PTRIOR ISSUES RESOLVED:- None PRIO 0-ISSUES .-,UNRESOVD None--
: d. PLAN ISSUES: None
3.3.-2.15,Piaftt Count                 Emrgn'c'y'" eration's Cntr The.Piatt.County EmergencyOperations*&                     C-ntetrgeC)demonstratedsthe; a:rget, Cpability of; Emergeny!-_           Opration*sCn*                                                         dManage*meentincl-udinalert g.the.e.sof.eijeprocedrs*o*
: e. NTDEMONSTRATED:None,
    - otfy&#xfd;and_`q     moiiz emergency, personniel               and   activate   facilitieOs       in a timneymaerPttCuy
: f.
  * ;prvied-suffcient multi agency coordination fo*r an incient at theCPS byprmptly* a*ctivating.
PTRIOR ISSUES - RESOLVED:- None PRIO 0-ISSUES.-,UNRESOVD None--
3.3.-2.15,Piaftt Count Emrgn'c'y'" eration's Cntr The.Piatt.County EmergencyOperations*&
C-ntetrgeC)demonstratedsthe; a:rget, Cpability of; Emergeny!-_
Opration*sCn*
dManage*meentincl-udin g.the.e.sof.eijeprocedrs*o* alert
-otfy&#xfd;and_`q moiiz emergency, personniel and activate facilitieOs in a timneymaerPttCuy
* ;prvied-suffcient multi agency coordination fo*r an incient at theCPS byprmptly* a*ctivating.
-.:and bpeatitung for the duration of the incident.The EOC was managed efficently and effectively.
-.:and bpeatitung for the duration of the incident.The EOC was managed efficently and effectively.
TheEEC cmpted                           aitio       and was's af e to" a oerain.-l .ev'l.TheEOC, manager providd :c90rdlnaIted7
.manag~~~f
        .manag~~~solaid management al*woifc'th.eittonsat 1,
:c90rdlnaIted7 al*woifc'th.eittonsat t, make, desin
dietionad                   desin t,make,usa.1,.3..,AiTh3..ei
-and e;&#xfd;_~
                                                                                  -and e;&#xfd;_~            ~ s aowe t~~iprpaeacin the":
~
: d.         A-N:ral                                                             esn se       to t           t The            .the
t~~iprpaeacin TheE EC cmpted aitio and was's af e to" a oerain.-l.ev'l.TheEOC, manager I.
  &#xfd;EOC tormaintain a common Operat                         picture And11dv6 ,                   0                                   QC, I.  ..-                    .                      .  -,,,        *-:    :      . - , - ;  h ,  '  '-    .
h,
manager coordinated     In sumary~he With-DS/FEM
In sumary~he
:tatusof                  crieriagor~
:tatusof DS/FEM crieriagor~
DeWittl County   to make decisions     riefmgiin~s and ensuresflldw:            .tfffth that.pprqpriate.actionsI were*taken to~protect te health and safety of th~e pulc                                                                                 I In summary, the status of DHS /FEMA criteria for, this location is' As-follows:
riefmgiin~s sflldw:
: a. MET:: La.l1, l.c. 1, l.d. 1, L~e.l1, 3.a.1,- 3.b.l , 3A.dl,;3.d.2.;'.1
.tfffth providd solaid management 1,
dietionad usa.1,.3..,AiTh3..ei s aowe the":
: d.
A-N:ral esn se to t t Th e
.the
&#xfd;EOC tormaintain a common Operat picture And11dv6,
0 QC, manager coordinated With-DeWittl County to make decisions and ensure that.pprqpriate.actionsI were* taken to~protect te health and safety of th~e pulc I
In summary, the status of DHS /FEMA criteria for, this location is' As-follows:
: a. MET:: La.l1, l.c. 1, l.d. 1, L~e.l1, 3.a.1,- 3.b.l, 3A.dl,;3.d.2.;'.1
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: b. AREAS REQUIRING CORRECTIVE ACTION: None
: c. DEFICIENCY: None
: c. DEFICIENCY: None
: d. PLAN ISSUES: NoneI 48                                                                     1
: d. PLAN ISSUES: NoneI 48 1


Unclassified.
Unclassified.
Radiological Emergency Preparedness Program (REP)
Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - RESOLVED: None
Line 966: Line 1,287:
: e. NOT DEMONSTRATED: None
: e. NOT DEMONSTRATED: None
: f. PRIOR ISSUES - RESOLVED: None
: f. PRIOR ISSUES - RESOLVED: None
: g. PRIOR ISSUES - UNRESOLVED- None 49
: g. PRIOR ISSUES - UNRESOLVED-None 49


dRaiological   .Eer ncy Preparedness Progra                 .(PP)
dRaiological  
    ",,,,Aftern Ation                       Plan lpRep~ovrt/lmprovement                         .  .            .  '. '.'                          C-             .Iiton     PoWer Station II "SECTION4 CONC USION No Deficiencies were identified forany jurisditin dunn" thIisexercise.
.Eer ncy Preparedness Progra  
      'Therewasone AreaeReqUiring Corrective Actin*e (ARCA) identifiedduring this: exercie for the State:6flhlinois There were no ARCks identified f6r DeWitt M                                                     "aconMleanorPiatt         Counties.
.(PP)
                                                    .non                                                   I,                   6rT.o         J4IWith TheIIARCAfor the State of Illinois"wais identified under Criteinn 1c 1 Keypersonnel with fiindtionfalroles fo the OR poide'direc~iini and contio&#xfd;l to that parto heofveral response' effoit;'0rhich they iiare responsibleh                             fthe State ofIllimois.Response c                                 Mnge,.
",,,,Aftern Ation lpRep~ovrt/lmprovement Plan C-  
                                                                                                                                            .ter knowingthat the Nuclear Accitent. Reporting System phones were not                                                                           not dei         'tehnat th         -A       A,.,I                             ~               otecage nEe de terrfiindanexpedited method of informiig                         DeWit       County_0f     the changes in                       gency Classification Levelsor.issuiance:of anjcProtective AgtionReommendations.
.Iiton PoWer Station II "SECTION 4 CONC USION No Deficiencies were identified forany jurisditin dunn" thIisexercise.
T oe e ARCA' fr6mn.previous exercises for theState of Illinis Prior ARCA 09-11i-2b2, A-01Adecisin-makmgprocess involving considerationof appropriate factors and necessar,.
'Therewasone AreaeReqUiring Corrective Actin*e (ARCA) identifiedduring this: exercie for the State:6flhlinois There were no ARCks identified f6r DeWitt M "aconMleanorPiatt Counties.
    ....-    TbIr                                                            .,Sas.             -li6,&sect;.Prr'ARA'4                             9-1 coorduiatidn is used t0miake Protectve:'ActIon DecIsions for thegeiieralp'ibhic kas resoled by
.non I,
            .. ....                                                                    109         54'
6rT.o J4IWith TheIIARCAfor the State of Illinois"wais identified under Criteinn 1c 1 Keypersonnel with fiindtionfalroles fo the OR poide'direc~iini and contio&#xfd;l to that parto eof h veral response' effoit;'0rhich they iiare responsibleh fthe State ofIllimois.Response c  
    'There -'was-one ARCA -Ifromthe p                     iiust   Clinton Poiker8Staio exriefo                                 Neit:            it SPrio.r ARCA 1-0-1               cI. A 01       epersonnel-withfictional-roles forthe ORO provide.-
.ter Mnge,.
diiecti         6 btrol,t6that There was.on ''i~r'l''
knowingthat the Nuclear Accitent. Reporting System phones were not not dei  
hd was resolved by DeWitt Cou-nty.
'tehnat th  
part of the-,oerlr'sipo611ste effort fWhich they are respolgnsil ed duringad t his0*al 7
-A A,.,I  
fxesci*se fo-eWf* T;                           ......      -* ***1i;.-.
~
                                                                                                                                                                    'U I
otecage nEe de terrfiindanexpedited method of informiig DeWit County_0f the changes in gency Classification Levelsor.issuiance:of anjcProtective AgtionReommendations.
: .There       Wa's ne.,Plans'lsue-idJeiiiifed-diig&#xfd;i'thiS Pla denifIsu'                      Mlen or,, e ittCo't)hr~~~~i6Pa exercise:                  it outy There were no Plan                              ..
T e oe ARCA' fr6mn.previous exercises for theState of Illinis Prior ARCA 09-11i-2b2, TbIr
Issues identified for-the .StateofflhnolSMaconMclean orPiatt Counties.
.,Sas.  
The Plan Issue for DeWitt C6ty was identified..unde# criterion 1'a.1 .seOROs                                    -                  effectiv.,
-li6,&sect;.Prr'ARA'4 9-1 A-01Adecisin-makmgprocess involving considerationof appropriate factors and necessar,.
coorduiatidn is used t0miake Protectve:'ActIon DecIsions for thegeiieralp'ibhic kas resoled by 109 54'
'There -'was -one ARCA -Ifrom the p iiust Clinton Poiker8 Staio exriefo Neit it SPrio.r ARCA 1-0-1 cI. A 01 epersonnel-withfictional-roles forthe ORO provide.-
diiecti 6
hd btrol,t6that part of the-, oerlr'sipo611ste effort fWhich they are respolgnsil  
'U was resolved by DeWitt Cou-nty.
7 There was.on ed duringad  
''i~r'l''
t his0*al fxesci*se fo-eWf* T; I
-* ** *1i;.-.
Pla Isu' denif Mlen it outy There were no Plan
:.There Wa's ne.,Plans'lsue-idJeiiiifed-diig&#xfd;i'thiS exercise: or,, e ittCo't)hr~~~~i6Pa Issues identified for-the.StateofflhnolSMaconMclean orPiatt Counties.
The Plan Issue for DeWitt C6ty was identified..unde# criterion 1'a.1  
- OROs
.se effectiv.,
proceduresto. alert,&#xfd;A6;tify and mobilize emergency personnael and, activate facilities in a timely' nianner.. The PlanIssue was. identified inDerWift Cuntry Plan Annex 2G, Notification Lists,'.
proceduresto. alert,&#xfd;A6;tify and mobilize emergency personnael and, activate facilities in a timely' nianner.. The PlanIssue was. identified inDerWift Cuntry Plan Annex 2G, Notification Lists,'.
whereby the primary and alternate pgoint of contact for .Macon County are reversed.
whereby the primary and alternate pgoint of contact for.Macon County are reversed.
There-was one Plan Issue from a previus exercise for the State of Illinois, which remains unresolved under Criterion S.b. 1 - Information contained within the Illinois Plan for Radiological Accidents (IPRA) Volume i, -Concept of Operations, and Radiological Task Force II
There-was one Plan Issue from a previus exercise for the State of Illinois, which remains unresolved under Criterion S.b. 1 - Information contained within the Illinois Plan for Radiological Accidents (IPRA) Volume i, -Concept of Operations, and Radiological Task Force II


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station (RTF) Procedure RTF-POS-2 are not consistent in regards to the KI information that is provided to the public.
After Action Report/Improvement Plan Clinton Power Station (RTF) Procedure RTF-POS-2 are not consistent in regards to the KI information that is provided to the public.
Based on the results of the November 2, 2011, exercise; the offsite radiological emergency response plans and preparedness for the State of Illinois and affected local jurisdictions, site-specific to the Clinton Power Station, can be implemented and are adequate to provide reasonable assurance that appropriate. measures can be taken offsite to protect'the health and safety of the public in the event of a radiological emergency at the site.
Based on the results of the November 2, 2011, exercise; the offsite radiological emergency response plans and preparedness for the State of Illinois and affected local jurisdictions, site-specific to the Clinton Power Station, can be implemented and are adequate to provide reasonable assurance that appropriate. measures can be taken offsite to protect'the health and safety of the public in the event of a radiological emergency at the site.
Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological. emergency response plans and preparedness for the State of Illinois site-specific to the Clinton Power Station, granted on December 4, 1980, remain in effect.
Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological. emergency response plans and preparedness for the State of Illinois site-specific to the Clinton Power Station, granted on December 4, 1980, remain in effect.
51
51


Unclassified                                                   .
Unclassified Radiological Emergency. Preparedness Program (REP)
Radiological Emergency. Preparedness Program (REP)
After Action Report/Improvement Plan Clinton Power Station APPENDIX A: IMPROVEMENT PLAN I
After Action Report/Improvement Plan                                                                 Clinton Power Station APPENDIX A: IMPROVEMENT PLAN                                                                               I Isu Nu     br       3         ml
Isu Nu br 3
                                      -P0rtro:I                                                                       a ISSUE:. The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex 2G Notification Lists..
ml  
-P0rtro:I a
ISSUE:. The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex 2G Notification Lists..
RECOMMENDATION: The Primary and Alternate points of contact for Macon County should be reversed in the DeWitt County Annex 2G Notification Lists. Clarification should be provided to make the 24-hour station '
RECOMMENDATION: The Primary and Alternate points of contact for Macon County should be reversed in the DeWitt County Annex 2G Notification Lists. Clarification should be provided to make the 24-hour station '
(Macon County's Dispatch Center) the .Primary notification point for initial notification of an incident at the CPS, and the EOC the Alternate notification point until such time as the EOC is sufficiently staffed to function as the primary notification point..
(Macon County's Dispatch Center) the.Primary notification point for initial notification of an incident at the CPS, and the EOC the Alternate notification point until such time as the EOC is sufficiently staffed to function as the primary notification point..
CORRECTIVE ACTION DESCRIPTION:
CAPABILITY:
PRIMARY RESPONSIBLE AGENCY:
CAPABILITY ELEMENT:
START DATE:
AGENCY POC:
ESTIMATED COMPLETION DATE:
Issue N b
*I 1 Cieon I
ISSUE: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification of an ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours, and it was known that DeWitt County EOC was not on the call. DeWitt County EOC received the PAR from the SIRC at 1129 hours. This was a delay of 10 minutes for critical information that I
the DeWitt County decision-makers required to protect the health and safety of the public.
The SIRC Manager.was informed that the NARS was not functioning properly from the SEOC to DeWitt County and that commercial lines had to be used to relay information which extended the time from a change in significant I
information to.DeWitt County being made aware. Discussions between the Communications Center Director and the SIRC Manager did not result in an expedited method of informing DeWitt County of the changes in ECLs or issuance of any PARs. There seemed to be a lack'of urgency on the part of SIRC Management that the NARS.was not working and that on the CPS announcement that there was.a release in progress with a six mile per hour wind.
RECOMMENDATION: The Communications Center Manager needs to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication systems and its operational capability. If there is.a continued problem such as the NARS system not operating properly, determine a prompt and efficient communication method to notify the risk county(ies) which may be outside the normal 3
communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding priority.
CORRECTIVE ACTION DESCRIPTION:
CORRECTIVE ACTION DESCRIPTION:
CAPABILITY:                                                        PRIMARY RESPONSIBLE AGENCY:
3
CAPABILITY ELEMENT:                                                START DATE:
,CAPABILITY:
AGENCY POC:                                                        ESTIMATED COMPLETION DATE:
IPRIMARY RESPONSIBLE AGENCY:I CAPABILITY ELEMENT:
Issue N      b                      *I 1                                                          Cieon                    I ISSUE: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification of an ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours, and it was known that DeWitt County EOC was not on the call. DeWitt County EOC received the PAR from the SIRC at 1129 hours. This was a delay of 10 minutes for critical information that the DeWitt County decision-makers required to protect the health and safety of the public.
START DATE:
I The SIRC Manager .was informed that the NARS was not functioning properly from the SEOC to DeWitt County and that commercial lines had to be used to relay information which extended the time from a change in significant information to.DeWitt County being made aware. Discussions between the Communications Center Director and I
AGENCY POC:
the SIRC Manager did not result in an expedited method of informing DeWitt County of the changes in ECLs or issuance of any PARs. There seemed to be a lack'of urgency on the part of SIRC Management that the NARS.was not working and that on the CPS announcement that there was.a release in progress with a six mile per hour wind.
ESTIMATED COMPLETION DATE:
RECOMMENDATION: The Communications Center Manager needs to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication systems and its operational capability. If there is.a continued problem such as the NARS system not operating properly, determine a prompt and efficient communication method to notify the risk county(ies) which may be outside the normal communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding 3
3 52
priority.
CORRECTIVE ACTION DESCRIPTION:                                                                                                 3
,CAPABILITY:                                                      IPRIMARY RESPONSIBLE AGENCY:I CAPABILITY ELEMENT:                                                 START DATE:
AGENCY POC:                                                         ESTIMATED COMPLETION DATE:                                 3 52


Unclassified Radiological Eimrgency Preparedness Program (REP)
Unclassified Radiological Eimrgency Preparedness Program (REP)
After Action Report!Improvement Plan                                                   Clinton Power Station APPENDIX B: EXERCISE TIMELINE Table 1, on the following page, presents the times&#xfd; at which key events andactivities occurred during the Clinton Power Station REP Partial Participation Plume Exposure Pathway exercise conducted on November 2, 2011. Also included are times notifications were made to the-participating jurisdictions/functional entities.
After Action Report!Improvement Plan Clinton Power Station APPENDIX B: EXERCISE TIMELINE Table 1, on the following page, presents the times&#xfd; at which key events andactivities occurred during the Clinton Power Station REP Partial Participation Plume Exposure Pathway exercise conducted on November 2, 2011. Also included are times notifications were made to the-participating jurisdictions/functional entities.
53
53


    .;&#xfd;Afie#Actidfiephl p                 ~e ent Plan                .
.;&#xfd;Afie#Actidfiephl p ~e
                                                                                          ,Unclassified..
,Unclassified..
                                                              .&#xfd;-kad~iojogical Emergency Preparedness Pr                   (REP)
.&#xfd;-kad~iojogical Emergency Preparedness Pr Inram (REP) ent Plan ClintoinPower Station II Alert' 0822 0846 0850 0850:
Inram
NA 0913 1, 0929 Sit6 rea Emerne5cncy 0940
                                                                                                                                        ,-            .              ClintoinPower Station II Alert'                   -              .                  0822               0846                 0850             0850:                   NA                   0913               1,0929 Sit6     rea Emerne5cncy GeneralEmer**r&#xfd;"y                         '
'948 0948.
0940 1105 1056 1111 1059
950 "0955 "
                                                                                                    '948 0948 111 1056
I 006 1037 GeneralEmer**r&#xfd;"y 1105 1111 111 1120 121-1132 1141 8 Simlated Riad. Release Started 1056 1059 1056 1120 121 132' 1148 Sirnmlated Rad.-Rele s-;
                                                                                                                .        950 1120 1120 "0955" 121-121 I006 1132 132' 1037 1141 8 1148 I
NA.
Simlated Riad. Release Started Sirnmlated Rad.-Rele s-;                                 NA.                                       NA             NA                     NA'                   N                   NA-.
NA NA NA' N
Tdrrm in-ate     &d,'
NA-.
Facility Declared Operational                     .900                       '                    0900             0914                 0955                   1002                 095&#xfd;.
T drrm in-ate &d,'
DeclaihtiOndifState ofEtiei'ge-ncy'-                                         1053               "NA: . .-- NA                 "          1058               .. NA                   NA 1-240.               1240             2*39                 1234                   1235             .1237 tEixcise-Terminated Early. PrecautionaryActi6n' State issu4eda                                   098                   0958"'           1031                 0958                     NA,                 NA,     "*I Livestock AdVisory: Alljlivestock are'to be:.-
Facility Declared Operational  
sheltereddanilplaced 6n'stored feed-aind'.water
.900 0900 0914 0955 1002 095&#xfd;.
DeclaihtiOndifState ofEtiei'ge-ncy'-
1053 "NA:  
.-- NA 1058  
.. NA NA t Eixcise-Terminated 1-240.
1240 2*39 1234 1235  
.1237 Early. PrecautionaryActi6n' State issu4eda 098 0958"'
1031 0958 NA, NA, Livestock AdVisory: Alljlivestock are'to be:.-
shelteredd anilplaced 6n'stored feed-aind'.water
:within. the10-m-ile EPZ__________
:within. the10-m-ile EPZ__________
1.v Early PrcutoayAction: State&#xfd;restrciced?                                       0.3                   NA           NA9SJ                   NA                         A>>,N
Early PrcutoayAction: State&#xfd;restrciced?
* att~ayWffic. within 10mlso PS tra ytraff al icwi cin ttretitd P~~utoa wlthile f m CPS rail        _0953
0.3 NA NA9SJ NA A>>,N
__..,o.       . _    .
* att~ayWffic. within 10mlso PS al P~~utoa cin ttretitd rail
NA 0957      '~N                                    ANA Q I.*_
_0953 NA 0957
Ear y Precautioniary Action:State is~sued an                               1113                     NA             NAN                 ':NANAA
'~N ANA tra ytraff icwi wlthile f m CPS
- order to evacuate state           parksaind hunting areas               .          .        .        - :                        -.          .    .;      ,        _        :_          ,  ,
__..,o.
E hrly lPre c auih n ationrV ct o : "Sta ~te     t 'esric ted a ir ":           i 28 : :*-i , :i - NA -*" -
Ear y Precautioniary Action:State is~sued an 1113 NA NAN  
11i;                                      * &deg;-i}
':NANAA
Nl A)"'-*      - ' :NA i ! : ) ; L ; N A I!.): , ' : . NA : .
- order to evacuate state parksaind hunting areas E hrly lP re c a uih n a tionr V c t o : "S ta ~te t 'es r ic te d a ir ":
traffic withii 10 milesOf CPS .
1 1i; i 2 8 : :* -i, :i - N A -* " -
Early                       Acion:-DeWitt County                             NA                   NA             -reNAtitiily NA             -NA                           1107                 NA Board Cha*imianiT orderede*ahitiindfschoils-an pca"6u'in-                                                 :  :
N A)"'-*
______30___-_:.  :; ________,        , I.
l * &deg; -i }  
Gen6ralInif6             n       sN s essage..ucave ofJNA66
-' :N A i ! : ) ; L ; N A I!.) :, ' :. N A :.
* N ..                                      .10"22                   NA ihcidentfP
traffic withii 10 milesOf CPS.
          &#xfd;___________             .-
Early  
GPrientfieoi-ationeSioenActivuatio                                            NA 1 '.               NA ji1"8A           NA : :.
-reNAtitiily Acion:-DeWitt County NA NA NA  
7 "."i**                     NA NA'= .             . :1030A-        ]:     NA.N .
-NA 1107 NA Board Cha*imianiT orderede*ahitiindfschoils-an pca"6u'in-
e ct nReom edain: Evcut Prtet                                                            NA:;11 S~iieiInf~~tivaiion : E                 '.e       :NA                                           .NA "NANA                 ,              .NA                   104                 NA Pioe tioeAnis Recom~mendation: Evacuate                             1111                 1108             NA&#xfd;                   NA                     NA                   NA.
______30___-_:.
SubzA&#xfd;f~a~s 1 -and                             ~ .                                                                                    ____                  _____                ____
Gen6ralInif6 n
Protective Action Decision: Evacuate Sub-Areas                                 NA .                 NA             NA                   -NA:                 .1139                 NA' Siren Activation-                                                             NA                   NA             &#xfd;NA             .NA                           1147                 NA.
essage..ucave sN s
Protective Action.Decision EAS Message                                         NA                   NA               NA     .          . .NA                     1154               'NA-1I1 Administration Decision:'.                   .                            NA                   N.A               NA                     NA         -          NA                   NA I
ofJNA66 N
54 I
.10"22 NA ihcidentfP  
&#xfd;___________
Prtet e ct nReom edain: Evcut NA:;11 1 '.
ji1"8A 7 "."i**
NA'=.
A
]:
N.
GPrientfieoi-ationeSioenActivuatio NA NA NA NA 1030 NA.
S~iieiInf~~tivaiion
: E  
'.e
:NA  
.NA "NANA  
.NA 104 NA Pioe tioeAnis Recom~mendation: Evacuate 1111 1108 NA&#xfd; NA NA NA.
SubzA&#xfd;f~a~s 1 -and  
~
Protective Action Decision: Evacuate Sub-Areas NA.
NA NA  
-NA:  
.1139 NA' Siren Activation-NA NA  
&#xfd;NA  
.NA 1147 NA.
Protective Action.Decision EAS Message NA NA NA  
..NA 1154  
'NA-1I1 Administration Decision:'.
NA N. A NA NA NA NA
"*I 1.v Q I.*_
, I.
I I
I 54


Uticlassified Radiological Emergency Preparedness Program (REP)
Uticlassified Radiological Emergency Preparedness Program (REP)
After* Action Report/Improvement Plan                                                                                 Clinton Power Station Table 1 - Exercise Timeline DATE: 2011-11-02,-SITE: ClintonmPower Station, IL Unusual Event                                 NA               NA               NA Alert                                         0822             0932             0936 Site Area Emergency                         0940             1038             1042 General Emergency                             1105             1144.           1142 Simulated Rad. Release Started               1056             1144             1,142 Simulated Rad. Release Terminated             NA               NA             NA Facility Declared Operational                                   0945           0945 Declaration of State of Emergency.                             NA             NA Exercise Terminated                                           1237             1237.
Clinton Power Station After* Action Report/Improvement Plan Table 1 - Exercise Timeline DATE: 2011-11-02,-SITE: ClintonmPower Station, IL Unusual Event NA NA NA Alert 0822 0932 0936 Site Area Emergency 0940 1038 1042 General Emergency 1105 1144.
Early Precautionary Action: State issued a                     NA             NA Livestock Advisory: All livestock are to be sheltered and placed on stored feed and water within the 10-mile EPZ.
1142 Simulated Rad. Release Started 1056 1144 1,142 Simulated Rad. Release Terminated NA NA NA Facility Declared Operational 0945 0945 Declaration of State of Emergency.
Early Precautionary Action: State restricted                   NA             NA waterway traffic within 10 miles of CPS                                 _______".    "_
NA NA Exercise Terminated 1237 1237.
Early Precautionary Action: State restricted rail               NA       . NA traffic within 10 miles of CPS Early.Precautionary Action: State issued an order to       . NA             NA evacuate state parks and hunting areas Early Precautionary Action: State restricted air               'NA .NA traffic within 10 miles of CPS Early Precautionary Action: DeWitt County Board                 NA     .        NA.
Early Precautionary Action: State issued a NA NA Livestock Advisory: All livestock are to be sheltered and placed on stored feed and water within the 10-mile EPZ.
Chairman ordered evacuation of schools and special populations                                                                     ._ .,___ .
Early Precautionary Action: State restricted NA NA waterway traffic within 10 miles of CPS Early Precautionary Action: State restricted rail NA NA traffic within 10 miles of CPS Early.Precautionary Action: State issued an order to  
General Informaion Message:,Public advised of                   NA .           NA.
. NA NA evacuate state parks and hunting areas Early Precautionary Action: State restricted air  
incident at CPS General Information Siren Activation               .            NA ...         .NA General Information EAS Message               -                NA ,         . NA Protective Action Recommendation: Evacuate Sub-                 NA               NA Areas   I and 3                                                                         ..
'NA.NA traffic within 10 miles of CPS Early Precautionary Action: DeWitt County Board NA NA.
Protective Action Decision: Evacuate Sub-Areas I             .- NA               NA .
Chairman ordered evacuation of schools and special populations General Informaion Message:,Public advised of NA.
and 3 Siren Activation .                                              NA               NA Protective Action Decision EAS Message                         NA               NA KI AdministrationDecision:                                     NA             'NA 1 55
NA.
incident at CPS General Information Siren Activation NA...  
.NA General Information EAS Message NA,  
. NA Protective Action Recommendation: Evacuate Sub-NA NA Areas I and 3 Protective Action Decision: Evacuate Sub-Areas I  
.- NA NA.
and 3 Siren Activation NA NA Protective Action Decision EAS Message NA NA KI AdministrationDecision:
NA  
'NA 1 55


                                                  -&#xfd;Radi6logidal Emqrgency, Preparedne~s s Ptoqgrm (REP)                                                 .            . .
-&#xfd;Radi6logidal Emqrgency, Preparedne~s s Ptoqgrm (REP)
                        -      .,                                                    ,'            -,                              "        ; '- R     ""
R
- The foflowing jis a, lstof the pan-sonel that evalute the:.Clon Power StationREP Full
- The foflowing jis a, lstof the pan-sonel that evalute the:. Clon Power StationREP Full
    . :Participation PltiffiEx[p               e TPathwayExercise owNovember 2i`201*                                                 T ist includes the.
. :Participation PltiffiEx[p e TPathwayExercise ow November 2i`201*
inldticatd b th6'i f `q!d.rs ip andaial!vlftorganizae.                                             tion echi ev'aluator represefit is.
T ist includes the.
fthbooll6win -ibbkviationis"                                           "
inldticatd b th6'i f `q!d.rs ip andaial!vlftorganizae.
DHS/FEMA             Dept of Homeland Securitye/FedralEmerge                                               Management Agency ICE   ...   *..    :.Consulting                                                     '3/4''   .
tion echi ev'aluator represefit is.
Title .....-     .                                                                      ame,.                                             Organization.        .
fthbooll6win -ibbkviationis" DHS/FEMA Dept of Homeland Securitye/FedralEmerge Management Agency ICE...
Radiologica*l   Assistancd Committee                                                 WiliamE.King     '-Chairman                          DHS/FEMA                 . 1
:.Consulting  
                                -i                             A          -                        e                 `7-f 7..            -.
'3/4''.
ExrieDretor     -E                  erm, I'Drin                                 W eA7                                   DHSe/FEMAg Alternate Exercise Directdr':-                             -          .            Gary Naskrent-'.                               .      DHS/EMA" Site ,Specialist                                                                         Todd M                       iGeinskie,DHS/F-EMA Tea5 Le~ader--Allihois                                                                 Dbra           ul                           -:-- DHiS/EMkA Jr
Title.....-
                    &#xfd;&#xfd;5w eah&#xfd;                                                                   aiei ,                                             DHS/FEMA         2
ame,.
        -T~aii i~er             acon Countp                                                     dGh~i               7 T4n.-d                               t.*                          4i.-t'C       '  ,j "Lam       Lea er+Mc, : C'OeT:n                "Cnty                                 -Dvae Otmn"" -5,*"                                         D   F,"";-'-,-EMA :
Organization.
C,,
Radiologica*l Assistancd Committee  
T   a       6~                                                   14           kl-:-'.         .--      ,,-.                                    IF
'-Chairman WiliamE.King DHS/FEMA  
:;tO*,,*:.r:
. 1
                        *5:.::,.'.-,:.:-.:'o   :-'-,.<),-<::.,..:.&#xf7;
-i e  
                                    ":7.."''.'-*.",;
`7-f A
                                        ~                              ':'2 :*. v',..-ri* ...:.uq *,-w         m   *_*
7..
                                                                                                                  .**,1;:
ExrieDretor I'Drin W eA7
A ,.'"'",v...
-E
                                                                                                              'r"       .*-.*.-'&deg;>.*'
: erm, DHSe/FEMAg Alternate Exercise Directdr':-
                                                                                                                                  -i      i. -*nm,*..:, ,.:,.: :.v" I*
Gary Naskrent-'.
                                                                                                                                  ...''. "",l*~r*1"*IA-"-:.
DHS/EMA" Site,Specialist Todd M iGeinskie  
                                                                                                                                                        ~
, DHS/F-EMA Tea5 Le~ader--Allihois Dbra ul  
456
-:-- DHiS/EMkA Jr eah&#xfd;  
&#xfd;&#xfd;5w aiei,
DHS/FEMA 2
-T~aii i~er acon Countp dGh~i 7
T4n.-d 4i.-t'C  
,j t.*
"Lam Lea er+Mc, OeT:n ae
: C' "Cnty  
-Dv Otmn  
-5,*"
D F,"";-'-,-EMA C,,
T a
6~
14 kl-:-'.
I 456
* :.: -,:.:-.:'o t O
~ *,*
5 :,.':;, :.r:
::.,..:.&#xf7; v'.-* uq *,-w m _* >.'. -* n m
~,*.. :,,.:,.: :.v"
'"'" 'r".** * *-.*.-&deg;-i...' i.
":7.."''.'-*.",; ),  
':'2
:*.,. ri.:.
A.
,1;:
,,v.... ' *' "",l*~r*1"*IA-"-:.
I*


I.
I.
Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Impr6vement Plan                                                                       Clinton Power Station DATE: 2011-11-02, SITE: Clinton Power Station, IL' LOCATION                                         1>EVALUATOR                                                 AGENCY State of Illinois - Initial Warning Point                                           Robert Swartz             FEMA RI State of Illinois - State of Illinois Response Center                               Christopher Bellone       FEMA RV Robert Swartz             FEMA RI State of Illinois - Public Inquiry Phone Bank                                       Christopher Bellone       FEMA RV State of Illinois - Radiological Emergency Assessment Center -                       Michael Howe             FEMA HQ
After Action Report/Impr6vement Plan Clinton Power Station DATE: 2011-11-02, SITE: Clinton Power Station, IL' LOCATION 1>EVALUATOR AGENCY State of Illinois - Initial Warning Point Robert Swartz FEMA RI State of Illinois - State of Illinois Response Center Christopher Bellone FEMA RV Robert Swartz FEMA RI State of Illinois - Public Inquiry Phone Bank Christopher Bellone FEMA RV State of Illinois -Radiological Emergency Assessment Center -
                                ....________        ___                -____        Bart Ray                 ICFI State of Illinois - Unified Area Command                                             Don Carlton               FEMA RI Richard McPeak           ICFI State of Illinois - Emergency Operations Facility                                   John Simpson             FEMA RV State of Illinois - Joint Information Center                                         Michael Meshenberg       ICFI
Michael Howe FEMA HQ Bart Ray ICFI State of Illinois - Unified Area Command Don Carlton FEMA RI Richard McPeak ICFI State of Illinois - Emergency Operations Facility John Simpson FEMA RV State of Illinois - Joint Information Center Michael Meshenberg ICFI John Simpson FEMA RV State of Illinois - Radiological Assessment Field Team Paul Ward FEMA HQ State of Illinois - Joint Information Center/Media Briefing Center Michael Meshenberg ICFI State of Illinois - Mobile Laboratory David Jacobson ICFI State of Illinois - Field Monitoring Team - I David Stuenkel ICFI State of Iliinois - Field Monitoring Team - 2 Richard Watts, ICF State of Illinois - Dewitt County Emergency Operations Center -
              *_ _            _          _          _        _          _        John Simpson             FEMA RV State of Illinois - Radiological Assessment Field Team                               Paul Ward                 FEMA HQ State of Illinois - Joint Information Center/Media Briefing Center                   Michael Meshenberg       ICFI State of Illinois - Mobile Laboratory                                               David Jacobson           ICFI State of Illinois - Field Monitoring Team - I                                       David Stuenkel           ICFI State of Iliinois - Field Monitoring Team - 2                                       Richard Watts,           ICF State of Illinois - Dewitt County Emergency Operations Center -                     Karl Rabenhorst           FEMA RV Illinois State Radiological Advisor State of Illinois - Dewitt County Emergency Operations Center -                     John Arszulowicz         FEMA HQ Illinois State Liaison State of Illinois - Macon County Emergency Operations Center -                       Carolyn Sturghill         FEMA RV Illinois State Liaison State of Illinois - McLean County Emergency Operations Center -                     Delwyn Kinsley           FEMARV Illinois State Liaison State of Illinois - Piatt County Emergency Operations Center - Illinois Edward Diaz                           FEMA RV State Liaison State of Illinois - Illinois State Police District 10 Headquarters -                 Richard Grundstfrm ,    ICFI:
Karl Rabenhorst FEMA RV Illinois State Radiological Advisor State of Illinois - Dewitt County Emergency Operations Center -
Dosimetry Control Officer Briefing State of Illinois - Illinois State Police District 10 Headquarters -                 Don Carlton               FEMA RI Traffic and Access Control Post State of Illinois -St. Mary's Hospital'- Medical Service -                           Richard McPeak           ICFI Transportation State of Illinois - St. Mary's Hospital - Medical Service - Facility                 Michael Howe             FEMAHQ State of Illinois - Illinois State University/Horton Field House -                   David Jacobson           ICFI Evacuee/Emergency Worker Monitoring State of Illinois - Illinois State University/Horton Field House -                   David Jacobson           ICFI Evacuee/Emergency -Worker Decontamination                                             John Simpson             FEMA RV State of-Illinois - Illinois State University/Horton Field House -                   David Jacobson           ICFI Emergency Worker Monitoring and Decontamination of Equipment State of Illinois - Illinois State University/Horton Field House -                   Michael Meshenberg       ICFI Evacuee Registration State of Illinois - Illinois State University/Horton Field House -                   Michael Meshenberg       ICFI Congregate Care Center Dewitt County - Initial Warning Point                                                 Carl Bebrich             FEMA Dewitt County - Emergency Operations Center                                           John Arszulowicz         FEMA HQ Todd Gemskie             FEMA Richard Grundstrom       ICFI Mark Ludeking             FEMA RV Karl Rabenhorst           FEMA RV 57
John Arszulowicz FEMA HQ Illinois State Liaison State of Illinois - Macon County Emergency Operations Center -
Carolyn Sturghill FEMA RV Illinois State Liaison State of Illinois - McLean County Emergency Operations Center -
Delwyn Kinsley FEMARV Illinois State Liaison State of Illinois - Piatt County Emergency Operations Center - Illinois Edward Diaz FEMA RV State Liaison State of Illinois - Illinois State Police District 10 Headquarters -
Richard Grundstfrm ICFI:
Dosimetry Control Officer Briefing State of Illinois - Illinois State Police District 10 Headquarters -
Don Carlton FEMA RI Traffic and Access Control Post State of Illinois -St. Mary's Hospital'- Medical Service -
Richard McPeak ICFI Transportation State of Illinois - St. Mary's Hospital - Medical Service - Facility Michael Howe FEMAHQ State of Illinois - Illinois State University/Horton Field House -
David Jacobson ICFI Evacuee/Emergency Worker Monitoring State of Illinois - Illinois State University/Horton Field House -
David Jacobson ICFI Evacuee/Emergency -Worker Decontamination John Simpson FEMA RV State of-Illinois - Illinois State University/Horton Field House -
David Jacobson ICFI Emergency Worker Monitoring and Decontamination of Equipment State of Illinois - Illinois State University/Horton Field House -
Michael Meshenberg ICFI Evacuee Registration State of Illinois - Illinois State University/Horton Field House -
Michael Meshenberg ICFI Congregate Care Center Dewitt County - Initial Warning Point Carl Bebrich FEMA Dewitt County - Emergency Operations Center John Arszulowicz FEMA HQ Todd Gemskie FEMA Richard Grundstrom ICFI Mark Ludeking FEMA RV Karl Rabenhorst FEMA RV 57


:;* I:"
Unclassfied:
Unclassfied:
Radiological Emergency Preparedness Program (REP)
Radiological Emergency Preparedness Program (REP)
    *,.*After
Cl~i6nto PowerSt~ation
        ;>* " . Action
*After Action Report/Imprvefi.6ent Pla'n
                    ' * * :Report/Imprvefi.6ent I-* : * . . - . . :
* : I -* :
* Pla'n                                                                                                                                                          Cl~i6nto  PowerSt~ation Dewitt County Emergency Operatiodas, Center fraffichandAcces.-- Mark LuIuelang                                                                                                                                 .            FEMA RV'iI(.-
* Dewitt County Emergency Operatiodas, Center fraffichandAcces.-- Mark LuIuelang FEMA RV'iI(. -
  ,.ControlPost                                                       -
,.ControlPost  
&sect;j Dewitt CountyCli.ntonPolice Depgrtment - Traffind AccesFs*''                                                                                                     C         Berc-EMA:-,;
&sect;j Dewitt CountyCli.ntonPolice Depgrtment - Traffind AccesFs*''
Cont olFIost . 7......CiBe Deitt County -
C Berc -EMA:-,;
Police Department Traffic adAcces'.,
Cont olFIost d
6Clinton
7......CiBe rc.
                                                                                                  ..                  d David Stuenkel rc .
Deitt County -
                                                                                                                                                                                                                            .        J          .... "I.
6Clinton Police Department Traffic adAcces'., David Stuenkel J
II C~onrtrol.Post D--osi*'m~e~try Briefinps DewittCo'uin ty EASWJBCric De'ilt Count?,Clfton Scho6b1District 15 EvacuationiSchool (2),WN'1i5                                          W N
"I.
                                                                                                                                                        .          RichirdWattsI-.                                         CF'-"
C~onrtrol.Post D--osi*'m~e~try Briefinps DewittCo'uin ty EASWJBCric (2),WN'1i5 W
FEMA~v                                        I Mao                             -inlitial     WagrninPoint                                       ,          ::.                :EMAR.                       Caro                                         .                                R*
N FEMA~v De'ilt Count?,Clfton Scho6b1District 15 EvacuationiSchool RichirdWattsI-.
Mdcin6U6.Cfiti' - Emer~genicy Op~ratiofis"*entter ?::5:::::,-i;; :.* .;2Edi~aifd;*olifisli :-,., *--*-,'? FEMK*RV::. i Macon Co'uti`y.
CF' -"
M                  ou            ' "'""'2&#xfd;P ~ perations rcendterTraff!.annd
Mao  
                                                                          -7 Acce.ss                         a1 dEmergency. Stfhiidghl; n              -             .
-inlitial WagrninPoint
FEMARV                                  i: I Controo
:EMAR.
      ! &#xfd;               Po.tr                                         per______-                                                                         ,. C                                                                     _____                    .
Caro R*
MLeanCount-                       Intal.WamigPoit,                                                                                                           Delwyn Kinsley                                                 FEMARV McLen'fiC6oty ti e                                        '                      n      enter. ,                 :                .:,                      D eIwhKirisley                                                 FEMA R.
Mdcin6U6.Cfiti'  
McLean                                                                                                                                                       Debv*,               firdais-n:*                           .FEMA-RV, Mcento -Counity.- EmergelicyOperations Center - Traffic and Acc~ess.                                                                                               I           Kiwnsley:                                     FEM             RV~
- Emer~genicy Op~ratiofis"*entter ?::5:::::,-i;;
  .'Piatt:Couny -c&#xfd;iiitial Warriing J4in'..Eward rE                                                                                                                                   Diaz sRV,:                                   FEMA  MA RV                  . -:.i :E'     .-
:.*.;2Edi~aifd;*olifisli :-,., *--*-,'? FEMK*RV::. i ou 2&#xfd;P
Pit ont:E-ergkency Ope onmrClifiton                                                                                                                                     Crackel                                     EAR S     -~-'                                                         '---          'divrd Diaz~                                                         FEM             'RV "Piattu PittCunty fmre~
-7
Control Post g
~
                                                  ~(-
FEMARV M
b periitn Cete ne       Traffic and Access
Macon Co'uti`y.
                                                                                                              ~~_
dEmergency.
d~rtin Edward Diaz
perations rcendterTraff!.annd Acce.ss a1 Stfhiidghl; -
                                                                                                                                                                            'rd9.,
n
_       _      _        _        _    _        _L_
! &#xfd; Controo Po.tr per______-
ts FEMA RV Team     1Leader
C MLeanCount-Intal.WamigPoit, Delwyn Kinsley FEMARV McLen'fiC6oty e
* 4.
ti enter.,
                    ,-    99,:,                                                                        -,.',
n D eIwhKirisley FEMA R.
..                                              ,..............                                      ........                        . .9.... ...                                                                                                                       .
McLean bv*,
. . .      , *    - , . '< -*  .                  . -            :    '  ; *  . :'.                  = ._ :   99"
De firdais-n:*  
                                                                                                                      %        .          9-
.FEMA-RV, Mcento -Counity. - EmergelicyOperations Center - Traffic and Acc~ess.
                                                                                                                                          . " ' "7 -       " ' -* i ) D ; }! :, .9-.           -. 9.9,                             . ..              , *,
I Kiwnsley:
9"
FEM RV~
                                    ' i i- 9";9   . . .T         " : ."      "  i     * "  " '    : .          ...    -          9,..
:;
                                                                                                                                ,.......          .  : .          ..      :      ,...            .    ,,                                      "'", 9 9 "
* I: "
                                                                                                                                                                  .              "* "=
II I
:"  *'          "    ,-'" *..-     .9.9..   -9   .9...
i : I
f        " 4.:'. 4:<
.'Piatt :Couny -c&#xfd;iiitial Warriing J4in '..Eward Diaz FEMA R rE MA sRV,:  
                  .:    .'.-'99....
. -:.i :E '
                              .* . " ... -:-.>.>.'                                  !-. "9. . .      .    .      .        .                "      ...                ..            .      ..........                          "....      .....          "
V Pit ont:E-ergkency Ope onmrClifiton Crackel EAR S  
                * : i*," "* "                      ,-:-        .99-9.4
-~-'  
                                                                    -      ,...        9..:
'divrd Diaz~
                                                                                      ,',,:                                                              ',,..,.':*,..:'                  .-.      :    .    .        . .-    ."4-             '.
FEM  
* I
'RV "Piattu g
                                                                                                                      -.58                                                                                                                                                         I I
periitn ne Traffic and Access Edward Diaz FEMA RV PittCunty fmre~
b d~rtin Cete ts
'rd9.,
Control Post
~(-
~~_
_L_
Team 1Leader 4.
99,:  
..9.......
99"
=._ :
9-  
. " ' " 7 -
" ' -* i ) D ; }! :,  
.9-. -.9.9, 9"  
' i i- ";9 9
...T i
9,..
9 9
"=  
,-'" *..-.9.9..  
-9  
.9...
4.:'.
f 4:  
-'99....  
"9.
: i*,  
.99-9.4 9..:  
." 4-  
-.58 I
I I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station APPENDIX D: EXERCISE PLAN This appendix lists the exercise criteria, which were scheduled for demonstration in the Clinton Power Station Radiological Emergency Preparedness Partial Participation:Plume Exposure Pathway Exercise on November 18, 2009.and the offsite extent-of-playsagreement accepted by DHS/FEMA Region V on October 21, 2009. "The exercise criteria, contained in the FEMA "Radiological Emergency Preparedness Exercise Evaluation Methodology; Notice," as published in the Federal RegisterNotice/Vol. 67, dated. April 25, 2002, represent a functional translation of the planning standards and evaluation criteria of NUREG-0654/FEMA-REP-1, Revl, "Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans'and Preparedness in Support of Nuclear Power Plants," November 1980. Because the exercise criteria are intended for use at all nuclear power plant sites, and'because of variations among offsite plans and procedures, an extent-of-play agreement is prepared by the State and accepted by DHS/FEMA to provide evaluators with guidance on expected actual demonstration of the criteria.
After Action Report/Improvement Plan Clinton Power Station APPENDIX D: EXERCISE PLAN This appendix lists the exercise criteria, which were scheduled for demonstration in the Clinton Power Station Radiological Emergency Preparedness Partial Participation:Plume Exposure Pathway Exercise on November 18, 2009.and the offsite extent-of-playsagreement accepted by DHS/FEMA Region V on October 21, 2009. "The exercise criteria, contained in the FEMA "Radiological Emergency Preparedness Exercise Evaluation Methodology; Notice," as published in the Federal RegisterNotice/Vol. 67, dated. April 25, 2002, represent a functional translation of the planning standards and evaluation criteria of NUREG-0654/FEMA-REP-1, Revl, "Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans'and Preparedness in Support of Nuclear Power Plants," November 1980. Because the exercise criteria are intended for use at all nuclear power plant sites, and'because of variations among offsite plans and procedures, an extent-of-play agreement is prepared by the State and accepted by DHS/FEMA to provide evaluators with guidance on expected actual demonstration of the criteria.
Exercise Criteria .
Exercise Criteria.
Listed on -the following pages are the specific radiological emergency preparedness criteria that were scheduled for demonstration during this exercise.
Listed on -the following pages are the specific radiological emergency preparedness criteria that were scheduled for demonstration during this exercise.
                                                            '59
'59


    . . . !;          .. ~~~..............................
Unclassified Rz adiological Emrergency Preparedness Progam(RP i :
i :                                                                                                                              i : !i iii
.. ~~~..............................
                                                                                    ... Unclassified Rzadiological Emrergency Preparedness Progam(RP
i : !i iii
                                                .Afte#7Atiot~iepbrt/lm*ovemen                                                                                 PowerStto         .
.Afte#7Atiot~iepbrt/lm*ovemen PowerStto ft r
_-    ft   r cto   -          -_                      !&#xfd;..                       .,  -      ,
cto  
                      -..              S         T   O- I             NEXTENT-OF-L                       F P OA          YEMENTS         E.-MNT-.
!&#xfd;..
: "-    - +:-*: .-i-' .:i:::C-LINTON:POWER                                   STATION (CPS.)'REP,-EXERCISE.*:*;--(,                                         ::*    "'"":.*:.
S T
        " "<;.;.'..,::* ;:,.. -'STATE OEFILLINOISTEXT:ENT-O)P&#xfd;                                                   L AYAG                         TRE.EMENP:::::::.                   . ::
O-I NEXTENT-OF-L OA F P YEMENTS E.-MNT-.
Criteariathat can be re-demonstrated immiedtately for credt at.the dtIscreton of.the evaluator include the6folowimg.
- +:-*:.-i-'.:i:::C-LINTON:POWER STATION (CPS.)'REP,-EXERCISE.*:*;--(,  
3.d.-1,3d i2 6 a ,I6.b., '6.c-.and,6.d.l.: Criteriaithiitim'ay be"re-demdemnstrated,'a -.&#xfd;approved on a case b*ycas'esbasis by the 3.a 1          I.
" "<;.;.'..,::* ;:,.. -'STATE OEFILLINOISTEXT:ENT-O)P&#xfd; L AYAG TRE.EMENP:::::::.
Chairperson of the R*gional AssistanceCoordiinatiingCo                               ttee,.include the foll6wingk 2.aj b, . 2b2Sa:-"and 5.b1.
Criteariathat can be re-demonstrated immiedtately for credt at.the dtIscreton of.the evaluator include the6folowimg. 3.a 1 I.
EVALUATION AREA 1 - EMERGENCY.OPERATIONS MANAGEMENT ,.'-.'                                                                 ;-  ..  ,  :.        *          .-
3.d.-1,3d i2 6 a,I6.b., '6.c-.and,6.d.l.: Criteriaithiitim'ay be"re-demdemnstrated,'a -.&#xfd;approved on a case b*ycas'esbasis by the Chairperson of the R*gional AssistanceCoordiinatiingCo ttee,.include the foll6wingk 2.aj b,
          " -Criterin 1 a1'OROs use. efective procedures to alert,.notifyandmobfllze emergency personnel and activate filities in a                                                         3 timely manner.-                                                                 J-                 .
2b2Sa:-"and 5.b1.
                    '-.. ,TheState Emergency Opserationfs Cente (SEOC) wihici.hhouse*-*he                                                                         i1l Waring           -MAComm
EVALUATION AREA 1 - EMERGENCY.OPERATIONS MANAGEMENT,.'-.'  
                    'Point)the"State of Illinois Re"sponse' Center (SIRC) a*dteRadi6logical Emergen-cy AAssessnent Center(REA-C),
" -Criterin 1 a1'OROs use. efective procedures to alert,.notifyandmobfllze emergency personnel and activate filities in a 3
                    . ll.be-activated       The !EMA, Emergency Respons-eTe-le'ormmurunicator.wll Implement proeidures .f6r:notification:of
timely manner.-
:- IE staff,*as' definedin.IEMA             SOPs :The S!RC .will be fullya                                         variety o- State agencies aind personnel ReEACactiva                                                 " f be providedto-'adentrate62 terswi                                                  u stffing ofthe 1IRC
J-  
                    &#xfd;~REACT.The r~o:ste"r,.w-ill be~available for review; howevyer                     itw-ill' not-b-e removedfromti~heEOC&#xfd;`                                 .7 T--he:Uniff~ie~d"Area.mfna (*UAC) willbe activatedwithSt~atedistrict-.and" reioallpersonnel Reg)ionagloii iort inBloomoington lRa diol ogical Assessmen6F.ield Team (RAFT) anidmobile lab will be activated
'-..,TheState Emergency Opserationfs Cente (SEOC) wihici.hhouse*-*he  
*; :.-::rt -EMXe"rnoel I* : Cent* TS      wil be ,e,prepositioned postine in the local       e aea l'noth    v*aand disp!atched.tojthe (ounty 0Cs(UAC EOF. -Tec hnca aea at the -Central Illmois I
-MAComm i1l Waring
C) an heJC EA il o eauaeth s TlMAe                                                                    SG&#xfd;
'Point)the"State of Illinois Re"sponse' Center (SIRC) a*dteRadi6logical Emergen-cy AAssessnent Center(REA-C),
                                                                                  .      *"dut y1offi ce ad s           th     of the situati   at-     " C li"on-'..   "on tatio       -S Anactualp phoe cal wil be mad torith FEMA                                                                                                               .,&#xfd; Crite e   epio
ll.be-activated The !EMA, Emergency Respons-eTe-le'ormmurunicator.wll Implement proeidures.f6r:notification:of
                        * *ia*1 EAw beisimulated    ll      '
:- IE staff,*as' definedin.IEMA SOPs :The S!RC.will be fullya variety o-State agencies aind personnel ReEACactiva terswi be f
State staff will begiexecisel ied                  be to su pl ft the emergen& o alier thanth nse 0 A~
providedto-'adentrate62 u stffing ofthe 1IRC
l et        .
&#xfd;~REACT.The r~o:ste"r,.w-ill be~available for review; howevyer itw-ill' not-b-e removedfromti~heEOC&#xfd;`  
1 This criferion will not be dnsta                 ted durin exer             cise                                                                                     Ia Criterion 1.c.: Key, personnel -with leadership roles for the'ORO, provide direction and control to that part-of the overall response effort frwihtey are responsibe.I                                                                           nU r       The abilitybto. direct andiucontrol emergency response activities ill. bedemonstra.ted at the .SIRC, REAC, the UAC and the JIC.- Coordination:
.7 T-- he:Uniff~ie~d"Area.mfna
                                      -                    Will be *demonstratedbetwseen the SIRC, the REAC, the UAC, the JIC, the EOF and the countyEOCs.,.
(*UAC) willbe activatedwithSt~atedistrict-.and" reioallpersonnel at the -Central Ill mois Reg)ionagloii iort inBloomoington lRa diol ogical Assessmen6F.ield Team (RAFT) anidmobile lab will be activated I
- I* :
EMXe"rnoel wil be prepositioned in the local aea and disp!atched.tojthe (ounty 0Cs(UAC EOF. Tec hnca
*; :.-::rt Cent*
TS
,e, postine l'noth e
v*a aea TlMAe s
C) an heJC EA il o eauaeth SG&#xfd; dut y1offi ce ad s th of the situati "on at-C li"on-'..
tatio  
-S Anactualp phoe cal wil be mad tori th FEMA  
.,&#xfd; EAw ll bei simulated pl 0 A~ et e
epio ied State staff be will begiexecisel alier thanth l
1 Crite
* *ia*1 to su ft the emergen& o nse This criferion will not be dnsta ted durin exer cise Ia Criterion 1.c.: Key, personnel -with leadership roles for the'ORO, provide direction and control to that part-of the overall response effort frwihtey are responsibe.I r
The abilitybto. direct andiucontrol emergency response activities ill. bedemonstra.ted at the.SIRC, REAC, the UAC and the JIC.- -Coordination: Will be *demonstrated betwseen the SIRC, the REAC, the UAC, the JIC, the EOF and the nU countyEOCs.,.
Criterion !.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate., locations:. Communications capabilities -are managed. in support, of emergency operations.
Criterion !.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate., locations:. Communications capabilities -are managed. in support, of emergency operations.
                                .                                                        *-:60
*-:60


Unclassified Radiological Emergency Preparedness'Program (REP)
Unclassified Radiological Emergency Preparedness'Program (REP)
After Action Report/improvement Plan                                                             Clinton.Power Station IEMA will use a variety of communication systems [Nuclear -Accident Reporting System (NARS), telefax, commercial telephone, cellular phone, radio] to communicate with other organizations and locations.
After Action Report/improvement Plan Clinton.Power Station IEMA will use a variety of communication systems [Nuclear -Accident Reporting System (NARS), telefax, commercial telephone, cellular phone, radio] to communicate with other organizations and locations.
Criterion Le.1: Equipmeni, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
Criterion Le.1: Equipmeni, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
The State of Illinois will demonstrate the use of equipment, maps and, displays to support emergency operations.
The State of Illinois will demonstrate the use of equipment, maps and, displays to support emergency operations.
Line 1,199: Line 1,675:
A message will be injected to'the.IEMA Radiologic&#xfd;l Advisoi in the DeWitt County EOC to drive the decision to authorize exposure in excess of administrative limits.
A message will be injected to'the.IEMA Radiologic&#xfd;l Advisoi in the DeWitt County EOC to drive the decision to authorize exposure in excess of administrative limits.
Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field
Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field
,monitoring data and licensee and ORO dose projections, 'as well as knowledge ,of on-site and off-site environmental conditions.
,monitoring data and licensee and ORO dose projections, 'as well as knowledge,of on-site and off-site environmental conditions.
The REAC will evaluate the licensee information and complete independent dose projections based on that information and simulated field monitoring data. REAC will make 'an evaluation of the data and make a protective action recommendation to the SIRC.
The REAC will evaluate the licensee information and complete independent dose projections based on that information and simulated field monitoring data. REAC will make 'an evaluation of the data and make a protective action recommendation to the SIRC.
Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and: necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).
Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and: necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).
The coordination to determine protective action recommendations (PARs) based *upon available shelters, evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.
The coordination to determine protective action recommendations (PARs) based *upon available shelters, evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.
The capability to determine which centers should be activated for monitoring, decontamination, registration reception*and congregate care will be' demonstrated at UAC,,with input from the SIRC and REAC.
The capability to determine which centers should be activated for monitoring, decontamination, registration reception* and congregate care will be' demonstrated at UAC,,with input from the SIRC and REAC.
Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups.
Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups.
The coordination to determineprotective action recommendations (PARs) based upon available shelters; evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.
The coordination to determineprotective action recommendations (PARs) based upon available shelters; evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.
Line 1,209: Line 1,685:


Unclassified
Unclassified
                                                                            *RdiologicalEmrngency Preparedness Prograrm,(REP)                               -.
*RdiologicalEmrngency Preparedness Prograrm,(REP)  
          .'4ftei Actioi'R*e&#xfd;otlmprove'ihe'nt Plan                                                                                                                                     fClintornPoweiStation
.'4ftei Actioi'R*e&#xfd;otlmprove'ihe'nt Plan fClintornPoweiStation it-.
                                                                  ,                          it-.
The ability to make the* deision torecornmend the, use of KI tofinstiiitionalized -persons wA~il,be demiionstrated in IREA.C' 7,
The ability to make the*deision torecornmend the, use of KI tofinstiiitionalized -persons wA~il ,be demiionstrated in IREA.C'                                     2'4*4444,y                                                               7,      ,*                                                                                  3
2'4*4444,y 3
      .Crteisonsa          md          Rades                cd csOqR nce f
.Crteisons a d
* in ge                                     n pathway are assessed arind appropni-ate -pr6tecti&                                         action planng s              cntena.
m Rade s
            .- Thisicniteriof wiliiidtbe demnsqitrated durin~thi~s exer -cise;.r,.,'
cd csOqR nce f
t.. --  . .             --    e   , .r s-o,       m a ...e     4         c.
in ge n pathway are assessed arind appropni-ate -pr6tecti&
Criterioni 2I.e. 1: Timely rfe-ocation;,reenti adetun .decisions ::are ,made
action s
  ...assessmentsof the radio1ogic6 conditionisanidi'"nteriai' ,the OROs plan and/or procedures
planng cntena.
                                                                                                                                                          .and coordinated as appropnate" based o I
.- Thisicniteriof wiliiidtbe demnsqitrated durin~thi~s exer -cise;.r,.,'
        .~   ~. Ths citenion Will notibe5 demonstrated durngtiexrse-EVALUATIONAREA 3 PROTE;C-TIV* -ACTIONIMPLEMENTATION..
t....
Criterion ,3a."The OROs issue appropriate' dlosimetry and pr6ced'regs'and manage radiol6gicalexposure to emergency
e  
    . orkers in accordance with the plan and procedures..:.-Emergency workers penodially and at the end of each.mssion read w                                                                                                                                                                                                                          '      5
, s-o,.r m a e 4
  -Atheir dosimeters-andrecordithe reading's onthe appropniiate exposure recordorchart.                                                                                   '          .                          ','-
c.
This will be demonstrated*                   -dnnithe ISPDCObnefingfTC interview.wAill be conducted onNovember-1 9 a.m.;;at theISP         District 1Headquarters in Pes6tum .This cn*e*no wil*laso be.demonstrated at the                                                                             fi*dteaimtaging-'area.
Criterioni 2I.e. 1: Timely rfe-ocation;,reenti adetun.decisions ::are,made  
    -Criterion 3                     .KI .and-approprite.instructions are aVailable' should a decision, to .recommefnd useof KI be made.
.and coordinated as appropnate" based o
Appropnae                     dkeeping of e aministrto of.K fr                                                           e       rkers.and                       institUtionalized'4idividials (not the tThis"wll be demonstratedodunngri theISF DCO'bnefing/TAC1iterview will be condtedpn Novemm r' .;theISP Distnct.1.o.-           . 0iHeadqUarters
... assessmentsof the radio1ogic6 conditionisanidi'"nteriai',the OROs plan and/or procedures I
                                                      ~ ~ ~ ~ ~ ~ ... .TuhisAcntenonwillalso demonstrated
.~ ~. Ths citenion Will notibe5 demonstrated durngtiexrse-EVALUATIONAREA 3 PROTE;C-TIV* -ACTIONIMPLEMENTATION..
                                                    ,,~                    iPesotui
Criterion,3a." The OROs issue appropriate' dlosimetry and pr6ced'regs'and manage radiol6gicalexposure to emergency
                                                                                                                                            ,..i...*.ris                   ..t    fte te s                    ar        -';r{ 5a.
.workers in accordance with the plan and procedures..:.-Emergency workers penodially and at the end of each.mssion read 5
44 4      .>44,     :,*                                                                                          . .      .,, .      .                            ,7 rT,'>-*- : '*. '    4 .    . .*
-Atheir dosimeters-andrecordithe reading's onthe appropniiate exposure recordorchart.
4,,     .
This will be demonstrated*  
CriterionCrit actions. 3 c..c:1Ptectiveactione 1                          t' ec.isions are implem&#xfd;entedforspecialpopuai e                mt            -,'"                4 rypswithin areas subject                         prtecte         : .
-dnnithe ISPDCObnefingfTC interview.wAill be conducted onNovember-1 9 a.m.;;at theISP District 1Headquarters in Pes6tum.This cn*e*no wil*laso be.demonstrated at the fi*dteaimtaging-'area.
              'This' critenon does not aoply to the State ofIllinoig-.                                         ."          >                                                  '"V" .... .   '...
-Criterion 3  
--Criterion 3.c2&#xfd;.       2OROs/Schoo                       fficials decide uoan               4"',
.KI.and -approprite.instructions are aVailable' should a decision, to.recommefnd us eof KI be made.
Impee                                       fr: sc             l                     4 This criteno.do.es.not.apply.                             the State-of Illinois.
Appropnae dkeeping of e aministrto of.K fr e
-,;,Criterion I.dil.jAppropnate.traffic and access control is established.j,Accurate instructions aie provided to traffic and access This will be demonstrated by theiState through coordination'between the UAC and the County EOCs, in accordance
rkers.and institUtionalized'4idividials (not the tThis"wll be demonstratedodunngri theISF DCO'bnefing/TAC1 iterview will be condtedpn Novemm r'.;theISP Distnct.1 0iHeadqUarters iPesotui
            . . ith. the, 01linton Station EPZ Traffic and Access Control procedures.                             11 .  -  I        '      4The             , staffing of the State posts' will be IF, "
.TuhisAcntenonwillalso demonstrated t te f
4-
te s
                'simnulated.during the'exercise. .-                                   :i.
ar
              -A TAC deimonstration Will be coinducted in conjunction With the DCO.briefing on November,,
.o.- ~ ~ ~ ~ ~ ~ ~...  
9 a.m., at the ISP District 10 Headquarters iii Peso:tum.
,..i...*.ris  
                                                                                                                                ,  .. , .                    . o..                        '
-';r{ 5a.
I
44  
                  .4:.,4.'4.4,4,
.>44, 4
                            ,.- .y ""'6   *        .          ,              "          .          '.                              -.                          .",.
rT,'>-*  
                      . . .                ;,    '      * ".:        "        ,,          ./.
,7 4
                                                                                          ,':.<        ...~ '-,;
4,,.*
                                                                                                        "7                 2'''   ,i 44:             ,       * :
CriterionCrit 3  
                                                                                                                                                            .....        .{*.'444 4!::,.            *.4..
.c:1Ptectiveactione ec.isions are implem&#xfd;entedforspecialpopuai rypswithin areas subject prtecte :.
62*                                                                                                           1
actions.
: c. 1
' t e
mt 4
'This' critenon does not ao ply to the State ofIllinoig-.  
'"V".....
4"',
--Criterion 3.c2&#xfd;.
2OROs/Schoo fficials decide uoan Impee fr: sc l
4 This criteno.do.es.not.apply.
the State-of Illinois.
-,;,Criterion I.dil.jAppropnate.traffic and access control is established.j, Accurate instructions aie provided to traffic and access This will be demonstrated by thei State through coordination'between the UAC and the County EOCs, in accordance
.. ith. the, 01linton Station EPZ Traffic and Access Control procedures. 4The staffing of the State posts' will be IF, 4
4-11 I
'simnulated.during the'exercise..-
:i.
o..
-A TAC deimonstration Will be coinducted in conjunction With the DCO.briefing on November,,
I 9 a.m., at the ISP District 10 Headquarters iii Peso:tum.
.4:., 4.'
4.4,4,  
.y ""'6  
./.  
... ~  
"7 2'''
44 4!::,.
,i
.{*.'444  
*.4..
62*
1


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                 Clinton Power Station Criterion 3.d.2: Impediments to evacuationare identified and resolved.
After Action Report/Improvement Plan Clinton Power Station Criterion 3.d.2: Impediments to evacuationare identified and resolved.
This will be demonstrated through discussions at the UAC between the Illinois State Police and Illinois Department of Transportation. A message will be injected at the. UAC that will drive this demonstration. State personnel. will deal with the impediment by discussing the need for equipment, and its, estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.
This will be demonstrated through discussions at the UAC between the Illinois State Police and Illinois Department of Transportation. A message will be injected at the. UAC that will drive this demonstration. State personnel. will deal with the impediment by discussing the need for equipment, and its, estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.
Criterion 3;e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.
Criterion 3;e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.
Line 1,261: Line 1,767:
Criterion 3.f.M: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.
Criterion 3.f.M: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.
This criterion will not be demonstrated during this exercise.
This criterion will not be demonstrated during this exercise.
EVALUATION AREA 4- FIELD MEASUREMENT AND ANALYSIS Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.
EVALUATION AREA 4-FIELD MEASUREMENT AND ANALYSIS Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.
This criterion will be demonstrated at RAFT with field teams performing radiation measurements with various monitoring equipment. Air samples will be taken with charcoal cartridges and'the availability of silver zeolite cartridges will be indicated. Two field teams will be evaluated.
This criterion will be demonstrated at RAFT with field teams performing radiation measurements with various monitoring equipment. Air samples will be taken with charcoal cartridges and'the availability of silver zeolite cartridges will be indicated. Two field teams will be evaluated.
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.
Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.
Line 1,269: Line 1,775:
Criterion 4.b.1: The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (e.g., food crops, milk, water, vegetation, and soil) to support adequate assessments and protective action decision-making.
Criterion 4.b.1: The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (e.g., food crops, milk, water, vegetation, and soil) to support adequate assessments and protective action decision-making.
This criterion will not be demonstrated during this exercise.
This criterion will not be demonstrated during this exercise.
                                                                  .63
.63


                                                                . *    *a "- "- -Unclassified-A..e Actionadiologiegl
a
                                  .                                        Emergency Preparedness Progamn(REP)                           ..                  :    -
* "- "- -Unclassified-A..e Actionadiologiegl Emergency Preparedness Progamn(REP)  
Repirtlmprbvement Plan
.e Repirtlmprbvement Plan ClintonPower-Station I
                                    .e ClintonPower-Station I
Criterion 4.c.l: The laboratory is capable-ofperformg required radhioogical analyes6 td isort protective action decisins.
Criterion 4.c.l: The laboratory is capable- ofperformg required radhioogical analyes6td                                      isort protective
Tbhs criterion will be demonstrated during this exercise at)iheRAFTMobile La i
                                                                                                                                                    .      action decisins.
ait. the RAtfStging Area  
Tbhs criterion will be demonstrated during this exercise at)iheRAFTMobile                   i La ait. the RAtfStging Area                             .
-EVALUATION AREA 5-EMERGENCY NOTIFICATION AND PUBLIC INFORMATION-.,
        -EVALUATION AREA 5- EMERGENCY NOTIFICATION AND PUBLIC INFORMATION-.,                                                                           -
Criterion.5.a.-- Activities associated-iffthpnmaiy alepting and notificatiofithe public are completed'inf a timielyh manner
Criterion.5.a.-- Activities associated-iffthpnmaiy alepting and notificatiofithe public are completed'inf a timielyh                                         manner
-following:the initiladecision.by.auithonized~offsite emergency officials'to notify thepublic of an emergency  
        -following:the initiladecision.by.auithonized~offsite emergency officials'to notify thepublic of an emergency                                                     .situation...,The 3 iial instructional message to the publc must inlude as a minimum the elements required by current-DHS.RREP guidance                                                                 3,
.situation...,The 3 iial instructional message to the publc must inlude as a minimum the elements required by current-DHS.R REP guidance 3,
                        .The State s role in demonstrating this criterion islimited to transm'ittngthe State s p"rtective :action recmmendation th L. (AR) coutiesand o          onitringthe nstrctioal mes'sa~ges'p'rovi!*de~d'to the. ,pubcby                         theconie                 hi m.omtring will be.. ccomlished by LEMA epresentatives in the.DeWitt'Cot. EO                                       ',5 Criterion 5.a. 2[ESERVED]-
.The State s role in demonstrating this criterion islimited to transm'ittngthe State s p"rtective :action recmmendation L. (AR) o th coutiesand onitringthe nstrctioal mes'sa~ges'p'rovi!*de~d'to the.,pubcby theconie hi m.omtring will be.. ccomlished by LEMA epresentatives in the.DeWitt'Cot.
      . Criterion. 5 a.3:Ativities associatedprwith HS approved -exception                                                 applicable)
EO  
Oareas(where are6completed6within:45-.                .
',5 Criterion 5.a. 2[ESERVED]-
        " .minutesfollowigthe mitial decision byauthorzed.offsite emergency officils to notify thepublic of, An emergency situation.
. Criterion. 5 a.3:Ativities associatedprwith HS approved -exception Oareas(where applicable) are6completed6within:45-.  
        "Bacupalertand        -n nifictio'no6fthe'pubi cjis:completed within           45   miutes                     the detection by teRO of             ofolloing a failure of       3       II the primary alert.andn6tification                                                                     '  .syst'e'm...      .
".minutes followigthe mitial decision byauthorzed.offsite emergency officils to notify thepublic of, An emergency situation.
3     .                           .3.3
-n Bacupalertand nifictio'no6fthe'pubi cjis:completed within 45 miutes ofolloing the detection by teRO of a failure of 3
                  .. This criterion does not apply to the State of Illinois.                ..
II the primary alert.andn6tification  
Criteri         '5 b       .OROs provide.accuriateemergency information and.instructions.to.the publc and the news medoi iatimely:.
.syst'e'm...
    ,manner.                                                                                    .                          ,,.
3.
.3.3 This criterion does not apply to the State of Illinois.
Criteri ' 5 b  
.OROs provide.accuriateemergency information and.instructions.to.the publc and the news medoi iatimely:.
,manner.
Thiswillbedemonstrat*"esd -at th* 4JI..ini icoordinaion-with the SIRCREAC UAC and the DeWitt CountyEOC.
Thiswillbedemonstrat*"esd -at th* 4JI..ini icoordinaion-with the SIRCREAC UAC and the DeWitt CountyEOC.
                      .-EMA
EMA personnel will be presentattheJJI &t-ofoinate'&#xfd;-t the" Exie&#xfd;lonstaff.e Media briefin will benconductedat'
                          ._.-.-:.personnel will be presentattheJJI &t- ofoinate'&#xfd;-t the"Exie&#xfd;lonstaff.e Media briefin will benconductedat'
.o  
          .o     -th'e JICAA livestockladvisory ,will be isue                         diaot6frehe JIGC bfe, SIRC when appropria_16' orumr control phone bainkfor public iquires will be operatedby th                   tat'euringthe e               cis                   jacent
-th'e JICAA livestockladvisory,will be isue diaot6frehe JIGC bfe, S IRC when appropria _16' orumr control phone bainkfor public iquires will be operatedby th tat'euringthe e cis jacent
      .EVALUATION AREA 6- SUPPORT OPERAT&#xfd;ION/FACI~ITIES                                           a   3..f,.rh       3 3-.&#xfd;   3j   3       33j 3 -Criterion;         6.a.1: -The.xrecepiion _center/emiergency, woke faclitha                 aproritespaceadq                       uat rsurces, and trainedf
.EVALUATION AREA 6-SUPPORT OPERAT&#xfd;ION/FACI~ITIES a 3..f,.rh 3 3-.&#xfd; 3j 3
    .persqnnel toprbide monng, decontm*inationi;,and registratiop of;evacueis                                   fd/toreme*rge.ncyworkq'ers&#xfd;.j. 3                 t';-   3       *          -*
33j 3  
This criterion will be demonstrated,'at Hort6n Fieldhouse at'Ililinoios Staeuniversity in Normial, IL willbe conducted 3--on)November1.Lwith.             set up..beginning - fAt.1a.m.., Twoportal monitors.Wi11 beset :up.ujrngthe demonstration.
-Criterion; 6.a.1: -The.xrecepiion _center/emiergency, woke faclitha aproritespaceadq uat rsurces, and trainedf
Evacuee and emergency woi'ker mwnitiring&#xfd;and~decontarlln evacuees will be processed to meet 20%"in         12 hiurs requ:irement       .
.persqnnel toprbide monng, decontm*inationi;,and registratiop of;evacueis fd/toreme*rge.ncyworkq'ers&#xfd;.j.
bedremnstrate~d The".appropnate .number of 3                                    . 1               n Criterion 6.6.1: The' facility/ORO has adequate Dpr6edures rand resources for- the accomplish*men. -of monitonfng -and decontamination of emergency worker equipment including vehicleS.                             "                                                                :    .              3 This criterion will be demonstrated at Horton'Fieldhou&#xfd;e at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November. -1,with set ip beginning at 11:00 a.m. An emergency worker vehicle will be monitored and decontamrinated by. fieldteam staff..3 b4.
3 t';-
3 This criterion will be demonstrated,'at Hort6n Fieldhouse a t'Ililinoios Staeuniversity in Normial, IL willbe conducted 3--on)November1.Lwith.
set up.. beginning - fAt.1a.m.., Twoportal monitors.Wi11 beset :up.ujrngthe demonstration.
Evacuee and emergency woi'ker mwnitiring&#xfd;and~decontarlln bedremnstrate~d The".appropnate.number of evacuees will be processed to meet 20%"in 12 hiurs requ:irement 3
. 1 n
Criterion 6.6.1: The' facility/ORO has adequate Dpr6edures rand resources for-the accomplish*men. -of monitonfng -and decontamination of emergency worker equipment including vehicleS.
3 This criterion will be demonstrated at Horton'Fieldhou&#xfd;e at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November. -1, with set ip beginning at 11:00 a.m. An emergency worker vehicle will be monitored and decontamrinated by. fieldteam staff..3 b4.


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                             Clinton Power Station Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. Managers demonstrate the procedures'to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities.
After Action Report/Improvement Plan Clinton Power Station Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. Managers demonstrate the procedures'to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities.
Horton Fieldhouse at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November 1, with set up beginning at 11:00 aim. Local organizations" responsible for operating a reception'and congregate care center will be present to demonstrate this criterion.
Horton Fieldhouse at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November 1, with set up beginning at 11:00 aim. Local organizations" responsible for operating a reception'and congregate care center will be present to demonstrate this criterion.
Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.
Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.
This criterion will be demonstrated during an out of sequence .drill conducted at St. Mary's Hospital in Decatur on November 1, 10:00 a.m. (confirmed).
This criterion will be demonstrated during an out of sequence.drill conducted at St. Mary's Hospital in Decatur on November 1, 10:00 a.m. (confirmed).
65
65


                                                      -   *~.
-Unclassified I
                                                                                  -Unclassified adiolgic'al Emnergency PrprdnesPgam(P)..
*~.
I j?,Aft& A         rRpr/mrvm tion cinRp nrvm          n Plan                                                                   ,,*              tai infon~PoWei'Station
adiolgic'al Emnergency PrprdnesPgam(P)..
            -    ~ ~                 ~DITO14TEXNT-O-LAY..AGREEMENT
j?,Aft& A tio n Rpr/mrvm Plan infon~PoWei'Station r
                                                      ~U
cinRp nrvm n
.Criteriatha~t .can be re dlemonstrate& i                               f   credt, at tihe discretionof the evaluator incude'the followin'g: 3.a.1, 3.d.1, 3.d.2, 6.a.1 ,---6.b 1,,,6.c. I and 6d. 1 Critena that" may"be redemonstrtaed as approved on a7cseh-b-ase :bsisbythe Chaiiperson of the Regional Assstance Committe,eiinclude the following:2 a I:2 b 1 2,b.2                                 and Sb. L.
tai
EVALUATION AREA 1 &#xfd;_EMERGENCY OPERATIONS MANAGEMENTf'
~ ~  
'Criterion 1.a.:l.OROs usei effective procedures to alert notifi*and mobiliie emergency personnel and activate 'facilities in a t imely manner.:-
~  
DeWitt County intends to fully activate the'Emergency Operations Center (EO) in Clnton-Illinois The .County
~U DITO14TEXNT-O-LAY..AGREEMENT
          -    will implement noitifcationiprocedures as definied in IPRA Clinton Representatives from the EPZ-municipalities, demonstrate 24-hour staffing of the EOC. Evaluators will not be allowed to remove the roster from theEOC IEa land Exv i belo     w is aff     th e e C ounty EOC bu will no be pr posnin   tio n-ed n th EO A oterw ll b pr v d d t An'evaluatorwillbe positioned at the Count Shenff's Conunuications Cetier-(nitial warning point) at the start of
.Cr iteriatha~t.can be re dlemonstrate& i f
              -the execs.
credt, at tihe discretionof the evaluator incude'the followin'g: 3.a.1, 3.d.1, 3.d.2, 6.a. 1,---6.b 1,,,6.c. I and 6d. 1 Critena that" may" be redemonstrtaed as approved on a7cseh-b-ase :bsisbythe Chaiiperson of the Regional Assstance Committe,eiinclude the following:2 a I:2 b 1 2,b.2 and Sb. L.
Criterion 1b.l: Facilities are sufficient to support the emergencyresponse*                               -    -..
EVALUATION AREA 1 &#xfd;_EMERGENCY OPERATIONS MANAGEMENT f'
'Criterion 1.a.:l.OROs usei effective procedures to alert notifi*and mobiliie emergency personnel and activate 'facilities in a t imely manner.:-
DeWitt County intends to fully activate the'Emergency Operations Center (EO) in Clnton-Illinois The.County will implement noitifcationiprocedures as definied in IPRA Clinton Representatives from the EPZ-municipalities, demonstrate 24-hour staffing of the EOC. Evaluators will not be allowed to remove the roster from theEOC IE a land Exv i belo w i e
s aff th e C ounty EO C bu will no be pr posnin tio n-ed n th EO A oterw ll b pr v d d t An'evaluatorwillbe positioned at the Count Shenff's Conunuications Cetier-(nitial warning point) at the start of
-the execs.
Criterion 1b.l: Facilities are sufficient to support the emergencyresponse*
criern 'will not-be de onstrated during this
criern 'will not-be de onstrated during this
  ,:sCriteoion 1 c i'Ke personel with leaderskhp ro1es for th* ORO pi0ovide direction andcoiit1.I tltht part of the overall c''kypr               u esponibhlea&Thjpfbq&sect;-
,:sCriteoion 1 c i'Ke personel with leaderskhp ro1es for th* ORO pi0ovide direction andcoiit1.I tl tht part of the overall rrin&#xfd; c''kypr u
rrin&#xfd; responseeffotfo hchte are                                                                                                             -                    .,n~
esponibhlea&Thjpfbq&sect;-
isio             I]       bedemonstated at the '-DeWitt CounrtyEOC Coordinatio of decisions )an emergency _..                                 f5h:on acivties -will_be demonstratedibewen DeWit Conyth SICUCadteJG                                             vnbeifwe~n                 n municipalitieswithin           theEPZ.-Coordiatlon between De"itt County and thesupportounties will be demonstrated.:
responseeffotfo hchte are  
r al     `W            ..                    on  bewe  -e.             ~,                                       Ie Criterion1.Ld. lV At least tw6:coihnfiunication systems are available,- at least-one oprtsppel'ad-oiincto                                             links hoetdn and'natac "are established .*ndamtainec                       ihappropripte                           ommunicati6is :capabilitiess aie, managedi Ccat6nm..                                      d  ssuppor potl,, of
.,n~
.emergency operations, DeWitt County will use NARS;comimer~cial telephone,radio and telefax to, communicate with departments and agencies at other locations.
isio I]
Criterion e.: Equipment,                             displays, dosimetry,,l'pta ssium iodide (KI)aid 'other supplies are sufficient to support emergency operations.                                                      .            .    ..
bedemonstated at the '-DeWitt CounrtyEOC Coordinatio of decisions )an emergency.._
DeWitt County will demonstrate the ability to support operations t.hrough the use-of                 e maps, status boards And other displays as appropriate. DCO logs will be ayailable from"the. JEMA Radiological Advisor. in the DeWitt County EOC. The availability of dosimetry and KI Will be demonstrated during the' traffic'and-access .control demonstration and the school interview. The DCO briefing for the deputy demonstrating traffic and access .control will be conducted at.the DeWitt County EOC. "-
f acivties -will_ be demonstratedi bewen DeWit Conyth SICUCadteJG vnbeifwe~n 5h:on n
The DCO briefing for the Clinton Police officer demonsitrating traffic and access control Will be conducted- at the Clinton Police Department on October 31, at 1:00 pm.                                                                                               3
municipalitieswithin theEPZ.-Coordiatlon between De"itt County and thesupportounties will be demonstrated.:
                                                                                      .466 I
r al  
-e.  
`W
~,
on bewe Ie Criterion1.Ld. lV At least tw6:coihnfiunication systems are available,- at least-one oprtsppel'ad-oiincto links hoetdn and 'natac s
d s
potl,,
"are established.*ndamtainec ihappropripte Ccat6nm..
ommunicati6is :capabilities aie, managedi suppor of
.emergency operations, DeWitt County will use NARS;comimer~cial telephone,radio and telefax to, communicate with departments and agencies at other locations.
Criterion e.: Equipment, displays, dosimetry,,l'pta ssium iodide (KI)aid 'other supplies are sufficient to support emergency operations.
DeWitt County will demonstrate the ability to support operations t.hrough the use-of e
maps, status boards And other displays as appropriate. DCO logs will be ayailable from"the. JEMA Radiological Advisor. in the DeWitt County EOC. The availability of dosimetry and KI Will be demonstrated during the' traffic'and-access.control demonstration and the school interview. The DCO briefing for the deputy demonstrating traffic and access.control will be conducted at.the DeWitt County EOC. "-
The DCO briefing for the Clinton Police officer demonsitrating traffic and access control Will be conducted-at the Clinton Police Department on October 31, at 1:00 pm.
3
.466 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                 Clinton Power Station EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, 1considering relevant factors, and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers ificluding provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
After Action Report/Improvement Plan Clinton Power Station EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, 1considering relevant factors, and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers ificluding provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
This criterion does not apply to DeWitt County.
This criterion does not apply to DeWitt County.
Criterion 2.b.I: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data and licensee and ORO dose projections, as well as knowledge of 6n-site and off-site environmental conditions.
Criterion 2.b.I: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data and licensee and ORO dose projections, as well as knowledge of 6n-site and off-site environmental conditions.
Line 1,340: Line 1,876:
Criterion 2.c.l: Protective action decisions are made, as appropriate, for special population groups.
Criterion 2.c.l: Protective action decisions are made, as appropriate, for special population groups.
The State of Illinois will provide protective action recommendations to DeWitt County officials in the County EOC.
The State of Illinois will provide protective action recommendations to DeWitt County officials in the County EOC.
The DeWitt County officials will make the final decision regarding what protective actions will be recommended for special, population groups.                          ..    ,.
The DeWitt County officials will make the final decision regarding what protective actions will be recommended for special, population groups.
Criterion 2.d.1: Radiological consequences for the ingestion pathway,are assessed and appropriate protective action decisions are made based on the ORO's planning criteria.
Criterion 2.d.1: Radiological consequences for the ingestion pathway,are assessed and appropriate protective action decisions are made based on the ORO's planning criteria.
This criterion does not apply to DeWitt County.
This criterion does not apply to DeWitt County.
Line 1,346: Line 1,882:
The DeWitt County EOC staff will demonstrate this criterion through discussions within the DeWitt County EOC and with REAC and UAC as appropriate. The controller will provide break messages which will contain the predesignated State recommendation regarding relocation, re-entry and return. The DeWitt County staff will discuss the State's recommendation and determine whether to ifollow that recommendation or another of the County's choosing. The State will participate to the, extent necessary to support DeWitt County.
The DeWitt County EOC staff will demonstrate this criterion through discussions within the DeWitt County EOC and with REAC and UAC as appropriate. The controller will provide break messages which will contain the predesignated State recommendation regarding relocation, re-entry and return. The DeWitt County staff will discuss the State's recommendation and determine whether to ifollow that recommendation or another of the County's choosing. The State will participate to the, extent necessary to support DeWitt County.
EVALUATION AREA 3'- PROTECTIVE ACTION IMPLEMENTATION Criterion 3.a.l: The OROs issue appropriate' dosimetry and procedures, and mianage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart..
EVALUATION AREA 3'- PROTECTIVE ACTION IMPLEMENTATION Criterion 3.a.l: The OROs issue appropriate' dosimetry and procedures, and mianage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart..
DeWitt County will demonstrate this criterion by close coordination with the IEMA Radioiogieal Advisor and timely dissemination and exchange of information within the County Dosimetry Control Officer network. Exercise messages will be injected which will ensure the opportunity to demonstrate this criterion in the County EOC.
DeWitt County will demonstrate this criterion by close coordination with the IEMA Radioiogieal Advisor and timely dissemination and exchange of information within the County Dosimetry Control Officer network.
Exercise messages will be injected which will ensure the opportunity to demonstrate this criterion in the County EOC.
67
67


                                                                                      -Unclasified
-Unclasified
                                                                <<adiological EniergenIcy Preparedness Prgrm(RP AferA &#xfd;oeportlmnprovemnent Plan                                                                                                             Citon Power Station f**                                      -
<<adiological EniergenIcy Preparedness Prgrm(RP AferA &#xfd;o eportlmnprovemnent Plan f**
      ."~~~~~~..'
Citon Power Station  
    ""..  .. ,t*
" " ~~~~~~..'  
                  ..This' criteriodn will also be demonstrated
"....."i. "-...  
                  ...   "i. "-...,::i': :"2-:g:*2?:.*             ..dnpute !::
,::i':
                                                              . Ioditrbte Ihehee theI-frtraffic- w-and         acoerar.intro fficaantaesI conirol -        .:
:"2-:g:*2?:.*
l
::':::"'-::.].. ::
::':::"'-::.]..
..This' criteriodn will also be demonstrated theI-fr traffic-w-and acoerar.intro l
izdembohstrationdd, the wi Ve coliducterca a                      the ts.cheo1.
izdembohstrationdd, the ts.cheo1.
s e.itt County EQC_;T,tDCO bii, Png'or1iAhe             i         hiintonitiPce.iofficer demonstrating traffic andicacess                                             tcoiwilln-be -            -
...,t*
* conducted'aftheClinton Police'Departe*,n octb.3,                             3i" a 1 p                 (etiv             , ,- *                ;            ,    .tr. *,         -C Criterion 3b1j               KI: and appropriate instructions are available shouldpapdecison to r;scottimareandruse,P,                                                           Kofrtecmae.                   i Appropnaterecord keepin g of the administirao*W                         ntof*iforem*erencyworkers and institution a'ieda                                               inividuas*s.(not the, 6.Wh" nnedby                 he S6ntateof Illinois tdiribue-and           ae adminittK'                                                                                    s     e.
Ihehee dnpute Ioditrbte ffica antaesI conirol wi a
issuaneofi'to ed                                         -ianDetCnosrid                                     ,     EDeWittCountyofficials-wailrl*discu                           the
Ve coliducterca s
                                              ,mergencyworkers                               bi                                                     y measure and will notytify thet
the e.itt County EQC_ ;T,tDCO bii, Png'or1iAhe i
                      'municipalitiesofthe- State                                   ,                    7                                                                   -            ..
hiintonitiPce.iofficer demonstrating traffic andicacess tcoiwilln-be conducted'aftheClinton Police'Departe*,n octb.3, a 1 p (etiv  
rir.wil                 1 bs l     oated         n           traffc*n'6ontrol demonstrations ahd the,-schhobl"intervi w. Th&DO                                       ..
.tr. *,
bie.fingf... .........                             trafi   an Ac'il'slsc:beoniit'1atonthe oeI"tt                                                       Cp-htT       EOCJthe
3i"
                    ;90 bidesn             the       lmtoonP.Plicebbfic'rdemontfating tra'ffir and                                   cotrol will be c                       e t.c6s
-C Criterion 3b1j KI: and appropriate instructions are available shouldpapdecison to r;scottimareandruse, P, Kof rtecmae.
                  ' Polic             .Departmient:                                                                      .:
i Appropnaterecord keepin g of the administirao*W nt of*iforem*erencyworkers and institution a'ieda inividuas*s.(not the, 6.Wh" nnedby he S6ntate of Illinois tdiribue-and adminitt K' ae s
Crtron3c1:Poect'iv                         -                                                                    ato         -,        -jhm~es-action decisionsu     rti, iliente e              fon. special-potion O                               witheto                               poitective actions.--,                                                                                                                                                                        ,
e.
This wi be d               ionsrated by DeWitteCountthrough the simulated                                     imenaion of She appropriae                     -,proce ures.
issuaneofi'to ed  
                    - r the, appropriate. offiials will codcsinate -transportation An recei                                 ingfcitieorspecialpopltions One                                       achss tp of special,     efcilite         willt b contactede dsuring heexercitse               rOie troaff each         i            sstyp-0otransportation i               provider_.in
-ianDetCnosrid  
                . (amdbulance/bus) wil e contacted-duringthie exercisThe.publsriill                               c,         not e involve6dfithe dem                         trationi                               -t
, EDeWittCountyofficials-wailrl*discu the
              ." The   iMobility impaired List ;wilbe avdai* inion                                   Oin tolhe CountyEOCdring te exriseThe                                      tevalatorhe
,mergencyworkers bi y measure and will notytify thet
        " .      awtl not bmallowed irmngfoveth'elist froim- the.:               EC,                     .-'              .      ;r-<-,-         ('                       15.A,     -
'municipalities ofthe-State 7
- - Crierin 3..2:OR&&#xfd;s/cho offcials de'cide uponadimpeetpoetv                                                                 cin       o col
rir.wil bs 1
                                                                                      -',                                              "1gS" ,
l oated n
Dnstate ti       c               i                                           implementation of the approprate pi~bdd469jfin he county EOCThe EPZ schools andA trnptinrvdr                                                         wil bcotteduighe. exercise' A-school -interview: Will be conductd               wih`he ClintonScho~ol.District                         #15onOcitober               31 -at3 pmini the DistitI
traffc*n'6ontrol demonstrations ahd the,-s chhobl"intervi w.
                                @fip isrit Te uprited                 nt rncipal .aTahrtetanpraincoriao-1,                                                                   th-e~mainltenance
Th& DO bie.fingf............
              .-   supervisor d&an4us driver' Will be~pre'sentaftfhidineiewt                             -,;U                     '          i,                   r' Criterion 3d 1` Apronate traffic and -ac"cess-co-ntro"lis. esita;blished AccAdurat instructions. are provid&#xfd;e d to6 tafc and access cnrlpersonne                           ,,-'I)                                                 .
trafi an A c'il'slsc:beoniit'1atonthe oeI"tt Cp-htT EOCJthe
Coordinatioii between DeWitt County agencies designated to provide traffc and access contowilbexbtd in' the Cohnty EOC. 'A. Sheriffs depitty killbe*aviilable: duriinh&#xfd;tefi&636cisie to'cddhiibnhira't~e the&sfa-ffin6ff ne post..                                                                       -
;90 bidesn the lmtoonP.Plicebbfic'rdemontfating tra'ffir and t.c6s cotrol will be c e
3/4The posf for the- deosath 2 wl b e:lected by D                                 itCuny doq gthee-.&#xfd;ercis6ebaid pn exetcise play&#xfd;. - The Oe~juty' will drive to the selecte& potlc                         binfr'the de6monstratiqn.~ The staffing of 1he reanng pots 11ibe Simiilated.i                                                                               ,      ----
' Polic  
              -- A Traffic &'Adcess control interview, and' demonstration &#xfd;(and dosimetry c'ontrol,-bri~efing), Will. take qplace at the.-
.Departmient:
C&#xfd;lintoii Police-&#xfd;Department oh Octob6r 3,1, at 1:00,pm .A Clinto Policeofficer willb available to demonstrate the actual~or simulated staffing of on pSst.             ---                                    ,...                              --        -     -     -
Crtron3c1:Poect'iv ato  
-jhm~es-action decisionsu
: rti, e
iliente fon. special-potion O witheto poitective actions.--,
This wi be d ionsrated by DeWitteCountthrough the simulated imenaion of She appropriae  
-,proce ures.
- r the, appropriate. offiials will codcsinate -transportation An recei ingfcitieorspecial popltions One achss tp of special, efcilite willt b contactede dsuring heexercitse rOie troaff i each sstyp-0 otransportation i
provider_.in
. (amdbulance/bus) wil e contacted-duringthie exercisThe.publsriill c,
not e involve6df ithe dem trationi  
-t
." The iMobility impaired List ;wil be avdai* inion Oin tolhe CountyEOCdring te exrise The tevalatorhe awtl not bmallowed irmngfove th'elist froim-the.:
EC,  
;r-<-,-
( '
15.A, Crierin 3..2:OR&&#xfd;s/cho offcials de'cide uponadimpeetpoetv cin o col "1gS" Dnstate ti c
i implementation of the approprate pi~bdd469jfin he county EOCThe EPZ schools andA trnptinrvdr wil bcotteduighe. exercise' A-school -interview: Will be conductd wih`he ClintonScho~ol.District #15onOcitober 31 -at3 pmini the DistitI
@fip Te isrit uprited nt rncipal.aTahrtetanpraincoriao-1, th-e~mainltenance
.- supervisor d&an4us driver' Will be~pre'sentaftfhidineiewt  
-,;U i,
r' Criterion 3d 1` Apronate traffic and -ac"cess-co-ntro"lis. esita;blished AccAdurat instructions. are provid&#xfd;e d to6 tafc and access cnrlpersonne  
,,-'I)
Coordinatioii between DeWitt County agencies designated to provide traffc and access contowilbexbtd in' the Cohnty EOC. 'A. Sheriffs depitty killbe* aviilable: duriinh&#xfd;tefi&636cisie to'cddhiibnhira't~e the&sfa-ffin6ff ne post..
3/4The posf for the-deosath 2 wl b e:lected by D itCuny doq gthee-.&#xfd;ercis6ebaid pn exetcise play&#xfd;. -The O e~juty' will drive to the selecte& potlc binfr'the de6monstratiqn.~ The staffing of 1he reanng pots 11i be Simiilated.i  
-- A Traffic &'Adcess control interview, and' demonstration &#xfd;(and dosimetry c'ontrol,-bri~efing), Will. take qplace at the.-
C&#xfd;lintoii Police-&#xfd;Department oh Octob6r 3,1, at 1:00,pm.A Clinto Policeofficer willb available to demonstrate the actual~or simulated staffing of on pSst. ---  


Unclassified Radiological Emergency Preparedness Program(REP)
Unclassified Radiological Emergency Preparedness Program(REP)
After Action Report/Improvement Plan                                                               Clinton Power Station Criterion 3.d.2: Impediments to evacuation are identified and resolved.
After Action Report/Improvement Plan Clinton Power Station Criterion 3.d.2: Impediments to evacuation are identified and resolved.
The DeWitt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that Will drive'this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providerswill be madeand logged.
The DeWitt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that Will drive'this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providerswill be madeand logged.
Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regardirig water,' food supplies, milk and agricultural production within the ingestion exposure pathway bmergency planning zone for implementation of protective actions.
Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regardirig water,' food supplies, milk and agricultural production within the ingestion exposure pathway bmergency planning zone for implementation of protective actions.
Line 1,395: Line 1,957:
EVALUATION AREA 4 FIELD MEASUREMENT AND ANALYSIS This evaluation area does not apply to-DeWitt County.
EVALUATION AREA 4 FIELD MEASUREMENT AND ANALYSIS This evaluation area does not apply to-DeWitt County.
EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Criterion 5.a.l: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial, decision&#xfd; by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.
EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Criterion 5.a.l: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial, decision&#xfd; by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.
DeWitt County will demonstrate the capability to provide both an alert signal and an initial instructional message to populated areas*throughout the 10-mile&#xfd;'plume pathway EPZ in a timely manner after their decision to activate the alert and notification system to implement protective' action recommendations (PAR).
DeWitt County will demonstrate the capability to provide both an alert signal and an initial instructional message to populated areas* throughout the 10-mile&#xfd;'plume pathway EPZ in a timely manner after their decision to activate the alert and notification system to implement protective' action recommendations (PAR).
This 'capability will be demonstrated through the simulated activation of the Clinton Station EPZ Siiren Warning System as defined in IPRA-Clinton. The Siren Warning System (outdoor warning sirens) will not be activated during the exercise.
This 'capability will be demonstrated through the simulated activation of the Clinton Station EPZ Siiren Warning System as defined in IPRA-Clinton. The Siren Warning System (outdoor warning sirens) will not be activated during the exercise.
The ability to provide ihstructions to' the public will be demonstrated through the simulated activation of the local radio station (WBNQ/WBWN/WJBC). The local radio station will be contacted during the first, and possibly the second, alert and notification sequence. An evaluator and a controller will be positioned at the radio station during the exercise to monitor for a message containing a PAR. If the initial message does not contain a PAR, the evaluator and controller will stay at the radio station for the second message.
The ability to provide ihstructions to' the public will be demonstrated through the simulated activation of the local radio station (WBNQ/WBWN/WJBC). The local radio station will be contacted during the first, and possibly the second, alert and notification sequence. An evaluator and a controller will be positioned at the radio station during the exercise to monitor for a message containing a PAR. If the initial message does not contain a PAR, the evaluator and controller will stay at the radio station for the second message.
69
69


                                                                                                -Ra*.
','.After-Attion Report/lmprorvement Plan
                                                                                                              ....                          .~q:""" ~
.~
V                                .
~
                                                                                                                        - ,          4Unc~assind                             P Ernerg*.ny-P. rparedness P gragmah
V q:"""
_#di?1gical                                                            _(REP)
-Ra*.
        ','.After-Attion Report/lmprorvement Plan                                                                                                                                                                                                ClifitohtpoweiStation
4Unc~assind P
                                                                                                                                                . . . ..:.            . . .              .  . -, -        -- .        ,,                    -4.- ..        - -,I<    "-  -
_#di?1gical Ernerg*.ny-P. rparedness P gragmah
Criterion           5.a.2: [RESERV E                                                                                     " 4D]   " -'.,                                    .' i             ", : .                Ui. '. r'             "
_(REP)
-Cfiferiow5.a.3:a                                                 associated with FEMAapprvedsexceptioh :aeas (where applidAble) are, completed within 45 mifiu
ClifitohtpoweiStation
      . .. te                                                                     i....         auth o ri ed f                                 eiee yI                                         fo ti ... .. ub.i...f..                  .        ..
-4. -
sfollowiiig;the lmtiaii                                             o             ahdec               d                 trercils't                                                                             o.ju.nemergency-sitiuation.
- -,I Criterion 5.a.2: [RESERV E 4D]  
  ,Balpaert'and notatinof                                                     thelpublicis-c-opletid wiithin5minutesfollowi                                                                                 eetectinbytheOROof afailure of thep'piim a y.alert a nd hd~tifich i &,q*4                                                                                                                                                       r   f       tt       , j     1/4 Th is       cr   ite io n     do  es        n oPp:                   P e i t Co n ya" A-             1:
.' i Ui.
Criterion 5.b.l: OROs provide accurate emergency information and instructions to-the public and the news mediain a -tielym DeWitt                           youniwill demionstfrate this criterion by using prteoscipted,                                                                 q essags.-s. idicatedian-nC*!inton.-.Contact with' thle radio station willbesimulated for "ehalerft.ind notification:s'eqiuence ifollowing the sequence issuingthe initialP.AR                                                                                                                                    v   ~ ~ . - ' --                                                -      -
'. r '  
h-e 'ability to provide informnaion jothe media will bedemoinstrated by DeWitt Cduhnt through befipngs                                                                                                                                                 held   at.
-Cfiferiow5.a.3: a associated with FEMAapprvedsexceptioh :aeas (where applidAble) are, completed within 45 mifiu te i....
  .theDeWitttCbunt* iedialbriefiuigocdtion.-If realiiedia die hot preseht forthqe briefingsthe                                                                                                                                         conetrollersand                       observers will serve as mock m edia.. Evaluatoswl                                                                 o ev               sm           c media-                                                                                                       4
auth o ri ed f eiee yI fo ti...
,L"           - The aity o .deal with rumors willbe,,demonstratedbyDeWitt, County throughcoordintin between ,the County and the.JIG.Th DeWitt County                               -EOC EOC conitroller,,wlll- inj ect.exercise messagesthat                                                                                                         ,te opportnty       ywillensure to demonstrate this cntenon .,,County, officials willinvestigate and address ,,rumors .If appropnate;the rumors
ub.i...f..
                  .... ,wll becoordinated between State and County officials in t'e County EOC and the JIG
sfollowiiig;the lmtiaii o
-, ..            Countyemergency broadcast.messages and-newsireleases*,f isued.willbefaxedto the JIG                                                                                                                                               --
ahdec d
EVALUATION. AREA 6 SUPPORT OPERATION/FACIITIES "i-,..-'This evaluation area-does not apply to DeWitt-County                                                                               ,                ,          . f-.-'W-.,                 *:-s-,                         r-.p             ,        -.
trercils't o.ju.nemergency-sitiuation.
              -. . -      ,    ,    .            ".  .            . - ,        -            .    .    -      .      .      [ . * *4 1-3Si* '
,Balpaert'and notatinof thelpublicis-c-opletid wiithin5minutesfollowi eetectinbytheOROof afailure of thep'piim a y. alert a nd hd~tifich i &,q*4 r
tm' , . -- , . ,---
f tt  
J~'                     . 3* :          --.                ,-,                          .    .  * .* ,
, j 1/4 Th is cr ite io n d o e s n oPp:
                  ;,I
P e i t C o n ya" A-1:
                    ) ;f ' .-'' ;,S
Criterion 5.b.l: OROs provide accurate emergency information and instructions to-the public and the n ews mediain a -tielym
                                  '; "*";)cl *     : ;*    .'*    ,-      :*,,      iq ! *, " r; *;'     i.-;-i.
, DeWitt youniwill demionstfrate this criterion by using prteoscipted, q
                                                                                                                  .* : * -:i---*
essags.-s. idicatedian-nC*!inton.-.Contact with' thle radio station willbesimulated for "ehalerft.ind notification:s'eqiuence ifollowing the sequence issuingthe initialP.A R v ~ ~.
2 . ".U*-br             .    ) .,     -* *L- :': . *-                                                     :..   ':'  .. , -''    .    ,  .
h-e 'ability to provide informnaion jo the media will bedemoinstrated by DeWitt Cduhnt through befipngs held at.
                                                      .r  -2
.theDeWitttCbunt* iedialbriefiuigocdtion.-If realiiedia die hot preseht forthqe briefingsthe conetrollersand observers will serve as mock m edia.. Evaluatoswl o ev sm c media-4
                                                            &deg;, '**    " ,'- . .-
,L"  
                                                                                  .i            . .    .  . --,.'*   .    : ','":*      ',*    "    , ",' ".*  .*.    'r   &#xa2; ? r ; .:#' $   * - '! .h       .    "  "', /:     " '  :  ,  = --   .,:      - " - "            "
- The aity o.deal with rumors willbe,,demonstratedbyDeWitt, County throughcoordintin between,the County
I 1-- A J<A'j&sect;33~K. rUV                           iS';         -12''         '      .i---           ~ *&#xb6;~-J:                           3       :                  -                        -.    '-        -      --
-EOC and the.JIG.Th DeWitt County EOC conitroller,,wlll-inj ect.exercise messagesthat ywillensure
                    -      -                -,-        -                    ~-                 C                        's         -              *-              I-         *~V       -.-
,te opportnty to demonstrate this cntenon.,,County, officials willinvestigate and address,,rumors.If appropnate;the rumors
....,wll becoordinated between State and County officials in t'e County EOC and the JIG Countyemergency broadcast.messages and-newsireleases*,f isued.willbefaxedto the JIG EVALUATION.
AREA 6 SUPPORT OPERATION/FACIITIES "i-,..-'This evaluation area-does not apply to DeWitt-County  
. f-.-'W-.,  
*:-s-,
r-.p Si J~'
3 tm
[
4 1-3
;,I ' -'' '; "*  
) ;f. ;,S ";)cl
* iq ! *, " r; *;'
2. ".U *-br  
).,  
*L - :':. *-
i.-;-i. -:i---*
;" -2 '* ",'-.
.r
&deg;, * ',,  
.i
'r &#xa2; ? r ;.:#' $ * - '!  
.h  
"', /:  
= --
I J<A'j&sect;33~K.
1-- A rUV iS';  
-12''  
.i---  
~ *&#xb6;~-J:
3  
~-  
's I-  
*~V C
V "70
V "70


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                               Clinton Power Station MACON COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately forcredit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.1. Criteria that may be re-demonstratecd, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a. 1,. 2.b.1, 2.b.2, 5.a.1 and 5.b. 1.
After Action Report/Improvement Plan Clinton Power Station MACON COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately forcredit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.1. Criteria that may be re-demonstratecd, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a. 1,. 2.b.1, 2.b.2, 5.a. 1 and 5.b. 1.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
Macon County intends to activate the Emergency Operations Center (EOC) in Decatur, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Board, EMA, and the Sheriffs Department. If the scenario does not drive protective actions in Macon County, the County may decide to downstaff the EOC to minimum staffing. A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.
Macon County intends to activate the Emergency Operations Center (EOC) in Decatur, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Board, EMA, and the Sheriffs Department.
          ;An evaluator will be positioned at the County. Sheriff's Communications Center (initial warning point).at the start of the exercise.
If the scenario does not drive protective actions in Macon County, the County may decide to downstaff the EOC to minimum staffing. A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.
;An evaluator will be positioned at the County. Sheriff's Communications Center (initial warning point).at the start of the exercise.
Criterion 1.b.l: Facilities are sufficient to support the emergency response.
Criterion 1.b.l: Facilities are sufficient to support the emergency response.
This criterion will not be demonstrated during this exercise.
This criterion will not be demonstrated during this exercise.
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.
Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.
Coordination of decisions and emergency activi.ties will be demonstrated between Macon County. and DeWitt County.
Coordination of decisions and emergency activi.ties will be demonstrated between Macon County. and DeWitt County.
Criterion .1.d.l: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.
Criterion.1.d.l: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.
Communications capabilities are managed in support of emergency operations.
Macon County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.
Macon County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.
Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
Line 1,450: Line 2,046:
71
71


Ao.t/Improvement                             Plan Unclassiffied j           Cn                   Station' 1
Unclassiffied 1
                                                                                    .$          4-                           -" '                  '4f-                 -       -
Ao.t/Improvement Plan j
I
Cn Station' I
                  """                "-3   ~               "      '                  '      Er  , s44ioog'a'egePrepi~en3 1/4               s Prora             (REP)'. .         ...                        .33 -,t'n , '       "            .I This- cnitenion does&#xfd; not apply to Macon County.
4-  
CPKritenon 2:b.lAppropnateprotective action recommendations are based onavailable momtonng data conditions.,
'4f-This-cnitenion does&#xfd; not apply to Macon County.
icensee and. ORO,
-3  
                                                  ;. e                                    .
~  
Was,&ell-,as knowledgeof
, s44ioog'a Er
                                                                                                                                            -4                      . .-
'ege 1/4 Prepi~en3 s Prora (REP)'..
ifornation on olant conditions,&#xfd; field on-site,    , andcoff-site
.33 -,t'n, '  
                                                                                                                                                                                    - > ,              ( enviro
.I CPKritenon 2:b.lAppropnateprotective action recommendations are based onavailable ifornation on olant conditions,&#xfd; field momtonng data icensee and. ORO, Was,&ell-,as knowledgeof on-site, andcoff-site enviro entalna conditions.,
                                                                                                                                                                                                            "        , entalna
-4 e
                                                                                                                                                                                                                          . " "-,      I This criterion does not apply to Macon Cout y, Criterion2.b.2: A decision-making pr-cess involvingconsideration,of appropnat factors and necessary coordina!0tion'                                                                                                   sed to miake protective acition II            decisions (PAD-s) for. tegnrlpblic (including the recommendation for the use of KI, if ORO Thiscniteridn does -not apply to'Macon Coutyjhis',fulction:is the responsibility of DeWitt County.
(
    -Criterion 2.c.1: Protective action'decisions aremane                                                                         for spe6ia 1asappropnate,:                         .1population gro'ps.          -                .
I This criterion does not apply to Macon Cout y, Criterion2.b.2: A decision-making pr-cess involvingconsideration,of appropnat factors and necessary coordina!0tion' sed II to miake protective acition decisions (PAD-s) for. tegnrlpblic (including the recommendation for the use of KI, if ORO Thiscniteridn does -not apply to'Macon Coutyjhis',fulction:is the responsibility of DeWitt County.
are~~saprpaef      ~ mae  ~~~hrespecial populaton giDeiitt.,
-Criterion 2.c.1: Protective action'decisions aremane 1asappropnate,:
This rterion does not apply to MaconCoun ty.                                                 fifsnctio'n is t erespo'nsibility of De                                   :i, Cont                                   -l
for spe6ia
              *        -m                   ''
.1population gro'ps.
* M     Th~ 3   Count         -'This''                                                              '
are~ ~  
    ,Criterion 2.d.1: Rhdiological ponsequencesq:,for ,themingestio'nrpaihway are .assessed                                                                           an       apprpate lprotectie ,ation decisions aredniaddebased o~h te                               panngctra' This &riterionfdd6o* bt apply t!'Macon',County
~ ~~~h mae saprpaef respecial populaton giDeiitt.,
: x. III                                                d-sretr                          ndcsl"*..are made .iafid',cootdfad         .....              ppf                         -,~sd"0n"L;._
This rterion does not apply to MaconCoun ty.
Criterion.2... 1:,-Tiel. re-.ocation, re-entry an.'.retrndecis                                                               ae           d n o                         ad         ap             t     ba         o C assessments bf.the radiological condtoi an rtrainteQ                                                                         -ln an-d/or pr-ocedures.,
fifsnctio'n is t erespo'nsibility of De
                        - f h-     di                 3'"'"i         ,.*.,''d                             3rtrai teO~p
:i,
              ":fThiscrterion'does not, apljto'Macon County.This functint                                                         is the1 responsibiltyy         t                                    i"b.           .              1I EVALUATION:ARA                         3'- PROTECTIVE ACTION*IMPLEMENT-ATION                                                                     ..  ,*,"        "3.33
Cont  
    .Criterion 3.a.1: "The' ORs issue appropat'edo-sim etryandprocedur snanddmanage radexposure to emergency                                                                                                                       -
-l
-yoworkersin acc6'ordnce with the plan and procedures*Emergency ,workerspeiodicallyand                                                   lror chrbe,....- atth,                       ndof each
-m M Th~
                                                                                                                                                                                        'O-o           - mission-read
3 Count  
                                                                                                                                                                                                              >:              d<<
-'This''  
  ' their dosimeters and record thereadings on the _pptopriate exposure record or ch.t I-
, Criterion 2.d.1: Rhdiological ponsequencesq:,for,themingestio'nrpaihway are.assessed an apprpate lprotectie,ation decisions aredniaddebased o~h te panngctra' This &riterionfdd6o* bt apply t!'Macon',County III
: 3. "1.l
: x.
                .Macon. 'ountyiffi- willai'3demonstrate tins                  " h-ru*r:D rby 'a;,*
d-s retr ndcsl"*..are made.iafid',cootdfad ppf  
                                                                              '""c                                closed*''*"*
-,~sd"0n"L ;._
                                                                                                                          ,.2;,,     -,.*,..A+s.-,.,- wf&#xa2;erh 3 uiiaii                  ithiot. TC E ".:5adtmi*ad" '-.;'5     ,:;...             .. ""      '
Criterion.2...
onC                         "Dthifft                                                         or
1:,-Tiel. re-.ocation, re-entry an.'.retrndecis ae d
* ."    "":"33   ex&#xfd;ch'ange
n o
                    ' 3 4.33'is .. information crit .of      3'3on
ad ap t
                                          ' 3i~         within-is !*"3n       e3or3te County
ba o
                                                                '3it                 e4i     Doietry "A ...               . Control 3'     "" Offier 3 ...      n-etwork.. ..... ....... "33,33"                   3- "             . ..
C assessments bf. the radiological condtoi an rtrainteQ  
This cri-terion will also,, e dd                                         during the traffic and access                           control       demonstration.             The     Sherfs         deI
-ln an-d/or pr-ocedures.,
              ...Will obtain dosimetry from the .DCO in the County EOC. The DCO briefing for the deputy deirionstrating. iffic and access 6onitr0ol wi be.conducted at the County EOC.
f h-di 3'"'"i  
Criterion :3b1.1:KI and appriopiate instructions" are available sh6old a decision 'to',re6ommnehdIbe made.,
,.*.,''d 3rtrai teO~p
Appropriate record-keeping of the administration o R.Ir for emergency workers andt institUtionaiied individuals -(not the I3'3.                                             N333                              434'-             ',''343
":fThiscrterion'does not, apljto'Macon County.This functint is the1 responsibiltyy "b.
  .general public) is-maintained.:
i t
When notified by the State of Illinois,                             t to distribute and administer.KI, Macon Cotnty0*officials will discuss the issuance of KI to emergency workers. ah'd i"knbbile pop*lations, as'a voluiita& hieasifre.Thi&-briterioh 'will also be demonstrated during the traffic and access ,6ontrol.demonstration..*The DCO briefing for the~deputydemonstrating Atraffic and access. control will be conducted at the County Eoc.                                               C. '"                " .                                      'E
1I EVALUATION:ARA 3'- PROTECTIVE ACTION*IMPLEMENT-ATION "3.33
                                                                                            .:',        "        2,            3 ;'                                                                                                  I7
.Criterion 3.a.1: "The' ORs issue appropat'edo-sim etryandprocedur snanddmanage radexposure to emergency workersin acc6'ordnce with the plan and procedures*Emergency,workerspeiodicallyand atth ndof each mission-read
                                                                                                                                                  .=7&#xa2;'I
-yo lror chrbe,....-  
, 'O-o d<<  
' their dosimeters and record thereadings on the _pptopriate exposure record or ch.t
: 3. "1.l iffi ai'3 demonstrate "
'""c h-ru*r:D closed*''*"*  
'a;,*
,. 2;,, -,.*,..A+s.-,.,- wf&#xa2;erh ithiot. TC E I-
".:5 " '-.;'5,:;...  
.Macon. 'ounty will tins rby 3 uiiaii adtmi*ad onC "Dthifft or
"":"33 3
4.33'is..
crit 3'3on 3i~
is  
!*"3n e3or3
'3it e4i "A...
3' 3  
"33,33" 3- "
ex&#xfd;ch'ange.of information within-te County Doietry Control Offier n-etwork..
This cri-terion will also,, e dd during the traffic and access control demonstration. The Sherfs deI
...Will obtain dosimetry from the.DCO in the County EOC. The DCO briefing for the deputy deirionstrating. iffic and access 6onitr0ol wi be.conducted at the County EOC.
Criterion :3b 1.1:KI and appriopiate instructions" are available sh6old a decision 'to',re6ommnehdIbe made.,
Appropriate record-keeping of the administration o R.Ir for emergency workers andt institUtionaiied individuals -(not the I3'3.
434'-
N333
',''343
.general public) is-maintained.:
When notified by the State of Illinois, to distribute and administer.KI, Macon Cotnty0*officials will discuss the issuance of KI to emergency workers.tah'd i"knbbile pop*lations, as'a voluiita& hieasifre.Thi&-briterioh 'will also be demonstrated during the traffic and access,6ontrol.demonstration..* The DCO briefing for the~deputydemonstrating Atraffic and access. control will be conducted at the County Eoc.  
'E C.
3 I7 2
.=7&#xa2;'I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                               Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
This criterion does not apply to Macon County. This function is the responsibility of DeWitt County.
This criterion does not apply to Macon County. This function is the responsibility of DeWitt County.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
Line 1,504: Line 2,129:
Coordination between Macon County and DeWitt County will be demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by Macon County during the exercise based on exercise play if the scenario causes Macon County to staff posts. If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
Coordination between Macon County and DeWitt County will be demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by Macon County during the exercise based on exercise play if the scenario causes Macon County to staff posts. If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
Criterion 3.d.2: Impediments to evacuation are. identified and resolved.
Criterion 3.d.2: Impediments to evacuation are. identified and resolved.
The Macon County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.                         :'
The Macon County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.
* Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion' exposure. pathway emergency.planning zone for implementation of protective actions.
Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion' exposure. pathway emergency.planning zone for implementation of protective actions.
This criterion does not apply to Macon County.
This criterion does not apply to Macon County.
Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.         -
Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.
This criterion does not apply to Macon County.
This criterion does not apply to Macon County.
Criterion 3.f.1: Decisions regarding controlled re-entry of emergency workers. and relocation and return of the public are coordinated with appropriate organizations and implemented;.
Criterion 3.f.1: Decisions regarding controlled re-entry of emergency workers. and relocation and return of the public are coordinated with appropriate organizations and implemented;.
Line 1,513: Line 2,138:
73
73


                                                                                                    "Ra                             -FUndiassified
"Ra  
                                                                        *. .          :.)-Radiological
-FUndiassified
                                                                                        -                                  EirgencyiPrepare&#xfd;dness.Programn (REP)                                     "              ..    -
-:.)-Radiological EirgencyiPrepare&#xfd;dness.Programn (REP)  
                    " .,After&iiofR~ponmrt/provxement Plan                               _" :;.                  7..             .",4                                                                                           lt                               -
".,After&iiofR~ponmrt/provxement Plan 7..  
                                                                                                                                                                            -",-            .    *. 2                 -  .  -"          ,    =     .,  .      -
.",4 lt  
  -..        "    " 7    .*.    ..    ..                  ..-      . ..        .    -        .  .    .  .    -          ". .    .  '
" 7 2  
EVALUATION AREA44-FIELD MEASURMENT-AND ANALYSIS                                                                                                                               .      _      -.-- ;                    IA                 -.
=  
                      -      Thisev~aluation are does not apply to Macon Co uinty EVALUATION AREA.5- EMERGIENCYV NOTIFICATION AND.PUBLIC INFORMATIO'N
- EVALUATION AREA4 4-FIELD MEASURMENT-AND ANALYSIS IA Thisev~aluation are does not apply to Macon Co uinty EVALUATION AREA.5-EMERGIENCYV NOTIFICATION AND.PUBLIC INFORMATIO'N
          . .Criierion 5.a.!1 Activites associated withprlma? alerting afndnotification of the public arefcompletedina timelymanner.
..Criierion 5.a.!1 Activites associated withprlma? alerting afndnotification of the public arefcompletedina timelymanner.
          *... .followingthe initiial decisi6n b authozed-ffsite emergency officials                                                                                       ntot th*           e p*bl p.1ic         ano.p emergency situatiofn.T'.The ihitialimstructionalmes Thio&#xfd;jisd inta'dcs.           getoth.eublimWustimcluaefasaminimum y2 au oiuinisiteamrg                                                                      eelmentsre6uired                         by   current         FEMA REP guidance.
*....followingthe initiial decisi6n b authozed-ffsite emergency officials nto t th*
Citerio crhis              esnot apply to MaiciioCfi6unty .This function is the responsibility of DeWitt Counity
e p*bl p.1ic ano.p emergency situatiofn.T'.The Thio&#xfd;jisd inta'dcs.
(      r              able)arecom pleted within 45 Crrite'ioni'. 5 a'3 Activities assoiated.withFEMA..approved exception,:areeas minites following the -initial decisioin by autli6rized 6ffsite emergefi.y officials to"notif,'the public of an emergency situation.
y2 au oiuinisiteamrg ihitialimstructionalmes getoth.eublimWustimcluaefasaminimum eelmentsre6uired by current FEMA REP guidance.
        .Backup alertand notificatiionf the public is cosmpleted withinc45minutes* followingthe detectinby theDOROofa faiure of thepriaryalet and                                     n-systemn:.
crhis Citerio esnot apply to MaiciioCfi6unty.This function is the responsibility of DeWitt Counity Crrite'ioni'. 5 a'3 Activities assoiated.withFEMA..approved exception,:areeas (
epiar                             notification                   t                                                                                                       Ali
r able)arecom pleted within 45 minites following the -initial decisioin by autli6rized 6ffsite emergefi.y officials to"notif,'the public of an emergency situation.
                                    *-d                         iot                         Ma                             -                        -  -          -            ..
.Backup alertand notificatiionf the public is cosmpleted withinc 45minutes* followingthe detectinby theDOROofa faiure of thepriaryalet and n-systemn:.
* hscieon does no apl                             oMcon Cut
epiar notification t
        .. :Criterion 5.b.: oR-s provide accurate emergey information and                                                                                                                                     an dthe news mediin a timely.
Ali
tote pu*bic6minstructionsan manner-.                                                                               ~                       .--
*-d iot Ma
                        "This. critenion do6s not apply*t*o*ac6n Countiy-This fu'nctionistthe resp&sect;osiibility:of DeWittnCounty-EVALATIN AEA 6-SUPPORT- OPERATIONIFACLI'TIE~S-
* hscieon does no apl oMcon Cut
                          ..This:.evaluation area does not apply to MaconCounty. *                                                                         .'.,:..-,-.
.. :Criterion 5.b.: oR-s provide accurate emergey information and 6minstructionsan tote pu*bic an dthe news mediin a timely.
        * ., "- ,'**: .'        ,'.    .    ,' .'    .'.  "  -4 .y-1q.       3
manner-.  
                                                                              '.4;"-   ,'   t&deg;/ t       't.- 7 "-i.Sp F..:               -;"-'4,-
~  
                                                                                                                                                .        , i ...-         b-?', .. ..i?         ' ti r.,'     1/2. =.-   -. "             : ' &.d
"This. critenion do6s not apply*t*o*ac6n Countiy-This fu'nctionistthe resp&sect;osiibility:of DeWittnCounty-EVALATIN AEA 6-SUPPORT-OPERATIONIFACLI'TIE~S-
                                                                                                                                                                                                                                        ... t * ?- : 4,y
.. This:.evaluation area does not apply to MaconCounty. *  
                                                                                                                                                                                                                                                          " - ''i-     I
-4 y-1q. 3  
  *        :.F*'       ..        .' i"     ."i .r     "        iL .
'.4;"- '
                                                                  .i--           ,.t- -  :-        -          .*                        '-
t&deg;/ t  
s.-f-.     *3-   ~     -F-.2 - -    .'.          .          ,          ,        ,5   ..      , :            -I:     .    -.
't.- 7 "-i.Sp F..:  
                            ,.-.        .      .      F   ,'        .'          . .
-;"-'4,-  
                                                                                  -"Fi~                     .'      -1 .    " "   ~       -              *.        ...        ...-                      .      : . *
, i...-
                                          ..                    -                        .                    .-.        .*                                                                                                .I I
b-?',
                                                                                                                                      ""                                                                                                                                I
i?
                                                                                                                                      * "'74                                                                                                                             1
r.,' ti 1/2. =.- -."  
&.d t * ? : "
' 'i-  
- 4,y -
I
:.F* '  
.' i"  
."i.r  
.i--.
iL
,.t-s.-f-.
3-  
* ~  
-F-. -
2 -
,5  
-I:
F  
-"Fi~  
. 1  
" ~  
.I I
I
* "'74 1


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                 Clinton Power Station MCLEAN COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.l. Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include. the following: 2.a.l1, 2.b.l,. 2,b.2, 5.a.1 and 5.b.!.
After Action Report/Improvement Plan Clinton Power Station MCLEAN COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.l. Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include. the following: 2.a.l1, 2.b.l,. 2,b.2, 5.a.1 and 5.b.!.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT1 Criterion 1.a.1: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT1 Criterion 1.a.1: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
McLean County intends to activate the Emergency Operations Center (EOC) in Bloomington, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Administrator's Office, EMA, and the Sheriffs Department. If the scenario does not drive protective actions in McLean County, the County may decide to down staff the EOC to minimum staffing. A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.
McLean County intends to activate the Emergency Operations Center (EOC) in Bloomington, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Administrator's Office, EMA, and the Sheriffs Department. If the scenario does not drive protective actions in McLean County, the County may decide to down staff the EOC to minimum staffing.
A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.
An evaluator will be positioned at the County Sheriffs Communications Center (initial warning point) at the start of the exercise.
An evaluator will be positioned at the County Sheriffs Communications Center (initial warning point) at the start of the exercise.
Criterion 1.b.l: Facilities are sufficient to support the emergency response.
Criterion 1.b.l: Facilities are sufficient to support the emergency response.
Line 1,556: Line 2,205:
Criterion 1.c.l: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.
Criterion 1.c.l: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.
Coordination of decisions and emergency activities will be demonstrated between McLean County and DeWitt County.
Coordination of decisions and emergency activities will be demonstrated between McLean County and DeWitt County.
Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.
Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.
Communications capabilities are managed in support of emergency operations.
McLean County will use commercial'telephone, radio and telefax to. communicate with departments and agencies at other locations.
McLean County will use commercial'telephone, radio and telefax to. communicate with departments and agencies at other locations.
Criterion 1.e.1: Equipment, maps, displays, dosimetry,, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
Criterion 1.e.1: Equipment, maps, displays, dosimetry,, potassium iodide (KI) and other supplies are sufficient to support emergency operations.
Line 1,563: Line 2,213:
75
75


                                                .            .'   Radiological Emergency Preparedness-Program.(REP)               .              .          ....              ..
.' Radiological Emergency Preparedness-Program.(REP)
* I After;ActioiRep6crI1mproveriieht Plan               .                                                                ;            ClintonPwistation. r
I After;Actio iRep6crI1mproveriieht Plan r
                -This criterion'does-not apply to McLean County.                         :              ., on           .      : ..        ..                  '
ClintonPwistation.
Crite~ijn 2.b1-!A1ppropriateprtective'actionr recominiendationsa1re based - viailableinfomation6on
-This criterion'does-not apply to McLean County.
    ",:                                                                                                                                                              s, field
on Crite~ijn 2.b1-!A1ppropriateprtective'actionr recominiendationsa1re based -
  .irnonit6ring. data ai           lhens-eel           *OR         dose projeclt9i ns as we1l as, kowledge 6f.on-site- And 6off-site -environmental conditions:g,   a,.a:njcin;,sw This criterion does notapply to                   c%
viailableinfomation6on field s,
policy) protectiveoap-p-rooessrevolvinig                                                                               a nonsl    ecessary coordinatinri is used.
.irnonit6ring. data ai lhens-eel  
    "to make pr~teqte action deislons (PADs): for the genreral public (including the recommendation for the use of KI, if ORO "This crterion does not             Ipply toMcLean: County This function is the responSibiity of DeWittCounty                             n Critenon2.c1.: Protective action decisions are made, as appropriate;.forspecial populationgroups                                               ',
*OR dose projeclt9i ns as we1l as, kowledge 6f.on-site-And 6off-site -environmental g, a,. a:njcin;,sw conditions:
This criterion does not apply to McLeanCounty.This function is the responsibility of.DeWitt County.
This criterion does notapply to c%
4heingstin     atwy are- assessed and approprinate protectieato deilsions are' made' based on the ORO                           -planing.
policy) protectiveoap-p-rooessrevolvinig nonsl a
                                                                        'critena.-
ecessary coordinatinri is used.
This crfiteriobn- does not a:p-y to McLean                                                 `ou.,ty.
" to make pr~teqte action deislons (PADs): for the genreral public (including the recommendation for the use of KI, if ORO "This crterion does not Ipply toMcLean: County This function is the responSibiity of DeWittCounty n
-,,--Criterion 2.e 1                 elrection             reentryand* return. ecisions: areimad and coinatdsaprep                                         rbase`d-assessments ofthe radiologicalconditions d criteria in                                     p an an orp.rjedf'-                            *t..., ,s                       .
Critenon2.c1.: Protective action decisions are made, as appropriate;.forspecial populationgroups This criterion does not apply to McLeanCounty.This function is the responsibility of.DeWitt County.
i'fi' Cuny.De;                   1t
4heingstin atwy are-assessed and approprinate protectieato deilsions are' made' based on the ORO  
              ,.This criterion:does notapp ly toMcLean County -This f                               i ,the responsibilit of D e-itt oun EVALUATION AREAk3 -PROTECTIVE..ACTION IMPLEMENTATION                                                                               ....
-planing.  
  -Criterion 3.a 1: The OROs issue appropriate. dosimetty anid procedites, and manage ;radioogic:a                                                       ex   to
'critena.-
  -.          in aacorane'it!Emfergecy' swmekers     d        ,      tpe.-p~Wcirkei_an proceduresEdi            rn           k*'S workerspenoticlly-and         :t amissiaonread-thicedof"enach                                       -
This crfiteriobn-does not a:p-y to McLean  
        . id    mete   and rcord;t         rediniigs on.the appropriate exposure: record o6r cIhart1A                                           :                              "
`ou.,ty.
McLean County. will demonstrate this ,iritefidn by: close )c6ordiiintion' With? JEMA'. and, timely dissemination and exchnge of ihforatiioii thinwthe County Dosimeftyeotryo'r.!                 C     Lfd.,       n     r.     ': '            ."
-,,--Criterion 2.e 1 elrection reentryand* return. ecisions: areimad and coinatdsaprep rbase`d-assessments ofthe radiologicalconditions d criteria in  
This criterion will also -be'demonstrated durng the traffica and access control demonstratin. The Sheriffs deputy fTr dii                                 eZ h'fi" t "                           duetonstrat-d will'obtai.n dosimetry, fio                 DCO in ,the ,DCO  ,Coty;EO'The               briefingfor te deputyy emnstrating raffic-and access control will be. conducted at the County.EOC.                                                                                                                       I Criterion 3. b.1:KI 'and appropriate lstfrctions.hare                              advilable.should apdecision.to recormend useiof KI be made.
*t...,,s p an an orp.rjedf'-
Appropriate recdrd keeping of itheadmmiinstration- of-KI for:emergency                       r       workeis-:and institutionahziedmiidivdii ls (not the general puII) ISimaiiitained                                             . ' ,                :                            '      " .            -
i'fi' De; 1t Cuny.
: i.    .
,.This criterion:does notapp ly toMcLean County -This f i,the responsibilit of D e-itt oun EVALUATION AREAk3 -PROTECTIVE..ACTION IMPLEMENTATION  
* Al            .
-Criterion 3.a 1: The OROs issue appropriate. dosimetty anid procedites, and manage ;radioogic:a ex to p~Wcirkei_
When notified by the State of Illinois to distribute and administer .K,,McLean County 6fficials will discuss the issuance of KIto emergency workers and immiobile j"p6gUlationsi, asa voluntary measure. This criterio n'ill also be demonstrated during the traffic and access control. demonstratibri. The DCO briefing for the deputy demonstrating                                                         I traffic and access control will be conducted dt. the County EOC.-
in acorane'it!Emfergecy' k*'S swmekers e.-
                                                                                      .76,
a d
tp an di proceduresE rn workerspenoticlly-and :t thic edof"enach amissiaonread-  
. i d mete and rcord;t rediniigs on.the appropriate exposure: record o6r cIhart1A McLean County. will demonstrate this,iritefidn by: close )c6ordiiintion' With? JEMA'. and, timely dissemination and exchnge of ihforatiioii thinwthe County Dosimeftyeotryo'r.!
C Lfd.,
n r.
This criterion will also -be'demonstrated durng the traffica and access control demonstratin. The Sheriffs deputy fTr dii h'fi" t "
eZ d uetonstrat-d will'obtai.n dosimetry, fio DCO in,the,Coty;EO'The  
,DCO briefingfor te deputyy emnstrating raffic-and access control will be. conducted at the County.EOC.
I Criterion 3. b.1:KI 'and appropriate lstfrctions.h are advilable.should apdecision.to recormend useiof KI be made.
Appropriate recdrd keeping of itheadmmiinstration-of-KI for:emergency r
workeis-:and institutionahziedmiidivdii ls (not the general puII) ISimaiiitained
: i.
A l When notified by the State of Illinois to distribute and administer.K,, McLean County 6fficials will discuss the issuance of KIto emergency workers and immiobile j"p6gUlationsi, asa voluntary measure. This criterio n'ill also be demonstrated during the traffic and access control. demonstratibri. The DCO briefing for the deputy demonstrating I
traffic and access control will be conducted dt. the County EOC.-
.76,


Unclassified Radiological.Emergency Preparedness Program (REP)
Unclassified Radiological.Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                               Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
This criterion does not apply to McLean County. This function is the responsibility of DeWitt County..
This criterion does not apply to McLean County. This function is the responsibility of DeWitt County..
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
This criterion does not apply to McLean County.
This criterion does not apply to McLean County.
Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.
Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.
Coordination between McLean County and DeWitt County will be demonstrated. A Sheriff's deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by McLean County during the exercise based on exercise play if the scenario causes McLean County to staff posts.
Coordination between McLean County and DeWitt County will be demonstrated.
A Sheriff's deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by McLean County during the exercise based on exercise play if the scenario causes McLean County to staff posts.
If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
Criterion 3.d.2: Impediments to evacuation are identified and resolved.
Criterion 3.d.2: Impediments to evacuation are identified and resolved.
Line 1,608: Line 2,273:
77
77


I 7l Unclassified
Unclassified I
                                                              <-:Radiological Emergency-Preparedness Program* (FP)
<-:Radiological Emergency-Preparedness Program* (FP)
          "" ;.After Action Report/Improvement Plan               -..                                                                                          Clinton Power Station EVALUATION AREA 5 *EMERGENCYNOTIFICATION AND iPUBLIC .INFORMATION*.                                                                                                 i -,
"" ;.After Action Report/Improvement Plan Clinton Power Station 7l EVALUATION AREA 5 *EMERGENCYNOTIFICATION AND iPUBLIC.INFORMATION*.
6     nCriion 5.a.l:1 Activities associated with primary ale~rting and' notificati6n of the public are comp.leted in' a. timelymanner.
i -,
follwingthej~niial de~sio,b.auithorized-&#xfd;offsite,:einergency obffi'cials to notifythe public bf an emergency situationi. The initial inmtructiiona-imessage to the~public must include as.a.minimuimtheelemieinsrequired-by current FEMA REP guidance.
6 nCriion 1 5.a.l: Activities associated with primary al e~rting and' notificati6n of the public are comp.leted in' a. timelymanner.
This criterion does notapply toMcLeaiiCouniy This function,is the rsp6rnsibilit, of DeWitt County                                                                   -
follwingthej~niial de~sio,b.auithorized-&#xfd;offsite,:einergency obffi'cials to notifythe public bf an emergency situationi. The initial inmtructiiona-imessage to the~public must include as. a.minimuimtheelemieinsrequired-by current FEMA REP guidance.
Crite ri n                 oo        no     1 ,t 'y                       hg Criterion 5a.3: :Activities assiated.d with.FEMA approved excepton areas (where applcable) are completed within 45
This criterion does notapply toMcLeaiiCouniy This function,is the rsp6rnsibilit, of DeWitt County C rite ri oo n
    .miinuteies     folowngthe :initial, deciis&#xfd;j         by authoriz6,d     ffsite.emergencyofficials.to notify the plblic o                                           Ffanemergeficy     situation..
no 1,t 'y h g Criterion 5a.3: :Activities assiated.d with.FEMA approved excepton areas (where applcable) are completed within 45
iBackup     alert and notificdtion 6f the.pl is "ompieted within 45 minutes following the detection by the oROof a failure of the ,primary alert And, ioi6cifictidn systr*                                                                                                                                                     1 II L    C                                                                                                 meerod:in:o moty             ..
.miinuteies folowngthe :initial, deciis&#xfd;j by authoriz6,d ffsite.emergencyofficials.to notify the plblic o Ffanemergeficy situation..
C                                 ets        I,
iBackup alert and notificdtion 6f the.pl is "ompieted within 45 minutes following the detection by the oROof a failure of the,primary alert And, ioi6cifictidn systr*
* it :i.iCrierio5n.b.1:1 OR     -Ospro'2ideaccurate.emergency iniormationi and instructions:to the'pUblic andathe news media in a timely h-is criterionsdoesnot apply to McLean"county Ths function is the respo                                   ibility ofDeWift County                                 -
1 II C
      ..EVALUATION AREA`6 -SUPPORT OPERATION/FACILITIES:
meerod:in:o ets moty I,
      *: .....,: -,L h*evalti-ti-ohi,a""re'a'*'d3* ,is
L C
* ..,.*                                                not     p~y     M cLeahrC6unfy..                               ,. ...         *              :.;.,..'                ;::,        ...
* it :i.iCrierio5n.b.1:1 OR  
                                                  '                .8:
-Ospro'2ide accurate.emergency iniormationi and instructions:to the'pUblic andathe news media in a timely h-is criterionsdoesnot apply to McLean"county Ths function is the respo ibility ofDeWift County  
                                  "~~~~'  "z                                '"*.:,                "
..EVALUATION AREA`6 -SUPPORT OPERATION/FACILITIES:
                                                                                                ,.'? :*!.!'.
.. *:.....,: -,L h*evalti-ti-ohi,a""re'a'*'d3*,is not p~y M cLeahrC6unfy..  
Is :
.-. :... } !  
                                                                                                            .o." . . .  '
..'- a' I
i-:  ..
                                                                                                                                    .o . ...
                                                                                                                                              .-. :... } !
a'
                                                                                                                                                                                                " s I
II
II
.8:
"~~~~'
"z Is s
i-:
'? *!.!'.
.o.
.o....


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                               Clinton Power Station PIATT"COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated irmnediately for credit, at the discretion of the evaluator, include the -following: 3.a. 1, 3.d.1, 3.d.2, 6.a.1, 6.b. 1, 6.c.] and 6.d.1. Criteria that may be.re-'demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee" include the following: 2.a.l, 2.b 1, 2.b.2; 5.a.1 and 5.b.1..-
After Action Report/Improvement Plan Clinton Power Station PIATT"COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated irmnediately for credit, at the discretion of the evaluator, include the -following: 3.a. 1, 3.d.1, 3.d.2, 6.a.1, 6.b. 1, 6.c.] and 6.d.1. Criteria that may be.re-'demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee" include the following: 2.a.l, 2.b 1, 2.b.2; 5.a.1 and 5.b.1..-
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l" OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l" OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.
Piatt County intends to activate the Emergency Operations Center (EOC) in Monticello, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with iepresentatives from the County Board, EMA and the Sheriff's Department. If the scenario does not drive protective actions in Piatt County, the County may decide to down staff the EOC to minimum staffing.             A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators Will not be allowed to j'emove the roster from the EOC.
Piatt County intends to activate the Emergency Operations Center (EOC) in Monticello, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with iepresentatives from the County Board, EMA and the Sheriff's Department. If the scenario does not drive protective actions in Piatt County, the County may decide to down staff the EOC to minimum staffing.
A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators Will not be allowed to j'emove the roster from the EOC.
An evaluator will be positioned at the County Sheriff's Communications Center (initial warning point) at the, start of the exercise.
An evaluator will be positioned at the County Sheriff's Communications Center (initial warning point) at the, start of the exercise.
Criterion 1.b.l: Facilitiesare sufficient to support the emergency response.
Criterion 1.b.l: Facilitiesare sufficient to support the emergency response.
Line 1,643: Line 2,311:
Criterion I.c.l: Key personnel with leadership roles for the' ORO provide direction and control to that part of the overall response effort for which they are responsible.
Criterion I.c.l: Key personnel with leadership roles for the' ORO provide direction and control to that part of the overall response effort for which they are responsible.
Coordination of decisions and emergency activities will be demonstrated between Piatt County and DeWitt County.
Coordination of decisions and emergency activities will be demonstrated between Piatt County and DeWitt County.
Criterion 1l.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.
Criterion 1l.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.
Communications capabilities are managed in support of emergency operations.
Piatt County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.
Piatt County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.
Criterion 1.e.l: Equipment, maps;, displays, dosimetry, potassium iodide (KI) .and other supplies are sufficient to support emergency operations.
Criterion 1.e.l: Equipment, maps;, displays, dosimetry, potassium iodide (KI).and other supplies are sufficient to support emergency operations.
Piatt County will adequately demonstrate the ability to support operations through the use of maps, status boards and other displays as appropriate. The availability of dosimetry and KI will be demonstrated during the traffic and access control demonstration. The DCO briefing for the deputy demonstrating traffic and access control will be conducted at the County EOC.
Piatt County will adequately demonstrate the ability to support operations through the use of maps, status boards and other displays as appropriate. The availability of dosimetry and KI will be demonstrated during the traffic and access control demonstration. The DCO briefing for the deputy demonstrating traffic and access control will be conducted at the County EOC.
EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.
79
79


              *Aer Actio .- R Unclssifed "Radiologi-cal.Emergency, Preparedne-ss Progr,.am (REP)                       .                  i             Pwer                     .ta I
Unclssifed I
                . Actioi..port/improvement Plan                                                                                                                             PCoiwe Station     -
*Aer Actio R "Radiologi-cal.Emergency, Preparedne-ss Progr,.am (REP) i Pwer  
This criterion does             notla       to Piatt Conty-.-:                                           .    --      --
.ta Actioi..port/improvement Plan PCoiwe Station This criterion does notla to Piatt Conty-.-:
Criterion 2.b.l: Appropriate protective action recommendations are based on available information on plantIconditions field "
Criterion 2.b.l: Appropriate protective action recommendations are based on available information on plantIconditions field  
        .motonndgidata. and-li.ensee and OROdose-projectins as well as kniowledge of on site and offsiite envtronmental-I This criterion does noi apply to Piatt County .                                                                                                                                   ..         1 Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessaiy coordiniation is used                                                                   ,  -
.motonndgidata. and-li.ensee and OROdose-projectins as well as kniowledge of on site and offsiite envtronmental-I This criterion does noi apply to Piatt County.
to make protective action decisions (PADs) for the general public (including the recommendaton for the Ius -of KI, &f'DO policy).
.. 1 Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessaiy coordiniation is used to make protective action decisions (PADs) for the general public (including the recommendaton for the Ius -of KI,  
This criterion does not'apply to                                           futnt              tyThis te   responsibilityo6f:DeWitt Coun 51oPiatt County.-&#xfd; ffction is                                   spo - .t                                   y action decisions are made,       as appropriate,         for   special   population groups.
&f'DO policy).
Criterion 2..1: Protective This cintenon does notapply to Pia ttCoun"tyiThis u                                                 responsibility of DeWitt County
This criterion does not'apply to tyThis futn t
-        Criterion:2.d1*.1:-Radiological consequences .for the,-ingesti6ni pathway are-assessed.and aappropriate protective action                                                                       -    -
te responsibilityo6f:DeWitt Coun 51 oPiatt County.-&#xfd; ffction is spo  
decisions are made based 0g          on the ORO plannimin ctteria.', :
.t y
                  -This crniterion' do'es'n-o't apply to Pidtt County.                         ''It   41,
Criterion 2..1: Protective action decisions are made, as appropriate, for special population groups.
                                                                                                                -                                /              -
This cintenon does notapply to Pia ttCoun"tyiThis u responsibility of DeWitt County Criterion:2.d 1*.1:-Radiological consequences.for t he,-ingesti6ni pathway are-assessed.and aappropriate protective action decisions are made based on the ORO plannimin t
_        Criterion '2 ej:1Timiely&#xfd; re location, re-entry- and reurin'decisions .are.ie made and oordinated-as appropriate based on                                                                     .
0g ct eria.',
assessments of the radiological conditions and criteria inthe                   tplan                       and/or procedutres-:-" ,                                                ... -.            U.
-This crniterion' do'es'n-o't apply to Pidtt County.  
  .1*.
/
i
41,
                  'T "Mls. -nsfriteindoe"         hot'appjIlyto P     ;Cbun y.'This               ntllst             rs       si                               tt EVALUATION     AREAo                         Piatti                        uncif istte responsib'i ity~bf DeWittCoht
''It Criterion '2 ej:1Timiely&#xfd; re location, re-entry-and reurin'decisions.are.ie made and oordinated-as appropriate based on assessments of the radiological conditions and criteria inthe tplan and/or procedutres-:-"
                      ....                        -PROTECTIVE;ACTION IMPLEMENTATION:
U.
AREA3TEVALUATION                                                                                                    -....
.1*.
    &#xfd;-_*Criteri6h13.i           l                                                                     &#xfd;roqedurqs Cr.iterio     3.a.l: The'OROs *istieapropriat                                       nd pe                            ddosime*try;radiologic iiefd,,manag                                   exposure to emergency
'T Mls.
* worKers n accordance -with the plan an .procedures&#xfd;., tmergency -workersoposurer'0rdrthat                            3penoalcan
i
      -thelrdosimeters andrord teadropat                                                     ex Piatt'iCounty will demioistrae this.ci'iterionn                                                       WithiiiAE        ad iimly~disseiination and'exchange by clos coor manon with                                 antmel of-i-onformaton withn the oInty Di metry Control Officreirnetwork
-nsfriteindoe" hot'appjIlyto P  
                  .This criterion will also be- demonstrated dunngAthe traffic and access control demonstration.i'                                                       The sheriffsd*eputy IM i:'   "i'r'r3*-h           DC           'if   ''i6-C'id"b                                                       de ut-df             ic   ..
;Cbun y.'This ntllst rs si tt EVALUATION AREAo Piatt i uncif ist te responsib'i ity~bf DeWittCoht 3TEVALUATION AREA -PROTECTIVE;ACTION IMPLEMENTATION:  
will' obtain dosinmetry froi the DCOm the County EOC. The'DCO bn6fng'for the deputy demonstrating traffic -and access control will be condiucted.at the County EOC.-                                  -'      -      -        -              -
&#xfd;-_*Criteri6h13.i l  
Criterion 0.~: KJ 'and appropriate instructions. are 'avaiIabIe should 'a d 6is1ion to rQcofimend usse of KI- be made.
&#xfd;roqedurqs Cr.iterio 3.a.l: The'OROs *istieapropriat ddosime*try nd pe iiefd,,manag  
Appropriate       -irecord     keeping of the admihiistrion
;radiologic exposure to emergency
                                                            -            i 'of-KI for. eiietgenc&#xfd;' workl.s and institutjonai'diindividuals (not the general public) is maintained.                   " ' . . - * - - -                  - - * -- ' "              - - - .        - .    -    -       &#xa2; .    - "-'    - .
* worKers n accordance -with the plan an.procedures&#xfd;., tmergency -workers 3penoalcan
When notified by the State of Illinois to distribute and administer KI, Piatt County officials will: discuss the issuance of KI to emergency workers and imniobile. populiatns,-as-,a-voluntary measure. This criteion--wi l ,also be I
-thelrdosimeters andro rd teadropat ex oposurer'0rdrthat Piatt'iCounty will demioistrae this.ci'iterionn Withi iiAE ad iimly~disseiination and'exchange by clos coor man on with antmel of-i-onformaton withn the oInty Di metry Control Officreirnetwork
demonstrated during the traffic and access control demonstration. The.DCO briefing for the deputy demonstrati]g                                                                             m traffic and access c6 inti-ol will be eondudted ai te '-- i                               E-the ;"            ."                  g-i for
.This criterion will also be-demonstrated dunngA the traffic and access control demonstration.i' The sheriffsd*eputy IM i:'  
* d              '"tdemostrai"-g I
"i'r'r3*-h DC  
'if  
''i6-C'id"b de ut-df ic will' obtain dosinmetry froi the DCOm the County EOC. The'DCO bn6fng'for the deputy demonstrating traffic -and access control will be condiucted.at the County EOC.-
Criterion 0.~: KJ 'an d appropriate instructions. are 'avaiIabIe should 'a d 6is1ion to rQcofim end usse of KI-be made.
Appropriate -irecord keeping of the -admihiistrion 'of i
-KI for. eiietgenc&#xfd;' workl.s and institutjonai'diindividuals (not the general public) is maintained.  
-2
-&#xa2;.
When notified by the State of Illinois to distribute and administer KI, Piatt County officials will: discuss the issuance I
of KI to emergency workers and imniobile. populiatns,-as-,a-voluntary measure. This criteion--wi l,also be demonstrated during the traffic and access control demonstration. The.DCO briefing for the deputy demonstrati]g m
traffic and access c6 inti-ol will be eondudted ai te i
-i g
for E-the d
'"t demostrai"-g I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                 Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.
This criterion does not apply to Piatt County. This function is the responsibility, of DeWitt County.
This criterion does not apply to Piatt County. This function is the responsibility, of DeWitt County.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.
This criterion does not apply to Piatt County.
This criterion does not apply to Piatt County.
Criterion 3.d.M: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.
Criterion 3.d.M: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.
Coordination between Piatt County and DeWitt County will be. demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be *selected'by Piatt County during the exercise based on exercise play if the scenario causes Piatt County to staff posts. If it does not, the post will be selected by the eValuator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
Coordination between Piatt County and DeWitt County will be. demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be *selected 'by Piatt County during the exercise based on exercise play if the scenario causes Piatt County to staff posts. If it does not, the post will be selected by the eValuator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.
Criterion,3.d.2: Impediments to evacuation are identified and resolved.
Criterion,3.d.2: Impediments to evacuation are identified and resolved.
The Piatt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controllerthat will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc: Actual contacts with resource providers will be made and logged.
The Piatt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controllerthat will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc: Actual contacts with resource providers will be made and logged.
Line 1,700: Line 2,382:


Radiologc&#xfd;al Epnergeniy PreparednessProgram (REP)
Radiologc&#xfd;al Epnergeniy PreparednessProgram (REP)
        "AfterActionePrt/mprovement
AfterActionePrt/mprovement Plan Clint6nPower Station EVALUATION A REA EMERGENCY-:NOTIkIATIN AND PUBLIC INFORMAXT-N C r
              '.                        Plan                                         "..                                      Clint6nPower Station EVALUATION A REA EMERGENCY-:NOTIkIATIN AND PUBLIC INFORMAXT-N C
: a.  
a.r      ,,ktifi6 associated With"m a           I'yaloiifi--
,,ktifi6 associated With"m a I'yaloiifi--
                                                                  ..                                    h.i                               m       a followinrtg the initial decision ,by*authorizedbofst xireiyofcast oiyte
h.i m
*initial instructional message to the pbimutncdeas amrnimum&#xfd;.th9lmnsrqie ycretFM 1ilc.
a followinrtg the initial decision,by* authorizedb ofst xireiyofcast oiyte 1ilc.
of-i aneegnytuation -"The' E guidance       3 Thiscriterion does notapply to PiattppCuntyo , thisfncioniisthP-atevures                 ibility o{fe     County     4-Criterion .a.2:, [RSRED                                                                                                                             Z-r Criterion 5.a.3: Activities associated with" FEMAapproved -ex-Iception areas..(whereapplicable) areIcompld witn..45 minte flloin     te nitaldeisonj by authorze ofstgmrec fiials to notify. the pulc of an emergencsiuto 1 Bcuplert an6ntification of the &#xfd;public is-compfleted within 45 'minutesfolwn the pimmaiy alert'and not jfication' systemn-:-
of-i aneegnytuation -"The'
he deeto by tIhe ORO of a-failre 'of .
*initial instructional message to the pbimutncdeas amrnimum&#xfd;. th9lmnsrqie ycretFM E guidance 3
                                                                                                                            ~     .
Thiscriterion does notapply to PiattppCuntyo  
I This. e terio             apply to/ itt- C       .                        .'..-    -oesnot Criterion 5A.: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner....
, thisfncioniisthP-atevures ibility o{fe County 4-Criterion.a.2:, [RSRED Z-r Criterion 5.a.3: Activities associated with" FEMAapproved -ex-Iception areas..(whereapplicable) areIcompld witn..45 minte flloin te nitaldeisonj by authorze ofstgmrec fiials to notify. the pulc of an emergencsiuto 1Bcuplert an6ntification of the &#xfd;public is-compfleted within 45 'minutes folwn he deeto by tIhe ORO of a-failre 'of.
SThis   cniterion-does not apply to Piatt County&#xfd; This function is the responsibility of De itt County."
I the pimmaiy alert'and not jfication' system n-:-
EVALUATIONAE                     SUPPORT OPERATION/FACILTE This evaluiation area does'not ap'ply to P-&#xfd;iattCony                            ,.                    i
~
                                      * ' *.........                        ;*."-7..'",*}".............
This. e terio  
                                                        ...........................                                          '.....,'...   .:/
-oesnot apply to/
822
itt-C Criterion 5A.: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner....
SThis cniterion-does not apply to Piatt County&#xfd; This function is the responsibility of De itt County."
EVALUATIONAE SUPPORT OPERATION/FACILTE
;*."-7..'",*}".............  
'.....,'....:/
This evaluiation area does'not ap'ply to P-&#xfd;iattCony i
2 82


Unclassified Radiological Emergency preparedness Program,(REP)
Unclassified Radiological Emergency preparedness Program,(REP)
After Action Report/Improvement Plan                                                                 Clinton Power Station ENCLOSURE 7 EXTENT-OF-PLAY AGREEMENTS CLINTON P0WER STATION (CPS) REP EXERCISE Week of November 2, 2011 7F MS-1 OFFSITE MEDICAL DRILL EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: For Transportation: l.d.1, 3.a.1 and 6.d.1; for the Hospital, 1.d.1, 1.e. 1, 3.a.1 and 6.d.1. Criteria may be re-demonstrated, as agreed by the Lead Controller and FEMA Evaluators.
After Action Report/Improvement Plan Clinton Power Station ENCLOSURE 7 EXTENT-OF-PLAY AGREEMENTS CLINTON P0WER STATION (CPS) REP EXERCISE Week of November 2, 2011 7F MS-1 OFFSITE MEDICAL DRILL EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: For Transportation: l.d.1, 3.a.1 and 6.d.1; for the Hospital, 1.d.1, 1.e. 1, 3.a.1 and 6.d.1. Criteria may be re-demonstrated, as agreed by the Lead Controller and FEMA Evaluators.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.
EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.
Decatur Ambulance will use 2-way radios to communicate with St. Mary's Hospital Other communication systems that can be used include commercial telephoneor cell phones.
Decatur Ambulance will use 2-way radios to communicate with St. Mary's Hospital Other communication systems that can be used include commercial telephoneor cell phones.
Line 1,729: Line 2,417:
83
83


                                                          .Radiological Emer0gency         Unlssfe Prearedness Program   i i (REP)
Unlssfe i i
SAfter ActionReport/Improvement Plan                 -,,                                                                      ,,,        ,                      Clinton Poer Station               .-
.Radiological Emer0gency Prearedness Program (REP)
Decatuir Ambulance&#xfd; willutilizeuniversal precatitions-and good .hoiisek&eping practicesto Tiniminethe spread of contanuhation;-hnd will focuson treating the -paitrienit's miedical condition.                                                                                 j Decatur Ambilance will                   ii the irformitfionregardifig the patient to St. MarY'sHqitalin Decatur so they can prepare       for receipt of a6potentallytcontarnated patient St* ary s Hospitalwill :implement their.plan for receipt, isolation anri treatment of an ijuredcontaiiimated patient                                                                                                         precaiitionisand good eMMedicalpersonnelwfllYutlizeiuversal
SAfter ActionReport/Improvement Plan Clinton Poer Station Decatuir Ambulance&#xfd; willutilizeuniversal precatitions-and good.hoiisek&eping practicesto Tiniminethe spread of contanuhation;-hnd will focuson treating the -paitrienit's miedical condition.
                                        ... ,oiekeetomnirzethe spreadof contamati                       andwill focuson'treatingh theipatint                                         'i house jeepmng practices' oaiila       minfiethdipeaaln condition.   .j      &#xfd;                       effrttwifbjkmhsdt~fattrth                   a                                                4dicaiiystabiliizd               The hospitalxwilide-m~onsirateprocedures forhliriiutng'expos4ietohospal-ift.sa'decontaminating a patient, 6in'iresnicting t .:;gc6esi   td ttih*a~ea wlhere the                                                                               ta       sie nefl il dden*onstatetheir kowedge
j Decatur Ambilance will ii the irformitfionregardifig the patient to St. MarY'sHqitalin Decatur so they can prepare for receipt of a6potentallytcontarnated patient St*
                                                                                                                          'dispersond.h acsfwhtothelara-                         pati~eiit. bisn~g -,treated and rnonitored-Hp ta                                                                                     he&#xfd;~dzg
ary s Hospitalwill :implement their.plan for receipt, isolation anri treatment of an ijuredcontaiiimated patient eMMedicalpersonnelwfllYutlizeiuversal precaiitionisand good
          ~who to c'albeyond'IEMA                   dsis.stance-i s'foi                RdadbI6gical Accidentse g4., REA'CGS:                                         -
...,oiekeetomnirze the spreadof contamati andwill focuson' treatingh theipatint  
Forprposesofth~is exerise an tEMAsta                                                willbedispatcheddto`St.
'i house jeepmng practices' oaiila minfiethdipeaaln condition.  
                                                                                          &#xfd;membe                                 Mary's Holspitail'ith'radiation:detedtidn" .                            .
&#xfd;  
and measuremeht equipmentlto survey out 'ambulance stiaoffl                                                     e ofShahie*anpIEMAMs
.j a
                    -        toin                  &sect;               'fv '           -i             -Eth        o.ae no yigMRT                                         available-is to-fadilitate           oitonn the ambulance and                                   personnelso they areDot lkept out 6 fkserv'e f                                               tendedpe6riodof The drill wfll conclude with thhieospital reprenr                                                     t remova o proen
effrttwifbjkmhsdt~fattrth 4dicaiiystabiliizd The hospitalxwilide-m~onsirateprocedures forhliriiutng'expos4ietohospal-ift.sa'decontaminating a patient, 6in'iresnicting t.:;gc6esi td ttih*a~ea wlhere the  
  .- ie   emergency room and hospital personnel. IEMA will also advise on the                                                                     lpure for-release       -          p,osal contaminated material.
'dis persond.h ta sie nefl il dden*onstatetheir kowedge acsfwhtothel ara-pati~eiit.
bisn~g -,treated and rnonitored-Hp ta he&#xfd;~dzg
~who to c'albeyond'IEMA s'foi dsis.stance-i RdadbI6gical Accidentse g4., REA'CGS:
Forprposesofth~is exerise t
an EMAsta
&#xfd;membe willbedispatcheddto`St. Mary's Holspitail'ith'radiation:detedtidn".
and measuremeht equipmentlto survey out 'ambulance stiaoffl e ofShahie*anpIEMAMs toin
&sect;  
'fv '  
-i  
-E th o.ae no yigMRT available-is to-fadilitate oitonn the ambulance and personnelso they areDot lkept out 6 fkserv'e f tendedpe6riodof The drill wfll conclude with thhieospital reprenr t
remova o proen
.-ie emergency room and hospital personnel. IEMA will also advise on the lpure for-release p, osal contaminated material.
Following the conclusion of the dnill, a short critique will be held.
Following the conclusion of the dnill, a short critique will be held.
4                         ""..                                                                                2,44" ~       .t-4.* .2     *t' 4
4 2, 4 4 " ~
4 '.   ..      .  $          .&#x17d; .
t-4.*  
44-q
.2  
                    *                          .. .*          ' ;2':                 !    .2t-* t,?m?',       "4-4     2   '
*t '
2..... 4'K;'-
4 4 '.  
1 ' .,      -    WI   *:    .44'                 I;:,:
.&#x17d;.
ti
44-q ti
"/t.,-;   ..        ' -:  v ,   ...        "7.&#x17d;       i     .      4..-'4 ',;:-     :'"    """1/2       ...        ,  4,,:                  ' ,      " ' .. .    :  "    -      '-          '
' ;2':  
                "4'8,                                                 4lJ~''~
.2t-* t,? m?', "4-4 2
2.....
4'K;'-
1 WI  
.44 '
I;:,:
"/t.,-;
v,  
"7.&#x17d; i
4..- '4 ',;:-  
"""1/2 4  
"4'8, 4lJ~''~


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                       Clinton Power Station APPENDIX E: SCENARIO DETAILS SCENARIO INFORMATION:...
After Action Report/Improvement Plan Clinton Power Station APPENDIX E: SCENARIO DETAILS SCENARIO INFORMATION:...
e-* Exercise Time Line.
e-* Exercise Time Line.
                                    ," Narrative Summary
," Narrative Summary
* Summary of Expected EALs and PARs
* Summary of Expected EALs and PARs
                                    *:.Meteorology
*:. Meteorology
                                    *:-.Release Information
*:-.Release Information
                                                              -85
-85


Uncl6assified&#xfd;
Uncl6assified&#xfd; A
        "--'*',:*    A                                                  Raologcal EmergencyPreparedness Program (REP)                         ...-....                      . n:     Power S
Raologcal EmergencyPreparedness Program (REP) n:
.1<:                     ftr4c             Report/Improvement Plan .'
Power S
                                            'i6ri                                                                                                                                in
.1<:
                      -                          EXERCIS                   TIM             I: NE                           y(Novemb er 2,2011)
ftr4c  
Anitial Condlfjoris,%-&#xfd; The plait is at full power.noa.270 day run. On'-Line Ri'sk Leyel issGreen'. 'A'.RHR 9n suppession pool circulation in'
'i6ri Report/Improvement Plan.'
          .preparationifor the RCI surveilance .
in EXERCIS TIM I: NE y(Novemb er 2,2011)
              .0750               StarScenario-                             Shift   -,                                                                -.          -
Anitial Condlfjoris,%-&#xfd;
: '.    '        ALERT          *HA5.
-4 The plait is at full power.noa.270 day run. On'-Line Ri'sk Leyel issGreen'. 'A'.RHR 9n suppession pool circulation '
Fi oj~d ig of.'A   ' 5RHRNatural pu l- and 0o dest*U'ctive (H area." phenormena'affecting
in
                                                                                                *;" &#xfd;..!;"-",  _--, - " &#xfd;.: : Y:      *.&#xa2;!i inthe i: plant I-i     1.
.preparationifor the RCI surveilance.
.0750 StarScenario-Shift ALERT
*HA5. 5 Natural and dest*U'ctive phenormena'affecting plant inthe Vital Area Fi oj~d ig of.'A ' RHR pu l- 0o (H area."  
&#xfd;.
: Y:
&#xfd;.
*.&#xa2;!
i i
i':
i':
                                                                                                                                                &#xfd;        Vital    ,.Area
I-i
: ,/-- -. _,_:       -'.:-:            -
: /-- _,_:
FlodinofA HR pump r6oom (H2,iarea)--                 Pool
: 1. &#xfd; Flodin ofA HR pump r6oom (H2,iarea)--
                                        ,Damage t6 A' RHR pump sucti6on-Suppressio6 Ponl Leaklintboatijbiildirng MCB Annunciator 5013-SD - '"Hi Hi. RFRR ARoom       o      7 Sump
Pool
                                                                                                          $ 'pl~ve ircr.ifg i'RHRA RoomR
,Damage t6 A' RHR pump sucti6on-Suppressio6 Pon l Leaklintboatijbiildirng MCB Annunciator 5013-SD - '"Hi Hi. RFRR ARoom  
                                  ;        ( 5 minutes'later) MCB Annunciator 505675G "SecondarypCOnt; Area Max SafeCrperat ngw aterbLevel" (8";water level).
'pl~ve ircr.ifg i'RHRA RoomR o
0805             *      'A'-.. RHR pump trips to                     (uewater 1ntrusion-(
7 Sump
Minuteafter sirnmp lelk a&#xfd;airm)                         "        .    ."        ..
( 5 minutes'later) MCB Annunciator 505675G "Secondaryp COnt; Area Max SafeCrperat ngw aterbLevel" (8";water level).
(15).                     A leak will'be discovered ohthe 'A' RHR'pumpsuction (Contrl MessageCM,-2 -,Suction line break, spraying'on motor, andn Water level rising inrobm L-'electrical zard?)
0805  
                                  " Suctioir MOV- Ei.2FO04B will' ot close -rshows open on indicatonrlights (&#xfd;thermwals tripped - c'ontroqlmessage)
'A RHR pump trips to (uewater 1ntrusion-(
                                  , . ManualIsolation valve -acan beclosed with MM assitance (,f room entry permitted control message)
Minuteafter sirnmp lelk a&#xfd;airm)
        - "- -            :
(15).
* De~t0"a decrease~in SU~pression pool :l~e~vel, the CR team willline u normal make up to~                           te suppr:esion pool-&#xfd;             .
A leak will'be discovered ohthe 'A' RHR'pumpsuction (Contrl MessageCM,-2 -,Suction line break, spraying'on motor, andn Water level rising inrobm L-'electrical zard?)
0900: r j_ - Ops Crew responds per EOP-8 and Flooding Off-Normal procedures
Suctioir MOV-Ei.2FO04B will' ot close -rshows open on indicatonrlights (&#xfd;thermwals tripped - c'ontroqlmessage)
: * *. .,(0900)'A APRM failedHigh bypass per 3305 .011 responseT 3 e(panel i back-MockUp.-[IM taSk] -Tech-Spec j-Crew will                                                 I
,. ManualIsolation valve -acan beclosed with MM assitance (,f room entry permitted control message)
              '(70) "                2     (0905) ERAl SVc.(Static VAR Compensatori) Arilnc'6i5to1 8_                             '8'"RATSVc Trip"-(look ait #9&r#10 in                             -
De~t0" a decrease~in SU~pression pool :l~e~vel, the CR team willline u normal make up to~ te suppr:esion pool-&#xfd; j_ - Ops Crew responds per EOP-8 and Flooding Off-Normal procedures  
pOrdcedr.01               Harmonic Flers or     coing skid issue Loss Of Coolant Accidentto the Containment .                                                                  ,                -    -              -      :    -
.*.,(0900)'A APRM failedHigh e(panel i back-MockUp.-[IM taSk] -Tech-Spec j-Crew will 0900: r bypass per 3305.011 responseT 3
S, :...LOCA- Loss"ofRCS .:Drywell pr'ess >,1.68,psig due to-RCS leakage ;(RC3):orDW Rad,>100 /Rhr.withRCS 095 leafka'ge (RC5                                                                                       .2
'(70) 2 (0905) ERAl SVc.(Static VAR Compensatori) Arilnc'6i5to1 8_  
* ecirc ra rsls nLC
'8'"RAT SVc Trip"-(look ait #9&r#10 in pOrdcedr.01 Harmonic Flers or coing skid issue Loss Of Coolant Accidentto the Containment S, :...LOCA-Loss"ofRCS.:Drywell pr'ess >,1.68,psig due to-RCS leakage ;(RC3):orDW Rad,>100  
                .(9)
/Rhr.withRCS 095 leafka'ge (RC5  
* Qr'oupl 1Ioain(pros u to hihsem flow arid Reac~tor- SCRAM',q
.2 ecirc ra rsls nLC
                                .        .DW/.ContRadsrise;,resulting in Loss.of RC:S.DWRa&#xfd;d*100 Rbhr/Cont Rad >33 R*hrwith RCS le.akage (RC5)
.(9)
                                        * 'SGTS     start   ,
Qr'oupl 1 Ioain(pros u to hihsem flow arid Reac~tor-SCRAM',q
* Cre~ repndispe
.DW/.ContRads rise;,resulting in Loss.of RC:S.DWRa&#xfd;d*100 Rbhr/Cont Rad >33 R*hrwith RCS le.akage (RC5)
                                                  .Ops      p         Proedr 4304,01 q,.                     -        ''
* 'SGTS start  
                                        *Concu rretFA -1 1-,                                                                                 ''
*.Ops
IA DG'trips due to overspeed (past OE)                   (can be-repaired per control message)                                         MM and EM task
~
    -4                        -SITE AREA EMERGENCY . FSi ..-*DWICont Rad's exced-,fuel barrier limit -,                                                           "-
p Cre repndispe Proedr 4304,01 q,.
Daiato Fuel cotirie~                                     '~'                          '
* Concu rretFA  
(105 .Containment Radiation >41*3R*Hr6and Dryw.ll Radiation,>260 WIr .
-1 1-,
[ALERT+90]                 .      DWCAMMonitorgoes.,to high Alarm                         -', .*.-                    '        .
IA DG'trips due to overspeed (past OE)
SLoss'of Fuel DWRad 260 RFhr (FC5).with previous'Loss of RCS (RC3/RC5) results in SITEAREA EMERGENCY FS                                                           .
(can be-repaired per control message)
                                *. ',Assembly/Accountability (simulated)-"Initial Condiitions (Exempt ln-Processing Personnel outside fence fromAssembly "actions orcontingencies).-
MM and EM task
GENERAL EMERGENCY' FG                   I     'RWCU'isolation failure w/break
-SITE AREA EMERGENCY. FSi..-*DWICont Rad's exced-,fuel barrier limit -,
                                                                                                                        -A, S ,Group 4*failure MCB Anriunciator 5000-4A (Max.Safe Temps.>2000- RWCU fails to isolate on RT Equip room high temps I
Daiato Fuel cotirie~  
(186.5&deg;F)due to break in'RWCUpmp room in AuX BId.,:: with b                           a                                       A.x Los&sect;f Contiainmone-f(CT6'i/:1/T6.3) ,RWCU :isolation-failure'withbBrieai-a.,W6U PU'm&#xfd;&#xfd;I*                           room in Aux Bid (RT_ Equip room)
'~'
(185)-             " and'pbthl tobihe environment (Release Path 'M'). *WCU pump room Max Safe area temps and rads.                                                       -
(105  
[SAE+80]                   . C~niaininnRadiation levels out at 60 R/Hr Drywell Radiation reaches ~300 R/Hr -
.Containment Radiation >41* 3R*Hr6and Dryw.ll Radiation,>260 WIr.
Loss.of Containmeibt (CT6.1/iCT6.3)'with previous, Loss of RCS (RC3/1R5)and Loss of Fuel Clad (FC5) results in GENERAL
[ALERT+90]
                                .EMERGENCY-M                  FGI     .
DWCAMMonitorgoes.,to high Alarm SLoss'of Fuel DWRad 260 RFhr (FC5).with previous'Loss of RCS (RC3/RC5) results in SITEAREA EMERGENCY FS  
* MAX PARS (Wind Direction from.240&deg;, Wirid Speed 6.0 mph, Stability Class.E) -Subareas 1&3
*. ',Assembly/Accountability (simulated)-" Initial Condiitions (Exempt ln-Processing Personnel outside fence fromAssembly "actions orcontingencies).-  
                                -          Release in'progress (Release from Containment to Aux Building to SGTS) - SGTS monitor increasin&#xfd;g'&#xfd;v 1130                                               -                                            "
-A, GENERAL EMERGENCY' FG I  
(220)             RG1-TEDE limits >lR/hr- Peak Release at 1.130'(3.80E+08 pCi/sec)
'RWCU'isolation failure w/break S,Group 4* failure MCB Anriunciator 5000-4A (Max.Safe Temps.>2000- RWCU fails to isolate on RT Equip room high temps (186.5&deg;F)due to break in'RWCUpmp room in AuX BId.,:: with b a
[SAE+801                   "
A.x Los&sect;f Contiainmone-f(CT6'i/:1/T6.3),RWCU
1230             Exercise Termination (280)-
:isolation-failure'withbBrieai-a.,W6U PU'm&#xfd;&#xfd;I*
room in Aux Bid (RT_ Equip room)
(185)-
and'pbthl tobihe environment (Release Path 'M'). *WCU pump room Max Safe area temps and rads.
[SAE+80]
C~niaininnRadiation levels out at 60 R/Hr Drywell Radiation reaches ~300 R/Hr Loss.of Containmeibt (CT6.1/iCT6.3)'with previous, Loss of RCS (RC3/1R5)and Loss of Fuel Clad (FC5) results in GENERAL M
.EMERGENCY-FGI MAX PARS (Wind Direction from.240&deg;, Wirid Speed 6.0 mph, Stability Class.E) -Subareas 1&3 Release in'progress (Release from Containment to Aux Building to SGTS) - SGTS monitor increasin&#xfd;g'&#xfd;v 1130 (220)
RG1-TEDE limits >lR/hr-Peak Release at 1.130'(3.80E+08 pCi/sec)
[SAE+801 1230 Exercise Termination (280)-
I I
I
I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                       Clinton Power Station NARRATIVE  
After Action Report/Improvement Plan Clinton Power Station NARRATIVE  


==SUMMARY==
==SUMMARY==
 
NORMAL OPERATIONS 0750- 0804 The Operating Crew will take the shift at 0750 with the unit operating at full power.
NORMAL OPERATIONS 0750- 0804               .
The Operating Crew will take the shift at 0750 with the unit operating at full power.
Expected Actions The Operating Crew is expectedto maintain current power operations.
Expected Actions The Operating Crew is expectedto maintain current power operations.
ALERT - Onsite Events 0805 -0934 The crew will receive a MCB Annunciator 5013-5D - "Hi Hi RF RHR A Room" - due to sump level increasing in
ALERT - Onsite Events 0805 -0934 The crew will receive a MCB Annunciator 5013-5D - "Hi Hi RF RHR A Room" - due to sump level increasing in
*RHR A Room. This Annunciator will be followed by the tripping of the '' RHR Pump.
*RHR A Room. This Annunciator will be followed by the tripping of the '' RHR Pump.
The local operator for the. RCIC surveillancewill report (via a control message).that a leak hasbeen discovered on the 'A' RHR pump suction (Control Message CM-2) - Suction' line break, water is spraying on the 'A' RHR pump motor, and water level rising in the room representing an electrical hazard.
The local operator for the. RCIC surveillancewill report (via a control message).that a leak hasbeen discovered on the 'A' RHR pump suction (Control Message CM-2) - Suction' line break, water is spraying on the 'A' RHR pump motor, and water level rising in the room representing an electrical hazard.
OnsiteExpected Actions The Operating Crew should respond to/contact local operator due to~the pump trip. Actions should be initiated to address the flooding issue per EOP-8 and Flooding Off-Normal procedures: The Emergency Director should declare an ALERT based on HA5.5 Natural and destructive phenomena affecting plant in theVital Area. [To=call to CR on electrical hazard with water leak spraying on 'A' RHR pump motor].                .
OnsiteExpected Actions The Operating Crew should respond to/contact local operator due to~the pump trip. Actions should be initiated to address the flooding issue per EOP-8 and Flooding Off-Normal procedures: The Emergency Director should declare an ALERT based on HA5.5 Natural and destructive phenomena affecting plant in theVital Area. [To=call to CR on electrical hazard with water leak spraying on 'A' RHR pump motor].
State notification should be completed via the NARS.' The ENS notification should be made.
State notification should be completed via the NARS.' The ENS notification should be made.
Unit should remain on-line during this evolution. Actions taken to manually isolate the 'A' RHR Pump suction will result in isolating the leak.
Unit should remain on-line during this evolution. Actions taken to manually isolate the 'A' RHR Pump suction will result in isolating the leak.
(Reference 'A' RHR Pump and Room pictures Section 6)
(Reference 'A' RHR Pump and Room pictures Section 6)
                                                                .87
.87


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/improvement Plan                                                       Clinton Power Station Approx.                                                                                                                 I Time               EventlAnticipated ORO Response to Alert NARS 0750                 Initial conditions/weather forecast message to players.-
After Action Report/improvement Plan Clinton Power Station Approx.
0805'               An Alert is declared at Clinton Station.
I Time EventlAnticipated ORO Response to Alert NARS 0750 Initial conditions/weather forecast message to players.-
0820               Exelon notifies the IEMA Telecommunicator of the ALERT via NARS.
0805' An Alert is declared at Clinton Station.
0820 Exelon notifies the IEMA Telecommunicator of the ALERT via NARS.
IEMA Telecommunicator verifies the NARS message.
IEMA Telecommunicator verifies the NARS message.
An IEMA Duty Officer contacts the Clinton Station Shift Engineer.
I An IEMA Duty Officer contacts the Clinton Station Shift Engineer.
I IEMA Telecommunicator notifies IEMA personnel of the ALERT per SOP.                                 3 IEMA may activate the State of Illinois Response Center (SIRC) and Radiological Emergency Assessment Center (REAC), if appropriate.
IEMA Telecommunicator notifies IEMA personnel of the ALERT per SOP.
3 IEMA may activate the State of Illinois Response Center (SIRC) and Radiological Emergency Assessment Center (REAC), if appropriate.
IEMA may dispatch liaisons to the County EOCs, Unified Area Command (UAC), Radiological Assessment Field Team (RAFT), Joint Information Center (JIC), Technical Support Center (TSC) and EmergencyOperations Facility (EOF), if appropriate.
IEMA may dispatch liaisons to the County EOCs, Unified Area Command (UAC), Radiological Assessment Field Team (RAFT), Joint Information Center (JIC), Technical Support Center (TSC) and EmergencyOperations Facility (EOF), if appropriate.
IEMA notifies Governor's Office of the ALERT. (Simulated)                 "
IEMA notifies Governor's Office of the ALERT. (Simulated)
IEMA Telecommunicator notifies ap ropriate State agencies of the ALERT.'         -
IEMA Telecommunicator notifies ap ropriate State agencies of the ALERT.'
IEMA notifies FEMA of the ALERT. ,(Simulated) 0835               IEMA Telecommunicator notifies DeWitt County of the ALERT via NARS.
IEMA notifies FEMA of the ALERT.,(Simulated) 0835 IEMA Telecommunicator notifies DeWitt County of the ALERT via NARS.
DeWitt County telecommunicator completes and verifies the NARS rues.sage..         '
DeWitt County telecommunicator completes and verifies the NARS rues.sage..
DeWitt County telecommunicator notifies County officials, support counties and municipalities of the ALERT per SOP.*"             .
DeWitt County telecommunicator notifies County officials, support counties and municipalities of 3
3 Support county and municipaltelecommunicators complete and verify the NARS message. "
the ALERT per SOP.*"
Support county and municipaltelecommunicators complete and verify the NARS message. "
Support. county and municipal telecommbnicators notify officials of the ALERT per SOP.
Support. county and municipal telecommbnicators notify officials of the ALERT per SOP.
Counties may activate the EOC, if appropriate.                     "
Counties may activate the EOC, if appropriate.
* 0925 At 0925, a Recirc line break results in a Loss of Coolant Accident (LOCA). Increasing Drywell Pressure due to.
0925 At 0925, a Recirc line break results in a Loss of Coolant Accident (LOCA). Increasing Drywell Pressure due to.
RCS leakage (RC3) AND Increasing Drywell and Containment radiation results in the Loss of the Reactor Coolant System'(RCS) fission product barrier (RC5). A spurious Group 1 Isolation occurs due to high steam flow and the I
RCS leakage (RC3) AND Increasing Drywell and Containment radiation results in the Loss of the Reactor Coolant I
Reactor SCRAMs. The Standby Gas Treatment System (SGTS) starts.. " "                                                  .
System'(RCS) fission product barrier (RC5). A spurious Group 1 Isolation occurs due to high steam flow and the Reactor SCRAMs. The Standby Gas Treatment System (SGTS) starts.. "
Onsite Expected Actions The Operating Crew should respond per Procedure 4304.01. A Concurrent ALERT - FA1 should be identified.                 I 88
Onsite Expected Actions The Operating Crew should respond per Procedure 4304.01. A Concurrent ALERT - FA1 should be identified.
I 88


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                     Clinton Power Station 1A DG Trips due to Overspeed                   ,
After Action Report/Improvement Plan Clinton Power Station 1A DG Trips due to Overspeed 0930 Main Control room will receive indications and annunciators for the tripping of 1A DG. Local investigation will indicated that the Diesel generator tripped due to Overspeed.'
0930 Main Control room will receive indications and annunciators for the tripping of 1A DG. Local investigation will indicated that the Diesel generator tripped due to Overspeed.'
Onsite, Expected Actions The Operating Crew should respond per Procedure. TSC/OSC should prioritize equipment investigation and restoration as appropriate.
Onsite, Expected Actions The Operating Crew should respond per Procedure. TSC/OSC should prioritize equipment investigation and restoration as appropriate.
SITE AREAlEMERGENCY (SAE) - Onsite Events 0935- 1044 Loss Of Coolant Accident FS Loss or Potential Loss of Two Fission Product Barriers Drywell and.Containment Radiation Increases to Loss of Fuel.Clad Barrier 0935 Fuel clad damage has continued to escalate as indicati6ns, of-fueldanageshow~risihg Drywell and Containment radiation levels. Drywell Radiation increases to >260 R/Hr AND Containment Radiation >41.3 R/Hr. [T=0 for SAE]
SITE AREAlEMERGENCY (SAE) - Onsite Events 0935-1044 Loss Of Coolant Accident FS Loss or Potential Loss of Two Fission Product Barriers Drywell and.Containment Radiation Increases to Loss of Fuel.Clad Barrier 0935 Fuel clad damage has continued to escalate as indicati6ns, of-fueldanageshow~risihg Drywell and Containment radiation levels. Drywell Radiation increases to >260 R/Hr AND Containment Radiation >41.3 R/Hr. [T=0 for SAE]
The Drywell CAM Monitor goes into high Alarm.
The Drywell CAM Monitor goes into high Alarm.
The Loss of Fuel Clad Barrier - Drywell Radiation >260 R/hr OR Containment Radiation >41.3 R/Hr (FC5) with previously identified Loss of RCS Barrier (RC3/RC5) results in a SITE AREA EMERGENCY - FSl Onsite Expected Actions Operations crew /TSC / EOF ERO should identify the Loss of the Fuel Clad fission product barrier -
The Loss of Fuel Clad Barrier - Drywell Radiation >260 R/hr OR Containment Radiation >41.3 R/Hr (FC5) with previously identified Loss of RCS Barrier (RC3/RC5) results in a SITE AREA EMERGENCY - FSl Onsite Expected Actions Operations crew /TSC / EOF ERO should identify the Loss of the Fuel Clad fission product barrier -
Line 1,870: Line 2,598:


U lnclassiflied
U lnclassiflied
                                                          ",Radiopogical Eni-gteny Pre&#xfd;pjaness Program (RE) P
",Radiopogical Eni-gteny Pre&#xfd;pjaness Program P
:After  ctibn Repoi'lmprovement Plan                                                                           ,  " .*        .d;-CiintonPo. S-Station Approx.
(RE)
Time               .Event/AntiCipated-ORO                                 Respbn+eitoSAE NARS" I
:Aft er ctibn Repoi'lmprovement Plan S-
0935                -A SITE AREA EMERGENCY is declarid at Clinion;Station.                                                                               .        ..        I 0950                   Exelon notifies the, IEMA Tele-ommunicatbr of thf SITE AREA EMERGENCYiviaNARS IEMA Telecormmunicator verifies the NAR*Smessage-                             (
.d;- Ciinton Po.
RECcntactsthe Clinton" Station:                       Enrgineer; SIRC is activated if not.previousl,y                         Vt         ,          -            .,                                  .
Station Approx.
:SIRC notifies the Governors Office and requests that arepresentative reportto.the ,State.EOC (Simiulated)-.
I Time  
JIC TSC-and EOF.- if not previously ,
.Event/AntiCipated-ORO Respbn+eitoSAE NARS" 0935
State dispatches li isons to the County EbOCs* UAC RAFT SIRC notifies:FEMA-of conditions.                                                                                       .            -
-A SITE AREA EMERGENCY is declarid at Clinion;Station.
                        "EMA'notifies State agencies:(Simulated):--.-
I 0950 Exelon notifies the, IEMA Tele-ommunicatbr of thf SITE AREA EMERGENCYiviaNARS IEMA Telecormmunicator verifies the NAR*Smessage- (
            ..   .    ::          ois.'StaP*6oi
RECcntactsthe Clinton" Station:
:"..-i~lllir        ce               .    ....
Enrgineer; SIRC is activated if not.previousl, y Vt
                          .~~.~                                     . .  .                                                        -. .    .      .  ; :;?-'   :.  .    ,
:SIRC notifies the Governors Office and requests that arepresentative reportto.the,State.EOC (Simiulated)-.
6DTDvso f Aeronautics                                                             -i;V
State dispatches li isons to the County EbOCs* UAC RAFT JIC TSC-and EOF.-if not previously,
*, .    ... ... .          CC .. .       ...     ,,, ..                                              ;: ,' /* -?                       .. .
SIRC notifies:FEMA-of conditions.  
IliosNational G'uard men                                           st
"EMA'notifies State agencies:(Simulated):--.-
                              ''AmncanRedCross~                   -'.-'                                                      z--                       ~~
:"..-i~lllir ois.' StaP*6oi ce  
IEPA"Y
.~~.~
            '.:        . ..DOA contacts-;..
:;?-'
                    .,* REAC            . ..      Feealaecis(Smlte)".''                       -
6DTDvso f Aeronautics  
                          -  ffice of the Staite Fire Marshal U                     I REAC provides.an update"to'the'SIRG a:d"CountyEOC&#xfd;Liaisons.                                                                                     .-  "
-i;V IliosNational G'uard CC......  
                      .REAC provides,an update~toiith&#xfd;Jibq.K                                   ~ -:. ~               -
;:,' /* -?
1& STEAREEMERGENCY'via NR 105 100nt
men st
                                            . .." *;'+.;'.' :4..".*."I" IEMA notifies De~vitt count                             . * - "-:"
''AmncanRedCross~
I    E'Rf DeWitt County telecommunicator coimpletes and v'erifie~s.the NARS; message.
z--  
                                                                                      .90
~~
I EPA" Y
...DOA.
- ffice of the Staite Fire Marshal REAC contacts-;.. Feealaecis(Smlte)".''
U I
REAC provides.an update"to'the'SIRG a:d"CountyEOC&#xfd;Liaisons.  
.REAC provides,an update~toiith&#xfd;Jibq.K  
~  
~
100nt 1& STEAREEMERGENCY'via NR 105 IEMA notifies De~vitt count Rf I
E' DeWitt County telecommunicator coimpletes and v'erifie~s.the NARS; message.
.90
" *;'+;'.'':4 ". *."I"


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                             Clinton Power Station Approx.
After Action Report/Improvement Plan Clinton Power Station Approx.
Time               Event/Anticipated ORO Response to SAE NARS (continued) 1005               DeWitt County telecommunicator notifies County officials, support counties and municipalities of the SAE per SOP.
Time Event/Anticipated ORO Response to SAE NARS (continued) 1005 DeWitt County telecommunicator notifies County officials, support counties and municipalities of the SAE per SOP.
DeWitt County implements public notification, procedures, if appropriate. (Simulated)
DeWitt County implements public notification, procedures, if appropriate. (Simulated)
Support county and municipal telecommunicators complete and verify thre NARS message.
Support county and municipal telecommunicators complete and verify thre NARS message.
Line 1,904: Line 2,644:
County EOCs are activated if not previously activated.
County EOCs are activated if not previously activated.
Dosimetry is issued to emergency personnel, EOC staff and exposure records are completed.
Dosimetry is issued to emergency personnel, EOC staff and exposure records are completed.
GENERAL EMERGENCY (GE)Onsite Events - Maximum PARs 1055 - End RWCU Isolation Failure with Break in Aux Building Group 4 failure Main Control Board Annunciator 5000-4A (Max Safe Temps >2000- Reactor Water Cleanup System fails to isolate on Rx Trip Equip room high temps (186.5 0 F) due to break in RWCU pump room in Aux Building.
GENERAL EMERGENCY (GE)Onsite Events - Maximum PARs 1055 - End RWCU Isolation Failure with Break in Aux Building Group 4 failure Main Control Board Annunciator 5000-4A (Max Safe Temps >2000- Reactor Water Cleanup System fails to isolate on Rx Trip Equip room high temps (186.5 0F) due to break in RWCU pump room in Aux Building.
Containment Radiation increases to -60 R/Hr and Drywell Radiation reaches -300 R/Hr.
Containment Radiation increases to -60 R/Hr and Drywell Radiation reaches -300 R/Hr.
Standby Gas Treatment System Effluent Monitor shows a release in progress..
Standby Gas Treatment System Effluent Monitor shows a release in progress..
GENERAL EMERGENCY - FG1                         - due to the Loss of ALL three Fission Product Barriers
GENERAL EMERGENCY - FG1 - due to the Loss of ALL three Fission Product Barriers
* Loss of Fuel Clad Barrier-       FC5 AND
* Loss of Fuel Clad Barrier-FC5 AND
* Loss of RCS Barrier-         RC3 ORRC5 AND
* Loss of RCS Barrier-RC3 ORRC5 AND
* Loss of Containment Barrier- CT6.1ICT6.3 - RWCU isolation failure with break at RWCU pump room in Aux Building (RT Equip room) and a pathway exists to the environment. RWCU pump room exceeds Maximum Safe area temperatures and radiation.
* Loss of Containment Barrier-CT6.1ICT6.3 - RWCU isolation failure with break at RWCU pump room in Aux Building (RT Equip room) and a pathway exists to the environment. RWCU pump room exceeds Maximum Safe area temperatures and radiation.
[CT6. la Failureof all isolation valves in any one line to close. AND CT 6. 1.b Downstream pathway to the environment exists.] OR [CT6.3 UNISOLABLE primary system leakage outside,primary containment resulting in .SecondaryContainmentarea temperatures of radiationlevels > EOP-8, Maximum Safe operatinglevels.]
[CT6. la Failure of all isolation valves in any one line to close. AND CT 6. 1.b Downstream pathway to the environment exists.] OR [CT6.3 UNISOLABLE primary system leakage outside, primary containment resulting in.Secondary Containment area temperatures of radiation levels > EOP-8, Maximum Safe operating levels.]
Onsite Expected Actions The Station Emergency Director should classify a GENERAL EMERGENCY, based on EAL FG1. All appropriate notifications should be made.
Onsite Expected Actions The Station Emergency Director should classify a GENERAL EMERGENCY, based on EAL FG1. All appropriate notifications should be made.
A release is occurring due'to the RWCU isolation failure W)ith break at'RWCU pump room in Aux Building (RT Equip room) and a pathway to the environment exists (Release Path 'M').
A release is occurring due'to the RWCU isolation failure W)ith break at'RWCU pump room in Aux Building (RT Equip room) and a pathway to the environment exists (Release Path 'M').
Line 1,917: Line 2,657:
91
91


            *  ,- ': : ..., :,          ,    - .. :.-  :*      .- ,. ;:Radioiogica!.Emergenc*yPrepared~ness.Program (REP)       :-[       . .  ,,  .:  :..).
.-,. ;:Radioiogica!.Emergenc*yPrepared~ness.Program (REP)
7
:-[  
                              '.-60'n ,eo       lmpi:6vement Plan-n;A- ;/        .      -- '                  " -S,                                         &#xfd;..Stat           .ion-,
.* :..).  
F.or thecurrent wind direction (fromh 240 Wind sp6ed 6,0 mph 'sta iity class E) the evacutio of Subarea;                                                                       :1
'.- 60'n,eo lmpi:6vement Plan-  
'.":"' ..-:'    1.&3 'shoul3d ?be' e rre~e           mm~d ecl.-! eak :release :occurs at., ;13O6" L:..* i- :L                           ;*: ;, o&#xa2; j-i;,- : <:":7, '
;/
Approx.                            ---..
7 n;A-  
Time,                   ,        Event/AntMipated ORO.ReS'OnSe.,to GEcNARS, 1055_             ..        - A GENERAL.EMERGENCYis declaredat clitonStato. ,.                                            .            .-
" -S,  
1110                       . Exelon -notifies ::the. IEMA-- Tejeco&#xfd;rruriciator_,,.of the GENERAL. EMERGENCY via NARS.
&#xfd;..Stat  
Prot6ctiveiationsvea        re recommended.** "i**::::*:.:...'&#xfd;,     7":'*'_t.;
.ion-,
IEMA Telecommunicator verifies the NARS message.                                                  .
F.or thecurrent wind direction (fromh 240 Wind sp6ed 6,0 mph 'sta iity class E) the evacutio of Subarea;
                                        -7IC and REAC.evaluate the protective action recornmendation                                     .
:1 1.&3 'shoul3d ?be' e rre~e mm~d ecl. -! eak :release :occurs at., ;13O6" L:..* i- :L  
A. recommendationi*sade                 to-the Governor TheiGovernor recommnend*                       s- atha6r6et   ctiv' 'acinstis               I
-".. ;*: ;, o&#xa2; j-i;,- : <:":7, '
                                      .,SIRC staf is advised of the situation,>,
Approx.
SIRC advisesUAC -the Cdunty EOC liaisonshand JIC staff of the*situation S IRC notifies FEMAEof.conditions: (Simulated)
: Time, Event/AntMipated ORO.ReS'OnSe.,to GEcNARS, 1055_  
I 7-               ',REAC 6provides'an update6to the SIRC*la                    :"County   EC         isons         '
- A GENERAL.EMERGENCYis declaredat clitonStato.
REACprovdes n udateJto the"JIG. ~%
1110  
SIRC notifiesTDeWitt County of the GENERAL .EMERGENCY&#xfd; andjheirecommended, proteci6 actions vu~NRS                 ~
. Exelon -notifies ::the. IEMA-- Tejeco&#xfd;rruriciator_,,.of the GENERAL. EMERGENCY via NARS.
                                      -eit-                             mm u~caty'o ricmp Itsand verifies the NARS message
Prot6ctiveiationsve a
                                        ". De.WitC0untyteleco~mmuicatornotifies Cnty.offi*cals suppo cnesanrc n)cii si       iounitri                            aes and municipa                   s
re recommended.** "i**::::*:.:...'&#xfd;,
                                      -DeW itt.Coun         i     ements publc notfic           i procedures and-trafficand accesspcontrol.per.S.'
7":'*'_t.;
                                    --!as applicable.-:.*         . -                                .                      1                                 .    :      "
IEMA Telecommunicator verifies the NARS message.  
Support county and municipal teLe6ommurnOpicators notfify ECsteaff, Suppo-curtcountyandmunicipaltelecoimm**               unicators complete anerify andthe NARS me ssage.t1
-7IC and REAC.evaluate the protective action recornmendation A..recommendationi*sade to-the Governor TheiGovernor recommnend*
                                                            "      munlcEXERCISE'-.                                           &#xfd;' ;..                                      !,:      .      "   1 The Clinton NRC Graded Exercise &#xfd;i -te riinatafe~r-concurrence from -'the State of I'llihois has '.been' received..-...'All facilities'will. te'rminae*i                         exercse p*rtic1-a-tioand conduct&#xfd;se*
s-atha6r6et ctiv' 'acinstis I
critiques of their performance.                                                                                           2,PY1y~
.,SIRC staf is advised of the situation,>,
I 92
SIRC advisesUAC -the Cdunty EOC liaisonshand JIC staff of the*situation I
S IRC notifies FEMAEof.conditions: (Simulated) 7-  
',REAC 6provides'an update6to the SIRC a County EC  
*l isons REACprovdes n udateJto the"JIG. ~%
SIRC notifiesTDeWitt County of the GENERAL.EMERGENCY&#xfd; andjheirecommended, prot eci6 actions vu~NRS  
~
-eit-mm u~caty'o ricmp Itsand verifies the NARS message
". De.WitC0untyteleco~mmuicatornotifies Cnty.offi*cals suppo cnesanrc n)cii iounitri si aes and municipa s
-DeW itt. Coun i
ements publc notfic i procedures and-trafficand accesspcontrol.per.S.'
--!as applicable.-:.*
1 Support county and municipal teLe6ommurnOpicators notfify ECsteaff, Suppo-curtcountyandmunicipaltelecoimm**
unicators complete anerify andthe NARS me ssage.t1 munlcEXERCISE'-.  
&#xfd;'  
" 1 The Clinton NRC Graded Exercise &#xfd;i -te riinatafe~r-concurrence from -'the State of I'llihois has '.been' received..-...'All facilities'will. te'rminae*i exercse p*rtic1-a-tioand conduct&#xfd;se*
critiques of their performance.
2,PY1y~
92 I


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                                   Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station


==SUMMARY==
==SUMMARY==
OF EXPECTED EALS and PARs EALs:
OF EXPECTED EALS and PARs EALs:
Time.             EAL #       Description Flooding of 'A'-RHR Pump Room' 0805               HA5       ALERT - HA5.5 - Natural and destructive phenomena affecting plant in the Vital Area. Flooding of 'A' RHR'pump room (H21 area).
Time.
EAL #
Description Flooding of 'A'-RHR Pump Room' 0805 HA5 ALERT - HA5.5 - Natural and destructive phenomena affecting plant in the Vital Area. Flooding of 'A' RHR'pump room (H21 area).
Loss or Potential Loss of ANY two barriers SITE AREA EMERGENCY - FSI
Loss or Potential Loss of ANY two barriers SITE AREA EMERGENCY - FSI
* Loss Of Coolant Accident.
* Loss Of Coolant Accident.
* Loss of Fuel Clad - FQ5 Drywell/Cnmt radiation monitor, reading > Fuel Cladding Loss Threshold, Drywell Rad > 2.60E+02 R/hr and Cnmt Rad >4.13E+01 R/hr.
* Loss of Fuel Clad - FQ5 Drywell/Cnmt radiation monitor, reading > Fuel Cladding Loss Threshold, Drywell Rad > 2.60E+02 R/hr and Cnmt Rad >4.13E+01 R/hr.
0935               FS1       AND (ALERT+90)                         e Loss of RCS - RC3 Drywell Pressure > 1.68 psig AND Drywell Pressure rise due to RCS leakage OR
0935 FS1 AND (ALERT+90) e Loss of RCS - RC3 Drywell Pressure > 1.68 psig AND Drywell Pressure rise due to RCS leakage OR
                                      *Loss of RCS - RC5 [Drywell Radiation monitor reading >.100 R/hr OR Containment Radiation reading > 33 R/hr] AND Indications of RCS leakage into the Drywell Loss of ANY two barriers AND Loss or Potential Loss of the third barrier GENERAL EMERGENCY - FG1 - RWCU isolation failure w/break
*Loss of RCS - RC5 [Drywell Radiation monitor reading >.100 R/hr OR Containment Radiation reading > 33 R/hr] AND Indications of RCS leakage into the Drywell Loss of ANY two barriers AND Loss or Potential Loss of the third barrier GENERAL EMERGENCY - FG1 - RWCU isolation failure w/break
* Loss of Fuel Clad - FC5 1055                           AND FG1
* Loss of Fuel Clad - FC5 1055 AND FG1
* Loss of RCS - RC3 OR RC5 (SAE+80)                         AND
* Loss of RCS - RC3 OR RC5 (SAE+80)
AND
* Loss of Containment - CT6.1/CT6.3 - RWCU isolation failure with break at RWCU pump'room in Aux Building (RT Equip room) and a pathway to the environment.
* Loss of Containment - CT6.1/CT6.3 - RWCU isolation failure with break at RWCU pump'room in Aux Building (RT Equip room) and a pathway to the environment.
RWCU pump room exceeds Maximum Safe area temperatures and radiation.
RWCU pump room exceeds Maximum Safe area temperatures and radiation.
1230                           Anticipated Termination PARs: Wind from 2400 (into 0600)
1230 Anticipated Termination PARs: Wind from 2400 (into 0600)
Sub-Area-TimEvntRelease.                                                       Recommendations.
Sub-Area-Tim EvntRelease.
                                                                                                    - Bold - "Added" Subareas) 0810                 HAS-ALERT                                                   None   None 0935 (AER+9)             FS1     - SITE AREA EMERGENCY                               None   None IL1 (DeWitt) 1055                 FGI     - GENERAL EMERGENCY                       -   G aseous (SAE+80)                 Maximumr PARs                                                     IL3 (DeWitt/McLean/Piatt) 93
Recommendations.
- Bold - "Added" Subareas) 0810 HAS-ALERT None None 0935 (AER+9)
FS1 - SITE AREA EMERGENCY None None IL 1 (DeWitt) 1055 FGI - GENERAL EMERGENCY -
G aseous (SAE+80)
Maximumr PARs IL 3 (DeWitt/McLean/Piatt) 93


                                                                                                                    ,Unclassified.&#xfd;
,Unclassified.&#xfd;
                                                                                    .Radiological Emergency Preparedness Program Q(RP)                                     -.                 "
.Radiological Emergency Preparedness Program Q(RP) -.
              -.. 4j After             e                           Plan             ..                                                    --                            -,.,;,,.,                  Clinton.Pow         drStation.
-.. 4j After e
                                                                                                ,,METEORLG.
Plan Clinton.Pow drStation.
,,METEORLG.
Th~e mtoooyprameters are:~
Th~e mtoooyprameters are:~
Viqrjopi        .          ,              2400    ?&#xfd;                    ~
.................,....r~ e r.. ure................................................
r.. ure...........
Viqrjopi 2400
                                                        . .. ............            .. ,....r~ e.....................................                                         .         ...........      ....      ...      .......          .....
?&#xfd;
W     &#xfd;ind.speedd                             6.0     m'ph
~
                  .    .-                  Precipit      a ion                                 None -                                                                                                                     .          ..
W  
                                                                            'RELEASE INFORMATION
&#xfd;ind.speedd 6.0 m'ph P recipit a ion None -
              *Release:Pa*th`is a mon~it'ored                                         leas*efrom:the RCSS6 theA*ukiliary building 'Via a Reatoir
'RELEASE INFORMATION
            .Water Cleanup-(RWCU) isolationfailureOWithba brea latRW.,CU *pump'room'in AuxBuiling'
*Release:Pa*th`is a mon~it'ored leas*efrom:the RCSS6 theA*ukiliary building 'Via a Reatoir
            . ,:"The   release :is thrgoug'hhe SGhst.rtGiem                                         t         which is c*nidered a groundlevel.release All
.Water Cleanup-(RWCU) isolationfailureOWithba brea latRW.,CU *pump'room'in A uxBuiling'
            -.Dose " 7 Based PARRsbou nde'd.by-lant-Based-PARs..                                                                                           ..--.            ,            ,          -
.,:"The release :is thrgoug'hhe SGhst.rtGiem t
        -.-,The -peak release%0occurs at approximnately 1130;.... qse.projectiots forthe                                                                                                                 Irelease were.
which is c*nidered a groundlevel.release All Dose 7Based PARRsbou nde'd.by-lant-Based-PARs..  
  -.:.,.:,;R lase,Path,&#xfd;(M)*Jsjtfro
-.-,The -peak release%0occurs at approximnately 1130;.... qse.projectiots forthe Irelease were.
  .,:.                                                              itheR St teA xBuiddhgto,:SG S o,,tl&#xfd;e;E wo                                                                                                                       aie nt:via~a*me:,.:::,,..-*
-.:.,.:,;R lase, Path,&#xfd;(M)*Jsjtfro itheR St teA xBuiddhgto,:SG S o,,tl&#xfd; e;E wo nt:via~a*me:,.:::,,..-*
;pe                             i    t`          e:t"i'h 6tration.iso             ation. 3ad                                   damage; from Conta, i                                                   radiation (basedon, Con-t       Spay         ON             %      rm       DW           'ra-dia'tion             is'ing         CDM--38%,                         clad     -d'amage                   was                     r..
aie
DAPA                 lculations.rocess Re                                           c00facto                                 04 Ws0,0 w             hrelease starts                                           .
;pe e:t"i'h i
4 -. '1       _....                                              ,...                                                  ,..
t`
DOSE-:PRO                             JECTIONS                             -
6tration.iso ation. 3ad da mage; from Conta, i radiation (basedon, Con-t Spay ON rm DW  
fTejflowing peak.dose projeci*Ons a                                                                                     the                           m          t3()0-1144
'ra-dia'tion is'ing CDM--38%,
clad  
-d'amage was r..
DAPA lculations.rocess Re c00facto 04 Ws0,0 w
hrelease starts 4 -. '1 DOSE-:PRO JECTIONS fTejflowing peak.dose projeci*Ons a the
:1*data-:
:1*data-:
                                                                                                                                                                                      .: -t .*%.-r ... -
m t3()0-1144 do&deg;e kerne'.
do&deg;e      kerne'.A.-:
. -U,
                                                                                                                                                                                                                    ,*J,.::                4 :  -      I
.: -t.*%.-r...
                                                  .              . -U,                . ..                                                                ,.          C oun                         -i             .'.c S,,Release:,Path.*,*,CS                                                                           tQCNT>1 ATAC                                                               ENV>.'-
C J,.::
                                                        -ore~a               a         e                                     8         Ca         Dama'ge.
A.-:
P   F.004`                                                         whe         'tble'e         `&#xfd;starfs_&#xfd; TihieAfteerSh'                       yfdoWn:'2:'05 t         *                      ,~~-:*rxelease:r. ura ion.",-3.                                 '*:          .:,*-A~ .     'w-I    r ua0:w ay , ,e                                             : .,
4 I
                                              .                  -Distance                             TEDE (Rem)                                     CDE           Rem 5:
oun  
                      *:          -- .:i..l:.,                 "as _D raio                       .                            1       (       ee da ,                 ay Ti               e).
-i  
SB                           -14           E+01_                             ,91,E           0~
.'.c S,,Release:,Path. *,*,CS tQCNT>1 ATAC ENV>.'-
les"                 '________                ____            J -,,
-ore~a a
10Miles- ".8.1T53E'01                                                                 B'.2.66E-i00
e 8
: : .....;                    ... 1 M les... *- -- .08E -01 o ... " '2:52 E &#xfd;F00 - *-. ....
Ca Dama'ge.
                                                                                                                      -':94                                       .                .
P F.004`
whe  
'tble'e  
`&#xfd;starfs_&#xfd; TihieAfteerSh' yfdoWn:'2:'05
'w-I t  
,~~-:*rxelease:r. ura ion.",-3.  
.:,*-A~.
r ua0:w y,,e a
-Distance TEDE (Rem)
CDE Rem 5:  
.:i. :.,  
.l as _D raio 1
(
ee da,
ay Ti e).
SB  
-14 E+01_  
,91,E 0~
les" J -,,
1 0Miles-  
".8.1T53E'01 B'.2.66E-i00
... 1 M les... *- --.08E -0 1 o... " '2:52 E &#xfd;F00 - *-.....  
-':94  


Unclassified Radiological Emergency Preparedness Program (REP)
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan                                                   Clinton Power Station
After Action Report/Improvement Plan Clinton Power Station
                                      *This page is intentionally blank.
*This page is intentionally blank.
95}}
95}}

Latest revision as of 02:49, 12 January 2025

FEMA, Submittal of After Action Improvement Plan for 11/2/2011 Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise for Clinton Power Station
ML121000530
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/09/2012
From: Velasquez A
US Dept of Homeland Security, Federal Emergency Management Agency
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML121000530 (95)


Text

U.S. Department of Homeland Security Region V 536 South Clark Street, Floor 6 Chicago, IL 60605 SFEMA NRC Headquarters Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 To Whom It May Concern:

Enclosed is one copy of the After Action (AAR) / Improvement Plan (IP) for the November 2, 2011, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise for the Clinton Power Station. The State of Illinois, DeWitt, Macon, McLean, and Piatt Counties, and the utility owner/operator, Exelon Nuclear, participated in this exercise.

The After Action (AAR) / Improvement Plan (IP) was prepared by the U.S. Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) Region V, Radiological Emergency Preparedness Program.

No Deficiencies were identified for any jurisdiction during this exercise.

There was one Area Requiring Corrective Action (ARCA) identified during this exercise for the State of Illinois. There were no ARCAs identified for DeWitt, Macon, Mclean or Piatt Counties.

The ARCA for the State of Illinois was identified under Criterion 1.c. 1 - Key personnel with functional roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible, whereby the State of Illinois ResPonse Center Manager, knowing that the Nuclear Accident Reporting System phones were not operational, did not determine an expedited method of informing DeWitt County of the changes in Emergency Classification Levels or issuance of any Protective Action Recommendations.

There was one ARCA from a previous exercise for the State of Illinois. Prior ARCA 09-11-2b2-A-01 - The SIRC Manager did not reconsider restricting air traffic after a change in radiological conditions, allowing aircraft to fly through the plume. During the November 2, 2011 CPS Exercise, the SIRC Manager directed a request to the Federal Aviation Agency (FAA) to restrict air space in the affected area surrounding CPS. This ARCA was successfully demonstrated, by the State of Illinois, during this exercise.

www.fema.gov

There was one ARCA from the previous Clinton Power Station exercise for DeWitt County. Prior ARCA 13-09-1 c l-A The Emergency Services and Disaster Coordinator left the Emergency Operations Center without delegating someone to provide direction and control. A State NARS message arrived stating a wind direction change had occurred and the State did not recommend Sub-area 2 be evacuated. No discussion concerning the wind direction change was identified or addressed as a concern. During the November 2, 2011 CPS Exercise, the evaluator observed mutual collaboration and support between DeWitt County's senior leaders allowing the command staff to maintain overall situational awareness and effectively manage the efforts of the DeWitt County EOC staff coordinating emergency response operations with the State and supporting counties. This ARCA was successfully demonstrated by the DeWitt County, during this exercise.

There was one Plan Issue identified during this exercise for DeWitt County. There were no Plan Issues identified for the State of Illinois, Macon, Mclean or Piatt Counties.

The Plan Issue for DeWitt County was identified under Criterion L.a. 1 - OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. The Plan Issue was identified in DeWitt County Plan Annex 2G, Notification Lists, whereby the primary and alternate point of contact for Macon County are reversed.

There was one Plan Issue from a previous exercise for the State of Illinois, which remains unresolved under Criterion 5.b. 1 - Information contained within the Illinois Plan for Radiological Accidents (IPRA) Volume I, Concept of Operations, and Radiological Task Force (RTF) Procedure RTF-POS-2 are not consistent in regards to the KI information that is provided to the public.

Based on the results of the November 2, 2011, exercise, the offsite radiological emergency response plans and preparedness for the State of Illinois and affected local jurisdictions site-specific to the Clinton Power Station can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site.

Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological emergency response plans and preparedness for the State of Illinois site-specific to the Clinton Power Station, granted on January 12, 1987, remains in effect.

Copies of this Report were transmitted to the DHS/FEMA National Office, Nuclear Regulatory Commission (NRC) Region III, and the State of Illinois.

If you have any questions, please contact William E. King, Chairman, Regional Assistance Committee, DHS/FEMA, Region V, at (312) 408-5575.

Sincerely, Andrew Velasquez III Regional Administrator Enclosure (1)

I

Clinton Power Station After Action Report/

Improvement Plan Exercise Date - November 02, 2011 Radiological Emergency Preparedness (REP) Program

  • IFEMA Published February 01, 2012

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Clinton Power Station After Action Report/Improvement Plan Published February 01, 2012 Contents Executive Summary 5

Section 1: Exercise Overview 10 1.1 Exercise Details 10 1.2 Exercise Plaining Team Leadership 10 1.3 Participating Organizations 12 Section 2: Exercise Design.Summary 15 2.1 Exercise Purpose-and Design 15 2.2 Exercise'Objectives, Capabilities and Activities 15 2.3 Scenario Summary 16 Section 3: Analysis of Capabilities 17 3.1 Exercise Evaluation and Results 17 3.2 Summary Results of Exercise Evaluation 18 3.3 Criteria Evaluation Summaries' 24 3.3.1 Illinois Jurisdictions 24

/

3.3.1.1 State of illinois Initial Warning.Point 24 3.3.1.2 State of Illinois - State of.Illinois Response Center 24 3.3.1.3 State of Illinois - Public Inquiry Phone Bank 27 3.3.1.4 State of Illinois - Radiological Emergency

.28 Assessment Center 3.3.1.5 State of Illinois Unified Area Command 28 3.3.1.6 State of Illinois - Emergency Operations Facility 29 3.3.1.7 State of Illinois - Joint Information Center 29 3.3.1.8 State of Illinois - Radiological Assessment Field 30 Team 3.3.1.9 State of Illinois-Joint Information Center/Media 30 Briefing Center 3.3.1.10 State of Illinois - Mobile Laboratory 31 1 1

..Und~issifled.

Radiological *erýgency Prepareess Program (REP)

"After ActionReport/lmprovement Plan 1,',-',.

linton Power Station 3.3.1.11 State of Illinois Field Moinitoing Team -1 32 3.3.1.12 Stateof Illinois - Field Monitofing.,Team - 2' 32 3.3.1.13 iState of.Illinois.- Dewitt County Emergency 33 Operations Center - Illinois State Radiological Advisor

.3.3.1.14 State: of Illinois -DewittCounty Emergency 33

. perationsCenter - Illinois State-Liaisoni 3.3.1.15 State of Illinois - Macon County Emergency I3 Operations Center - Illinois StateLiaison 3.3. 1.16 State of Illinois - McLean County. Emergency:

34

  • Qiefations Center-'Illinois State :Laisn>,

3.3.1.17 State of-Illinoi"_9Piatt County Emergency 34 Operations. cent*rf--Illiniti State Liison "s

3.3'.11.18 S-tate'of Illinois -,Illinois Stat-ePolike District' 10:

34 Headquarters 'Doisimetr CnrlOfficer Briefing i

-1 3:3.1.19. State of Illinois - I 6is -State Pol1iceDistricto

'10 35 U

'Headquarte~

raffic and Acce*ss Con trol Post 3.3.1.20 State ofIllinois-' St. Mary's Hospital, Medical

'-. 35

,'ervice -

ransportation

'I St. -Mary's Hosit-

.:i '

3:

'.1,

ýS at,.

?..:Joi

'L

'xr". ""}"Il iio s

ft

,,U p i

qr' it } :

.,or.

A on 3 6-lServi c

Me 36 Evaue/

egency Worker

? .:*:*i

(_ :*,: }."3.

3 0

1,

3 222 State[ of Iliniiios 1l*.iihfois'st-at* U~ii tiv sity/HoIeton -,
,".,.-

. 36 ":.5..-...

31.231 2State,ofIllinois*

lino*is stateUniverityHorton.

37 H

5* 'Field HouiSe Eva}g eer Emergenyok Workert1if~!id"

.3.3.12'tjflmis llniSte UnverSity/Hi. n3 Decontamination oSf Equipme~nt :

--i£::, ".

I Field HouseEvacueeRegistration 3.3.1.26 Stateolf Illinois-38 n

" FieldHouse'-CongregaiteCii~'.

Cefkte' r 3.3.2 R~~iskJu!~r'isi tiosb' 39 I

3.3.2.1

.D 9 itt.Cbo' t -i itia'lWaringit Pint":-

39 3..32.2 Dewitt County -IEmergency Operations Center 40 3.3.2.3 Dewitt County - Emergency. Operations Center -4 Traffic and Access Control Post

.2 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station 3.3.2.4 Dewitt County - Clinton Police Department - Traffic 42 and Access Control Post 3.3.2.5 Dewitt County - Clinton Police Department - Traffic 43 and Access Control Post - Dosimetry Briefing 3.3.2.6 Dewitt County - EAS WJBC (1230), WBNQ 43 (101.5), WBWN (104.1) 3.3.2.7 Dewitt County - Clinton School District 15 -

44 Evacuation School 3.3.2.8 Macon County - Initial Warning Point 44 3.3.2.9 Macon County - Emergency Operations Center.

45 3.3.2.10 Macon County' Emergency Operations Center -

45 Traffic and Access Control Post 3.3.2.11 McLean County - Initial Warning Point 46 3.3.2. 12 McLean County - Emergency Operations Center 46 3.3.2.13 McLean County - Emergency Operations Center -

47 Traffic and Access Control Post 3.3.2.14 Piatt County - Initial Warning Point 48 3.3.2.15 Piatt County - Emergency Operations Center 48 3.3.2.16 Piatt County - Emergency Operations Center -

49 Traffic and Access Control Post Section 4: Conclusion 50 Appendix A: Improvement Plan 52 Appendix B: Exercise Timeline 53 Appendix C: Exercise Evaluators and Team Leaders 56 Appendix D: Exercise Plan 59 Appendix E: Scenario Details

,85 3

-Unclassified Radiological Emergency Preparednress Program (REP)

After Action Report/Improvement Plan Clinton Power Station

'A

-?

This page is intentionallyblank 7'4 4

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station EXECUTIVE

SUMMARY

On November 2, 2011, a Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise was evaluated by the U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA) for the 10-mile Emergency Planning Zone (EPZ) around the Clinton Power Station (CPS). The purpose of the exercise was to assess the capabilities of the State and local preparedness in responding to a radiological emergency.

This exercise was held in accordance with DHS/FEMA's policies and guidance concerning the exercise of State and local Radiological Emergency Response Plans (RERPs) and procedures.

The most recent exercise at this site was conducted on November 18, 2009. The qualifying emergency preparedness exercise was conducted on January 13, 1987.

DHS/FEMA wishes to acknowledge the efforts of the many individuals who participated in this exercise. In the State of Illinois, the risk county of DeWitt and the support counties of Macon, McLean and Piatt participated along with State Government.

Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this responsibility by volunteering to provide vital emergency services to their communities.

Cooperation and teamwork on the part of all the participants were evident during this exercise.

This Final After Action Report (AAR)/Improvement Plan (IP) contains the evaluation of the biennial exercise and the evaluation of the following out-of-sequence interviews and activities;

" Illinois State Police (ISP) District 10 Headquarters Dosimetry Control Officers (DCO) Briefing;

" ISP Traffic and Access Control Post (TACP) at the ISP District 10 Headquarters;

  • Medical Services Transportation and Hospital (MS-i) evaluation at St Mary's Hospital;
  • Protective Actions for Schools (EV-2) for the Clinton School District 15;
  • Monitoring and Decontamination of evacuees and emergency workers;

" Monitoring and Decontamination of emergency worker's equipment;

" Public Registration and Congregate Care;

" Clinton Police Department DCO Briefing;

" Clinton Police Department TACP.

5

Unclassified Radiological Emergency Prep'airedness Program (REP)

After Action ReporL/improvement Plan Clinton Power Station Except where noted in this'repori, the State rand local oxganizaiions dermonstrated knowledge of and adequately implemented their emergency response plans and procedures.

INTRODUCTION - EXERCISE BASIS On Deceberib7, 1979, the Prsiddeht directed FEMA to assume the leadresponsibility for all offsite nuclear m

planng and response. the-DHs/EMA's actities are cnfictcd p ursuiFit EtoA Title.44 of the Code of Fedefal :Regulafins'(CfFR) Parts 350 "Rev6ieik 'and' Approva' o*' S""state and Local Radiolog cal E rgehy* y P d. and Prepa.redness3/4 -,35 a1 mloe n

I ilni F~mr*,nc Plns Preare-iess, "Raidog" a Ernr"e Planning and Preparedness" and 352 "Commercial NuclearT Power Plants: Emergency Preparedness Pleig

.gu on are, au I~

Planning (Comnmionly referred to as 44 CFR 350 thiough 352). Thes' r' lati.n'` ae a key element in the REP Program that wass established following theThreeMile Island.Nudlear Station accident in March,1979.

FEMARegulation'44,,,

,R,,v

'350 establishes the policies and.procediuies for DiS/FEiA'§ iitial and continued approvglrnof State. and lc g

-e m-ergency planning and preparedness Tor commercial nuclear power plants. This approval is cOntingent;,in part, on State and local governments' participation n jpint exetcises uith licensees' -

DHS/FEMA s responsibilities in radiloogical emergency -planning for fixed nuclear facilities

-include "the 1 folwng 0.,

  • angth ladmofs~e~megec-planin'g'and rathe-`reiwewand evaluat'n of RERPs and proce ures developed by state and local governments,'

D.Determining whether such plans and procedures can be.mplemented.

"the basis ofobservatin and evaluation of exercises of the plans and pr6cedures conductedby State and local 2

II governments;,

II he Uce ri(gulat mis

£(NfC) piirsuanto Responding to requests by the U.S.Nuclear Regulatory.'Comission to the Memorandum of Understanding bieteen the NRC and FEMA dated Jtihe 17,- 1993, (Federal Register, Vol. 58, No. 176, September 14, 1993); and

  • Coordinating the activities of Federal agencies with responsibilities in the radiological 3

6 3

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station emergency planning process:

- U.S. Department of Agriculture;

- U.S. Department of Commerce;

- U.S. Department of Energy;

- U.S. Department of Health and Human Services;

- U.S. Department of the Interior;

- U.S. Department of Transportation;*

- U.S. Environmental Protection Agency;

- U.S. Food and Drug Administration; and

- U.S. Nuclear Regulatory Commission.

Representatives of these agencies serve on the DHS/FEMA Region V Regional Assistance Committee (RAC), which is chaired by DHS/FEMA.

Formal submission of the RERPs for the CPS to FEMA Region V by the State of Illinois and involved local jurisdictions occurred on March 31, 1981. Formal approval, of these RERPs was granted by FEMA on June.4, 1982; under 44 CFR 350.

A REP Full Participation Plume Exposure Pathway Exercise was conducted on November 2, 2011, and evaluated by DHS/FEMA to assess the capabilities of State and local offsite emergency preparedness Organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the CPS. The purpose.of this AAR/IP is to present the exercise results and findings based on the performance of the Offsite Response Organizations (OROs) during a simulated radiological emergency.

The findings presented in this AAR/IP are based on the evaluations of the Federal evaluation team, with final determinations madeby the DHS/FEMA Region V RAC Chairperson, and approved by the DHS/FEMA Headquarters.

The criteria utilized in the FEMA evaluation process are contained in:,

  • NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980; 7,

Unclassified Radiological Emergency Preparedness Program (RE.P)

After Action Report/Improvement Plan ClintonPower Station FEMA-REP-14, "Radiological Emergency Preparedness Exercise Manual," September 1991; and

  • FEMA "Radiological Emergency Preparedness: Exercise Evaluation Methodology; Notice" as

.published in the Federal Register Notice, Vol: 67, No.-80, dated-April 25,ý2002..

Section. 1 of this report, entitled "Exercise Overview," presents information pertaining to the team that planned a nd coordinated the exercise. This section also provides a.listing of all participating jurisdictions and functional entities that were evaluated.,

Section 2 of this report, entitled "Exercise Design Summary," contains the-purpose and'design of the exercise and presents basic information and data rele'ant to the exercise scenario.

Section'3 of this report, entitled "Analysis of Capabilities,". presents detailed information on the

  • demonstration of 'ppiicabie exercise ýcriteria at eaach iusdiction or functional, entity evaluated in 3

a jurisdiction4based; issiies-onIlyformrt. -This section also contains:,(1)idescriptions ofal ai Deficiencies, Areas Requiring Corrective Acti6fi,(-ACAs)ý and Plan Issu.es if any; assessed, during this exercise, recommended corrective actions, an*t the State and local governments' I

.schedule of correctiv.e a tions, if applicabIe, for each idefntifiedexe*rcise issue; and (Q).

edscriptions ofuresolvedARCAss' sssd during previo*,s xercises an.d the status. of th&..

OROs'.ffbrts to.resolve'them..

Section 4 of this report, entitled ".Conclusion," presents. the DHS/FEMA summary of overall exercise conduct and results as evaluated, against the'requirements of 4,4.CFR 350..

EMERGENCY PLANNING ZONE (EPZ). DESCRIPTION,:,

The CPS is located approximately seven miles northeast of the City of Clinton in Harp Township, within DeWitt County, Illinois. DeWitt County is located near the geographical-center of the State of Illinois. The topography of the area is predominantly rolling prairies.

The I 0-mile EPZ.contains a total population of 12,702 (20.10 census) within the risk county of DeWitt, and the support counties of Macon, McLean and Piatt. Nearly two-thirds of the total 10-8

Unclassified Radiological E'mergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station mile EPZ population (8,576) resides in the communities of Clinton, Weldon, Wapella and DeWitt. The land use within the 10-mile EPZ is predominantly agricultural, with cash grain crops of corn and soybeans. The closest industries are located in the community of Clinton.

Recreational, facilities outside the municipalities include the Clinton Lake State Recreation Area and the Weldon Springs State Park. The park encompasses approximately 370 acres and contains a 28-acre lake with camping, fishing, and picnicking facilities. Weldon Springs is one of the two sizeable lakes within 10 miles of the site. Clinton Lake is a 4,895 acre man-made, cooling lake within the CPS property lines. Recreational facilities accommodate camping, boating, hunting, fishing and hiking.

The nearest major highways are State Highways 54,. 10, and 48, all of which intersect the plant location. Other major thoroughfares are U.S. Highway 51, located about six miles west of the plant and Interstate Highway 74, located about 11 miles northeast of the plant. The nearest railroad is the Illinois Central Gulf Railroad (ICG), which crosses the site east to west and comes Within about three-fourths of a mile to the north of the reactor centerline. Another ICG track is located approximately three and a half miles south of the CPS.

9

-J

Unclassified

  • Radiological Emergency. Preparedness Program.(REP)

After Action Report/Improvement Plan

-Clinton Power Station

!I SECTION 1:' EXERCISE OVERVIEW, 1.1 Exercise Details.

Exercise.Name

&Qlinton Power Station

-,,. * ~~~~~~~~~~~~.*.

i.....-...'i;.'".;..

'. Type of.Exercise Plume Exercise Date November 02, 2011 1

Program e mnt ofHome'land Securit /FEMA Radiological Emergen&y Preparedess 3

Programn-Seen ario.Type Radiological Emergency 1.2 Exercise Planning Team Leadership William King ExefcisetRAC Chairperson DHS/FEMA Radiological Assistance Committee, Chairman 536 South Clark Street Chicago, Illinois, 60605 312-408-:5575 Wiiliam.King@dhs.gov Dwaine Warren Exercise Director DHS/FEMA Supervisory REP Team Leader 3

536 South Clark Street 1*0 I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Chicago, Illinois, 60605 312-408-5342 Dwaine.Warren@dhs.gov Gary Naskrent Alternate Exercise Director DHS/FEMA Supervisory REP Team Leader 536 South Clark Street Chicago, Illinois, 60605 312-408-5214 Gary.Naskrent@dhs.gov Todd Gemskie Clinton Site Specialist/Exercise Coordination DHS/FEMA Technical Hazards Program Specialist 536 South Clark Street Chicago, Illinois, 60605 312-408-4443 Todd.Gemskie@dhs.gov William Conway State Lead Controller Illinois Emergency Management Agency Manager,. REP Section 1035 Outer Park Drive (1st floor)

Springfield, Illinois, 62704 217-785-9886 William.Conway@Illinois.gov Jerry DeYoung Lead Offsite Controller 11

I R.

  • Unclassified Radiological Emergency Preparedriess Program (REP)

_,After.Action Report/Improvement Plan Clinton Power Station Exelon Offsite Programs 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4666 gerald.deyoung@exeloncorp.com Mike Muth Lead Offsite Planner Exelon Offsite Programs 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4674 mike.muth@exeloncorp.com Randy Mika Lead Exercise Scenario Developer Exelon Corporate Drill and Exercise Coordinatc 4300 Winfield Road Warrenville, Illinois, 60555 630-657-4662 randy.mike@exeloncorp.com r

I I

I I

I i

I I

I I

13 Participating Organizations,

Agencies and organizations of the following jurisdictions participated in the Clinton Power Station exercise:

State Jurisdictions Mutual Aid Box Alarm System (MABAS) 7 Illinois State Police Illinois National Guard 12

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Illinois Environmental Protection Agency Illinois Emergency Management Agency Illinois Department onAging Illinois Department of Transportation Illinois Department of Public Health Illinois Department.of Natural Resources, Illinois Department of Agriculture Illinois Central Management System Exelon Nuclear Risk Jurisdictions American Red Cross ARES/RACES Volunteer Chief of Police City of Decatur Mayor Clinton Police Department Decatur Fire Department Decatur Medical Hospital DeWitt - Piatt Bi-County Health Department DeWitt County Coroner DeWitt County Sheriffs Office Central Communications (CEN COM)

Exelon Nuclear IEMA State Liaison Regent Communications - Bloomington [WBNQ (101.5), WBWN (104.1), WJBC (1230)]

St. Mary's Hospital Wapella Mayor Weldon Mayor Support Jurisdictions Illinois Emergency Management Agency Liaisons Macon County Board Chairperson Macon County Highway Macon County Mental Health Macon County Public Health Macon County Sherriffs Office 13

I R

Unclassified.

  • RadioJogical EmergencyPreparednres Program. (REP)

. After Action Report/Improvement Plan

  • Clinton Power Station

.Macon County Sherriffs Telecommunrications Specialist.

McLean County Administrator-Mclean County Emergency Management Agency McLean County Health Department McLean County METCOM McLean County Sheriffs Office.:

Piatt County Commissioner `

.. /

Piatt County Emergency Management Agency Coordinator.

Piatt County EOC Administrative Staff Piatt County Highway Engineer Piatt County Public nformation Officer Piatt County Sheriff-Piatt County. Sheriffs Deputy/Security and TACP I

I I

I I

1 I

I I

I I

I 1

I 14

Unclassified,

Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station SECTION 2: EXERCISE DESIGN

SUMMARY

2.1 Exercise Purpose and Design.

The DHS/FEMA Region V Office evaluated the CPS REP Full Participation Plume Exposure Pathway Exercise conducted on November 2, 201 1, to assess the capabilities of local emergency preparedness organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the CPS. The purpose of this report is to present the results and findings on the performance of the OROs during a simulated radiological emergency.

2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be demonstrated are discussed in Appendix E "Exercise Plan."

The Exercise Planning Team (EPT) selected objectives that focus on evaluating emergency response procedures, identifying areas for improvement, and fostering collaboration between the various OROs and stakeholders. This exercise focused on the following objectives:

  • ORO demonstration of effective Emergency Operations Management;
  • ORO demonstration of effective Protective Action Decision Making;
  • ORO demonstration of effective Protective Action Implementation;

" ORO demonstration of effective Field Measurement and Analysis;

  • ORO demonstration of effective Emergency Notification and Public Information;

" ORO demonstration of effective Support Operations and Facilities.

15

""Unclassified Aftr

" "Radiological Emergenicy Preparedness Program (REP) l o

S After ActiorRePOrt/hmprovement Plan,

,Clinton Power Station 2.3-Scenario Summary Appendix F "Scenario Details," contains a summafof th& Exe-rcise.Scenarib, aSi, inlated",

sequence of events that was used as the basis for invoking emergency response actions by OROs I

during the CPS REP Full Participation Piuimie Exposuri Pathway 6ixefciseon Noovember 2'.2011.

Resulsi of a technical review of the scenario; submitted bythe State of Illinois 1and Exenlon' W tNuclear" on September 1, 201 1, indicated that the'scenifri wasadequate tosupp*6rt demonstration of DHS/FEMA requrementsas well ascriteria selected by the OROs prvided in3 the State's September 17, 2011, extent-of-play submission. The DHS/FEMA Region 'V accepted this:exercise scenario on September 29, 2011..

w<

.During the exercise, in addition to information and data provided throuagh the CPS onsite scenai contllersfrom eState of Ihnos prdedinject messages" containing scenario 1

events and/or relevant data to those persons or locations fho w!ould fiormiall-yreceive notification of such events. These inject messages were the method used for invoking-additional specific-response actio0ns byOROs,.-

I

?

"I I

,I v..

I

_163 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Exercise Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the November 2, 2011, REP Full Participation Plume Exposure Pathway Exercise conducted to test the offsite emergency response capabilities of State and local governments in the 10-mile EPZ surrounding the CPS.

Each jurisdiction and functional entity was evaluated based on its demonstration of exercise criteria delineated in Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002. Detailed information on the exercise criteria and the extent-of-play agreements used in this exercise are found in Appendix E "Exercise Plan" of this report.

Presented below are definitions of the terms used in this report relative to the criteria demonstration status:

  • M - Met: The status of a REP exercise Evaluation Area Criterion indicating that the participating ORO demonstrated all demonstration criteria for the Evaluation Area Criterion to the level required in the extent-of-play agreement with no Deficiencies, ARCAs or Plan Issues assessed in the current exercise and no unresolved prior ARCAs.
  • D - Deficiency: An observed or identified inadequacy of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant.
  • A - Area Requiring Corrective Action - An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety. Listing of the demonstrated exercise criteria under which one or more ARCAs was/were assessed during the current exercise or ARCAs assessed during prior exercises remain unresolved. Included is a description of any ARCAs assessed during this exercise and the recommended corrective action to be demonstrated before or during the next-biennial exercise.

- P - Plan Issue - An observed or identified inadequacy in the ORO's emergency plan or

.17

Unclassified Radiological Emergency Prepar~dness Progriam (REP)

After Action. Report/improvement Plan I

..,,,-.Clinton Power Station implementing procedures, rather than in the ORO's performance.

  • N -Not Demonstrated - Exercise criteria thai were dt demonsatedas s.hediuld d4uing this exercise and the reason(s) they were not demonstrated.
  • Prior ARCAs - Resolved - Descriptionsbof ARCAs assessed during previohs exerciseslthatwere resolved and the corrective actions demonstiated,: in'this exercise. - '

J

.t-

=

  • Prior ARCAS - Unresolved - Descriptions of ARCAs assessed during prior exercises that Were not resolved in this exercise. Included is the reason the ARCA remains unresolved and:.

recommended corrective Actions to be demonstrated.before'or during the next exercise..'-

3.2 Summary Results of Exercise'Evaluati'on......

The matrix presented in.Table" 3.1,,on the following pages,:presents the 'status of all exercise.

criteria'from Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002, which were'.,::

scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Th6 criferion status box is bla"ikif itwas hot schedul&&f6r derionst-.tio.I-this subsection pirvides information o9n the evaluatiornif each'participating ju'r*i'sic*ation.

f..":ctioiia entity in a; The D EMAhasdeveloped,a stafidardized isystem for ifumbening' exercise issues. This system'As~used to achieve consistency in numbeing exercise issu'es 'among DHS/FEMAkRegins aisie;=sp'e'ific'!exercise reports wihne'. 'Regjii!n>J,,,t-al

~so

'ýu"s~ed t'o exfeditd trac~king of

e x e r c i s e i s s u e s o n a n a t i o n w i d1ba s i "

r, The identifying number of Deficiencies, ARCAs, and Plan Issues includes the following elements, withfeach element separated by. a hyphen ()

j

  • Plant Site Identifier A two-digit number, corresponding t6 the Utility Billable Plant Site Code (13 for Clinton,Pow er:Station).: -,
  • Exercise Year - The -last two digits of the year the exercise was conducted.

II I

I I

I I

I I

I I

I I

I I

,18 I

i

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion Number - An alpha and two-digit number corresponding to the criteria numbers in the six Exercise Evaluation Areas described in Federal Register Notice, Vol. 67, No. 80, dated April 25, 2002, which amends FEMA-REP 14, Radiological Emergency Preparedness Exercise Manual.

" Issue Classification Identifier - (D = Deficiency, A ARCA, P = PlantIssue).

" Exercise Identification Number - A separate two or three-digit indexing number assigned to each issue identified in.the exercise.-

19

U Unclassified Radiologica! Emergency Preparedniess-Program (REP)

- Clinton Power Station I After Action Report/Improvement Plan

.Table3.1 - Surmary of Exercise Evaluation,(4 pages),.

~DATE:2O11-Ii1 0-2

,'Z,-

SITE: Clinton Power Station, IL.

M. Met, A: ARCA, D: Deficiency, -P: Plan Issue, N: Not.

Demonstrated Mobilizatio.n

-al M M M M' M MIM M dm M 2 Facilities l

Direction and Control.

cl A

M M M M M Communications Equipment M....

ld M M' t

M M M M M M EquT p &'Supplies to support operations "leI M M M M M M K M ProtectiveAction Decisicii Makiniig EmergencyWorker Exposure Control 2al M.

M Radiological Assessment and PARs 2bl M

M Decisi6hs for the Plume Phase - PADs 2b2 M

M, M PADs'for protection of special populations 2c0 M

M Rad Assessment and Decision making for Ingestion Pathway -

2dI Rad Assess/Decision making concerning Relocation, Reentry,.and Return

.2el Iinplementation.of emergency worker exposure control, 3al I

I M MI M Impfementation of KI decisin io.

3bl M

M Implementation of protective actions for special populhtions -EOCs 3cl Implementation of protective actions for Sch'ools 3c2 Implementation of traffic and'access control 3d]

M Inipediments io evacuation are idenftifijl and iesolved -'.

3d2 M

Implementaion 6fofingestion t6athwy9decisiohs - availahlitiuse of info

. 3el Materiaisfor'Ingestion PathwaViPADs :are available&.2:

". 3e2.

Irmpleýientati6n of relo a riin:-entiy, and returmndecisionis, 3fl' Adeqluate Equipmentfor Plume Phase Field Measurements 4al M

Field Tearns bbtatin sufficient info -mation.

4a2 M

Field Teais Mafiage Sample Collection"Approprnitel 4a3 M.

Post plume.phase-field measurements ahd samripling 4b1l Laboratory operations

.4c1 M

Aciivation of the prompt alert ahd notification system Sal M

Activation of the prompt alert and notification systemn-Fast Breaker 5a2 Activation of the prompt alert and'notification system - Exception areas 5a3 Emergency information and instructions for-the public and the media b

51 M M M' M M

M Mon/Decon of evacuees and EWs and registration of evacuees 6al.

Mon/Decon of EW worker equipment 6b F Temporary care of evacuees 6cl Transportation and treatment of contaminated injured individuals 6d1 I

I I

I I

I I

I I

I I

I U

I I

20 1

I I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 2/4)

-0 DATE: 2011-11-02 SITE: Clinton Power Station,IL LY M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not U

Demonstrated U U U U 4

ri Fý 4

l

'Emergency Oputions Managqement 7 Mobilization lal M

Facilities Ibi Direction and Control lc

.... M M M M Communieations Equipment Idl M I

M_

M M M Equip& Supplies to support operations lel M

_M M M M M Trote~ctve Action Decis ionMak in g Emergency Worker Exposure Control 2al M

Radiological Assessment and P ARs 2bl Decisions for the Plume Phase - PADs 2b2 M I PADs for protection of special populations 2cl M I Rad Assessment and Decision making for Ingestion Pathway 2d1 Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action implementation:2.,

Implementation of emergency worker exposure control 3a]

M M M M M

Implementation of KI decision 3b]

M M M Implementation of protective actions for'special populations - EOCs 3cd Implementation of protective actions for Schools 3c2 Implementation of traffic and access control, 3d M

Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3el.

Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions 3fl Adequate Equipment for Plume Phase Field Measurements 4al M

Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 M

Post plume phase field measurements and sampling 4b]

Laboratory operations a 4cl Activation of the prompt alert and notification system 5al M M Activation of the pr6mpt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas-5a3.

Emergency information and instructions for the public and the media 5b]

M M

'Support 0 &rations/Ficilities

~v~.i Mon/Decon of evacuees and EWs and registration of evacuees 6a 1 M

Mon/Decon of EW worker equipment 6bl Temporary care of evacuees 6c 1 Transportation and treatment of contaminated injured individuals 6dl M M 21

After Action Reportlmprovemnent Plan

/;

j*unea~ssfied

'Radiological Emergency;PrepDaredheis'Program tREP)

C inton P6wer Station I

I 7,

-..:-.-Tabe-3.1 Summaryof

-Eer cio

"(

u age304)

>'UU

0DATE 211-11-02.
,SITE.Clinton Power Station, IL.

M'Me tAARCA[ )Deficiency,:P: Plan Issue, N bfNot.-

'<7,

  • Demo-"

"strafed" Emergency Opp-ratioris Management.'

Mob'ilization a

_P Facilities b

Direction and Cotrol l

1 M

M mCmunications Equipment"-.<-

Idi:

V MM MMMMM MM Eguip'& Supplies~td'suiplprt 0peratiO~nsK'::-:

.+">*<

lel. M M "M

M

  • M: M:
  • M :

M Priocive CAu~ied)iiaMakini".1

.F.'*.

Ernergency.WorkerExposure Control a

Radi01ogical.Assessment and PARs 2b" Decisions fof thePlurme Phase,.PADs 2b2 M

PADs foirprtectin of specil populations-.

2c1 M.

RadAssessnment ani Decsion maktng for Ingestion Pathway 2d1 Rad Assess/Dec4isniomaking concemingRelocation.Reentry andReturn c

1 Protectivc tiin 1p1erie~iitition 7

77.

o worker expoiure control 3

M M1 7M M

CInimplem entation of. 1decisMon`-6:.

-3bý

.MM MM Implemeitatlon "of protective acthons' for Speial popiulations -,EOCs 1mplemenam v& drt ctiveat ns! fo~r Sctio6ols -

. 3'c5

-(: M

, '2' Inmplementatin of traffic and-access control 1

3d*

mm' M

M

.M Impediments to evacuatinare identified and resolved

  • 3d2 M

Imilementaion of1 igestion pathwaydecisions ava labilty/use of info,.

  • 3" Matenials~forIng'estion Pathway PADs are available".... <=:-: :

a:r-"-

3e2: *;;

i*:**

,Implementatimnof relocaton¢ re entry,-and-return decisins.

3fl]*

M/-

    • i-,:::*,*;:*,-<***"*:c:v" AdeFuite Equpment for Plume Phase*Fild Measurements

-and<:

A,4a"

-'i '>"<:,'

Field T~cafsibbfa~in-nifficient n foimtioin-44,a2 Fild-Teams-Maag6 Sample; a

ollection-Appiropriately 4ý3 Post plumephase feiedmnesurements and samphng...

4bl Laborator o'eatiots>':.'.

c E~ergn~y.Nifiniion and Puiblic Into "~.7

~

~

7 "1'n~<

Activation of thý`prorp falert anid'notification system 51MM Aciainof the piornpt'aliti and notifidatio~n -syst'~ ~as rakr 5a2

.Activation -of the' pronipt al'ert-and notifcation syst~Eeto are'as -

5a3 Emef~ge iy ihforinatioii and instructions for the pubic n-tenei 5b1 M

Support Operatjions FaLc'iitics

i.

7 77 MonlDecon of eVacuees and EWs and registration of evacuees 6a1 l Mon/Decon of EW worker cquipment

,6b]

Temb~ority care of ev acuee

'6c1 Transpqrtation and -treatment of contaminated injured individul 16d'

-'[-

/I I

I I

m I

I I

I 22.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 4/4)

DATE: 2011-11-02 SITE: Clinton Power Station, IL M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not t.

Demonstrated Em ergecy Oerain~npnet Mobilization lal M M M M M M Facilities IbI Direction and Control ici C 1

_M M

M Communications Equipment Idl M M M M M M M M M M Equip & Supplies to support operations lel M

M M M M M M Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2b-

_2bl Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2cl Rad Assessment and Decision making for Ingestion Pathway 2d]

Rad Assess/Decision making concerning Relocation, Reentry. and Return 2el -

Implementation of emergency worker exposure control 3al M

M M M M M M Implementation of KI decision 3bl M

MM M

M MM Implementation of protective actions for special populations - EOCs 3cl Implementation of protective actions for Schools 3c2 M

Implementation of traffic and access control 3d1 I

M M M M M M Impediments to evacuation are identified and resolved 3d2

  • M
M M

Implementation of ingestion-pathway decisions - availability/use of info 3e 1

  • I; Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation. re-entry; and return decisions 3fl Field Measurement ad Aralsi A'9jK'2 Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl Laboratory operations 4c 1

'Emergenc Notificationi andiubiit~lnfo <9X

<.~">

Activation of the prompt alert and notification system 5a]

Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system -Exception areas 5a3 Emergency information and instructions for the public and the media 5bl SýIpport-0pcra~ii't/aiiisý

.. 7.

925

<7;<

2.

Mon/Decon of evacuees andEWs and-registration of evacuees 6al Mon/Decon of EW worker equipment 6bf Temporary care-of evacuees 6cl Transportation and treatment of contaminated injured individuais

-6dl 23

Unclassified

-I Radiological Emergency Prepadriness Program.(REP)

After Action Report/improvement Plan Clinton Power Station

.3.3 Criteria Evaluatin Sum iaries. L 3.3.1 Illinois Jurisdictions' LlState of Ilhlnois, n

Intial Warning Point The Illinois Emergency Managemenft Agency (IEMA) Co unications Center l ocated within U

the State-Emergency Operations Center-(SEOC) in Springfield,: Illinois, demonstrated the -Target QCpability of emergency-O1eratin Ceter an t The CommunickitionsC tetdr efeci e

m pe'aton moilz

'n u.-

.e tlve procedures to alert, notify, and mobihze emergency personnel and activate faclities 'in a*timely manner.' Dispatcheis were.familiar with their ntuclieai inci t notificati6 n

.proce ur-e -.

-There are redundanit communication systems available at the, Communications Center, ahd b6thi

-prinmaryand *badk-up systems were used effectively during* this exercise. There was a system failue ini the Nuclear Accideht ien rting lSystem (NARS) telephone line Whilchcaused ttheluse I

d i the co.ninercial teleshone line§ to notify theRisk County~fDeWit,.

In sumrtenau fTH/E\\4ciei for, thi loaion is as follows!-I aMT:, L~a.l, A.d";',

b ARES REUIRIG CORRECTIVE ACTIONNn.

c:DEFICIENCY:' None',

-d. ýPLAN'ISSUES: None-

b..NOT DEMONSTRATED: None-.*%:

' f. :PO ISSUES -' RESOVED: None' g

PRIOR ISSUES -. UNRESOLVED: None 3.3.1.22State of Illinoisi-Staie o6f-lllnoisResponse-Cennter I

The State of Illinois demonstrated the Target.Capability 6f Emergency Operations Center -

Mainagment by activities including the use of effectiv&efoceduet alerto notify and mobilize etnerg ency personnel and'activate'facilities'in a timely* manner, -The State, of Illinois Response Center (SIRC) provided sufficient multi-agency c odiiin}ti6&nfoiran.incidentathth CPSb Ii-I promptly -activating and operatiný foi:the' diration of the iincident. The SIRC was maa efficiently and effectively completed a full activation, notification and staffed to an operational level. The SIRC Manager provided management, dirdctionaffd control using briefings. This allowed the staff of the SIRC to maintain a common operating picture and overall response to the.

event. The SIRC Manager coordinated with other jurisdictions including the State to make 24 I

Unclassified Radiological Emergency Preparedness Program (REP)

  • After Action Report/Improvement Plan Clinton Power Station decisions and ensure that appropriate actions were taken to protect the health and safety of the public..

An area of concern was that when the NARS telephone line had continued difficulties which started at the notification of an Alert Emergency Classification Level (ECL) in connecting with the primary Risk County of DeWitt, when the ECL of a General Emergency (GE) was communicated to the State, the delay and coordinated decision for more efficient method of rapid communication was not thoroughly discussed between the Communications Center Manager and the SIRC Manager.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: l4a.1, L.d.l, L.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.l. 5.a.l, 5.b..
b. AREAS REQUIRING CORRECTIVE ACTION: 1.c.1..

ISSUE NO.: 13-11-1cl-A-0l CRITERION: Key personnel with functional roles for the ORO provide direction'and control to that part of the overall response effort for which they are responsible.

CONDITION: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification~of an=ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used. to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective-Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.257795e-4 months <br />, and it wasý known that DeWitt County EOC was not on the call. DeWitt County EOC.

received the PAR from the SIRC at 1129 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.295845e-4 months <br />. This was a delayý of 10 minutes-for critical information that the DeWitt County decision-makers required* to protect the health and safety ýof the public.

The SIRC Manager.wasinformed that the NARS :was not functioning properly from the SEOCto-DeWitt County and that commercial lines had to be used to relay 25

ii

,Uncla -ssifie Radiological Emergiency Prearedness Progra

?(REP,)

After Action Reoirt/Imlbrovement Plan tClintonaPowertation

,.winoraton which extehdedthe time fr om achange n significant information to DeWitt County being made aware.Discussions betweie the Cotn'minications9C enter Director and the S!RC Manager did not result m an expedited method of infoiming

'.--DeWitt County of the.chages in ECLs-or issuance ofanyPARs.,-T-here-seeme-dto.

-'be a' lack ofurgency onthepar.ofSIRCManagement that theNARS was not, wo:,w'orking and that on tlhe-CPS a*n*oi u

nceethat there was a trlease -in progress with I h

~

POSSIBLE CAUSE: Discussion between th&eCommunications.Center: Directotr and:,

the SIRC.Mainge did no includ specific pointshoffthe NARS telephone sytem difficultie. §ýich as the DeWitt.Counbeing.affeted byv:-delayed n*tificationiof the ECL changes., "'lhereeas no further 6onsideration'6f expeditedcommurnications even I

after realizing that the NARSdiffulteS Wert iiuin ttheSAE-ECL and the,-

pos~sibilhty ofaGE ECL occurring. This would have al o6ed DeWitt County to be 5

" {notifiediprolpit y forfif ulati-onof thIat

-aGEd EDand-the State, -provided PARs.-ý_ýý

.SIRCManagement must have ors have.kowthattheNARS notifcation..

-sstem, wasnfi t operating :thealternatiVe-ipocegs was taking an inordin:ate afmoutof I

.SIRCManiigmenitshoiuld-hqve.directed :theComunications:,Centeir t'ontact

-Dewitt County directlyrathierthanusig the roll call system.There seemed to*b

.I lack 6,ffSIencR6n the paRt iag--`ent that theeNARS was ijot v6ikingr

andthat oi-the,,CPS diidunouncefmiint ýthaLt-there 'wa a'r refrsq, i~jiprogress with asix-:

haul h

wind s

.v.Kr>.T' "REFERENCE-N A,;2 EFFECT: Protectie Acion Recomendtid'tfns omr i the State ýwere.co0mmunicated

1. minutes later, than they-cbul.:h-,b e;,,Prot btive Action.Decisions by the

- county were directly affected by he deqlavynco0timunicationof theeState PARs.

5 RECOMMENDATION: The Communication§s.Center Manager neieds to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication. systems and its operational-bapabiljity. If there is a continued

'problem such asthe NARS system not operating properly, determine a prompt and 261

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station efficient communication method to notify the risk county(ies) which may be outside the normal communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding priority.

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: 2.b.2.

ISSUE NO.: 09-11-2b2-A-01 ISSUE: Neither the SIRC Manager, REAC Manager nor any other IEMA staff addressed the decision to restrict or allow aircraft to fly through the plume after radiological conditions, changed.

CORRECTIVE ACTION DEMONSTRATED: The SIRC Manager directed a request to the Federal Aviation Agency (FAA) to restrict air space in the affected area surrounding CPS. At 1128 hours0.0131 days <br />0.313 hours <br />0.00187 weeks <br />4.29204e-4 months <br />,a temporary flight restriction (TFR) was granted by the FAA for a 10-mile radius area five miles northeast of CPS for altitudes below 2,000 feet.

These actions adequately clear ARCA 09-11-2b2-A-01, which stated "Neither the SIRC Manager, REAC Manager nor any other IEMA staff addressed the decision to restrict or allow aircraft to fly through the plume after radiological conditions changed."

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.3 State of Illinois - Public Inquiry Phone Bank In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.a.1, L.e.i, 5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None 27

Unclassified 3

Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g.

PRIOR ISSUES - UNRESOLVED-None 3.3.1.4 State of Illinois - Radiological Emergency Assessment Center The Radiological Emergency Assessment Center (REAC) effectively demonstrated the Target Capability of Emergency Operations Center Management by promptly activating and providing multi-agency coordination throughout the REP Exercise at the CPS. The REAC Manager used a decision-making process that involved considerations of appropriate factors, including utility recommendations, plant status, release rate, dose projections, field measurements, weather conditions and knowledge of the area, and provided necessary coordination to make appropriate and timely PARs to the SIRC Manager which provided consistent PARs for the protection of the public.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.a.l, 1.c.l,l.d.l, i.e.1, 2.a.l., 2.b.1, 2.b.2, 2.c.1, 5.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED; None 3.3.1.5 State of Illinois - Unified Area Command The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to support Protective Action Decision-making throughout the REP Exercise at the.'CPS. The Unified Area Command (UAC) was well equipped with all necessary communications, equipment and supplies required for the capability of efficient communications with offsite organizations. A representative of the Illinois State Police (ISP) at the UAC activated the call-down procedures in advance of evacuation orders and stationed Troopers at appropriate Traffic and Access Control Posts. The coordination efforts between the ISP, Illinois Department of Transportation and County Sheriffs Departments allowed for the effective removal of traffic impediments that occurred during the evacuation process. Throughout the exercise, the Incident Commander (IC) had frequent briefings and 28

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station discussions to resolve issues as they occurred. The IC was able to pass command to the Deputy IC without any loss of continuity to the operation process. The UAC staff interacted and communicated with each other and respective agencies effectively.

In summary, the status of DHS/FEMA criteria for this:location is as follows:

a.

MET: 1.a.1, l.c.1, 1.d.1, L.e.1, 2.b.2, 3.d.1, 3.d.2, 5.b.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.6 State of Illinois - Emergency Operations Facility In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.a.1, l.c.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None, 3.3.1.7 State of Illinois - Joint Information Center The Joint Information Center (JIC) demonstrated the Target Capability of Providing Emergency Public Information from the State through the County Public Information Officers(PIOs) at the JIC.

Effective procedureswere used to alert, notify, and mobilize personnel and activate the facility in a timely manner. Key personnel with leadership roles provided direction and control. Emergency information *and instructions were presented to the public and the news media in a timely, manner.

In summary, the status of DHS/FEMA criteria for this location is as follows:

29

Unclassified Radiological Emergency Prepare'dess Program (REP)

.After Action, Report/Improvement Plan Clinton Power Station

,aMET:,i.a1,1,.cAi, 1.d.1,-1.e.1, 5.:b:

b. -AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None,,,-:

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

.j...

f. PRIORISSUES-RESOLVED: None: -;.:,,.,'-
g.

PRIOR ISSUES-UNRESOLVED: None <

3.3.1.8 State of Illinois -Radiological Assessment Field Team.

The State of Illinois demonstrated the Target Capability of On-Site Incident Management by coordinating radiological sampling operations required to suppot Protective Action Decision-making throughout the REP Exercise at the CPS. The Radiological. Assessment Field Team (RAFT) was well equipped With all necessary, communications,; equipment, and supplies required for'the capability of efficient communications with offsite organizations. Throughout the exercise, the RAFT Commander had frequent briefings and discussions to resolve issues as-ihey I

occurred. 1The RAFT. stiffifiteracted and communicated with each other:and respective field monitoifig teams effectively.

In summary the status of DHS/FEMA critera for.this location is-as,folloxws a.,, M ET.:..-.a.1,.!.c.1, I'd.1, 1.e.6, 3.a.1, 3,b.1,4a2..

b., AREAS REQUIRING CORRECTIVE ACTION-Noneý..

C.,

DEFICIENCY: None 3

d. PLAN, ISSUES:None
e.

NOT DEMONSTRATED:.None

f.

PRIOR ISSUES - RESOLVED: None g.PRIOR(

_ISSUES UNRESOLVED: Noi

'5..;:-.*. ~ ~...

i.e:

3.3.1.9 State of Illinois - Joint Information Ceniter/Media Briefing Center.

1' "

  • i

~

The Joint Information Center (JIC)/Media Briefing Center.(MBC) demonstrated the Target.

Capability of Providing-Emergency Public Information fromrtthe State through the)Public...

Information Officers at the JIC/MBC. Key personnel with leadership roles provided direction and control. Emergency information and instructions were presented to the public and the news' media in a timely manner.

-,I 30 I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station In summary, the status of DHS/FEMA criteria for this location-is as follows:

a.

MET: 5.b.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.10 State of Illinois - Mobile Laboratory The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of the Mobile Laboratory (Mobile Lab) throughout the REP Exercise at CPS.

The laboratory analyzed samples and sample data in an appropriate manner maintaining sample integrity. The laboratory implements a quality assurance (QA) program to ensure the reliability of analytical results and counting system functionality. Provisionsý for analyzing samples with high radiation levels included: reducing counting times, increasing Sample height or sending samples above the limit to the IEMA fixed laboratory facilities in Springfield, IL or West Chicago, IL. Federal Agencies, if involved in the response, could also provide additional analytical capabilities. Mobile Lab staff demonstrated when and how they would check for contamination during sample preparation and analysis for three simulated samples. Chain of custody forms were completed for sample transfer to individuals outside of the Mobile Lab staff.

Sample integrity was maintained throughout the process by utilizing sample data forms.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.a.1, 1.d.1, 1.e.1, 3.a.l, 4.c.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None"
d. PLAN ISSUES: None e: NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. 'PRIOR ISSUES - UNRESOLVED: None 31

Unclassified.

I Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station 3.3.1.11 State of Illinois - Field Monitoring Team - 1 The State of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation exposure (cloud &

ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and

.1 collected radioiodine and particulate samples.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.a.1, l.d.1, L.e.1, 3.a.1, 3.b.l, 4.a.l, 4.a.3.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.12 State of Illinois - Field Monitoring Team - 2 The State.of Illinois demonstrated the Target Capability of On-Site Incident Management through the use of Field Monitoring Teams (FMTs) throughout the REP Exercise at CPS. The FMTs were equipped to perform field measurements of direct radiation. exposure (cloud &

ground shine) and to sample airborne radioiodine and particulates. The FMTs also demonstrated they could take and record ambient radiation measurements at appropriate locations, and collected radioiodine and particulate samples.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.a.1, 1.d.1, I.e.:1, 3.a.1, 3.b..l, 4.a.l,4.a.3.

b.

AREAS REQUIRING CORRECTIVE ACTION::None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None I

32

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station 3.3.1.13 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Radiological Advisor In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 2.a.1, 2.b.2, 2.c.1, 3.a.1, 5.a.1, 5.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.14 State of Illinois - Dewitt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
a.

MET: 1.c.1,5.a.1,5.b.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None-
f. : PRIOR ISSUES - RESOLVED: None

.g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.15,State of Illinois Macon County, Emergency Operations. Center,- Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is. as follows:

a.

MET: 1.c.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d.

PLAN ISSUES: None

e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 33

Unclassified 1

Radiological Emergency Preparedness Program.(REP)

After Action Report/Improvement Plan Clinton Power Station 3.3.1.16 State of Illinois.- McLean County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.c.l.
b. AREAS REQUIRING CORRECTIVE ACTION:. None
c.

DEFICIENCY: None I

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.17 State of Illinois - Piatt County Emergency Operations Center - Illinois State Liaison In summary, the status of DHS/FEMA criteria for this location is as follows:
a.

MET: I.c.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES. - UNRESOLVED: None 3.3.1.18 State of Illinois - Illinois State Police District 10 Headquarters - Dosimetry Control Officer Briefing The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Illinois State Police, District 10, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ.. Appropriate dosimetry, record-keeping documents, and information on how to manage each emergency workers dose was discussed by the Dosimetry Control Officer (DCO).

Equipment requiring, calibration and testing was within proper dates. The DCO provided instructions on potassium iodide and instructions on when to ingest.

In summary, the status of DHS/FEMA criteria for this location is as follows:

34 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station a.. MET: 1.d.,

1.e.1, 3.a.1,. 3.b.I.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.19 State of Illinois - Illinois State Police District 10 Headquarters - Traffic and Access Control Post The State of Illinois demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the Illinois State Police, District 10, which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.

During the interview, the Trooper demonstrated. knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d. 1, L.e. 1, 3.a. 1, 3.b. 1, 3.d. 1.

b. AREAS REQUIRING CORRECTIVE ACTION: None,
c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.20 State of Illinois St. Mary's Hospital Medical Service - Transportation The State of Illinois and theRiverside Ambulance Service demonstrated the Target Capability that they have the appropriate space, adequate resources, and trained personnel to provide.

transport, monitoring, decontamination, and medical services to contaminated injured individuals. Decatur Ambulance Service demonstrated the capability to-transport and provide 35

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station initial medical care to a contaminated, injured individual.

In summary, the status of DHS/FEMA criteria for this location isas follows:

a.

MET: 1.d.1, 1.e.1, 6.d. 1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None.
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.21 State of Illinois - St. Mary's Hospital - Medical Service - Facility The State of Illinois (St. Mary's - Decatur) demonstrated the Target Capability that they have proper space, resources, and trained personnel to monitor decontaminate and provide medical services to contaminated injured individuals.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.d.l,1.e.l,3.a.l,6.d.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e. "NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None.
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.22 State of Illinois - Illinois State University/Horton Field House -

Evacuee/Emergency Worker Monitoring The State of Illinois demonstrated the Target Capability for Evacuee and Emergency Worker Monitoring. The State established adequate facilities, resources, and trainedpersonnel to provide monitoring of evacuees and emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.d.1, L.e.l; 6.a. 1.

36

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.23 State of Illinois - Illinois State University/Horton Field House -

Evacuee/Emergency Worker Decontamination The State of Illinois demonstrated the Target Capability for Evacuee and Emergency Worker Decontamination. The State established adequate facilities, resources, and trained personnel to provide decontamination of evacuees and emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: I.c.1, l.d.1, 1.e.1, 6.a.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None.

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.24 State of Illinois - Illinois State University/Horton Field House - Emergency Worker Monitoring and Decontamination of Equipment The State of Illinois demonstrated the Target Capability for Emergency Worker Monitoring and Decontamination of Equipment and Vehicles. The State had adequate procedures and resources for accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.

In summary, the status of DHS/FEMA criteria for this location is as follows;

a.

MET: l.d.1, L.e.1, 6.b.1.

b.

AREAS REQUIRING CORRECTIVE. ACTION: None

c.

DEFICIENCY: None 37

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station I

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.25 State of Illinois - Illinois State University/Horton Field House - Evacuee Registration 3

The State of Illinois demonstrated the Target Capability for Evacuee Registration. The State had the capability to establish adequate facilities, resources, and trained personnel to provide monitoring and registration of evacuees.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: l.d.1, L.e.l,6.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None I
g. PRIOR ISSUES - UNRESOLVED: None 3.3.1.26 State of Illinois - Illinois State University/Horton Field House - Congregate Care Center The State of Illinois demonstrated the Target Capability of Congregate Care Center (CCC) at the Illinois State University/Horton Field House! As part of the CPS REP Exercise, the American 3

Red Cross (ARC) demonstrated the capability to provide resources and trained personnel to evacuees. The ARC successfully demonstrated that the CCC has the resources to provide 3

services and accommodations consistent with ARC planning guidelines.

In summary, the'status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, 1.e.l,6.c.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None
d.

PLAN ISSUES: None 3

38 3

I

Unclassified Radiological EmergencyPreparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR.ISSUES - UNRESOLVED: None 3.3.2 Risk Jurisdictions 3.3.2.1 Dewitt County - Initial Warning Point In summary, the status of DHS/FEMA criteria for this location is as follows:
a. MET: 1.d.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: 1.a.l.

ISSUE NO.: 13-1l-lal-P-02 CRITERION: OROs use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner.

CONDITION: The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex.2G Notification Lists.

POSSIBLE CAUSE: Annex 2G lists the Primary point of contact for initial notification to Macon County as the Telecommunications Specialist in the Macon County EOC, and the Alternate point of contact as the 24-hour Sheriff's Dispatch Center. However, the EOC is not staffed on a 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> basis, and after-hours contact with Macon County can only be made through the 24-hour Dispatch Center. The call at 0923 hours0.0107 days <br />0.256 hours <br />0.00153 weeks <br />3.512015e-4 months <br /> from DeWitt CEN COM made to the Macon County EOC was taken by the Macon County Assistant Emergency Management Director. The Macon County EOC had not yet been activated and staffed, and the Initial Warning Point' (Dispatch Center) was unaware of the initial notification of an Alert Emergency Classification Level (ECL).

REFERENCE:

Annex 2G of the DeWitt County Plan, dated 11/11 EFFECT: While the notification, as made, had no adverse effect on the response, the 39

I

, -Unclassified

-"Radiological Emergency Preparedness Program.(REP)

"'After Action Report/Improvement Plan Cliriton Power Station Macon County EOC had not yet been activatedand nstaffed, and thhe Initial.Warning Point (Dispatch Center) was unaware of-the initial notificfation-.

RECOMMENDATION: The Primary and Alternate points 0f.contact for Macon County should be reversed in. the DeWitt County Annex 2G N6tificajion ists:

Clarification should be provided td fmiake the 24-hour station (Macoh County's Dispatch Center) the Primary notific'itjon p6int, for initial n6tificitlio ofo i nident at the CPS, and the EOC the Alternate notification point until such'time as'the EOC is sufficiently staffedto 'function as the ~phi-arynotificitio'npomnt.- -

I I

I I

I I

e.

f.

g.

NOT DEMONSTRATED: None' PRIOR ISSUES - RESOLVED: None PRIOR'ISSUES - UNRESOLVED:.None 3.3.2.2 Dewitt County -'Emergency.Operations Center-The DeWitCounty Emergenc".Operations:,C~nter,(EOC)demonstratedthe Tagei Capability of

,Emergency Operations Center Management by actiVities includingthe use6f effective' procedures to alert noti~fyad'mob'ilize emergency per'snnel and a~tivate facilities in-a timely; manner:

  • The focus' lways iremailned onWthe'prinfiy*objetive4 iwhich is'rd&6tini-ithe public

'health and*-sfety of those.wholive and work inlocal comnmnities The Dewitt County Emergency Services. ani iatr y'

(ESDAj C6ootdin'ator'full'y d'-fo~tfdtho~e:c'n maki~ng processjolvmg appropriatefactors and necessary coordiation when makng Co0rty)EOC' was sucessfullyid'e~monstrated by.,the'DeW~itt, County: Boa~r~dChairperson (CBC).

' and the'ESDADrector.'.,

In summary, thie-status'of DHS/FEMA critea rfor this"1ocationisas follows:

a., 'M ET,'4i a14,A"d'l i'd 1;i.1e.1;"2.b. 2,.c 1 *2-e.*1', 3.it,3.b~ i 3.c.-1, 3.c.2;3.d.1, 3.d.2,

b. AREAS REQUIiRING CORRECTIVE ACTiON:.None..
c.

D N

ie.n,.

' one S'd. PLAN ISSUES: None rated o

e.. NOT DEMONSTRATED:

oe e.~ OC:. a succes

-b."h&j "t,~fN

f.

PRIOR ISSUES -RESOLVED: 1.cll.

7 T

U I

I I

I I

I I

40 I

Unclassified Radiological Emergency Preparedness Program (REP)

After. Action Report/Improvement Plan Clinton Power Station ISSUE NO.: 13-09-lcl-A-01 ISSUE: At 1229 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.676345e-4 months <br />, the CBC, ESDA Coordinator, and two IEMA representatives departed the EOC to attend a media briefing located down the hall away from the EOC. There was no one delegatedto provide direction and control during their absence, nor was anyone tasked with bringing important messages to them at the media briefing room if necessitated. At,1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the CBC, ESDA Coordinator, and two IEMA representatives returned to the EOC. During the time they were out of the EOC (31 minutes), State NARS Message No.4 arrived, stating that a wind direction change had occurred, and the State did not recommendthat Sub-area 2 be evacuated. Since the decision-makers were out of the room when this message arrived, and no delegate was present, the message sat on the desk and not*

acknowledged. The Mayor of Clinton noticed the message approximately 10 minutes after the form arrived, and informed the Clinton. Police Chief of the message, and that evacuation of Sub-area No.2 was not recommended. No other discussion concerning the wind direction change and its affect on Sub-area No.2 was identified or addressed as a concern, even when the decision-makers returned from the media briefing.

CORRECTIVE ACTION DEMONSTRATED: Despite total failure of the NARS phone system, various problems with facsimile machine connectivity and multiple, simultaneous controller inject messages, the mutual collaboration:and support between DeWitt County's senior leaders allowed the command staff to maintain.

overall situational awareness, effectively manage the efforts. of the DeWitt County EOC staff and coordinate emergency response operations with the State and supporting counties.

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.3 Dewitt County - Emergency Operations Center - Traffic and Access Control Post The DeWitt County EOC demonstrated the Target Capability of Emergency Public Safety and Security Response through interview with the DeWitt County Sheriff's Deputy,,which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile EPZ.

During the interview, the Deputy demonstrated knowledge of the provisions of the Emergency 41

.~~~~

R iloia Unlsi

,e EegnyP~rep~ar~ednesýsPrra (R

A ion R

  • eport/mpr oement Plan

'A Clinton Po.er tSiaion Operation Plan rel'atedio ihevestalishment: 6o TACs in addiion tothe useof thie appropriate S dosimetr-yprocedures, docuhmentatioiinand-counicatio'inifeq'uip'metincudefigfi'abl rd-di-s, cell -phones anid mobile data terminalS.Thisincluded th.e proiion of tdosimetryand the ability-to m~n~e erergncv wor-ker radiological, ex qj icuigtedcsih o~np~et11 q-

",In summary; thie a~tu.f DHS/FEMA.driteia 'for tss. lo.iti:onis as-followxs qI S.*b.

AREAS,:

.'REQUIRINGCOR.RECTIVE ACTION. None S

DEFICI:ENC Y: N E..N.

a,

d. PLAN ISSUES:.No.

n N NTD ON.

.STRATEDE_.

f R-IOR ISSUES. -,RESOLE None 4

g RIOR ISSUES - UNRESOLVIED: None 13;3.

Dewitt County - Clinton Police Departmen Traffic and Access Control Pos i.,L!dncluded the._,:..,..

".1< dit ibutio of dosimetry emergency worker radiological, ex)posure maaemn Ul 2An tecpblttoipment Trafi an AcesCnrosts'(TCs*ihi h

0ml E

Dnhe intnto PoliciDw tlOfrdemonstrated t

ihe, of.the.prvisiono bth EmeedgecTt1pr, Rons Plang relatedtoth establs.hm t

ntof APs aD io u

porta e rdiostrlmution mobiletdat eergnals Ths il ed the pxovsi of dosmetr and'the caability to imlilengenteTn~fre,ancy worker s Codntrog l' eposure(Tin~s)dintheeisin

-toeI0-'

EP:.

Di*>

rv 1 w of ns of"t Insumry,ý the statu of e

DUFEMA -deontera~frthis loaton is, gs fhpollsows,.

- erg5. NOT D QtRATED. N s

f.

yPRIOr a iosUES e

d Ro ne.

t

gplPRIO, R ISSE e

URESoLViED:None and Ia ion portbleadi

,ýc~l & es nd obile. data :t~ermnals.:*- Ths

,a,,:*te~rviin'o oiner In summar the stel at uso f

.manag emren 6writeri aflot hloglcal i-i.,epsr~ udf*@;*~ii~ t i".

4;.2"L 13 3 I,

-,..b. AREAS REQUIRING E

TIVACTIONNone-

c..D EFICIEN CY : N one.

e,.:

e. NOT DEMONSTRATED:N n.!.~ ~.4.)...;"

-,/"(-.;¢.;.i,.ii -

.;;!*...4..i.

f..

P:RIOR ISSUIES -RESOLVED:None-, -.,

,.7;,:--_

.).-if.-d g..P R I O R I S S U E S -U N R E S O L V E D : N o n e.., : *,

-:. >: i / "

  • 42

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station 3.3.2.5 Dewitt County., Clinton Police Department -Traffic and Access Control Post -

Dosimetry Briefing.

The Clinton Police Department demonstrated the Target Capability of Emergency Public Safety and Security Response through interview of the Clinton Poljce Department Officer, which included the distribution of dosimetry and emergency worker radiological exposure management within the 10-mile EPZ. Appropriate dosimetry, record-keeping documents, and information on-how to manage each emergency worker's dose was discussed by the Dosimetry Control Qfficer (DCO).

Equipment requiring calibration and testing was within proper dates. The DCO provided instructions on potassium iodide (KI)and instructions on when to ingest KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:.

a.

MET: 1.d.1, L.e.1, 3.a.1, 3.b.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None;
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIORJISSUES - UNRESOLVED: None.

3.3.2.6 Dewitt County - EAS WJBC (1230); WBNQ (101.5), WBWN (104.1)

DeWitt County demonstrated the Target Capability of Emergency Public Information and Warning associated with primary alerting and notification of the, public was completed in a timely manner. Following the decision by County emergency management officials to notify the public of an emergency situation at the CPS, Radio Stations WBNQ (105.0 FM), WBWN (104.1 FM) and WJBC (1230 AM) personnel demonstrated a thorough understanding ýof their equipment, the EAS process and executed their duties in a timely and professional manner.

In summary, the status of DHS/FEMA criteria for this location is as follows:,:,

a.

MET: 1.d.l,5.a.l1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None 43

I

-.. ~.,.Undasifed 0Radiol gic4!

Porm RP

_,After;Ation Report/Imrpfovemient Plani

., i: -

Stn PoW ar s tion:

NQ EONSTRA-T-ED: Nne 4;~

'f,-

f.

-PRI1OR ISSUES -RESOLVED:

No'ne I

I g.-PRIOR ISSUES - UNRESOLVED: None, 3.3.2 7;DeWitt County -. Clinton School District15 Evacuaio Schcool'

DeWittCounty demonstrated the Target Ca

.abi otf Citizen)BvacUatioin adShelter*in-Place, for. school.childien. TheClinton Conuty Unit Schoo Dvistrct #1l{&presentatv e describeds plaiis and proceduresto safely evacuate stuents from theCPS EPS.anid reunite 4the withhir.i families2* Thekschool district&demonstratedsguffic*eiietperso elý,*ciuent-contacti*nfo iirmation, emergency worker idosimetry, and conunuicationsrcapalnliieO totiffamilies and guardin.

regarding how to reunite with evacuadted students I

I I

I I

In-sumary, the staus of DHS/FEMA citeria for this location is as follows

.a. MET l'd 1lxl.e1',3.a!L3; i,:x2 b.ý. AREAS REQUIRING CORRECTIVE ACTION: None c DEFICIENdY: None

d. PLAN ISSUES: None e

NOT DEMONSTRATED: None

f.

PRIORISS;UES RESOLVEDNone g-.

PRIOR ISSUES - UNRESOLVED:None

,.3.3.2.8 Mlacon County Initial Warnlinlg ýPoint.

Mac00nCi*i dpemonstra*ed" the Target -

ity of a.....tial Warning Point (TWP) i dluditg the useof effective Drocedures to alert notify and mobiliz*e emergency personnel aýnd activ'aete' :,

ýaI~ities ýin'a timely. manner a'Dispa~thers. ee fmlarwt thi nuclea icidetnotifcto d

o redurs.se.'Thre.. are re~dul,4 lctl ofsystems....ilablePat4the:'.,?and both irimay.

and bapexerclsek tm.-

s:tmswee sd ff-t 1d Iiisummary, the status ofDHS/FEMAcriteria for?:his.i6.ation isas follows:

a. -MET:iI.a0I.,l.dl

.1.

b. AREAS REQUIRING CORRECTIVE AcTION:.None:
c.

DEFICIENCY: None

d. PLAN ISSUES: None-,

.I :'

I:

I?

-=li

  • I-I.,

I.,

.44 I

I I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None g,

PRIOR ISSUES - UNRESOLVED: None 3.3.2.9 Macon County - Emergency Operations Center The Macon County Emergency Operations'Center (EOC) demonstrated the Target Capability of Emergency Operations Center Management including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely mann3er. Macon County, provided sufficient multi-agency coordination for an incident at the CPS by promptly activating and operating for the duration of the incident. The EOC was managed* efficiently and effectively. The EOC completed all notifications and was staffed to an operational level. The EOC manager provided solid management, direction and control using briefings. This allowed the staff of the EOC,to maintain a common operating. picture and overall response to the event.

The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect. the health and safety of the public.

In summary, the status of DHS/FEMA criteria for this location is as follows:,

a.

MET: 1.a.1, 1.c.1, l.d.1, L.e.l 3.a.1, 3.b.1, 3.d.1, 3.d.2.

b, AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None d,

PLAN ISSUES: None

e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None g,

PRIOR ISSUES - UNRESOLVED: None.

3.3.2.10 Macon County - Emergency Operations Center - Traffic and Access Control Post Macon County demonstrated the Target Capability of Emergency Public Safety. and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure, management, and the capabilityto implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.

45

=...qi'Uficlaissified

- RadiologicalEmergency Preparedness Program(REP)

AftefA~ctirn.Repqrt/Improvement Plan CInton Power Station In summary, the status ofDHS/FEMA criteria for thislocation is as follows

a.

MET: L.d.1, L.e.1,3.a.1 I3.b.1, 3.d.l: 1-,

b.

AREAS REQUIRING CORRECTIVE ACTION:None

c. DEFICIENCY: None

.i,

-,8

d. PLAN ISSUES: None

-6e. NOT DEMONSTR;ATED:Noiie`

.f. PRIOR ISSUES -RESOLVED-Nonfe g

-PRIOR ISSUES UNRESO.tVD:.Nonez. r,

33.

3 3 3 3.3.2.11 Mc~eAn Countyý-Initial, WarningPoýi*t.*ý 4

731t

3.

~

.3 7

-I McLean Couty* *,emostrated¢d t*hejirgetCadpabilit6 of an Initial Warming Point,(IW1) including 6the 6f effectivv&procediysato`aleit;,noti

,r

  • facilitýii a timey ffi i,-ae:spatcher&sýw~rfjiiihafwith t eirhnucear~incdentitatri..-
  • procedures. There arered udant communiatnsyItems

-availeabl!eatheIt WP,a-ndbothprma and bacikup systemswere.used effecti.elY dng this exeise-i.e-In summary, th.e staus :ofDHS/NFEMAcriteria for this l*cataionis as follows d.'

Ji ANiSSUES:Nonei--i

!v,:*/°i:*-;d*i:2

.i4;{i** -;

.d; I.;>4 -:;:'

-e.

NOT DEMONSTRATED:None

'U-"*:)?(¢t:

T;,5@;:p..2.....

f-.

PRIOR ISSUESI-RESOLVED: N---

g PR IO RI SSU ES on U N E

O V

D4N n

3.3.2.12 McLean Count~iy - Emergency Operatfions Centerl ii 5:*,:.

The:McLean C~unty Emergncy QJperations i~enter*(Eo2) demonstrat~ed the T~arget c~ap,~bilityi of.Emergency operaitions Ceniter Manag~remt:iincludifig the use of effective~pr6pedures it0 aiert, sttti Va-faiite notify'and mobilize emhergenp* personnieband4 ~ct,,faiiiie iff, tim~iely a~miei-,McI~ean.,

  • CouitY~pro~vide~t{sfficientimiilti.-agency :cobrdlna~tionm for an i~nciden~t at the CPS' by promptly.-,

activating~and 6perating for'the durationofthe incdent. The E`C was.mafrg..effiietl and

'3

,V effectively. The.EOC completedall......i.insad.as stafied oa6eatna.lYl)he-notifications and w

to an

.pe-atE' parations enter EOC manager provided solid management, direction and control using briefings. This allowed I

I I

I

,: ! : I I.:

I 46 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station the staff of the EOC to maintain a common operating picture and overall response to the event.

The EOC manager coordinated with DeWitt County to make decisions and ensure that appropriate actions were taken to protect the health and safety of the public.

In summary, the status of DHS/FEMA criteria for this location is as. follows:

a. MET: 1.a.1, 1.c.1, 1.d.1, l.e.1, 3.a.1, 3.b.1, 3.d.1, 3.d.2.
b. AREAS REQUIRING CORRECTIVE ACTION:. None c
c. DEFICIENCY: None
d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES -.RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.13 McLeanCounty. - Emergency. Operations Center - Traffic and Access Control Post McLean County demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.d.l,l.e.1, 3.a.1, 3.b.l,3.d.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None'
f. 'PRIOR ISSUES% RESOLVED: None
g.

PRIOR ISSUES,- UNRESOLVED: None 47.

  • ~ ailogical Emerec Preparednesis Program;(EP

..,;A,.ýfier:Action ;Repocrt/Imp~rovement Plan PoeSttn 3.3.21.14 iatt _Cout Inta~rng Pit p~

~~

Patt.County demonstrated the TargetCapability. of anj Iitial Wrarning Pint(W)inldgth use Of effective proc-edures to. alert, notify anid mobil Iize emergency person nel and ac,tivate

-facilities in a timely manner Pipt~

e~~famJ wh einulea inciden notiication,

  • proe6durs. There are redundant.. c6nicaii6*n i

SYsteme sailableait theJWP, and b pmary

  • and back-up :systems were used effeti I'"uiingdhis:exeicise

'In summary, the status of DIHS/FEMA criteria for this-l'cition is as follows.

a. MET:- 1.a.l, 1.d.l.

b.' ARE!AS-REQUIRING CORRECTIVE -ACTIO `No'ne c.- DEFICIENCY: None

d. PLAN ISSUES: None
e. NTDEMONSTRATED:None,
f.

PTRIOR ISSUES - RESOLVED:- None PRIO 0-ISSUES.-,UNRESOVD None--

3.3.-2.15,Piaftt Count Emrgn'c'y'" eration's Cntr The.Piatt.County EmergencyOperations*&

C-ntetrgeC)demonstratedsthe; a:rget, Cpability of; Emergeny!-_

Opration*sCn*

dManage*meentincl-udin g.the.e.sof.eijeprocedrs*o* alert

-otfyýand_`q moiiz emergency, personniel and activate facilitieOs in a timneymaerPttCuy

  • ;prvied-suffcient multi agency coordination fo*r an incient at theCPS byprmptly* a*ctivating.

-.:and bpeatitung for the duration of the incident.The EOC was managed efficently and effectively.

.manag~~~f

c90rdlnaIted7 al*woifc'th.eittonsat t, make, desin

-and e;ý_~

~

t~~iprpaeacin TheE EC cmpted aitio and was's af e to" a oerain.-l.ev'l.TheEOC, manager I.

h,

In sumary~he

tatusof DS/FEM crieriagor~

riefmgiin~s sflldw:

.tfffth providd solaid management 1,

dietionad usa.1,.3..,AiTh3..ei s aowe the":

d.

A-N:ral esn se to t t Th e

.the

ýEOC tormaintain a common Operat picture And11dv6,

0 QC, manager coordinated With-DeWittl County to make decisions and ensure that.pprqpriate.actionsI were* taken to~protect te health and safety of th~e pulc I

In summary, the status of DHS /FEMA criteria for, this location is' As-follows:

a. MET:: La.l1, l.c. 1, l.d. 1, L~e.l1, 3.a.1,- 3.b.l, 3A.dl,;3.d.2.;'.1
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: NoneI 48 1

Unclassified.

Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.16 Piatt County - Emergency Operations Center.- Traffic and Access Control Post Piatt County demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure. management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: lld.1, L.e.l, 3.a.1, 3.b.1, 3.d.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED-None 49

dRaiological

.Eer ncy Preparedness Progra

.(PP)

",,,,Aftern Ation lpRep~ovrt/lmprovement Plan C-

.Iiton PoWer Station II "SECTION 4 CONC USION No Deficiencies were identified forany jurisditin dunn" thIisexercise.

'Therewasone AreaeReqUiring Corrective Actin*e (ARCA) identifiedduring this: exercie for the State:6flhlinois There were no ARCks identified f6r DeWitt M "aconMleanorPiatt Counties.

.non I,

6rT.o J4IWith TheIIARCAfor the State of Illinois"wais identified under Criteinn 1c 1 Keypersonnel with fiindtionfalroles fo the OR poide'direc~iini and contioýl to that parto eof h veral response' effoit;'0rhich they iiare responsibleh fthe State ofIllimois.Response c

.ter Mnge,.

knowingthat the Nuclear Accitent. Reporting System phones were not not dei

'tehnat th

-A A,.,I

~

otecage nEe de terrfiindanexpedited method of informiig DeWit County_0f the changes in gency Classification Levelsor.issuiance:of anjcProtective AgtionReommendations.

T e oe ARCA' fr6mn.previous exercises for theState of Illinis Prior ARCA 09-11i-2b2, TbIr

.,Sas.

-li6,§.Prr'ARA'4 9-1 A-01Adecisin-makmgprocess involving considerationof appropriate factors and necessar,.

coorduiatidn is used t0miake Protectve:'ActIon DecIsions for thegeiieralp'ibhic kas resoled by 109 54'

'There -'was -one ARCA -Ifrom the p iiust Clinton Poiker8 Staio exriefo Neit it SPrio.r ARCA 1-0-1 cI. A 01 epersonnel-withfictional-roles forthe ORO provide.-

diiecti 6

hd btrol,t6that part of the-, oerlr'sipo611ste effort fWhich they are respolgnsil

'U was resolved by DeWitt Cou-nty.

7 There was.on ed duringad

i~r'l

t his0*al fxesci*se fo-eWf* T; I

-* ** *1i;.-.

Pla Isu' denif Mlen it outy There were no Plan

.There Wa's ne.,Plans'lsue-idJeiiiifed-diigýi'thiS exercise: or,, e ittCo't)hr~~~~i6Pa Issues identified for-the.StateofflhnolSMaconMclean orPiatt Counties.

The Plan Issue for DeWitt C6ty was identified..unde# criterion 1'a.1

- OROs

.se effectiv.,

proceduresto. alert,ýA6;tify and mobilize emergency personnael and, activate facilities in a timely' nianner.. The PlanIssue was. identified inDerWift Cuntry Plan Annex 2G, Notification Lists,'.

whereby the primary and alternate pgoint of contact for.Macon County are reversed.

There-was one Plan Issue from a previus exercise for the State of Illinois, which remains unresolved under Criterion S.b. 1 - Information contained within the Illinois Plan for Radiological Accidents (IPRA) Volume i, -Concept of Operations, and Radiological Task Force II

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station (RTF) Procedure RTF-POS-2 are not consistent in regards to the KI information that is provided to the public.

Based on the results of the November 2, 2011, exercise; the offsite radiological emergency response plans and preparedness for the State of Illinois and affected local jurisdictions, site-specific to the Clinton Power Station, can be implemented and are adequate to provide reasonable assurance that appropriate. measures can be taken offsite to protect'the health and safety of the public in the event of a radiological emergency at the site.

Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological. emergency response plans and preparedness for the State of Illinois site-specific to the Clinton Power Station, granted on December 4, 1980, remain in effect.

51

Unclassified Radiological Emergency. Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station APPENDIX A: IMPROVEMENT PLAN I

Isu Nu br 3

ml

-P0rtro:I a

ISSUE:. The Primary and Alternate points of contact for Macon County are reversed in the DeWitt County Annex 2G Notification Lists..

RECOMMENDATION: The Primary and Alternate points of contact for Macon County should be reversed in the DeWitt County Annex 2G Notification Lists. Clarification should be provided to make the 24-hour station '

(Macon County's Dispatch Center) the.Primary notification point for initial notification of an incident at the CPS, and the EOC the Alternate notification point until such time as the EOC is sufficiently staffed to function as the primary notification point..

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY:

PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT:

START DATE:

AGENCY POC:

ESTIMATED COMPLETION DATE:

Issue N b

  • I 1 Cieon I

ISSUE: The NARS in the SEOC incurred difficulties connecting with the primary risk county of DeWitt, from the initial notification of an ECL of an Alert at CPS. The secondary communication method of commercial telephone lines were used to contact DeWitt County and notify them of the Alert ECL. The same difficulties occurred at the Site Area Emergency (SAE) and GE ECLs in contacting DeWitt County. This delayed DeWitt County from receiving Protective Action Recommendations (PARs) and being able to evaluate and determine Protective Action Decisions (PADs). The initial notification call from the Communications Center to affected entities regarding State NARS No. 3 started at 1119 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.257795e-4 months <br />, and it was known that DeWitt County EOC was not on the call. DeWitt County EOC received the PAR from the SIRC at 1129 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.295845e-4 months <br />. This was a delay of 10 minutes for critical information that I

the DeWitt County decision-makers required to protect the health and safety of the public.

The SIRC Manager.was informed that the NARS was not functioning properly from the SEOC to DeWitt County and that commercial lines had to be used to relay information which extended the time from a change in significant I

information to.DeWitt County being made aware. Discussions between the Communications Center Director and the SIRC Manager did not result in an expedited method of informing DeWitt County of the changes in ECLs or issuance of any PARs. There seemed to be a lack'of urgency on the part of SIRC Management that the NARS.was not working and that on the CPS announcement that there was.a release in progress with a six mile per hour wind.

RECOMMENDATION: The Communications Center Manager needs to convey to the SIRC Manager if problems have occurred and/or continue to occur in regards to the communication systems and its operational capability. If there is.a continued problem such as the NARS system not operating properly, determine a prompt and efficient communication method to notify the risk county(ies) which may be outside the normal 3

communication procedures. Ensure that relaying of significant information, especially PARs, is the overriding priority.

CORRECTIVE ACTION DESCRIPTION:

3

,CAPABILITY:

IPRIMARY RESPONSIBLE AGENCY:I CAPABILITY ELEMENT:

START DATE:

AGENCY POC:

ESTIMATED COMPLETION DATE:

3 52

Unclassified Radiological Eimrgency Preparedness Program (REP)

After Action Report!Improvement Plan Clinton Power Station APPENDIX B: EXERCISE TIMELINE Table 1, on the following page, presents the timesý at which key events andactivities occurred during the Clinton Power Station REP Partial Participation Plume Exposure Pathway exercise conducted on November 2, 2011. Also included are times notifications were made to the-participating jurisdictions/functional entities.

53

.;ýAfie#Actidfiephl p ~e

,Unclassified..

.ý-kad~iojogical Emergency Preparedness Pr Inram (REP) ent Plan ClintoinPower Station II Alert' 0822 0846 0850 0850:

NA 0913 1, 0929 Sit6 rea Emerne5cncy 0940

'948 0948.

950 "0955 "

I 006 1037 GeneralEmer**rý"y 1105 1111 111 1120 121-1132 1141 8 Simlated Riad. Release Started 1056 1059 1056 1120 121 132' 1148 Sirnmlated Rad.-Rele s-;

NA.

NA NA NA' N

NA-.

T drrm in-ate &d,'

Facility Declared Operational

.900 0900 0914 0955 1002 095ý.

DeclaihtiOndifState ofEtiei'ge-ncy'-

1053 "NA:

.-- NA 1058

.. NA NA t Eixcise-Terminated 1-240.

1240 2*39 1234 1235

.1237 Early. PrecautionaryActi6n' State issu4eda 098 0958"'

1031 0958 NA, NA, Livestock AdVisory: Alljlivestock are'to be:.-

shelteredd anilplaced 6n'stored feed-aind'.water

within. the10-m-ile EPZ__________

Early PrcutoayAction: Stateýrestrciced?

0.3 NA NA9SJ NA A>>,N

  • att~ayWffic. within 10mlso PS al P~~utoa cin ttretitd rail

_0953 NA 0957

'~N ANA tra ytraff icwi wlthile f m CPS

__..,o.

Ear y Precautioniary Action:State is~sued an 1113 NA NAN

':NANAA

- order to evacuate state parksaind hunting areas E hrly lP re c a uih n a tionr V c t o : "S ta ~te t 'es r ic te d a ir ":

1 1i; i 2 8 : :* -i, :i - N A -* " -

N A)"'-*

l * ° -i }

-' :N A i ! : ) ; L ; N A I!.) :, ' :. N A :.

traffic withii 10 milesOf CPS.

Early

-reNAtitiily Acion:-DeWitt County NA NA NA

-NA 1107 NA Board Cha*imianiT orderede*ahitiindfschoils-an pca"6u'in-

______30___-_:.

Gen6ralInif6 n

essage..ucave sN s

ofJNA66 N

.10"22 NA ihcidentfP

ý___________

Prtet e ct nReom edain: Evcut NA:;11 1 '.

ji1"8A 7 "."i**

NA'=.

A

]:

N.

GPrientfieoi-ationeSioenActivuatio NA NA NA NA 1030 NA.

S~iieiInf~~tivaiion

E

'.e

NA

.NA "NANA

.NA 104 NA Pioe tioeAnis Recom~mendation: Evacuate 1111 1108 NAý NA NA NA.

SubzAýf~a~s 1 -and

~

Protective Action Decision: Evacuate Sub-Areas NA.

NA NA

-NA:

.1139 NA' Siren Activation-NA NA

ýNA

.NA 1147 NA.

Protective Action.Decision EAS Message NA NA NA

..NA 1154

'NA-1I1 Administration Decision:'.

NA N. A NA NA NA NA

"*I 1.v Q I.*_

, I.

I I

I 54

Uticlassified Radiological Emergency Preparedness Program (REP)

Clinton Power Station After* Action Report/Improvement Plan Table 1 - Exercise Timeline DATE: 2011-11-02,-SITE: ClintonmPower Station, IL Unusual Event NA NA NA Alert 0822 0932 0936 Site Area Emergency 0940 1038 1042 General Emergency 1105 1144.

1142 Simulated Rad. Release Started 1056 1144 1,142 Simulated Rad. Release Terminated NA NA NA Facility Declared Operational 0945 0945 Declaration of State of Emergency.

NA NA Exercise Terminated 1237 1237.

Early Precautionary Action: State issued a NA NA Livestock Advisory: All livestock are to be sheltered and placed on stored feed and water within the 10-mile EPZ.

Early Precautionary Action: State restricted NA NA waterway traffic within 10 miles of CPS Early Precautionary Action: State restricted rail NA NA traffic within 10 miles of CPS Early.Precautionary Action: State issued an order to

. NA NA evacuate state parks and hunting areas Early Precautionary Action: State restricted air

'NA.NA traffic within 10 miles of CPS Early Precautionary Action: DeWitt County Board NA NA.

Chairman ordered evacuation of schools and special populations General Informaion Message:,Public advised of NA.

NA.

incident at CPS General Information Siren Activation NA...

.NA General Information EAS Message NA,

. NA Protective Action Recommendation: Evacuate Sub-NA NA Areas I and 3 Protective Action Decision: Evacuate Sub-Areas I

.- NA NA.

and 3 Siren Activation NA NA Protective Action Decision EAS Message NA NA KI AdministrationDecision:

NA

'NA 1 55

-ýRadi6logidal Emqrgency, Preparedne~s s Ptoqgrm (REP)

R

- The foflowing jis a, lstof the pan-sonel that evalute the:. Clon Power StationREP Full

. :Participation PltiffiEx[p e TPathwayExercise ow November 2i`201*

T ist includes the.

inldticatd b th6'i f `q!d.rs ip andaial!vlftorganizae.

tion echi ev'aluator represefit is.

fthbooll6win -ibbkviationis" DHS/FEMA Dept of Homeland Securitye/FedralEmerge Management Agency ICE...

.Consulting

'3/4.

Title.....-

ame,.

Organization.

Radiologica*l Assistancd Committee

'-Chairman WiliamE.King DHS/FEMA

. 1

-i e

`7-f A

7..

ExrieDretor I'Drin W eA7

-E

erm, DHSe/FEMAg Alternate Exercise Directdr':-

Gary Naskrent-'.

DHS/EMA" Site,Specialist Todd M iGeinskie

, DHS/F-EMA Tea5 Le~ader--Allihois Dbra ul

-:-- DHiS/EMkA Jr eahý

ýý5w aiei,

DHS/FEMA 2

-T~aii i~er acon Countp dGh~i 7

T4n.-d 4i.-t'C

,j t.*

"Lam Lea er+Mc, OeT:n ae

C' "Cnty

-Dv Otmn

-5,*"

D F,"";-'-,-EMA C,,

T a

6~

14 kl-:-'.

I 456

  • :.: -,:.:-.:'o t O

~ *,*

5 :,.':;, :.r:

.,..:.÷ v'.-* uq *,-w m _* >.'. -* n m

~,*.. :,,.:,.: :.v"

'"'" 'r".** * *-.*.-°-i...' i.

":7..".'-*.",; ),

':'2

  • .,. ri.:.

A.

,1;:

,,v.... ' *' "",l*~r*1"*IA-"-:.

I*

I.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Impr6vement Plan Clinton Power Station DATE: 2011-11-02, SITE: Clinton Power Station, IL' LOCATION 1>EVALUATOR AGENCY State of Illinois - Initial Warning Point Robert Swartz FEMA RI State of Illinois - State of Illinois Response Center Christopher Bellone FEMA RV Robert Swartz FEMA RI State of Illinois - Public Inquiry Phone Bank Christopher Bellone FEMA RV State of Illinois -Radiological Emergency Assessment Center -

Michael Howe FEMA HQ Bart Ray ICFI State of Illinois - Unified Area Command Don Carlton FEMA RI Richard McPeak ICFI State of Illinois - Emergency Operations Facility John Simpson FEMA RV State of Illinois - Joint Information Center Michael Meshenberg ICFI John Simpson FEMA RV State of Illinois - Radiological Assessment Field Team Paul Ward FEMA HQ State of Illinois - Joint Information Center/Media Briefing Center Michael Meshenberg ICFI State of Illinois - Mobile Laboratory David Jacobson ICFI State of Illinois - Field Monitoring Team - I David Stuenkel ICFI State of Iliinois - Field Monitoring Team - 2 Richard Watts, ICF State of Illinois - Dewitt County Emergency Operations Center -

Karl Rabenhorst FEMA RV Illinois State Radiological Advisor State of Illinois - Dewitt County Emergency Operations Center -

John Arszulowicz FEMA HQ Illinois State Liaison State of Illinois - Macon County Emergency Operations Center -

Carolyn Sturghill FEMA RV Illinois State Liaison State of Illinois - McLean County Emergency Operations Center -

Delwyn Kinsley FEMARV Illinois State Liaison State of Illinois - Piatt County Emergency Operations Center - Illinois Edward Diaz FEMA RV State Liaison State of Illinois - Illinois State Police District 10 Headquarters -

Richard Grundstfrm ICFI:

Dosimetry Control Officer Briefing State of Illinois - Illinois State Police District 10 Headquarters -

Don Carlton FEMA RI Traffic and Access Control Post State of Illinois -St. Mary's Hospital'- Medical Service -

Richard McPeak ICFI Transportation State of Illinois - St. Mary's Hospital - Medical Service - Facility Michael Howe FEMAHQ State of Illinois - Illinois State University/Horton Field House -

David Jacobson ICFI Evacuee/Emergency Worker Monitoring State of Illinois - Illinois State University/Horton Field House -

David Jacobson ICFI Evacuee/Emergency -Worker Decontamination John Simpson FEMA RV State of-Illinois - Illinois State University/Horton Field House -

David Jacobson ICFI Emergency Worker Monitoring and Decontamination of Equipment State of Illinois - Illinois State University/Horton Field House -

Michael Meshenberg ICFI Evacuee Registration State of Illinois - Illinois State University/Horton Field House -

Michael Meshenberg ICFI Congregate Care Center Dewitt County - Initial Warning Point Carl Bebrich FEMA Dewitt County - Emergency Operations Center John Arszulowicz FEMA HQ Todd Gemskie FEMA Richard Grundstrom ICFI Mark Ludeking FEMA RV Karl Rabenhorst FEMA RV 57

Unclassfied:

Radiological Emergency Preparedness Program (REP)

Cl~i6nto PowerSt~ation

  • After Action Report/Imprvefi.6ent Pla'n
  • : I -* :
  • Dewitt County Emergency Operatiodas, Center fraffichandAcces.-- Mark LuIuelang FEMA RV'iI(. -

,.ControlPost

§j Dewitt CountyCli.ntonPolice Depgrtment - Traffind AccesFs*

C Berc -EMA:-,;

Cont olFIost d

7......CiBe rc.

Deitt County -

6Clinton Police Department Traffic adAcces'., David Stuenkel J

"I.

C~onrtrol.Post D--osi*'m~e~try Briefinps DewittCo'uin ty EASWJBCric (2),WN'1i5 W

N FEMA~v De'ilt Count?,Clfton Scho6b1District 15 EvacuationiSchool RichirdWattsI-.

CF' -"

Mao

-inlitial WagrninPoint

EMAR.

Caro R*

Mdcin6U6.Cfiti'

- Emer~genicy Op~ratiofis"*entter ?::5:::::,-i;;

.*.;2Edi~aifd;*olifisli :-,., *--*-,'? FEMK*RV::. i ou 2ýP

-7

~

FEMARV M

Macon Co'uti`y.

dEmergency.

perations rcendterTraff!.annd Acce.ss a1 Stfhiidghl; -

n

! ý Controo Po.tr per______-

C MLeanCount-Intal.WamigPoit, Delwyn Kinsley FEMARV McLen'fiC6oty e

ti enter.,

n D eIwhKirisley FEMA R.

McLean bv*,

De firdais-n:*

.FEMA-RV, Mcento -Counity. - EmergelicyOperations Center - Traffic and Acc~ess.

I Kiwnsley:

FEM RV~

  • I: "

II I

i : I

.'Piatt :Couny -cýiiitial Warriing J4in '..Eward Diaz FEMA R rE MA sRV,:

. -:.i :E '

V Pit ont:E-ergkency Ope onmrClifiton Crackel EAR S

-~-'

'divrd Diaz~

FEM

'RV "Piattu g

periitn ne Traffic and Access Edward Diaz FEMA RV PittCunty fmre~

b d~rtin Cete ts

'rd9.,

Control Post

~(-

~~_

_L_

Team 1Leader 4.

99,:

..9.......

99"

=._ :

9-

. " ' " 7 -

" ' -* i ) D ; }! :,

.9-. -.9.9, 9"

' i i- ";9 9

...T i

9,..

9 9

"=

,-'" *..-.9.9..

-9

.9...

4.:'.

f 4:

-'99....

"9.

i*,

.99-9.4 9..:

." 4-

-.58 I

I I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station APPENDIX D: EXERCISE PLAN This appendix lists the exercise criteria, which were scheduled for demonstration in the Clinton Power Station Radiological Emergency Preparedness Partial Participation:Plume Exposure Pathway Exercise on November 18, 2009.and the offsite extent-of-playsagreement accepted by DHS/FEMA Region V on October 21, 2009. "The exercise criteria, contained in the FEMA "Radiological Emergency Preparedness Exercise Evaluation Methodology; Notice," as published in the Federal RegisterNotice/Vol. 67, dated. April 25, 2002, represent a functional translation of the planning standards and evaluation criteria of NUREG-0654/FEMA-REP-1, Revl, "Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans'and Preparedness in Support of Nuclear Power Plants," November 1980. Because the exercise criteria are intended for use at all nuclear power plant sites, and'because of variations among offsite plans and procedures, an extent-of-play agreement is prepared by the State and accepted by DHS/FEMA to provide evaluators with guidance on expected actual demonstration of the criteria.

Exercise Criteria.

Listed on -the following pages are the specific radiological emergency preparedness criteria that were scheduled for demonstration during this exercise.

'59

Unclassified Rz adiological Emrergency Preparedness Progam(RP i :

.. ~~~..............................

i : !i iii

.Afte#7Atiot~iepbrt/lm*ovemen PowerStto ft r

cto

!ý..

S T

O-I NEXTENT-OF-L OA F P YEMENTS E.-MNT-.

- +:-*:.-i-'.:i:::C-LINTON:POWER STATION (CPS.)'REP,-EXERCISE.*:*;--(,

" "<;.;.'..,::* ;:,.. -'STATE OEFILLINOISTEXT:ENT-O)Pý L AYAG TRE.EMENP:::::::.

Criteariathat can be re-demonstrated immiedtately for credt at.the dtIscreton of.the evaluator include the6folowimg. 3.a 1 I.

3.d.-1,3d i2 6 a,I6.b., '6.c-.and,6.d.l.: Criteriaithiitim'ay be"re-demdemnstrated,'a -.ýapproved on a case b*ycas'esbasis by the Chairperson of the R*gional AssistanceCoordiinatiingCo ttee,.include the foll6wingk 2.aj b,

2b2Sa:-"and 5.b1.

EVALUATION AREA 1 - EMERGENCY.OPERATIONS MANAGEMENT,.'-.'

" -Criterin 1 a1'OROs use. efective procedures to alert,.notifyandmobfllze emergency personnel and activate filities in a 3

timely manner.-

J-

'-..,TheState Emergency Opserationfs Cente (SEOC) wihici.hhouse*-*he

-MAComm i1l Waring

'Point)the"State of Illinois Re"sponse' Center (SIRC) a*dteRadi6logical Emergen-cy AAssessnent Center(REA-C),

ll.be-activated The !EMA, Emergency Respons-eTe-le'ormmurunicator.wll Implement proeidures.f6r:notification:of

- IE staff,*as' definedin.IEMA SOPs :The S!RC.will be fullya variety o-State agencies aind personnel ReEACactiva terswi be f

providedto-'adentrate62 u stffing ofthe 1IRC

ý~REACT.The r~o:ste"r,.w-ill be~available for review; howevyer itw-ill' not-b-e removedfromti~heEOCý`

.7 T-- he:Uniff~ie~d"Area.mfna

(*UAC) willbe activatedwithSt~atedistrict-.and" reioallpersonnel at the -Central Ill mois Reg)ionagloii iort inBloomoington lRa diol ogical Assessmen6F.ield Team (RAFT) anidmobile lab will be activated I

- I* :

EMXe"rnoel wil be prepositioned in the local aea and disp!atched.tojthe (ounty 0Cs(UAC EOF. Tec hnca

  • .-::rt Cent*

TS

,e, postine l'noth e

v*a aea TlMAe s

C) an heJC EA il o eauaeth SGý dut y1offi ce ad s th of the situati "on at-C li"on-'..

tatio

-S Anactualp phoe cal wil be mad tori th FEMA

.,ý EAw ll bei simulated pl 0 A~ et e

epio ied State staff be will begiexecisel alier thanth l

1 Crite

  • *ia*1 to su ft the emergen& o nse This criferion will not be dnsta ted durin exer cise Ia Criterion 1.c.: Key, personnel -with leadership roles for the'ORO, provide direction and control to that part-of the overall response effort frwihtey are responsibe.I r

The abilitybto. direct andiucontrol emergency response activities ill. bedemonstra.ted at the.SIRC, REAC, the UAC and the JIC.- -Coordination: Will be *demonstrated betwseen the SIRC, the REAC, the UAC, the JIC, the EOF and the nU countyEOCs.,.

Criterion !.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate., locations:. Communications capabilities -are managed. in support, of emergency operations.

  • -:60

Unclassified Radiological Emergency Preparedness'Program (REP)

After Action Report/improvement Plan Clinton.Power Station IEMA will use a variety of communication systems [Nuclear -Accident Reporting System (NARS), telefax, commercial telephone, cellular phone, radio] to communicate with other organizations and locations.

Criterion Le.1: Equipmeni, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.

The State of Illinois will demonstrate the use of equipment, maps and, displays to support emergency operations.

Dosimetry Control Officer (DCO), logs will be available from an IEMA Radiological Advisor in each County EOC.

A DCO briefing/Traffic and Access Control (TAC) interview will be conducted by the Illinois State Police on November 1, 9 a.m. at the ISP District 10 Headquarters in Pesotum. During this event, the availability of dosimetry will be demonstrated. No more than 10% of the ISP District 10 dosimetry kits will be inspected during the interview to confirm serial numbers.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of Ki, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

The ability to make the, decision to recommend the use of KI to emergency workers will be demonstrated in REAC.

A message will be injected to'the.IEMA Radiologicýl Advisoi in the DeWitt County EOC to drive the decision to authorize exposure in excess of administrative limits.

Criterion 2.b.1: Appropriate protective action recommendations are based on available information on plant conditions, field

,monitoring data and licensee and ORO dose projections, 'as well as knowledge,of on-site and off-site environmental conditions.

The REAC will evaluate the licensee information and complete independent dose projections based on that information and simulated field monitoring data. REAC will make 'an evaluation of the data and make a protective action recommendation to the SIRC.

Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and: necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).

The coordination to determine protective action recommendations (PARs) based *upon available shelters, evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.

The capability to determine which centers should be activated for monitoring, decontamination, registration reception* and congregate care will be' demonstrated at UAC,,with input from the SIRC and REAC.

Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups.

The coordination to determineprotective action recommendations (PARs) based upon available shelters; evacuation time estimates and other relevant factors will be demonstrated between the SIRC and REAC. The State PAR will be transmitted to DeWitt County via NARS.

61

Unclassified

  • RdiologicalEmrngency Preparedness Prograrm,(REP)

.'4ftei Actioi'R*eýotlmprove'ihe'nt Plan fClintornPoweiStation it-.

The ability to make the* deision torecornmend the, use of KI tofinstiiitionalized -persons wA~il,be demiionstrated in IREA.C' 7,

2'4*4444,y 3

.Crteisons a d

m Rade s

cd csOqR nce f

in ge n pathway are assessed arind appropni-ate -pr6tecti&

action s

planng cntena.

.- Thisicniteriof wiliiidtbe demnsqitrated durin~thi~s exer -cise;.r,.,'

t....

e

, s-o,.r m a e 4

c.

Criterioni 2I.e. 1: Timely rfe-ocation;,reenti adetun.decisions ::are,made

.and coordinated as appropnate" based o

... assessmentsof the radio1ogic6 conditionisanidi'"nteriai',the OROs plan and/or procedures I

.~ ~. Ths citenion Will notibe5 demonstrated durngtiexrse-EVALUATIONAREA 3 PROTE;C-TIV* -ACTIONIMPLEMENTATION..

Criterion,3a." The OROs issue appropriate' dlosimetry and pr6ced'regs'and manage radiol6gicalexposure to emergency

.workers in accordance with the plan and procedures..:.-Emergency workers penodially and at the end of each.mssion read 5

-Atheir dosimeters-andrecordithe reading's onthe appropniiate exposure recordorchart.

This will be demonstrated*

-dnnithe ISPDCObnefingfTC interview.wAill be conducted onNovember-1 9 a.m.;;at theISP District 1Headquarters in Pes6tum.This cn*e*no wil*laso be.demonstrated at the fi*dteaimtaging-'area.

-Criterion 3

.KI.and -approprite.instructions are aVailable' should a decision, to.recommefnd us eof KI be made.

Appropnae dkeeping of e aministrto of.K fr e

rkers.and institUtionalized'4idividials (not the tThis"wll be demonstratedodunngri theISF DCO'bnefing/TAC1 iterview will be condtedpn Novemm r'.;theISP Distnct.1 0iHeadqUarters iPesotui

.TuhisAcntenonwillalso demonstrated t te f

te s

ar

.o.- ~ ~ ~ ~ ~ ~ ~...

,..i...*.ris

-';r{ 5a.

44

.>44, 4

rT,'>-*

,7 4

4,,.*

CriterionCrit 3

.c:1Ptectiveactione ec.isions are implemýentedforspecialpopuai rypswithin areas subject prtecte :.

actions.

c. 1

' t e

mt 4

'This' critenon does not ao ply to the State ofIllinoig-.

'"V".....

4"',

--Criterion 3.c2ý.

2OROs/Schoo fficials decide uoan Impee fr: sc l

4 This criteno.do.es.not.apply.

the State-of Illinois.

-,;,Criterion I.dil.jAppropnate.traffic and access control is established.j, Accurate instructions aie provided to traffic and access This will be demonstrated by thei State through coordination'between the UAC and the County EOCs, in accordance

.. ith. the, 01linton Station EPZ Traffic and Access Control procedures. 4The staffing of the State posts' will be IF, 4

4-11 I

'simnulated.during the'exercise..-

i.

o..

-A TAC deimonstration Will be coinducted in conjunction With the DCO.briefing on November,,

I 9 a.m., at the ISP District 10 Headquarters iii Peso:tum.

.4:., 4.'

4.4,4,

.y ""'6

./.

... ~

"7 2

44 4!::,.

,i

.{*.'444

  • .4..

62*

1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 3.d.2: Impediments to evacuationare identified and resolved.

This will be demonstrated through discussions at the UAC between the Illinois State Police and Illinois Department of Transportation. A message will be injected at the. UAC that will drive this demonstration. State personnel. will deal with the impediment by discussing the need for equipment, and its, estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.

Criterion 3;e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.

This criterion will not be demonstrated during this exercise.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.

This criterion will not be demonstrated during this exercise.

Criterion 3.f.M: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

This criterion will not be demonstrated during this exercise.

EVALUATION AREA 4-FIELD MEASUREMENT AND ANALYSIS Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.

This criterion will be demonstrated at RAFT with field teams performing radiation measurements with various monitoring equipment. Air samples will be taken with charcoal cartridges and'the availability of silver zeolite cartridges will be indicated. Two field teams will be evaluated.

Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.

This criterion will be demonstrated during this exercise at RAFT.

Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine.whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media.

This criterion will be demonstrated by the field teams and information will be. coordinated with RAFT. Two field teams will be evaluated. Each team will take an air sample with particulate filters.

Criterion 4.b.1: The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (e.g., food crops, milk, water, vegetation, and soil) to support adequate assessments and protective action decision-making.

This criterion will not be demonstrated during this exercise.

.63

a

.e Repirtlmprbvement Plan ClintonPower-Station I

Criterion 4.c.l: The laboratory is capable-ofperformg required radhioogical analyes6 td isort protective action decisins.

Tbhs criterion will be demonstrated during this exercise at)iheRAFTMobile La i

ait. the RAtfStging Area

-EVALUATION AREA 5-EMERGENCY NOTIFICATION AND PUBLIC INFORMATION-.,

Criterion.5.a.-- Activities associated-iffthpnmaiy alepting and notificatiofithe public are completed'inf a timielyh manner

-following:the initiladecision.by.auithonized~offsite emergency officials'to notify thepublic of an emergency

.situation...,The 3 iial instructional message to the publc must inlude as a minimum the elements required by current-DHS.R REP guidance 3,

.The State s role in demonstrating this criterion islimited to transm'ittngthe State s p"rtective :action recmmendation L. (AR) o th coutiesand onitringthe nstrctioal mes'sa~ges'p'rovi!*de~d'to the.,pubcby theconie hi m.omtring will be.. ccomlished by LEMA epresentatives in the.DeWitt'Cot.

EO

',5 Criterion 5.a. 2[ESERVED]-

. Criterion. 5 a.3:Ativities associatedprwith HS approved -exception Oareas(where applicable) are6completed6within:45-.

".minutes followigthe mitial decision byauthorzed.offsite emergency officils to notify thepublic of, An emergency situation.

-n Bacupalertand nifictio'no6fthe'pubi cjis:completed within 45 miutes ofolloing the detection by teRO of a failure of 3

II the primary alert.andn6tification

.syst'e'm...

3.

.3.3 This criterion does not apply to the State of Illinois.

Criteri ' 5 b

.OROs provide.accuriateemergency information and.instructions.to.the publc and the news medoi iatimely:.

,manner.

Thiswillbedemonstrat*"esd -at th* 4JI..ini icoordinaion-with the SIRCREAC UAC and the DeWitt CountyEOC.

EMA personnel will be presentattheJJI &t-ofoinate'ý-t the" Exieýlonstaff.e Media briefin will benconductedat'

.o

-th'e JICAA livestockladvisory,will be isue diaot6frehe JIGC bfe, S IRC when appropria _16' orumr control phone bainkfor public iquires will be operatedby th tat'euringthe e cis jacent

.EVALUATION AREA 6-SUPPORT OPERATýION/FACI~ITIES a 3..f,.rh 3 3-.ý 3j 3

33j 3

-Criterion; 6.a.1: -The.xrecepiion _center/emiergency, woke faclitha aproritespaceadq uat rsurces, and trainedf

.persqnnel toprbide monng, decontm*inationi;,and registratiop of;evacueis fd/toreme*rge.ncyworkq'ersý.j.

3 t';-

3 This criterion will be demonstrated,'at Hort6n Fieldhouse a t'Ililinoios Staeuniversity in Normial, IL willbe conducted 3--on)November1.Lwith.

set up.. beginning - fAt.1a.m.., Twoportal monitors.Wi11 beset :up.ujrngthe demonstration.

Evacuee and emergency woi'ker mwnitiringýand~decontarlln bedremnstrate~d The".appropnate.number of evacuees will be processed to meet 20%"in 12 hiurs requ:irement 3

. 1 n

Criterion 6.6.1: The' facility/ORO has adequate Dpr6edures rand resources for-the accomplish*men. -of monitonfng -and decontamination of emergency worker equipment including vehicleS.

3 This criterion will be demonstrated at Horton'Fieldhouýe at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November. -1, with set ip beginning at 11:00 a.m. An emergency worker vehicle will be monitored and decontamrinated by. fieldteam staff..3 b4.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. Managers demonstrate the procedures'to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities.

Horton Fieldhouse at Illinois State University in Normal, IL during an out of sequence demonstration conducted on November 1, with set up beginning at 11:00 aim. Local organizations" responsible for operating a reception'and congregate care center will be present to demonstrate this criterion.

Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

This criterion will be demonstrated during an out of sequence.drill conducted at St. Mary's Hospital in Decatur on November 1, 10:00 a.m. (confirmed).

65

-Unclassified I

  • ~.

adiolgic'al Emnergency PrprdnesPgam(P)..

j?,Aft& A tio n Rpr/mrvm Plan infon~PoWei'Station r

cinRp nrvm n

tai

~ ~

~

~U DITO14TEXNT-O-LAY..AGREEMENT

.Cr iteriatha~t.can be re dlemonstrate& i f

credt, at tihe discretionof the evaluator incude'the followin'g: 3.a.1, 3.d.1, 3.d.2, 6.a. 1,---6.b 1,,,6.c. I and 6d. 1 Critena that" may" be redemonstrtaed as approved on a7cseh-b-ase :bsisbythe Chaiiperson of the Regional Assstance Committe,eiinclude the following:2 a I:2 b 1 2,b.2 and Sb. L.

EVALUATION AREA 1 ý_EMERGENCY OPERATIONS MANAGEMENT f'

'Criterion 1.a.:l.OROs usei effective procedures to alert notifi*and mobiliie emergency personnel and activate 'facilities in a t imely manner.:-

DeWitt County intends to fully activate the'Emergency Operations Center (EO) in Clnton-Illinois The.County will implement noitifcationiprocedures as definied in IPRA Clinton Representatives from the EPZ-municipalities, demonstrate 24-hour staffing of the EOC. Evaluators will not be allowed to remove the roster from theEOC IE a land Exv i belo w i e

s aff th e C ounty EO C bu will no be pr posnin tio n-ed n th EO A oterw ll b pr v d d t An'evaluatorwillbe positioned at the Count Shenff's Conunuications Cetier-(nitial warning point) at the start of

-the execs.

Criterion 1b.l: Facilities are sufficient to support the emergencyresponse*

criern 'will not-be de onstrated during this

,:sCriteoion 1 c i'Ke personel with leaderskhp ro1es for th* ORO pi0ovide direction andcoiit1.I tl tht part of the overall rriný ckypr u

esponibhlea&Thjpfbq§-

responseeffotfo hchte are

.,n~

isio I]

bedemonstated at the '-DeWitt CounrtyEOC Coordinatio of decisions )an emergency.._

f acivties -will_ be demonstratedi bewen DeWit Conyth SICUCadteJG vnbeifwe~n 5h:on n

municipalitieswithin theEPZ.-Coordiatlon between De"itt County and thesupportounties will be demonstrated.:

r al

-e.

`W

~,

on bewe Ie Criterion1.Ld. lV At least tw6:coihnfiunication systems are available,- at least-one oprtsppel'ad-oiincto links hoetdn and 'natac s

d s

potl,,

"are established.*ndamtainec ihappropripte Ccat6nm..

ommunicati6is :capabilities aie, managedi suppor of

.emergency operations, DeWitt County will use NARS;comimer~cial telephone,radio and telefax to, communicate with departments and agencies at other locations.

Criterion e.: Equipment, displays, dosimetry,,l'pta ssium iodide (KI)aid 'other supplies are sufficient to support emergency operations.

DeWitt County will demonstrate the ability to support operations t.hrough the use-of e

maps, status boards And other displays as appropriate. DCO logs will be ayailable from"the. JEMA Radiological Advisor. in the DeWitt County EOC. The availability of dosimetry and KI Will be demonstrated during the' traffic'and-access.control demonstration and the school interview. The DCO briefing for the deputy demonstrating traffic and access.control will be conducted at.the DeWitt County EOC. "-

The DCO briefing for the Clinton Police officer demonsitrating traffic and access control Will be conducted-at the Clinton Police Department on October 31, at 1:00 pm.

3

.466 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, 1considering relevant factors, and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers ificluding provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

This criterion does not apply to DeWitt County.

Criterion 2.b.I: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data and licensee and ORO dose projections, as well as knowledge of 6n-site and off-site environmental conditions.

This criterion does'not apply'to DeWitt County.

Criterion 2.b,2: A decisionI-making process involving consideratiin.of appropriate factors and necessary coordination is used to make protective action decisions (PADS) for the general public (including'the recommendation for the use of KI, if ORO policy).

The State of Illinois will provide protective action recommendations to DeWitt County officials in the County EOC.

The DeWitt County officials will make the final decision regarding what protective actions will be recommended to the public.

Criterion 2.c.l: Protective action decisions are made, as appropriate, for special population groups.

The State of Illinois will provide protective action recommendations to DeWitt County officials in the County EOC.

The DeWitt County officials will make the final decision regarding what protective actions will be recommended for special, population groups.

Criterion 2.d.1: Radiological consequences for the ingestion pathway,are assessed and appropriate protective action decisions are made based on the ORO's planning criteria.

This criterion does not apply to DeWitt County.

Criterion 2.e.l: Timely re-location, re-entry and return decisions are made and coordinated as appropriate, based on assessments of the radiological conditions and criteria in the OROs plan and/or procedures.

The DeWitt County EOC staff will demonstrate this criterion through discussions within the DeWitt County EOC and with REAC and UAC as appropriate. The controller will provide break messages which will contain the predesignated State recommendation regarding relocation, re-entry and return. The DeWitt County staff will discuss the State's recommendation and determine whether to ifollow that recommendation or another of the County's choosing. The State will participate to the, extent necessary to support DeWitt County.

EVALUATION AREA 3'- PROTECTIVE ACTION IMPLEMENTATION Criterion 3.a.l: The OROs issue appropriate' dosimetry and procedures, and mianage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart..

DeWitt County will demonstrate this criterion by close coordination with the IEMA Radioiogieal Advisor and timely dissemination and exchange of information within the County Dosimetry Control Officer network.

Exercise messages will be injected which will ensure the opportunity to demonstrate this criterion in the County EOC.

67

-Unclasified

<<adiological EniergenIcy Preparedness Prgrm(RP AferA ýo eportlmnprovemnent Plan f**

Citon Power Station

" " ~~~~~~..'

"....."i. "-...

,::i':

"2-:g:*2?:.*
':::"'-::.].. ::

..This' criteriodn will also be demonstrated theI-fr traffic-w-and acoerar.intro l

izdembohstrationdd, the ts.cheo1.

...,t*

Ihehee dnpute Ioditrbte ffica antaesI conirol wi a

Ve coliducterca s

the e.itt County EQC_ ;T,tDCO bii, Png'or1iAhe i

hiintonitiPce.iofficer demonstrating traffic andicacess tcoiwilln-be conducted'aftheClinton Police'Departe*,n octb.3, a 1 p (etiv

.tr. *,

3i"

-C Criterion 3b1j KI: and appropriate instructions are available shouldpapdecison to r;scottimareandruse, P, Kof rtecmae.

i Appropnaterecord keepin g of the administirao*W nt of*iforem*erencyworkers and institution a'ieda inividuas*s.(not the, 6.Wh" nnedby he S6ntate of Illinois tdiribue-and adminitt K' ae s

e.

issuaneofi'to ed

-ianDetCnosrid

, EDeWittCountyofficials-wailrl*discu the

,mergencyworkers bi y measure and will notytify thet

'municipalities ofthe-State 7

rir.wil bs 1

l oated n

traffc*n'6ontrol demonstrations ahd the,-s chhobl"intervi w.

Th& DO bie.fingf............

trafi an A c'il'slsc:beoniit'1atonthe oeI"tt Cp-htT EOCJthe

90 bidesn the lmtoonP.Plicebbfic'rdemontfating tra'ffir and t.c6s cotrol will be c e

' Polic

.Departmient:

Crtron3c1:Poect'iv ato

-jhm~es-action decisionsu

rti, e

iliente fon. special-potion O witheto poitective actions.--,

This wi be d ionsrated by DeWitteCountthrough the simulated imenaion of She appropriae

-,proce ures.

- r the, appropriate. offiials will codcsinate -transportation An recei ingfcitieorspecial popltions One achss tp of special, efcilite willt b contactede dsuring heexercitse rOie troaff i each sstyp-0 otransportation i

provider_.in

. (amdbulance/bus) wil e contacted-duringthie exercisThe.publsriill c,

not e involve6df ithe dem trationi

-t

." The iMobility impaired List ;wil be avdai* inion Oin tolhe CountyEOCdring te exrise The tevalatorhe awtl not bmallowed irmngfove th'elist froim-the.:

EC,

r-<-,-

( '

15.A, Crierin 3..2:OR&ýs/cho offcials de'cide uponadimpeetpoetv cin o col "1gS" Dnstate ti c

i implementation of the approprate pi~bdd469jfin he county EOCThe EPZ schools andA trnptinrvdr wil bcotteduighe. exercise' A-school -interview: Will be conductd wih`he ClintonScho~ol.District #15onOcitober 31 -at3 pmini the DistitI

@fip Te isrit uprited nt rncipal.aTahrtetanpraincoriao-1, th-e~mainltenance

.- supervisor d&an4us driver' Will be~pre'sentaftfhidineiewt

-,;U i,

r' Criterion 3d 1` Apronate traffic and -ac"cess-co-ntro"lis. esita;blished AccAdurat instructions. are providýe d to6 tafc and access cnrlpersonne

,,-'I)

Coordinatioii between DeWitt County agencies designated to provide traffc and access contowilbexbtd in' the Cohnty EOC. 'A. Sheriffs depitty killbe* aviilable: duriinhýtefi&636cisie to'cddhiibnhira't~e the&sfa-ffin6ff ne post..

3/4The posf for the-deosath 2 wl b e:lected by D itCuny doq gthee-.ýercis6ebaid pn exetcise playý. -The O e~juty' will drive to the selecte& potlc binfr'the de6monstratiqn.~ The staffing of 1he reanng pots 11i be Simiilated.i

-- A Traffic &'Adcess control interview, and' demonstration ý(and dosimetry c'ontrol,-bri~efing), Will. take qplace at the.-

Cýlintoii Police-ýDepartment oh Octob6r 3,1, at 1:00,pm.A Clinto Policeofficer willb available to demonstrate the actual~or simulated staffing of on pSst. ---

Unclassified Radiological Emergency Preparedness Program(REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 3.d.2: Impediments to evacuation are identified and resolved.

The DeWitt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that Will drive'this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providerswill be madeand logged.

Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regardirig water,' food supplies, milk and agricultural production within the ingestion exposure pathway bmergency planning zone for implementation of protective actions.

This criterion does not apply to DeWitt County.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.

This criterion does not apply to DeWitt County.

Criterion 3.f.l: Decisions regarding controlled re~entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

This criterion will be demonstrated through discussions in the DeWitt County EOC. DeWitt County EOC staff will coordinate with REAC, UAC and the JIC as appropriate. The State will participate to the extent necessary to support DeWitt County.,

EVALUATION AREA 4 FIELD MEASUREMENT AND ANALYSIS This evaluation area does not apply to-DeWitt County.

EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Criterion 5.a.l: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial, decisioný by authorized offsite emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.

DeWitt County will demonstrate the capability to provide both an alert signal and an initial instructional message to populated areas* throughout the 10-mileý'plume pathway EPZ in a timely manner after their decision to activate the alert and notification system to implement protective' action recommendations (PAR).

This 'capability will be demonstrated through the simulated activation of the Clinton Station EPZ Siiren Warning System as defined in IPRA-Clinton. The Siren Warning System (outdoor warning sirens) will not be activated during the exercise.

The ability to provide ihstructions to' the public will be demonstrated through the simulated activation of the local radio station (WBNQ/WBWN/WJBC). The local radio station will be contacted during the first, and possibly the second, alert and notification sequence. An evaluator and a controller will be positioned at the radio station during the exercise to monitor for a message containing a PAR. If the initial message does not contain a PAR, the evaluator and controller will stay at the radio station for the second message.

69

','.After-Attion Report/lmprorvement Plan

.~

~

V q:"""

-Ra*.

4Unc~assind P

_#di?1gical Ernerg*.ny-P. rparedness P gragmah

_(REP)

ClifitohtpoweiStation

-4. -

- -,I Criterion 5.a.2: [RESERV E 4D]

.' i Ui.

'. r '

-Cfiferiow5.a.3: a associated with FEMAapprvedsexceptioh :aeas (where applidAble) are, completed within 45 mifiu te i....

auth o ri ed f eiee yI fo ti...

ub.i...f..

sfollowiiig;the lmtiaii o

ahdec d

trercils't o.ju.nemergency-sitiuation.

,Balpaert'and notatinof thelpublicis-c-opletid wiithin5minutesfollowi eetectinbytheOROof afailure of thep'piim a y. alert a nd hd~tifich i &,q*4 r

f tt

, j 1/4 Th is cr ite io n d o e s n oPp:

P e i t C o n ya" A-1:

Criterion 5.b.l: OROs provide accurate emergency information and instructions to-the public and the n ews mediain a -tielym

, DeWitt youniwill demionstfrate this criterion by using prteoscipted, q

essags.-s. idicatedian-nC*!inton.-.Contact with' thle radio station willbesimulated for "ehalerft.ind notification:s'eqiuence ifollowing the sequence issuingthe initialP.A R v ~ ~.

h-e 'ability to provide informnaion jo the media will bedemoinstrated by DeWitt Cduhnt through befipngs held at.

.theDeWitttCbunt* iedialbriefiuigocdtion.-If realiiedia die hot preseht forthqe briefingsthe conetrollersand observers will serve as mock m edia.. Evaluatoswl o ev sm c media-4

,L"

- The aity o.deal with rumors willbe,,demonstratedbyDeWitt, County throughcoordintin between,the County

-EOC and the.JIG.Th DeWitt County EOC conitroller,,wlll-inj ect.exercise messagesthat ywillensure

,te opportnty to demonstrate this cntenon.,,County, officials willinvestigate and address,,rumors.If appropnate;the rumors

....,wll becoordinated between State and County officials in t'e County EOC and the JIG Countyemergency broadcast.messages and-newsireleases*,f isued.willbefaxedto the JIG EVALUATION.

AREA 6 SUPPORT OPERATION/FACIITIES "i-,..-'This evaluation area-does not apply to DeWitt-County

. f-.-'W-.,

  • -s-,

r-.p Si J~'

3 tm

[

4 1-3

,I ' - '; "*

) ;f. ;,S ";)cl

  • iq ! *, " r; *;'

2. ".U *-br

).,

  • L - :':. *-

i.-;-i. -:i---*

" -2 '* ",'-.

.r

°, * ',,

.i

'r ¢ ? r ;.:#' $ * - '!

.h

"', /:

= --

I J<A'j§33~K.

1-- A rUV iS';

-12

.i---

~ *¶~-J:

3

~-

's I-

  • ~V C

V "70

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station MACON COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately forcredit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.1. Criteria that may be re-demonstratecd, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a. 1,. 2.b.1, 2.b.2, 5.a. 1 and 5.b. 1.

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

Macon County intends to activate the Emergency Operations Center (EOC) in Decatur, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Board, EMA, and the Sheriffs Department.

If the scenario does not drive protective actions in Macon County, the County may decide to downstaff the EOC to minimum staffing. A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.

An evaluator will be positioned at the County. Sheriff's Communications Center (initial warning point).at the start of the exercise.

Criterion 1.b.l: Facilities are sufficient to support the emergency response.

This criterion will not be demonstrated during this exercise.

Criterion 1.c.1: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.

Coordination of decisions and emergency activi.ties will be demonstrated between Macon County. and DeWitt County.

Criterion.1.d.l: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.

Communications capabilities are managed in support of emergency operations.

Macon County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.

Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.

Macon County will adequately demonstrate the ability to support operations through the use of maps, status boards and other displays as appropriate. The availability of dosimetry and KI will be demonstrated during the traffic and access control demonstration. The DCO briefing for the deputy demonstrating traffic and access control will be conducted at the County EOC.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

71

Unclassiffied 1

Ao.t/Improvement Plan j

Cn Station' I

4-

'4f-This-cnitenion doesý not apply to Macon County.

-3

~

, s44ioog'a Er

'ege 1/4 Prepi~en3 s Prora (REP)'..

.33 -,t'n, '

.I CPKritenon 2:b.lAppropnateprotective action recommendations are based onavailable ifornation on olant conditions,ý field momtonng data icensee and. ORO, Was,&ell-,as knowledgeof on-site, andcoff-site enviro entalna conditions.,

-4 e

(

I This criterion does not apply to Macon Cout y, Criterion2.b.2: A decision-making pr-cess involvingconsideration,of appropnat factors and necessary coordina!0tion' sed II to miake protective acition decisions (PAD-s) for. tegnrlpblic (including the recommendation for the use of KI, if ORO Thiscniteridn does -not apply to'Macon Coutyjhis',fulction:is the responsibility of DeWitt County.

-Criterion 2.c.1: Protective action'decisions aremane 1asappropnate,:

for spe6ia

.1population gro'ps.

are~ ~

~ ~~~h mae saprpaef respecial populaton giDeiitt.,

This rterion does not apply to MaconCoun ty.

fifsnctio'n is t erespo'nsibility of De

i,

Cont

-l

-m M Th~

3 Count

-'This

, Criterion 2.d.1: Rhdiological ponsequencesq:,for,themingestio'nrpaihway are.assessed an apprpate lprotectie,ation decisions aredniaddebased o~h te panngctra' This &riterionfdd6o* bt apply t!'Macon',County III

x.

d-s retr ndcsl"*..are made.iafid',cootdfad ppf

-,~sd"0n"L ;._

Criterion.2...

1:,-Tiel. re-.ocation, re-entry an.'.retrndecis ae d

n o

ad ap t

ba o

C assessments bf. the radiological condtoi an rtrainteQ

-ln an-d/or pr-ocedures.,

f h-di 3'"'"i

,.*.,d 3rtrai teO~p

":fThiscrterion'does not, apljto'Macon County.This functint is the1 responsibiltyy "b.

i t

1I EVALUATION:ARA 3'- PROTECTIVE ACTION*IMPLEMENT-ATION "3.33

.Criterion 3.a.1: "The' ORs issue appropat'edo-sim etryandprocedur snanddmanage radexposure to emergency workersin acc6'ordnce with the plan and procedures*Emergency,workerspeiodicallyand atth ndof each mission-read

-yo lror chrbe,....-

, 'O-o d<<

' their dosimeters and record thereadings on the _pptopriate exposure record or ch.t

3. "1.l iffi ai'3 demonstrate "

'""c h-ru*r:D closed**"*

'a;,*

,. 2;,, -,.*,..A+s.-,.,- wf¢erh ithiot. TC E I-

".:5 " '-.;'5,:;...

.Macon. 'ounty will tins rby 3 uiiaii adtmi*ad onC "Dthifft or

"":"33 3

4.33'is..

crit 3'3on 3i~

is

!*"3n e3or3

'3it e4i "A...

3' 3

"33,33" 3- "

exých'ange.of information within-te County Doietry Control Offier n-etwork..

This cri-terion will also,, e dd during the traffic and access control demonstration. The Sherfs deI

...Will obtain dosimetry from the.DCO in the County EOC. The DCO briefing for the deputy deirionstrating. iffic and access 6onitr0ol wi be.conducted at the County EOC.

Criterion :3b 1.1:KI and appriopiate instructions" are available sh6old a decision 'to',re6ommnehdIbe made.,

Appropriate record-keeping of the administration o R.Ir for emergency workers andt institUtionaiied individuals -(not the I3'3.

434'-

N333

',343

.general public) is-maintained.:

When notified by the State of Illinois, to distribute and administer.KI, Macon Cotnty0*officials will discuss the issuance of KI to emergency workers.tah'd i"knbbile pop*lations, as'a voluiita& hieasifre.Thi&-briterioh 'will also be demonstrated during the traffic and access,6ontrol.demonstration..* The DCO briefing for the~deputydemonstrating Atraffic and access. control will be conducted at the County Eoc.

'E C.

3 I7 2

.=7¢'I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.

This criterion does not apply to Macon County. This function is the responsibility of DeWitt County.

Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.

This criterion does not apply to Macon County.

Criterion 3.d.l: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and-access control personnel.

Coordination between Macon County and DeWitt County will be demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by Macon County during the exercise based on exercise play if the scenario causes Macon County to staff posts. If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.

Criterion 3.d.2: Impediments to evacuation are. identified and resolved.

The Macon County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controller that will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.

Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion' exposure. pathway emergency.planning zone for implementation of protective actions.

This criterion does not apply to Macon County.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.

This criterion does not apply to Macon County.

Criterion 3.f.1: Decisions regarding controlled re-entry of emergency workers. and relocation and return of the public are coordinated with appropriate organizations and implemented;.

This criterion does not apply to Macon County. This function is the responsibility of DeWitt County.

73

"Ra

-FUndiassified

-:.)-Radiological EirgencyiPrepareýdness.Programn (REP)

".,After&iiofR~ponmrt/provxement Plan 7..

.",4 lt

" 7 2

=

- EVALUATION AREA4 4-FIELD MEASURMENT-AND ANALYSIS IA Thisev~aluation are does not apply to Macon Co uinty EVALUATION AREA.5-EMERGIENCYV NOTIFICATION AND.PUBLIC INFORMATIO'N

..Criierion 5.a.!1 Activites associated withprlma? alerting afndnotification of the public arefcompletedina timelymanner.

  • ....followingthe initiial decisi6n b authozed-ffsite emergency officials nto t th*

e p*bl p.1ic ano.p emergency situatiofn.T'.The Thioýjisd inta'dcs.

y2 au oiuinisiteamrg ihitialimstructionalmes getoth.eublimWustimcluaefasaminimum eelmentsre6uired by current FEMA REP guidance.

crhis Citerio esnot apply to MaiciioCfi6unty.This function is the responsibility of DeWitt Counity Crrite'ioni'. 5 a'3 Activities assoiated.withFEMA..approved exception,:areeas (

r able)arecom pleted within 45 minites following the -initial decisioin by autli6rized 6ffsite emergefi.y officials to"notif,'the public of an emergency situation.

.Backup alertand notificatiionf the public is cosmpleted withinc 45minutes* followingthe detectinby theDOROofa faiure of thepriaryalet and n-systemn:.

epiar notification t

Ali

  • -d iot Ma
  • hscieon does no apl oMcon Cut

.. :Criterion 5.b.: oR-s provide accurate emergey information and 6minstructionsan tote pu*bic an dthe news mediin a timely.

manner-.

~

"This. critenion do6s not apply*t*o*ac6n Countiy-This fu'nctionistthe resp§osiibility:of DeWittnCounty-EVALATIN AEA 6-SUPPORT-OPERATIONIFACLI'TIE~S-

.. This:.evaluation area does not apply to MaconCounty. *

-4 y-1q. 3

'.4;"- '

t°/ t

't.- 7 "-i.Sp F..:

-;"-'4,-

, i...-

b-?',

i?

r.,' ti 1/2. =.- -."

&.d t * ? : "

' 'i-

- 4,y -

I

.F* '

.' i"

."i.r

.i--.

iL

,.t-s.-f-.

3-

  • ~

-F-. -

2 -

,5

-I:

F

-"Fi~

. 1

" ~

.I I

I

  • "'74 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station MCLEAN COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.l. Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include. the following: 2.a.l1, 2.b.l,. 2,b.2, 5.a.1 and 5.b.!.

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT1 Criterion 1.a.1: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

McLean County intends to activate the Emergency Operations Center (EOC) in Bloomington, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with representatives from the County Administrator's Office, EMA, and the Sheriffs Department. If the scenario does not drive protective actions in McLean County, the County may decide to down staff the EOC to minimum staffing.

A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators will not be allowed to remove the roster from the EOC.

An evaluator will be positioned at the County Sheriffs Communications Center (initial warning point) at the start of the exercise.

Criterion 1.b.l: Facilities are sufficient to support the emergency response.

This criterion will not be demonstrated during this exercise.

Criterion 1.c.l: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.

Coordination of decisions and emergency activities will be demonstrated between McLean County and DeWitt County.

Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.

Communications capabilities are managed in support of emergency operations.

McLean County will use commercial'telephone, radio and telefax to. communicate with departments and agencies at other locations.

Criterion 1.e.1: Equipment, maps, displays, dosimetry,, potassium iodide (KI) and other supplies are sufficient to support emergency operations.

McLean County will adequately demonstrate the ability to support operations through the use of maps, status boards and other displays as appropriate. The availability of dosimetry and KI will be demonstrated during the traffic and access control demonstration. The DCO briefing for the deputy demonstrating traffic and access control will be conducted at the County EOC.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of K!, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

75

.' Radiological Emergency Preparedness-Program.(REP)

I After;Actio iRep6crI1mproveriieht Plan r

ClintonPwistation.

-This criterion'does-not apply to McLean County.

on Crite~ijn 2.b1-!A1ppropriateprtective'actionr recominiendationsa1re based -

viailableinfomation6on field s,

.irnonit6ring. data ai lhens-eel

  • OR dose projeclt9i ns as we1l as, kowledge 6f.on-site-And 6off-site -environmental g, a,. a:njcin;,sw conditions:

This criterion does notapply to c%

policy) protectiveoap-p-rooessrevolvinig nonsl a

ecessary coordinatinri is used.

" to make pr~teqte action deislons (PADs): for the genreral public (including the recommendation for the use of KI, if ORO "This crterion does not Ipply toMcLean: County This function is the responSibiity of DeWittCounty n

Critenon2.c1.: Protective action decisions are made, as appropriate;.forspecial populationgroups This criterion does not apply to McLeanCounty.This function is the responsibility of.DeWitt County.

4heingstin atwy are-assessed and approprinate protectieato deilsions are' made' based on the ORO

-planing.

'critena.-

This crfiteriobn-does not a:p-y to McLean

`ou.,ty.

-,,--Criterion 2.e 1 elrection reentryand* return. ecisions: areimad and coinatdsaprep rbase`d-assessments ofthe radiologicalconditions d criteria in

  • t...,,s p an an orp.rjedf'-

i'fi' De; 1t Cuny.

,.This criterion:does notapp ly toMcLean County -This f i,the responsibilit of D e-itt oun EVALUATION AREAk3 -PROTECTIVE..ACTION IMPLEMENTATION

-Criterion 3.a 1: The OROs issue appropriate. dosimetty anid procedites, and manage ;radioogic:a ex to p~Wcirkei_

in acorane'it!Emfergecy' k*'S swmekers e.-

a d

tp an di proceduresE rn workerspenoticlly-and :t thic edof"enach amissiaonread-

. i d mete and rcord;t rediniigs on.the appropriate exposure: record o6r cIhart1A McLean County. will demonstrate this,iritefidn by: close )c6ordiiintion' With? JEMA'. and, timely dissemination and exchnge of ihforatiioii thinwthe County Dosimeftyeotryo'r.!

C Lfd.,

n r.

This criterion will also -be'demonstrated durng the traffica and access control demonstratin. The Sheriffs deputy fTr dii h'fi" t "

eZ d uetonstrat-d will'obtai.n dosimetry, fio DCO in,the,Coty;EO'The

,DCO briefingfor te deputyy emnstrating raffic-and access control will be. conducted at the County.EOC.

I Criterion 3. b.1:KI 'and appropriate lstfrctions.h are advilable.should apdecision.to recormend useiof KI be made.

Appropriate recdrd keeping of itheadmmiinstration-of-KI for:emergency r

workeis-:and institutionahziedmiidivdii ls (not the general puII) ISimaiiitained

i.

A l When notified by the State of Illinois to distribute and administer.K,, McLean County 6fficials will discuss the issuance of KIto emergency workers and immiobile j"p6gUlationsi, asa voluntary measure. This criterio n'ill also be demonstrated during the traffic and access control. demonstratibri. The DCO briefing for the deputy demonstrating I

traffic and access control will be conducted dt. the County EOC.-

.76,

Unclassified Radiological.Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.

This criterion does not apply to McLean County. This function is the responsibility of DeWitt County..

Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.

This criterion does not apply to McLean County.

Criterion 3.d.1: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Coordination between McLean County and DeWitt County will be demonstrated.

A Sheriff's deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be selected by McLean County during the exercise based on exercise play if the scenario causes McLean County to staff posts.

If it does not, the post will be selected by the evaluator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.

Criterion 3.d.2: Impediments to evacuation are identified and resolved.

The McLean County EOC staff will demonstrate:the capability to identify and take appropriate actions concerning impediments to evacuation' A message will be injected by the Controller that will drive this. demonstration.. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc. Actual contacts with resource providers will be made and logged.

Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning, zone for implementation of protective actions.

This criterion does not apply to McLean County.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed foi implementing protective action decisions for contaminated water, food products, milk and agricultural production.

This criterion does not apply toMcLean County.

Criterion 3..1: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

This criterion does not apply to McLean County. This function is the responsibility of DeWitt County.

EVALUATION AREA 4 - FIELD MEASUREMENT AND ANALYSIS This evaluation area does not apply to McLean County.

77

Unclassified I

<-:Radiological Emergency-Preparedness Program* (FP)

"" ;.After Action Report/Improvement Plan Clinton Power Station 7l EVALUATION AREA 5 *EMERGENCYNOTIFICATION AND iPUBLIC.INFORMATION*.

i -,

6 nCriion 1 5.a.l: Activities associated with primary al e~rting and' notificati6n of the public are comp.leted in' a. timelymanner.

follwingthej~niial de~sio,b.auithorized-ýoffsite,:einergency obffi'cials to notifythe public bf an emergency situationi. The initial inmtructiiona-imessage to the~public must include as. a.minimuimtheelemieinsrequired-by current FEMA REP guidance.

This criterion does notapply toMcLeaiiCouniy This function,is the rsp6rnsibilit, of DeWitt County C rite ri oo n

no 1,t 'y h g Criterion 5a.3: :Activities assiated.d with.FEMA approved excepton areas (where applcable) are completed within 45

.miinuteies folowngthe :initial, deciisýj by authoriz6,d ffsite.emergencyofficials.to notify the plblic o Ffanemergeficy situation..

iBackup alert and notificdtion 6f the.pl is "ompieted within 45 minutes following the detection by the oROof a failure of the,primary alert And, ioi6cifictidn systr*

1 II C

meerod:in:o ets moty I,

L C

  • it :i.iCrierio5n.b.1:1 OR

-Ospro'2ide accurate.emergency iniormationi and instructions:to the'pUblic andathe news media in a timely h-is criterionsdoesnot apply to McLean"county Ths function is the respo ibility ofDeWift County

..EVALUATION AREA`6 -SUPPORT OPERATION/FACILITIES:

.. *:.....,: -,L h*evalti-ti-ohi,a""re'a'*'d3*,is not p~y M cLeahrC6unfy..

.-. :... } !

..'- a' I

II

.8:

"~~~~'

"z Is s

i-:

'? *!.!'.

.o.

.o....

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station PIATT"COUNTY EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated irmnediately for credit, at the discretion of the evaluator, include the -following: 3.a. 1, 3.d.1, 3.d.2, 6.a.1, 6.b. 1, 6.c.] and 6.d.1. Criteria that may be.re-'demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee" include the following: 2.a.l, 2.b 1, 2.b.2; 5.a.1 and 5.b.1..-

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l" OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

Piatt County intends to activate the Emergency Operations Center (EOC) in Monticello, Illinois, to the appropriate level. The County will implement notification procedures as defined in IPRA-Clinton. The EOC will be staffed with iepresentatives from the County Board, EMA and the Sheriff's Department. If the scenario does not drive protective actions in Piatt County, the County may decide to down staff the EOC to minimum staffing.

A roster will be provided to demonstrate 24-hour County staffing of the EOC. Evaluators Will not be allowed to j'emove the roster from the EOC.

An evaluator will be positioned at the County Sheriff's Communications Center (initial warning point) at the, start of the exercise.

Criterion 1.b.l: Facilitiesare sufficient to support the emergency response.

This criterion will not be demonstrated during this exercise.

Criterion I.c.l: Key personnel with leadership roles for the' ORO provide direction and control to that part of the overall response effort for which they are responsible.

Coordination of decisions and emergency activities will be demonstrated between Piatt County and DeWitt County.

Criterion 1l.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations.

Communications capabilities are managed in support of emergency operations.

Piatt County will use commercial telephone, radio and telefax to communicate with departments and agencies at other locations.

Criterion 1.e.l: Equipment, maps;, displays, dosimetry, potassium iodide (KI).and other supplies are sufficient to support emergency operations.

Piatt County will adequately demonstrate the ability to support operations through the use of maps, status boards and other displays as appropriate. The availability of dosimetry and KI will be demonstrated during the traffic and access control demonstration. The DCO briefing for the deputy demonstrating traffic and access control will be conducted at the County EOC.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

79

Unclssifed I

  • Aer Actio R "Radiologi-cal.Emergency, Preparedne-ss Progr,.am (REP) i Pwer

.ta Actioi..port/improvement Plan PCoiwe Station This criterion does notla to Piatt Conty-.-:

Criterion 2.b.l: Appropriate protective action recommendations are based on available information on plantIconditions field

.motonndgidata. and-li.ensee and OROdose-projectins as well as kniowledge of on site and offsiite envtronmental-I This criterion does noi apply to Piatt County.

.. 1 Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessaiy coordiniation is used to make protective action decisions (PADs) for the general public (including the recommendaton for the Ius -of KI,

&f'DO policy).

This criterion does not'apply to tyThis futn t

te responsibilityo6f:DeWitt Coun 51 oPiatt County.-ý ffction is spo

.t y

Criterion 2..1: Protective action decisions are made, as appropriate, for special population groups.

This cintenon does notapply to Pia ttCoun"tyiThis u responsibility of DeWitt County Criterion:2.d 1*.1:-Radiological consequences.for t he,-ingesti6ni pathway are-assessed.and aappropriate protective action decisions are made based on the ORO plannimin t

0g ct eria.',

-This crniterion' do'es'n-o't apply to Pidtt County.

/

41,

It Criterion '2 ej:1Timielyý re location, re-entry-and reurin'decisions.are.ie made and oordinated-as appropriate based on assessments of the radiological conditions and criteria inthe tplan and/or procedutres-:-"

U.

.1*.

'T Mls.

i

-nsfriteindoe" hot'appjIlyto P

Cbun y.'This ntllst rs si tt EVALUATION AREAo Piatt i uncif ist te responsib'i ity~bf DeWittCoht 3TEVALUATION AREA -PROTECTIVE;ACTION IMPLEMENTATION

ý-_*Criteri6h13.i l

ýroqedurqs Cr.iterio 3.a.l: The'OROs *istieapropriat ddosime*try nd pe iiefd,,manag

radiologic exposure to emergency
  • worKers n accordance -with the plan an.proceduresý., tmergency -workers 3penoalcan

-thelrdosimeters andro rd teadropat ex oposurer'0rdrthat Piatt'iCounty will demioistrae this.ci'iterionn Withi iiAE ad iimly~disseiination and'exchange by clos coor man on with antmel of-i-onformaton withn the oInty Di metry Control Officreirnetwork

.This criterion will also be-demonstrated dunngA the traffic and access control demonstration.i' The sheriffsd*eputy IM i:'

"i'r'r3*-h DC

'if

i6-C'id"b de ut-df ic will' obtain dosinmetry froi the DCOm the County EOC. The'DCO bn6fng'for the deputy demonstrating traffic -and access control will be condiucted.at the County EOC.-

Criterion 0.~: KJ 'an d appropriate instructions. are 'avaiIabIe should 'a d 6is1ion to rQcofim end usse of KI-be made.

Appropriate -irecord keeping of the -admihiistrion 'of i

-KI for. eiietgencý' workl.s and institutjonai'diindividuals (not the general public) is maintained.

-2

-¢.

When notified by the State of Illinois to distribute and administer KI, Piatt County officials will: discuss the issuance I

of KI to emergency workers and imniobile. populiatns,-as-,a-voluntary measure. This criteion--wi l,also be demonstrated during the traffic and access control demonstration. The.DCO briefing for the deputy demonstrati]g m

traffic and access c6 inti-ol will be eondudted ai te i

-i g

for E-the d

'"t demostrai"-g I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.

This criterion does not apply to Piatt County. This function is the responsibility, of DeWitt County.

Criterion 3.c.2: OROs/School officials decide upon and implement protective actions for schools.

This criterion does not apply to Piatt County.

Criterion 3.d.M: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Coordination between Piatt County and DeWitt County will be. demonstrated. A Sheriff s deputy will be available during the exercise to demonstrate the staffing of one post. The post for the demonstration will be *selected 'by Piatt County during the exercise based on exercise play if the scenario causes Piatt County to staff posts. If it does not, the post will be selected by the eValuator. The deputy may be asked to drive to the selected post location for the demonstration. The staffing of the remaining posts will be simulated.

Criterion,3.d.2: Impediments to evacuation are identified and resolved.

The Piatt County EOC staff will demonstrate the capability to identify and take appropriate actions concerning impediments to evacuation. A message will be injected by the Controllerthat will drive this demonstration. County personnel will deal with the impediment by identifying the equipment needed, discussing its estimated time of arrival, etc: Actual contacts with resource providers will be made and logged.

Criterion 3.e.1: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion. exposure pathway emergency planning zone for implementation of irotective actions.

This criterion does not apply to Piatf County.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminatedwater, food products, milk andagricultural production.,

This criterion does not applyto Piatt County.

Criterion 3.U.1: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

This criterion does not apply to Piatt County. This function is the responsibility of DeWitt County.

EVALUATION AREA 4 r FIELD MEASUREMENT AND ANALYSIS This evaluation area does not apply to Piatt County.

81

Radiologcýal Epnergeniy PreparednessProgram (REP)

AfterActionePrt/mprovement Plan Clint6nPower Station EVALUATION A REA EMERGENCY-:NOTIkIATIN AND PUBLIC INFORMAXT-N C r

a.

,,ktifi6 associated With"m a I'yaloiifi--

h.i m

a followinrtg the initial decision,by* authorizedb ofst xireiyofcast oiyte 1ilc.

of-i aneegnytuation -"The'

  • initial instructional message to the pbimutncdeas amrnimumý. th9lmnsrqie ycretFM E guidance 3

Thiscriterion does notapply to PiattppCuntyo

, thisfncioniisthP-atevures ibility o{fe County 4-Criterion.a.2:, [RSRED Z-r Criterion 5.a.3: Activities associated with" FEMAapproved -ex-Iception areas..(whereapplicable) areIcompld witn..45 minte flloin te nitaldeisonj by authorze ofstgmrec fiials to notify. the pulc of an emergencsiuto 1Bcuplert an6ntification of the ýpublic is-compfleted within 45 'minutes folwn he deeto by tIhe ORO of a-failre 'of.

I the pimmaiy alert'and not jfication' system n-:-

~

This. e terio

-oesnot apply to/

itt-C Criterion 5A.: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner....

SThis cniterion-does not apply to Piatt Countyý This function is the responsibility of De itt County."

EVALUATIONAE SUPPORT OPERATION/FACILTE

  • ."-7..'",*}".............

'.....,'....:/

This evaluiation area does'not ap'ply to P-ýiattCony i

2 82

Unclassified Radiological Emergency preparedness Program,(REP)

After Action Report/Improvement Plan Clinton Power Station ENCLOSURE 7 EXTENT-OF-PLAY AGREEMENTS CLINTON P0WER STATION (CPS) REP EXERCISE Week of November 2, 2011 7F MS-1 OFFSITE MEDICAL DRILL EXTENT-OF-PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, at the discretion of the evaluator, include the following: For Transportation: l.d.1, 3.a.1 and 6.d.1; for the Hospital, 1.d.1, 1.e. 1, 3.a.1 and 6.d.1. Criteria may be re-demonstrated, as agreed by the Lead Controller and FEMA Evaluators.

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.d.1: At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.

Decatur Ambulance will use 2-way radios to communicate with St. Mary's Hospital Other communication systems that can be used include commercial telephoneor cell phones.

Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.

St. Mary's Hospital will adequately demonstrate the ability to support operations, with adequate resources.' The availability of dosimetry and KI for hospital personnel will not beý demonstrated' during this exercise, howiever IEMA staff will be issued dosimetry and KI as field team members.

EVALUATION AREA 3 - PROTECTIVE ACTION IMPLEMENTATION Criterion 3.a.l: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.

The use of dosimetry and KI will.not be demonstrated by hospital staff. IEMA staff will demonstrate appropriate use of dosimetry and KI.

Nasal swabs will be taken to ensure inhalation and/or ingestion exposure pathways are not a concern. For the purposes of this drill if there is no medical need for equipment or supplies to be brought in/out of the controlled area these swabs can be used to demonstrate the movement of equipment and supplies across the buffer zone.

EVALUATION AREA 6.d - TRANSPORTATION AND TREATMENT OF CONTAMINATED INJURED INDIVIDUALS Criterion 6.d.l: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

Decatur Ambulance will demonstrate the capability to transport contaminated, injured individuals to St. Mary's Hospital.

The ambulance crew will pick up a contaminated injured patient near the grounds of St. Mary's Hospital. The ambulance crew will be aware that a release has occurred from Clinton plant but not able to determine if the patient is contaminated.

83

Unlssfe i i

.Radiological Emer0gency Prearedness Program (REP)

SAfter ActionReport/Improvement Plan Clinton Poer Station Decatuir Ambulanceý willutilizeuniversal precatitions-and good.hoiisek&eping practicesto Tiniminethe spread of contanuhation;-hnd will focuson treating the -paitrienit's miedical condition.

j Decatur Ambilance will ii the irformitfionregardifig the patient to St. MarY'sHqitalin Decatur so they can prepare for receipt of a6potentallytcontarnated patient St*

ary s Hospitalwill :implement their.plan for receipt, isolation anri treatment of an ijuredcontaiiimated patient eMMedicalpersonnelwfllYutlizeiuversal precaiitionisand good

...,oiekeetomnirze the spreadof contamati andwill focuson' treatingh theipatint

'i house jeepmng practices' oaiila minfiethdipeaaln condition.

ý

.j a

effrttwifbjkmhsdt~fattrth 4dicaiiystabiliizd The hospitalxwilide-m~onsirateprocedures forhliriiutng'expos4ietohospal-ift.sa'decontaminating a patient, 6in'iresnicting t.:;gc6esi td ttih*a~ea wlhere the

'dis persond.h ta sie nefl il dden*onstatetheir kowedge acsfwhtothel ara-pati~eiit.

bisn~g -,treated and rnonitored-Hp ta heý~dzg

~who to c'albeyond'IEMA s'foi dsis.stance-i RdadbI6gical Accidentse g4., REA'CGS:

Forprposesofth~is exerise t

an EMAsta

ýmembe willbedispatcheddto`St. Mary's Holspitail'ith'radiation:detedtidn".

and measuremeht equipmentlto survey out 'ambulance stiaoffl e ofShahie*anpIEMAMs toin

§

'fv '

-i

-E th o.ae no yigMRT available-is to-fadilitate oitonn the ambulance and personnelso they areDot lkept out 6 fkserv'e f tendedpe6riodof The drill wfll conclude with thhieospital reprenr t

remova o proen

.-ie emergency room and hospital personnel. IEMA will also advise on the lpure for-release p, osal contaminated material.

Following the conclusion of the dnill, a short critique will be held.

4 2, 4 4 " ~

t-4.*

.2

  • t '

4 4 '.

.Ž.

44-q ti

' ;2':

.2t-* t,? m?', "4-4 2

2.....

4'K;'-

1 WI

.44 '

I;:,:

"/t.,-;

v,

"7.Ž i

4..- '4 ',;:-

"""1/2 4

"4'8, 4lJ~~

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station APPENDIX E: SCENARIO DETAILS SCENARIO INFORMATION:...

e-* Exercise Time Line.

," Narrative Summary

  • . Meteorology
  • -.Release Information

-85

Uncl6assifiedý A

Raologcal EmergencyPreparedness Program (REP) n:

Power S

.1<:

ftr4c

'i6ri Report/Improvement Plan.'

in EXERCIS TIM I: NE y(Novemb er 2,2011)

Anitial Condlfjoris,%-ý

-4 The plait is at full power.noa.270 day run. On'-Line Ri'sk Leyel issGreen'. 'A'.RHR 9n suppession pool circulation '

in

.preparationifor the RCI surveilance.

.0750 StarScenario-Shift ALERT

  • HA5. 5 Natural and dest*U'ctive phenormena'affecting plant inthe Vital Area Fi oj~d ig of.'A ' RHR pu l- 0o (H area."

ý.

Y:

ý.

  • .¢!

i i

i':

I-i

/-- _,_:
1. ý Flodin ofA HR pump r6oom (H2,iarea)--

Pool

,Damage t6 A' RHR pump sucti6on-Suppressio6 Pon l Leaklintboatijbiildirng MCB Annunciator 5013-SD - '"Hi Hi. RFRR ARoom

'pl~ve ircr.ifg i'RHRA RoomR o

7 Sump

( 5 minutes'later) MCB Annunciator 505675G "Secondaryp COnt; Area Max SafeCrperat ngw aterbLevel" (8";water level).

0805

'A RHR pump trips to (uewater 1ntrusion-(

Minuteafter sirnmp lelk aýairm)

(15).

A leak will'be discovered ohthe 'A' RHR'pumpsuction (Contrl MessageCM,-2 -,Suction line break, spraying'on motor, andn Water level rising inrobm L-'electrical zard?)

Suctioir MOV-Ei.2FO04B will' ot close -rshows open on indicatonrlights (ýthermwals tripped - c'ontroqlmessage)

,. ManualIsolation valve -acan beclosed with MM assitance (,f room entry permitted control message)

De~t0" a decrease~in SU~pression pool :l~e~vel, the CR team willline u normal make up to~ te suppr:esion pool-ý j_ - Ops Crew responds per EOP-8 and Flooding Off-Normal procedures

.*.,(0900)'A APRM failedHigh e(panel i back-MockUp.-[IM taSk] -Tech-Spec j-Crew will 0900: r bypass per 3305.011 responseT 3

'(70) 2 (0905) ERAl SVc.(Static VAR Compensatori) Arilnc'6i5to1 8_

'8'"RAT SVc Trip"-(look ait #9&r#10 in pOrdcedr.01 Harmonic Flers or coing skid issue Loss Of Coolant Accidentto the Containment S, :...LOCA-Loss"ofRCS.:Drywell pr'ess >,1.68,psig due to-RCS leakage ;(RC3):orDW Rad,>100

/Rhr.withRCS 095 leafka'ge (RC5

.2 ecirc ra rsls nLC

.(9)

Qr'oupl 1 Ioain(pros u to hihsem flow arid Reac~tor-SCRAM',q

.DW/.ContRads rise;,resulting in Loss.of RC:S.DWRaýd*100 Rbhr/Cont Rad >33 R*hrwith RCS le.akage (RC5)

  • .Ops

~

p Cre repndispe Proedr 4304,01 q,.

  • Concu rretFA

-1 1-,

IA DG'trips due to overspeed (past OE)

(can be-repaired per control message)

MM and EM task

-SITE AREA EMERGENCY. FSi..-*DWICont Rad's exced-,fuel barrier limit -,

Daiato Fuel cotirie~

'~'

(105

.Containment Radiation >41* 3R*Hr6and Dryw.ll Radiation,>260 WIr.

[ALERT+90]

DWCAMMonitorgoes.,to high Alarm SLoss'of Fuel DWRad 260 RFhr (FC5).with previous'Loss of RCS (RC3/RC5) results in SITEAREA EMERGENCY FS

  • . ',Assembly/Accountability (simulated)-" Initial Condiitions (Exempt ln-Processing Personnel outside fence fromAssembly "actions orcontingencies).-

-A, GENERAL EMERGENCY' FG I

'RWCU'isolation failure w/break S,Group 4* failure MCB Anriunciator 5000-4A (Max.Safe Temps.>2000- RWCU fails to isolate on RT Equip room high temps (186.5°F)due to break in'RWCUpmp room in AuX BId.,:: with b a

A.x Los§f Contiainmone-f(CT6'i/:1/T6.3),RWCU

isolation-failure'withbBrieai-a.,W6U PU'mýýI*

room in Aux Bid (RT_ Equip room)

(185)-

and'pbthl tobihe environment (Release Path 'M'). *WCU pump room Max Safe area temps and rads.

[SAE+80]

C~niaininnRadiation levels out at 60 R/Hr Drywell Radiation reaches ~300 R/Hr Loss.of Containmeibt (CT6.1/iCT6.3)'with previous, Loss of RCS (RC3/1R5)and Loss of Fuel Clad (FC5) results in GENERAL M

.EMERGENCY-FGI MAX PARS (Wind Direction from.240°, Wirid Speed 6.0 mph, Stability Class.E) -Subareas 1&3 Release in'progress (Release from Containment to Aux Building to SGTS) - SGTS monitor increasinýg'ýv 1130 (220)

RG1-TEDE limits >lR/hr-Peak Release at 1.130'(3.80E+08 pCi/sec)

[SAE+801 1230 Exercise Termination (280)-

I I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station NARRATIVE

SUMMARY

NORMAL OPERATIONS 0750- 0804 The Operating Crew will take the shift at 0750 with the unit operating at full power.

Expected Actions The Operating Crew is expectedto maintain current power operations.

ALERT - Onsite Events 0805 -0934 The crew will receive a MCB Annunciator 5013-5D - "Hi Hi RF RHR A Room" - due to sump level increasing in

  • RHR A Room. This Annunciator will be followed by the tripping of the RHR Pump.

The local operator for the. RCIC surveillancewill report (via a control message).that a leak hasbeen discovered on the 'A' RHR pump suction (Control Message CM-2) - Suction' line break, water is spraying on the 'A' RHR pump motor, and water level rising in the room representing an electrical hazard.

OnsiteExpected Actions The Operating Crew should respond to/contact local operator due to~the pump trip. Actions should be initiated to address the flooding issue per EOP-8 and Flooding Off-Normal procedures: The Emergency Director should declare an ALERT based on HA5.5 Natural and destructive phenomena affecting plant in theVital Area. [To=call to CR on electrical hazard with water leak spraying on 'A' RHR pump motor].

State notification should be completed via the NARS.' The ENS notification should be made.

Unit should remain on-line during this evolution. Actions taken to manually isolate the 'A' RHR Pump suction will result in isolating the leak.

(Reference 'A' RHR Pump and Room pictures Section 6)

.87

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Clinton Power Station Approx.

I Time EventlAnticipated ORO Response to Alert NARS 0750 Initial conditions/weather forecast message to players.-

0805' An Alert is declared at Clinton Station.

0820 Exelon notifies the IEMA Telecommunicator of the ALERT via NARS.

IEMA Telecommunicator verifies the NARS message.

I An IEMA Duty Officer contacts the Clinton Station Shift Engineer.

IEMA Telecommunicator notifies IEMA personnel of the ALERT per SOP.

3 IEMA may activate the State of Illinois Response Center (SIRC) and Radiological Emergency Assessment Center (REAC), if appropriate.

IEMA may dispatch liaisons to the County EOCs, Unified Area Command (UAC), Radiological Assessment Field Team (RAFT), Joint Information Center (JIC), Technical Support Center (TSC) and EmergencyOperations Facility (EOF), if appropriate.

IEMA notifies Governor's Office of the ALERT. (Simulated)

IEMA Telecommunicator notifies ap ropriate State agencies of the ALERT.'

IEMA notifies FEMA of the ALERT.,(Simulated) 0835 IEMA Telecommunicator notifies DeWitt County of the ALERT via NARS.

DeWitt County telecommunicator completes and verifies the NARS rues.sage..

DeWitt County telecommunicator notifies County officials, support counties and municipalities of 3

the ALERT per SOP.*"

Support county and municipaltelecommunicators complete and verify the NARS message. "

Support. county and municipal telecommbnicators notify officials of the ALERT per SOP.

Counties may activate the EOC, if appropriate.

0925 At 0925, a Recirc line break results in a Loss of Coolant Accident (LOCA). Increasing Drywell Pressure due to.

RCS leakage (RC3) AND Increasing Drywell and Containment radiation results in the Loss of the Reactor Coolant I

System'(RCS) fission product barrier (RC5). A spurious Group 1 Isolation occurs due to high steam flow and the Reactor SCRAMs. The Standby Gas Treatment System (SGTS) starts.. "

Onsite Expected Actions The Operating Crew should respond per Procedure 4304.01. A Concurrent ALERT - FA1 should be identified.

I 88

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station 1A DG Trips due to Overspeed 0930 Main Control room will receive indications and annunciators for the tripping of 1A DG. Local investigation will indicated that the Diesel generator tripped due to Overspeed.'

Onsite, Expected Actions The Operating Crew should respond per Procedure. TSC/OSC should prioritize equipment investigation and restoration as appropriate.

SITE AREAlEMERGENCY (SAE) - Onsite Events 0935-1044 Loss Of Coolant Accident FS Loss or Potential Loss of Two Fission Product Barriers Drywell and.Containment Radiation Increases to Loss of Fuel.Clad Barrier 0935 Fuel clad damage has continued to escalate as indicati6ns, of-fueldanageshow~risihg Drywell and Containment radiation levels. Drywell Radiation increases to >260 R/Hr AND Containment Radiation >41.3 R/Hr. [T=0 for SAE]

The Drywell CAM Monitor goes into high Alarm.

The Loss of Fuel Clad Barrier - Drywell Radiation >260 R/hr OR Containment Radiation >41.3 R/Hr (FC5) with previously identified Loss of RCS Barrier (RC3/RC5) results in a SITE AREA EMERGENCY - FSl Onsite Expected Actions Operations crew /TSC / EOF ERO should identify the Loss of the Fuel Clad fission product barrier -

FC5. The TSC should declare a SITE AREA EMERGENCY - FS1 due to the Loss of two Fission Product barriers. State notifications should be completed via the NARS.

There isno path to the. environment and no release ýis. in progress.

Actions, should be talken for site 'Assembly / Acco(ntalability (simulated). Fo.llowing c0ompletionh ofthe Assembly/Accountability (simulated), the TSC should initiate an evacuation of non-essential personnel if the conditions warrant it (simulated).

89

U lnclassiflied

",Radiopogical Eni-gteny Preýpjaness Program P

(RE)

Aft er ctibn Repoi'lmprovement Plan S-

.d;- Ciinton Po.

Station Approx.

I Time

.Event/AntiCipated-ORO Respbn+eitoSAE NARS" 0935

-A SITE AREA EMERGENCY is declarid at Clinion;Station.

I 0950 Exelon notifies the, IEMA Tele-ommunicatbr of thf SITE AREA EMERGENCYiviaNARS IEMA Telecormmunicator verifies the NAR*Smessage- (

RECcntactsthe Clinton" Station:

Enrgineer; SIRC is activated if not.previousl, y Vt

SIRC notifies the Governors Office and requests that arepresentative reportto.the,State.EOC (Simiulated)-.

State dispatches li isons to the County EbOCs* UAC RAFT JIC TSC-and EOF.-if not previously,

SIRC notifies:FEMA-of conditions.

"EMA'notifies State agencies:(Simulated):--.-

"..-i~lllir ois.' StaP*6oi ce

.~~.~

?-'

6DTDvso f Aeronautics

-i;V IliosNational G'uard CC......

,' /* -?

men st

AmncanRedCross~

z--

~~

I EPA" Y

...DOA.

- ffice of the Staite Fire Marshal REAC contacts-;.. Feealaecis(Smlte)".

U I

REAC provides.an update"to'the'SIRG a:d"CountyEOCýLiaisons.

.REAC provides,an update~toiithýJibq.K

~

~

100nt 1& STEAREEMERGENCY'via NR 105 IEMA notifies De~vitt count Rf I

E' DeWitt County telecommunicator coimpletes and v'erifie~s.the NARS; message.

.90

" *;'+;'.:4 ". *."I"

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station Approx.

Time Event/Anticipated ORO Response to SAE NARS (continued) 1005 DeWitt County telecommunicator notifies County officials, support counties and municipalities of the SAE per SOP.

DeWitt County implements public notification, procedures, if appropriate. (Simulated)

Support county and municipal telecommunicators complete and verify thre NARS message.

Support county and municipal telecommunicators notify officials per SOP.

County EOCs are activated if not previously activated.

Dosimetry is issued to emergency personnel, EOC staff and exposure records are completed.

GENERAL EMERGENCY (GE)Onsite Events - Maximum PARs 1055 - End RWCU Isolation Failure with Break in Aux Building Group 4 failure Main Control Board Annunciator 5000-4A (Max Safe Temps >2000- Reactor Water Cleanup System fails to isolate on Rx Trip Equip room high temps (186.5 0F) due to break in RWCU pump room in Aux Building.

Containment Radiation increases to -60 R/Hr and Drywell Radiation reaches -300 R/Hr.

Standby Gas Treatment System Effluent Monitor shows a release in progress..

GENERAL EMERGENCY - FG1 - due to the Loss of ALL three Fission Product Barriers

  • Loss of Fuel Clad Barrier-FC5 AND
  • Loss of RCS Barrier-RC3 ORRC5 AND
  • Loss of Containment Barrier-CT6.1ICT6.3 - RWCU isolation failure with break at RWCU pump room in Aux Building (RT Equip room) and a pathway exists to the environment. RWCU pump room exceeds Maximum Safe area temperatures and radiation.

[CT6. la Failure of all isolation valves in any one line to close. AND CT 6. 1.b Downstream pathway to the environment exists.] OR [CT6.3 UNISOLABLE primary system leakage outside, primary containment resulting in.Secondary Containment area temperatures of radiation levels > EOP-8, Maximum Safe operating levels.]

Onsite Expected Actions The Station Emergency Director should classify a GENERAL EMERGENCY, based on EAL FG1. All appropriate notifications should be made.

A release is occurring due'to the RWCU isolation failure W)ith break at'RWCU pump room in Aux Building (RT Equip room) and a pathway to the environment exists (Release Path 'M').

Protective Action Recommendations (PARS) for the public should be developed to evacuate a five-mile radius and downwind Subareas to ten miles (Maximum PARs).

91

.-,. ;:Radioiogica!.Emergenc*yPrepared~ness.Program (REP)

-[

.* :..).

'.- 60'n,eo lmpi:6vement Plan-

/

7 n;A-

" -S,

ý..Stat

.ion-,

F.or thecurrent wind direction (fromh 240 Wind sp6ed 6,0 mph 'sta iity class E) the evacutio of Subarea;

1 1.&3 'shoul3d ?be' e rre~e mm~d ecl. -! eak :release :occurs at., ;13O6" L:..* i- :L

-".. ;*: ;, o¢ j-i;,- : <:":7, '

Approx.

Time, Event/AntMipated ORO.ReS'OnSe.,to GEcNARS, 1055_

- A GENERAL.EMERGENCYis declaredat clitonStato.

1110

. Exelon -notifies ::the. IEMA-- Tejecoýrruriciator_,,.of the GENERAL. EMERGENCY via NARS.

Prot6ctiveiationsve a

re recommended.** "i**::::*:.:...'ý,

7":'*'_t.;

IEMA Telecommunicator verifies the NARS message.

-7IC and REAC.evaluate the protective action recornmendation A..recommendationi*sade to-the Governor TheiGovernor recommnend*

s-atha6r6et ctiv' 'acinstis I

.,SIRC staf is advised of the situation,>,

SIRC advisesUAC -the Cdunty EOC liaisonshand JIC staff of the*situation I

S IRC notifies FEMAEof.conditions: (Simulated) 7-

',REAC 6provides'an update6to the SIRC a County EC

  • l isons REACprovdes n udateJto the"JIG. ~%

SIRC notifiesTDeWitt County of the GENERAL.EMERGENCYý andjheirecommended, prot eci6 actions vu~NRS

~

-eit-mm u~caty'o ricmp Itsand verifies the NARS message

". De.WitC0untyteleco~mmuicatornotifies Cnty.offi*cals suppo cnesanrc n)cii iounitri si aes and municipa s

-DeW itt. Coun i

ements publc notfic i procedures and-trafficand accesspcontrol.per.S.'

--!as applicable.-:.*

1 Support county and municipal teLe6ommurnOpicators notfify ECsteaff, Suppo-curtcountyandmunicipaltelecoimm**

unicators complete anerify andthe NARS me ssage.t1 munlcEXERCISE'-.

ý'

" 1 The Clinton NRC Graded Exercise ýi -te riinatafe~r-concurrence from -'the State of I'llihois has '.been' received..-...'All facilities'will. te'rminae*i exercse p*rtic1-a-tioand conductýse*

critiques of their performance.

2,PY1y~

92 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

SUMMARY

OF EXPECTED EALS and PARs EALs:

Time.

EAL #

Description Flooding of 'A'-RHR Pump Room' 0805 HA5 ALERT - HA5.5 - Natural and destructive phenomena affecting plant in the Vital Area. Flooding of 'A' RHR'pump room (H21 area).

Loss or Potential Loss of ANY two barriers SITE AREA EMERGENCY - FSI

  • Loss Of Coolant Accident.
  • Loss of Fuel Clad - FQ5 Drywell/Cnmt radiation monitor, reading > Fuel Cladding Loss Threshold, Drywell Rad > 2.60E+02 R/hr and Cnmt Rad >4.13E+01 R/hr.

0935 FS1 AND (ALERT+90) e Loss of RCS - RC3 Drywell Pressure > 1.68 psig AND Drywell Pressure rise due to RCS leakage OR

  • Loss of RCS - RC5 [Drywell Radiation monitor reading >.100 R/hr OR Containment Radiation reading > 33 R/hr] AND Indications of RCS leakage into the Drywell Loss of ANY two barriers AND Loss or Potential Loss of the third barrier GENERAL EMERGENCY - FG1 - RWCU isolation failure w/break
  • Loss of Fuel Clad - FC5 1055 AND FG1
  • Loss of RCS - RC3 OR RC5 (SAE+80)

AND

  • Loss of Containment - CT6.1/CT6.3 - RWCU isolation failure with break at RWCU pump'room in Aux Building (RT Equip room) and a pathway to the environment.

RWCU pump room exceeds Maximum Safe area temperatures and radiation.

1230 Anticipated Termination PARs: Wind from 2400 (into 0600)

Sub-Area-Tim EvntRelease.

Recommendations.

- Bold - "Added" Subareas) 0810 HAS-ALERT None None 0935 (AER+9)

FS1 - SITE AREA EMERGENCY None None IL 1 (DeWitt) 1055 FGI - GENERAL EMERGENCY -

G aseous (SAE+80)

Maximumr PARs IL 3 (DeWitt/McLean/Piatt) 93

,Unclassified.ý

.Radiological Emergency Preparedness Program Q(RP) -.

-.. 4j After e

Plan Clinton.Pow drStation.

,,METEORLG.

Th~e mtoooyprameters are:~

.................,....r~ e r.. ure................................................

Viqrjopi 2400

~

W

ýind.speedd 6.0 m'ph P recipit a ion None -

'RELEASE INFORMATION

  • Release:Pa*th`is a mon~it'ored leas*efrom:the RCSS6 theA*ukiliary building 'Via a Reatoir

.Water Cleanup-(RWCU) isolationfailureOWithba brea latRW.,CU *pump'room'in A uxBuiling'

.,:"The release :is thrgoug'hhe SGhst.rtGiem t

which is c*nidered a groundlevel.release All Dose 7Based PARRsbou nde'd.by-lant-Based-PARs..

-.-,The -peak release%0occurs at approximnately 1130;.... qse.projectiots forthe Irelease were.

-.:.,.:,;R lase, Path,ý(M)*Jsjtfro itheR St teA xBuiddhgto,:SG S o,,tlý e;E wo nt:via~a*me:,.:::,,..-*

aie

pe e
t"i'h i

t`

6tration.iso ation. 3ad da mage; from Conta, i radiation (basedon, Con-t Spay ON rm DW

'ra-dia'tion is'ing CDM--38%,

clad

-d'amage was r..

DAPA lculations.rocess Re c00facto 04 Ws0,0 w

hrelease starts 4 -. '1 DOSE-:PRO JECTIONS fTejflowing peak.dose projeci*Ons a the

1*data-:

m t3()0-1144 do°e kerne'.

. -U,

.: -t.*%.-r...

C J,.::

A.-:

4 I

oun

-i

.'.c S,,Release:,Path. *,*,CS tQCNT>1 ATAC ENV>.'-

-ore~a a

e 8

Ca Dama'ge.

P F.004`

whe

'tble'e

`ýstarfs_ý TihieAfteerSh' yfdoWn:'2:'05

'w-I t

,~~-:*rxelease:r. ura ion.",-3.

.:,*-A~.

r ua0:w y,,e a

-Distance TEDE (Rem)

CDE Rem 5:

.:i. :.,

.l as _D raio 1

(

ee da,

ay Ti e).

SB

-14 E+01_

,91,E 0~

les" J -,,

1 0Miles-

".8.1T53E'01 B'.2.66E-i00

... 1 M les... *- --.08E -0 1 o... " '2:52 E ýF00 - *-.....

-':94

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Clinton Power Station

  • This page is intentionally blank.

95