{{#Wiki_filter:Pacific Gas and Electric Company Edward D. Halpin                          Diablo Canyon Power Plant Senior Vice President                      Mail Code 104/6 Nuclear Generation & Chief Nuclear Officer P. O. Box 56 Avila Beach, CA 93424 April 1, 2013                                                                                        805.545.4100 E*Mail: E1H8@pge.com PG&E Letter DCL-13-033 u.s. Nuclear Regulatory Commission                                                        10 CFR 50.75(f)
{{#Wiki_filter:}}
ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2
 
==Dear Commissioners and Staff:==
 
Pacific Gas and Electric Company (PG&E) is submitting the decommissioning fund report for Diablo Canyon Power Plant (DCPP), Units 1 and 2, pursuant to the requirements of 10 CFR 50.75(f).
Diablo Canyon Power Plant, Units 1 and 2 At the end of calendar year 2012, the market value of the DCPP Units 1 (3411 MWt) and 2 (3411 MWt) decommissioning trust fund Market value was $920.8 million and $1,221.1 million, respectively. TLG Services, Inc., prepared a site-specific decommissioning cost estimate that PG&E submitted to the California Public Utilities Commission (CPUC) in the 2012 Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) on December 12, 2012. Based on this cost estimate, PG&E currently has more funds in the DCPP, Units 1 and 2, decommissioning trust fund than required to meet the minimum NRC decommissioning amount of $643.0 million (2013 dollars) for each unit that was calculated pursuant to the requirements of 10 CFR 50.75(c).
Supporting Cost Estimates Based on site-specific cost estimates prepared by TLG Services, Inc., PG&E estimates that the decommissioning costs are about $1,062.3 million for DCPP, Unit 1 and $1,100.4 million for Unit 2 in 2013 dollars. These costs do not include site restoration of the facilities ($306.4 million) or spent fuel management costs after shutdown of Units 1 and 2
($477.5 million).
To assure that sufficient funds will be available for decommissioning, PG&E has established separate external sinking trust fund accounts for DCPP, Units 1 and 2.
Supporting Enclosures Enclosures 1-5 provide supporting documentation for this report.
A member of the  STARS  (Strategic Teaming  and  Resource    Sharing)  Alliance Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde
* San Onofre
* South Texas Project
* Wolf Creek
 
m I
Document Control Desk April 1,2013
  & Page 2 PG&E Letter DCL-13-033 Enclosure 1 provides decommissioning funding status information in a format suggested by the Nuclear Energy Institute (NEI) and the NRC.
Enclosure 2 provides information on the escalation of the required decommissioning funding amounts from 1986 dollars to 2013 dollars. As required by 10 CFR 50.75(c)(2), and using NUREG 1577, "Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance," Revision 1, and NUREG 1307, "Report on Waste Burial Charges," Revision 15, the information includes escalation factors for energy, labor, and waste burial costs.
Enclosure 3 is the 2013 DCPP Appendix C1 and 2013 DCPP Appendix C2 from the TLG Services, Inc. decommissioning cost estimate report prepared in December 2012 for PG&E for DCPP, Units 1 and 2. PG&E then adjusted the TLG Services, Inc. cost estimate to reflect the costs in 2013 dollars per the NDCTP submitted on December 12, 2012, to the CPUC by applying the escalation factors included in the submittal. The report provides cost estimates for decommissioning of both nuclear and non-nuclear facilities, including the DCPP Independent Spent Fuel Storage Installation (ISFSI).
Enclosure 4 is a cash flow for the total decommissioning of DCPP that identifies the monies for NRC scope (removal of radiological contamination), site restoration (including nonradiological work), and the spent fuel management based on the TLG Services, Inc.
2012 Cost Estimate by unit.
Enclosure 5 contains the TLG Services, Inc. decommissioning cost estimate report prepared in December 2012 for PG&E for DCPP, Unit 1 and Unit 2. The report provides cost estimates for the decommissioning of the nuclear, non-nuclear facilities, and spent fuel management, including operation of the ISFSI in 2011 dollars.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter. Should you have any questions, please contact Mr. Bob Kapus at (707) 444-0810.
Sincerely,
  ~,
Edward D. Halpin Senior Vice President and Chief Nuclear Officer Enclosures cc/enc: John B. Hickman, NRC/FSME/DWMEP Project Manager Arthur T. Howell, III, NRC Region IV Diablo Distribution INPO A member of the  STARS (Strategic Teaming and  Resource Sharing)  Alliance Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde
* San Onofre
* South Texas Project
* Wolf Creek
 
Enclosure 1 PG&E Letter DCL-13-033 NRC Decommissioning Funding Status Report Diablo Canyon Power Plant -- Units 1 (3411 MWt) and 2 (3411 MWt)
 
Enclosure 1 PG&E Letter DCL-13-033 Page 1 of 2 NRC Decommissioning Funding Status Report Diablo Canyon Power Plant - Units 1 (3411 MWt) & 2 (3411 MWt)
As provided in 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every 2 years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns.
Note that Items 3, 4, and 8 are data included in PG&E's Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) filed with the California Public Utilities Commission (CPUC) on December 12, 2012. PG&E does not anticipate a decision on this filing until late 2013 or early 2014.
: 1. The minimum decommissioning fund estimate, pursuant to 10 CFR 50. 75 (b) and (C)1
                                                                                      $ in Millions Value in January 2013 dollars                          Unit 1 $ 643.0 Unit 2 $ 643.0
: 2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75 (b) and (c). (Alternatively, the total amount accumulated at the end of the calendar year preceding the date of the report can be reported here if the cover letter transmitting the report provides the total estimate and indicates what portion of that estimate is for items not included in 10 CFR 50.75 (b) and (c)).
Market Value (December 2012 dollars)                      Unit 1 $ 920.8 Unit 2 $1,221.1
: 3. A schedule of the annual amounts remaining to be collected; for items in 10 CFR 50.75 (b) and (c). (Alternatively, the annual amounts remaining to be collected can include items beyond those required in 10 CFR 50.75 (b) and (c) if the cover letter transmitting the report provides a total cost estimate and indicates what portion of that estimate is for items that are not included in 10 CFR 50.75 (b) and (c). (See item 6 of this enclosure describing the collection of additional funds.)
1
* The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing nonradiological systems and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to DOE are not included in the cost formulas.
 
Enclosure 1 PG&E Letter DCL-13-033 Page 2 of 2 Unit 1 amount remaining            $ 551.4
($51.3 million per year beginning 2014 to shutdown)
Unit 2 amount remaining            $ 340.0
($30.0 million per year beginning 2014 to shutdown)
: 4. The assumptions used regarding escalation in decommissioning cost, rates of earnings on decommissioning funds (anticipates that the portfolio of each trust will be gradually converted to a more conservative all income portfolio beginning in 2024 for Unit 1 and Unit 2), and rates of other factors used in funding projections; Rate of Return on Qualified Trust Unit 1              4.80 percent Until end of commercial operation November 2, 2024 Rate of Return on Qualified Trust Unit 2              4.80 percent Until end of commercial operation August 26, 2025
: 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v).
NONE
: 6. Any modifications to a licensee's current method providing financial assurance occurring since the last submitted report.
NONE
: 7. Any material changes to trust agreements.
NONE
: 8.      CPUC Submittal in 2013 Dollars in Millions Total Unit 1 (Decommission 2024)                      $ 1,399.9 Scope Excluded from NRC calculations                  $      77.4 Spent Fuel Management                                ~    260.2 Total NRC Decommissioning Costs                        $ 1,062.3 Total Unit 2 (Decommission 2025)                      $ 1,546.7 Scope Excluded from NRC calculations                  $    229.0 Spent Fuel Management                                ~    217.3 Total NRC Decommissioning Costs                        $ 1,100.4
 
Enclosure 2 PG&E Letter DCL-13-033 2013 Decommissioning Estimate Unit 1 (1 page) 2013 Decommissioning Estimate Unit 2 (1 page)
Composite Escalation (1 page)
Development of E Component (7 pages)
Development of L Component (9 pages)
Development of B Component (1 page)
 
2013 Decommissioning Estimate Unit 1                            Enclosure 2 PG&E Letter DCL-13-033 Nuclear Regulatory Commission Estimate of Decommission Costs for Pressurized Water Reactor (PWR) Diablo Canyon Power Plant (DCPP) Unit 2 in 2013 DCPP PWR (millions)
January 1986 Estimate          $105 Escalated to 1999            $118.2 (Table 2.1 in NUREG 1307 Revision 10 has no value for 1999 Burial)
Escalated to 2000                    (No Submittal Required)
Escalated to 2001            $333.8 ($396.7 in 2001 Submittal)
Escalated to 2002                    (No Submittal Required)
Escalated to 2003            $347.5 ($404.8 in 2003 Submittal)
Escalated to 2004                    (No Submittal Required)
Escalated to 2005            $404.2 ($427.2 in 2005 Submittal)
Escalated to 2006                    (No Submittal Required)
Escalated to 2007            $495.8 ($494.8 in 2007 Submittal)
Escalated to 2008                    (No Submittal Required)
Escalated to 2009            $540.4 ($679.5 in 2009 Submittal)
Escalated to 2010                    (No Submittal Required)
Escalated to 2011            $588.1 ($583.9 in 2011 Submittal)
Escalated to 2012                    (No Submittal Required)
Escalated to 2013            $643.0 Based on 10 CFR 50.75 (c), "Table of Minimum Amounts" (January 1986 dollars).
PWR Greater than or equal to 3400 MWt = $105 million per unit between 1200 MWt and 3400 MWt (for PWR less than 1200 MWt, use P=1200 MWt $75+0.0088P)
Page 1 of 1
 
2013 Decommissioning Estimate Unit 2                            Enclosure 2 PG&E Letter DCL-13-033 Nuclear Regulatory Commission Estimate of Decommission Costs for Pressurized Water Reactor (PWR) Diablo Canyon Power Plant (DCPP) Unit 2 in 2013 DCPP PWR (millions)
January 1986 Estimate          $105 Escalated to 1999            $118.2 (Table 2.1 in NUREG 1307 Revision 10 has no value for 1999 Burial:
Escalated to 2000                    (No Submittal Required)
Escalated to 2001            $333.8 ($396.7 in 2001 Submittal)
Escalated to 2002                    (No Submittal Required)
Escalated to 2003            $347.5 ($404.8 in 2003 Submittal)
Escalated to 2004                    (No Submittal Required)
Escalated to 2005            $404.2 ($427.2 in 2005 Submittal)
Escalated to 2006                    (No Submittal Required)
Escalated to 2007            $495.8 ($494.8 in 2007 Submittal)
Escalated to 2008                    (No Submittal Required)
Escalated to 2009            $540.4 ($720.9 in 2009 Submittal)
Escalated to 2010                    (No Submittal Required)
Escalated to 2011            $588.1 ($546.5 in 2011 Submittal)
Escalated to 2012                    (No Submittal Required)
Escatlated to 2013          $643.0 Based on 10 CFR 50.75 (c), "Table of Minimum Amounts" (January 1986 dollars).
PWR Greater than or equal to 3400 MWt = $105 million per unit between 1200 MWt and 3400 MWt (for PWR less than 1200 MWt, use P=1200 MWt $75+0.0088P)
Page 1 of 1
 
Composite Escalation                                                            Enclosure 2 PG&E letter DCl-13-033 Calculating Overall Escalation Rate PWR                          Jan-86      Jan-99      Jan-OO    Jan-01      Jan-02      Jan-03      Jan-04    Jan-05  Jan-06  Jan-07  Jan-08  Jan-09  Jan-10  Jan-11  Jan-12  Jan-13 Weight (1)
L (Labor)                    1.0000      1.5624      1.6370    0.9365      0.9733      1.0122      1.0612    1.0958  2.0724  2.1465  2.2207  2.2639  2.2948  2.3175  2.3711  2.4081      0.65 E (Energy)                    1.0000      0.8499      1.0297    1.1850      0.9909      1.2027      1.2164    1.4656  1.8306  1.7950  2.3262  1.7850  2.0766  2.3145  2.6030  2.5637      0.13 B (Burial)                    1.0000      0.0000    10.8039    10.9840    11.1633      11.3433    13.0733    13.3951 13.7247 14.0626 15.0364 15.6505 16.2646 17.2446 18.2247 19.2044      0.22 (1) From NUREG 1307, Revision 15, Report on Waste Burial Charges, Section 2 Summary, Page 3, where A, B, and C are the fractions of the total 1986 dollar costs that are attributable to labor (0.65), energy (0.13), and burial (0.22), respectively, and sum to 1.0.
PWR Combined Escalation Rate for:
Jan-05      Jan-06      Jan-07    Jan-08      Jan-09      Jan-10      Jan-11    Jan-12  Jan-13 3.8497      4.6044      4.7224    5.0538      5.1467      5.3398      5.6011    5.8890  6.1235 Page 1 of 1
 
Development of E Component                                                                  Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 = 100 PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light          Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils              Factor (E)
(1982 = 100)                    (1982 = 100)                    (1986 = 100)                      (1986 = 100)          forPWR (P) = Industrial Energy Power  (F) = Light Fuel Oils          (P) = Industrial Energy Power    (F) = Light Fuel Oils  (Diablo Canyon)
PWRwt=            0.58            PWRwt=            0.42 Jan-86                  114.2                            82.0                          1.0000                            1.0000                1.0000 Feb-86                  115.0                            62.4                          1.0070                            0.7610                0.9037 Mar-86                  114.4                            51.3                          1.0018                            0.6256                0.8438 Apr-86                  113.7                            49.8                          0.9956                            0.6073                0.8325 May-86                  114.1                            47.0                          0.9991                            0.5732                0.8202 Jun-86                  115.3                            44.7                          1.0096                            0.5451                0.8145 Jul-86                116.2                            36.4                          1.0175                            0.4439                0.7766 Aug-86                  116.3                            40.1                          1.0184                            0.4890                0.7961 Sep-86                  116.3                            46.3                          1.0184                            0.5646                0.8278 Oct-86                  113.0                            43.1                          0.9895                            0.5256                0.7947 Nov-86                  112.7                            43.5                          0.9869                            0.5305                0.7952 Dec-86                  112.3                            45.6                          0.9834                            0.5561                0.8039 Jan-87                  110.3                            51.4                          0.9658                            0.6268                0.8235 Feb-87                  109.8                            53.1                          0.9615                            0.6476                0.8296 Mar-87                  110.2                            49.7                          0.9650                            0.6061                0.8142 Apr-87                  109.9                            52.0                          0.9623                            0.6341                0.8245 May-87                  111.8                            53.3                          0.9790                            0.6500                0.8408 Jun-87                  113.9                            55.1                          0.9974                            0.6720                0.8607 Jul-87                116.2                            56.3                          1.0175                            0.6866                0.8785 Aug-87                  115.7                            59.4                          1.0131                            0.7244                0.8919 Sep-87                  115.5                            56.8                          1.0114                            0.6927                0.8775 Oct-87                  111.0                            59.3                          0.9720                            0.7232                0.8675 Nov-87                  109.2                            61.2                          0.9562                            0.7463                0.8681 Dec-87                  109.6                            58.1                          0.9597                            0.7085                0.8542 Jan-88                  108.8                            54.8                          0.9527                            0.6683                0.8333 Feb-88                  109.0                            51.5                          0.9545                            0.6280                0.8174 Mar-88                  109.0                            49.7                          0.9545                            0.6061                0.8082 Apr-88                  109.1                            53.3                          0.9553                            0.6500                0.8271 May-88                  108.9                            54.3                          0.9536                            0.6622                0.8312 Jun-88                  117.2                            50.6                          1.0263                            0.6171                0.8544 JUI-88                118.2                            46.9                          1.0350                            0.5720                0.8405 Aug-88                  118.3                            46.8                          1.0359                            0.5707                0.8405 Sep-88                  118.5                            45.9                          1.0377                            0.5598                0.8369 Oct-88                  114.2                            42.3                          1.0000                            0.5159                0.7967 Nov-88                  109.2                            47.2                          0.9562                            0.5756                0.7964 Dec-88                  110.5                            50.6                          0.9676                            0.6171                0.8204 Jan-89                  112.0                            54.9                          0.9807                            0.6695                0.8500 Feb-89                  112.0                            54.0                          0.9807                            0.6585                0.8454 Mar-89                  112.3                            57.3                          0.9834                            0.6988                0.8638 Apr-89                  112.4                            61.5                          0.9842                            0.7500                0.8859 May-89                  113.6                            57.5                          0.9947                            0.7012                0.8715 Jun-89                  119.8                            53.3                          1.0490                            0.6500                0.8814 Jul-89                122.2                            52.7                          1.0701                            0.6427                0.8906 Aug-89                  122.4                            53.5                          1.0718                            0.6524                0.8957 Sep-89                  122.5                            59.3                          1.0727                            0.7232                0.9259 Oct-89                  117.2                            64.0                          1.0263                            0.7805                0.9230 Page 1 of 7
 
Development of E Component                                                              Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light      Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils          Factor (E)
(1982 = 100)                    (1982 = 100)                          =
(1986 100)                              =
(1986 100)          forPWR
                        =
(P) Industrial Energy Power        =
(F) Light Fuel Oils                =
(P) Industrial Energy Power          =
(F) Light Fuel Oils (Diablo Canyon)
Nov-89                  113.5                            64.4                        0.9939                            0.7854              0.9063 Dec-89                  114.2                            68.1                        1.0000                            0.8305            0.9288 Jan-90                  114.9                            85.3                        1.0061                            1.0402            1.0205 Feb-90                  115.0                            59.4                        1.0070                            0.7244            0.8883 Mar-90                  115.4                            60.4                        1.0105                            0.7366            0.8955 Apr-90                  115.1                            61.0                        1.0079                            0.7439            0.8970 May-90                  117.0                            58.4                        1.0245                            0.7122            0.8933 Jun-90                  123.9                            53.0                        1.0849                            0.6463            0.9007 Jul-90                124.4                            51.6                        1.0893                            0.6293            0.8961 Aug-90                  124.6                            72.3                        1.0911                            0.8817            1.0031 Sep-90                  125.0                            87.3                        1.0946                            1.0646            1.0820 Oct-90                  121.2                          104.8                        1.0613                            1.2780            1.1523 Nov-90                  120.2                            98.9                        1.0525                            1.2061              1.1170 Dec-90                  118.9                            89.3                        1.0412                            1.0890            1.0613 Jan-91                  124.2                            82.9                        1.0876                            1.0110            1.0554 Feb-91                  124.3                            74.3                        1.0884                            0.9061            1.0119 Mar-91                  124.3                            61.6                        1.0884                            0.7512            0.9468 Apr-91                  124.7                            60.0                        1.0919                            0.7317            0.9406 May-91                  128.2                            59.6                        1.1226                            0.7268            0.9564 Jun-91                  132.6                            57.6                        1.1611                            0.7024            0.9685 Jul-91                134.5                            58.1                        1.1778                            0.7085            0.9807 Aug-91                  133.8                            62.1                        1.1716                            0.7573            0.9976 Sep-91                  133.8                            65.4                        1.1716                            0.7976            1.0145 Oct-91                  128.3                            67.6                        1.1235                            0.8244            0.9979 Nov-91                  123.1                            71.0                        1.0779                            0.8659            0.9889 Dec-91                  125.1                            62.2                        1.0954                            0.7585            0.9539 Jan-92                  125.9                            54.4                        1.1025                            0.6634            0.9181 Feb-92                  125.3                            57.3                        1.0972                            0.6988            0.9299 Mar-92                  125.8                            56.0                        1.1016                            0.6829            0.9257 Apr-92                  124.8                            59.0                        1.0928                            0.7195            0.9360 May-92                  128.5                            62.1                        1.1252                            0.7573            0.9707 Jun-92                  134.8                            65.4                        1.1804                            0.7976              1.0196 JUI-92                135.6                            64.6                        1.1874                            0.7878              1.0196 Aug-92                  135.1                            63.3                        1.1830                            0.7720            1.0104 Sep-92                  135.9                            65.6                        1.1900                            0.8000              1.0262 Oct-92                  131.2                            68.2                        1.1489                            0.8317              1.0157 Nov-92                  125.5                            64.2                        1.0989                            0.7829            0.9662 Dec-92                  126.7                            59.4                        1.1095                            0.7244            0.9477 Jan-93                  127.1                            59.0                        1.1130                            0.7195            0.9477 Feb-93                  126.4                            60.4                        1.1068                            0.7366            0.9513 Mar-93                  126.7                            63.2                        1.1095                            0.7707            0.9672 Apr-93                  126.8                            62.4                        1.1103                            0.7610            0.9636 May-93                  127.5                            62.6                        1.1165                            0.7634            0.9682 Jun-93                  136.9                            60.8                        1.1988                            0.7415              1.0067 Jul-93                137.1                            57.0                        1.2005                            0.6951            0.9883 Aug-93                  137.2                            54.4                        1.2014                            0.6634            0.9754 Sep-93                  137.6                            59.3                        1.2049                            0.7232              1.0026 Oct-93                  131.9                            65.4                        1.1550                            0.7976              1.0049 Page 2 of 7
 
Development of E Component                                                              Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light      Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils          Factor (E)
                            =
(1982 100)                            =
(1982 100)                            =
(1986 100)                              =
(1986 100)          forPWR
                        =
(P) Industrial Energy Power        =
(F) Light Fuel Oils                =
(P) Industrial Energy Power          =
(F) Light Fuel Oils (Diablo Canyon)
Nov-93                  126.3                            61.6                        1.1060                            0.7512            0.9570 Dec-93                  126.0                            51.4                        1.1033                            0.6268            0.9032 Jan-94                  126.2                            51.5                        1.1051                            0.6280            0.9047 Feb-94                  125.9                            57.5                        1.1025                            0.7012            0.9339 Mar-94                  125.8                            56.2                        1.1016                            0.6854            0.9268 Apr-94                  125.4                            54.7                        1.0981                            0.6671            0.9171 May-94                  126.0                            54.7                        1.1033                            0.6671            0.9201 Jun-94                  133.5                            54.1                        1.1690                            0.6598            0.9551 Jul-94                134.5                            56.3                        1.1778                            0.6866            0.9715 Aug-94                  134.5                            57.5                        1.1778                            0.7012            0.9776 Sep-94                  134.9                            57.7                        1.1813                            0.7037            0.9807 Oct-94                  129.1                            57.7                        1.1305                            0.7037            0.9512 Nov-94                  127.0                            58.8                        1.1121                            0.7171            0.9462 Dec-94                  127.4                            54.7                        1.1156                            0.6671            0.9272 Jan-95                  127.6                            54.7                        1.1173                            0.6671            0.9282 Feb-95                  128.0                            53.3                        1.1208                            0.6500            0.9231 Mar-95                  128.3                            54.3                        1.1235                            0.6622            0.9297 Apr-95                  126.4                            57.1                        1.1068                            0.6963              0.9344 May-95                  130.2                            59.1                        1.1401                            0.7207              0.9640 Jun-95                  135.3                            55.8                        1.1848                            0.6805              0.9730 Jul-95                136.6                            53.5                        1.1961                            0.6524            0.9678 Aug-95                  136.5                            55.6                        1.1953                            0.6780            0.9780 Sep-95                  133.7                            58.2                        1.1708                            0.7098            0.9771 Oct-95                  131.4                            57.8                        1.1506                            0.7049              0.9634 Nov-95                  127.6                            59.5                        1.1173                            0.7256              0.9528 Dec-95                  127.7                            60.6                        1.1182                            0.7390              0.9590 Jan-96                  127.9                            62.6                        1.1200                            0.7634              0.9702 Feb-96                  127.1                            59.7                        1.1130                            0.7280            0.9513 Mar-96                  127.8                            63.5                        1.1191                            0.7744              0.9743 Apr-96                  129.1                            74.7                        1.1305                            0.9110              1.0383 May-96                  135.0                            72.0                        1.1821                            0.8780              1.0544 Jun-96                  137.5                            62.8                        1.2040                            0.7659              1.0200 JUI-96                136.0                            64.3                        1.1909                            0.7841              1.0201 Aug-96                  136.2                            66.5                        1.1926                            0.8110              1.0323 Sep-96                  136.2                            73.4                        1.1926                            0.8951              1.0677 Oct-96                  131.2                            79.7                        1.1489                            0.9720              1.0746 Nov-96                  127.1                            76.5                        1.1130                            0.9329              1.0373 Dec-96                  127.7                            76.1                        1.1182                            0.9280              1.0383 Jan-97                  128.3                            73.7                        1.1235                            0.8988              1.0291 Feb-97                  128.1                            72.3                        1.1217                            0.8817              1.0209 Mar-97                  128.2                            65.2                        1.1226                            0.7951              0.9851 Apr-97                  127.3                            65.3                        1.1147                            0.7963              0.9810 May-97                  129.7                            64.2                        1.1357                            0.7829              0.9876 Jun-97                  135.1                            60.8                        1.1830                            0.7415              0.9976 Jul-97                135.9                            57.8                        1.1900                            0.7049              0.9863 Aug-97                  134.7                            61.5                        1.1795                            0.7500              0.9991 Sep-97                  136.0                            60.4                        1.1909                            0.7366              1.0001 Oct-97                  130.1                            64.8                        1.1392                            0.7902              0.9927 Page 3 of?
 
Development of E Component                                                              Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light      Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils          Factor (E)
                            =
(1982 100)                            =
(1982 100)                      (1986 = 100)                            =
(1986 100)          for PWR
                        =
(P) Industrial Energy Power        =
(F) Light Fuel Oils                =
(P) Industrial Energy Power          =
(F) Light Fuel Oils (Diablo Canyon)
Nov-97                  127.9                            65.8                        1.1200                            0.8024              0.9866 Dec-97                  128.3                            59.4                        1.1235                            0.7244              0.9559 Jan-98                  127.4                            54.1                        1.1156                            0.6598              0.9241 Feb-98                  127.2                            52.0                        1.1138                            0.6341              0.9124 Mar-98                  126.7                            48.3                        1.1095                            0.5890              0.8909 Apr-98                  126.4                            50.2                        1.1068                            0.6122              0.8991 May-98                  129.2                            50.0                        1.1313                            0.6098              0.9123 Jun-98                  133.8                            46.3                        1.1716                            0.5646              0.9167 Jul-98                134.8                            45.0                        1.1804                            0.5488              0.9151 Aug-98                  135.2                            44.0                        1.1839                            0.5366              0.9120 Sep-98                  135.2                            48.3                        1.1839                            0.5890              0.9340 Oct-98                  130.4                            47.4                        1.1419                            0.5780              0.9051 Nov-98                  127.6                            46.2                        1.1173                            0.5634              0.8847 Dec-98                  126.6                            38.8                        1.1086                            0.4732              0.8417 Jan-99                  126.1                            40.9                        1.1042                            0.4988              0.8499 Feb-99                  125.5                            38.2                        1.0989                            0.4659              0.8330 Mar-99                  125.5                            42.8                        1.0989                            0.5220              0.8566 Apr-99                  125.2                            52.5                        1.0963                            0.6402              0.9048 May-99                  127.4                            52.6                        1.1156                            0.6415              0.9165 Jun-99                  131.0                            52.4                        1.1471                            0.6390              0.9337 Jul-99                133.9                            58.7                        1.1725                            0.7159              0.9807 Aug-99                  133.9                              63                        1.1725                            0.7683              1.0027 Sep-99                  134.1                            67.6                        1.1743                            0.8244              1.0273 Oct-99                  129.5                            65.5                        1.1340                            0.7988              0.9932 Nov-99                  127.5                            71.3                        1.1165                            0.8695              1.0127 Dec-99                  126.5                            72.9                        1.1077                            0.8890              1.0159 Jan-OO                  126.8                            75.3                        1.1103                            0.9183              1.0297 Feb-OO                  126.7                            87.9                        1.1095                            1.0720              1.0937 Mar-OO                  126.7                            89.7                        1.1095                            1.0939              1.1029 Apr-OO                  126.8                            83.1                        1.1103                            1.0134              1.0696 May-OO                  128.6                            82.9                        1.1261                            1.0110              1.0777 Jun-OO                  133.6                            86.2                        1.1699                            1.0512              1.1200 Jul-OO                136.2                            88.7                        1.1926                            1.0817              1.1461 Aug-OO                  137.4                            91.6                        1.2032                            1.1171              1.1670 Sep-OO                  137.8                          110.1                        1.2067                            1.3427              1.2638 Oct-OO                  134.1                          108.6                        1.1743                            1.3244              1.2373 Nov-OO                  130.9                          108.4                        1.1462                            1.3220              1.2200 Dec-OO                  132.7                          100.6                        1.1620                            1.2268              1.1892 Jan-01                  136.4                            96.1                        1.1944                            1.1720              1.1850 Feb-01                  136.4                            91.6                        1.1944                            1.1171              1.1619 Mar-01                  136.5                            83.1                        1.1953                            1.0134              1.1189 Apr-01                  135.1                            86.2                        1.1830                            1.0512              1.1277 May-01                  136.2                            94.2                        1.1926                            1.1488              1.1742 Jun-01                  148.4                            90.2                        1.2995                            1.1000              1.2157 Jul-01                149.5                            81.3                        1.3091                            0.9915              1.1757 Aug-01                  148.9                            83.2                        1.3039                            1.0146              1.1824 Sep-01                  148.2                              93                        1.2977                            1.1341              1.2290 Oct-01                  143.8                            76.8                        1.2592                            0.9366              1.1237 Page 4 of 7
 
Development of E Component                                                              Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light      Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils          Factor (E)
                            =
(1982 100)                            =
(1982 100)                            =
(1986 100)                              =
(1986 100)          forPWR
                        =
(P) Industrial Energy Power        =
(F) Light Fuel Oils                =
(P) Industrial Energy Power          =
(F) Light Fuel Oils (Diablo Canyon)
Nov-01                  137.3                            70.5                        1.2023                            0.8598              1.0584 Dec-01                  136.9                            56.6                        1.1988                            0.6902            0.9852 Jan-02                  136.3                            58.3                        1.1935                            0.7110            0.9909 Feb-02                  135.4                            59.6                        1.1856                            0.7268              0.9929 Mar-02                  135.7                            69.1                        1.1883                            0.8427              1.0431 Apr-02                  135.4                            76.4                        1.1856                            0.9317              1.0790 May-02                  137.9                              75                        1.2075                            0.9146              1.0845 Jun-02                  143.6                            71.4                        1.2574                            0.8707              1.0950 Jul-02                144.9                            75.5                        1.2688                            0.9207              1.1226 Aug-02                  145.0                            77.9                        1.2697                            0.9500              1.1354 Sep-02                  145.8                            89.5                        1.2767                            1.0915            1.1989 Oct-02                  140.0                            95.1                        1.2259                            1.1598            1.1981 Nov-02                  139.5                            82.8                        1.2215                            1.0098              1.1326 Dec-02                  139.6                            84.6                        1.2224                            1.0317              1.1423 Jan-03                  140.3                            95.7                        1.2285                            1.1671              1.2027 Feb-03                  140.6                          120.4                        1.2312                            1.4683            1.3308 Mar-03                  143.3                          128.9                        1.2548                            1.5720            1.3880 Apr-03                  144.3                            98.3                        1.2636                            1.1988              1.2364 May-03                  145.1                            85.5                        1.2706                            1.0427              1.1749 Jun-03                  148.3                            87.2                        1.2986                            1.0634              1.1998 Jul-03                151.6                            90.1                        1.3275                            1.0988              1.2314 Aug-03                  151.3                            94.1                        1.3249                            1.1476            1.2504 Sep-03                  152.0                            88.2                        1.3310                            1.0756            1.2237 Oct-03                  147.4                            97.8                        1.2907                            1.1927              1.2495 Nov-03                  142.7                            93.0                        1.2496                            1.1341              1.2011 Dec-03                  142.9                            95.8                        1.2513                            1.1683              1.2164 Jan-04                  143.1                          106.8                        1.2531                            1.3024            1.2738 Feb-04                  143.1                          100.8                        1.2531                            1.2293            1.2431 Mar-04                  143.1                          107.8                        1.2531                            1.3146              1.2789 Apr-04                  143.1                          115.2                        1.2531                            1.4049              1.3168 May-04                  144.2                            116                        1.2627                            1.4146              1.3265 Jun-04                  152.4                          111.5                        1.3345                            1.3598              1.3451 Jul-04                152.2                          119.3                        1.3327                            1.4549            1.3840 Aug-04                  154.0                          131.1                        1.3485                            1.5988            1.4536 Sep-04                  154.0                          136.8                        1.3485                            1.6683              1.4828 Oct-04                  145.8                          161.7                        1.2767                            1.9720              1.5687 Nov-04                  144.9                          153.6                        1.2688                            1.8732            1.5227 Dec-04                  146.2                          133.8                        1.2802                            1.6317            1.4278 Jan-05                  148.9                          138.5                        1.3039                            1.6890            1.4656 Feb-05                  148.0                            146                        1.2960                            1.7805            1.4995 Mar-05                  148.1                          169.4                        1.2968                            2.0659              1.6198 Apr-05                  148.7                          170.9                        1.3021                            2.0841              1.6306 May-05                  151.1                          165.3                        1.3231                            2.0159              1.6141 Jun-05                  159.7                          180.6                        1.3984                            2.2024              1.7361 Jul-05                162.1                          186.2                        1.4194                            2.2707              1.7770 Aug-05                  162.5                          194.5                        1.4229                            2.3720              1.8215 Sep-05                  162.8                          209.9                        1.4256                            2.5598              1.9019 Oct-05                  159.5                          252.0                        1.3967                            3.0732              2.1008 Page 5 of 7
 
Development of E Component                                                                Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light        Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils            Factor (E)
                            =
(1982 100)                      (1982 = 100)                    (1986 = 100)                            =
(1986 100)            forPWR
                        =
(P) Industrial Energy Power    (F) = Light Fuel Oils              =
(P) Industrial Energy Power      (F) = Light Fuel Oils (Diablo Canyon)
Nov-05                  161.1                          199.1                        1.4107                            2.4280              1.8380 Dec-05                  161.4                          193.6                        1.4133                            2.3610                1.8113 Jan-06                  167.0                          191.8                        1.4623                            2.3390                1.8306 Feb-06                  168.6                          190.0                        1.4764                            2.3171                1.8295 Mar-06                  167.4                          199.2                        1.4658                            2.4293                1.8705 Apr-06                  169.6                          221.9                        1.4851                            2.7061                1.9979 May-06                  170.8                          231.4                        1.4956                            2.8220              2.0527 Jun-06                  181.2                          238.1                        1.5867                            2.9037              2.1398 Jul-06                181.9                          231.6                        1.5928                            2.8244              2.1101 Aug-06                  180.2                          241.4                        1.5779                            2.9439              2.1516 Sep-06                  181.0                          203.1                        1.5849                            2.4768                1.9595 Oct-06                  171.2                          198.1                        1.4991                            2.4159                1.8842 Nov-06                  167.2                          198.2                        1.4641                            2.4171                1.8643 Dec-06                  167.8                          200.4                        1.4694                            2.4439                1.8787 Jan-07                  171.9                          180.0                        1.5053                            2.1951                1.7950 Feb-07                  175.7                          191.5                        1.5385                            2.3354                1.8732 Mar-07                  172.1                          215.1                        1.5070                            2.6232                1.9758 Apr-07                  173.1                          231.8                        1.5158                            2.8268              2.0664 May-07                  179.2                          225.3                        1.5692                            2.7476              2.0641 Jun-07                  186.7                          222.4                        1.6349                            2.7122              2.0873 Jul-07                187.0                          237.8                        1.6375                            2.9000              2.1677 Aug-07                  187.6                          225.5                        1.6427                            2.7500              2.1078 Sep-07                  188.4                          238.9                        1.6497                            2.9134              2.1805 Oct-07                  182.7                          243.3                        1.5998                            2.9671                2.1741 Nov-07                  180.3                          288.2                        1.5788                            3.5146              2.3919 Dec-07                  180.0                          266.7                        1.5762                            3.2524              2.2802 Jan-08                  181.9                          273.8                        1.5928                            3.3390              2.3262 Feb-08                  180.0                          280.2                        1.5762                            3.4171              2.3494 Mar-08                  183.1                          339.6                        1.6033                            4.1415              2.6693 Apr-08                  185.2                          352.5                        1.6217                            4.2988              2.7461 May-08                  189.5                          384.9                        1.6594                            4.6939              2.9339 Jun-08                  191.9                          410.5                        1.6804                            5.0061              3.0772 Jul-08                196.1                          423.8                        1.7172                            5.1683              3.1666 Aug-08                  197.1                          343.9                        1.7259                            4.1939              2.7625 Sep-08                  195.9                          335.1                        1.7154                            4.0866                2.7113 Oct-08                  193.0                          279.0                        1.6900                            3.4024              2.4092 Nov-08                  187.7                          218.2                        1.6436                            2.6610              2.0709 Dec-08                  188.3                          163.0                        1.6489                            1.9878                1.7912 Jan-09                  190.3                          159.8                        1.6664                            1.9488                1.7850 Feb-09                  190.3                          145.6                        1.6664                            1.7756                1.7123 Mar-09                  187.6                          136.8                        1.6427                            1.6683                1.6535 Apr-09                  186.9                          159.9                        1.6366                            1.9500                1.7682 May-09                  190.5                          158.6                        1.6681                            1.9341                1.7799 Jun-09                  193.3                          183.7                        1.6926                            2.2402                1.9226 Jul-09                196.2                          165.2                        1.7180                            2.0146                1.8426 Aug-09                  194.7                          196.1                        1.7049                            2.3915                1.9933 Sep-09                  194.9                          186.6                        1.7067                            2.2756                1.9456 Oct-09                  189.9                          193.3                        1.6629                            2.3573                1.9545 Page 6 of?
 
Development of E Component                                                              Enclosure 2 PG&E Letter DCL-13-033 Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices Series ID: WPU0573 Light Fuel Oils (as of 03/02/11) and WPU0543 Industrial Electric Power (as of 03/02/11)
REBASED TO 1986 100  =
PPI for Fuels &                PPI for Light                  PPI for Fuels &                  PPI for Light      Energy Escalation Related Products                Fuel Oils                      Related Products                  Fuel Oils          Factor (E)
(1982 = 100)                    (1982 = 100)                          =
(1986 100)                        (1986 =100)        forPWR
                        =
(P) Industrial Energy Power        =
(F) Light Fuel Oils                =
(P) Industrial Energy Power          =
(F) Light Fuel Oils (Diablo Canyon)
Nov-09                  186.0                          207.8                        1.6287                            2.5341            2.0090 Dec-09                  186.0                          197.5                        1.6287                            2.4085            1.9562 Jan-10                  186.3                          220.7                        1.6313                            2.6915            2.0766 Feb-10                  186.1                          200.2                        1.6296                            2.4415            1.9706 Mar-10                  189.0                          217.0                        1.6550                            2.6463            2.0714 Apr-10                  188.8                          231.5                        1.6532                            2.8232              2.1446 May-10                  192.0                          226.0                        1.6813                            2.7561            2.1327 Jun-10                  197.8                          212.4                        1.7320                            2.5902            2.0925 Jul-10                199.8                          209.3                        1.7496                            2.5524            2.0868 Aug-10                  200.8                          221.4                        1.7583                            2.7000            2.1538 Sep-10                  200.0                          220.0                        1.7513                            2.6829              2.1426 Oct-10                  194.6                          235.8                        1.7040                            2.8756              2.1961 Nov-10                  190.9                          245.3                        1.6716                            2.9915            2.2260 Page 7 of 7
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry        Escalation (1989=100)              Factor Dec-85                    89.8              1.00000 Jan-86 Feb-86 Mar-86                    90.8              1.01114 Apr-86 May-86 Jun-86                    91.2              1.01559 JUI-86 Aug-86 Sep-86                    91.6              1.02004 Oct-86 Nov-86 Dec-86                    92.5              1.03007 Jan-87 Feb-87 Mar-87                    92.6              1.03118 Apr-87 May-87 Jun-87                    93.7              1.04343 Jul-87 Aug-87 Sep-87                    94.1              1.04788 Oct-87 Nov-87 Dec-87                    95.4              1.06236 Jan-88 Feb-88 Mar-88                    96.3*              1.07238 Apr-88 May-88 Jun-88                      97              1.08018 JUI-88 Aug-88 Sep-88                    97.7              1.08797 Oct-88 Nov-88 Dec-88                    98.8              1.10022 Jan-89 Feb-89 Mar-89                    100              1.11359 Apr-89 Page 1 of9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series ID: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry        Escalation (1989=100)            Factor Dec-85                    89.8              1.00000 May-89 Jun-89                    101              1.12472 Jul-89 Aug-89 Sep-89                  101.8                1.13363 Oct-89 Nov-89 Dec-89                  103.3                1.15033 Jan-90 Feb-90 Mar-90                  104.5                1.16370 Apr-90 May-90 Jun-90                  105.6                1.17595 Jul-90 Aug-90 Sep-90                  106.3                1.18374 Oct-90 Nov-90 Dec-90                  107.5                1.19710 Jan-91 Feb-91 Mar-91                  108.9                1.21269 Apr-91 May-91 Jun-91                    110              1.22494 JUI-91 Aug-91 Sep-91                  110.9                1.23497 Oct-91 Nov-91 Dec-91                  111.9                1.24610 Jan-92 Feb-92 Mar-92                  112.9                1.25724 Apr-92 May-92 Jun-92                  114.1                1.27060 JUI-92 Aug-92 Page 2 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry        Escalation (1989=100)              Factor Dec-85                    89.8              1.00000 Sep-92                  114.9                1.27951 Oct-92 Nov-92 Dec-92                  116.2                1.29399 Jan-93 Feb-93 Mar-93                  116.4                1.29621 Apr-93 May-93 Jun-93                  117.8                1.31180 JUI-93 Aug-93 Sep-93                  118.1                1.31514 Oct-93 Nov-93 Dec-93                  119.4                1.32962 Jan-94 Feb-94 Mar-94                  120.5                1.34187 Apr-94 May-94 Jun-94                  121.3                1.35078 Jul-94 Aug-94 Sep-94                  121.7                1.35523 Oct-94 Nov-94 Dec-94                  122.6                1.36526 Jan-95 Feb-95 Mar-95                  123.4                1.37416 Apr-95 May-95 Jun-95                  123.9                1.37973 Jul-95 Aug-95 Sep-95                    125              1.39198 Oct-95 Nov-95 Dec-95                  125.9                1.40200 Page 3 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series ID: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry      Escalation (1989=100)            Factor Dec-85                    89.8              1.00000 Jan-96 Feb-96 Mar-96                  127.3              1.41759 Apr-96 May-96 Jun-96                  128.3              1.42873 Jul-96 Aug-96 Sep-96                  128.9              1.43541 Oct-96 Nov-96 Dec-96                  130.3              1.45100 Jan-97 Feb-97 Mar-97                  131.4              1.46325 Apr-97 May-97 Jun-97                  132.5              1.47550 Jul-97 Aug-97 Sep-97                  133.4              1.48552 Oct-97 Nov-97 Dec-97                  135.2              1.50557 Jan-98 Feb-98 Mar-98                  136.6              1.52116 Apr-98 May-98 Jun-98                  138.5              1.54232 Jul-98 Aug-98 Sep-98                    140              1.55902 Oct-98 Nov-98 Dec-98                  140.3              1.56236 Jan-99 Feb-99 Mar-99                  142.1              1.58241 Apr-99 Page 4 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series ID: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry      Escalation (1989=100)              Factor Dec-85                    89.8              1.00000 May-99 Jun-99                  143.3              1.59577 Jul-99 Aug-99 Sep-99                  144.7              1.61136 Oct-99 Nov-99 Dec-99                    147              1.63697 Jan-OO Feb-OO Mar-OO                  148.8              1.65702 Apr-OO May-OO Jun-OO                  150.8              1.67929 Jul-OO Aug-OO Sep-OO                  151.8              1.69042 Oct-OO Nov-OO Dec-OO                    84.1              0.93653 Jan-01 Feb-01 Mar-01                      85              0.94655 Apr-01 May-01 Jun-01                    85.9              0.95657 Jul-01 Aug-01 Sep-01                    86.9              0.96771 Oct-01 Nov-01 Dec-01                    87.4              0.97327 Jan-02 Feb-02 Feb-02 Mar-02                    88.5              0.98552 Apr-02 May-02 Jun-02                    89.1              0.99220 Jul-02 Page 5 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry        Escalation (1989=100)              Factor Dec-85                    89.8              1.00000 Aug-02 Sep-02                    89.8              1.00000 Oct-02 Nov-02 Dec-02                    90.9              1.01225 Jan-03 Feb-03 Mar-03                      92              1.02450 Apr-03 May-03 Jun-03                    93.2              1.03786 Jul-03 Aug-03 Sep-03                    93.8              1.04454 Oct-03 Nov-03 Dec-03                    95.3              1.06125 Jan-04 Feb-04 Mar-04                    96.2              1.07127 Apr-04 May-04 Jun-04                    96.9              1.07906 Jul-04 Aug-04 Sep-04                    97.4              1.08463 Oct-04 Nov-04 Dec-04                    98.4              1.09577 Jan-05 Feb-05 Mar-05                    99.3              1.10579 Apr-05 May-05 Jun-05                    99.7              1.11024 Jul-05 Aug-05 Sep-05 (Note 1)            100              2.06000 Oct-05 Nov-05 Page 6 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry      Escalation (1989=100)            Factor Dec-85                    89.8              1.00000 Dec-05                  100.6              2.07236 Jan-06 Feb-06 Mar-06                  101.8              2.09708 Apr-06 May-06 Jun-06                  102.5              2.11150 Jul-06 Aug-06 Sep-06                    103              2.12180 Oct-06 Nov-06 Dec-06                  104.2              2.14652 Jan-07 Feb-07 Mar-07                  104.9              2.16094 Apr-07 May-07 Jun-07                  105.7              2.17742 Jul-07 Aug-07 Sep-07                  106.5              2.19390 Oct-07 Nov-07 Dec-07                  107.8              2.22068 Jan-08 Feb-08 Mar-08                  108.4              2.23304 Apr-08 May-08 Jun-08                  109.3              2.25158 Jul-08 Aug-08 Sep-08                  109.4              2.25364 Oct-08 Nov-08 Dec-08                  109.9              2.26394 Jan-09 Feb-09 Mar-09                  110.0              2.26600 Page 7 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry        Escalation (1989=100)            Factor Dec-85                    89.8              1.00000 Apr-09 May-09 Jun-09                  110.3                2.27218 Jul-09 Aug-09 Sep-09                  110.6                2.27836 Oct-09 Nov-09 Dec-09                  111.4              2.29484 Jan-10 Feb-10 Mar-10                  111.7              2.30102 Apr-10 May-10 Jun-10                  112.3              2.31338 Jul-10 Aug-10 Sep-10                  112.3              2.31338 Oct-10 Nov-10 Dec-10                  112.5              2.31750 Jan-11 Feb-11 Mar-11                  113.5              2.33810 Apr-11 May-11 Jun-11                  114.3              2.35458 Jul-11 Aug-11 Sep-11                  114.6              2.36076 Oct-11 Nov-11 Dec-11                  115.1              2.37106 Jan-12 Feb-12 Mar-12                  115.7              2.38342 Apr-12 May-12 Jun-12                  116.3              2.39578 JUI-12 Page 8 of 9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices Series 10: CIU20100000002401 (as of 03/02/11)
January 1986 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Page 7)
Note 1: The Base Labor factor was re-indexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region            Labor Private Industry      Escalation (1989=100)            Factor Dec-85                    89.8              1.00000 Aug-12 Sep-12                  116.9              2.40814 Oct-12 Nov-12 Dec-12                  116.9              2.40814 Page 9 of9
 
Enclosure 2 PG&E Letter DCL-13-033 Development of B Component Development of Burial Escalation Developed from NUREG-1307, Revision 14 Table 2.1 "VALUES OF B SUB-X AS A FUNCTION OF LLW BURIAL SITE, WASTE VENDOR, AND YEAR" (Summary for non-Atlantic Compact)
Revised to Bx Values for Generic LLW Disposal Site (Assumed to be same as that provided for the Atlantic Compact for lack of a better alternative at this time.
PWR                      PWR Burial Costs            Restated to (South Carolina)        1986 = 100 1986                    1.678                  1.0000 1987 1988                    2.007                  1.1961 1989 1990 1991                    2.494                  1.4863 1992 1993                  11.408                  6.7986 1994                  11.873                  7.0757 1995                  12.824                  7.6424 1996                  12.771                  7.6108 1997                  15.852                  9.4470 1998                  15.886                  9.4672 1999                                            0.0000 2000                  18.129                  10.8039 2001                                            0.0000 2002                  18.732                  11.1633 2003                  19.034                  11.3433 2004                  21.937                  13.0733 2005                  22.477                  13.3951 2006                  23.030                  13.7247 2007                  23.597                  14.0626 2008                  25.231                  15.0364 2009                  26.262                  15.6505 2010                  27.292                  16.2646 2011                  28.937                  17.2446 2012                  30.581                  18.2247 2013                  32.225                  19.2044 Table 2.1 Note (e): Bx values for the generic site are assumed to be the same as that provided for the Atlantic Compact for lack of a better alternative at this time.
Note (f): Effective with NUREG-1307, Revision 8 (Reference3) an alternative disposal option was introduced in which the bulk of the LLW is assumed to be dis positioned by waste vendors and/or disposed of at a non-compact disposal facility.
Note (g): Effective with NUREG1307, Revision 15, the nomenclature for the two disposal options, referred to as "Direct Disposal" and "Direct Disposal with Vendors" in previous revisions of NUREG-1307, is changed to "Compact-Affiliated Disposal.
Facility Only" and "Combination of Comapct-Affiliated and Non-Compact Disposal Facilities" to better describe the options.
2013 has no information in NUREG-1307 Revision 15. 2013 is an estimate that is calculated by applying the average percent by applying the average percent change between 2010 and 2012 and adding to the 2012 base.
Page 1 of 1
 
Enclosure 3 PG&E Letter DCL-13-033 Table C-1 Diablo Canyon Power Plant Unit 1 Decon Decommissioning Cost Estimate (7 pages)
Table C-2 Diablo Canyon Power Plant Unit 2 Decon Decommissioning Cost Estimate (8 pages)
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                  PG&E letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 1 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                        DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                              (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site                                            Off-Site  LLRW                                          NRC        Spent Fuel      Site Activity                                              Decon Removal  Packaging    Transport  Processing Disposal  Other      Total    Total    Lie. Term. Management    Restoration  Decon Removal  Packaging  Transport Processing Disposal  Other        Total    Total      Lie. Term. Management    Restoration Index                    Activity Descri tion        Cost  Cost    Costs        Costs      Costs    Costs    Costs  Contin enc  Costs      Costs        Costs        Costs      Cost  Cost      Costs      Costs      Costs    Costs    Costs    Contin enc  Costs        Costs          Costs        Costs PERIOD 1a - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.L1      Prepare preliminary decommissioning cost                                                                    191          41      232          232                                                                                          200            43      242        242.275 1a.L2      Notification of Cessation of Operations                                                                                            a 1a.L3      Remove fuel & source material                                                                                                      nla 1a.L4      Notification of Permanent Defueling 1a.L5      Deactivate plant systems & process waste                                                                                            a 1a.L6      Prepare and submit PSDAR                                                                                    294          63      357          357                                                                                          307            65      373        372.731 1a.L7      Review plant dwgs & specs.                                                                                  676          144      820          820                                                                                          707          150      857        857.281 1a.L8      Perform detailed rad survey                                                                                                        a 1a.L9      Estimate by*product inventory                                                                              147          31      178          178                                                                                          154            33      186        186.365 1a.L10      End product description                                                                                    147          31      178          178                                                                                          154            33      186        186.365 1a.L11      Detailed by*product inventory                                                                              191          41      232          232                                                                                          200            43      242        242.275 1a.L12      Define major work sequence                                                                                1,103          235    1,337        1,337                                                                                        1,152          245    1,398      1,397.741 1a.L13      Perform SER and EA                                                                                          456          97      553          553                                                                                          476          101      578        577.733 1a.L14      Perform Site*Specific Cost Study                                                                            735          156      891          891                                                                                          768          164      932        931.827 1a.L15      Prepare/submit License Termination Plan                                                                    602          128      730          730                                                                                          629          134      763        763.353 1a.L16      Receive NRC approval of termination plan                                                                                            a Activity Specifications 1a.L17.1    Plant & temporary facilities                                                                                723          154      877          789                        88                                                                756          161      917        825.226                    91.692 1a.L17.2    Plant systems                                                                                              613          130      743          669                        74                                                                640          136      777        698.876                    77.653 1a.L17.3    NSSS Decontamination Flush                                                                                  74          16        89          89                                                                                            77          16        93        93.183 1a.L17.4    Reactor internals                                                                                        1,044          222    1,266        1,266                                                                                        1,091          232    1,323      1,323.195 1a.L17.5    Reactor vessel                                                                                              956          203    1,159        1,159                                                                                          999          213    1,211      1,211.375 1a.L17.6    Biological shield                                                                                            74          16        89          89                                                                                            77          16        93        93.183 1a.L17.7    Steam generators                                                                                            459          98      556          556                                                                                          479          102      581        581.460 1a.L17.8    Reinforced concrete                                                                                        235          50      285          143                        143                                                                246            52      298        149.092                    149.092 1a.L17.9    Main Turbine                                                                                                59          13        71                                    71                                                                61            13        75                                    74.546 1a.L17.1O  Main Condensers                                                                                              59          13        71                                    71                                                                  61          13        75                                    74.546 1a.1.17.11  Plant structures & buildings                                                                                459          98      556          278                        278                                                                479          102      581        290.730                  290.730 1a.1.17.12  Waste management                                                                                            676          144      820          820                                                                                          707          150      857        857.281 1a.1.17.13  Facility & site closeout                                                                                    132          28      160          80                        80                                                                138            29      168        83.864                    83.864 la.L17      Total                                                                                                    5,561        1,184    6,744        5,938                        806                                                              5,812        1,237    7,050      6,207.466                  842.124 Planning  & Site Preparations la.l.18    Prepare dismantling sequence                                                                                353          75      428          428                                                                                          369            78      447        447.277 la.l.19    Plant prep. & temp. svces                                                                                2,800          596    3,396        3,396                                                                                        2,927          623    3,550      3,549.818 1a.l.20    Design water clean*up system                                                                                206          44      250          250                                                                                          215            46      261        260.912 la.1.21    Rigging/Cont. Cntrl Envlps/tooling/etc.                                                                  2,200          468    2,668        2,668                                                                                        2,300          489    2,789      2,789.143 la.1.22    Procure caskslliners & containers                                                                          181          38      219          219                                                                                          189            40      229        229.229 la.1        Subtotal Period la Activity Costs                                                                        15,842        3,372  19,214      18,408                        806                                                            16,559        3,525  20,084    19,241.791                    842.124 Period 1a Additional Costs 1a.2.1      Spent Fuel Pool Isolation                                                                                19,825        4,220  24,045      24,045                                                                                        20,723        4,411  25,134    25,134.244 1a.2.2      Disposal of Contaminated Tools & Equipment                      234            97                3,145                1,170    4,646        4,646                                                  245      101                3,623                  1,223    5,192      5,191.554 1a.2        Subtotal Period 1a Additional Costs                              234            97                3,145  19,825        5,389  28,691      28,691                                                  245      101                3,623  20,723        5,633  30,326    30,325.798 Period la Period*Dependent Costs la.4.1      Insurance                                                                                                1,056          150    1,205        1,205                                                                                        1,103          157    1,260      1,260.001 la.4.2      Property taxes                                                                                              165          23      189          189                                                                                          173            25      198        197.539 la.4.3      Health physics supplies                              485                                                                172      657          657                                        507                                                              180      687        687.091 1a.4.4      Heavy equipment rental                                480                                                                102      582          582                                        501                                                              107      608        607.979 1a.4.5      Disposal ofDAW generated                                          15            4                  49                  21        89          89                                                    16                            56                    21        99        98.604 1a.4.6      Plant energy budget                                                                                      1,156          246    1,402        1,402                                                                                        1,209          257    1,466      1,465.973 1a.4.7      NRC Fees                                                                                                  1,177          167    1,344        1,344                                                                                        1,231          175    1,405      1,405.380 1a.4.8      Emergency Planning Fees                                                                                  1,001          142    1,143                      1,143                                                                          1,047          149    1,195                    1,195.198 1a.4.9      Spent Fuel Pool O&M                                                                                        763          162      926                        926                                                                            798          170      968                      967.515 1a.4.10    ISFSI Operating Costs                                                                                        45          10        54                        54                                                                              47          10        57                      56.705 1a.4.11    Severance Related Costs                                                                                  35,456        7,547  43,002      43,002                                                                                        37,062        7,889  44,950    44,950.419 1a.4.12    Spent Fuel Storage Canisters/Overpacks                                                                    7)353        1,565    8,919                    8,919                                                                            7,687        1,636    9,323                    9,322.615 1a.4.13    Security Staff Cost                                                                                      14,837        3,158  17,995      17,995                                                                                        15,509        3,301  18,810    18,810.143 1a.4.14    Utility Staff Cost                                                                                      33,000        7,024  40,024      40,024                                                                                        34,495        7,342  41,837    41,837.165 1a.4        Subtotal Period 1a Period*Dependent Costs            965        15            4                  49  96,010      20,489  117,533      106,491      11,042                        1,008        16                            56  100,359        21,417  122,862    111,320.294    11,542.032 1a.0        TOTAL PERIOD 1a COST                                  965        249          101                3,194 131,677      29,250  165,437      153,590      11,042          806          1,008        261      106                3,679  137,642        30,575  173,272    160,887.884    11,542.032      842.124 PERIOD 1b - Decommissioning Preparations Period 1b DiI'ect Decommissioning Activities Detailed Work Procedures 1b.1.1.1 Plant syslems                                                                                                  696          148      844          759                        84                                                                727          155      882        793.861                    88.207 1b.1.1.2 NSSS Decontamination Flush                                                                                    147          31      178          178                                                                                          154            33      186        186.365 1b.1.1.3 Reactor internals                                                                                            368          78      446          446                                                                                          384            82      466        465.914 1b.1.1.4 Remaining buildings                                                                                          198          42      241          60                        181                                                                207            44      252        62.898                    188.695 1b.1.1.5 CRD cooling assembly                                                                                          147          31      178          178                                                                                          154            33      186        186.365 lb. 1. 1.6 CRD housings & ICI tubes                                                                                    147          31      178          178                                                                                          154            33      186        186.365 1b.1.1.7 Incore instrumentation                                                                                        147          31      178          178                                                                                          154            33      186        186.365 1b.1.1.8 Reactor vessel                                                                                                534          114      647          647                                                                                          558          119      677        676.507 1b .1.1.9 Facility closeout                                                                                            176          38      214          107                        107                                                                184            39      224        111.819                    111.819 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                              Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                        PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 2 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                        DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                                (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site                                              Off-Site  LLRW                                          NRC        Spent Fuel      Site Activity                                              Decon  Removal  Packaging    Transport  Processing Disposal  Other      Total    Total    Lie. Term. Management  Restoration  Decon    Removal  Packaging  Transport Processing Disposal  Other        Total    Total      Lie. Term. Management  Restoration Index                  Activit                        Cost    Cost      Costs        Costs      Costs    Costs    Costs  Contin enc'  Costs      Costs        Costs        Costs      Cost      Cost      Costs      Costs      Costs    Costs    Costs    Contin ency  Costs        Costs        Costs        Costs 1b.Ll.10  Missile shields                                                                                                  66          14      80          80                                                                                                69          15        84        83.864 1b.Ll.ll  Biological shield                                                                                              176          38    214          214                                                                                              184            39      224        223.639 Ib.I.Ll2  Steam generators                                                                                                676          144    820          820                                                                                              707          150      857        857.281 Ib.I.Ll3  Reinforced concrete                                                                                            147          31    178          89                        89                                                                  154            33      186        93.183                    93.183 Ib.l.Ll4  Main Turbine                                                                                                    229          49    278                                    278                                                                  240            51      291                                  290.730 Ib.l.Ll5  Main Condensers                                                                                                229          49    278                                    278                                                                  240            51      291                                  290.730 Ib.l.l.16  Auxiliary building                                                                                              401          85    487          438                        49                                                                  419            89      509        457.900                    50.878 Ib.l.l.17  Reactor building                                                                                                401          85    487          438                        49                                                                  419            89      509        457.900                    50.878 Ib.Ll      Total                                                                                                        4,887        1,040  5,927        4,812                      1,115                                                                5,108        1,087    6,195      5,030.227                1,165.120 Ib.1.2    Decon primary loop                              750                                                                        532  1,283        1,283                                784                                                                        556    1,341      1,340.806 1b.1      Subtotal Period 1b Activity Costs                750                                                          4,887        1,573  7,210        6,095                      1,115    784                                                        5,108        1,644    7,536      6,371.033                1,165.120 Period 1b Additional Costs 1b.2.1    Site Characterization                                                                                        4,765        2,029  6,794        6,794                                                                                            4,981        2,120    7,101      7,101.355 1b.2.2    Hazardous Waste Management                                                                                      204          43    247          247                                                                                              213            45      259        258.630 1b.2.3    Mixed Waste Management                                                                                          270          57    327          327                                                                                              282            60      342        342.304 1b.2      Subtotal Period 1b Additional Costs                                                                          5,239        2,129  7,368        7,368                                                                                            5,476        2,226    7,702      7,702.289 Period 1b Collateral Costs 1b.3.1    Decon equipment                                  931                                                                        198  1,129        1,129                                973                                                                        207    1,180      1,179.852 1b.3.2    DOC staff relocation expenses                                                                                1,415          301  1,716        1,716                                                                                            1,479          315    1,793      1,793.397 1b.3.3    Process decommissioning water waste              46                  21          66                  88                  81    302          302                                  48                  22        69                101                    85      325        325.126 1b.3A      Process decommissioning chemical flush waste                          63          256                6,210                2,267  8,797        8,797                                  2                  65      267                7,154                2,370    9,858      9,858.305 1b.3.5    Small tool allowance                                                                                                          1        3            3                                                                                                            1        3          30408 1b.3.6    Pipe cutting equipment                                  1,100                                                              234  1,334        1,33,1                                        1,150                                                            245    1,395      1,394.571 1b.3.7    Decon rig                                      1,500                                                                        319  1,819        1,819                              1,568                                                                        334    1,902      1,901.688 1b.3.8    Spent Fuel Transfer - Pool to ISFSI                                                                          1,989          423  2,412                      2,412                                                                              2,079          443    2,522                    2,521.691 1b.3      Subtotal Period 1b Collateral Costs            2,479    1,103        84          321                6,298  3,404        3,825  17,513      15,100        2,412                2,591      1,153        88      336                7,255    3,558        3,998    18,978    16,456.348    2,521.691 Period 1b Period-Dependent Costs 1bA.1      Decon supplies                                    28                                                                          10      38          38                                29                                                                          10        40        39.899 1bA.2      Insurance                                                                                                      523          74    598          598                                                                                              547            78      625        624.822 1bA.3      Property taxes                                                                                                  82          12      94          94                                                                                                86          12        98        97.958 1bAA      Health physics supplies                                    269                                                                96    365          365                                          282                                                            100      381        381.488 1bA.5      Heavy equipment rental                                    238                                                                51    288          288                                          249                                                              53      301        301.491 1bA.6      Disposal of DAW generated                                              9                                28                  12      52          52                                                                                      33                    12        57        57.303 1bA.7      Plant energy budget                                                                                          1,147          244  1,391        1,391                                                                                            1,199          255    1,454      1,453.924 1bA.8      NRC Fees                                                                                                        346          49    395          395                                                                                              361            51      413        412.710 1bA.9      Emergency Planning Fees                                                                                        497          70    567                        567                                                                                519            74      593                      592.687 1bA.1O    Spent Fuel Pool O&M                                                                                            378          81    459                        459                                                                                396            84      480                      479.781 1bA.ll    ISFSI Operating Costs                                                                                            22            5      27                        27                                                                                  23            5        28                      28.119 1b.4.12    Severance Related Costs                                                                                      5,351        1,139  6,490        6,490                                                                                            5,594        1,191    6,784      6,784.275 1bA.13    Spent Fuel Storage Canisters/Overpacks                                                                        7,347        1,564  8,911                      8,911                                                                              7,680        1,635    9,315                    9,314.974 IbA.14    Security Staff Cost                                                                                          7,357        1,566  8,924        8,924                                                                                            7,691        1,637    9,328      9,327.769 IbA.15    DOC Staff Cost                                                                                                6,563        1,397  7,960        7,960                                                                                            6,860        1,460    8,320      8,320.136 1b.4.16    Utility Staff Cost                                                                                          16,460        3,504  19,963      19,963                                                                                          17,206        3,662    20,868    20,867.807 1bA        Subtotal Period 1b Period-Dependent Costs        28      507                                          28  46,074        9,872  56,522      46,557        9,964                  29        530                                        33  48,161      10,319    59,085    48,669.583    10,415.561 1b.0      TOTAL PERIOD 1b COST                          3,257    1,610        93          324                6,326  59,604      17,399  88,612      75,121        12,377        1,115  3,405      1,683        97      339                7,288  62,304      18,187    93,302    79,199.253    12,937.252    1,165.120 PERIOD 1 TOTALS                                          3,257    2,575        342          425                9,520 191,280      46,649 254,049    228,711        23,418        1,920  3,405      2,691        358      445              10,967  199,945      48,763  266,574    240,087.136    24,479.284    2,007.244 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping                            370      354        52          40                1,342                  880  3,038        3,038                                386        370        54        42              1,546                  920    3,319      3,318.819 2a.1.1.2 Pressurizer Quench Tank                            39        35          8            6                  189                  110    387          387                                41        37          8          6                217                  115      424        424.373 2a.1.1.3 Reactor Coolant Pumps & Motors                    118      126        103          185                1,443                  694  2,669        2,669                                123        132        108      193                1,663                  726    2,944      2,944.148 2a.1.1A Pressurizer                                          50        70        448          114                  750                  414  1,846        1,846                                  53        73        468      119                  864                  433    2,010      2,010.016 2a.1.1.5 Steam Generators                                  477    4,206      3,368        1,922              12,807                7,260  30,039      30,039                                498      4,397      3,520    2,009              14,753                7,589    32,766    32,765.969 2a.1.1.6 Retired Steam Generator Units                                        2,496        1,878              12,597                5,223  22,194      22,194                                                    2,609    1,963              14,512                5,459    24,543    24,543.070 2a.1.1.7  CRDMslICIs/Service Structure Removal            196      112        262          37                  444                  381  1,433        1,433                                205        117        274        39                511                  399    1,545      1,544.887 2a.1.1.8 Reactor Vessel Internals                          175    3,110    14,996        1,468              10,438    283      16,741  47,212      47,212                                183      3,251    15,675    1,535              12,025      296      17,499    50,464    50,464.306 2a.1.1.9 Reactor Vessel                                    122    5,226      2,439          742                2,651    283        8,718  20,181      20,181                                127      5,463      2,549      776                3,054      296        9,113    21,378    21,3780442 2a.1.1    Totals                                        1,546    13,241    24,170        6,392              42,661    567      40,422 128,998      128,998                              1,616    13,840    25,265    6,681              49,146      592      42,253  139,394    139,394.030 Removal of Major Equipment 2a.1.2    Main Turbine/Generator                                    202                                                                43    245                                    245                211                                                              45      256                                  2560499 2a.1.3    Main Condensers                                            668                                                              142    810                                    810                698                                                            149      847                                  847.009 Cascading Costs from Clean Building Demolition 2a.1.4.1 *Reactor                                                  1,194                                                              254  1,448        1,448                                        1,248                                                            266    1,513      1,513.285 2a.1.4.2 Containment Penetration Area                                  73                                                                16      89          89                                            77                                                              16        93        92.930 2a.1.4.3 Fuel Handling                                                193                                                                41    234          234                                          202                                                              43      245        244.662 2a.1.4    Totals                                                  1,460                                                              311  1,771        1,771                                        1,526                                                            325    1,851      1,850.877 Disposal of Plant Systems 2a.1.5.1  Auxiliary Steam                                            148                                                                31    179                                    179                154                                                              33      187                                  187.042 2a.1.5.2 Auxiliary Steam (RCA)                                        277        61          19                  652                  342  1,351        1,351                                          289        64        20                751                  358    1,482      1,482.297 2a.1.5.3 Condensate System                                            679                                                              145    824                                    824                710                                                            151      861                                  860.998 2a.1.5A Condensate System (Insulated)                                281                                                                60    341                                    341                294                                                              63      357                                  356.810 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                              Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                        PG&E letter DCl-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 3 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Deconunissioning Cost Estimate                                                                                                                        DECON Deconunissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                                (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site                                                Off-Sitc  LLRW                                          NRC        Spent 'Fuel    Site Activity                                              Decon  Removal  Packaging    Transport  Processing Disposal  Other      Total    Total    Lie. Term. Management  Restoration  Decon    Removal  Packaging  Transport Processing Disposal  Other      Total    Total      Lie. Term. Management  Restoration Index                  Activity Descri tion          Cost    Cost      Costs        Costs      Costs    Costs    Costs  Contin cncy  Costs      Costs      Costs        Costs      Cost      Cost      Costs      Costs    Costs    Costs    Costs    Contin enc  Costs        Costs        Costs        Costs 2a.1.5.5  Containment Spray                                          249        167          53                1,786                  757  3,011        3,011                                          261        174          55              2,057                    791    3,338      3,338.397 2a.1.5.6  Extraction Steam & Heater Drip                            263                                                                56    318                                    318                274                                                                58      333                                  332.880 2a.1.5.7  Feedwater System                                            46                                                                10      56                                    56                48                                                                10        58                                  58.022 2a.1.5.8  Feedwater System (Insulated)                              168                                                                36    204                                    204                176                                                                37      214                                  213.608 2a.1.5.9  Feedwater System (RCA Insulated)                          126        43          15                  506                  234    923          923                                          132          45        16                583                    244    1,019      1,019.130 2a.1.5.10  Feedwater System (RCA)                                      6                                          27                  12      48          48                                            6                                        31                    13        53        52.873 2a.1.5.1l  Lube Oil Distribution & Purification                      115                                                                25    140                                    140                120                                                                26      146                                  146.028 2a.1.5.12  Nitrogen & Hydrogen                                        20                                                                4      24                                    24                21                                                                4        25                                  25.054 2a.1.5.13  Nitrogen & Hydrogen (Insulated)                                                                                                o        1                                    1                  1                                                                o        1                                    1.319 2a.1.5.14  Nitrogen & Hydrogen (RCA Insulated)                                                                                            4      16          16                                            6                      o                                                  17        17.347 2a.1.5.15  Nitrogen & Hydrogen (RCA)                                  110        12                              102                  78    305          305                                          115          13          3                118                    81      330        329.598 2a.1.5.16  Oily Water Separator & TB Sump                              37        12                              157                  72    282          282                                          39          13          5                180                    75      312        311.866 2a.1.5.17  Saltwater System                                          190                                                                41    231                                    231                199                                                                42      241                                  241.356 2a.1.5.18  Turbine Steam Supply                                      759                                                              161    920                                    920                793                                                              169      962                                  961.902 2a.1.5.19  Turbine Steam Supply (RCA)                                862        335          112                3,799                1,725  6,833        6,833                                          901        350        117                4,377                  1,803    7,548      7,547.512 2a.1.5.20  Turbine and Generator                                      80                                                                17      98                                    98                84                                                                18      102                                  102.003 2a.1.5.21  Turbine and Generator (Insulated)                          26                                                                6      32                                    32                28                                                                6        34                                  33.592 2a.1.5    Totals                                                  4,450        633          207                7,034                3,814  16,138      12,770                    3,368              4,652        661        217                8,103                  3,987  17,620    14,099.021                  3,520.615 2a.1.6    Scaffolding in support of decommissioning                2,465                                          113                  917  3,509        3,509                                        2,577          10                            130                    958    3,680      3,680.347 2a.1      Subtotal Period 2a Activity Costs              1,546    22,486    24,812        6.604              49,808    567      45,648 151,472      147,048                    4,424  1,616    23,505    25,936      6,903              57,379      592      47,716  163,648    159,024.276                  4,624.123 Period 2a Additional Costs 2a.2.1    Retired Reactor Head                                                  225          179                1,557                  622  2,583        2,583                                                    235        187                1,794                    651    2,866      2,866.226 2a.2      Subtotal Period 2a Additional Costs                                  225          179                1,557                  622  2,583        2,583                                                    235        187                1.794                    651    2.866      2,866.226 Period 2a Collateral Costs 2a.3.1    Process decommissioning water waste              84                  40          122                  163                  149    558          558                                88                    41      128                  188                    156      600        600.230 2a.3.2    Process decommissioning chemical flush waste 2a.3.3    Small tool allowance                                      287                                                                61    348          313                        35                300                                                                64      364        327.556                    36.395 2a.3.4    Spent Fuel Transfer - Pool to ISFSI                                                                          9,666        2,057  11,723                    11,723                                                                              10,104        2,151  12,254                  12,254.166 2a.3      Subtotal Period 2a Collateral Costs              84      287        40          122                  163  9,666        2,267  12,629          871      11,723          35      88        300          41      128                  188    10,104        2,370  13,218        927.786  12,254.166      36.395 Period 2a Period-Dependent Costs 2a.4.1    Decon supplies                                    92                                                                          32    124          124                                96                                                                          34      130        129.618 2a.4.2    Insurance                                                                                                      765          109    873          873                                                                                              800          113      913        913.055 2a.4.3    Property taxes                                                                                                  267          38    304          274                        30                                                                    279          40      318        286.405                    31.823 2a.4.4    Health physics supplies                                  1,863                                                              661  2,523        2,523                                        1,947                                                              691    2,638      2,637.606 2a.4.5    Heavy equipment rental                                  3,362                                                              716  4,077        4,077                                        3,514                                                              748    4,262      4,261.904 2a.4.6    Disposal ofDAW generated                                              96          27                  305                  127    555          555                                                    101          28                351                    133      613        613.046 2a.4.7    Plant energy budget                                                                                          1,770          377  2,146        2,146                                                                                            1,850          394    2,244      2,243.542 2a.4.8    NRC Fees                                                                                                      1,022          145  1,167        1,167                                                                                            1,068          152    1,220      1,220.081 2a.4.9    Emergency Planning Fees                                                                                      1,152          163  1,315                    1,315                                                                                1,204          171    1,375                    1,374.882 2a.4.10    Spent Fuel Pool O&M                                                                                          1,229          262  1,491                    1,491                                                                                1,285          274    1,559                    1,558.626 2a.4.1l    ISFSI Operating Costs                                                                                            72          15      87                      87                                                                                  75          16        91                      91.349 2a.4.12    Severance Related Costs                                                                                      3,173          675  3,848        3,848                                                                                            3,317          706    4,023      4,022.623 2a.4.13    Spent Fuel Storage Canisters/Overpacks                                                                      20,381        4,338  24,720                    24,720                                                                              21,305        4,535  25,839                  25,839.340 2a.4.14    Security Staff Cost                                                                                          23,902        5,087  28,989      28,989                                                                                            24,984        5,318  30,302    30,302.363 2a.4.15    DOC Staff Cost                                                                                              26,041        5,543  31,584      31,584                                                                                            27,221        5,794  33,015    33,015.006 2a.4.16    Utility Staff Cost                                                                                          36,803        7,834  44,636      44,636                                                                                            38,470        8,188  46,658    46,658.452 2a.4      Subtotal Period 2a Period-Dependent Costs        92    5,224        96          27                  305 116,577      26,122 148,443      120,799      27,613          30      96    5,461        101          28                351  121,858      27,306  155,200    126,303.700    28,864.197      31.823 2a.0      TOTAL PERIOD 2a COST                          1,722    27,997    25,173        6,932              51,833 126,809      74,660 315,127      271,302      39,336        4,489  1,800    29,266    26,313      7,246              59,712  132,554      78,043  334,933    289,121.988    41,118.363    4,692.341 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b.1.1.1 Capital Additions 85-2002 (clean)                            182                                                                39    220                                    220                190                                                                40      230                                  230.400 2b.1.1.2 Capital Additions 85-2002 (contaminated)                    485        54          19                  635                  409  1,603        1.603                                          507          57        20                732                    428    1,743      1,743.017 2b.1.1.3 Chemical & Volume Control                          875    1.229        197          67                2,277                1,907  6,551        6.551                              914      1,285        205          70              2,623                  1.993    7,091      7.091.212 2b.1.1.4 Chemical & Volume Control (Insulated)              324      465        50          14                  466                  570  1.887        1,887                              338        486          52        14                536                    595    2.022      2,022.032 2b.1.1.5 Component Cooling Water                                      196                                                                42    237                                    237                205                                                                44      248                                  248.194 2b.1.1.6 Component Cooling Water (RCA)                                617        194          67                2,260                1,063  4,201        4,201                                          645        203          70              2,604                  1,111    4,632      4,632.046 2b.1.1.7 Compressed Air                                              174                                                                37    211                                    211                182                                                                39      221                                  220.968 2b.1.1.8 Compressed Air (Insulated)                                    6                                                                1        7                                                        6                                                                1        8                                    7.838 2b.1.1.9 Compressed Air (RCA Insulated)                                29                      1                  31                  22      87          87                                          30          4          1                  36                    23        94        94.082 2b.1.1.10 Compressed Air (RCA)                                        534        67          18                  595                  414  1,626        1,626                                          558          70        18                685                    432    1,764      1,763.614 2b.1.1.1l Diesel Engine-Generator                                    179                                                                38    217                                    217                187                                                                40      227                                  227.013 2b.1.1.12 Diesel Engine-Generator (Insulated)                          11                                                                2      14                                    14                12                                                                2        14                                  14.210 2b.1. 1.13 Electrical (Clean)                                      2,130                                                              453  2,584                                  2,584              2,227                                                              474    2,701                                2,700.862 2b.1.1.14 Electrical (Contaminated)                                  633        91          38                1,275                  698  2,735        2,735                                          661          96        39              1,469                    730    2,995      2,995.292 2b.1.1.15 Electrical (Decontaminated)                              3,324                                                              708  4,032                                  4,032              3,475                                                              740    4,214                                4,214.453 2b.1.1.16 Fire Protection                                            386        147          54                1,820                  815  3,222        3,222                                          404        154          56              2,097                    852    3,562      3,562.131 2b.1.1.17 Gaseous Radwaste                                            88        10            3                  91                  66    258          258                                          92          11          3                105                    69      280        279.865 2b.1.1.18 HVAC (Clean Insulated)                                      29                                                                6      35                                    35                30                                                                6        36                                  36.336 2b.1.1.19 HVAC (Clean)                                                372                                                                79    451                                    451                388                                                                83      471                                  471.120 2b.1.1.20 HVAC (Contaminated Insulated)                              309        55          22                  733                  382  1,501        1,501                                          323          57        23                845                    399    1,647      1,646.983 2b.1.1.21 HVAC (Contaminated)                                      1,372        272          108                3,662                1,848  7,262        7,262                                        1,434        285        113                4,219                  1,931    7,982      7,981.659 2b.1.1.22 Liquid Radwaste                                  582      785        116          38                1,283                1,171  3,973        3,973                              608        820        121        40              1,478                  1,224    4,290      4,290.085 2b.1.1.23 Liquid Radwaste (Insulated)                        69        86        10            3                  91                  114    372          372                                72        90          10          3                105                    119      399        399.053 2b.1.1.24 Make-up Water                                              360                                                                77    437                                    437                376                                                                80      457                                  456.552 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                        PG&E Letter DCL-13-033 Document P01-1648-001 , Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 4 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                        DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                              (Thousands of 2013 Dollars) o ff-Site  LLRW                                      NRC      Spent Fuel      Site                                              Off-Site  LLRW                                          NRC        Spent Fucl      Site Activity                                                Decon  Removal  Packaging    Transport  Processing  Disposal  Other      Total    Total    Lie. Term. Management  Restoration  Decon    Removal  Packaging  Transport Processing Disposal  Other        Total    Total      Lie. Term,    Management  Restoration Index                                                  Cost    Cost      Costs        Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cost    Cost      Costs      Costs    Costs    Costs    Costs    Contin enc  Costs        Costs        Costs        Costs 2b.1.1.25  Make-up Water (Insulated)                                    33                                                                          40                                    40                34                                                                        41                                  41.375 2b.1.1.26  Make-up Water (RCA Insulated)                                44          8            2                    81                  46    182          182                                          46          8          2                  93                    48      199        198.951 2b.1.1.27  Make-up Water (RCA)                                        237        46          14                  459                  256  1,012        1,012                                        248        48        14                529                    268    1,107      1,106.536 2b.1.1.28  Miscellaneous Reactor Coolant                      21      137        17            5                  155                  121    455          455                                21      143        17          5                179                    127      492        491.708 2b.1.1.29  Nuclear Steam Supply Sampling                              182        13            4                  141                  117    457          457                                        190        14          4                162                    123      493        493.234 2b.1.1.30  Nuclear Steam Supply Sampling (Insulated                    55          2            1                    19                  27    103          103                                          58          2          1                  21                    28      110        109.973 2b.1.1.31  Residual Heat Removal                            319      336        165          55                1,873                1,045  3,793        3,793                              333      351        172        58              2,158                  1,092    4,165      4,164.679 2b.1.1.32  Safety Injection                                            128        22                                245                  137    538          538                                        134        23          8                282                    143      589        588.967 2b.1.1.33  Safety Injection (Insulated)                                  6          1            o                    11                    6      24          24                                                      1          o                  12                      6        27        26.629 2b.1.l.34  Safety Injection (RCA Insulated)                            42          9            3                    95                  50    198          198                                          43          9          3                109                    53      217        217.469 2b.1.1.35  Safety Injection (RCA)                                      350        80          25                  854                  444  1,753        1,753                                        366        84        26                984                    464    1,924      1,923.642 2b.1.1.86  Service Cooling Water                                      118                                                                25    143                                    143              123                                                              26      149                                  149.091 2b.1.1.37  Service Cooling Water (RCA)                                  30                                            73                  38    149          149                                          31                    2                  84                    40      164        163.953 2b.1.l    Totals                                          2,188    15,679      1,635          567                19,225              13,278  52,572      43,945                    8,628  2,287    16,389      1,710      592              22,147                13,879  57,005    47,986.809                  9,018.411 2b.1.2    Scaffolding in support of decommissioning                3,081        12                                141                1,146  4,387        4,387                                      3,221        12                            163                  1,198    4,600      4,600.434 Decontamination of Site Buildings 2b.1.3.1 "Reactor                                            958    2,483      1,120        5,645                26,011              12,149  48,366      48,366                            1,002    2,596      1,171    5,901              29,964                12,699  53,333    53,332.747 2b.1.3.2 Capital Additions 85-2004                            33        27          7            3                    96                  69    236          236                                34      29          8          3                111                    72      256        256.462 2b.1.3.3 Containment Penetration Area                        327      213        26          28                  379                  452  1,425        1,425                              341      223        27        30                437                    472    1,530      1,530.063 2b.1.3    Totals                                          1,318    2,724      1,153        5,677                26,486              12,669  50,027      50,027                            1,378    2,848      1,205    5,934              30,512                13,243  55,119    55,119.273 2b.1      Subtotal Period 2b Activity Costs              3,506    21,484      2,800        6,250                45,852              27,093 106,986      98,358                    8,628  3,665    22,458      2,927    6,533              52,822                28,321  116,725    107,312.002                  9,412.951 Period 2b Collateral Costs 2b.3.1    Process decommissioning water waste              133                  65          199                  266                  241    904          904                              139                  68      208                  306                    252      974        973.623 2b.3.2    Process decommissioning chemical flush waste        3                  103          420                  782                  384  1,692        1,692                                  3                108      439                  901                    401    1,853      1,852.615 2b.3.3    Small tool allowance                                        408                                                                87    495          495                                        426                                                              91      517        516.961 2b.3.4    Spent Fuel Transfer - Pool to ISFSI                                                                            7,355        1,566  8,921                    8,921                                                                            7,688        1,636    9,325                    9,324.785 2b.3      Subtotal Period 2b Collateral Costs              136      408        168          620                1,048  7,355        2,277  12,012        3,091        8,921                  143      426        175      648                1,208    7,688        2,380  12,668      3,343.199    9,324.785 Period 2b Period-Dependent Costs 2b.4.1    Decon supplies                                    796                                                                          283  1,079        1,079                              832                                                                        295    1,128      1,127.827 2b.4.2    Insurance                                                                                                      1,138          162  1,300        1,300                                                                                          1,190          169    1,359      1,358.713 2b.4.3    Property taxes                                                                                                    397          56    453          453                                                                                            415            59      474        473.553 2b.4.4    Health physics supplies                                  2,527                                                                897  3,424        3,424                                      2,642                                                              937    3,579      3,579.210 2b.4.5    Heavy equipment rental                                    4,962                                                              1,056  6,018        6,018                                      5,187                                                            1,104    6,291      6,290.954 2b.4.6    Disposal of DAW generated                                              104          29                  330                  138    601          601                                                    109        31                380                    144      663        663.328 2b.4.7    Plant energy budget                                                                                            2,079          443  2,522        2,522                                                                                          2,173          463    2,636      2,635.740 2b.4.8    NRC Fees                                                                                                        1,521          216  1,737        1,737                                                                                          1,590          226    1,816      1,815.597 2b.4.9    Emergency Planning Fees                                                                                        1,714          243  1,957                    1,957                                                                            1,792          254    2,046                    2,045.955 2b.4.10    Spent Fuel Pool O&M                                                                                            1,829          389  2,219                    2,219                                                                            1,912          407    2,319                    2,319.385 2b.4.11    Liquid Radwaste Processing Equipment/Services                                                                    465          99    563          563                                                                                            486          103      589        588.948 2b.4.12    ISFSI Operating Costs                                                                                            107          23    130                      130                                                                              112            24      136                      135.936 2b.4.13    Severance Related Costs                                                                                        7,661        1,631  9,291        9,291                                                                                          8,008        1,704    9,712      9,711.936 2b.4.14    Spent Fuel Storage Canisters/Overpacks                                                                        11,034        2,349  13,383                    13,383                                                                            11,534        2,455  13,989                  13,989.174 2b.4.15    Security Staff Cost                                                                                            35,568        7,571  43,139      43,139                                                                                        37,179        7,914  45,093    45,092.805 2b.4.16    DOC Staff Cost                                                                                                26,233        5,584  31,816      31,816                                                                                        27,421        5,837  33,257    33,257.357 2b.4.17    Utility Staff Cost                                                                                            38,925        8,285  47,210      47,210                                                                                        40,689        8,661  49,349    49,349.125 2b.4      Subtotal Period 2b Period-Dependent Costs        796    7,490        104          29                  330 128,671      29,422 166,842      149,153      17,689                  832    7,829        109        31                380  134,500      30,755  174,436    155,945.091    18,490.449 2b.0      TOTAL PERIOD 2b COST                            4,439    29,382      3,072        6,899                47,230 136,026      58,793 285,840    250,603        26,610        8,628  4,640    30,713      3,211    7,211              54,409  142,188      61,456  303,829    266,600.292    27,815.234    9,412.951 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1    Spent Fuel Transfer - Pool to ISFSI                                                                            7,990        1,701  9,691                    9,691                                                                            8,352        1,778  10,130                  10,129.745 2c.3      Subtotal Period 2c Collateral Costs                                                                            7,990        1,701  9,691                    9,691                                                                            8,352        1,778  10,130                  10,129.745 Period 2c Period-Dependent Costs 2c.4.1    Insurance                                                                                                      3,475          493  3,968        3,968                                                                                          3,632          515    4,148      4,147.568 2c.4.2    Property taxes                                                                                                  1,211          172  1,383        1,383                                                                                          1,266          180    1,446      1,445.553 2c.4.3    Health physics supplies                                  2,437                                                                864  3,301        3,301                                      2,547                                                              904    3,451      3,450.720 2c.4.4    Disposal ofDAW generated                                                70          20                  220                  92    401          401                                                    73        20                253                    96      443        442.793 2c.4.5    Plant energy budget                                                                                            1,692          360  2,053        2,053                                                                                          1,769          377    2,146      2,145.543 2c.4.6    NRC Fees                                                                                                        2,671          379  3,050        3,050                                                                                          2,792          396    3,188      3,187.862 2c.4.7    Emergency Planning Fees                                                                                        5,232          742  5,975                    5,975                                                                            5,469          776    6,245                    6,245.423 2c.4.8    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    12,973        2,761  15,735                    15,735                                                                            13,561        2,886  16,448                  16,447.536 2c.4.9    Spent Fuel Pool O&M                                                                                            5,585        1,189  6,773                    6,773                                                                            5,838        1,243    7,080                    7,080.088 2c.4.10    Liquid Radwaste Processing Equipment/Services                                                                    355          75    430          430                                                                                            371            79      449        449.460 2c.4.11    ISFSI Operating Costs                                                                                            327          70    397                      397                                                                              342            73      415                      414.954 2c.4.12    Spent Fuel Storage Canisters/Overpacks                                                                        11,985        2,551  14,535                    14,535                                                                            12,527        2,666  15,194                  15,193.905 2c.4.13    Security Staff Cost                                                                                          108,574      23,110 131,684      131,684                                                                                        113,492      24,157  137,649    137,649.013 2c.4.14    Utility Staff Cost                                                                                              8,384        1,785  10,169      10,169                                                                                          8,764        1,865  10,630    10,629.510 2c.4      Subtotal Period 2c Period-Dependent Costs                2,437        70          20                  220 162,464      34,644 199,853      156,438      43,415                          2,547        73        20                253  169,823      36,213  208,930    163,548.022    45,381.905 2c.0      TOTAL PERIOD 2c COST                                      2,437        70          20                  220 170,454      36,344 209,544      156,438      53,106                          2,547        73        20                253  178,175      37,991  219,060    163,548.022    55,511.650 PERIOD 2d -Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activities TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                        PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 5 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                        DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                              (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site                                              Off-Site  LLRW                                          NRC        Spent Fuel      Site Activity                                                Decon  Removal  Packaging    Transport  Processing Disposal  Other      Total    Total    Lic. Term. Management  Restoration  Decon    Removal  Packaging  Transport Processing Disposal  Other        Total    Total      Lic. Term. Management    Restoration Index                                                  Cost    Cost      Costs        Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cost      Cost      Costs      Costs    Costs    Costs    Costs    Contin cnc  Costs        Costs          Costs        Costs 2d.1.1    Remove spent fuel racks                          585        56        174          36                1,207                  896  2,954        2,954                              612        59        181        37              1,391                    936    3,216      3,216.231 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated) - FHB                              184        14            6                  194                  138    536          536                                          193        15          6                224                    144      581        581.018 2d.1.2.2 Electrical (Decontaminated) - FHB                          1,165        133          53                1,781                1,075  4,206        4,206                                        1,218        139        55              2,051                  1,124    4,587      4,586.911 2d.1.2.3 Fire Protection (RCA)                                        250        50          14                  471                  266  1,052        1,052                                          261        53        15                543                    278    1,150      1,149.807 2d.1.2.4 HVAC (Contaminated)* FHB                                      326        64          25                  838                  427  1,680        1,680                                          341        67        26                965                    447    1,845      1,845.423 2d.1.2.5 Spent Fuel Pit Cooling                                        94        65          21                  706                  297  1,183        1,183                                          98        68        22                814                    311    1,312      1,311.792 2d.1.2.6 Spent Fuel Pit Cooling - FHB                                  130        70          23                  764                  332  1,319        1,319                                          136        73        24                880                    347    1,461      1,460.505 2d.1.2    Totals                                                    2,150        396          140                4,754                2,535  9,976        9,976                                        2,247        414        147              5,477                2,650    10,935    10,935.457 Decontamination of Site Buildings 2d.1.3.1 Fuel Handling                                      811      859        63          41                  637                1,124  3,534        3,534                              848        898        66        43                733                1,174    3,762      3,762.422 2d.1.3    Totals                                            811      859        63          41                  637                1,124  3,534        3,534                              848        898        66        43                733                1,174    3,762      3,762.422 2d.1.4    Scaffolding in support of decommissioninr:                  616                                          28                  229    877          877                                          644                                        33                    240      920        920.087 2d.1      Subtotal Period 2d Activity Costs              1,396    3,682        635          218                6,626                4,784  17,342      17,342                            1,459      3,849        664        228              7,634                5,001    18,834    18,834.197 Period 2d Additional Costs 2d.2.1    License Termination Survey Planning                                                                              800          340  1,140        1,140                                                                                            836          356    1,192      1,191.806 2d.2      Subtotal Period 2d Additional Costs                                                                              800          340  1,140        1,140                                                                                            836          356    1,192      1,191.806 Period 2d Collateral Costs 2d.3.1    Process decommissioninr: waler waste              34                  19          58                  77                  67    255          255                                36                  20        61                  89                    70      275        275.060 2d.3.2    Process decommissioninr: chemical flush waste 2d.3.3    Small tool allowance                                        84                                                                18    101          101                                          87                                                              19      106        105.864 2d.3.4    Decommissioninr: Equipment Disposition                                155          54                1,828                  682  2,718        2,718                                                    162        56              2,105                    713    3,036      3,036.144 2d.3      Subtotal Period 2d Collateral Costs                34        84        174          112                1,905                  766  3,075        3,075                                36        87        181        117              2,195                  801    3,417      3,417.068 Period 2d Period-Dependent Costs 2d.4.1    Decon supplies                                    209                                                                          74    283          283                              219                                                                          78      296        296.076 2d.4.2    Insurance                                                                                                        219          31    250          250                                                                                            228            32      261        260.873 2d.4.3    Property taxes                                                                                                    76          11      87          87                                                                                              80          11        91        90.922 2d.4.4    Health physics supplies                                    443                                                              157    600          600                                          463                                                              164      627        627.279 2d.4.5    Heavy equipment rental                                      953                                                              203  1,156        1,156                                          996                                                            212    1,208      1,207.863 2d.4.6    Disposal ofDAW generated                                                34            9                  106                  44    194          194                                                      35        10                122                    46      214        213.631 2d.4.7    Plant energy budr:et                                                                                            213          45    258          258                                                                                            223            47      270        269.900 2d.4.8    NRC Fees                                                                                                        250          35    285          285                                                                                            261            37      298        298.233 2d.4.9    Emerr:ency Planninr: Fees                                                                                        165          23    188                      188                                                                                172            24      196                      196.413 2d.4.10    Spent Fuel Transfer* Pool or ISFSI to DOE                                                                        690          147    837                      837                                                                                722          154      875                      875.298 2d.4.11    Liquid Radwaste Processing Equipment/Services                                                                    178          38    216          216                                                                                            186            40      226        226.156 2d.4.12    ISFSI Operating Costs                                                                                            21            4      25                      25                                                                                  22            5        26                      26.100 2d.4.13    Severance Related Costs                                                                                        9,595        2,042  11,637      11,637                                                                                          10,030        2,135    12,164    12,164.283 2d.4.14    Security Staff Cost                                                                                            1,035          220  1,255        1,255                                                                                          1,082          230    1,312      1,312.072 2d.4.15    DOC Staff Cost                                                                                                3,363          716  4,Q78        4,078                                                                                          3,515          748    4,263      4,262.976 2d.4.16    Utility Staff Cost                                                                                            4,500          958  5,458        5,458                                                                                          4,704        1,001    5,705      5,705.125 2d.4      Subtotal Period 2d Period-Dependent Costs        209    1,396        34                              106  20,304        4,750  26,808      25,757        1,050                  219      1,459        35        10                122  21,224        4,965    28,033    26,935.390      1,097.810 2d.0      TOTAL PERIOD 2d COST                            1,639    5,161        842          339                8,638  21,103      10,641  48,364      47,314        1,050                1,714      5,395        881        355              9,951  22,059      11,123    51,476    50,378.460      1,097.810 PERIOD 2f - License Termination Period 2fDirect Decommissioning Activities 2£.1.1    ORISE confirmatory survey                                                                                        178          76    254          254                                                                                            186            79      265        265.355 2£.1.2    Terminate license                                                                                                                        a 2£.1      Subtotal Period 2f Activity Costs                                                                                178          76    254          254                                                                                            186            79      265        265.355 Period 2f Additional Costs 2£,2.1    License Termination Survey                                                                                    9,248        3,937  13,184      13,184                                                                                          9,666        4,115    13,781    13,781.463 2£.2      Subtotal Period 2f Additional Costs                                                                            9,248        3,937  13,184      13,184                                                                                          9,666        4,115    13,781    13,781.463 Period 2f Collateral Costs 2£.3.1    DOC staffrelocation expenses                                                                                  1,415          301  1,716        1,716                                                                                          1,479          315    1,793      1,793.397 2£.3      Subtotal Period 2f Collateral Costs                                                                            1,415          301  1,716        1,716                                                                                          1,479          315    1,793      1,793.397 Period 2fPeriod-Dependent Costs 2£,4.1    Insurance                                                                                                        319          45    365          365                                                                                            334            47      381        381.132 2£.4.2    Property ta.xes                                                                                                  125          18    142          142                                                                                            130            18      149        148.831 2£.4.3    Health physics supplies                                    632                                                              224    856          856                                          660                                                            234      895        894.553 2£,4.4    Disposal ofDAW generated                                                                                  27                  11      49          49                                                                                    31                    12        54        54.471 2f.4.5    Plant energy budr:et                                                                                            174          37    211          211                                                                                            182            39      221        220.900 2f.4.6    NRC Fees                                                                                                        462          66    528          528                                                                                            483            69      551        551.479 2f.4.7    Emergency Planninr: Fees                                                                                        269          38    308                      308                                                                                282            40      322                      321.509 2f.4.8    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    1,130          241  1,371                    1,371                                                                              1,181          251    1,433                    1,432.779 2£.4.9    ISFSI Operatinr: Costs                                                                                            34            7      41                      41                                                                                  35            7        43                      42.723 2f.4.10    Security Staff Cost                                                                                            1,694          361  2,055        2,055                                                                                          1,771          377    2,148      2,147.737 2f.4.11    DOC Staff Cost                                                                                                4,689          998  5,687        5,687                                                                                          4,902        1,043    5,945      5,945.058 2f.4.12    Utility Staff Cost                                                                                            5,150        1,096  6,246        6,246                                                                                          5,384        1,146    6,529      6,529.383 2f.4      Subtotal Period 2fPeriod-Dependent Costs                    632                                          27  14,047        3,142  17,859      16,140        1,719                            660                                        31  14,683        3,284    18,671    16,873.544      1,797.010 2£.0      TOTAL PERIOD 2fCOST                                        632          9                                27  24,887        7,456  33,012      31,293        1,719                            660                                        31  26,015        7,793    34,511    32,713.760      1,797.010 PERIOD 2 TOTALS                                            7,800    65,609    29,166      14,192              107,948 479,280      187,894 891,887      756,949      121,822      13,117  8,153    68,581    30,487    14,835            124,356  500,991      196,405  943,808    802,362.522  127,340.068    14,105.293 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                    PG&E letter DC l-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                Table C-1                        Appendix C1, Page 6 Of 7 Diablo Canyon Unit 1                                                                                                                                      Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                        DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                                (Thousands of 2013 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site                                            Off-Site  LLRW                                          NRC        Spent Fuel      Site Activity                                              Decon Removal  Packaging    Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management    Restoration  Decon Removal  Packaging  Transport Processing Disposal  Other        Total    Total      Lie. Term. Management  Restoration Index                    Activity Descri tion        Cost  Cost      Costs        Costs      Costs    Costs    Costs    Contin enc    Costs      Costs        Costs        Costs      Cost  Cost      Costs      Costs      Costs    Costs    Costs    Cantin ene  Costs        Costs        Costs        Costs PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.LL1 *Reactor                                                  6,798                                                              1,447    8,245                                  8,245          7,106                                                          1,512    8,618                                8,618.390 3b. 1. 1.2 Capital Additions 85-2004                              302                                                                  64      366                                    366            316                                                              67      383                                  382.756 3b. 1. 1.3 Containment Penetration Area                            686                                                                146      832                                    832            717                                                              153      870                                  869.654 3b.LL4 Miscellaneous                                                28                                                                    6      34                                    34              30                                                                6        36                                  35.839 3b.L1.5 Turbine                                                  3,659                                                                779    4,438                                  4,438          3,825                                                            814    4,639                                4,639.371 3b.L1.6 Turbine Pedestal                                        1,318                                                                281    1,599                                  1,599          1,378                                                            293    1,672                                1,671.526 3b.1.1.7 Fuel Handling                                          1,858                                                                395    2,253                                  2,253          1,942                                                            413    2,355                                2,355.138 3b.l.l      Totals                                              14,650                                                              3,118  17,768                                  17,768          15,313                                                          3,259    18,573                                18,572.673 Site Closeout Activities 3b.1.2      Grade & landscape site                              2,758                                                                587    3,S45                                  3,345          2,883                                                            614    3,496                                3,496.266 3b.L3      Final report to NRC                                                                                        229            49      278          278                                                                                          240            51      291        290.730 3b.1        Subtotal Period 3b Activity Costs                  17,407                                                  229          3,754  21,391          278                    21,113          18,196                                                240        3,924    22,360        290.730                3,496.266 Period 3b Additional Costs Sb.2.1      Concrete Crushing                                      476                                                                101      577                                    577            497                                                              106      603                                  603.188 Sb.2.2      Cofferdam Construction and Teardown                    478                                                                102      580                                    580            500                                                              106      606                                  606.381 Sb.2.S      Soil/ Sediment Control Plant Area                    1,052                                                                224    1,276                                  1,276          1,100                                                            234    1,334                                1,333.697 Sb.2        Subtotal Period Sb Additional Costs                  2,006                                                                427    2,433                                  2,433          2,097                                                            446    2,543                                2,543.266 Period Sb Collateral Costs Sb.S.1      Small tool allowance                                  210                                                                  45      254                                    254            219                                                              47      266                                  265.680 Sb.S        Subtotal Period Sb Collateral Costs                    210                                                                  45      254                                    254            219                                                              47      266                                  265.680 Period Sb  Period-Dependent Costs SbA.1      Insurance                                                                                                  525            74      599                        599                                                                            549            78      626                      626.447 SbA.2      Property ta.xes                                                                                            410            58      468                        468                                                                            428            61      489                      489.247 SbA.S      Heavy equipment rental                              7,347                                                              1,564    8,911                                  8,911          7,680                                                          1,635    9,315                                9,314.820 SbA.4      Plant energy budget                                                                                        286            61      347                                    347                                                                299            64      363                                  36S.079 SbA.5      NRC ISFSI Fees                                                                                              348            49      397                        397                                                                            364            52      415                      415.268 SbA.6      Emergency Planning Fees                                                                                    885            126    1,011                    1,011                                                                              926          131    1,057                    1,056.887 SbA.7      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                3,711            790    4,501                    4,501                                                                            3,879          826    4,705                    4,704.721 SbA.8      ISFSI Operating Costs                                                                                      111            24      134                        134                                                                            116            25      140                    140.441 SbA.9      Security Staff Cost                                                                                      5,569          1,185    6,754            o        5,471        1,283                                                              5,821        1,239    7,060          0.000    5,718.761    1,341.438 Sb.4.l0    DOC Staff Cost                                                                                          14,111          3,003  17,114                                  17,114                                                            14,750        3,139    17,889                                17,889.231 SbA.11      Utility Staff Cost                                                                                        7,357          1,566    8,923                      1,785        7,138                                                              7,690        1,637    9,327                    1,865.S66    7,461.465 SbA        Subtotal Period Sb Period-Dependent Costs            7,347                                              33,312          8,501  49,160            o      14,366        34,794          7,680                                            34,821        8,886    51,387          0.000  15,017.139  36,370.033 Sb.O        TOTAL PERIOD 3b COST                                26,970                                              33,542        12,726    73,238          278      14,366        58,594          28,192                                            35,061      13,303    76,556        290.730  15,017.139  61,247.919 PERIOD 3e - Fuel Storage Operations/Shipping Period Sc Direct Decommissioning Activities Period 3c Period-Dependent Costs 3eA.l      Insurance                                                                                                3,099            440    3,539                    3,539                                                                            3,239          460    3,699                    3,699.088 3eA.2      Property taxes                                                                                            2,420            343    2,764                    2,764                                                                            2,530          359    2,889                    2,888.940 3c.4.3      Plant energy budget 3c.4.4      NRC ISFSI Fees                                                                                            2,054            292    2,346                    2,346                                                                            2,147          305    2,452                    2,452.105 3cA.5      Emergency Planning Fees                                                                                  5,228            742    5,970                    5,970                                                                            5,465          776    6,241                    6,240.778 3cA.6      Spent Fuel Transfer - Pool or ISFSI to DOE                                                              21,995          4,682  26,676                    26,676                                                                          22,991        4,894    27,885                  27,884.503 ScA.7      ISFSI Operating Costs                                                                                      654            139      793                        793                                                                            684          146      829                      829.286 3cA.8      Security Staff Cost                                                                                      26,771          5,698  32,469                    32,469                                                                          27,984        5,956    33,940                  33,940.240 3eA.9      Utility Staff Cost                                                                                        8,802          1,874  10,676                    10,676                                                                            9,201        1,958    11,160                  11,159.565 3eA        Subtotal Period 3c Period-Dependent Costs                                                                71,024        14,209  85,233                    85,233                                                                          74,242      14,853    89,094                  89,094.506 3e.0      TOTAL PERIOD Sc COST                                                                                    71,024        14,209  85,233                    85,233                                                                          74,242      14,853    89,094                  89,094.506 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.1.1.1 Vessel & Internals GTCC Disposal                                  2,500                            9,179                  2,309  13,988      13,988                                                2,613                        10,574                2,413    15,601    15,600.611 3d.l.l      Totals                                                        2,500                            9,179                  2,309  13,988      13,988                                                2,613                        10,574                2,413    15,601    15,600.611 3d.1        Subtotal Period 3d Activity Costs                              2,500                            9,179                  2,309  13,988      13,988                                                2,613                        10,574                2,413    15,601    15,600.611 Period 3d Collateral Costs 3d.3        Subtotal Period 3d Collateral Costs Period 3d Period-Dependent Costs 3dA.l      Insurance                                                                                                    10                      11                        11                                                                              10                    12                      11.781 3dA.2      Property taxes                                                                                                8                      9                        9                                                                                8                      9                      9.200 3d.4.3      Plant energy budget 3dA.4      NRC ISFSI Fees                                                                                                6                                                                                                                                  7                      8                      7.506 Sd.4.5      ISFSI Operating Costs                                                                                        2                                                                                                                                  2                      3                      2.641 3d.4.6      Security Staff Cost                                                                                        85              18    103                        103                                                                              89          19      108                    108.090 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                                Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                        PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-l                                                                                                                                                      Table C-1                        Appendix C1, Page 7 Of 7 Diablo Canyon Unit 1                                                                                                                                              Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate                                                                                                                              DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                                      (Thousands of 2013 Dollars)
Off-Site    LLRW                                          NRC      Spent Fuel      Site                                              Off-Site  LLRW                                          NRC        Spent Fuel      Site Activity                                                        Decon    Removal  Packaging    Transport    Processing  Disposal    Other      Total      Total    Lie. Term. Management  Restoration  Decon  Removal  Packaging  Transport Processing Disposal  Other      Total    Total      Lie. Term. Management    Restoration Index                    Activity Description                    Cost    Cost      Costs        Costs        Costs        Costs      Costs  Contingency    Costs      Costs        Costs        Costs      Cost    Cost      Costs      Costs    Costs    Costs    Costs    Contin enc  Costs        Costs          Costs        Costs 3d.4.7      Utility Staff Cost                                                                                                              28            6        84                      34                                                                                29            6        36                        35.540 3d.4        Subtotal Period 3d Period-Dependent Costs                                                                                      139          28      167                      167                                                                                146          29      175                      174.758 3d.0        TOTAL PERIOD 3d COST                                                          2,500                                9,179      139        2,336    14,155      13,988          167                                    2,613                        10,574      146        2,442    15,775      15,600.611      174.758 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 8e Additional Costs 8e.2.1      ISFSI License Termination                                            40          6            14                    393      622          290    1,365                    1,365                            42                    15                453      650          303    1,469                    1,468.953 3e.2        Subtotal Period 8e Additional Costs                                  40          6            14                    393      622          290    1,365                    1,365                            42                    15                453      650          303    1,469                    1,468.953 Period 8e Collateral Costs 8e.3.1      Small tool allowance                                                                                                                                                                                                                                                                                                  0.741 8e.3        Subtotal Period 8e Collateral Costs                                                                                                                                                                                                                                                                                    0.741 Period 3e Period-Dependent Costs 3e.4.1      Insurance 3e.4.2      Property taxes                                                                                                                  55            8        63                      63                                                                                57            8        65                        65.486 3e.4.3      Heavy equipment rental                                              136                                                                      29      165                      165                            142                                                              30      172                      172.357 3e.4.4      Plant energy budget 3e.4.5      NRC ISFSI Fees                                                                                                                  94          13      107                      107                                                                                98          14      112                      112.217 3e.4.6      Security Staff Cost                                                                                                              61          13        74                      74                                                                                64          14        77                        77.290 3e.4.7      Utility Staff Cost                                                                                                              163          35      198                      198                                                                                171          36      207                      206.940 3e.4        Subtotal Period 3e Period.Dependent Costs                            186                                                        373          98      607                      607                            142                                                390          102      634                      634.290 3e.0        TOTAL PERIOD 3e COST                                                177                      14                    393      995          388    1,973                    1,973                            185          6        15                453    1,040          405    2,104                    2,103.984 PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3£,2.1      ISFSI Demolition and Site Restoration                              1,371                                                        27          297    1,695                    1,695                          1,433                                                  28          311    1,772                    1,771.980 3f.2.2      ISFSI Area Soil! Sediment Control                                    16                                                                      4        20                      20                            17                                                                4        21                        20.884 3£.2        Subtotal Period 3f Additional Costs                                1,387                                                        27          301    1,715                    1,715                          1,450                                                  28          315    1,793                    1,792.865 Period 3f Collateral Costs 3f.8.1      Small tool allowance                                                  20                                                                      4        24                      24                            20                                                                        25                        24.816 3£.8        Subtotal Period 3f Collateral Costs                                  20                                                                      4        24                      24                            20                                                                        25                        24.816 Period 3fPeriod.Dependent Costs 3£,4.1      Insurance 3£,4.2      Property taxes                                                                                                                  28            4        32                      32                                                                                29                    33                        33.013 3f.4.3      Heavy equipment rental                                                54                                                                      11        65                      65                            56                                                              12        68                        67.903 3f.4.4      Plant energy budget 3f.4.5      Security Staff Cost                                                                                                              11            2        14                      14                                                                                12            2        14                        14.169 3£.4.6      Utility Staff Cost                                                                                                              69          15        83                      83                                                                                72          15        87                        87.157 3f.4        Subtotal Period 8fPeriod*Dependent Costs                              54                                                        108          32      193                      193                            56                                                112          84      202                      202.242 3£.0        TOTAL PERIOD 3f COST                                              1.461                                                        134          338    1,932                    1,932                          1,527                                                140          353    2,020                    2,019.922 PERIOD 3 TOTALS                                                              28,607      2,506            14                  9,572  105,834      29,997  176,531      14,266      103,672      58,594            29,903      2,620        15              11,027  110,629      31,356  185,550      15,891.341  108,410.809  61,247.919 TOTAL COST TO DECOMMISSION                                        11,057    96,791    32,014        14,632                  127,040  776,395      264,540 1,322,468    999,926      248,912      73,630  11,558  101,175      33,465    15,295              146,350  811,565      276,524  1,395,931  1,058,340.999  260,229.661  77,360.455 TOTAL COST TO DECOMMISSION WITH 25.01 % CONTINGENCY:                                              $1,322,468  thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 75.61 % OR:                                                  $999,926  thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 18.82% OR:                                                            $248,912  thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 5.57% OR:                                                            $73,630  thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                            49,854 Tons I TOTAL    CRAFT LABOR REQUIREMENTS:                                                                  962 738 Man-hours End Notes:
nJa - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
o - indicates that this value is less than 0.5 but is non-zero.
a cell containing U - " indicates a zero value TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                  Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                        PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-2                                                                                                                                      Table C-2                          Appendix C2, Page 1 of 8 Diablo Canyon Unit 2                                                                                                                            Diablo Canyon Unit 2 DEC ON Decommissioning Cost Estimate                                                                                                          DEC ON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                    (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel                                          Off-Site    LLRW                                      NRC        Spent Fuel    Site    I Activity                                            Decon Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lic. Term. Management  Decon Removal Packaging  Transport    Processing  Disposal  Other      Total      Total  Lic. Term. Management Restoration Index                                                Cost  Cost    Costs      Costs      Costs    Costs    Costs  Contin enc'  Costs    Costs      Costs      Cost  Cost    Costs      Costs        Costs      Costs    Costs  Contin enc    Costs    Costs        Costs      Costs PERIOD la - Shutdown through Transition Period 1a Direct Decommissioning Activities la.1.1    Prepare preliminary decommissioning cost                                                                  82            17      99          99                                                                                85            18    103      103.446 1a.1.2    Notification of Cessation of Operations                                                                                          a 1a.1.3    Remove fuel & source material                                                                                                  nla la.1.4    Notification of Permanent Defueling 1a.1.5    Deactivate plant systems & process waste                                                                                        a la.1.6    Prepare and submit PSDAR                                                                                126            26    152        152                                                                              131            28    159      159.148 1a.1. 7    Review plant dwgs & specs.                                                                              289            61    350        350                                                                              302            64    366      366.040 la.1.8    Perform detailed rad survey                                                                                                      a 1a.1.9    Estimate by*product inventory                                                                            63            13      76          76                                                                                66            14      80        79.574 1a.l.10    End product description                                                                                  63            13      76          76                                                                                66            14      80        79.574 1a.1.ll    Detailed by*product inventory                                                                            82            17      99          99                                                                                85            18    103      103.446 la.1.12    Define major work sequence                                                                              472            99    57l        571                                                                              493          104    597      596.804 1a.l.13    Perform SER and EA                                                                                      195            41    236        236                                                                              204            43    247      246.679 1a.1.14    Perform Site.Specific Cost Study                                                                        315            66    381        381                                                                              329            69    398      397.869 1a.1.15    Prepare/submit License Termination Plan                                                                  258            54    312        312                                                                              269            57    326      325.934 1a.1.16    Receive NRC approval of termination plan Activity Specifications 1a.1.17.1 Plant & temporary facilities                                                                              310            65    375        337                                                                              323            68    392      352.353                39.150 1a.1.17.2 Plant systems                                                                                            262            55    317        286                                                                              274            58    332      298,404                  33.156 1a.1.17.3 NSSS Decontamination Flush                                                                                31            7      38          38                                                                                33            7      40        39.787 1a.1.17,4 Reactor internals                                                                                        447            94    541        541                                                                              467            98    565      564.974 1a.1.17.5 Reactor vessel                                                                                            409            86    495        495                                                                              427            90    517      517.230 1a.1.17.6 Biological shield                                                                                          31            7      38          38                                                                                33            7      40        39.787 1a.1.17.7 Steam generators                                                                                          196            41    238        238                                                                              205            43    248      248.270 1a.1.17.8 Reinforced concrete                                                                                      101            21    122          61                                                                              105            22    127        63.659                63.659 1a.1.17.9 Main Turbine                                                                                              25            5      30                                                                                            26            6      32                              31.830 1a.1.17.10 Main Condensers                                                                                          25                    30                                                                                            26            6      32                              31.830 1a.1.17.11 Plant structures & buildings                                                                            196            41    238        119                                                                              205            43    248      124.135                124.135 1a.1.17.12 Waste management                                                                                        289            61    350        350                                                                              302            64    366      366.040 1a.1.17.13 Facility & site closeout                                                                                  57            12      69          34                                                                                59            12      72        35.808                35.808 1a.1.17    Total                                                                                                  2,380          500  2,880      2,536                                                                            2,487          523  3,010    2,650.448                359.568 Planning & Site Preparations 1a.1.18    Prepare dismantling sequence                                                                            151            32    183        183                                                                              158            33    191      190.977 1a.1.19    Plant prep. & temp. svces                                                                              2,800          589  3,389      3,389                                                                            2,926          615  3,541    3,541.338 1a.1.20    Design water clean*up system                                                                              88            19    107        107                                                                                92            19    111      111.403 1a.1.21    Rigging/Cont. Cntrl Envlps/tooling/etc.                                                                2,200          463  2,663      2,663                                                                            2,299          483  2,782    2,782.480 1a.1.22    Procure caskslliners & containers                                                                        77            16      94          94                                                                                81            17      98        97.876 1a.1      Subtotal Period 1a Activity Costs                                                                      9,640        2,027  11,668      11,323                                                                            10,074        2,119  12,193  11,833.036                359.568 Period 1a Additional Costs 1a.2.1    Spent Fuel Pool Isolation                                                                            13,217        2,779  15,996      15,996                                                                            13,812        2,905  16,716  16,716.127 1a.2.2    Disposal of Contaminated Tools & Equipment                      234          97                3,145                1,156  4,632      4,632                                  245        101                    3,623                1,208  5,176    5,176,462 1a.2      Subtotal Period 1a Additional Costs                            234          97                3,145  13,217        3,935  20,628      20,628                                  245        101                    3,623  13,812        4,112  21,893  21,892.589 Period 1a Period*Dependent Costs 1a.4.1    Insurance                                                                                              1,056          148  1,204      1,204                                                                            1,103          155  1,258    1,257.764 1a.4.2    Property taxes                                                                                          165            23    189        189                                                                              173            24    197      197.188 1a.4.3    Health physics supplies                              457                                                              160    617        617                        477                                                                  167    644      644.466 1a.4.4    Heavy equipment rental                                480                                                              101    580        580                        501                                                                  105    607      606.527 1a.4.5    Disposal of DAW generated                                        14          4                  45                    19      83          83                                    15          4                      52                    20      91        91.145 1a.4.6    Plant energy budget                                                                                    1,156          243  1,399      1,399                                                                            1,208          254  1,462    1, 462.47l 1a.4.7    NRC Fees                                                                                                838          117    955        955                                                                              875          123    998      998.141 1a.4.8    Emergency Planning Fees                                                                                1,001          140  1,142                    1,142                                                                1,046          147  1,193                1,193.076 1a,4.9    Spent Fuel Pool O&M                                                                                      763          160    924                      924                                                                  797          168    965                  965.203 1a.4.10    ISFSI Operating Costs                                                                                    45            9      54                      54                                                                  47            10      57                    56.569 1a.4.ll    Severance Related Costs                                                                              38,503        8,097  46,600      46,600                                                                            40,236        8,462  48,697  48,697.139 1a.4.12    Spent Fuel Storage Canisters/Overpacks                                                                5,714        1,202  6,916                    6,916                                                                5,971        1,256  7,227                7,226.824 1a.4.13    Security Staff Cost                                                                                  14,837        3,120  17,957      17,957                                                                            15,505        3,261  18,765  18,765.207 1a.4.14    Utility Staff Cost                                                                                    26,317        5,534  31,851      31,851                                                                            27,501        5,783  33,285  33,284.616 1a.4      Subtotal Period la Period* Dependent Costs            936        14          4                  45  90,395        19,075 110,470    101,435        9,035          978        15          4                      52  94,463        19,934 115,446  106,004.664    9,441.673 la.O      TOTAL PERIOD 1a COST                                  936      248        101                3,190 113,252      25,038  142,766    133,387        9,035          978        260        106                  3,675 118,348        26,164 149,532  139,730.289    9,441.673    359.568 PERIOD Ib - Decommissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures 1b.1.l.1 Plant systems                                                                                              298            63    360        324                                                                              311            65    377      338.961                37.662 lb. 1. 1.2 NSSS Decontamination Flush                                                                                63            13      76          76                                                                                66            14      80        79.574 lb. 1. 1.3 Reactor internals                                                                                        157            33    190        190                                                                              164            35    199      198.935 1b.1.1.4 Remaining buildings                                                                                        85            18    103          26                                                                                89            19    107        26.856                80.569 lb. 1. 1.5 CRD cooling assembly                                                                                      63            13      76          76                                                                                66            14      80        79.574 lb. 1. 1.6 CRD housings & ICI tubes                                                                                  63            13      76          76                                                                                66            14      80        79.574 1b.1.1. 7 Incore instrumentation                                                                                    63            13      76          76                                                                                66            14      80        79.574 lb. 1. 1.8 Reactor vessel                                                                                          228            48    276        276                                                                              239            50    289      288.853 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                  PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-2                                                                                                                                          Table C-2                          Appendix C2, Page 2 of 8 Diablo Canyon Unit 2                                                                                                                              Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate                                                                                                              DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                        (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel                                            Off-Site    LLRW                                      NRC      Spent Fuel    Site Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Decou  Removal  Packaging  Transport  Processing  Disposal  Other      Total      Total  Lie. Term. Management Restoration Index                                                  Cost    Cost      Costs      Costs      Costs    Costs      Costs  Contin enc'  Costs    Costs      Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Contin 'enc  Costs      Costs      Costs      Costs lb. 1. 1.9  Facility closeout                                                                                              75            16      91          46                                                                                  79            17      95      47.744                47.744 lb. 1.1.10  Missile shields                                                                                                28            6      34          34                                                                                  30            6      36      35.808 lb. 1. 1.11 Biological shield                                                                                              75            16      91          91                                                                                  79            17      95      95.489 lb. 1. 1.12 Steam generators                                                                                              289            61    350        350                                                                                302            64    366      366.040 1b.1.1.13  Reinforced concrete                                                                                            63            13      76          38                                                                                  66            14      80      39.787                39.787 lb. 1. 1.14 Main Turbine                                                                                                    98            21    119                                                                                            103            22    124                            124.135 lb. 1. 1.15 Main Condensers                                                                                                98            21    119                                                                                            103            22    124                            124.135 1b.1.1.16  Auxiliary building                                                                                            172            36    208        187                                                                                179            38    217      195.513                21.724 lb. 1. 1.17 Reactor building                                                                                              172            36    208        187                                                                                179            38    217      195.513                21.724 1b.1.1      Total                                                                                                        2,092          440  2,531      2,055                                                                              2,186          460  2,645    2,147.794                497.480 lb. 1.2    Decon primary loop                              750                                                                        526  1,276      1,276                  784                                                                          550  1,334    1,333.756 1b.1        Subtotal Period 1b Activity Costs                750                                                        2,092          966  3,808      3,332                  784                                                          2,186        1,009  3,979    3,481.551                497.480 Period 1b Additional Costs 1b.2.1      Site Characterization                                                                                        2,038          857  2,895      2,895                                                                              2,129          896  3,025    3,024.755 1b.2.2      Hazardous Waste Management                                                                                    204            43    247        247                                                                                213            45    258      258.012 1b.2.3      Mixed Waste Management                                                                                        270            57    327        327                                                                                282            59    341      341.486 1b.2        Subtotal Period 1b Additional Costs                                                                          2,512          957  3,468      3,468                                                                              2,625        1,000  3,624    3,624.253 Period Ib Collateral Costs Ib.3.1      Decon equipment                                  931                                                                        196  1,126      1,126                  973                                                                          205  1,177    1,177.034 1b.3.2      DOC staff relocation expenses                                                                                1,415          297  1,712      1,712                                                                              1,478          311  1,789    1,789.113 Ib.3.3      Process decommissioning water waste              46                  21        66                  88                    80    301        301                  48                  22        69                    101                    84    324      324.049 1b.3.4      Process decommissioning chemical flush waste                          63        256                6,210                  2,240  8,770      8,770                                      65        267                  7,154                2,341  9,829    9,829.140 1b.3.5      Small tool allowance                                        3                                                                1      3          3                            3                                                                  1      3        3.400 1b.3.6      Pipe cutting equipment                                  1.100                                                              231  1,331      1,331                        1,150                                                                242  1,391    1,391.240 1b.3.7      Decon rig                                      1,500                                                                        315  1,815      1,815                1,568                                                                          330  1,897    1,897.145 1b.3        Subtotal Period 1b Collateral Costs            2,479    1,103        84        321                6,298    1,415        3,361  15,060      15,060                2,590    1,152        88        336                  7,255  1,478        3,512  16,411  16,411.122 Period Ib Period.Dependent Costs 1b.4.1      Decon supplies                                    28                                                                          10      38          38                  29                                                                          10      40      39.763 Ib.4.2      Insurance                                                                                                      523            73    597        597                                                                                547            77    624      623.713 1b.4.3      Property taxes                                                                                                  82            12      94          94                                                                                  86            12      98      97.784 Ib.4.4      Health physics supplies                                    249                                                                87    336        336                          260                                                                  91    351      351.035 Ib.4.5      Heavy equipment rental                                    238                                                                50    288        288                          249                                                                  52    301      300.771 1b.4.6      Disposal ofDAW generated                                                8                              26                    11      47          47                                        9                                30                    11      52      51.943 1b.4.7      Plant energy budget                                                                                          1,147          241  1,388      1,388                                                                              1,198          252  1,450    1,450.451 1b.4.8      NRC Fees                                                                                                      237            33    270        270                                                                                247            35    282      282.193 1b.4.9      Emergency Planning Fees                                                                                        497            70    566                      566                                                                    519            73    592                  591.635 1b.4.10    Spent Fuel Pool O&M                                                                                            378            80    458                      458                                                                    395            83    479                  478.635 1b.4.11    ISFSI Operating Costs                                                                                          22            5      27                      27                                                                    23            5      28                  28.052 1b.4.12    Severance Related Costs                                                                                      2.018          424  2,442      2,442                                                                              2,109          443  2,552    2,552.042 1b.4.13    Spent Fuel Storage Canisters/Overpacks                                                                      3,086          649  3,735                    3,735                                                                  3,225          678  3,903                3,903.096 1b.4.14    Security Staff Cost                                                                                          7,357        1,547  8,905      8,905                                                                              7,689        1,617  9,305    9,305.486 1b.4.15    DOC Staff Cost                                                                                              4,664          981  5,645      5,645                                                                              4,874        1,025  5,899    5,898.867 1b.4.16    Utility Staff Cost                                                                                          13,050        2,744  15,795      15,795                                                                              13,638        2,868  16,506  16,505.518 1b.4        Subtotal Period Ib Period*Dependent Costs        28      487          8          2                    26  33,062        7,017  40,630      35,844        4,786      29      508          9                                30  34,550        7,333  42,461  37,459.566  5,001.418 Ib.O        TOTAL PERIOD Ib COST                          3,257    1,589        92        324                6,323  39,080      12,300  62,965      57,703        4,786  3,404    1,661        96        338                  7,285  40,838        12,854  66,475  60,976.491  5,001.418    497.480 PERIOD 1 TOTALS                                            3,257    2,525        341        425                9,514  152,332      37,338  205,731    191,090      13,821  3,404    2,639        356        444                  10,960 159,187        89,018 216,007  200,706.780  14,443.091    857.048 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping                              370      354        52        40                1,342                    869  3,027      3,027                  386      370        64        42                  1,646                  909  3,307    3,307.293 2a. 1. 1.2 Pressurizer Quench Tank                            39        35          8          6                  189                    108    385        385                  41      37          8          6                    217                  113    423      422.941 2a. 1. 1.3 Reactor Coolant Pumps & Motors                    118      126        103        185                1,4*13                  686  2,661      2,661                  123      132        108        193                  1,663                  717  2,935    2,935.089 2a. 1. 1. 4 Pressurizer                                      50        70        448        114                  750                    409  1,841      1,841                  53      73        468        119                    864                  428  2,004    2,004.499 2a.1.1.5 Steam Generators                                    477    4,206      3,368      1,922              12,807                  7,173  29,952      29,952                  498    4,395      3,519      2,008                  14,753                7,496  32,670  32,669.906 2a.1.1.6 Retired Steam Generator Units                                          2,496      1,878              12,597                  5,160  22,131      22,131                                    2,608      1,962                  14,512                5,392  24,475  24,474.805 2a.1.1. 7 CRDlVIsIICIs/Service Structure Removal            196      112        262        37                  444                    377  1,428      1,428                  205      117        274        39                    511                  394  1,540    1,539.815 2a.1.1.8 Reactor Vessel Internals                            163    3,064    14,919      1,413              10,366      278        16,385  46,588      46,588                  170    3,202    15,590      1,476                  11,942    290        17,123  49,793  49,793.474 2a.1.1.9 Reactor Vessel                                      122    5,180      2,387        742                2,651      278        8,545  19,905      19,905                  127    5,413    .2,494        776                  3,054    290        8,930  21,084  21,084.302 2a.1.1      Totals                                        1,534    13,148    24,042      6,336              42,589      556      39,714  127,919    127,919                1,603  13,740    25,124      6,621                  49,063    581        41,501 138,232  138,232.124 Removal of Major Equipment 2a.1.2      Main Turbine/Generator                                    202                                                                43    245                                      211                                                                  44    256                            255.886 2a.1.3      Main Condensers                                            668                                                              141    809                                      698                                                                147    845                            844.986 Cascading Costs from Clean Building Demolition 2a.1.4.1 *Reactor                                                    1,194                                                              251  1,445      1,445                        1,247                                                                262  1,510    1,509.670 2a.1.4.2 Auxiliary                                                    719                                                              151    870        870                          751                                                                158    909      909.444 2a.1.4.3 Containment Penetration Area                                  73                                                                15      89          89                            77                                                                  16      93      92.735 2a.1.4.4 Radwaste Storage                                              91                                                                19    110        110                            95                                                                  20    115      115.117 2a.1.4.5 Fuel Handling                                                193                                                                41    234        234                          202                                                                  42    244      244.077 2a.1.4      Totals                                                  2,270                                                              477  2,747      2,747                        2,372                                                                499  2,871    2,871.044 Disposal of Plant Systems 2a.1.5.1 Auxiliary Steam                                                76                                                                16      92                                        79                                                                  17      96                              95.728 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                            Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                  PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-2                                                                                                                                        Table C-2                              Appendix C2, Page 3 of 8 Diablo Canyon Unit 2                                                                                                                              Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate                                                                                                              DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                      (Thousands of 2013 Dollars)
Off-Site  LLRW                                    NRC      Spent Fuel                                            Off-Site    LLRW                                        NRC        Spent Fuel    Site Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lic. Term_  Management  Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total      Total    Lic_ Term. Management Restoration Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs    Costs      Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Con tin 'enc  Costs      Costs        Costs      Costs 2a.1.5.2    Auxiliary Steam (RCA)                                      141        32          9                  319                  168    670        670                            148        33        10                    368                    175    734        734.162 2a.1.5.3    Building Services (Non-Power Block)                          7                                                              1      8                                          7                                                                    1        9                                8.612 2a.1.5.4    Condensate System                                          619                                                            130    749                                        646                                                                  136    782                              782.362 2a.1.5.5    Condensate System (lnsulated)                              274                                                              58    332                                        287                                                                  60    347                              346.967 2a.1.5.6    Containment Spray                                          235        161        51                1,719                  718  2,885      2,885                            245        169        53                  1,981                    751  3,199    3,198.533 2a.1.5.7    Extraction Steam & Heater Drip                            230                                                              48    279                                        241                                                                  51    291                              291.126 2a.1.5.8    Feedwater System                                            67                                                              14      82                                        70                                                                  15      85                                85.180 2a.1.5.9    Feedwater System (lnsulated)                              162                                                              34    196                                        169                                                                  36    205                              204.543 2a. 1.5. 10 Feedwater System (RCA Insulated)                          119        42        15                  497                  225    897        897                            124        43        15                    572                    235    990        990.254 2a. 1.5. 11 Feedwater System (RCA)                                      6          2          1                  26                  12      46          46                              6          2          1                      30                    12      51        51.378 2a.1.5.12  NSSS Sampling                                              159          9          3                  100                  93    364        364                            166        10          3                    115                    97    391        390.790 2a.1.5.13  NSSS Sampling (lnsulated)                                  47                    o                  10                  20      78          78                            49          1          o                      11                    21      83        82.581 2a.1.5.14  Nitrogen & Hydrogen                                        19                                                              4      23                                        20                                                                    4      25                                24.555 2a.1.5.15  Nitrogen & Hydrogen (lnsulatd)                              1                                                              o      1                                          1                                                                    o        1                                1.250 2a.1.5.16  Nitrogen & Hydrogen (RCA Insulated)                          5                    o                                        4      15          15                              6                    o                      6                      4      16        15.905 2a.1.5.17  Nitrogen & Hydrogen (RCA)                                  103        11          3                  92                  71    280        280                            108        12          3                    106                    74    302        302.189 2a.1.5.18  Oily Water Separator & TB Sump                              29        11          3                  102                  48    192        192                            31        11          3                    117                    50    212        211.920 2a.1.5.19  Saltwater System                                          181                                                              38    219                                        189                                                                  40    228                              228.446 2a,1.5.20  Turbine Steam Supply                                      762                                                            160    922                                        796                                                                  167    964                              963.855 2a.1.5.21  Turbine Steam Supply (RCA)                                878        345        117                3,961                1,769  7,070      7,070                            918        361        122                  4,563                  1,849  7,812    7,811.829 2a.1.5.22  Turbine and Generator                                      81                                                              17      98                                        85                                                                  18    102                              102.373 2a.1.5.23  Turbine and Generator (lnsulated)                          24                                                              5      29                                        25                                                                    5      30                                30.095 2a.1.5      Totals                                                  4,226        614        201                6,830                3,653  15,525      12,496                          4,416        642        210                  7,869                  3,817  16,955    13,789.541              3,165.092 2a.1.6      Scaffolding in support of decommissioning                4,785        21        11                  251                1,770  6,838      6,838                          5,001        22        12                    289                  1,850  7,173    7,172.591 2a.1        Subtotal Period 2a Activity Costs              1,534    25,300    24,677      6,548              49,671    556      45,798 154,083    150,001                1,603    26,438    25,787      6,843                  57,220    581        47,859 166,331  162,065.300              4,265.964 Period 2a Additional Costs 2a.2.1      Retired Reactor Head                                                  225        179                1,557                  615  2,576      2,576                                      235        187                  1,794                    643  2,858    2,858.126 2a.2        Subtotal Period 2a Additional Costs                                  225        179                1,557                  615  2,576      2,576                                      235        187                  1,794                    643  2,858    2,858.126 Period 2a  Collateral Costs 2a.3.1      Process decommissioning water waste              85                  40        123                  165                  149    562        562                  89                  42        129                    190                    155    605        604.671 2a.3.2      Process decommissioning chemical flush waste 2a.3.3      Small tool allowance                                      315                                                              66    381        343                            329                                                                  69    398        358.486                39.832 2a.3.4      Spent Fuel Transfer - Pool to ISFSI                                                                        2,279          479  2,758                    2,758                                                                  2,381            501  2,882                  2,882.002 2a.3        Subtotal Period 2a Collateral Costs              85      315        40        123                  165  2,279          694  3,701        905        2,758      89      329        42        129                    190  2,381            725  3,885        963.157  2,882.002    39.832 Period 2a Period-Dependent Costs 2a.4.1      Decon supplies                                    92                                                                        32    124        124                  96                                                                            34    130        129.614 2a.4.2      Insurance                                                                                                    768          108    875        875                                                                                  802            112    915        914.534 2a.4.3      Property taxes                                                                                                268          38    305        275                                                                                  280            39    319        286.869                31.874 2a.4.4      Health physics supplies                                  1,968                                                            690  2,658      2,658                          2,057                                                                  721  2,778    2,777.736 2a.4.5      Heavy equipment rental                                  3,373                                                            709  4,082      4,082                          3,525                                                                  741  4,266    4,266.185 2a.4.6      Disposal ofDAW generated                                              110        31                  349                  144    635        635                                      115        32                    402                    151    700        700.397 2a.4.7      Plant energy budget                                                                                        1,776          373  2,149      2,149                                                                                1,856            390  2,246    2,245.795 2a.4.8      NRC Fees                                                                                                    724          102    826        826                                                                                  757            106    863        863.096 2a.4.9      Emergency Planning Fees                                                                                    1,156          162  1,318                    1,318                                                                  1,208            169  1,377                  1,377.109 2a.4.10    Spent Fuel Pool O&M                                                                                        1,234          259  1,493                    1,493                                                                  1,289            271  1,560                  1,560.192 2a.4.11    ISFSI Operating Costs                                                                                          72          15      88                      88                                                                      76            16      91                    91.441 2a.4.12    Severance Related Costs                                                                                      494          104    598        598                                                                                  516            109    625        624.989 2a.4.13    Spent Fuel Storage Canisters/Overpacks                                                                      3,418          719  4,137                    4,137                                                                  3,572            751  4,323                  4,323.006 2a.4.14    Security Staff Cost                                                                                        23,983        5,044  29,027      29,027                                                                              25,062          5,271  30,333    30,332.798 2a.4. 15    DOC Staff Cost                                                                                            26,130        5,495  31,625      31,625                                                                              27,306          5,742  33,048    33,048_169 2a.4.16      Utility Staff Cost                                                                                        37,794        7,948  45,742      45,742                                                                              39,494          8,306  47,800    47,800.003 2a.4        Subtotal Period 2a Period-Dependent Costs        92    5,341        110        31                  349  97,815      21,942 125,681    118,615        7,035      96    5,582        115        32                    402 102,217        22,929 131,374  123,990.184    7,351.748    31.874 2a.0        TOTAL PERIOD 2a COST                          1,711    30,956    25,052      6,881              51,741 100,650      69,049 286,040    272,096        9,793  1,788    32,349    26,180      7,191                  59,606 105,179        72,156 304,448  289,876.768  10,233.749  4,337.670 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b. 1. 1.1 Capital Additions 85-2002 (Clean)                          450                                                              95    544                                        470                                                                  99    569                              568.794 2b. 1. 1.2 Capital Additions 85-2002 (contaminated)                    483        61        24                  797                  462  1,827      1,827                            505        64        25                    919                    483  1,995      1,994.510 2b.1.1.3 Chemical & Volume Control                          809    1,066        172        58                1,966                1,666  5,736      5,736                  845    1,114        180        61                  2,264                  1,741  6,205      6,201.744 2b. 1. 1.4 Chemical & Volume Control (lnsulated)            294      432        47        13                  438                  520  1,744      1,744                  307      452        49        13                    505                    544  1,870      1,869.843 2b. 1. 1.5 Component Cooling Water                                    190                                                              40    230                                        198                                                                  42    240                              240.173 2b. 1. 1.6 Component Cooling Water (RCA)                              595        191        66                2,245                1,036  4,133      4,133                            622        200        69                  2,586                  1,083  4,559      4,559.272 2b. 1. 1.7 Compressed Air                                              118                                                              25    143                                        124                                                                  26    150                              149.818 2b. 1. 1.8 Compressed Air (lnsulated)                                    6                                                              1      8                                          6                                                                    1        8                                7.859 2b.l.L9 Compressed Air (RCA Insulated)                                  29          4          1                  33                  23      89          89                            30          4          1                      38                    24      97        96.948 2b. 1. 1.10 Compressed Air (RCA)                                      531        69        19                  629                  420  1,667      1,667                            555        72        19                    725                    439  1,809      1,808.866 2b.1.1.11 Diesel Engine-Generator                                      137                                                              29    165                                        143                                                                  30    173                              172.901 2b.1.1.12 Diesel Engine-Generator (lnsulated)                            3                                                              1      4                                          3                                                                    1        4                                3.776 2b. 1. 1.13 Electrical (Clean)                                      3,115                                                            655  3,770                                      3,255                                                                  685  3,940                            3,940.024 2b.1.1.14 Electrical (Contaminated)                                    360        44        18                  613                  351  1,386      1,386                            376        46        19                    706                    367  1,514      1,514.326 2b.L1.15 Electrical (RCA)                                            1,875                                                            394  2,269                                      1,959                                                                  412  2,371                            2,371.163 2b.1.1.16 Fire Protection                                              364        148        53                1,792                  788  3,145      3,145                            381        155        55                  2,064                    823  3,478      3,477.701 2b. 1. 1.17 Gaseous Radwaste                                          133        20          6                  217                  127    502        502                            139        20          7                    250                    132    548        548.019 2b.1.1.18 HVAC (Clean Insulated)                                        40                                                              8      48                                        42                                                                    9      50                              50.445 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                PG&E Letter DCL ..13 ..033 Document P01-1648 ..001, Rev. 0 Table C-2                                                                                                                                          Table C-2 Diablo Canyon Unit 2 Appendix C2, Page 4 of 8 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate                                                                                                              DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                        (Thousands of 2013 Dollars)
Off-Site  LLRW                                    NRC      Spent Fuel                                            Off-Site    LLRW                                    NRC      Spent Fuel    Site Activity                                                Decon;  Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lic. Term. Management    Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total    Total  Lie. Terrn. Management Restoration Index                  Activity Descri tion            Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin ency  Costs    Costs        Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Contin enc  Costs      Costs        Costs    Costs 2b.1.1.19 HVAC (Clean)                                                428                                                              90    518                                        448                                                                94    542                            541.824 2b.1.1.20 HVAC (Contaminated Insulated)                                232        37        15                  506                  267  1,057      1,057                            242        38        16                    583                  279  1,158    1,158.404 2b.1.1.21 HVAC (Contaminated)                                        1,033        185        76                2,563                1,302  5,159      5,159                          1,080        194        79                  2,952                1,361  5,665    5,665.097 2b.1.1.22 Liquid Radwaste                                    362      447        74        25                  862                  728  2,498      2,498                  378      468        77        27                    992                  761  2,703    2,702.883 2b.l.1.23 Liquid Radwaste (Insulated)                        29        44          5          1                  45                  53    177        177                    31        46          5                                52                  55    190      190.303 2b.1.1.24 Lube Oil Distribution & Purification                        126                                                              26    152                                        132                                                                28    159                            159.247 2b.1.1.25 Make*up Water                                                244                                                              51    296                                        255                                                                54    309                            309.107 2b.1.1.26 Make*up Water (Insulated)                                    24                                                              5      29                                          25                                                                        30                              29.991 2b.1.1.27 Make*up Water (RCA Insulated)                                32          7                              67                  36    144        144                              34          7          2                      77                  38    158      157.563 2b.1.1.28 Make*up Water (RCA)                                          164        39        11                  378                  198    790        790                            171        40        12                    436                  207    866      865.951 2b.1.1.29 Mechanical Department Equipment                                1                                                              o      1                                          1                                                                  o      2                              1.532 2b.1.1.30 Miscellaneous Reactor Coolant                      21      141        17          5                  158                  123    464        464                    21      148        18          5                    182                  128    502      501.626 2b.l.1.31 Nuclear Steam Supply Sampling                                21                    1                  21                  15      61          61                              22          3          1                      24                  16      66      65.771 2b.1.1.32 Nuclear Steam Supply Sampling (Insulated                      9                    o                    9                          26          26                              10          1          o                      10                    7      28      28.188 2b.1.1.33 Residual Heat Removal                              307      305        162        54                1,845                1,003  3,675      3,675                  321      319        169        57                  2,125                1,048  4,038    4,038.242 2b.1.1.34 Safety Injection                                            124        21          7                  242                  133    527        527                            129        22          7                    279                  139    577      576.505 Disposal of Plant Systems (continued) 2b.1.1.35 Safety Injection (Insulated)                                  5          1          o                  10                          23          23                              6          1          o                      12                    6      25      24.759 2b.1.1.36 Safety Injection (RCA Insulated)                              38          8          3                  92                  48    189        189                              40          9          3                    106                  50    208      207.851 2b.1.1.37 Safety Injection (RCA)                                      322        76        24                  830                  420  1,672      1,672                            336        80        26                    957                  439  1,837    1,836.529 2b.1.1.38 Service Cooling Water                                        138                                                              29    167                                        145                                                                30    175                            174.960 2b.1.1.39 Service Cooling Water (RCA)                                  37          9          3                  96                  49    195        195                              39        10                                111                  51    214      213.669 2b.l.1.40 Sewer System Expansion                                        47                                                              10      57                                          50                                                                10      60                              59.997 2b.1.1    Totals                                          1,821    13,893      1,400        485              16,454              11,238  45,291      36,887                1,903    14,519      1,463        507                  18,955              11,744  49,089  40,307.570              8,781.612 2b.1.2    Scaffolding in support of decommissioning                5,982        26        14                  313                2,213  8,548      8,548                          6,251        27        14                    361                2,312  8,966    8,965.737 Decontamination of Site Buildings 2b.1.3.1 *Reactor                                            959    2,483      1,120      5,645              26,011              12,003  48,221      48,221                1,002    2,595      1,170      5,899                  29,964              12,543  53,174  53,174.030 2b.1.3.2 Auxiliary                                        1,325      739        65        98                  927                1,542  4,695      4,695                1,384      772        68        102                  1,067                1,611  5,005    5,005.272 2b.1.3.3 Capital Additions 85*2004                          423      168        10        20                  151                  414  1,187      1,187                  442      176        10        21                    174                  433  1,257    1,256.658 2b.1.3.4 Containment Penetration Area                        327      213        26        28                  379                  446  1,420      1,420                  341      223        27        30                    437                  466  1,524    1,524.095 2b.1.3.5 Radwaste Storage                                      8        62          4          9                  59                  51    194        194                    9        65          4        10                      67                  53    209      208.644 2b.1.3    Totals                                          3,042    3,666      1,224      5,801              27,526              14,457  55,716      55,716                3,179    3,831      1,279      6,062                  31,710              15,107  61,169  61,168.698 2b.1      Subtotal Period 2b Activity Costs              4,863    23,541      2,650      6,300              44,293              27,908 109,554    101,151                5,082    24,600      2,769      6,583                  51,026              29,163 119,224  110,442.006              8,781.612 Period 2b Collateral Costs 2b.3.1    Process decommissioning water waste              143                  69        213                  284                  254    964        964                  149                  72        223                    328                  266  1,038    1,037.629 2b.3.2    Process decommissioning chemical flush waste        3                  90        369                  687                  333  1,482      1,482                    3                  94        386                    791                  348  1,622    1,622.024 2b.3.3    Small tool allowance                                        445                                                              94    539        539                            465                                                                98    563      563.189 2b.3.4    Spent Fuel Transfer* Pool to ISFSI                                                                          7,172        1,508  8,681                    8,681                                                                  7,495        1,576  9,071                9,071.313 2b.3      Subtotal Period 2b Collateral Costs              145      445        160        582                  971  7,172        2,189  11,665      2,985        8,681    152      465        167        609                  1,119  7,495        2,288  12,294    3,222.843  9,071.313 Period 2b Period*Dependent Costs 2b.4.1    Decon supplies                                  1,456                                                                      510  1,966      1,966                1,521                                                                          533  2,054    2,054.127 2b.4.2    Insurance                                                                                                    1,136          159  1,295      1,295                                                                                1,187          166  1,353    1,353.200 2b.4.3    Property taxes                                                                                                396          55    451        451                                                                                  414          58    472      471.631 2b.4.4    Health physics supplies                                  2,764                                                            969  3,733      3,733                          2,888                                                              1,012  3,901    3,900.908 2b.4.5    Heavy equipment rental                                    4,951                                                          1,041  5,992      5,992                          5,174                                                              1,088  6,262    6,261.581 2b.4.6    Disposal ofDAW generated                                              127        36                  401                  166    730        730                                        133        37                    463                  174    806      806.048 2b.4.7    Plant energy budget                                                                                          2,074          436  2,510      2,510                                                                                2,168          456  2,623    2,623.433 2b.4.8    NRC Fees                                                                                                    1,072          150  1,222      1,222                                                                                1,120          157  1,277    1,277.090 2b.4.9    Emergency Planning Fees                                                                                      1,710          240  1,950                    1,950                                                                  1,787          251  2,038                2,037.654 2b.4.10    Spent Fuel Pool O&M                                                                                          1,825          384  2,209                    2,209                                                                  1,907          401  2,309                2,308.555 2b.4.11    Liquid Radwaste Processing Equipment/Services                                                                  463          97    561        561                                                                                  484          102    586      586.198 2b.4.12    ISFSI Operating Costs                                                                                          107          22    129                      129                                                                    112          24    135                  135.301 2b.4.13    Severance Related Costs                                                                                      7,908        1,663  9,571      9,571                                                                                8,263        1,738  10,001  10,001.276 2b.4.14    Spent Fuel Storage Canisters/Overpacks                                                                      10,760        2,263  13,023                    13,023                                                                  11,244        2,365  13,609              13,608.918 2b.4.15    Security Staff Cost                                                                                        35,487        7,463  42,950      42,950                                                                                37,084        7,799  44,882  44,882.259 2b.4.16    DOC Staff Cost                                                                                              37,206        7,824  45,030      45,030                                                                                38,880        8,176  47,056  47,056.183 2b.4.17    Utility Staff Cost                                                                                          53,628      11,278  64,905      64,905                                                                                56,041      11,785  67,826  67,826.133 2b.4      Subtotal Period 2b Period* Dependent Costs      1,456    7,715        127        36                  401 153,771      34,722 198,227    180,916        17,311  1,521    8,062        133        37                    463 160,691      36,284 207,190  189,100.068  18,090.429 2b.0      TOTAL PERIOD 2b COST                          6,464    31,701      2,936      6,918              45,666 160,943      64,819 319,447    285,051        25,992  6,755    33,128      3,069      7,229                  52,607 168,186      67,735 338,708  302,764.917  27,161.741  8,781.612 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1    Spent Fuel Transfer* Pool to ISFSI                                                                          7,549        1,588  9,137                    9,137                                                                  7,889        1,659  9,548                9,547.665 2c.3      Subtotal Period 2c Collateral Costs                                                                          7,549        1,588  9,137                    9,137                                                                  7,889        1,659  9,548                9,547.665 Period 2c Period*Dependent Costs 2c.4.1    Insurance                                                                                                    3,088          433  3,521      3,521                                                                                3,227          452  3,680    3,679.837 2c.4.2    Property taxes                                                                                              1,076          151  1,227      1,227                                                                                1,125          158  1,283    1,282.534 2c.4.3    Health physics supplies                                  2,326                                                            815  3,142      3,142                          2,431                                                                852  3,283    3,283.064 2c.4.4    Disposal of DAW generated                                              68        19                  216                  89    392        392                                        71        20                    248                  93    433      432.930 2c.4.5    Plant energy budget                                                                                          1,504          316  1,820      1,820                                                                                1,572          331  1,902    1,902.414 2c.4.6    NRC Fees                                                                                                    2,000          280  2,281      2,281                                                                                2,090          293  2,383    2,383.386 2c.4.7    Emergency Planning Fees                                                                                      4,651          652  5,303                    5,303                                                                  4,860          681  5,541                5,541.113 2c.4.8    Spent Fuel Transfer* Pool or ISFSI to DOE                                                                  13,947        2,933  16,880                    16,880                                                                  14,575        3,065  17,640              17,639.909 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                PG&E letter DCl-13-033 Document P01-1648-001, Rev. 0 Table C-2                                                                                                                                        Table C-2                          Appendix C2, Page 5 of 8 Diablo Canyon Unit 2                                                                                                                              Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate                                                                                                              DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                      (Thousands of 2013 Dollars)
Off-Site  LLRW                                    NRC      Spent Fuel                                            Off-Site    LLRW                                    NRC        Spent Fuel    Site    I Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lic_ Term_  Management  Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total    Total  Lic. Term. Management Restoration Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Cantin enc  Costs      Costs      Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Cantin enc  Costs      Costs        Costs      Costs Period 2c Period-Dependent Costs (continued) 2c.4.9    Spent Fuel Pool O&M                                                                                          4,964        1,044  6,007                    6,007                                                                  5,187        1,091  6,278                6,277.789 2c.4.10    Liquid Radwaste Processing Equipment/Services                                                                  315          66    381        381                                                                                  329          69    399      398.528 2c.4.11    ISFSI Operating Costs                                                                                          291          61    352                      352                                                                    304          64    368                  367.932 2c.4.12    Spent Fuel Storage Canisters/Overpacks                                                                      11,323        2,381  13,704                  13,704                                                                  11,832        2,488  14,321                14,320.741 2c.4.13    Security Staff Cost                                                                                        96,501      20,294 116,795    116,795                                                                              100,844      21,207 122,051  122,050.963 2c.4.14    Utility Staff Cost                                                                                          42,556        8,950  51,506      51,506                                                                              44,471        9,352  53,824  53,823.681 2c.4      Subtotal Period 2c Period-Dependent Costs                2,326          68        19                  216 182,217      38,467 223,313    181,066      42,246            2,431          71        20                    248 190,417      40,198 233,385  189,237.339  44,147.484 2c.O      TOTAL PERIOD 2c COST                                    2,326          68        19                  216 189,766      40,054 232,449    181,066      51,383            2,431          71        20                    248 198,305      41,857 242,933  189,237.339  53,695.150 PERIOD 2d - Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activilies 2d.1.1    Remove spent fuel racks                          585        56        174        36                1,207                  885  2,943      2,943                  612        59        181        37                  1,391                  925  3,204    3,204.494 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated) - FHB                              111          8          3                  115                  81    317        317                            116          9          4                    132                  84    344      344.044 2d.1.2.2 Electrical (RCA)-FHB                                          690        78        31                1,042                  624  2,464      2,464                            721        81        32                  1,200                  652  2,687    2,686.685 2d.1.2.3 Fire Protection (RCA)                                        264        67        18                  613                  321  1,283      1,283                            276        70        19                    706                  335  1,407    1,406.541 2d.1.2.4 HVAC (Contaminated) - FHB                                    231        39        16                  542                  280  1,107      1,107                            241        41        17                    624                  292  1,215    1,215.201 2d.1.2.5 Spent Fuel Pit Cooling                                        94        65        21                  712                  296  1,189      1,189                            99        68        22                    821                  310  1,319    1,318.983 2d.1.2.6 Spent Fuel Pit Cooling - FHB                                  130        71        23                  772                  331  1,327      1,327                            136        74        24                    889                  346  1,469    1,468.832 2d.1.2    Totals                                                    1,520        328        112                3,795                1,933  7,688      7,688                          1,588        343        117                  4,372                2,020  8,440    8,440.286 Decontamination of Site Buildings 2d.1.3.1 Fuel Handling                                      811      859        63        41                  637                1,110  3,521      3,521                  847      898        66        43                    733                1,160  3,747    3,747.485 2d.1.3    Totals                                            811      859        63        41                  637                1,110  3,521      3,521                  847      898        66        43                    733                1,160  3,747    3,747.485 2d.1.4    Scaffolding in support of decommissioning                1,196                                        63                  443  1,710      1,710                          1,250                                            72                  462  1,793    1,793.147 2d.l      Subtotal Period 2d Activity Costs              1,396    3,632        570        191                5,702                4,370  15,862      15,862                1,459    3,795        596        200                  6,568                4,567  17,185  17,185.411 Period 2d Additional Costs 2d.2.1    License Termination Survey Planning                                                                            800          336  1,136      1,136                                                                                  836          351  1,187    1,187.202 2d.2      Subtotal Period 2d Additional Costs                                                                            800          336  1,136      1,136                                                                                  836          351  1,187    1,187.202 Period 2d Collateral Costs 2d.3.1    Process decommissioning water waste                37                  20        62                  82                  70    271        271                  38                  21        64                      95                  73    292      291.605 2d.3.2    Process decommissioning chemical flush waste 2d.3.3    Small tool allowance                                        79                                                              17      96          96                            83                                                                17    100        99.853 2d.3.4    Decommissioning Equipment Disposition                                  155        54                1,828                  674  2,710      2,710                                      162        56                  2,105                  704  3,027    3,027.341 2d.3      Subtotal Period 2d Collateral Costs                37        79        175        115                1,910                  760  3,076      3,076                  38        83        183        121                  2.200                  795  3,419    3,418.799 Period 2d Period-Dependent Costs 2d.4.1    Decon supplies                                    209                                                                        73    282        282                  218                                                                          77    295      295.062 2d.4.2    Insurance                                                                                                      219          31    249        249                                                                                  228          32    260      260.410 2d.4.3    Property taxes                                                                                                  76          11      87          87                                                                                  80          11      91        90.761 2d.4.4    Health physics supplies                                    445                                                            156    601        601                            465                                                                163    628      627.742 2d.4.5    Heavy equipment rental                                      953                                                            200  1,153      1,153                            996                                                                209  1,205    1,204.978 2d.4.6    Disposal ofDAW generated                                                45        13                  143                  59    260        260                                        47        13                    165                  62    287      287.402 2d.4.7    Plant energy budget                                                                                            213          45    258        258                                                                                  222          47    269      269.255 2d.4.8    NRC Fees                                                                                                      175          24    199        199                                                                                  182          26    208      208.060 2d.4.9    Emergency Planning Fees                                                                                        165          23    188                      188                                                                    172          24    196                  196.064 2d.4.10    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  1,216          256  1,472                    1,472                                                                  1,271          267  1,539                1,538.506 2d.4.11    Liquid Radwaste Processing Equipment/Services                                                                  178          38    216        216                                                                                  186          39    226      225.616 2d.4.12    ISFSI Operating Costs                                                                                          21            4      25                      25                                                                      22            5      26                    26.037 2d.4.13    Severance Related Costs                                                                                    12,313        2,589  14,902      14,902                                                                              12,867        2,706  15,573  15,572.666 2d.4.14    Security Staff Cost                                                                                          1,035          218  1,253      1,253                                                                                1,081          227  1,309    1,308.938 2d.4.15    DOC Staff Cost                                                                                              4,884        1,027  5,911      5,911                                                                                5,104        1,073  6,177    6,177.439 2d.4.16    Utility Staff Cost                                                                                          7,532        1,584  9,117      9,117                                                                                7,871        1,655  9,527    9,526.765 2d.4      Subtotal Period 2d Period-Dependent Costs        209    1,398        45        13                  143  28,027        6,338  36,173      34,488        1,685    218    1,460        47        13                    165  29,288        6,624  37,816  36,055.096    1,760.607 2d.O      TOTAL PERIOD 2d COST                            1,642    5,108        790        319                7,755  28,826      11,805  56,246      54,561        1,685  1,716    5,338        826        334                  8,933  30,123      12,337  59,607  57,846.507    1,760.607 PERIOD 2f - License Termination Period 2fDirect Decommissioning Activities 2f. 1. 1  ORISE confirmatory survey                                                                                      178          75    253        253                                                                                  186          78    264      264.330 2f.1.2    Terminate license                                                                                                                    a 2f.1      Subtotal Period 2f Activity Costs                                                                              178          75    253        253                                                                                  186          78    264      264.330 Period 2f Additional Costs 2f.2.1    License Termination Survey                                                                                  14,399        6,056  20,456      20,456                                                                              15,047        6,329  21,376  21,376.388 2f.2      Subtotal Period 2f Additional Costs                                                                        14,399        6,056  20,456      20,456                                                                              15,047        6,329  21,376  21,376.388 Period 2f Collateral Costs 2f.3.1    DOC staff relocation expenses                                                                                1,415          297  1,712      1,712                                                                                1,478          311  1,789    1,789.113 2f.3      Subtotal Period 2f Collateral Costs                                                                          1,415          297  1,712      1,712                                                                                1,478          311  1,789    1,789.113 Period 2fPeriod-Dependent Costs 2f.4.1    Insurance                                                                                                      319          45    364        364                                                                                  334          47    380      380.455 2f.4.2      Property taxes                                                                                                125          17    142        142                                                                                  130          18    149      148.567 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                PG&E Letter DCL-13-033 Document P01-1648-001, Rev. 0 Table C-2                                                                                                                                          Table C-2                          Appendix C2, Page 6 of 8 Diablo Canyon Unit 2                                                                                                                              Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate                                                                                                              DEC ON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                        (Thousands of 2013 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel                                            Off-Site    LLRW                                    NRC        Spent Fuel    Site    I Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total    Total  Lic_ Term_    Management Restoration Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin encv  Costs    Costs      Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Contin enc  Costs      Costs        Costs      Costs 2f.4.3    Health physics supplies                                    834                                                              292  1,127      1,127                          872                                                                306  1,177    1,177.386 2f.4.4    Disposal ofDAW generated                                                                              27                    11      49          49                                        9          3                      31                  12      54        54.322 2f.4.5    Plant energy budget                                                                                          174            37    211        211                                                                                182          38    220      220.372 2f.4.6    NRC Fees                                                                                                      312            44    356        356                                                                                326          46    372      372.172 2f.4.7    Emergency Planning Fees                                                                                      269            38    307                      307                                                                    281          39    321                  320.938 2f.4.8    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  1,130            238  1,368                    1,368                                                                  1,181          248  1,429                1,429.356 2f.4.9    ISFSI Operating Costs                                                                                          34              7      41                      41                                                                    35            7      43                    42.621 2f.4.10    Security Staff Cost                                                                                        1,694            356  2,050      2,050                                                                              1,770          372  2,143    2,142.607 2f.4.11    DOC Staff Cost                                                                                              4,689            986  5,675      5,675                                                                              4,900        1,031  5,931    5,930.855 2f.4.12    Utility Staff Cost                                                                                          5,150          1,083  6,233      6,233                                                                              5,382        1,132  6,514    6,513.785 2£.4      Subtotal Period 2£ Period-Dependent Costs                  834                                        27  13,897          3,154  17,924      16,208        1,716              872          9                                31  14,523        3,296  18,733  16,940.522    1,792.915 2£.0      TOTAL PERIOD 2£ COST                                      834                                        27  29,889          9,583  40,345      38,629        1,716              872          9                                31  31,234      10,014  42,163  40,370.353    1,792.915 PERIOD 2 TOTALS                                          9,816    70,926    28,855    14,141              105,405 510,074        195,310 934,527    831,404      90,569  10,258  74,118    30,154    14,777                121,426 533,028      204,099 987,859  880,095.884  94,644.162  13,119.282 PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 *Reactor                                                  6,798                                                            1,430  8,228                                    7,104                                                              1,494  8,598                            8,597.801 3b.1.1.2 Administration                                            1,067                                                              224  1,291                                    1,115                                                                234  1,349                            1,349.170 3b.1.1.3 Auxiliary                                                  6,587                                                            1,385  7,972                                    6,883                                                              1,447  8,330                            8,330.418 3b. 1. 1.4 Capital Additions 85-2004                                4,359                                                              917  5,276                                    4,556                                                                958  5,514                            5,513.700 3b. 1. 1.5 Chemical Storage                                            4                                                                        5                                        5                                                                  1      6                                5.637 3b. 1. 1.6 Chlorination                                                9                                                                2      11                                        10                                                                  2      12                                12.014 3b.1.1.7 Circulating Water Tunnels                                  1,153                                                              243  1,396                                    1,205                                                                253  1,459                            1,458.827 3b.1.1.8 Cold Machine Shop                                            396                                                                83    479                                      414                                                                87    501                              500.859 3b. 1. 1.9 Communication                                                4                                                                1      5                                        4                                                                          5                                5.395 3b.1.1.l0 Condensate PolishinglTechnical Support                      870                                                              183  1,053                                      909                                                                191  1,100                            1,100.449 3b.1.1.11 Containment Penetration Area                                686                                                              144    830                                      717                                                                151    868                              867.817 3b.1.1.12 Discharge Structure                                        937                                                              197  1,134                                      979                                                                206  1,185                            1,185.470 3b.1.1.13 Fabrication Shop                                            120                                                                25    145                                      125                                                                26    152                              151.827 3b.1.1.14 Fire Pump House                                              5                                                                1      6                                        5                                                                  1      6                                6.423 3b.1.1.15 Hazardous Waste Storage Facility                            39                                                                8      48                                        41                                                                  9      50                                49.824 3b.1.1.16 Intake Structure                                          5,309                                                            1,116  6,425                                    5,547                                                              1,167  6,714                            6,714.119 3b.1.1.17 Maintenance Shop                                            365                                                                77    442                                      381                                                                80    462                              461.522 3b.1.1.18 Miscellaneous Structures                                    64                                                                13      77                                        66                                                                14      80                                80.319 3b.1.1.19 NPO Permanent Warehouse                                  1,367                                                              287  1,654                                    1,428                                                                300  1,729                            1,728.795 3b.1.1.20 Ponds                                                        2                                                                o      2                                                                                                            o      3                                2.564 3b.1.1.21 Portable Fire Pump & Fuel Cart                                1                                                                o      2                                                                                                            o                                        1.632 3b.1.1.22 Pretreatment                                                10                                                                2      12                                        10                                                                  2      12                                12.446 3b.1.1.23 Radwaste Storage                                          1,777                                                              374  2,150                                    1,857                                                                390  2,247                            2,247.115 3b.1.1.24 Radwaste Storage Facility (Additional)                      49                                                                10      60                                        51                                                                11      62                                62.209 3b.1.1.25 Rotor Warehouse                                            847                                                              178  1,025                                      885                                                                186  1,072                            1,071.610 3b.1.1.26 Security                                                    344                                                                72    417                                      360                                                                76    435                              435.443 3b.1.1.27 Security Buildings (additional)                              53                                                                11      65                                        56                                                                12      68                                67.549 Demolition of Remaining Site Buildings (continued) 3b.1.1.28 Simulator                                                  413                                                                87    500                                      432                                                                91    523                              522.676 3b.1.1.29 Steam Generator Storage Facility                            909                                                              191  1,100                                      950                                                                200  1,150                            1,149.992 3b.1.1.30 Telephone Terminal                                            3                                                                1      3                                        3                                                                  1      3                                3.386 3b.1.1.31 Turbine                                                  5,538                                                            1,165  6,703                                    5,788                                                              1,217  7,005                            7,004.849 3b.1.1.32 Turbine Pedestal                                          1,318                                                              277  1,596                                    1,378                                                                290  1,668                            1,667.533 3b.1.1.33 Vehicle Maintenance                                          34                                                                7      41                                        36                                                                  8      43                                43.172 3b.1.1.34 Waste Water Holding & Treatment Facility                    23                                                                5      27                                        24                                                                  5      29                                28.625 3b.1.1.35 Fuel Handling                                            1,858                                                              391  2,248                                    1,941                                                                408  2,350                            2,349.512 3b.1.1    Totals                                                  43,321                                                            9,110  52,431                                    45,270                                                              9,520  54,791                            54,790.700 Site Closeout Activities 3b.1.2    Grade & landscape site                                  2,758                                                              580  3,338                                    2,882                                                                606  3,488                            3,487.914 3b.1. 3    Final report to NRC                                                                                            98            21    119        119                                                                                103          22    124      124.135 3b.1      Subtotal Period 3b Activity Costs                      46,079                                                98          9,711  55,888        119                        48,152                                                  103      10,148  58,403      124.135              58,278.614 Period 3b Additional Costs 3b.2.1    Backfill Structures & Remove Concrete Rubble            35,142                                                            7,390  42,532                                    36,723                                                              7,723  44,446                            44,446.319 3b.2.2    Breakwater Demolition and Removal                      41,893                                                            14,684  56,577                                    43,778                                                            15,344  59,122                            59,122.443 3b.2.3    Cofferdam Construction and Teardown                        478                                                              101    579                                      500                                                                105    605                              604.933 3b.2.4    Concrete Crushing                                        9,113                                                  5        1,917  11,035                                    9,523                                                              2,004  11,532                            11,531.911 3b.2.5    Disposal of Galbestos Siding                                                                                  317            67    383                                                                                            331          70    400                              400.377 3b.2.6    Disposition of Mobile Barriers                          1,318                                                              277  1,595                                    1,377                                                                290  1,667                            1,666.958 3b.2.7    Soil 1 Sediment Control Plant Area                      1,052                                                              221  1,273                                    1,099                                                                231  1,331                            1,330.531 3b.2      Subtotal Period 3b Additional Costs                    88,996                                                321        24,657 113,975                                    93,001                                                  336      25,766 119,103                          119,103.473 Period 3b Collateral Costs 3b.3.1    Small tool allowance                                    1,107                                                              233  1,340                                    1,157                                                                243  1,400                            1,399.967 3b.3      Subtotal Period 3b Collateral Costs                      1,107                                                              233  1,340                                    1,157                                                                243  1,400                            1,399.967 Period 3b Period-Dependent Costs 3b.4.1    Insurance                                                                                                    525            74    598                      598                                                                    548          77    625                  625.335 3b.4.2    Property taxes                                                                                                410            57    467                      467                                                                    428          60    488                  488.379 3b.4.3    Heavy equipment rental                                  7,347                                                            1,545  8,892                                    7,678                                                              1,615  9,293                            9,292.567 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                  Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                          PG&E Letter DCL-13-033 Document P01-1S48-001, Rev. 0 Table C-2                                                                                                                                        Table C-2                          Appendix C2, Page 7 of 8 Diablo Canyon Unit 2                                                                                                                            Diablo Canyon Unit 2 DEC ON Decommissioning Cost Estimate                                                                                                            DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)                                                                                                                      (Thousands of 2013 Dollars)
O££-Site  LLRW                                      NRC      Spent Fuel                                          Off-Site    LLRW                                    NRC      Spent Fuel    Site Activity                                            Decon Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Managemen    Decon Removal  Packaging  Transport  Processing  Disposal  Other    Total      Total  Lie. Term. Management Restoration Index                  Activit Descri tion          Cost  Cost      Costs      Costs      Costs    Costs    Costs  'Contin        Costs    Costs      Costs      Cost  Cost      Costs      Costs      Costs      Costs    Costs  Contin enc    Costs    Costs        Costs      Costs 3b.4.4    Plant energy budget                                                                                      286            60    347                                                                                          299            63    362                              362.212 3b.45      NRC ISFSI Fees                                                                                          348            49    397                      397                                                                  364            51    415                  414.531 3b.4.6    Emergency Planning Fees                                                                                  885            124  1,010                    1,010                                                                  925          130  1,055                1,055.011 3b.47      Spent Fuel Transfer - Pool or ISFSI to DOE                                                            3,711            780  4,491                    4,491                                                                3,878          816  4,693                4,693.482 3b.4.8    ISFSI Operating Costs                                                                                    111            23    134                      134                                                                  116            24    140                  140.106 3b.4.9    Security Staff Cost                                                                                    5,569          1,171  6,740                    5,459                                                                5,819        1,224  7,043                5,705.099  1,338.233 3b.4.10    DOC Staff Cost                                                                                        14,111          2,967  17,078                                                                                        14,746        3,101  17,846                          17,846.495 3b.411    Utility Staff Cost                                                                                    7,357          1,547  8,904                    1,781                                                                7,688        1,617  9,305                1,860.910  7,443.642 3b.4      Subtotal Period 3b Period-Dependent Costs            7,347                                            33,312          8,399  49,058                  14,338          7,678                                              34,811        8,777  51,266              14,982.852  36,283.150 3b.0      TOTAL PERIOD 3b COST                              143,529                                            33,732        42,999 220,261        119      14,338        149,988                                              35,250      44,934  230,172      124.135  14,982.852 215,065.203 PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Period-Dependent Costs 3c.4.1    Insurance                                                                                              3,099            434  3,534                    3,534                                                                3,238          454  3,693                3,692.521 3c.4.2    Property taxes                                                                                        2,420            339  2,760                    2,760                                                                2,529          355  2,884                2,883.812 3c.4.3    Plant energy budget 3c.4.4    NRC ISFSI Fees                                                                                        2,054            288  2,342                    2,342                                                                2,147          301  2,448                2,447.752 3c.4.5    Emergency Planning Fees                                                                                5,228            733  5,961                    5,961                                                                5,464          766  6,230                6,229.699 3c.4.6    Spent Fuel Transfer - Pool or ISFSI to DOE                                                            21,995          4,625  26,620                  26,620                                                              22,984        4,834  27,818              27,817.891 3c.4.7    ISFSI Operating Costs                                                                                    654            138    792                      792                                                                  684          144    827                  827.305 3c.4.8    Security Staff Cost                                                                                  26,771          5,630  32,401                  32,401                                                              27,976        5,883  33,859              33,859.160 3c.4.9    Utility Staff Cost                                                                                    8,802          1,851  10,654                  10,654                                                                9,198        1,934  11,133              11,132.906 3c.4      Subtotal Period 3c Period-Dependent Costs                                                            71,024        14,039  85,063                  85,063                                                              74,220      14,671  88,891              88,891.045 3c.0      TOTAL PERIOD 3c COST                                                                                  71,024        14,039  85,063                  85,063                                                              74,220      14,671  88,891              88,891.045 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.!'!'1 Vessel & Internals GTCC Disposal                                  2,500                          9,179                2,281  13,960      13,960                                  2,613                            10,574                2,383  15,570  15,570.267 3d.l.l    Totals                                                          2,500                          9,179                2,281  13,960      13,960                                  2,613                            10,574                2,383  15,570  15,570.267 3d. 1      Subtotal Period 3d Activity Costs                              2,500                          9,179                2,281  13,960      13,960                                  2,613                            10,574                2,383  15,570  15,570.267 Period 3d Collateral Costs 3d.3      Subtotal Period 3d Collateral Costs Period 3d Period-Dependent Costs 3dA.1      Insurance                                                                                                10                    11                      11                                                                  10                    12                  11.760 3d.4.2    Property taxes                                                                                            8                      9                        9                                                                    8                    9                    9.184 3d.4.3    Plant energy budget 3d.4.4    NRC ISFSI Fees                                                                                                            1      7                        7                                                                                          7                    7.493 3d.4.5    ISFSI Operating Costs                                                                                      2              o      3                        3                                                                    2                    3                    2.635 3d.4.6    Security Staff Cost                                                                                      85            18    103                      103                                                                  89            19    108                  107.832 3d.4.7    Utility Staff Cost                                                                                        28              6      34                      34                                                                  29            6      35                  35.455 3d.4      Subtotal Period 3d Period-Dependent Costs                                                                139            28    167                      167                                                                  146            29    174                  174.358 3d.0      TOTAL PERIOD 3d COST                                            2,500                          9,179    139          2,308  14,127      13,960          167                      2,613                            10,574    146        2,412  15,745  15,570.267    174.358 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1    ISFSI License Termination                              40          6        14                  393    622            286  1,362                    1,362              42                    15                    453    650          299  1,465                1,465.032 3e.2      Subtotal Period 3e Additional Costs                    40          6        14                  393    622            286  1,362                    1,362              42                    15                    453    650          299  1,465                1,465.032 Period 3e Collateral Costs 3e.3.1    Small tool allowance                                                                                                      o                                                                                                                  o                            0.739 3e.3      Subtotal Period 3e Collateral Costs                                                                                      o                                                                                                                  o                            0.739 Period 3e Period-Dependent Costs 3e.41      Insurance 3e.4.2    Property taxes                                                                                            55              8      63                      63                                                                  57            8      65                  65.369 3e.4.3    Heavy equipment rental                                136                                                              29    165                      165            142                                                                30    172                  171.945 3e.4.4    Plant energy budget 3e.4.5    NRC ISFSI Fees                                                                                            94            13    107                      107                                                                  98            14    112                  112.018 3e.4.6    Security Staff Cost                                                                                      61            13      74                      74                                                                  64            13      77                  77.106 3e.4.7    Utility Staff Cost                                                                                      163            34    198                      198                                                                  171            36    206                  206.446 3e.4      Subtotal Period 3e Period-Dependent Costs              136                                              373            97    606                      606            142                                                  390          101    633                  632.884 3e.0      TOTAL PERIOD 3e COST                                  177                    14                  393    995            383  1,968                    1,968            185          6        15                    453  1,040          400  2,099                2,098.655 PERIOD 3£ - ISFSI Site Restoration Period 3£ Direct Decommissioning Activities Period 3f Additional Costs TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                                Enclosure 3 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                      PG&E Letter DCL-13-033 Document P01-1S48-001, Rev. 0 Table C-2                                                                                                                                                Table C-2                              Appendix C2, Page 8 of 8 Diablo Canyon Unit 2                                                                                                                                      Diablo Canyon Unit 2 DEC ON Decommissioning Cost Estimate                                                                                                                    DECON Decommissioning Cost Estimate Activity                                                        Decon    Removal (Thousands of 2011 Dollars)
Packaging  Transport Off-Site Processing LLRW Disposal    Other      Total      Total NRC Lie. Term.
Spent Fuel Management  Decon  Removal  Packaging  Transport Off-Site Processing (Thousands of 2013 Dollars)
LLRW Disposal  Other      Total      Total NRC Lie. Term.
Spent Fuel      Site Management Restoration Index                    Activity Description                  Cost      Cost      Costs      Costs        Costs      Costs      Costs  Contingency    Costs    Costs      Costs      Cost    Cost      Costs      Costs      Costs      Costs    Costs  Contin enc    Costs      Costs        Costs      Costs 3£.2.1      ISFSI Demolition and Site Restoration                              1,371                                                        27          294    1,692                    1,692            1,433                                                    28          307    1,768                  1,767.747 3£.2.2      ISFSI Area Soil / Sediment Control                                    16                                                                      3        20                      20              17                                                                  4        21                    20.834 3£.2        Subtotal Period 3£ Additional Costs                                1,387                                                        27          297    1,712                    1,712            1,450                                                    28          311    1,789                  1,788.582 Period 3£ Collateral Costs 3f.3.1      Small tool allowance                                                  20                                                                      4        24                      24              20                                                                  4        25                    24.757 3f.3        Subtotal Period 3f Collateral Costs                                  20                                                                      4        24                      24              20                                                                  4        25                    24.757 Period 3£ Period-Dependent Costs 3£.4.1      Insurance 3£,4.2      Property taxes                                                                                                                  28            4        32                      32                                                                      29            4        33                    32.955 3£.4.3      Heavy equipment rental                                                54                                                                    11        65                      65              56                                                                  12        68                    67.741 3£A.4      Plant energy budget 3£A.5      Security Staff Cost                                                                                                            11            2        14                      14                                                                      12            2        14                    14.135 3£A.6      Utility Staff Cost                                                                                                              69          14        83                      83                                                                      72          15        87                    86.949 3£A        Subtotal Period 3f Period-Dependent Costs                            54                                                      108          32      193                      193              56                                                    112          33      202                    201.779 3£.0        TOTAL PERIOD 3f COST                                              1,461                                                      134          333    1,928                    1,928            1,526                                                    140          348    2,015                  2,015.117 PERIOD 3 TOTALS                                                              145,167      2,506          14                  9,572  106,024      60,063  323,347      14,079      103,464          151,699      2,619        15                  11,027  110,795      62,766  338,922    15,694.402  108,162.027 215,065.203 TOTAL COST TO DECOMMISSION                                        13,073    218,618      31,702      14,580                124,490    768,430      292,711 1,463,605  1,036,573      207,854  13,662  228,456      33,129    15,236                143,413 803,010      305,883 1,542,788 1,096,497.067  217,249.280 229,041.533 TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:                                                $1,463,605  thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 70.82% OR:                                                $1,036,573  thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 14.2% OR:                                                            $207,854  thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 14.98% OR:                                                          $219,178  thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                            77,728 Tons TOTAL CRAFT LABOR REQUIREMENTS:                                                                    1,686,102 Man-hours End Notes:
nJa - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
a - indicates that this value is less than a.5 but is non-zero.
a cell containing" - " indicates a zero value TLG Services, Inc.
 
Enclosure 4 PG&E Letter DCL-13-033 Decommissioning Cash Flow 2013 Dollars Diablo Canyon Power Plant Unit 1 (1 page)
Decommissioning Cash Flow 2013 Dollars Diablo Canyon Power Plant Unit 2 (1 page)
 
Enclosure 4 PG&E Letter DCL-13-033 Diablo Canyon Power Plant - Unit 1 Decommissioning Cash Flow (Note 1)
Estimated in 2013 Dollars Cummulative NRC Scope            Non-NRC Scope              Spent Fuel                                  Decommissioning    Trust Account Year          (Radiological)        (Non-Radiological)        Management                Total                  Estimate          Funding 2024          $26A79A98                    $136,124            $1,865,698            $28A81,320                $28A81,320 2025        $158,025,627                $1,314,337          $16A31,182          $175,771,146              $204)52A65 2026        $176,658,846                $2A95,965            $23,175,197          $202,330,008              $406,582A73 2027        $176,748,743                $2,968,558          $24J62,074          $204A79,375                $611,061,848 2028        $112,326,527                $3,931,038          $11,616,202          $127,873,767              $738,935,615 2029        $111,975,770                  $3,931,038          $11,616,202          $127,523,010              $866A58,626    $831,654A85 2030          $52,615A95                  $1,335A76            $8,958,805            $62,909,776              $929,368A01    $920,843,822 2031          $22A77,699                                        $7,591,515            $30,069,214              $959A37,615 2032          $22,560,633                                      $7,591,515            $30,152,148              $989,589,763 2033          $22A77,699                                        $7,591,515            $30,069,214            $1,019,658,977 2034          $22A77,699                                        $7,591,515            $30,069,214            $1,049,728,191 2035          $22A77,699                                        $7,591,515            $30,069,214            $1,079,797A04 2036          $22,560,633                                      $7,591,515            $30,152,148            $1,109,949,552 2037          $53,098,748                                      $5,779,975            $58,878,723            $1,168,828,275 2038          $44,721A37                  $3AOO,545            $2,879,812            $51,001,794            $1,219,830,069 2039              $2,576              $24,749,777            $6,070,050            $30,822A03            $1,250,652A72 2040              $80,903              $24,756,911            $6,070,050            $30,907,864            $1,281,560,336 2041              $2,576                $8,340,686            $6,086,854            $14A30,116            $1,295,990A52 2042              $2,576                                      $6,095,500            $6,098,076            $1,302,088,528 2043              $2,576                                      $6,095,500            $6,098,076            $1,308,186,603 2044              $19,313                                      $6,095,502            $6,114,815            $1,314,301A18 2045              $2,576                                      $6,095,500            $6,098,076            $1,320,399A94 2046              $2,576                                      $6,095,500            $6,098,076            $1,326A97,569 2047              $2,576                                      $6,095,500            $6,098,076            $1,332,595,645 2048              $19,313                                      $6,095,502            $6,114,815            $1,338,710A60 2049              $2,576                                      $6,095,500            $6,098,076            $1,344,808,535 2050              $2,576                                      $6,095,500            $6,098,076            $1,350,906,611 2051              $2,576                                      $6,095,500            $6,098,076            $1,357,004,686 2052              $19,313                                      $6,095,502            $6,114,815            $1,363,119,501 2053              $2,576                                      $6,095,500            $6,098,076            $1,369,217,577 2054              $2,576                                      $6,095,500            $6,098,076            $1,375,315,652 2055          $14A84,673                                        $5,992,778            $20A77A51              $1,395,793,103 2056            -$13A59                                        $4,134,185            $4,120,726            $1,399,913,830 TOTAL            $1,062,323,715              $77,360A55          $260,229,660        $1,399,913,830 NOTES:
: 1) Cash Flow is based on construction of Independent Spent Fuel Storage Installation (ISFSI) and assumes Department of Energy (DOE) Used Fuel Repository opens in 2024.
: 2) Trust Account Value of $920.8 million Market Value as of 12/31/12.
Trust Account Value of $831.7 million Liquidation Value as of 12/31/12.
Page 1 of 1
 
Enclosure 4 PG&E Letter DCL-13-033 Diablo Canyon Power Plant - Unit 2 Decommissioning Cash Flow (Note 1)
Estimated in 2013 Dollars Cummulative NRC Scope            Non-NRC Scope              Spent Fuel                              Decommissioning    Trust Account Year        Radiological)        (Non-Radiological)          Management                Total              Estimate        Funding 2025        $49,029,734                  $125,110              $3,285,185          $52,440,029          $52,440,029 2026      $134,075,307                  $583,475              $9,665,770          $144,324,552          $196,764,581 2027      $172,483,925                $2,434,868              $6,886,536          $181,805,329          $378,569,909 2028      $168,475,912                $2,917,279              $7,518,145          $178,911,336          $557,481,245 2029      $127,400,028                $3,675,789            $11,369,307          $142,445,124          $699,926,369 2030      $127,400,028                $3,675,789            $11,369,307          $142,445,124          $842,371,493 2031        $44,063,757                  $563,957              $8,739,189          $53,366,903          $895,738,396 2032        $29,403,421                                        $8,262,534          $37,665,955          $933,404,350 2033        $29,300,432                                        $8,262,534          $37,562,966          $970,967,317 2034        $29,300,432                                        $8,262,534          $37,562,966        $1,008,530,283 2035        $29,300,432                                        $8,262,534          $37,562,966        $1,046,093,249 2036        $29,403,421                                        $8,262,534          $37,665,955        $1,083,759,203 2037        $63,201,408                                        $6,718,560          $69,919,968        $1,153,679,171 2038        $52,859,967              $13,106,933              $3,035,610          $69,002,510        $1,222,681,682 2039            $53,851              $86,307,846              $6,056,192          $92,417,889        $1,315,099,571 2040            $29,870              $86,585,403              $6,056,192          $92,671,465        $1,407,771,036 2041            $40,414              $29,065,020              $6,072,955          $35,178,389        $1,442,949,425 2042              $3,941                                        $6,081,580            $6,085,521        $1,449,034,946 2043              $3,941                                        $6,081,580            $6,085,521        $1,455,120,467 2044            $20,680                                        $6,081,580            $6,102,260        $1,461,222,727 2045              $3,941                                        $6,081,580            $6,085,521        $1,467,308,248 2046              $3,941                                        $6,081,580            $6,085,521        $1,473,393,769 2047              $3,941                                        $6,081,580            $6,085,521        $1,479,479,290 2048            $20,680                                        $6,081,580            $6,102,260        $1,485,581,550 2049              $3,941                                        $6,081,580            $6,085,521        $1,491,667,071 2050              $3,941                                        $6,081,580            $6,085,521        $1,497,752,592 2051              $3,941                                        $6,081,580            $6,085,521        $1,503,838,113 2052            $20,680                                        $6,081,580            $6,102,260        $1,509,940,374 2053              $3,941                                        $6,081,580            $6,085,521        $1,516,025,895 2054              $3,941                                        $6,081,580            $6,085,521        $1,522,111,416 2055        $14,458,874                                        $5,979,092          $20,437,966        $1,542,549,382 2056            -$12,776                                        $4,124,028            $4,111,252        $1,546,660,634 TOTAL        $1,100,369,887              $229,041,469            $217,249,278        $1,546,660,634 NOTES:
: 1) Cash Flow is based on construction of ISFSI and assumes DOE Used Fuel Repository opens in 2024.
: 2) Trust Account Value of $1,221.1 million Market Value as of 12/31/12.
Trust Account Value of $1,101.5 million Liquidation Value as of 12/31/12.
Page 1 of 1
 
Enclosure 5 PG&E Letter DCL-13-033 Decommissioning Cost Analysis for the Diablo Canyon Power Plant (TLG Services, Inc.)
(138 pages)
 
Document POl-1648-001, Rev. 0 DECOMMISSIONING COST ANALYSIS for the DIABLO CANYON POWER PLANT prepared for Pacific Gas and Electric Company prepared by TLG Services, Inc.
Bridgewater, Connecticut December 2012
 
Diablo Canyon Power Plant                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Page ii of xix APPROVALS Project Manager Geoffr                        Date Proj ect Engineer                'wk~g2v William J. Di z 1?5 :De~
Date Loll.-
Technical Manager TLG Services, Inc.
 
Diablo Canyon Power Plant                                                        Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                              Page iii of xix TABLE OF CONTENTS SECTION                                                                                                              PAGE EXECUTIVE
 
==SUMMARY==
................................................................................. vii-xix
: 1. INTRODUCTION ................................................................................................... 1-1 1.1 Objectives of Study ......................................................................................... 1-1 1.2 Site Description .............................................................................................. 1-2 1.3 Regulatory Guidance ...................................................................................... 1-3 1.3.1 Nuclear Waste Policy Act .................................................................... 1-5 1.3.2 Low-Level Radioactive Waste Acts ..................................................... 1-6 1.3.3 Radiological Criteria for License Termination .................................. 1-7
: 2. DECOMMISSIONING ALTERNATIVES ............................................................. 2-1 2.1 DECON ........................................................................................................... 2-2 2.1.1 Period 1 - Preparations ........................................................................ 2-3 2.1.2 Period 2 - Decommissioning Operations ............................................ 2-5 2.1.3 Period 3 - Site Restoration .................................................................. 2-8 2.1.4 ISFSI Operations and Decommissioning ........................................... 2-9 2.2 SAFSTOR ........................................................................................................ 2-9 2.2.1 Period 1 - Preparations ...................................................................... 2-10 2.2.2 Period 2 - Dormancy .......................................................................... 2-11 2.2.3 Periods 3 and 4 - Delayed Decommissioning ................................... 2-12 2.2.4 Period 5 - Site Restoration ................................................................ 2-13
: 3. COST ESTIMATES ................................................................................................ 3-1 3.1 Basis of Estimates .......................................................................................... 3-1 3.2 Methodology .................................................................................................... 3-1 3.3 Impact of Decommissioning Multiple Reactor Units .................................... 3-3 3.4 Financial Components of the Cost Model. ..................................................... 3-4 3.4.1 Contingency ......................................................................................... 3-5 3.4.2 Financial Risk ...................................................................................... 3-6 3.5 Site-Specific Considerations ........................................................................... 3-7 3.5.1 Spent Fuel Management ..................................................................... 3-8
        -3.5.2 Reactor Vessel and Internal Components ........................................ 3-10 3.5.3 Primary System Components ........................................................... 3-11 3.5.4 Main Turbine and Condenser ........................................................... 3-13 3.5.5 Retired Components .......................................................................... 3-13 3.5.6 Transportation Methods ................................................................... 3-13 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                          Document PO 1-1 648-00 1, Rev. 0 Decommissioning Cost Analysis                                                                              Page iv of xix TABLE OF CONTENTS (continued)
SECTION                                                                                                              PAGE 3.5.7 Low-Level Radioactive Waste Disposal. ........................................... 3-14 3.5.8 Site Restoration Following License Termination ............................ 3-15 3.6 Assumptions .................................................................................................. 3-16 3.6.1 Estimating Basis ............................................................................... 3-16 3.6.2 Labor Costs ........................................................................................ 3-16 3.6.3 Design Conditions .............................................................................. 3-17 3.6.4 General ............................................................................................... 3-18 3.7 Cost Estimate Summary ............................................................................. 3-20
: 4. SCHEDULE ESTIMATE ...................................................................................... 4-1 4.1 Schedule Estimate Assumptions ................................................................... 4-1 4.2 Project Schedule .............................................................................................. 4-2
: 5. RADIOACTIVE WASTES ...................................................................................... 5-1
: 6. RESULTS .............................................................................................................. 6-1
: 7. REFERENCES ........................................................................................................ 7-1 TABLES DECON Cost Summary Decommissioning Cost Elements ............................ xvii SAFSTOR Cost Summary Decommissioning Cost Elements ...................... xviii DECON Cost Summary Yr License Renewal Decommissioning Cost Elements ........................................................................................................... xix 3.1    DECON Alternative, Schedule of Total Annual Expenditures, Unit 1 ........ 3-22 3.2    DECON Alternative, Schedule of Total Annual Expenditures, Unit 2 ........ 3-24 3.3    SAFSTOR Alternative, Schedule of Total Annual Expenditures, Unit 1 .... 3-26 3.4    SAFSTOR Alternative, Schedule of Total Annual Expenditures, Unit 2 .... 3-28 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                          Page v of xix TABLE OF CONTENTS (continued)
SECTION                                                                                                        PAGE TABLES (continued) 5.1    DECON Alternative, Decommissioning Waste Summary, Unit 1 ................                                      5-4 5.2    DECON Alternative, Decommissioning Waste Summary, Unit 2 ................                                      5-5 5.3    SAFSTOR Alternative, Decommissioning Waste Summary, Unit 1 .............                                      5-6 5.4    SAFSTOR Alternative, Decommissioning Waste Summary, Unit 2 .............                                      5-7 6.1    DECON Alternative Decommissioning Cost Elements, Unit 1 .....................                                  6-4 6.2    DECON Alternative Decommissioning Cost Elements, Unit 2 .....................                                  6-5 6.3    SAFSTOR Alternative Decommissioning Cost Elements, Unit 1 .................                                    6-6 6.4    SAFSTOR Alternative Decommissioning Cost Elements, Unit 2 .................                                    6-7 FIGURES 1.1    Diablo Canyon Power Plant General Plan ..................................................... 1-9 1.2    Diablo Canyon Power Plant Aerial View ....................................................... 1-10
: 1. 3  Diablo Canyon Power Plant Reactor Building Section ................................. 1-11 4.1    Activity Schedule - DECON ............................................................................ 4-3 4.2    DECON Alternative Decommissioning Timeline ........................................... 4-5 4.3    SAFSTOR Alternative Decommissioning Timeline ....................................... 4-6 APPENDICES A. Unit Cost Factor Development ............................................................................ A-1 B. Unit Cost Factor Listing ..................................................................................... B-1 C. Detailed Cost Analysis, DECON ......................................................................... C-1 D. Detailed Cost Analysis, SAFSTOR .................................................................... D-1 E. Detailed Cost Analysis, DECON Year License Renewal. .......................... E-1 TLG Services, Inc.
 
Diablo Canyon Power Plant                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Page vi of xix REVISION LOG No.          Date      Item Revised I    Reason for Revision I
0        12/18/2012                        Original Issue TLG Services, Inc.
 
Diablo Canyon Power Plant                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                    Page vii of xix EXECUTIVE
 
==SUMMARY==
 
This report presents estimates of the cost to decommission the Diablo Canyon Power Plant (Diablo Canyon) for the selected decommissioning scenarios following the scheduled cessation of plant operations. The estimates are designed to provide the Pacific Gas and Electric Company (PG&E) with the information to assess its current decommissioning liability, as it relates to Diablo Canyon.
The analysis relies upon site-specific, technical information from an evaluation prepared in 2009,[1] updated to reflect current assumptions pertaining to the disposition of the nuclear plant and relevant industry experience in undertaking such projects. The costs are based on several key assumptions in areas of regulation, component characterization, high-level radioactive waste management, low-level radioactive waste disposal, performance uncertainties (contingency) and site restoration requirements. The plant inventory, the basis for the decontamination and dismantling requirements and cost, and the decommissioning waste streams, were reviewed for this analysis. Significant "physical" changes reflected in the estimates include:
* Reclassifying all concrete located within the containment liner as likely low-level waste. This eliminates decontamination of concrete in containment and reduces final status survey costs.
* Reclassifying the turbine, condenser, and associated systems from potentially contaminated to likely clean.
* Removing all demolished concrete from the station and disposing of it off-site in lieu of using the demolished concrete as on site filL
* Updating material inventories associated with updated security barriers.
The analysis is not a detailed engineering evaluation, but an estimate prepared in advance of the detailed engineering required to carry out the decommissioning of the nuclear unit. It may also not reflect the actual plan to decommission Diablo Canyon; the plan may differ from the assumptions made in this analysis based on facts that exist at the time of decommissioning.
The costs to decommission Diablo Canyon for the scenarios evaluated are tabulated at the end of this section. Costs are reported in 2011 dollars and include monies anticipated to be spent for radiological remediation and operating license termination, spent fuel management, and site restoration activities.
  "Decommissioning Cost Analysis for the Diablo Canyon Power Plant," Document POl-1604-003, Rev. 0, TLG Services, Inc., March 2009.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                            Page viii of xix A complete discussion of the assumptions relied upon in this analysis is provided in Section 3, along with schedules of annual expenditures for each scenario. A sequence of significant project activities is provided in Section 4 with a time line for each scenario. Detailed cost reports used to generate the summary tables contained within this document are provided in Appendices C through E.
Consistent with the 2009 analysis, the current cost estimates assume that the shutdown of the nuclear unit is a scheduled and pre-planned event (e.g., there is no delay in transitioning the plant and workforce from operations or in obtaining regulatory relief from operating requirements, etc.). The estimates include the continued operation of the fuel handling areas as an interim wet fuel storage facility for approximately twelve years after operations cease. [2] During this time period, it is assumed that the spent fuel residing in the pools will be transferred to an independent spent fuel storage installation (ISFSI) located on the site. The ISFSI will remain operational until the Department of Energy (DOE) is able to complete the transfer of the fuel to a federal facility. The estimates also include the dismantling of site structures and non-essential facilities and the limited restoration of the site.
Alternatives and Regulations The Nuclear Regulatory Commission (NRC) provided general decommissioning requirements in a rule adopted on June 27, 1988. [3] In this rule, the NRC set forth technical and financial criteria for decommissioning licensed nuclear facilities. The regulations addressed planning needs, timing, funding methods, and environmental review requirements for decommissioning. The rule also defined three decommissioning alternatives as being acceptable to the NRC: DECON, SAFSTOR, and ENTOMB.
DECON is defined as "the alternative in which the equipment, structures, and portions of a facility and site containing radioactive contaminants are removed or decontaminated to a level that permits the property to be released for unrestricted use shortly after cessation of operations. "[4]
2  The current Part 72 ISFSI license does not allow dry cask storage of spent fuel with burnups above 45,000 MWD/metric ton. It is assumed that PG&E can amend the Part 72 license to store the higher burnup fuel, but that as a condition of the amendment it will require longer decay times (12 years) before storing the spent fuel in the casks.
3  U.S. Code of Federal Regulations, Title 10, Parts 30, 40, 50, 51, 70 and 72 "General Requirements for Decommissioning Nuclear Facilities," Nuclear Regulatory Commission, Federal Register Volume 53, Number 123 (p 24018 et seq.), June 27, 1988 4  Ibid. Page FR24022, Column 3 TLG Services, Inc.
 
Diablo Canyon Power Plant                                              Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                            Page ix of xix SAFSTOR is defined as "the alternative in which the nuclear facility is placed and maintained in a condition that allows the nuclear facility to be safely stored and subsequently decontaminated (deferred decontamination) to levels that permit release for unrestricted use. "[5]
Decommissioning is required to be completed within 60 years, although longer time periods will be considered when necessary to protect public health and saf~ty.
ENTOMB is defined as "the alternative In which radioactive contaminants are encased in a structurally long-lived material, such as concrete; the entombed structure is appropriately maintained and continued surveillance is carried out until the radioactive material decays to a level permitting unrestricted release of the property."[6] As with the SAFSTOR alternative, decommissioning is currently required to be completed within 60 years, although longer time periods will also be considered when necessary to protect public health and safety.
The 60-year restriction has limited the practicality for the ENTOMB alternative at commercial reactors that generate significant amounts of long-lived radioactive material. In 1997, the Commission directed its staff to re-evaluate this alternative and identify the technical requirements and regulatory actions that would be necessary for entombment to become a viable option. The resulting evaluation provided several recommendations, however, rulemaking has been deferred pending the completion of additional research studies (e.g., on engineered barriers).
In 1996, the NRC published revisions to its general requirements for decommissioning nuclear power plants to clarify ambiguities and codify procedures and terminology as a means of enhancing efficiency and uniformity in the decommissioning processJ7] The amendments allow for greater public participation and better define the transition process from operations to decommissioning. Regulatory Guide 1.184, issued in July 2000, further described the methods and procedures that are acceptable to the NRC staff for implementing the requirements of the 1996 revised rule that relate to the initial activities and the major phases of the decommissioning process. The costs and schedules presented in this analysis follow the general guidance and sequence in 5  Ibid.
6  Ibid. Page FR24023, Column 2 7  U.S. Code of Federal Regulations, Title 10, Parts 2, 50, and 51, "Decommissioning of Nuclear Power Reactors," Nuclear Regulatory Commission, Federal Register Volume 61, (p 39278 et seq.), July 29, 1996 TLG Services, Inc.
 
Diablo Canyon Power Plant                                        Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                      Page x of xix the amended regulations. The format and content of the estimates is also consistent with the recommendations of Regulatory Guide 1.202, issued February 2005. [8]
Decommissioning Scenarios Two basic decommissioning scenarios are evaluated for the two nuclear units. The scenarios selected are representative of alternatives available to the owner and are defined as follows:
DECON: The operating licenses for Units 1 and 2 currently expire in November 2024 and August 2025, respectively. The first scenario assumes that decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling processes. Any residual spent fuel is transferred to the ISFSI to facilitate decontamination and dismantling activities within the fuel handling building. Spent fuel storage operations continue at the site until the transfer of the fuel to the DOE is complete in year 2055.
SAFSTOR: The units are placed into safe-storage in the second scenario. Spent fuel remaining in the spent fuel storage pools after a minimum cooling period of 12 years is transferred to the ISFSI for interim storage. The length of SAFSTO R dormancy is based on spent fuel storage operations. Physical dismantling of the station is assumed to commence after all spent fuel has been removed from the station in 2055. As with the DECON scenario, decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling processes.
An alternative decommissioning scenario was also evaluated for the units; decommissioning after renewing the license for 20 years. A summary of the two basic and an alternate scenario are shown below.
Unit 1/2 Scenario Name                    Type                                    Basis 1 Results Shutdown Dates DECON                      Basic                    2024/2025              Body of Report SAFSTOR                    Basic                    2024/2025              Body of Report DECON (20-Year            Alternative              2044/2045                Appendix E License Renewal) 8  "Standard Format and Content of Decommissioning Cost Estimates for Nuclear Power Reactors,"
Regulatory Guide 1.202, Nuclear Regulatory Commission, February 2005 TLG Services, Inc.
 
Diablo Canyon Power Plant                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                          Page xi of xix Methodology The methodology used to develop the estimates follows the basic approach originally presented in the cost estimating guidelines [9] developed by the Atomic Industrial Forum (now Nuclear Energy Institute). This reference describes a unit cost factor method for estimating decommissioning activity costs. The unit cost factors used in this analysis incorporate site-specific costs and the latest available information about worker productivity in decommissioning.
An activity duration critical path is used to determine the total decommissioning program schedule. This is required for calculating the carrying costs, which include program management, administration, field engineering, equipment rental, quality assurance, and security. This systematic approach for assembling decommissioning estimates ensures a high degree of confidence in the reliability of the resulting costs.
The estimates also reflect lessons learned from previously completed decommissioning projects, including TLG's involvement in the Shippingport Station decommissioning, completed in 1989, and the decommissioning of the Cintichem reactor, hot cells and associated facilities, completed in 1997. In addition, the planning and engineering for the Pathfinder, Shoreham, Rancho Seco, Trojan, Yankee Rowe, Big Rock Point, Maine Yankee, Humboldt Bay-3, Connecticut Yankee and San Onofre-1 nuclear units have provided additional insight into the process, the regulatory aspects, and technical challenges of decommissioning commercial nuclear units.
Contingency Consistent with cost estimating practice, contingencies are applied to the decontamination and dismantling costs developed as "specific provision for unforeseeable elements of cost within the defined project scope, particularly important where previous experience relating estimates and actual costs has shown that unforeseeable events which will increase costs are likely to occur." [10] The cost elements in the estimates are based on ideal conditions; therefore, the types of unforeseeable events that are almost certain to occur in decommissioning, based on industry experience, are addressed through a percentage contingency applied on a line-item basis. This contingency factor is a nearly universal element in all large-scale construction and demolition projects. It should be noted that contingency, as used in this analysis, is based on a preliminary technical position [11] to reflect the California 9  T.S. LaGuardia et aI., "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May. 1986 10  Project and Cost Engineers' Handbook, Second Edition, American Association of Cost Engineers, Marcel Dekker, Inc., New York, New York, p. 239.
11  "Technical Position Paper for Establishing an Appropriate Contingency Factor for Inclusion in the TLG Services, Inc.
 
Diablo Canyon Power Plant                                          Document P01-1 648-00 1, Rev. 0 Decommissioning Cost Analysis                                                        Page xii of xix Public Utilities Commission's desire for owners to conservatively establish an appropriate contingency factor for inclusion in the decommissioning revenue requirements.
Contingency funds are expected to be fully expended throughout the program. As such, inclusion of contingency is necessary to provide assurance that sufficient funding will be available to accomplish the intended tasks.
Low -Level Radioactive Waste Disposal The contaminated and activated material generated in the decontamination and dismantling of a commercial nuclear reactor is generally classified as low-level radioactive waste, although not all of the material is suitable for shallow-land disposal. With the passage of the "Low-Level Radioactive Waste Disposal Act" in 1980 and its Amendments of 1985, [12] the states became ultimately responsible for the disposition of low-level radioactive waste generated within their own borders.
For the purpose of this analysis, the EnergySolutions' facility is used as the disposal site for the majority of the radioactive waste (Class A). The disposal costs for Class A low-level radioactive waste are based on a study' sponsored by PG&E and Southern California Edison Company, "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning", [13] escalated to year 2011 dollars.
For the purpose of this analysis, the Waste Control Specialists (WCS) facility in Andrews County, TX is used as the disposal site for the higher radioactivity Class B and C waste. In the prior 2008 decommissioning analysis the disposal rate for these waste classes were based on the previously cited study which was based on published Barnwell rates. A change in location was designated with the current analysis since Barnwell is not open to California generators, and with the exception of Texas, where WCS recently declared the site operational in November 2011; no new compact facilities have been successfully sited, licensed, and constructed. WCS will be able to accept limited quantities of non-Compact waste, although at this time the cost for non-Compact generators is being negotiated on an individual basis. The cost used in this estimate is a blended combination of preliminary information for the two WCS Class Band C rates. It should be noted that PG&E has a contract with Decommissioning Revenue Requirements", Study Number: DECON-POS-H002, Revision A, Status:
Preliminary (provided by PG&E).
12  "Low-Level Radioactive Waste Policy Amendments Act of 1985," Public Law 99-240, January 15, 1986 13 "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning", Robert A Snyder NEWEX, Revision 0, July 2008 (provided by PG&E).
TLG Services, Inc.
 
Diablo Canyon Power Plant                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                      Page xiii of xix WCS to dispose of Class Band C waste originating from Humboldt Bay 3. This contract requires waste delivery by April 2013.
The dismantling of the components residing closest to the reactor core generates radioactive waste that may be considered unsuitable for shallow-land disposal (i.e.,
low-level radioactive waste with concentrations of radionuclides that exceed the limits established by the NRC for Class C radioactive waste (GTCC>>. The Low-Level Radioactive Waste Policy Amendments Act of 1985 assigned the federal government the responsibility for the disposal of this materiaL The Act also stated that the beneficiaries of the activities resulting in the generation of such radioactive waste bear all reasonable costs of disposing of such waste. However, to date, the federal government has not identified a cost for disposing of GTCC or a schedule for acceptance.
For purposes of this analysis, the GTCC radioactive waste is assumed to be packaged and disposed of in a similar manner as high-level waste and at a cost equivalent to that envisioned for the spent fueL The GTCC is packaged in the same canisters used for spent fuel and either stored on site or shipped directly to a DOE facility as it is generated (depending upon the timing of the decommissioning and whether the spent fuel has been removed from the site prior to the start of decommissioning) .
High-Level Radioactive Waste Management Congress passed the "Nuclear Waste Policy Act"[14] (NWPA) in 1982, assigning the federal government's long-standing responsibility for disposal of the spent nuclear fuel created by the commercial nuclear generating plants to the DOE. The NWPA provided that DOE would enter into contracts with utilities in which DOE would promise to take the utilities' spent fuel and high-level radioactive waste and utilities would pay the cost of the disposition services for that material. The NWPA, along with the individual contracts with the utilities, specified that the DOE was to begin accepting spent fuel by January 31, 1998.
Since the original legislation, the DOE has announced several delays in the program schedule. By January 1998, the DOE had failed to accept any spent fuel or high level waste, as required by the NWPA and utility contracts. To date no progress in the removal of spent fuel from commercial generating sites has been made. Delays continue and, as a result, generators have initiated legal action against the DOE in an attempt to obtain compensation for DOE's breach of contract.
14  "Nuclear Waste Policy Act of 1982 and Amendments," DOE's Office of Civilian Radioactive Management, 1982 TLG Services, Inc.
 
Diablo Canyon Power Plant                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                          Page xiv of xix It is necessary that spent fuel be cooled and stored for a minimum period at the generating site prior to transfer. As such, the NRC requires that licensees establish a program to manage and provide funding for the management of all irradiated fuel at the reactor site until title of the fuel is transferred to the Secretary of Energy, pursuant to 10 CFR Part 50.54(bb)J15] This funding requirement is fulfilled through inclusion of certain cost elements in the decommissioning estimates, for example, associated with the isolation and continued operation of the spent fuel pools and the ISFSI.
PG&E's current spent fuel management plan for the Diablo Canyon spent fuel is based upon the DOE accepting spent fuel from commercial generators starting in year 2024, and accepting it at a rate which removes all spent fuel from the station by year 2055.
The DOE's generator allocation/receipt schedules are based upon the oldest fuel receiving the highest priority. For purposes of this analysis, the first assemblies removed from the Diablo Canyon site are assumed to be in 2033. With an estimated average rate of transfer of 6 canisters (192 spent fuel assemblies) per year, completion of the removal of fuel from the site is projected to be in the year 2055.
Consequently, costs are included within the estimates for the long-term caretaking of the spent fuel at the Diablo Canyon site until the year 2055.
An ISFSI, which is independently licensed and operated, will remain operational after the cessation of plant operations. For the DECON and SAFSTOR scenarios, the facility is project to have the capacity to accommodate the inventory of spent fuel residing in the plant's storage pools at the conclusion of the required cooling period. Once emptied, the spent fuel pool facilities can be either decontaminated and dismantled or prepared for long-term storage.
Site Restoration The efficient removal of the contaminated materials at the site may result in damage to many of the site structures. Blasting, coring, drilling, and the other decontamination activities can substantially damage power block structures, potentially weakening the footings and structural supports. It is unreasonable to anticipate that these structures would be repaired and preserved after the radiological contamination is removed. The cost to dismantle site structures with a work force already mobilized is more efficient and less costly than if the process is deferred. Consequently, this study assumes that non-essential site structures addressed by this analysis are removed to a nominal depth of three feet below the 15  U.S. Code of Federal Regulations, Title 10, Part 50, "Domestic Licensing of Production and Utilization Facilities," Subpart 54 (bb), "Conditions of Licenses."
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                            Page xv of xix local grade level wherever possible. The site is then graded and stabilized. As previously noted an additional site restoration alternative has been evaluated in this analysis, where all below grade concrete is demolished and removed off site.
Summary The estimates to decommission Diablo Canyon assume the removal of all contaminated and activated plant components and structural materials such that the owner may then have unrestricted use of the site with no further requirements for an operating license. Low-level radioactive waste, other than GTCC waste, is sent to a commercial processor for treatment/conditioning or to a controlled disposal facility.
Decommissioning is accomplished within the 60-year period required by current NRC regulations. In the interim, the spent fuel remains in storage at the site until such time that the transfer to a DOE facility is complete. Once emptied, the storage facility can also be decommissioned.
Both the DECON and SAFSTOR scenarIOS are described in Section 2. The assumptions are presented in Section 3, along with schedules of annual expenditures.
The major cost contributors are identified in Section 6, with detailed activity costs, waste volumes, and associated manpower requirements delineated in Appendices C and D. The alternative scenario is contained in Appendix E DECON scenario 20-year license renewal. The major cost components for all scenarios are also identified in the cost summary provided at the end of this section.
The cost elements in the estimates for all the decommissioning alternatives are assigned to one of three subcategories: NRC License Termination (radiological remediation), Spent Fuel Management, and Site Restoration. The subcategory "NRC License Termination" is used to accumulate costs that are consistent with "decommissioning" as defined by the NRC in its financial assurance regulations (i.e., 10 CFR §50.75). The cost reported for this subcategory is generally sufficient to terminate the unit's operating license, recognizing that there may be some additional cost impact from spent fuel management.
The "Spent Fuel Management" subcategory contains costs associated with the containerization and transfer of spent fuel from the wet storage pool to a DOE transport cask or to the ISFSI for interim storage, as well as the transfer of the spent fuel in storage at the ISFSI to the DOE. Costs are included for the operation of the storage pool and the management of the ISFSI until such time that the transfer is complete. It does not include any spent fuel management expenses incurred prior to the cessation of plant operations, nor does it include any costs related to the final disposal of the spent fueL TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                              Page xvi of xix "Site Restoration" is used to capture costs associated with the dismantling and demolition of buildings and facilities demonstrated to be free from contamination.
This includes structures never exposed to radioactive materials, as well as those facilities that have been decontaminated to appropriate levels. Structures are removed to a depth of three feet and backfilled to conform to local grade.
It should be noted that the costs assigned to these subcategories are allocations.
Delegation of cost elements is for the purposes of comparison (e.g., with NRC financial guidelines) or to permit specific financial treatment (e.g., Asset Retirement Obligation determinations). In reality, there can be considerable interaction between the activities in the three subcategories. For example, an owner may decide to remove non-contaminated structures early in the project to improve access to highly contaminated facilities or plant components. In these instances, the non-contaminated removal costs could be reassigned from Site Restoration to an NRC License Termination support activity. However, in general, the allocations represent a reasonable accounting of those costs that can be expected to be incurred for the specific subcomponents of the total estimated program cost, if executed as described.
As noted within this document, the estimates were developed and costs are presented in 2011 dollars. As such, the estimates do not reflect the escalation of costs (due to inflationary and market forces) over the remaining operating life of the plant or during the decommissioning period.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                          Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                Page xvii of xix DECON COST
 
==SUMMARY==
 
DECOMMISSIONING COST ELEMENTS (thousands of 2011 dollars)
Cost Element                                                                                                                                                            Unit 1                    Unit 2                        Total l  Decontamination                                                                                                                                                          17,296 I                20,420                        37,715 Removal
.--.---.----.-.--------.--.------......-------.-----.----..- .....- ....--..- - - - -..- - - -..- - f - - - - - - - - - - - - .--..---.------.-.-.-.--
129,569 I                283,111                        412,680 Packaging                                                                                                                                                                40,268 I                39,786                        80,054 Transportation                                                                                                                                              __            18,060      I          17,954                        36,014
-_Waste
      .._..._-_.----_._._.-..Disposal    _--                                  _._---------_._----_..__.__._--_..-                                                        175,448        I ..._171,400
                                                                                                                                                                                  -------+_                                        346,848 Program Management [1]                                                                                                                                                315,3341                  368,348                        683,682 Security                                                                                                                                                              273,454 I                258,268                        531,722 Spent Fuel Pool Isolation                                                                                                                                                24,045 I                15,996                        40,041 Spent Fuel Management [2]                                                                                                                                              187,973 I                147,039                        335,012 Insurance and Regulatory Fees                                                                                                                                            21,214 I                18,358                        39,571 E*~;~gy**-*****-***--*-**--**----***-*--******-*--*-*----                        . . -.. --.-.-. --.._.---.-.-.. ._-..--..-.. .-._-..--.. .----..--.. . -..-.--. -*-****--*---1~3*3il*-***--*-**-*-*-*-io:-o83**-* '-"-'-"--"'--'-2o~~i13-Characterization and Licensing Surveys                                                                                                                                    21,372 I                24,739                        46,111 Property Taxes                                                                                                                                                              5,987 I                  5,825                        11,812
: Severance                                                                                                                                                                  74,2691                  74,113                      148,382 LMis.c:ill~~_l!.~q~ _________ ~~_~~ ____ ~_
* Total [3]                                                                                                                                                            1,322,468          I      1,463,605                      2,786,073
!  Cost Element License
  -........~---
Termination 999,926 ._._. ___. . . .!?_Q?_2?_~_7_~._. _. __. . . . _gLQ~~L1~~. .
Spent Fuel Management                                                                                                                                                  248,912                    207,854                      456,766 Site Restoration                                                                                                                                                        73,630                  219,178                      292,809
, Total [3]                                                                                                                                                            1,322,468                  1,463,605                      2,786,073
[1]        Includes engineering costs
[2]        Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3]        Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                    Page xviii of xix SAFSTOR COST
 
==SUMMARY==
 
DECOMMISSIONING COST ELEMENTS (thousands of 2011 dollars)
Cost Element                                                                                                                                                          Unit 1                          Unit 2                      Total Decontamination                                                                                                                                                            13,853                        20,517                        34,370 Removal
-.-----.----------~-------                                                ..- ..--.----.--....---...-.-------------_._. ---_.--_.._---
128,358 .__._______280, 4~ ._.__._iQ§1-7§_I?_
Packaging                                                                                                                                                                  30,285                        29,795                        60,081 nsportation                                                                                                                                                    15,714                        15,641                        31,355 i.l~~_ D~~E2~~__._.___________._._.__.____.                                                                                                  -.~-.
_._- 162,651 -_._----_._._-----            157,468 ___. 32Q1_J19 Program Management [1]                                                                                                                                                449,004                          323,748                      772, Security                                                                                                                                                              214,618                          205,101                      419, Spent Fuel Pool Isolation                                                                                                                                                  24,155                        16,006                        40,161 Spent Fuel Management [2]                                                                                                                                            186,420                          144,752                      331,173 Insurance and__Regulatory                                      Fees
                                                                                                ...__......._....__.__.__.._---..__._._---........ -_.._._......_. __....35,759  __._---_.-..-.- _._______._. ._?~zJ§~. -_..__._...._...__68,911 Energy                                                                                                                                                                      15,066                        14,907                        29,973 Characterization and Licensing Surveys                                                                                                                                      23,406                        26,614                        50,020
~
Property Taxes                                                                                                                                                              7,750                          7,564                        15,314 Severance                                                                                                                                                                  74,608                        74,158                    148,765
._..Miscellaneous                              .._.._.........._._.......__.-------_.__..._...._..._............-_._........._...-._--_._-_._---- .-----..-.. -..!.~-~.~-? . . _
_.._. __..._._.._. __.._-_._---_..._.._._Equipment                                                                                                                                          ._________I_!d:_7.JL..__.__._._._.._._._. . ~~1.!~_
Total 3]                                                                                                                                                            1,395,643                      1,364,305              .2,759,947 Cost Element
__._-_ __ f-***-*-**---....736,693                  . _14J.l.~_?_?__.____1!.~.712~Q~
... License.._--_ _-_..Termination Spent Fuel Management                                                                                                                                                584,671                          403,424                    988,095 Site Restoration                                                                                                                                                            74,279                      219,617                    293,896 Total [3]                                                                                                                                                          1,395,643                        1,364,305                2,759,947
[1]      Includes engineering costs
[2]      Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3]      Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                          Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                              Page xix of xix DECON COST
 
==SUMMARY==
YEAR LICENSE RENEWAL DECOMMISSIONING COST ELEMENTS (thousands of 2011 dollars)
Cost Element                                                                                                                                                                      Unit 1                          Unit 2                                                Total Decontamination                                                                                                                                                                      17,212                        20,362                                                  37,574
_._.._-_._-_..._--_._..__.__..__...-_-_.._.._---_.._---_._----------_.._-_.....__... 1----_.._-..129,130 Removal                                                                                                                                                                            - - _.._ - - ..__......_._--"-
282,605 ________~1_J, 73~
Packaging                                                                                                                                                                            40,158                        39,723                                                  79,880 Transportation                                                                                                                                                                        18,014                        17,927                                                  35,942 W asj;~_R~~.P_<?~~.L. __._. . ._. . .____. ____._____. . __.__._._. .___. _. . _.___.___. f--....- - - -174,779                                                                    - - - - - - - f----.-----.-..--.--- --_.._...-_.__._-
171,032                                                345,81C am Management [1]                                                                                                                                                311,678                        364,934                                                676,61~
Security                                                                                                                                                                          263,946                        249,060                                                513,006 Spent Fuel Pool Isolation                                                                                                                                                            23,989                          15,974                                                  39,963 Spent Fuel Management [2]
.............,.                                                                                                                                                                        103,865                        101,694                                                205,559
_!~_ ~. ~!:.~!!~~_.~!!~:LR~gu!~.!Q!y._. ~~.~. ~. . __._. ._. . _. . . ._.__. . . . . ___. . . . _. . __. . _. . . . . .__. . _. . ?gt~!?. ._-_.....__..--..._..--.....17,374                                                                                                        ... ..__..__..
37,585 Energy                                                                                                                                                                                10,306                        10,069                                                  20,375 Characterization and Licensing Surveys                                                                                                                                              21,286                        24,682                                                  45,968 Property Taxes                                                                                                                                                                            5,222                          5,065                                              10,287 Severance                                                                                                                                                                            74,095                        74,012                                              148,107 Miscellaneous
._.....                                            Equipment
                                                                                                                                                                                            . .7J..&sect;_~.Q.. . .__._. _.____. . .&sect;.?IQ&sect;_. __. . .___. _. J_Q.L~. ~}_.
. . Total [3]                                                                                                                                                                  1,221,721                          1,402,667                                        2,624,388 Cost Element
            . n~~__!~~!!?:~!iQ.!?:. .__. _. . . _._. . ._._. . . . _._. . . __. _. ._._._. _. . _. . . . . . . ._. _. . ._. . . _. . . . . ___.~~~!9.1 . . _.__J1.Q.Q.=h~&sect;Q. . ._. .__. ._~.?..Q..~. !J..Q.&sect;I nt Fuel Mana ement                                                                                                                                                    151,162                        148,940                                              300,102 73,457                      218,842                                              292,299 1,221,721                          1,402,667                                        2,624,388
[1]        Includes engineering costs
[2]        Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer/spent fuel pool O&M and EP fees
[3]        Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 1, Page 1 of 11
: 1. INTRODUCTION This report presents estimates of the cost to decommission the Diablo Canyon Power Plant (Diablo Canyon) for the selected decommissioning scenarios following the scheduled cessation of plant operations. The estimates are designed to provide Pacific Gas and Electric Company (pG&E) with the information to assess its current decommissioning liability, as it relates to Diablo Canyon.
The analysis relies upon site-specific, technical information compiled by TLG from information provided by Pacific Gas and Electric Company (pG&E). The analysis reflects current assumptions pertaining to the disposition of nuclear power plants and relevant industry experience in undertaking such projects. The costs are based on several key assumptions in areas of regulation, component characterization, high-level radioactive waste management, low -level radioactive waste disposal, performance uncertainties (contingency) and site restoration requirements.
The analysis is not a detailed engineering evaluation, but estimates prepared in advance of the detailed engineering required to carry out the decommissioning of the nuclear units. It may also not reflect the actual plan to decommission Diablo Canyon; the plan may differ from the assumptions made in this analysis based on facts that exist at the time of decommissioning.
1.1 OBJECTIVES OF STUDY The objectives of this study are to prepare comprehensive estimates of the costs to decommission Diablo Canyon based on the DECON and SAFSTOR scenarios, to provide a sequence or schedule for the associated activities, and to develop waste stream projections from the decontamination and dismantling activities. For the purposes of this study, the shutdown dates are based on the expiration of the current operating licenses, or 2 November 2024 for Unit 1, and 26 August 2025 for Unit 2.
It is possible that an application to renew the license for an additional 20 years will be submitted prior to expiration of the current operating licenses.
Therefore, for the purposes of analysis, DECON scenario estimates were developed based on shutdown dates 20 years beyond the current license, or 2 November 2044 for Unit 1, and 26 August 2045 for Unit 2. The estimates for the alternate shutdown dates are provided in an appendix to this analysis, and will be referred to as "DECON - 20 Year License Renewal".
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 1, Page 2 of 11 1.2 SITE DESCRIPTION Diablo Canyon is located on the central California coast in San Luis Obispo County, approximately 12 miles west southwest of the City of San Luis Obispo.
The plant, comprised of two nuclear units, is located on a 750-acre site adjacent to the Pacific Ocean, roughly equidistant from San Francisco and Los Angeles.
The Nuclear Steam Supply System (NSSS) consists of a pressurized water reactor and a four-loop Reactor Coolant System. The systems were supplied by the Westinghouse Electric Corporation. V nits 1 and 2 each have a license rating of 3411 MWt, with corresponding net electrical outputs 1131 and 1156 megawatts (electric), respectively, with the reactors at rated power.
The Reactor Coolant System is comprised of the reactor vessel and four heat transfer loops, each containing a vertical V-tube type steam generator, and a single-stage centrifugal reactor coolant pump. In addition, the system includes an electrically heated pressurizer, a pressurizer relief tank, and interconnected piping. The system is housed within a "containment structure," a seismic Category I reinforced-concrete dry structure. It consists of an upright cylinder topped with a hemispherical dome, supported on a reinforced concrete foundation mat, which is keyed into the bedrock. A welded steel liner plate anchored to the inside face of the containment serves as a leak-tight membrane. The liner on top of the foundation mat is protected by a two-foot thick concrete fill mat, which supports the containment internals and forms the floor of the containment. The lower portion of the containment cylindrical wall has additional embedded wide flange steel beams between elevations 88 ft. 2 in. and 108 ft. 2 in. (mean sea level).
Heat produced in the reactor is converted to electrical energy by the Steam and Power Conversion Systems. A turbine-generator system converts the thermal energy of steam produced in the steam generator:s into mechanical shaft power and then into electrical energy. The plant's' turbine-generators are each tandem compound, four element units. They consist of one high-pressure double-flow and three low-pressure double-flow elements driving a direct-coupled generator at 1800 rpm. The turbines are operated in a closed feedwater cycle that condenses the steam; the heated feedwater is returned to the steam generators. Heat rejected in the main condensers is removed by the Circulating Water System (CWS).
The circulating water system provides the heat sink required for removal of waste heat in the power plant's thermal cycle. The system has the principal function of removing heat by absorbing this energy in the main condenser.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 1, Page 3 of 11 Condenser circulating water is water from the Pacific Ocean. Each unit is served by two circulating water pumps at the intake structure. From this structure seawater is pumped through two circulating water conduits to the condenser inlet water boxes. The water is returned to the ocean at Diablo Cove through an outfall at the water's edge.
1.3 REGULATORY GUIDANCE The Nuclear Regulatory Commission (NRC or Commission) provided initial decommissioning requirements in its rule "General Requirements for Decommissioning Nuclear Facilities," issued in June 1988Jl] This rule set forth financial criteria for decommissioning licensed nuclear power facilities. The regulation addressed decommissioning planning needs, timing, funding methods, and environmental review requirements. The intent of the rule was to ensure that decommissioning would be accomplished in a safe and timely manner and that adequate funds would be available for this purpose.
Subsequent to the rule, the NRC issued Regulatory Guide 1.159, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors," [2] which provided additional guidance to the licensees of nuclear facilities on the financial methods acceptable to the NRC staff for complying with the requirements of the rule. The regulatory guide addressed the funding requirements and provided guidance on the content and form of the financial assurance mechanisms indicated in the rule.
The rule defined three decommissioning alternatives as being acceptable to the NRC: DECON, SAFSTOR, and ENTOMB. The DECON alternative assumes that any contaminated or activated portion of the plant's systems, structures and facilities are removed or decontaminated to levels that permit the site to be released for unrestricted use shortly after the cessation of plant operations, while the SAFSTOR and ENTOMB alternatives defer the process.
The rule also placed limits on the time allowed to complete the decommissioning process. For all alternatives, the process is restricted in overall duration to 60 years, unless it can be shown that a longer duration is necessary to protect public health and safety. At the conclusion of a 60-year dormancy period (or longer if the NRC approves such a case), the site would still require significant remediation to meet the unrestricted release limits for license termination.
The ENTOMB alternative has not been viewed as a viable option for power reactors due to the significant time required to isolate the long-lived radionuclides for decay to permissible levels. However, with rulemaking permitting the controlled release of a site,[3] the NRC did re-evaluate the TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 1, Page 4 of 11 alternative. The resulting feasibility study, based upon an assessment by Pacific Northwest National Laboratory, concluded that the method did have conditional merit for some, if not most reactors. The staff also found that additional rulemaking would be needed before this option could be treated as a generic alternative.
The NRC had considered rule making to alter the 60-year time for completing decommissioning and to clarify the use of engineered barriers for reactor entombmentsJ4] However, the NRC's staff has subsequently recommended that rule making be deferred, based upon several factors (e.g., no licensee has committed to pursuing the entombment option, the unresolved issues associated with the disposition of greater-than-Class C material (GTCC), and the NRC's current priorities), at least until after the additional research studies are complete. The Commission concurred with the staffs recommendation.
In 1996, the NRC, published reVISIons to the general requirements for decommissioning nuclear power plantsJ5] When the decommissioning regulations were adopted in 1988, it was assumed that the majority of licensees would decommission at the end of the facility's operating licensed life.
Since that time, several licensees permanently and prematurely ceased operations. Exemptions from certain operating requirements were required once the reactor was defueled to facilitate the decommissioning. Each case was handled individually, without clearly defined generic requirements. The NRC amended the decommissioning regulations in 1996 to clarify ambiguities and codify procedures and terminology as a means of enhancing efficiency and uniformity in the decommissioning process. The amendments allow for greater public participation and better define the transition process from operations to decommissioning.
Under the revised regulations, lice~sees will submit written certification to the NRC within 30 days after the decision to cease operations. Certification will also be required once the fuel is permanently removed from the reactor vessel.
Submittal of these notices entitle the licensee to a fee reduction and eliminate the obligation to follow certain requirements needed only during operation of the reactor. Within two years of submitting notice of permanent cessation of operations, the licensee is required to submit a Post-Shutdown Decommissioning Activities Report (PSDAR) to the NRC. The PSDAR describes the planned decommissioning activities, the associated sequence and schedule, and an estimate of expected costs. Prior to completing decommissioning, the licensee is required to submit an application to the NRC to terminate the license, which includes a license termination plan (LTP).
TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 1, Page 5 of 11 1.3.1 Nuclear Waste Policy Act Congress passed the "Nuclear Waste Policy Act" [6] (NWPA) in 1982, assigning the federal government's long-standing responsibility for disposal of the spent nuclear fuel created by the commercial nuclear generating plants to the DOE. The NWPA provided that DOE would enter into contracts with utilities in which DOE would promise to take the utilities' spent fuel and high-level radioactive waste and utilities would pay the cost of the disposition services for that material. The NWPA, along with the individual contracts with the utilities, specified that the DOE was to begin accepting spent fuel by January 31, 1998.
Since the original legislation, the DOE has announced several delays in the program schedule. By January 1998, the DOE had failed to accept any spent fuel or high level waste, as required by the NWPA and utility contracts. To date no progress in the removal of spent fuel from commercial generating sites has been made. Delays continue and, as a result, generators have initiated legal action against the DOE In an attempt to obtain compensation for DOE's breach of contract.
It is necessary that spent fuel be cooled and stored for a minimum period at the generating site prior to transfer. As such, the NRC requires that licensees establish a program to manage and provide funding for the management of all irradiated fuel at the reactor site until title of the fuel is transferred to the Secretary of Energy, pursuant to 10 CFR Part
: 50. 54(bb)J7] This funding requirement is fulfilled through inclusion of certain cost elements in the decommissioning estimates, for example, associated with the isolation and continued operation of the spent fuel pools and the ISFSI.
PG&E's current spent fuel management plan for the Diablo Canyon spent fuel is based upon the DOE accepting spent fuel from commercial generators starting in year 2024. The DOE's generator allocation/receipt schedules are based upon the oldest fuel receiving the highest priority.
For purposes of this analysis, the first assemblies removed from the Diablo Canyon site are assumed to be in 2033. With an estimated, maximum rate of transfer of 3,000 metric tons of uranium (MTU) per year (commercial generators to the DOE), which corresponds to an average rate of transfer of 6 canisters (192 spent fuel assemblies) per year (Diablo Canyon to DOE), completion of the removal of spent fuel from the site is projected to be in the year 2055. Consequently, costs are included within the estimates for the long-term caretaking of the spent fuel at the Diablo Canyon site until the year 2055.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 1, Page 6 of 11 An ISFSI, which is independently licensed and operated, will remain operational after the cessation of plant operations. For the DECON and SAFSTOR scenarios, the facility is projected to have the capacity to accommodate the inventory of spent fuel residing in the plant's storage pools at the conclusion of the required cooling period. Once emptied, the spent fuel pool facilities can be either decontaminated and dismantled or prepared for long-term storage.
1.3.2 Low-Level Radioactive Waste Acts The contaminated and activated material generated in the decontamination and dismantling of a commercial nuclear reactor is classified as low-level (radioactive) waste, although not all of the material is suitable for "shallow-land" disposal. With the passage of the "Low-Level Radioactive Waste Policy Act" in 1980,[8] and its Amendments of 1985, [9] the states became ultimately responsible for the disposition of low -level radioactive waste generated within their own borders.
For the purpose of this analysis, the EnergySolutions' facility is used as the disposal site for the majority of the radioactive waste (Class A). [10]
The disposal costs for Class A low-level radioactive waste are based on a study sponsored by PG&E and Southern California Edison Company, "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning", [11] escalated to year 2011 dollars.
For the purpose of this analysis, the Waste Control Specialists (WCS) facility in Andrews County, TX is used as the disposal site for the higher radioactivity Class Band C waste. In the prior 2008 decommissioning analysis the disposal rate for these waste classes were based on the previously cited study which was based on published Barnwell rates. A change in location was designated since Barnwell is not open to California generators, and with the exception of Texas, where WCS recently declared the site operational in November 2011; no new compact facilities have been successfully sited, licensed, and constructed. WCS will be able to accept limited quantities of non-Compact waste, although at this time the cost for non-Compact generators is being negotiated on an individual basis. The cost used in this estimate is a blended combination of preliminary information for the two WCS Class Band C rates. It should be noted that PG&E has a contract with WCS to dispose of Class Band C waste originating from Humboldt Bay 3. This contract requires waste delivery by April 2013.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 1, Page 7 of 11 The dismantling of the components residing closest to the reactor core generates radioactive waste that may be considered unsuitable for shallow-land disposal (i.e., low-level radioactive waste with concentrations of radionuclides that exceed the limits established by the NRC for Class C radioactive waste (GTCC>>. The Low-Level Radioactive Waste Policy Amendments Act of 1985 assigned the federal government the responsibility for the disposal of this material. The Act also stated that the beneficiaries of the activities resulting in the generation of such radioactive waste bear all reasonable costs of disposing of such waste.
However, to date, the federal government has not identified a cost for disposing of GTCC or a schedule for acceptance.
For purposes of this analysis, the GTCC radioactive waste is assumed to be packaged and disposed of in a similar manner as high-level waste and at a cost equivalent to that envisioned for the spent fuel. The GTCC is packaged in the same canisters used for spent fuel and either stored on site or shipped directly to a DOE facility as it is generated (depending upon the timing of the decommissioning and whether the spent fuel has been removed from the site prior to the start of decommissioning).
1.3.3 Radiological Criteria for License Termination In 1997, the NRC published Subpart E, "Radiological Criteria for License Termination," [12] amending 10 CFR Part 20. This subpart provides radiological criteria for releasing a facility for unrestricted use.
The regulation states that the site can be released for unrestricted use if radioactivity levels are such that the average member of a critical group would not receive a Total Effective Dose Equivalent (TEDE) in excess of 25 millirem per year, and provided that residual radioactivity has been reduced to levels that are As Low As Reasonably Achievable (ALARA).
The decommissioning estimates assume that the Diablo Canyon site will be remediated to a residual level consistent with the NRC-prescribed level.
It should be noted that the NRC and the Environmental Protection Agency (EPA) differ on the amount of residual radioactivity considered acceptable in site remediation. The EPA has two limits that apply to radioactive materials. An EPA limit of 15 millirem per year is derived from criteria established by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund). [13]
An additional and separate limit of 4 millirem per year, as defined in 40 CFR &sect;141.16, is applied to drinking water. [14]
TLG Services, Inc.
 
Diablo Canyon Power Plant                              Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 1, Page 8 of 11 On October 9, 2002, the NRC signed an agreement with the EPA on the radiological decommissioning and decontamination of NRC-licensed sites. The Memorandum of Understanding (MOU)[15] provides that EPA will defer exercise of authority under CERCLA for the majority of facilities decommissioned under NRC authority. The MOU also includes provisions for NRC and EPA consultation for certain sites when, at the time of license termination, (1) groundwater contamination exceeds EPA-permitted levels; (2) NRC contemplates restricted release of the site; and/or (3) residual radioactive soil concentrations exceed levels defined in the MOU.
The MOU does not impose any new requirements on NRC licensees and should reduce the involvement of the EPA with NRC licensees who are decommissioning. Most sites are expected to meet the NRC criteria for unrestricted use, and the NRC believes that only a few sites will have groundwater or soil contamination in excess of the levels specified in the MOU that trigger consultation with the EPA. However, if there are other hazardous materials on the site, the EPA may be involved in the cleanup. As such, the possibility of dual regulation remains for certain licensees. The present study does not include any costs for this occurrence.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                            Section 1, Page 9 of 11 FIGURE 1.1 DIABLO CANYON POWER PLANT GENERAL PLAN ltiii($      _ _ _ _~
TO MUlVATTlOll:      -""""--
                                                  ~~ H            "r
                                                          /                              \
                                                  //                                      \
                                                                                              \
                                                                                                \
                                                                                                  \
                                                                                                    \ ,\
ISFSI not shown on figure - location
                                                                                                          \,
indicated with arrow                                  SUE 8(JUtIDAW(-..
o (l    400    MO      120{)    16M SCALE If{ fEET PACIFIC        OCEAN TLG Services, Inc.
 
Diablo Canyon Power Plant                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                    Section 1, Page 10 of 11 FIGURE 1.2 DIABLO CANYON POWER PLANT AERIAL VIEW TLG Services, Inc.
 
Diablo Canyon Power Plant                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                      Section 1, Page 11 of 11 FIGURE 1.3 DIABLO CANYON POWER PLANT REACTOR BUILDING SECTION TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 1 of 13
: 2. DECOMMISSIONING ALTERNATIVES Detailed cost estimates were developed to decommission Diablo Canyon based upon the approved decommissioning alternatives: DECON and SAFSTOR. Although the alternatives differ with respect to technique, process, cost, and schedule, they attain the same result: the ultimate release of the site for unrestricted use.
Multiple decommissioning scenarios were evaluated for the two nuclear units. The scenarios selected are representative of alternatives available to the owner and are defined as follows:
DECON: Units 1 and 2 are currently expected to cease operations in November 2024 and August 2025, respectively. Spent fuel remaining in the spent fuel storage pools after a minimum cooling period of 12 years is transferred to the ISFSI for interim storage. This scenario assumes that decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling processes. Any residual spent fuel is transferred to the ISFSI so as to facilitate decontamination and dismantling activities within the fuel handing building. Spent fuel storage operations continue at the site until the transfer of the fuel to the DOE is complete, assumed to be in the year 2055.
SAFSTOR: The units are placed into safe-storage in this scenario. The start of field decommissioning is deferred to the end of the fuel storage period. Spent fuel remaining in the spent fuel storage pools after a minimum cooling period of 12 years is transferred to the ISFSI for interim storage. As with the DECON scenario, decommissioning activities at the two units are sequenced and integrated so as to minimize the total duration of the physical dismantling processes. Spent fuel storage operations continue at the site until the transfer of the fuel to the DOE is complete, assumed to be in the year 2055.
DECON (20-YEAR LICENSE RENEWAL): The results provided in the main body of this analysis are based on Units 1 and 2 operating until the expiration of their current operating licenses (base case). An estimate based on the DECON scenario was also prepared assuming a 20 year license renewal for each of the units. This estimate relies on essentially all of the same principles used in the base case estimate, but incorporates the following significant changes in the analysis:
    ., Units shut down 20 years later than the current operating license (impacts the timing of decommissioning expenditures) .
    ., Incorporates changes associated with post-shutdown spent fuel management.
An additional 20 years of operations will result in more spent fuel assemblies TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 2 of 13 being generated than the base case, but will reflect that many assemblies will be accepted by the DOE prior to unit shut down. As a result there are changes to spent fuel schedules and cost, and ISFSI capacity requirements.
Spent fuel storage operations continue at the site until the transfer of the fuel to the DOE is complete, assumed to be in 2071 for the 20 year license renewal case.
* Incorporates changes associated with higher activation of the reactor and internals (longer period of operation affects the concentrations of long-lived activated radioactive materials remaining in the reactor after shut down).
The results of the license renewal estimates are provided in an appendix in this analysis.
The following sections describe the basic activities associated with each base case alternative (DECON and SAFSTOR). Although detailed procedures for each activity identified are not provided, and the actual sequence of work may vary, the activity descriptions provide a basis not only for estimating but also for the expected scope of work, i.e., engineering and planning at the time of decommissioning. A descriptions of the changes associated with the alternate license renewal scenario is provided in the appendices to this report.
The conceptual approach that the NRC has described in its regulations divides decommissioning into three phases. The initial phase commences with the effective date of permanent cessation of operations and involves the transition of both plant and licensee from reactor operations (i.e., power production) to facility de-activation and closure.
During the first phase, notification is to be provided to the NRC certifying the permanent cessation of operations and the removal of fuel from the reactor vessel.
The licensee is then prohibited from reactor operation.
The second phase encompasses activities during the storage period or during major decommissioning activities, or a combination of the two. The third phase pertains to the activities involved in license termination. The decommissioning estimates developed for Diablo Canyon are also divided into phases or periods; however, demarcation of the phases is based upon major milestones within the project or significant changes in the projected expenditures.
2.1 DECON The DECON alternative, as defined by the NRC, is "the alternative in which the equipment, structures, and portions of a facility and site containing TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 2, Page 3 of 13 radioactive contaminants are removed or decontaminated to a level that permits the property to be released for unrestricted use shortly after cessation of operations." This study does not address the cost to dispose of the spent fuel residing at the site; such costs are funded through a surcharge on electrical generation. However, the study does estimate the costs incurred with the interim on-site storage of the fuel pending shipment by the DOE to an off-site disposal facility.
2.1.1 Period 1 - Preparations In anticipation of the cessation of plant operations, detailed preparations are undertaken to provide a smooth transition from plant operations to site decommissioning. Through implementation of a staffing transition plan, the organization required to manage the intended decommissioning activities is assembled from available plant staff and outside resources. Preparations include the planning for permanent defueling of the reactor, revision of technical specifications applicable to the operating conditions and requirements, a characterization of the facility and major components, and the development of the PSDAR.
Engineering and Planning The PSDAR, required prior to or within two years of permanent cessation of operations, provides a description of the licensee's planned decommissioning activities, a timetable, and the associated financial requirements of the intended decommissioning program. Upon receipt of the PSDAR, the NRC will make the document available to the public for comment in a local hearing to be held in the vicinity of the reactor site.
Ninety days following submittal and NRC receipt of the PSDAR, the licensee may begin to perform major decommissioning activities under a modified 10 CFR &sect;50.59 procedure, i.e., without specific NRC approval.
Major activities are defined as any activity that results in permanent removal of major radioactive components, permanently modifies the structure of the containment, or results in dismantling components (for shipment) containing GTCC, as defined by 10 CFR &sect;61. Major>
components are further defined as comprising the reactor vessel and internals, large bore reactor coolant system piping, and other large components that are radioactive. The NRC includes the following additional criteria for use of the &sect;50.59 process in decommissioning. The proposed activity must not:
              @  foreclose release of the site for possible unrestricted use, TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 4 of 13
* significantly increase decommissioning costs,
* cause any significant environmental impact, or
* violate the terms of the licensee's existing license Existing operational technical specifications are reviewed and modified to reflect plant conditions and the safety concerns associated with permanent cessation of operations. The environmental impact associated with the planned decommissioning activities is also considered.
Typically, a licensee will not be allowed to proceed if the consequences of a particular decommissioning activity are greater than that bounded by previously evaluated environmental assessments or impact statements.
In this instance, the licensee would have to submit a license amendment for the specific activity and update the environmental report.
The decommissioning program outlined in the PSDAR will be designed to accomplish the required tasks within the ALARA guidelines (as defined in 10 CFR &sect;20) for protection of personnel from exposure to radiation hazards. It will also address the continued protection of the health and safety of the public and the environment during the dismantling activity. Consequently, with the development of the PSDAR, activity specifications, cost-benefit and safety analyses, work packages, and procedures, would be assembled to support the proposed decontamination and dismantling activities.
Site Preparations Following final plant shutdown, and in preparation for actual decommissioning activities, the following activities are initiated:
* Characterization of the site and surrounding environs. This includes radiation surveys of work areas, major components (including the reactor vessel and its internals), internal piping, and primary shield cores.
* Isolation of the spent fuel storage pools and fuel handling systems, such that decommissioning operations can commence on the balance of the plant. The pools will remain operational for approximately twelve years following the cessation of operations before the inventory resident at shutdown can be transferred to the ISFSI.
* Specification of transport and disposal requirements for activated materials and/or hazardous materials, including shielding and waste stabilization.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 5 of 13 It  Development of procedures for occupational exposure control, control and release of liquid and gaseous effluent, processing of radwaste (including dry-active waste, resins, filter media, metallic and non-metallic components generated in decommissioning), site security and emergency programs, and industrial safety.
2.1.2 Period 2 - Decommissioning Operations This period includes the physical decommissioning activities associated with the removal and disposal of contaminated and activated components and structures, including the successful release of the site from the 10 CFR &sect;50 operating license, exclusive of the ISFSI.
Significant decommissioning activities in this phase include:
* Construction of temporary facilities and/or modification of existing facilities to support dismantling activities. For example, this will include a centralized processing area to facilitate equipment removal and component preparations for off-site disposal.
          $    Reconfiguration and modification of site structures and facilities as needed to support decommissioning operations. This will include the upgrading of roads (on- and off-site) to facilitate hauling and transport. Modifications will be required to the containment structure to facilitate access of large/heavy equipment. Modifications will also be required to the refueling area of the building to support the segmentation of the reactor vessel internals and component extraction.
It  Transfer of the spent fuel from the storage pool to the ISFSI pad for interim storage.
* Design and fabrication of temporary and permanent shielding to support removal and transportation activities, construction of contamination control envelopes, and the procurement of specialty tooling.
It  Procurement (lease or purchase) of shipping canisters, cask liners, and industrial packages.
* Decontamination of components and piping systems as required to control (minimize) worker exposure.
          $    Removal of piping and components no longer essential to support decommissioning operations.
* Removal of control rod drive housings and the head service structure from reactor vessel head. Segmentation of the vessel closure head.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 6 of 13
          $    Removal and segmentation of the upper internals assemblies.
Segmentation will maximize the loading of the shielded transport casks, i.e., by weight and activity. The operations are conducted under water using remotely operated tooling and contamination controls.
* Disassembly and segmentation of the remaining reactor internals, including the core former and lower core support assembly. Some material is expected to exceed Class C disposal requirements. As such, the segments will be packaged in modified fuel storage canisters for geologic disposal.
          $    Segmentation of the reactor vessel. A shielded platform is installed for segmentation as cutting operations are performed in-air using remotely operated equipment within a contamination control envelope. The water level is maintained just below the cut to minimize the working area dose rates. Segments are transferred in-air to containers that are stored under water, for example, in an isolated area of the refueling canal.
          $    Removal of the activated portions of the concrete biological shield and accessible contaminated concrete surfaces. If dictated by the steam generator and pressurizer removal scenarios, those portions of the associated cubicles necessary for access and component extraction are removed.
          $    Removal of the steam generators and pressurizer for controlled disposal. The generators will be moved to an on-site processing center, the steam domes removed and segmented for transportation and disposal. The lower shell and tube bundle will be packaged as a one-piece container for direct disposal. These components can serve as their own disposal containers provided that all penetrations are properly sealed and steel shielding added, as necessary, to those external areas of the package to meet transportation limits and regulations.
At least two years prior to the anticipated date of license termination, an LTP is required. Submitted as a supplement to the Final Safety Analysis Report (FSAR) or its equivalent, the plan must include: a site characterization, description of the remaining dismantling activities, plans for site remediation, procedures for the final radiation survey, designation of the end use of the site, an updated cost estimate to complete the decommissioning, and any associated environmental concerns. The NRC will notice the receipt of the plan, make the plan available for public comment, and schedule a local hearing. LTP TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 7 of 13 approval will be subject to any conditions and limitations as deemed appropriate by the Commission. The licensee may then commence with the final remediation of site facilities and services, including:
          ~    Removal of remaining plant systems and associated components as they become nonessential to the decommissioning program or worker health and safety (e.g., waste collection and treatment systems, electrical power and ventilation systems).
          @    Removal of the steel liners from refueling canal, disposing of the activated and contaminated sections as radioactive waste. Removal of activated/ contaminated concrete (all concrete inside the containment liner).
          ~    Surveys of the decontaminated areas of the containment structure.
          @    Remediation and removal of the contaminated equipment and material from the auxiliary building and any other contaminated facility. Radiation and contamination controls will be utilized until residual levels indicate that the structures and equipment can be released for unrestricted access and conventional demolition. This activity may necessitate the dismantling and disposition of most of the systems and components (both clean and contaminated) located within these buildings. This activity facilitates surface decontamination and subsequent verification surveys required prior to obtaining release for demolition.
          ~    Routing of material removed in the decontamination and dismantling to a central processing area. Material certified to be free of contamination is released for unrestricted disposition, e.g., as scrap, recycle, or construction debris. Contaminated material is characterized and segregated for packaging and disposal at a low-level radioactive waste disposal facility.
Incorporated into the LTP is the Final Survey Plan. This plan identifies the radiological surveys to be performed once the decontamination activities are completed and is developed using the guidance provided in the "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)."[16] This document incorporates the statistical approaches to survey design and data interpretation used by the EPA. It also identifies commercially available instrumentation and procedures for conducting radiological surveys. Use of this guidance ensures that the surveys are conducted in a manner that provides a high degree of confidence that applicable NRC criteria are satisfied. Once the survey is complete, the results are provided to the NRC in a format that can be TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 2, Page 8 of 13 verified. The NRC then reviews and evaluates the information, performs an independent confirmation of radiological site conditions, and makes a determination on the requested change to the operating licenses (that would release the property, exclusive of the ISFSI, for unrestricted use).
The NRC will amend the operating licenses if it determines that site remediation has been perfor_med in accordance with the LTP, and that the terminal radiation survey and associated documentation demonstrate that the property (exclusive of the ISFSI) is suitable for release.
2.1.3 Period 3 - Site Restoration Following completion of decommissioning operations, site restoration activities can begin. Efficient removal of the contaminated materials and verification that residual radionuclide concentrations are below the NRC limits will result in substantial damage to many of the structures.
Although performed in a controlled, safe manner, blasting, coring, drilling, scarification (surface removal), and the other decontamination activities will substantially degrade power block structures including the reactor and auxiliary buildings. Under certain circumstances, verifying that subsurface radionuclide concentrations meet NRC site release requirements will require removal of grade slabs and lower floors, potentially weakening footings and structural supports. This removal activity will be necessary for those facilities and plant areas where historical records indicate the potential for radionuclides having been present in the soil, where system failures have been recorded, or where it is required to confirm that subsurface process and drain lines were not breached over the operating life of the station.
It is not currently anticipated that these structures would be repaired and preserved after the radiological contamination is removed. The cost to dismantle site structures with a work force already mobilized on site is more efficient than if the process is deferred.
This cost study presumes that non-essential structures and site facilities are dismantled as a continuation of the decommissioning activity.
Foundations and exterior walls are removed to a nominal depth of three feet below grade. The three-foot depth allows for the placement of gravel for drainage, as well as topsoil, so that vegetation can be established for erosion control. Non-contaminated concrete rubble produced by demolition activities is processed on -site to remove reinforcing steel and TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 2, Page 9 of 13 miscellaneous embedments. The processed rubble is then transported and disposed of offsite. Below grade voids are backfilled with clean imported fill to provide a reasonably uniform site contour (i.e., no large localized on site depressions). Site areas affected by the dismantling activities are restored and the plant area graded as required to prevent ponding and inhibit the refloating of subsurface materials.
2.1.4 ISFSI Operations and Decommissioning The ISFSI will continue to operate under a separate and independent license (10 CFR &sect;72) following the termination of the &sect;50 operating licenses. Completion of the decommissioning process is dependent upon the DOE's ability to remove spent fuel from the site in a manner timely enough to complete license termination activities within 60 years of unit shut down. This analysis assumes that the last of the spent fuel will be removed from the site within approximately 31 years of the shutdown of Unit 1 or year 2055.
At the conclusion of the spent fuel transfer process, the ISFSI will be decommissioned. The Commission will terminate the &sect;72license when it determines that the remediation of the ISFSI has been performed in accordance with an ISFSI license termination plan and that the final radiation survey and associated documentation demonstrate that the facility is suitable for release. Once the requirements are satisfied, the NRC can terminate the license for the ISFSI.
The ISFSI is based upon the currently licensed facility that uses multi-purpose canisters and concrete overpacks for pad storage. For purposes of this cost analysis, it is assumed that once the inner canisters containing the spent fuel assemblies have been removed, any required decontamination performed on the storage overpack (some minor neutron activation is assumed), and the license for the facility terminated, the concrete overpacks can be dismantled using conventional techniques for the demolition of reinforced concrete. The concrete storage pad is then removed and the area regraded.
2.2 SAFSTOR The NRC defines SAFSTOR as "the alternative in which the nuclear facility is placed and maintained in a condition that allows the nuclear facility to be safely stored and subsequently decontaminated (deferred decontamination) to levels that permit release for unrestricted use." The facility is left intact (during the dormancy period), with structures maintained in a sound condition.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 2, Page 10 of 13 Systems that are not required to support the spent fuel pool or site surveillance and security are drained, de-energized, and secured. Minimal cleaning/removal of loose contamination and/or fixation and sealing of remaining contamination are performed. Access to contaminated areas is secured to provide controlled access for inspection and maintenance.
The engineering and planning requirements for physical dismantling activities are similar to those for the DECON alternative. Site preparations for physical dismantling are also similar to those. for the DECON alternative, with the exception of certain activities, such as spent fuel pool operations and maintenance, and chemical decontamination of primary systems.
Decommissioning operations are assumed to begin once the transfer of the spent fuel to the DOE is completed (in year 2055).
2.2.1 Period 1 - Preparations Preparations for long-term storage include the planning for permanent defueling of the reactor, revision of technical specifications appropriate to the operating conditions and requirements, a characterization of the facility and major components, and the development of the PSDAR.
The process of placing the plant in safe-storage includes, but is not limited to, the following activities:
            $  Isolation of the spent fuel storage services and fuel handling systems so that safe-storage operations may commence on the balance of the plant. This activity may be carried out by plant personnel in accordance with existing operating technical specifications. Activities are scheduled around the fuel handling systems to the greatest extent possible.
            $  Transferring the spent fuel from the storage pool to the ISFSI for interim storage, following the minimum required cooling period in the spent fuel pooL
            ~  Draining and de-energizing of the non-contaminated systems not required to support continued site operations or maintenance.
            $  Disposing of ,contaminated filter elements and resin beds not required for processing wastes from layup activities for future operations.
            ~  Draining of the reactor vessel, with the internals left in place and the vessel head secured.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 11 of 13
* Draining and de-energizing non-essential, contaminated systems with decontamination as required for future maintenance and inspection.
* Preparing lighting and alarm systems whose continued use is required; de-energizing portions of fire protection, electric power, and HVAC systems whose continued use is not required.
* Cleaning of the loose surface contamination from building access pathways.
* Performing an interim radiation survey of plant, posting warning signs where appropriate.
* Erecting physical barriers and/or securing all access to radioactive or contaminated areas, except as required for inspection and maintenance.
* Installing security and surveillance monitoring equipment and relocating security fence around secured structures, as required.
2.2.2 Period 2 - Dormancy The second phase identified by the NRC in its rule addresses licensed activities during a storage period and is applicable to the dormancy phases of the deferred decommissioning alternatives. Dormancy activities include a 24-hour security force, preventive and corrective maintenance on security systems, area lighting, general building maintenance, heating and ventilation of buildings, routine radiological inspections of contaminated structures, maintenance of structural integrity, and a site environmental and radiation monitoring program.
Resident maintenance personnel perform equipment maintenance, inspection activities, routine services to maintain safe conditions, adequate lighting, heating, and ventilation, and periodic preventive maintenance on essential site services.
An environmental surveillance program is carried out during the dormancy period to ensure that releases of radioactive material to the environment are prevented or detected and controlled. Appropriate emergency procedures are established and initiated for potential releases that exceed prescribed limits. The environmental surveillance program constitutes an abbreviated version of the program in effect during normal plant operations.
Security during the dormancy period is conducted primarily to prevent unauthorized entry and to protect the public from the consequences of TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 2, Page 12 of 13 its own actions. The security fence, sensors, alarms, and other surveillance equipment provide security. Fire and radiation alarms are also monitored and maintained.
Consistent with the DECON scenario, the spent fuel storage pools are emptied within approximately 12 years of the cessation of operations.
The transfer of the spent fuel to the DOE takes place during the dormancy period until completed in 2055. Once emptied, the ISFSI is secured decommissioned along with the power block structures in Period 4.
2.2.3 Periods 3 and 4 - Delayed Decommissioning Prior to the commencement of decommissioning operations, preparations are undertaken to reactivate site services and prepare for decommissioning. Preparations include engineering and planning, a detailed site characterization, and the assembly of a decommissioning management organization. Final planning for activities and the writing of activity specifications and detailed procedures are also initiated at this time.
Much of the work in developing a termination plan is relevant to the development of the detailed engineering plans and procedures. The activities associated with this phase and the follow-on decontamination and dismantling processes are detailed in Sections 2.1.1 and 2.1.2. The primary difference between the sequences anticipated for the DECON and this deferred scenario is the absence, in the latter, of any constraint on the availability of the fuel storage facilities for decommissioning.
Variations in the length of the dormancy period are expected to have little effect upon the quantities of radioactive wastes generated from system and structure removal operations. Given the levels of radioactivity and spectrum of radionuclides expected from forty years of plant operation, no plant process system identified as being contaminated upon final shutdown will become releasable due to the decay period alone, i.e., there is no significant reduction in the waste generated from the decommissioning activities. However, due to the lower activity levels, a greater percentage of the waste volume can be designated for off-site processing and recovery.
The delay in decommissioning also yields lower working area radiation levels. As such, the estimate for this delayed scenario incorporates TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 2, Page 13 of 13 reduced ALARA controls for the SAFSTOR's lower occupational exposure potential.
Although the initial radiation levels due to 60CO will decrease during the dormancy period, the internal components of the reactor vessel will still exhibit sufficiently high radiation dose rates to require remote sectioning under water due to the presence of long-lived radionuclides such as 94Nb, 59Ni, and 63Ni. Therefore, the dismantling procedures described for the DECON alternative would still be employed during this scenario. Portions of the biological shield will still be radioactive due to the presence of activated trace elements with long half-lives (152Eu and 154Eu). Decontamination will require controlled removal and disposal. It is assumed that radioactive corrosion products on inner surfaces of piping and components will not have decayed to levels that will permit unrestricted use or allow conventional removal. These systems and components will be surveyed as they are removed and disposed of in accordance with the existing radioactive release criteria.
2.2.4 Period 5 - Site Restoration Following completion of decommissioning operations, site-restoration activities begin. Dismantling, as a continuation of the decommissioning process is a cost-effective option, as described in Section 2.1.3. The basis for the dismantling cost is consistent with that described for DECON, presuming the removal of structures and site facilities to a nominal depth of three feet below grade and the limited restoration of the site.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 1 of 29
: 3. COST ESTIMATES The cost estimates prepared for decommissioning Diablo Canyon consider the unique features of the site, including the nuclear steam supply system, electric power generating systems, structures, and supporting facilities. The basis of the estimates, including the sources of information relied upon, the estimating methodology employed, site-specific considerations, and other pertinent assumptions, is described in this section.
3.1 BASIS OF ESTIMATES The estimates were developed using site-specific, technical information extracted from the 2008 and previous estimates. This information was reviewed for the current analysis and updated as deemed appropriate. The site-specific considerations and assumptions used in the previous evaluation were also revisited. Modifications were incorporated where new information was available or experience from ongoing decommissioning programs provided viable alternatives or improved processes. The following are the significant changes associated with the plant configuration or radiological status that have been incorporated into the current estimate.
    $  Concrete located within the containment building was reclassified as potentially contaminated and disposed of as radioactive waste.
* The turbine, condenser, and their associated systems were previously categorized as potentially contaminated. Based on updated information provided by PG&E this status was changed to expected to meet release criteria. As such the materials are removed as "clean" and released as scrap metal from the station.
    $  Portions of the reactor building base mat concrete located greater than 3 feet below grade were left in place in previous studies. Consistent with the basis of the estimate the inventory was modified to remove this concrete to a level of 3 feet below grade.
* Removing and disposing of materials associated with recently installed security measures, particularly physical barriers, were incorporated into the estimate.
3.2 METHODOLOGY The methodology used to develop the estimates follows the basic approach originally presented in the AIF/NESP-036 study report, "Guidelines for TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 2 of 29 Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates,"[17] and the DOE "Decommissioning Handbook."[18] These documents present a unit factor method for estimating decommissioning activity costs, which simplifies the estimating calculations. Unit factors for concrete removal ($/cubic yard), steel removal ($/ton), and cutting costs ($/inch) are developed using local labor rates. The activity-dependent costs are estimated with the item quantities (cubic yards and tons), developed from plant drawings and inventory documents. Removal rates and material costs for the conventional disposition of components and structures rely upon information available in the industry publication, "Building Construction Cost Data," published by R.S. Means. [19]
The unit factor method provides a demonstrable basis for establishing reliable cost estimates. The detail provided in the unit factors, including activity duration, labor costs (by craft), and equipment and consumable costs, ensures that essential elements have not been omitted. Appendix A presents the detailed development of a typical unit factor. Appendix B provides the values contained within one set of factors developed for this analysis.
This analysis reflects lessons learned from TLG's involvement in the Shippingport Station Decommissioning Project, completed in 1989, as well as the decommissioning of the Cintichem reactor, hot cells, and associated facilities, completed in 1997. In addition, the planning and engineering for the Pathfinder, Shoreham, Rancho Seco, Trojan, Yankee Rowe, Big Rock Point, Maine Yankee, Humboldt Bay-3, Oyster Creek, Connecticut Yankee, and San Onofre-1 nuclear units have provided additional insight into the process, the regulatory aspects, and the technical challenges of decommissioning commercial nuclear units.
Wor k Difficulty Factors TLG has historically applied work difficulty adjustment factors (WDFs) to account for the inefficiencies in working in a power plant environment. WDFs are assigned to each unique set of unit factors, commensurate with the inefficiencies associated with working in confined, hazardous environments.
The ranges used for the WD Fs are as follows:
        $  Access Factor                                    10% to 20%
        $  Respiratory Protection Factor                    10% to 50%
        $  Radiation/ALARA Factor                          10% to 37%
        $  Protective Clothing Factor                      10% to 30%
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 3 of 29
* Work Break Factor                                    8.33%
The factors and their associated range of values were developed in conjunction with the AIF/NESP-036 study. The application of the factors is discussed in more detail in that publication.
Scheduling Program Durations The unit factors, adjusted by the WDFs as described above, are applied against the inventory of materials to be removed in the radiological controlled areas.
The resulting labor-hours, or crew-hours, are used in the development of the decommissioning program schedule, using resource loading and event sequencing considerations. The scheduling of conventional removal and dismantling activities is based upon productivity information available from the "Building Construction Cost Data" publication. In the DECON alternative, dismantling of the fuel handing systems and decontamination of the spent fuel pool is also dependent upon the timetable for the transfer of the spent fuel assemblies from the pool to the ISFSI.
An activity duration critical path is used to determine the total decommissioning program schedule. The schedule is relied upon in calculating the carrying costs, which include program management, administration, field engineering, equipment rental, and support services such as quality control and security. This systematic approach for assembling decommissioning estimates ensures a high degree of confidence in the reliability of the resulting costs.
3.3 IMPACT OF DECOMMISSIONING MULTIPLE REACTOR UNITS In estimating the near simultaneous decommissioning of two co-located reactor units there can be opportunities to achieve economies of scale, by sharing costs between units, and coordinating the sequence of work activities. There will also be schedule constraints, particularly where there are requirements for specialty equipment and staff, or practical limitations on when final status surveys can take place. For purposes of the estimate, Units 1 and 2 are assumed to be essentially identical. Common facilities have been assigned to Unit 2. A summary of the principal impacts are listed below.
    $  The sequence of work generally follows the principal that the work is done at Unit 1 first, followed by similar work at Unit 2. This permits the experience gained at Unit 1 to be applied by the workforce at the second unit. It should be noted however, that the estimate does not consider productivity improvements at the second unit, since there is little TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 3, Page 4 of 29 documented experience with decommissioning two units simultaneously.
The work associated with developing activity specifications and procedures can be considered essentially identical between the two units, therefore the second unit costs are assumed to be a fraction of the first unit (--- 43%).
    ~    Segmenting the reactor vessel and internals will require the use of special equipment. This equipment will be shared between the two reactors. The decommissioning project will be scheduled such that Unit 2's reactor internals and vessel are segmented immediately after the activities at Unit 1 have been completed.
tI!t Some program management and support costs, particularly costs associated with the more senior positions, can be avoided with two reactors undergoing decommissioning simultaneously. As a result, the estimate is based on a "lead" unit that includes these senior positions, and a "second" unit that excludes these positions. The designation as lead is based on the unit undertaking the most complex tasks (for instance vessel segmentation) or performing tasks for the first time.
The final radiological survey sched ule is also affected by a two-unit decommissioning schedule. It would be considered impractical to try to complete the final status survey of Unit 1, while Unit 2 still has ongoing radiological remediation work and waste handling in process. As such, the transfer of the spent fuel from the storage pools and subsequent decontamination of the spent fuel pool areas is coordinated so as to synchronize the final status survey for the station.
    ~    The final demolition of buildings at Units 1 and 2 are considered to take place concurrently.
tI!t Unit 1, as the first unit to enter decommissioning, incurs the majority of site characterization costs.
    ~    Shared systems and common structures are generally assigned to Unit 2.
tI!t Station costs such as emergency response fees, regulatory agency fees, corporate overhead, and insurance are generally allocated on an equal basis between the two units.
3.4 FINANCIAL COMPONENTS OF THE COST MODEL TLG's proprietary decommissioning cost model, DECCER, produces a number of distinct cost elements. These direct expenditures, however, do not comprise the total cost to accomplish the project goal, i.e., license termination, spent fuel management and site restoration.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 5 of 29 3.4.1 Contingency The activity- and period-dependent costs are combined to develop the total decommissioning cost. A contingency is then applied on a line-item basis, using one or more of the contingency types listed in the AIF/NESP-036. study. "Contingencies" are defined in the American Association of Cost Engineers "Project and Cost Engineers' Handbook" [20] as "specific provision for unforeseeable elements of cost within the defined project scope; particularly important where previous experience relating estimates and actual costs has shown that unforeseeable events which will increase costs are likely to occur." The cost elements in this analysis are based upon ideal conditions and maximum efficiency; therefore, consistent with industry practice, contingency is included. In the AIF/NESP-036 study, the types of unforeseeable events that are likely to occur in decommissioning are discussed and guidelines are provided for percentage contingency in each category. It should be noted that contingency, as used in this analysis, includes contingency based on a preliminary technical position
[21] to reflect the California Public Utilities Commission's desire for owners to conservatively establish an appropriate contingency factor for inclusion in the decommissioning revenue requirements.
Contingency Based on AIF Guidelines As stated in the AIF study contingency funds are an integral part of the total cost to complete the decommissioning process. Exclusion of this component puts at risk a successful completion of the intended tasks and, potentially, subsequent related activities. For this study, TLG examined the major activity-related problems (decontamination, segmentation, equipment handling, packaging, transport, and waste disposal) that necessitate a contingency. Individual activity contingencies ranged from 10% to 75%, depending on the degree of difficulty judged to be appropriate from TLG's actual decommissioning experience. The contingency values used in this study are as follows:
              ~  Decontamination                                          50%
              ~ Contaminated Component Removal                            25%
* Contaminated Component Packaging                          10%
* Contaminated Component Transport                          15%
              ~ Low -Level Radioactive Waste Disposal                      25%
              ~  Reactor Segmentation                                    75%
* NSSS Component Removal                                    25%
TLG Services, Inc.
 
Diablo Canyon Power Plant                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 6 of 29
              ~  Reactor Waste Packaging                                25%
              ~  Reactor Waste Transport                                25%
              ~  Reactor Vessel Component Disposal                      50%
              ~  GTCC Disposal                                          15%
              ~  Non-Radioactive Component Removal                      15%
              ~  Heavy Equipment and Tooling                            15%
              ~  Supplies                                                25%
              ~  Engineering                                            15%
              ~  Energy                                                  15%
              ~  Characterization and Termination Surveys                30%
              ~  Construction                                            15%
              ~  Taxes and Fees                                          10%
CII Insurance                                              10%
              ~  Staffing                                                15%
The contingency values are applied to the appropriate components of the estimates on a line item basis. The composite contingency value (excluding additional contingency described in the Preliminary Technical Position) for the DECON alternative is approximately 17.7%.
The value for the SAFSTOR alternative is approximately 17.5%.
Contingency Based on Preliminary Technical Position In addition to the contingency based on the AIF guidelines additional contingency was added to reflect the California Public Utilities Commission desire for owners to conservatively establish an appropriate contingency factor for inclusion in the decommissioning revenue requirements. Based on the previously referenced technical position, additional contingency was added to reflect an overall project contingency of 25% (both scenarios). This contingency was incorporated on a line item basis, with each line item receiving a pro-rated share of the increase.
3.4.2 Financial Risk In addition to the routine uncertainties addressed by contingency, another cost element that is sometimes necessary to consider when bounding decommissioning costs relates to uncertainty, or risk.
Examples can include changes in work scope, pricing, job performance, and other variations that could conceivably, but not necessarily, occur.
Consideration is sometimes necessary to generate a level of confidence in TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 3, Page 7 of 29 the estimate, within a range of probabilities. TLG considers these types of costs under the broad term "financial risk." Included within the category of financial risk are:
* Transition activities and costs: ancillary expenses associated with eliminating 50% to 80% of the site labor force shortly after the cessation of plant operations, added cost for worker separation packages throughout the decommissioning program, national or company-mandated retraining, and retention incentives for key personnel.
            ~  Delays in approval of the decommissioning plan due to intervention, public participation in local community meetings, legal challenges, and national and local hearings.
            ~  Changes in the project work scope from the baseline estimate, involving the discovery of unexpected levels of contaminants, contamination in places not previously expected, contaminated soil previously undiscovered (either radioactive or hazardous material contamination), variations in plant inventory or configuration not indicated by the as-built drawings.
            ~  Regulatory changes, for example, affecting worker health and safety, site release criteria, waste transportation, and disposal.
            ~  Policy decisions altering national commitments (e.g., in the ability to accommodate certain waste forms for disposition, or in the timetable for such, or the start and rate of acceptance of spent fuel by the DOE.
          ~    Pricing changes for basic inputs such as labor, energy, materials, and waste disposal.
This cost study does not add any additional costs to the estimate for financial risk, since there is insufficient historical data from which to project future liabilities. Consequently, the areas of uncertainty or risk are revisited periodically and addressed through repeated revisions or updates of the base estimates.
3.5 SITE-SPECIFIC CONSIDERATIONS There are a number of site-specific considerations that affect the method for dismantling and removal of equipment from the site and the degree of restoration required. The cost impact of the considerations identified below is included in this cost study.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 3, Page 8 of 29 3.5.1 Spent Fuel Management The cost to dispose of spent fuel generated from plant operations is not reflected within the estimates to decommission the Diablo Canyon site.
Ultimate disposition of the spent fuel is within the province of the DOE's Waste Management System, as defined by the NWPA. As such, the disposal cost is financed by a 1 milllkWhr surcharge paid into the DOE's waste fund during operations. However, the NRC requires licensees to establish a program to manage and provide funding for the management of all irradiated fuel at the reactors until title of the fuel is transferred to the Secretary of Energy. This funding requirement is fulfilled through inclusion of certain high-level waste cost elements within the estimate, as described below.
The total inventory of assemblies that will require handling during decommissioning is based upon the following assumptions. The DOE's generator allocation/receipt schedules are based upon the oldest fuel receiving the highest priority. For purposes of this analysis, acceptance of Diablo Canyon spent fuel by the DOE is expected to be complete by 2055 to permit license termination within approximately 32 years of unit shut down. The first assemblies removed from the Diablo Canyon site are assumed to be in 2033.
The estimates incorporate a minimum cooling period of approximately 12 years for the spent fuel that resides in the storage pools when operations cease. The current Part 72 ISFSI license does not allow dry cask storage of spent fuel with burnups above 45,000 MWD/metric ton.
It is assumed that PG&E can amend the Part 72 license to store the higher burnup fuel, but that as a condition of the amendment it will require longer decay times (12 years) before storing the spent fuel in the casks.
In both scenarios, any residual, fuel remaining in the pool after the 12-year period is relocated to the ISFSI to await transfer to a DOE facility.
Operation and maintenance costs for the storage facilities are included within the estimates and address the cost for staffing the facilities, as well as security, insurance, and licensing fees. The estimates include the costs to purchase, load, and transfer the fuel storage canisters. Costs are also provided for the final disposition of the facilities once the transfer is complete.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 3, Page 9 of 29 Canister Design A multi-purpose storage canister (HOLTEC HI-STORM 100 system),
with a 32-fuel assemblies capacity, is assumed for future cask acquisitions. A unit cost of $1,500,000 is used for pricing the internal multi-purpose canister (MPC) and concrete overpack.
Canister Loading and Transfer An average cost of $1,000,000 per canister is used for the labor and consumables to load/transport the spent fuel from the pools to the ISFSI pad, based upon Diablo Canyon operating experience. The same cost,
          $1,000,000 per canister, is used to estimate the cost to transfer the fuel from the spent fuel pools to the DOE. For estimating purposes, 50% of the pool to DOE cost is used to estimate the cost to transfer the fuel from the ISFSI to the DOE.
Operations and Maintenance Annual costs (excluding labor) of $1.53 million and $180,000 are used for operation and maintenance of the spent fuel pools and the ISFSI, respectively.
ISFSI Decommissioning Design Considerations A HI-STORM multi-purpose (storage and transport) dry shielded storage canister with a vertical, reinforced concrete storage overpack is used as a basis for the cost analyses. Approximately seven overpacks per unit (quantity necessary to manage the final core offload) are assumed to have some level of neutron-induced activation as a result of the long-term storage of the fuel, i.e., to levels exceeding free-release limits. The steel liners in these activated overpacks are assumed to be removed and disposed of as radioactive material. The cost to dispose of this material, as well as the demolition of the ISFSI facility, is included in the estimates.
GTCC The dismantling of the reactor internals generates radioactive waste considered unsuitable for shallow land disposal (i.e., low-level radioactive waste with concentrations of radionuclides that exceed the limits established by the NRC for Class C radioactive waste (GTCC>>.
The Low-Level Radioactive Waste Policy Amendments Act of 1985 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 10 of 29 assigned the federal government the responsibility for the disposal of this material. The Act also stated that the beneficiaries of the activities resulting in the generation of such radioactive waste bear all reasonable costs of disposing of such waste. Although there are strong arguments that GTCC waste is covered by the spent fuel contact with DOE and the fees being paid pursuant to that contract, DOE has taken the position that GTCC waste is not covered by that contract or its fees and that utilities, including PG&E, will have to pay an additional fee for the disposal of their GTCC waste. However, to date, the federal government has not identified a cost for disposing of GTCC or a schedule for acceptance. As such, the GTCC radioactive waste has been packaged and disposed of as high-level waste, at a cost equivalent to that envisioned for the spent fuel.
For purposes of this study, GTCC is packaged in the same type of canister used to store spent fuel. Disposal costs are based upon a cost equivalent to that envisioned for the spent fuel. It is not anticipated that the DOE would accept this waste prior to completing the transfer of spent fuel. Therefore, until such time the DOE is ready to accept GTCC waste, it is reasonable to assume that this material would remain in storage with the spent fuel in the ISFSI at the Diablo Canyon site (for the DECON alternative). In the SAFSTOR scenario, the GTCC material is shipped directly to a DOE facility as it is generated since the fuel has been removed from the site prior to the start of decommissioning and the ISFSI deactivated.
The cost to dispose of GTCC material is based on the equivalent cost to dispose of spent fuel (weight basis). The details for estimating this value is provided in Section 5 of this analysis.
3.5.2 Reactor Vessel and Internal Components The reactor pressure vessel and internal components are segmented for disposal in shielded, reusable transportation casks. Segmentation is performed in the refueling canal, where a turntable and remote cutter are installed. The vessel is segmented in place, using a mast-mounted cutter supported off the lower head and directed from a shielded work platform installed overhead in the reactor cavity. Transportation cask specifications and transportation regulations dictate the segmentation and packaging methodology.
Intact disposal of reactor vessel shells has been successfully demonstrated at several of the sites that have been decommissioned.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 11 of 29 Access to navigable waterways has allowed these large packages to be transported to the Barnwell disposal site with minimal overland travel.
Intact disposal of the reactor vessel and internal components as a single package can provide savings in cost and worker exposure by eliminating the complex segmentation requirements, isolation of the GTCC material, and transport/storage of the resulting waste packages. Portland General Electric (PGE) was able to dispose of the Trojan reactor as an intact package (including the internals). However, its location on the Columbia River simplified the transportation analysis since:
                ~  the reactor package could be secured to the transport vehicle for the entire journey, i.e., the package was not lifted during transport,
                ~  there were no man-made or natural terrain features between the plant site and the disposal location that could produce a large drop, and
                ~  transport speeds were very low, limited by the overland transport vehicle and the river barge.
As a member of the Northwest Compact, PGE had a site available for disposal of the package - the US Ecology facility in Washington State.
The characteristics of this arid site proved favorable in demonstrating compliance with land disposal regulations.
It is not known whether this option will be available when the Diablo Canyon plant ceases operation. Future viability of this option will depend upon the ultimate location of the disposal site, as well as the disposal site licensee's ability to accept highly radioactive packages and effectively isolate them from the environment. Consequently, the study assumes that the reactor vessel will require segmentation, as a bounding condition.
3.5.3 Primary System Components In the DECON scenario, the reactor coolant system components are assumed to be decontaminated using chemical agents prior to the start of dismantling operations. This type of decontamination can be expected to have a significant ALARA impact, since in this scenario the removal work is done within the first few years of shutdown. A decontamination factor (average reduction) of 10 is assumed for the process. Disposal of the decontamination solution effluent is included within the estimate as a "process liquid waste" charge. In the SAFSTOR scenarios, radionuclide TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 12 of 29 decay is expected to provide the same benefit and, therefore, a chemical decontamination is not included.
The following discussion deals with the removal and disposition of the steam generators, but the techniques involved are also applicable to other large components, such as heat exchangers, component coolers, and the pressurizer. The steam generators' size and weight, as well as their location within the reactor building, will ultimately determine the removal strategy.
A trolley crane is set up for the removal of the generators. It can also be used to move portions of the steam generator cubicle walls and floor slabs from the reactor building to a location where they can be decontaminated and transported to the material handling area.
Interferences within the work area, such as grating, piping, and other components are removed to create sufficient laydown space for processing these large components.
The generators are rigged for removal, disconnected from the surrounding piping and supports, and maneuvered into the open area where they are lowered onto a dolly. Each generator is rotated into the horizontal position for extraction from the containment and placed onto a multi-wheeled vehicle for transport to an on-site processing and storage area.
The generators are disassembled on-site with the outer shell and lightly contaminated subassemblies designated for segmentation and direct disposal. The more highly contaminated tube sheet and tube bundle contained within the steam generator lower shell are packaged as a one-piece container for direct disposal.
Disposal costs are based upon the displaced volume and weight of the units.
Reactor coolant piping is cut from the reactor vessel once the water level in the vessel (used for personnel shielding during dismantling and cutting operations in and around the vessel) is dropped below the nozzle zone .. The piping is boxed and transported by shielded van. The reactor coolant pumps and motors are lifted out intact, packaged, and transported for processing and/or disposal.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 13 of 29 3.5.4 Main Turbine and Condenser The main turbine is dismantled uSIng conventional maintenance procedures. The turbine rotors and shafts are removed to a laydown area. The lower turbine casings are removed from their anchors by controlled demolition. The main condensers are also disassembled and moved to a laydown area. Material is then surveyed and prepared for transportation to an off-site scrap facility.
3.5.5 Retired Components Both Diablo Canyon units have replaced their original sets of steam generators and reactor closure heads; these retired components are stored on site within a concrete protective structure. The cost for transportation and disposal of these items has been included in this analysis.
3.5.6 Transportation Methods Contaminated piping, components, and structural material other than the highly activated reactor vessel and internal components will qualify as LSA-I, II or III or Surface Contaminated Object, SCO-I or II, as described in Title 49. [22] The contaminated material will be packaged in Industrial Packages (IP-l, IP-2, or IP-3, as defined in subpart 173.411) for transport unless demonstrated to qualify as their own shipping containers. The reactor vessel and internal components are expected to be transported in accordance with 10 CFR Part 71, in Type B containers.
It is conceivable that the reactor, due to its limited specific activity, could qualify as LSA II or III. However, the high radiation levels on the outer surface would require that additional shielding be incorporated within the packaging so as to attenuate the dose to levels acceptable for transport.
Any fuel cladding failure that occurred during the lifetime of the plant is assumed to have released fission products at sufficiently low levels that the buildup of quantities of long-lived isotopes (e.g., 137CS, 90Sr, or transuranics) has been prevented from reaching levels exceeding those that permit the major reactor components to be shipped under current transportation regulations and disposal requirements.
Transport of the highly activated metal, produced in the segmentation of the reactor vessel and internal components, will be by shielded truck cask. Cask shipments may exceed 95,000 pounds, including vessel TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 14 of 29 segment(s), supplementary shielding, cask tie-downs, and tractor-trailer.
The maximum level of activity per shipment assumed permissible was based upon the license limits of the available shielded transport casks.
The segmentation scheme for the vessel and internal segments is designed to meet these limits.
The transport of large intact components (e.g., large heat exchangers and other oversized components) will be by a combination of truck, rail, and/or multi-wheeled transporter.
Transportation costs for Class A radioactive material requIrIng controlled disposal are based upon the mileage to the EnergySolutions facility in Clive, Utah. Transportation costs for the higher activity Class Band C radioactive material are based upon the mileage to the WCS facility in Andrews County, Texas. The transportation cost for the GTCC material is assumed to be contained within the disposal cost. Truck transport costs were developed from published tariffs from Tri-State Motor Transit. [23]
3.5.7 Low-Level Radioactive Waste Disposal The mass of radioactive waste generated during the various decommissioning activities at the site is shown on a line-item basis in the detailed Appendices C through E, and summarized in Section 5. The quantified waste summaries shown in these tables are consistent with 10 CFR Part 61 classifications. Commercially available steel containers are presumed to be used for the disposal of piping, small components, and concrete. Larger components can serve as their own containers, with proper closure of all openings, access ways, and penetrations. The volumes are calculated based on the exterior package dimensions for containerized material or a specific calculation for components serving as their own waste containers.
The more highly activated reactor components will be shipped in reusable, shielded truck casks with disposable liners. In calculating disposal costs, the disposal fees are applied against the liner volume, as well as the special handling requirements of the payload. Packaging efficiencies are lower for the highly activated materials (greater than Class A waste), where high concentrations of gamma-emitting radionuclides limit the capacity of the shipping canisters.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 15 of 29 Class A Waste For the purpose of this analysis, the EnergySolutions' facility is used as the disposal site for the majority of the radioactive waste (Class A). The disposal costs for Class A low-level radioactive waste are based on a study sponsored by PG&E and Southern California Edison Company, "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning" [11] , escalated to year 2011 dollars. A complete explanation of the basis for Class A waste disposal is provided in Section 5 of this analysis.
Class Band C Waste For purposes of this analysis, the Waste Control Specialists (WCS)
Andrews County, TX facility is used as the disposal site for the higher radioactivity waste (Class B and C). The disposal costs are based on a combination of two WCS rates projected for out-of-compact generators. A complete explanation of the basis for class Band C waste disposal is provided in Section 5 of this analysis.
3.5.8 Site Restoration Following License Termination The NRC will amend or terminate the site license if it determines that site remediation has been performed in accordance with the license termination plan, and that the terminal radiation survey and associated documentation demonstrate that the facility is suitable for release. The NRC's involvement in the decommissioning process will end at this point. Building codes and environmental regulations will dictate the next step in the decommissioning process, as well as owner's own future plans for the site.
Only existing site structures are considered in the dismantling cost. It is assumed that the electrical switchyards remain after Diablo Canyon is decommissioned. Structures are removed to a nominal depth of three feet below grade. The voids are backfilled with clean fill and capped with soil. The site is then re-graded to conform to the adjacent landscape.
Vegetation is established to inhibit erosion. These "non-radiological costs" are included in the total cost of decommissioning.
Concrete rubble generated from demolition activities is processed and transported off-site for disposal. Clean fill is brought on site to backfill below grade voids as needed. The excavations will be regraded such that the power block area will have a final contour consistent with adjacent surroundings.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 16 of 29 The estimates do not assume the remediation of any significant volume of contaminated soil.
3.6 ASSUMPTIONS The following are the major assumptions made In the development of the estimates for decommissioning the site.
3.6.1 Estimating Basis Decommissioning costs are reported in the year of projected expenditure; however, the values are provided in 2011 dollars. Costs are not inflated, escalated, or discounted over the periods of performance.
The estimates were developed using site-specific, technical information extracted from the 2008 estimates. This information was reviewed for the current analysis and updated as deemed appropriate. The site-specific considerations and assumptions used in the previous evaluation were also revisited. Modifications were incorporated where new information was available or experience from ongoing decommissioning programs provided viable alternatives or improved processes.
The study follows the principles of ALARA through the use of work duration adjustment factors. These factors address the impact of activities such as radiological protection instruction, mock-up training, and the use of respiratory protection and protective clothing. The factors lengthen a task's duration, increasing costs and lengthening the overall schedule. ALARA planning is considered in the costs for engineering and planning, and in the development of activity specifications and detailed procedures. Changes to worker exposure limits may impact the decommissioning cost and project schedule.
3.6.2 Labor Costs The craft labor required to decontaminate and dismantle the nuclear units will be acquired through standard site contracting practices. The current cost of labor at the site is used as an estimating basis. Costs for site administration, operations, construction, and maintenance personnel are based upon average salary information provided by PG&E.
PG&E will hire a Decommissioning Operations Contractor (DOC) to manage the decommissioning. The owner will provide site security, TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 17 of 29 radiological health and safety, quality assurance and overall site administration during the decommissioning and demolition phases.
Contract personnel will provide engineering services (e.g., for preparing the activity specifications, work procedures, activation, and structural analyses) under the direction of PG&E.
Personnel costs are based upon average salary information provided by PG&E. Overhead costs are included for site and corporate support, reduced commensurate with the staffing of the project.
Security is maintained close to operational levels while fuel is stored in the spent fuel pool. Security is reduced substantially once all spent fuel has been relocated to the ISFSI.
Staffing levels are assigned for each unit by sub-period and functional area. Economies of a multi-unit decommissioning are recognized by establishing a primary and a secondary staff level. The unit assigned the primary staff will include common supervisory positions and positions that may be shared across both units. The types of positions and staffing levels are adjusted based upon the type of activity occurring in each sub-period.
3.6.3 Design Conditions Any fuel cladding failure that occurred during the lifetime of the plant is assumed to have released fission products at sufficiently low levels that the buildup of quantities of long-lived isotopes (e.g., 137CS, 90Sr , or transuranics) has been prevented from reaching levels exceeding those that permit the major NSSS components to be shipped under current transportation regulations and disposal requirements.
The curie contents of the vessel and internals at final shutdown are derived from those listed in NUREG/CR-347 4)24] Actual estimates are derived from the curie/gram values contained therein and adjusted for the different mass of the Diablo Canyon components, projected operating life, and different periods of decay. Additional short-lived isotopes were derived from NUREG/CR-0130[25] and NUREG/CR-0672,f26] and benchmarked to the long-lived values from NUREG/CR-3474.
It is anticipated that there will be control element assemblies (CEAs) in the spent fuel pool at the cessation of operations, including those CEAs from the final core. This analysis assumes that the CEAs can be disposed of along with the spent fuel at no additional cost.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 3, Page 18 of 29 Neutron activation of the containment building structure is assumed to be confined to the biological shield.
3.6.4 General Transition Activities Existing warehouses are cleared of non-essential material and remain for use by PG&E and its subcontractors. The plant's operating staff performs the following activities at no additional cost or credit to the project during the transition period:
          <$  Drain and collect fuel oils, lubricating oils, and transformer oils for recycle and/or sale.
          $    Drain and collect acids, caustics, and other chemical stores for recycle and/or sale.
          $    Process operating waste inventories. Disposal of operating wastes (e.g., filtration media, resins) during this initial period is not considered a decommissioning expense; however, the estimates do include the disposition of a small volume of material currently being stored in the spent fuel pool (as described in Section 5).
Scrap and Salvage The existing plant equipment is considered obsolete and suitable for scrap as deadweight quantities only. PG&E will make economically reasonable efforts to salvage equipment following final plant shutdown.
However, dismantling techniques assumed by TLG for equipment in this analysis are not consistent with removal techniques required for salvage (resale) of equipment. Experience has indicated that some buyers wanted equipment stripped down to very specific requirements before they would consider purchase. This required expensive rework after the equipment had been removed from its installed location. Since placing a salvage value on this machinery and equipment would be speculative, and the value would be small in comparison to the overall decommissioning expenses, this analysis does not attempt to quantify the value that an owner may realize based upon those efforts.
It is ass:umed, for purposes of this analysis, that any value received from the sale of scrap generated in the dismantling process would be offset by the on-site processing costs. The dismantling techniques assumed in the TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 19 of 29 decommissioning estimates do not include the additional cost for size reduction and preparation to meet "furnace ready" conditions. For example, the recovery of copper from electrical cabling may require the removal and disposition of any contaminated insulation, an added expense. With a volatile market, the potential profit margin in scrap recovery is highly speculative, regardless of the ability to free release this material. This assumption is an implicit recognition of scrap value in the disposal of clean metallic waste at no additional cost to the project.
Furniture, tools, mobile equipment such as forklifts, trucks, bulldozers, and other property is removed at no cost or credit to the decommissioning project. Disposition may include relocation to other facilities. Spare parts are also made available for alternative use.
Energy For estimating purposes, the plant is assumed to be de-energized, with the exception of those facilities associated with spent fuel storage.
Replacement power costs are used to calculate the cost of energy consumed during decommissioning for tooling, lighting, ventilation, and essential services.
Insurance Costs for continuing coverage (nuclear liability and property insurance) following cessation of plant operations and during decommissioning are included and based upon current operating premiums. Reductions in premiums, throughout the decommissioning process, are based upon the guidance and the limits for coverage defined in the NRC's proposed rulemaking "Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors." [27] The NRC's financial protection requirements are based on varIOUS reactor (and spent fuel) configurations.
Taxes Property taxes (land) are included for all decommissioning periods.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 3, Page 20 of 29 Site Modifications The perimeter fence and in-plant security barriers will be moved, as appropriate, to conform to the Site Security Plan in force during the various stages of the project.
3.7 COST ESTIMATE
 
==SUMMARY==
 
Schedules of expenditures for the DECON and SAFSTOR scenarios are provided in Tables 3.1 and 3.2. The tables delineate the cost contributors by year of expenditures as well as cost contributor (e.g., labor, materials, and waste disposal).
Additional tables in Appendices C and D provide detailed costs elements. The cost elements are also assigned to one of three subcategories: "License Termination," "Spent Fuel Management," and "Site Restoration." The subcategory "License Termination" is used to accumulate costs that are consistent with "decommissioning" as defined by the NRC in its financial assurance regulations (i.e., 10 CFR &sect;50.75). The cost reported for this subcategory is generally sufficient to terminate the plant's operating license, recognizing that spent fuel management represents an additional cost liability that will interact with the license termination effort.
The "Spent Fuel Management" subcategory contains costs associated with the containerization and transfer of spent fuel from the pools to the DOE and the transfer of casks from the ISFSI to the DOE. Costs are also included for the operations of the pools and management of the ISFSI until such time that the transfer of all fuel from this facility to an off-site location (e.g., geologic repository) is complete.
    "Site Restoration" is used to capture costs associated with the dismantling and demolition of buildings and facilities demonstrated to be free from contamination. This includes structures never exposed to radioactive materials, as well as those facilities that have been decontaminated to appropriate levels. Structures are removed to a depth of three feet and backfilled to conform to local grade.
As discussed in Section 3.4.1, it is not anticipated that the DOE will accept the GTCC waste prior to completing the transfer of spent fuel. Therefore, the cost of GTCC disposal is shown in the final year of ISFSI operation (for the DECON alternative). While designated for disposal at the geologic repository along with the spent fuel, GTCC waste is still classified as low-level radioactive waste and, as such, included as a "License Termination" expense.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Section 3, Page 21 of 29 Decommissioning costs are reported in 2011 dollars. Costs are not inflated, escalated, or discounted over the period of expenditure (or projected lifetime of the plant). The schedules are based upon the detailed activity costs reported in Appendices C and D, along with the time line presented in Section 4.
The decommissioning cost estimate for the DECON - 20 Year License Renewal scenario is provided in Appendix E. This appendix contains an explanation of the specific contributors that influenced the decommissioning cost, as well as the results provided in tables similar to that provided for the base case DECON scenario.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                          Section 3, Page 22 of 29 TABLE 3.1 DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 1 (thousands, 2011 dollars)
PG&E                Equipment &                                  Contractor                                              LLRW Year              Labor                Materials                                        Labor                                          Disposal                            Other                            Total 2025            58,057 t-----_ _- ; - - _ . ! . - - - - - t ._ _ _                  1_O-'-,2_6_7__+_1_ _37,515                                                                    6,                          55,320 I                          167,616 I 2026            49,863                                29,643 I                            41,863                                              36,795                            31,841 I                          190,005!
2027            45,242                                32,533 I                            40,970                                              45,334                            27,142 I                        191,220 i 2028            37,792                                11,225 I                          26,247                                              26,764                            17,535 I                          119,563 I 2029            37,688                                11,194 I                          26,175                                              26,691                            17,487 I                        119,236 I 2030 .........! 25,553                                                  I .......... *.........*.9,041 4,736 . . . *r******
                                      . . . .. . . *. .*. *. * . **i>iii*4*                            *. . * . 3*:3'2..
                                                                                                                          . . . . . . . . . . . . . . . . . ~.?.Q~J 41 . . . . i....I    ...J..9.?.&sect;'J~.                          59,166. . *. . I1 7,423 . . 1'I. . * * . *. * * . *. ***2*ti:*6*S*5 2031            19,385 2032 i____
----*-*t 19,438
                        -'_ _--+--._ _ _1--<.,_4_5_8_-+1____                                                    333                                            41                        7,444      I                        28,713        I 2033 I 19,385                                              1,454                                        332                                            41                        7,423      I                        28,635        I 2034          i  19,385                                    1,454                                        332                                            41                        7,423                              28,635        I 2035            19,385 2040              6,347                                    7,966 i                        12,319                                                        0                        3,020                              29,652 I 2041              4,089                                    2,677 I                              4,140                                                    0,                      2,923                              13,829 I 2042              2,950                                            0 I                                          0                                          0 :                      2,878      I                          5,828 1
--~~!!--' ~: :~~
~.--+-~-+_----~-----r_------+----~-~--
                                                                        ~                                            ~-----____~_l                                              ______  t~~~ --I-t~~:--I 2045              2,950                                            0                                            0                                          0                        2,878      I                          5,828 2046              2,950                                            0                                          0                                          0                        2,878      I                          5,828 J 2047              2,950                                            0                                            0                                          0                        2,878      I                          5,8281 2053              2,950                                            0                                            0                                          0                        2,878      I                          5,828      I TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                                                    Section 3, Page 23 of 29 TABLE 3.1 (continued)
DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 1 (thousands, 2011 dollars)
PG&E                          Equipment &                                                                          Contractor                                                                      LLRW Year                                  Labor                            Materials                                                                                    Labor                                                            Disposal                                                              Other                        Total
.:**::::*:.:::*g.Q*&sect;*~:::""::'*:::*I''':''''''''''''''.2, 9&sect;..9.........                                                          0                                                                        0                                                  *****************-0*********1********************************2~**8*78*******T***  . . . . . . .&sect;.J.. &sect;~.~. . . . .
e-'        2055                                    2, 950 f************************************************ * *. ,. .8** * *5* *
* 5* * * * * * . t ..... ,.......................................*"("..0. . *.). . . . . .1..........*................*..............*,,"..........0. . *. . . . i!i .......................... i3, 96'6. . .
2                                                                                                                                                                                                                                                19,711 2056                                          369                                                        738                                                              1,261                                                                          532                        1                                1,005                        3,905 Total                        1  467,076                                            139,347                                                                    253,726                                                                164,315                                                                  298,004                1,322,468 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                                                            Section 3, Page 24 of 29 TABLE 3.2 DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 2 (thousands, 2011 dollars)
PG&E                                                      Equipment &                                                                  Contractor                                          LLRW Year                                                  Labor                                                          Materials                                                                  Labor                                        Disposal                                                          Other                                                                      Total
.................................................................................................................................................................... ****.. ****************T******                                    .........................................................................................................................................., ............................ *********************************************1
. . . . . . . .g.9.gJ?. . . . . . ...I.............!..7..?..4..~.7.......... . . . . . . . .                                                .. . . . . . .g.? . !..g.~. . . ...l..........          . ............. &sect;J.. Q.~.&sect;........ .. . . . . . . . . . . . . ....!.?. &sect;.. !.. ! . . . . ! . . . . . . . . . . . .gQJ.. &sect;..~.7.. . . . .t. . . . . . . * * * * * * *. *&sect;.*QJ.**Q~*~*********II 2026 I 49,808                                                                                                                                9,039                          I                23,451                                                  8,837                                                          46,092 I                                                            137,228.
2027                                                46,771                                                                            28,350                                I                38,828                                            41,865                                                                13,885 I                                                            169,699 i 2028                                                46,102                                                                            26,378                                I                39,424                                            41,291                                                                13,784                                                              166,979 I 2029                                  i            45,094                                                                            12,443                                                  32,973                                            25,785                                                                17,265 I                                                            133,560 I 2030                                                45,094                                                                            12,443                                                  32,973                                            25,785                                                                17,265 I                                                            133,560 I
----i6~-i ---I ~:: ~~~                                                                                                                                    i:-}~~- ----5'~-~in----~'-~~~-:---------i:~-~i--l- --~~~i~ij
_~_0_33_~!. . _~_5,_87.~_                                                                                                                                  1,548                                                        352            ______4~_-t                                                                                        7,918                                I                                35,739                                      III 2034                                                25,876                                                                                  1,548                                                        352                                                          45!                                                  7,918                                                                35,739 2035                                                25,876                                                                                  1,548                                                        352                                                          45                                                    7,918                                                                35,739 2041                                                      4,080                                                                        14,827                                                  11,948                                                                        0                                              2,970                                I                                33,825                                    I 2042                                                      2,944                                                                                                  0                                                0                                                          0                                              2,872                                I                                      5,816                              I 2043                                                      2,944                                                                                                  0                                                0                                                          0                                              2,872                                I                                      5,816                                I
                                                                        ~2. . .J,..*99. . . ~4. . .24.. . . . .. . . . .... ...........................................0. . . . . . . 1.......
1 2 0 4.4            . . . . . . . . . . ...............
:"                                                                                                                                                                        0                                                          0:                                              2,880                                I                  . . . . . . . . . .Q.?.&sect;.9..g                            I
                                                                                                                                                                                            '--------~                                                                . .--~--:                                  -----~:~~TT-                                                                                            ~:~~:-I 1
2 2046  0      4    5                                      2,944                                                                                                00 1 2047                                                      2,944                                                                                                  0                                                0                                                          0                                              2,872 I                                                                      5,816 2048                                                      2,952                                                                                                  0                                                0                                                          0                                              2,880                                                                        5,832 2049                                                      2,944                                                                                                  0                                                0                                                          0                                                2,872                                                                      5,816                                I
            . 29.~.9. . . . . . . .: . . . . . . . .g.?.~.4..4.........                                                                                                        0                                                0 ............................................9                                                              2,872                                                              . . . . &sect;..?.&sect;..!..~.....1
              ~~~~--i-i:-~:~--                                                                                                                                                ~                                                ~      ...n                                ----%~: ::::::::~::~~~:::r--t~~~ -I 2053                                                      2,944                                                                                                0                                                0                                                            0                                              2,872                              I                                      5,816 2054                                                      2,944                                                                                                0          I                                    0                                                            0                                              2,872                                                                      5,816 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                        Section 3, Page 25 of 29 TABLE 3.2 (continued)
DECON ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 2
                                                                                                                      ~housands,2011dollar~
PG&E                                                      Equipment &              Contractor  LLRW Year                                  Labor                                                          Materials          Labor    Disposal  Other          Total
.*.*. * * .* *.*. *. * * * .*. I 2055
                                  *r...........***..**************************. *********T..*....*..*****.........
2,944 I E
***************2*65*6***********. *1"***************************36*8********r*************. ********
Total                    I 503,289                                                                      221,200    312,806    160,290    266,020      1,463,605 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                          Section 3, Page 26 of 29 TABLE 3.3 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 1 (thousands, 2011 dollars)
PG&E                  Equipment &                                            Contractor                                    LLRW Year                      Labor                Materials                                                          Labor                          Disposal                                            Other                                                        Total
----%~~:- -:::~~~!~-+-.                                              :B~FF'-':Hf!1:=::'-=a!F :::::::~~:~~FI::::=~!~:~~:1 2026                          32,819                                  5,566                                                  3,358 I                                    695                                      32,454                                                          74,891 I 2027                          20,346                                  2,474                                                          673 I                                    25                                  10,562                                                          34,081 I 2028                          20,402                                  2,480                                                          675 '                                    25                                  10,591                                                          34,174 I 2029                          20,346                                  2,474                                                          673 i                                    25                                  10,562                                                          34,081 I 2039.. . . . . . . ,.. .. . . ~.9.?.?..4..~.    .. . . . . . . . . . .~.?.4.7..4..                                .. . . . . . . . . .~.7..~.. i ..............................~.&sect;.......... . . . . . .. . . . .J..9.1. ~. ~.~. . . .                l. . . . . . . . . . ?.4..1. 9&sect;I. . . . j                  j
~31 , 20,346:                                                            2,474              ****i,l*                                    673                                      25                                  10,5621....- 34,081                                                                            I 2032 I 20,402 I                                                      2,48Q                                                          675                                      25                                10,591 I                                                        34,174                        I
-*2033*---~,346t----2"--,4-74--+----67-3--' .                                                                                                                                    25                                  10,562                                                          34,081                        I 2034                          20,346                                  2,474                                                          673                                      25                                  10,562                                                          34,081 2045                            5,576                                    315                                                                                                  12                                        3,442                                                          9,346 2048                            5,591                                    316                                                            &deg;                                    12                                        3,451 I                                                        9,371 2~0~4:9~                :=:H ,:. . . . . . . . . . . . .33****1!*55********1**.......... ........................99.........................
55', 55:7~f 6                                                                                                                                    1122 . . . . . . . . . . . . . . . . . . .39..'., .44..4 2. . . . . . . 11....... . ..................... 9 * * * ,~* 3?*4 *6~*
* I F                  ***************s*ii5. * *
* r *****************..*..                      &deg;                                                                                          42 12 . *****************************3*~**442********r***..                                                  9,346 . . .
2052                            5,591                                    316                                                            &deg;                                    12                                      3,451                          I                                9,371 2053                              5,576                                    315                                                            &deg;                                    12                                        3,442                                                          9,346 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                      Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                    Section 3, Page 27 of 29 TABLE 3.3 (continued)
SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 1 (thousands, 2011 dollars)
PG&E                                Equipment &                                        Contractor                        LLRW Year                                                    Labor                          Materials                                                    Labor                  Disposal                                  Other                              Total
                  .....................................+...................&sect;..1. &sect;..7..~. . .
2054
--              2055                                    I 5,576 2056                                                25,568 2057                                                25,281                                            19,571                                  34,344 i                      29,425                                          10,447                  119,069 2058                                                22,630                                            25,410                                    34,083 i                      49,206                                          14,638                  145,966 2059                                                16,984                                                  8,226                              22,941 i                      27,369                                                6,172                81,692 3,::: I 2060
                ..........................*...... . :..........!.!.?..9.?....!                i  ...........................&sect;.I. g.iHt. . ..L................. 2.~, 004 . . . . . . . . . . . ?.!..1. 4..4..4........... . . . . . . . . . . . . . . ~.?..!. ~.~.    .. . .&sect;.!.?.~.!.~. . . . .l r______
2061 2062 4 -_____~5t_4_0_9-+__ _
8,542 3,~~~          I                  ~~:~~:                        12,O~~                                                                      :~:~~:              I 2063                                                        4,412 2064                                                        3,331                                            8,202                              12,870                                      0                                            345      I        24,748 2065                                                        2,285                                            5,625                                8,826                                      0                                            236      I        16,972 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                            Section 3, Page 28 of 29 TABLE 3.4 SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 2 (thousands, 2011 dollars)
PG&E                                                            Equipment &                                        Contractor                                                LLRW Year          Labor                                                            Materials                                                        Labor                                      Disposal                                Other                    Total
-- 2027            18,837                                                                                    2,331            I                            1,181                                              318                      18,283                            40,951 2028          13,724                                                                                    1,891                                                  494                                          21                    8,811                            24,941            I 2029          13,687                                                                                    1,886                                                  493                                          21                    8,786.                            24,873 2030          13,687                                                                                    1,886          I                                      493                                          21                    8,786 I                          24,873            I'
  -i~~i--li~~~~I---                                                                            ----t~~i--I                                                          :::                    ----------i}- -----~:-Hi--1-~!~-~II--1 2033      L_~3,687                                                                                        1,886          I                                      493                                          21                    8,786                            24,873 2034          13,687                                                                                    1,886          I                                      493                                          21                    8,786                            24,873 2035          13,687                                                                                    1,886          I                                      493                                          21                    8,786                            24,873 2036          13,724                                                                                    1,891          I                                      494                                          21                    8,8111                            24,941 22 00 338 7                                              0~2
              , . . . . . . 9. . . . '.,. 9. . . . :5?3. . . . . .:. :. .: : .'  .. . . . . . . . . . . . . . 12..??.9. . . . 1.......**..............................?.gJ. . . . .l. . . . .  . . . . . . . . . . ...!.7............. 6,910  I . . . . . . . . . . . . ...!.??.. ~.g~... ./
3 0Q                                                                                                                                        3 ~                                                                    I                            . .~?.7..&sect;.?.. . I
              * ~:~:~-----~~~-T-----~f---i~
301 I                                                                                                10                  3 436
    ~~:~                                                                                                                                                                                                                                  f:!~-r-- ~:~~~ 1 2041                    3,032                                                                              301          I                                          3                                          10                  3,436                                  6,783        I 2042                    3,032                                                                              301          I                                          3                                          10                  3,436                                  6,783        I 2046                    3,032                                                                              301          I                                          3                                          10                  3,436                                  6,783 2047                    3,032                                                                              301                                                      3                                          10                  3,436                                  6,783        I 2048                    3,040                                                                              302                                                      3                                          10                  3,446                                  6,801        I 2049                    3,032                                                                              301                                                      3                                          10                  3,436                                  6,783        I
---~~!!-:::-:::~:~1~- ------- :~! T:::::::::~:::1:;---------!~-----:~!!~:::f:::::=:::~~~~:::1 2053                    3,032                                                                              301 I "                                                  3                                          10                  3,436  I                              6,783 2054                    3,032                                                                              301                                                      3                                          10                  3,436                                  6,783        I TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                      Section 3, Page 29 of 29 TABLE 3.4 (continued)
SAFSTOR ALTERNATIVE SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 2 (thousands, 2011 dollars)
PG&E                        Equipment &                                          Contractor                              LLRW Year                                  Labor                            Materials                                                Labor                      Disposal                            Other                                    Total 2058                      22,297                                            20,195                                  29,378                        29,042                                    10,258            I              111,169 2059                      25,056                                            26,668                                    36,948                        48,171                                    14,335            I              151,178 2060                      24,201                                              9,347                                29,608                        25,762                                      5,927            I                94,845 .
._._.~Q&sect;L.~ ..~1,!&sect;.~(_...                                                                  ... -!l.&?} ..f ..... .?1).L~~!L                                            25,~!l..?                            ... _.~,!l..lLt ....__9.M~_6.i 2062                        15,626 I                                            5,275            I                    33,566                        11,851                                      3,231 I                            69,549              I f--                  2063                          4,385,                                        35,166 1 __                              36,192                                10                                      594 I.                        76,348              I 2064                          3,311                                          44,349 I                                  36,069                                  0                                    500 I                          84,229              I 2065                          2,271                                          30,414                                  24,736                                  0                                    343                            57,764 1.................. T.9..t..9.:.! . . .I.......4.J. 7.J.. 4.. &sect;.~..... .. . . . . . . . . . . . ~.?.9.?.. 7..?..~ . ...1...... .......... ?~.~.J.&sect;.~ . . . . . . . . . .J4..~.??. ~.?.. . . . ..I.. .............~.&sect;.?.?...~.4..~ . . .I ............L.?~.4.?. ?.Q.~. . . . .1 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 4, Page 1 of 6
: 4. SCHEDULE ESTIMATE The schedules for the decommissioning scenarios considered in this study follow the sequences presented in the AIF/NESP-036 study, with minor changes to reflect recent experience and site-specific constraints. In addition, the scheduling has been revised to reflect the spent fuel management plan described in Section 3.5.1.
A schedule or sequence of activities for the DECON alternative from shutdown to ISFSI site restoration is presented in Figure 4.1. The scheduling sequence is based on the fuel being removed from the spent fuel pools within twelve years. The key activities listed in the schedule do not reflect a one-to-one correspondence with those activities in the cost tables, but reflect dividing some activities for clarity and combining others for convenience. The schedule was prepared using the "Microsoft Project Professional 2010" computer softwareJ28]
4.1 SCHEDULE ESTIMATE ASSUMPTIONS The schedule reflects the results of a precedence network developed for the site decommissioning activities, i.e., a PERT (Program Evaluation and Review Technique) Software Package. The work activity durations used in the precedence network reflect the actual man-hour estimates from the cost table, adjusted by stretching certain activities over their slack range and shifting the start and end dates of others. The following assumptions were made in the development of the decommissioning schedule:
* The spent fuel pools are isolated until such time that all spent fuel has been discharged from the spent fuel pools to the DOE. Decontamination and dismantling of the storage pools is initiated once the transfer of spent fuel is complete (DECON option).
    ~  All work (except vessel and internals removal) is performed during an 8-hour workday, 5 days per week, with no overtime.
* Reactor and internals removal activities are performed by using separate crews for different activities working on different shifts, with a corresponding backshift charge for the second shift.
    ~  Multiple crews work parallel activities to the maximum extent possible, consistent with optimum efficiency, adequate access for cutting, removal and laydown space, and with the stringent safety measures necessary during demolition of heavy components and structures.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 4, Page 2 of 6
* For plant systems removal, the systems with the longest removal durations in areas on the critical path are considered to determine the duration of the activity.
4.2 PROJECT SCHEDULE The period-dependent costs presented in the detailed cost tables are based upon the durations developed in the schedules for decommissioning. Durat,ions are established between several milestones in each project period; these durations are used to establish a critical path for the entire project. In turn, the critical path duration for each period is used as the basis for determining the period-dependent costs. A second critical path is shown for the spent fuel storage period, which determines the release of the fuel handling area of the auxiliary building for final decontamination.
Project timelines are for the DECON and SAFSTOR scenarios are provided in Figures 4.2 and 4.3 with milestone dates based on the 2024 and 2025 shutdown dates for Units 1 and 2, respectively. The fuel pools are emptied approximately twelve years after shutdown, while ISFSI operations continue until the DOE can complete the transfer of assemblies to its geologic repository. Deferred decommissioning in the SAFSTOR scenarios is assumed to commence so that the physical dismantling takes place immediately after all spent fuel has been removed from the site.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                Section 4, Page 3 of 6 FIGURE 4.1 ACTIVITY SCHEDULE - DECON Task Name Y1 I Y3 I Y5 I Y7 I Y9 I Y11 I Y13 I 115 I 117 I Y19 J 321                                                        Y23        Y25          Y2'7 Y29 Y31 Y33 Y35 Y37 lDi alJle CBI1yon !'()\ller ~a,J1t :P:E_()()!II _______ ._____ ____ _
Diablo Canyon Uni11 Shutdown Date November
* 1 1
2,2024
  -p.;~i-Crl-i~ stiui.do;.mihi:ouiitiT~mitio~                                    I!!!::lII Certificate .of permanent CE;"ssatien efope;.;:tions-submitted 1
          ~~i:~~~i~8e: ~~i_oj;e;i~ti~~~                                            ~I
        .1)r.Y_ ~\J!l1. _s.t<:lr_'!i,!ClPe.r_ati_eJ1!;_                            m;g l Re.c.o.nfigure pla,nt                                                    ~I
          !'r..!lp_3&#xa3;e_:l&#xa3;.ti~_ty_~~~~~~~                                          ~I
                                                                                    ~I Perferm site characterizaticin
_~~~ui:!rik~ ::::":                        --.. -
Written certificate .of perm ~nt re~eval .of fuel
_~u):l!Ilitte~      _____ _
                                                                                        *~
Site specific decommissiening cost estimate                                    ~
submitted                                                                        1
_ j:l9..Q:i~9jL~9~Ij~L_                                                              ~
Pe!!~Jb__Il?C:OIl.l!Ills_s19t:1.it:lg !'reParations                                    I:!!
:F\le.1. stet:a gep<:l()! _ep~r.!l-ti()l}s _                                    o i
          ~.2!!.~gu~plant                j:entinued)
Dry fuel sterage eperatians
          ?tep'~j:I~t~!I~d ~r!tp~~dut:es DeconNSSS
_ jSi~ti~~nt&~~L                                _____ _                                ~
Period 2a, Lar.ge Compon.ellt Remaval                                                    ~
_Jf\l~I _s_t.~r~ge_ P()<l1()PIlE_a~()Il_s                                            ~
Dryfue} star age eperatiens                                                          ~
        ~p_arat!Q.n fer reactor vess~ fetp.ev~
9          1
                                                                                                  ~ I
_~l!c.t.o.r'y~ss.~L~_!J:lll:!rl}~_s Remaining large NSSS cempenents dispositien                                                  ~,
Nen-essential systems                                                                          ,
M;;;~-t~ti~ige;:;r~~                                                                          1 Main cerrlenser                                                                                1
_~~S_~ns.Il_~~!~il}!l-ti()!l pl.!lJ.1_ ~~I:rn_*_E!~
    ;perl9&#xa3;l_gtl_P.eE.on~i!l_ati()l}                (VIJ!3tJuel)
                                                                                                        *~I
:li'llel s.tllr.!l-ge_ PCl()~ppe.r.!l-ti()l}s _
                                                                                                        /,., ":."." ,,1 prY.f\J8_!.~()r.age_ .op~r!l-_ti.o_rlS___ ______ _ _. _. ______ _
Remeve systems not supporting wet fuel storage                                                I;:;;;;:;;*::
DeCo~buiidings net ~upportiiig wet fuel starage                                                ~:
1              ,
__ p'~e~e. t.e~nii_ii~~.o_ri_pi~_~Jr'()~~ _. ___ . _____ _                                          1          ~
Period :&#xa3; Spent Fuel Delay Prier t.o Spent Fuel FOOl                                                  ,          1m'l!l!~rl!m~~!lm!lI Decon tti~is&sect;i~~~~_i.oy_eE~~i?:ris                                                                  :,            g~~:,.:;.~~:~>:;:;~        :.j;. .,:.:'~:-::;;:':;~; :'.:~
p'ry f~l _~~arag~ .o~~_B:tiel1S
                                                                                                                        ,            ,              1              ,
nlabio 6~y';n Unit 2 siiuirl~wnriate August 26,
_2 (m._                                                                                1 1            1
  .TJP:i!?Jl~Il!~~LW.e.U!()r.,!-ge_ (1.~XI:l'!-r.~)                                      9"" ....-..-...... " *., ";' * **:;;''''''1*;-;;.'(***;.''1,**'' *****;-*1',**,*<;-"',J Perioj l ,a S,hutdeVlll1 _Through _TransitieIl , _                                  ~
Certificate .of permanent cessatian .of eper atiens                        ~
s.1J.~Ill_it.!-el:!                                                              1 P.\Jf:lL~!QE~e P().oJ.pp~Ia~e_~                                              t2Zl i
            ~Y~IJf3J. ,~b.?r,lIgl:l, ()pe.r_!l-ti()n.s lleconfigur~ pi_ant
_PrePare _l1-Cti vi ty _specific_~ien_s Perferm site characterizati.on PsD.~s.Ubli-itt;;ct-Certificate .of permanent rem .oval .of fuel submitted
            ~te specific decommissianing cost estimate submitted
        -:iX)C~~-mobil;zed -
Pe!i.~JE.;Qe.c!?P.lIllJ.s_siel!iIlll, ;F!~p_ar,a~i~~
                                                                                                *m Fuel stor age pool aperatiens                                                        E':;J
_I<icorlt'ig~~p'I~~_ I:Cll}tiIl1J.~)                                                  ~
_~y_ ~\J!lJ. .~!Q!'!ie_ llpe.r.a,gQI1~__        _                                      EZl Iiijj
_:f>r~p_ar~_ ge!.aJled :~rlt prCJ<:!l~_lIr_es DlcenNSSS                                                                            !Oil
___ ji_oi:a:~:~~iitj~e.i~i , ________ , , , _                                            Iiijj J~It~Jl_3,.~g~CO.J!lp<:l~.12t~_m_e'!.al_                                                          ~
Fuel storage pool eperatians                                                              ~
Milestone
* Critical Path Task 1*<x,,:*: :<:<x .nx*<Xl Summary task                                                        Non-critical Tasks ...........;;;;;;;;;;;;..
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                  Section 4, Page 4 of 6 FIGURE 4.1 (continued)
ACTIVITY SCHEDULE - DECON Task Name IX)' f1,lE!1.s.~rage. 9PElrllJiofls .      . ..... .
Preparation for reactor vessel removal                                      I::l I
        ~~act1)l' lIe~sel *&.intern.als Remaining large NSSS components disposition
                                                                                        $I fl ril?n:~_~flt;ai sys.te.m~
        ~Ilt.lIr!Ji.nelgenerator Main ~.nd8~r                                                                                  I
    .. !it:eIlsEl. ~r.minati011 plan..stlbmi.tte!d
* I'
                                                                                                ~
                                                                                                =    ,.~" ,
Peritxi 2b Decontamination (_t fuel)
_~Ls!Q~ag~pQ<lLo.E8.!a!i_I?~                                                              ,-,      .
IXyfuel storage operati0Ils .                  .    ...
Remove systems not supporting wet fuel storage                                          . ......
I Thcon buildings not supporting Wet fuel stcrage                                        ~
        .li.ce.ns~ terrnin&#xa2;.on planapllroved. . .
Peritxi a: Spent Fuel Delay Prior to Spent Fuel FOOl Decon
_. ~l ~U;i_~e.P<ioI ~~~iti~~
IXy fuel storage operations                                                                        ,.::<>:3;:<;';:0;;:- + ,,>:;,,:<* <>:,.:<3 Peritxi a:t Unit 1 and 2 Decontamination Following                                                                                                  ~
W.e.!:_F}l~1 IXy fuel stor age operations                                                                                                                  ~
        ~lIl.()lIe.EEl_rn~.lli.f1g. sys tl3111s.                                                                                                      ~
Theon wet fuel stor age area                                                                                                                  Iii Perltxi 2fUnit i ~ 2li~en;e Termination                                                                                                                m
--  ~Y~l.:siO~ag-e-pperations-                  .-_. - -..                                                                                            G'J Flnal .Site. f3urvey                                                                                                                              ~
I ll!)
l"BQ!.e!!~y!:~ .apP~911~
Part 50. license terminated Pe.rll:Xi. ~ 1!llit    1.1lIld 2.8ite Restoration
                                                                                                                                                            *~
Dry fuel storage operations                                                                                                                            ~
Building demoli tions. backfill an::llandscaping                                                                                                        ~
Period      9;) Fuel Storage OperationS/Shipping
  .@~.!:?.o_~.5)...        _ . ....
Peritxi 3:\      aTee Shipping I.SF.:~ J:le.CC?nt.an\illa.ti.o.ll .CJo.!5~)
ISFSI ~ite .Restoration (20.56)
Decommissionin Com lete Jul Milestone
* Critical Path Task IXx."'.<:,!! ... :::"',,,, Summary task                                            Non-critical Tasks 0;;;;;;;;;;;;;;;;;;;;;;;;;;.0 TLG Services, Inc.
 
Diablo Canyon Power Plant                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                Section 4, Page 5 of 6 FIGURE 4.2 DECON ALTERNATIVE DECOMMISSIONING TIMELINE (not to scale)
Unit 1 (Shutdown November 2, 2024)
Pool and ISFSI Operations                ISFSIOperations Period 1            Period 2                            Period 3 Transition and                                    Site Prepara tions    Decommissioning        Restoration  ISFSIOperations  ISFSI D&D 11/2024        05/2026                    11/2038      05/2041          12/2055      07/2056 Storage Pools Empty Unit 1 - 11/2036 Unit 2 - 08/2037 Unit 2 (Shutdown August 26, 2025)
Period 1            Period 2                            Period 3 Transition and                                    Site Preparations      Decommissioning        Restoration  ISFSIOperations  ISFSI D&D 08/2025        02/2027                  11/2038      05/2041          12/2055      07/2056 TLG Services, Inc.
 
Diablo Canyon Power Plant                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                Section 4, Page 6 of 6 FIGURE 4.3 SAFSTOR ALTERNATIVE DECOMMISSIONING TIMELINE (not to scale)
Unit 1 (Shutdown November 2, 2024)
Period 1          Period 2              Period 3      Period 4        Period 5 Transition and                                  Delayed                          Site Prep ara tions      Dormancy            Preparations  Decommissioning  Restoration 11/2024          05/2026                01/2056        07/2057          03/2063      09/2065 Unit 1 Pool Empty 11/2036 Dry Spent Fuel Storage          ~I ISFSIEmpty 12/2055 Unit 2 (Shutdown August 26, 2025)
Period 1          Period 2              Period 3      Period 4        Period 5 Transition and                                    Delayed                        Site Preparations        Dormancy            Preparations  Decommissioning  Restoration 08/2025        02/2027                  01/2057      07/2058          03/2063      09/2065 Unit 2 Pool Empty 08/2037 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 5, Page 1 of 7
: 5. RADIOACTIVE WASTES The objectives of the decommissioning process are the removal of all radioactive material from the site that would restrict its future use and the termination of the NRC license. This currently requires the remediation of all radioactive material at the site in excess of applicable legal limits. Under the Atomic Energy Act, [29] the NRC is responsible for protecting the public from sources of ionizing radiation. Title 10 of the Code of Federal Regulations delineates the production, utilization, and disposal of radioactive materials and processes. In particular, Part 71 defines radioactive material as it pertains to transportation and Part 61 specifies its disposition.
Most of the materials being transported for controlled Disposal are categorized as Low Specific Activity (LSA) or Surface Contaminated Object (SCO) materials containing Type A quantities, as defined in 49 CFR Parts 173-178. Shipping containers are required to be Industrial Packages (IP-l, IP-2 or IP-3, as defined in 10 CFR &sect;173.411). For this study, commercially available steel containers are presumed to be used for the disposal of piping, small components, and limited quantities of concrete. Larger components can serve as their own containers, with proper closure of all openings, access ways, and penetrations. Material that is expected to meet requirements for transport in bulk, such as the majority of contaminated concrete, is disposed of without its' packaging.
The waste material produced in the decontamination and dismantling of the nuclear plants is primarily generated during Period 2 of DECON and Period 4 of SAFSTOR. The volumes of radioactive waste generated during the various decommissioning activities at the site are shown on a line-item basis in Appendices C and D, and summarized in Tables 5.1 and 5.2. The quantified waste volume summaries shown in these tables are consistent with Part 61 classifications. The volumes are calculated based on the exterior dimensions for containerized material and on the displaced volume of components serving as their own waste containers.
The reactor vessel and internals are categorized as large quantity shipments and, accordingly, will be shipped in reusable, shielded truck casks with disposable liners.
In calculating disposal costs, the disposal fees are applied against the liner volume, as well as the special handling requirements of the payload. Packaging efficiencies can be lower for the highly activated materials (greater than Type A quantity waste), where high concentrations of gamma-emitting radionuclides limit the capacity of the shipping canisters.
No process system containing/handling radioactive substances at shutdown is presumed to meet material release criteria by decay alone (i.e., systems radioactive TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 5, Page 2 of 7 at shutdown will still be radioactive over the time period during which the decommissioning is accomplished, due to the presence of long-lived radionuclides).
While the dose rates decrease with time, radionuclides such as 137CS will still control the disposition requirements.
Disposal costs are based on the following:
Class A Waste For the purpose of this analysis, the EnergySolutions' facility is used as the disposal site for the majority of the radioactive waste (Class A). The disposal costs for Class A low-level radioactive waste are based on a study sponsored by PG&E and Southern California Edison Company, "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning"[11], escalated to year 2011 dollars. The study was originally done in 2008 dollars to reflect the California Public Utilities Commission's desire for these owners to be consistent and to conservatively estimate their nuclear decommissioning LLRW disposal rates. The rates published in the study were escalated from 2008 to 2011 year dollars using an average rate of 6.93% per year, which reflects a rate consistent with CPUC Decision 10-07-047 dated July 29, 2010. This decision approved use of a LLRW escalation rate of 6.93 percent per year for SONGS and 7.5 percent per year for Diablo Canyon. The resulting 2011 rates, using this approach, results in a disposal cost of
$76 per cubic foot for "Bulk" waste and a cost of $307 per cubic foot for "General" waste.
Class Band C Waste For purposes of this analysis, the WCS Andrews County, TX facility is used as the disposal site for the higher activity radioactive waste (Class Band C).The disposal costs for this waste is based on the following:
In 2008 there were no currently operating disposal facilities available to PG&E that had a license to dispose of the more highly radioactive waste (Classes B and C), for example, generated in the dismantling of the reactor vessel. As such, waste disposal costs were estimated using information extracted from the previously referenced study establishing appropriate disposal rates for decommissioning.
In March of 2012, the Texas compact opened its LLRW disposal site in Andrews County, Texas. This disposal site is operated by Waste Control Specialists LLC (WCS). Out-of-compact generators may send waste to WCS, if approved by the Texas Low-Level Radioactive Waste Compact Commission, at higher rates than in-compact generators.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 5, Page 3 of 7 As of November 2011, rates for out-of-compact generators (including California utilities) in 2012 were projected to be $6,200 for Routine Class Band C waste, and
$18,500 per cubic foot for High Activity Class Band C waste.
While the projected decommissioning waste for Diablo Canyon has not been divided precisely into these WCS categories (which are different from other disposal sites),
it is clear that use of these rates for Diablo Canyon would result in LLRW disposal costs significantly higher than the 2008 rates ($2,916 per cubic foot) escalated to 2011 dollars ($3,572 per cubic foot). However, since the 2008 cost for Class Band C waste was not based on an available facility, the WCS rate for disposal of this waste has been used instead of the previous rate (w hich was based on costs from Barnwell, which is no longer available for California generators). A combination of the two WCS Class Band C rates would predict an average disposal cost of $7,384 per cubic foot (using the waste distribution provided by WCS). The 2011 study uses
$7,000 per cubic foot for disposal of Class Band C radioactive waste.
GTCC Waste The volume and cost to dispose of GTCC material is developed using the following method:
* A projection of the amount of electricity delivered from the station through the end of currently licensed life is calculated. Using a rate of 1 mill per kw-hr (DOE standard contract rate) this is converted to a total spent fuel disposal cost for the station.
~  An estimate of the total weight of spent fuel generated through the end of currently licensed life is calculated.
* An average disposal cost for the spent fuel (per pound) is calculated by dividing the total spent fuel disposal cost by the total spent fuel mass. This calculation results in the cost per pound used for disposal ($107 per pound).
~  This average disposal cost is applied against the total mass of GTCC material to estimate the GTCC disposal cost. This cost is also used in alternate scenarios (20 year license renewal) for consistency.
* The reported disposal volume is calculated by assuming that GTCC waste is placed in a canister equivalent in size to a spent fuel canister (nominal 360 cubic feet, each) and loading these canisters with up to 20,000 pounds of waste. The reported disposal mass is the mass of the GTCC material plus the mass of the spent fuel canister (nominal 53,000 pounds).
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                    Section 5, Page 4 of 7 TABLE 5.1 DECON ALTERNATIVE DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 1 I                                                                          Waste Volume                                                        I!
Weight Class                                                                                                        I Waste            ii    Cost Basis                                        [1]                      (cubic feet)                                                I            (pounds)
                              !                                                                                                                                              iI I                                                                                                                                              I Low-Level Radioactive        Ii EnergySolutions                                                                                                                            I 94,959 I!
Waste (near-surface          I LarKe Component                            A                                                                                                                        7,860,384 disposal)                  I EnergySolutions I~.----------
General ..--..-----.----- .-..-_._._A.._...._----.- *-**-*--------*****--**-*-*--*---------**-*1--*--*-*-*-...
147,369 I                          I                        9,579,584 I EnergySolutions I Bulk                                        A                                                          331,077 I                                                33,107,720 EnergySolutions DAW                                        A                                                                14,017 I                                                        288,673 WCS                      ._-_.._......-.-B                                                                    1,732/
                                                                              ....__...._..__..... -_.._-_ ......__..........._-_...._._-._....._-_ ..._............_........"("-_. __... __                  197,501 WCS                                        C                                                                          574                  I                                    69,650 Greater than Class C            Spent Fuel (geologic repository)      I Equivalent                          GTCC                                                                        1,785                        I!                              350,510 Ij I
                                                              -..-..-..-.... ~--  ...*.-.-- .
i Total [2]                                                                                                                            591,514                                                  51,454,022
[1]  Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]    Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                    Section 5, Page 5 of 7 TABLE 5.2 DECON ALTERNATIVE DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 2 Waste Volume                                        II Weight Waste                                                          Cost Basis                                Class      [1]                (cubic feet)                                          (pounds)
Low-Level Radioactive                                                      I EnergySolutions Waste (near-surface                                                        I Large Component                                              A                                              94,9591                            7,860,384 disposal)                                                                      EnergySolutions                                                                                                                I General                                                    A 138,015 I
                                                                                                                                                            -*--**------**--**-*-*-*-*--*--**---r-**-*--**--*-*--*-.-.----.--.
9,004,003 EnergySolutions Bulk                                                      A                                        337,395                    I        33,739,520 I EnergySolutions                                                                                                                  II IDAW                                                          A                                              15,898                                327,416 I
WCS                                                        B                                                  1,732 I                          197,501
                                                                                                                                      -~--------::r-:~
WCS Greater than Class C                                                        I Spent Fuel                                                                                                                        I Jgeologic repository)                                                          I Equivalent                                                GTCC                                                  1,785 i                          350,510 i****-*-***---***-**---*---***-***--*****-*---**-*-*--*--*-**-***--*-*---*-**-*****---t----****------*------.-..- ...- ...-.--.-.--._-+---..-.--.-.-.-.-+ ..-..--.. . -..-..-.--.--.-.-.......--....- ..----..----*-+*----*---*-*-****-***-***----*--*-*i Total [2]                                                                                                                                                                          590,359                              51,548,984
[1]            Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]            Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                  Section 5, Page 6 of 7 TABLE 5.3 SAFSTOR ALTERNATIVE DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 1 I                                            Waste Volume I                                      Weight Waste            I      Cost Basis    Class        [1]          (cubic feet)                    I            (pounds)
                              !                                                                                i!
I!
I                                                                                  !
Low -Level Radioactive      I EnergySolutions                                                                I !
Waste (near-surface            Large Component            A                                94,277            I                    7,615,715 disposal)                      Energy Solutions                                                              I General            --.--..
A
                                                            ~--.--.-.
148,159 I                                9,531,433
                                                                      - - - - - . - - . - - -..- -..- . -....--t---..- ..- - . - - - - - - - - - - - - - - - - - . ,
EnergySolutions I
Bulk                        A                            330,412 !                            33,041,160 I EnergySolutions                                                                I IDAW                          A                                15,318 I                                    315,463 Iwcs                          B                                      3761                                    38,100 WCS                        C                                      5841                                    68,960 Greater than Class C          Spent Fuel (geologic repository)          Equivalent          GTCC                                      1,7851                                  350,510 I
I Total [2]
Ii                                                          590,911              I                50,961,341                          !
[1]  Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]    Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                        Section 5, Page 7 of 7 TABLE 5.4 SAFSTOR ALTERNATIVE DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 2 i!
I                                                Waste Volume                      !
Weight Waste            I    Cost Basis        Class [1]                    (cubic feet)                  I          (pounds)
I I
I Low-Level Radioactive        I EnergySolutions                                                                    I i
Waste (near-surface          ! Large Component              A                                    94,277          I              7,615,715 disposal)                      EnergySolutions                                                                    i I
General            ..-.--..
A
                                                            --.~---.--
138,969            I              8,975,852
                                                                        .. ~-"--"----'------"---"--"'-'----""-""'r'--'-"'--...-.--------...-.-.--.-.--.
Energy Solutions Bulk                          A                                335,149            I          33,514,930 EnergySolutions I
DAW                          A                                    15,850 I                          326,419 WCS                          B                                          3761                          38,100 WCS                          C          I                              5841                          68,960 Greater than Class C          Spent Fuel (geologic repository)          Equivalent              GTCC                                        1,785                          350,510 I
Total [2]                                                                                      586,991 II          50,890,486
[1]    Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]    Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 6, Page 1 of 7
: 6. RESULTS The analysis to estimate the costs to decommission Diablo Canyon relied upon the site-specific, technical information extracted from the 2008 and previous estimates.
This information was reviewed for the current analysis and updated as deemed appropriate. The site-specific considerations and assumptions used in the previous evaluation were also revisited. Modifications were incorporated where new information was available or experience from ongoing decommissioning programs provided viable alternatives or improved processes. While not an engineering study, the estimates provide PG&E with sufficient information to assess their financial obligations, as they pertain to the eventual decommissioning of the nuclear station.
The estimates described in this report are based on numerous fundamental assumptions, including regulatory requirements, project contingencies, low-level radioactive waste disposal practices, high-level radioactive waste management options, and site restoration requirements. The decommissioning scenarios assume continued operation of the station's spent fuel pools for a minimum of twelve years following the cessation of operations for continued cooling of the assemblies.
The cost projected to promptly decommission (DECON) Diablo Canyon is estimated to be $2,786.1 million. The majority of this cost (approximately 73.1%) is associated with the physical decontamination and dismantling of the nuclear plant so that the operating license can be terminated. Another 16.4% is associated with the management, interim storage, and eventual transfer of the spent fueL The remaining 10.5% is for the demolition of the designated structures and limited restoration of the site.
The cost projected for deferred decommissioning (SAFSTOR) is estimated to be
$2,759.9 million. The majority of this cost (approximately 53.6%) is associated with placing the plant in storage, ongoing caretaking of the plant during dormancy, and the eventual physical decontamination and dismantling of the nuclear plant so that the operating license can be terminated. Another 35.8% is associated with the management, interim storage, and eventual transfer of the spent fueL The remaining 10.6% is for the demolition of the designated structures and limited restoration of the site.
The primary cost contributors, identified in Tables 6.1 thru 6.4, are either labor-related or associated with the management and disposition of the radioactive waste.
Program management is the largest single contributor to the overall cost. The magnitude of the expense is a function of both the size of the organization required to manage the decommissioning, as well as the duration of the program. The size and composition of the management organization varies with the decommissioning TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                        Section 6, Page 2 of 7 phase and associated site activities. However, once the operating licenses are terminated, the staff is substantially reduced for the conventional demolition and restoration of the site, and the long-term care of the spent fuel (for the DECON alternative).
As described in this report, the spent fuel pools will remain operational for a minimum of twelve years following the cessation of operations. The pools will be isolated and independent spent fuel islands created. This will allow decommissioning operations to proceed in and around the pool areas. Over the twelve-year period, the spent fuel will be packaged into multi-purpose canisters for transfer to the ISFSI. Spent fuel stored in the ISFSI is assumed to be transferred to the DOE in order to support license termination within 60 years of shut down.
The cost for waste disposal includes those costs associated with the controlled disposition of the low-level radioactive waste generated from decontamination and dismantling activities, including plant equipment and components, structural material, filters, resins and dry-active waste. As described in Section 5, disposition of the majority of the low-level radioactive material requiring controlled disposal is at the EnergySolutions' facility. Highly activated components, requiring additional isolation from the environment (GTCC), are packaged for geologic disposal. The cost of geologic disposal is based upon a cost equivalent for spent fuel.
Decontamination and removal costs reflect the labor-intensive nature of the decommissioning process, as well as the management controls required to ensure a safe and successful program. Non-radiological demolition is a natural extension of the decommissioning process. With a work force mobilized to support decommissioning operations, non-radiological demolition can be an integrated activity and a logical expansion of the work being performed in the process of terminating the operating license. Prompt demolition reduces future liabilities and can be more cost effective than deferral, due to the deterioration of the facilities (and therefore the working conditions) with time.
The reported cost for transport includes the tariffs and surcharges associated with moving large components and/or overweight shielded casks overland, as well as the general expense, e.g., labor and fuel, of transporting material to the destinations identified in this report. For purposes of this analysis, material is primarily moved overland by truck.
Decontamination is used to reduce the plant's radiation fields and minimize worker exposure. Slightly contaminated material or material located within a contaminated area is sent to an off-site waste disposal facility, i.e., this analysis does not assume that contaminated plant components and equipment can be decontaminated for uncontrolled release in-situ.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 6, Page 3 of 7 License termination survey costs are associated with the labor intensive and complex activity of verifying that contamination has been removed from the site to the levels specified by the NRC. This process involves a systematic survey of all remaining plant surface areas and surrounding environs, sampling, isotopic analysis, and documentation of the findings. The status of any plant components and materials not removed in the decommissioning process will also requIre confirmation and will add to the expense of surveying the facilities alone.
The remaining costs include allocations for heavy equipment and temporary services, as well as for other expenses such as regulatory fees and the premiums for nuclear insurance. While site operating costs are greatly reduced following the final cessation of plant operations, certain administrative functions do need to be maintained either at a basic functional or regulatory level.
Alternative Scenario In addition to the DECON and SAFSTOR alternatives considered in this analysis, one other decommissioning alternative was evaluated. The complete basis and results for this alternative are contained within the noted appendix.
Appendix E - DECON Alternative with 20 Year License Renewal The cost projected to promptly decommission Diablo Canyon under this alternative is estimated to be $2,624.4 million. The majority of this cost (approximately 77.4%)
is associated with the physical decontamination and dismantling of the nuclear plant so that the operating license can be terminated. Another 11.4% is associated with the management, interim storage, and eventual transfer of the spent fuel. The remaining 11.1% is for the demolition of the designated structures and limited restoration of the site.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                      Section 6, Page 4 of 7 TABLE 6.1 DECON ALTERNATIVE DECOMMISSIONING COST ELEMENTS, UNIT 1 (thousands of 2011 dollars)
Cost Element                                                                                                                        Total I                      Percentage Decontamination                                                                                                                  17,296        I                                    1.3 Removal                                                                                                                        129,569          I                                    9.8
      -P;~kagi~g-'-'----'--'-'--------'-----'-'-'------'-'-'.----.- -*----*-*-46~26s-T--------*--*3-~-*
Transportation                                                                                                                    18,060 I                                            1.4 Waste
    -----..                  Disposal
                  -.------.--..      --.---..-.--------.----.-.-..----..----------.----.--.--------------t----------                      175,448 I                                          13.3 Program Management [1]                                                                                                          315,334 I                                          23.8 Security                                                                                                                        273,454 I                                          20.7 I    Spent Fuel Pool Isolation                                                                                                        24,045 I                                            1.8 Spent Fuel Management [2]                                                                                                      187,973 I                                          14.2 Insurance and Regulatory Fees                                                                                                    21,214 I                                            1.6
      *-E~;~-***---*-*-***-*-*-*--***--***-*-**-**-----*--*--.- . -.-.---.--.. .-.-.. . .--.. . . . . -.. . --.. . -.-. . --*----*----**---i-O~3-ii-*r*---------------**********O~'8 Characterization and Licensing Surveys                                                                                            21,372        I                                    1.6
    . . .!~E~P..~~~.~_!_~~~.~_. . ._.__.___. . _. . .__. _.____. _.__._. . .__._______._._. __. . _. . ._ ._. _. .-.---.-.--.-. -.. ._._.____. ~.?~_~.7.. J. _._ ._._. . ._._ . ________. _ _. .g~&sect;_
Severance                                                                                                                        74,269        I                                    5.6 Miscellaneous Equipment                                                                                                              7,849      I                                    0.6 Total [3]                                                                                                                1,322,468              I                              100.0 Cost Element                                                                                                                        Total                      Percentage License
      .._._..__._..__._... .... ._-_._.__._.__..._--_. __..*..._._._......_-_....-._....._._.__._--_..__._.. _._. . . ____.__. __. . Q.~!t, 92~_
__ __Termination                                                                                                                --.--.--~
75.6 Spent Fuel Management                                                                                                          248,912                                              18.8 Site Restoration                                                                                                                  73,630                                              5.6 Total            [3]                                                                                                    1,322,468                                              100.0
[1]      Includes engineering costs
[2]      Excludes program management costs (staffing) but includes costs for spent fuel loadingltransfer costs/spent fuel pool O&M and EP fees
[3]      Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                            Section 6, Page 5 of 7 TABLE 6.2 DECON ALTERNATIVE DECOMMISSIONING COST ELEMENTS, UNIT 2 (thousands of 2011 dollars)
Cost Element                                                                                                                                                          Total I                        Percentage Decontamination                                                                                                                                                    20,420            I                                        1.4 Removal                                                                                                                                                          283,111              I                                      19.3
    ---~k;gi~g--***---*---*-*--***-**-------*------*-"--.-.-----------                                                                            . . . .*-----*-3~)"~786T--*--*--*--**---2-:7 nsportation                                                                                                                                            17,954            I                                        1.2 Waste Disposal                                                                                                                                                  171,400              I                                      11
      . Pr~-~;~-M~;;;ge~;~t-[i]------                                                                                      . --*--                          ******--*--**36S:34ST-*--*------25 Security                                                                                                                                                        258,268                                                      17.~
Spent Fuel Pool Isolation                                                                                                                                          15,996 !                                                    1.l Spent Fuel Management [2]
147,039 I            i 10.0 Insurance and Regulatory Fees                                                                                                                                      18,358 I                                                    1.3
        .-.-.._ ..--...-.-_.--.---....-.--..._-.......--..-........-.....--...-......- ...-...-....-....-.._-...-.....-....-..-.--...-.-.-...--...--- ****--***-****-*-***---*-****-*---*--*--*-r-*..--*----..-...-.....- ...-..--.----..---.-
Energy                                                                                                                                                              10,083 I                                                    0.7 Characterization and Licensing Surveys                                                                                                                            24,739 I                                                    1. 7 Property Taxes                                                                                                                                                        5,825                                                    0.4 Severance                                                                                                                                                          74,113 I
_-_._._-_...._._._....__....._..._._-._---Equipment
        ..Miscellaneous                                **......._.-_....._---_...__......._. __......._..__..._.__..__..__. - - -*.. --_..._-_._. __....._._-_.                8,167
__._.._-,. I __._--------_._.----
5.1 0.6 Total [3]                                                                                                                                                  1,463,605                I                                    100.0 Cost Element                                                                                                                                                          Total                          Percentage
    . J.~!~~~~~. . T~~.~i~~!i2.!!__.___. _. . . _._. . . . . . _. _._. . . _. ._. _. __.____. . ._. . . .__._. _. . . . . .J.?..9._?_~2...? 7~__._____.___. .___. . _'1..9* ~_
    . Spent Fuel Management                                                                                                                                              207,854                                                      14.2
    ._~i!.~. B~_~tora~ion____.__.___. __________________.__._. ____._. __.__._.~ 19~!}~ ____________E...:2...
Total          [3]                                                                                                                                        1,463,605                                                      100.0
[1]      Includes engineering costs
[2]      Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer costs/spent fuel pool O&M and EP fees
[3]      Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                            Section 6, Page 6 of 7 TABLE 6.3 SAFSTOR ALTERNATIVE DECOMMISSIONING COST ELEMENTS, UNIT 1 (thousands of 2011 dollars)
Cost Element                                                                                                                                                                        Total I                              Percentage Decontamination                                                                                                                                                                  13,853                I                                          1.0 I Removal
    '-p;~;gi~g--'-"'--'-'--'------"--"--'-'-'----'---''''                                                              . . --..-.--..---.. * *. *-*-..* -. . -***--..              128,358 30~285-1-*----**--**
I                                          9.2 2.2 Transportation                                                                                                                                                                    15,714 I                                                          1.1 Waste Disposal
      . - - - . - - - - -....--.-....----.--..- ..- - - - . - - -..- ..--.-----..-----....- - . - - - - - . - - -..- ....- ...--.------.-..- . - -..- .. t - . -....-
162,651 I                                                              11.7 Program Management [1]                                                                                                                                                      449,004 I                                                              32.2 Security                                                                                                                                                                    214,618 I                                                              15.4 Spent Fuel Pool Isolation                                                                                                                                                        24,155 I                                                          1. 7
    ~pent Fuel Management [2]                                                                                                                                                      186,420 I                                                              13.4
    ~~~~~~-----f--it~f---H-Characterization and Licensing Surveys                                                                                                                                            23,406 I                                                          1.7 Property Taxes                                                                                                                                                                      7,750 I                                                        0.6 Severance                                                                                                                                                                        74,608 I                                                          5.3
    -...Miscellaneous
          --.-.. -.-.--..----.-.--.-.--.-.-----.........      Equipment  -.-....--..---....-.---.-----.----.-..-...-...-.-.-.-.. -......-....---...-. -.---..-      . . -.-.--.....13,996                        I -...-...-...-.--....-....-..--..-.-...-..----.
                                                                                                                                                                                            -.-..-..-...-.--...-..1"-....                                    1.0. . ..
Total [3]                                                                                                                                                          1,395,643                            i                                    100.0 Cost Element                                                                                                                                                                        Total                                Percentage License
      .............. _._...._-_..._.__Termination
                                              ... ........... _.._.._ __.._.._...._..._.__..._._.._...._..._ _ -_ _._.................._..._.._ 736,693 52.8 Spent Fuel Management                                                                                                                                                      584,671                                                                41.9 Site                  Restoration 74,279                                                            5.3 Total [3]                                                                                                                                                        1,395,643                                                                    100.0
[1]            Includes engineering costs
[2]            Excludes program management costs (staffmg) but includes costs for spent fuel loadingltransfer costs/spent fuel pool O&M and EP fees
[3]            Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                          Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                            Section 6, Page 7 of 7 TABLE 6.4 SAFSTOR ALTERNATIVE DECOMMISSIONING COST ELEMENTS, UNIT 2 (thousands of 2011 dollars)
Cost Element                                                                                                                                                                                                        Total I                                          Percentage I
Decontamination                                                                                                                                                                                                  20,517                          I                                      1.5
      -~~----~-"-----~~1-Transportation                                                                                                                                                                                                    15,641 I                                                                1.1 Waste Disposal
      - -..--.--.------------..-.----....- ...-.--..-----.-....--.....- - - - - - -..- . - -....---.---.--t------.--..-.---....- - - - -..
157,468 I                                                                11.5 Program Management [1]                                                                                                                                                                                        323,748 I                                                                23.7 Security                                                                                                                                                                                                      205,101 I                                                                15.0 Spent Fuel Pool Isolation                                                                                                                                                                                        16,006 I                                                                1.2 Spent Fuel Management [2]                                                                                                                                                                                    144,752 I                                                                10.6 Insurance and Regulatory Fees 33,152 I
                                                                                                                            .....- .........- ...._ ....- ....................- ....................- ...........- ...- . -..- ...- ......- -...-.-......t-..- . _ - -..._ -..- - . -..- ..._ ...-
2.4
    ! Energy                                                                                                                                                                                                                14,907 I                                                                1.1 Characterization and Licensing Surveys                                                                                                                                                                            26,614 I                                                                2.0 Property Taxes                                                                                                                                                                                                        7,564 I                                                            0.6 Severance                                                                                                                                                                                                        74,158 I                                                                5.4
        . .Miscellaneous Equipment                                                                                                                                                          14,476    . . .*. .*. . *-. . *r*I . . -.._. -..*. --..*-*. -_*.*--..--.-.
1.1.-.
Total [3]                                                                                                                                                                                                1,364,305                                I                                  100.0 st Element                                                                                                                                                                                                Total                                            Percent
        . . 1i~~.!?:~~.J~.erpli.!?-_~.!i2!.!. . . . .__. ._. ._. . .__. . _._. ._. __. . . ._. . _. . . . . . . . _... . . . . . . .___. __. ._.Z~!1. g&sect;. ~. . . . _. ._._. ._.__. . . _. . . ._. . . . ._. __.____. .__.
Sent Fuel Mana ement                                                                                                                                                                                          403,424 Total [3]                                                                                                                                                                                              1,364,305                                                                    100.0
[1]          Includes engineering costs
[2]          Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer costs/spent fuel pool O&M and EP fees
[3]          Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 7, Page 1 of 3
: 7. REFERENCES
: 1. U.S. Code of Federal Regulations, Title 10, Parts 30, 40, 50, 51, 70 and 72, "General Requirements for Decommissioning Nuclear Facilities," Nuclear Regulatory Commission, 53 Fed. Reg. 24018, June 27,1988.
: 2. U.S. Nuclear Regulatory Commission, Regulatory Guide 1.159, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors," Rev. 2, October 2011.
: 3. U.S. Code of Federal Regulations, Title 10, Part 20, Subpart E, "Radiological Criteria for License Termination."
: 4. U.S. Code of Federal Regulations, Title 10, Parts 20 and 50, "Entombment Options for Power Reactors," Advanced Notice of Proposed Rulemaking, 66 Fed.
Reg. 52551, October 16, 2001.
: 5. U.S. Code of Federal Regulations, Title 10, Parts 2, 50 and 51, "Decommissioning of Nuclear Power Reactors," Nuclear Regulatory Commission, 61 Fed. Reg. 39278, July 29, 1996.
: 6.    "Nuclear Waste Policy Act of 1982 and Amendments," U.S. Department of Energy's Office of Civilian Radioactive Management, 1982
: 7. U.S. Code of Federal Regulations, Title 10, Part 50, "Domestic Licensing of Production and Utilization Facilities," Subpart 54 (bb), "Conditions of Licenses."
: 8.    "Low Level Radioactive Waste Policy Act," Public Law 96-573, 1980.
: 9.    "Low-Level Radioactive Waste Policy Amendments Act of 1985," Public Law 99-240,1986.
: 10. U.S. Code of Federal Regulations, Title 10, Part 61.55 "Waste Classification."
: 11.    "Establishing an Appropriate Disposal Rate for Low Level Radioactive Waste During Decommissioning", Robert A Snyder, NEWEX, Revision 0, July 2008.
: 12. U.S. Code of Federal Regulations, Title 10, Part 20, Subpart E, "Final Rule, Radiological Criteria for License Termination," 62 Fed. Reg. 39058, July 21, 1997.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Section 7, Page 2 of 3
: 7. REFERENCES (continued)
: 13.  "Establishment of Cleanup Levels for CERCLA Sites with Radioactive Contamination," EPA Memorandum OSWER No. 9200.4-18, August 22, 1997.
: 14. U.S. Code of Federal Regulations, Title 40, Part 141.16, "Maximum contaminant levels for beta particle and photon radioactivity from man-made radionuclides in community water systems."
: 15.  "Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites," OSWER 9295.8-06a, October 9, 2002.
: 16.  "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM),"
NUREG/CR-1575, Rev. 1, EPA 402-R-97-016, Rev. 1, August 2000
: 17. T.S. LaGuardia et aI., "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May 1986.
: 18. W.J. Manion and T.S. LaGuardia, "Decommissioning Handbook," U.S.
Department of Energy, DOE/EV/I0128-1, November 1980.
: 19.  "Building Construction Cost Data 2011," Robert Snow Means Company, Inc.,
Kingston, Massachusetts.
: 20. Project and Cost Engineers' Handbook, Second Edition, p. 239, American Association of Cost Engineers, Marcel Dekker, Inc., New York, New York, 1984.
: 21.  "Technical Position Paper for Establishing an Appropriate Contingency Factor for Inclusion in the Decommissioning Revenue Requirements", Study Number:
DECON-POS-H002, Revision A, Status: Preliminary (provided by PG&E).
: 22. U.S. Department of Transportation, Title 49 of the Code of Federal Regulations, "Transportation," Parts 173 through 178.
: 23. Tri-State Motor Transit Company, published tariffs, Interstate Commerce Commission (ICC), Docket No. MC-427719 Rules Tariff, March 2004, Radioactive Materials Tariff, August 2011.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Section 7, Page 3 of 3
: 7. REFERENCES (continued)
: 24. J.C. Evans et aI., "Long-Lived Activation Products in Reactor Materials" NUREG/CR-34 74, Pacific Northwest Laboratory for the Nuclear Regulatory Commission, August 1984.
: 25. R.I. Smith, G.J. Konzek, W.E. Kennedy, Jr., "Technology, Safety and Costs of Decommissioning a Reference Pressurized Water Reactor Power Station,"
NUREG/CR-0130 and addenda, Pacific Northwest Laboratory for the Nuclear Regulatory Commission, June 1978.
: 26. H.D. Oak, et aI., "Technology, Safety and Costs of Decommissioning a Reference Boiling Water Reactor Power Station," NUREG/CR-0672 and addenda, Pacific Northwest Laboratory for the Nuclear Regulatory Commission, June 1980.
: 27.  "Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors," 10 CFR Parts 50 and 140, Proposed Rule, 62 Fed. Reg. 58690, October 30, 1997.
: 28.    "Microsoft Project Professional 2010," Microsoft Corporation, Redmond, WA.
: 29.  "Atomic Energy Act of 1954," (68 Stat. 919).
TLG Services, Inc.
 
Diablo Canyon Power Plant                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                    Appendix A, Page 1 of 4 APPENDIX A UNIT COST FACTOR DEVELOPMENT TLG Services, Inc.
 
Diablo Canyon Power Plant                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                Appendix A, Page 2 of 4 APPENDIX A UNIT COST FACTOR DEVELOPMENT Example:      Unit Factor for Removal of Contaminated Heat Exchanger < 3,000 lbs.
: 1. SCOPE Heat exchangers weighing < 3,000 lbs. will be removed in one piece using a crane or small hoist. They will be disconnected from the inlet and outlet piping. The heat exchanger will be sent to the waste processing area.
: 2. CALCULATIONS Activity        Critical Act    Activity                                                        Duration        Duration ID    Description                                                      (minutes)        (minutes)*
a      Remove insulation                                                    60              (b) b      Mount pipe cutters                                                  60              60 c      Install contamination controls                                      20              (b) d      Disconnect inlet and outlet lines                                    60              60 e      Cap openings                                                        20              (d) f      Rig for removal                                                      30              30 g      Unbolt from mounts                                                  30              30 h      Remove contamination controls                                        15              15 1      Remove, wrap, send to waste processing area                          60            ~
Totals (Activity/Critical)                                          355              255 Duration adjustment(s):
+ Respiratory protection adjustment (50% of critical duration)                            128
+ RadiationiALARA adjustment (37.1% of critical duration)                                  95 Adjusted work duration                                                                      478
+ Protective clothing adjustment (30% of adjusted duration)                                143 Productive work duration                                                                    621
+ Work break adjustment (8.33 % of productive duration)
Total work duration (minutes)                                                              673
                            *** Total duration = 11.217 hr ***
* alpha designators indicate activities that can be performed in parallel TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Appendix A, Page 3 of 4 APPENDIX A (continued)
: 3. LABOR REQUIRED Duration    Rate Crew                              Number          (hours)      ($/hr)            Cost Laborers                            3.00          11.217      $57.61        $1,938.63 Craftsmen                          2.00          11.217      $70.00        $1,570.38 Foreman                            1.00          11.217      $74.17          $831.96 General Foreman                    0.25          11.217      $77.53          $217.41 Fire Watch                          0.05          11.217      $57.61            $32.31 Health Physics Technician          1.00          11.217      $75.96          $852.04 Total Labor Cost                                                              $5,442.73
: 4. EQUIPMENT & CONSUMABLES COSTS Equipment Costs                                                                    none ConsumableslMaterials Costs
-Universal Sorbent 50 @ $0.6 sq. ft. {l} ,                                      $30.00
-Tarpaulins (7.5 mils, oil resistant, fire retardant) 50 @ $0.44/sq. ft. {2}    $22.00
-Gas torch consumables 1 @ $11.43/hr. x 1 hr. {3}                              $11.43 Subtotal cost of equipment and materials                                        $63.43 Overhead & profit on equipment and materials @ 17.75 %                          $11.26 Total costs, equipment & material                                                $74.69 TOTAL COST:
Removal of contaminated heat exchanger <3000 pounds:                      $5,517.42 Total labor cost:                                                            $5,442.73 Total equipment/material costs:                                                  $74.69 Total craft labor man-hours required per unit:                                    81.88 TLG Services, Inc.
 
Diablo Canyon Power Plant                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                      Appendix A, Page 4 of 4
: 5. NOTES AND REFERENCES
      $  Work difficulty factors were developed in conjunction with the Atomic Industrial Forum's (now NEI) program to standardize nuclear decommissioning cost estimates and are delineated in Volume 1, Chapter 5 of the "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates," AIF/NESP-036, May 1986.
* References for equipment & consumables costs:
: 1. W\VW .mClnaster .conl online catalog, McMaster Carr Spill Control (7193T88)
: 2. R.S. Means (2011) Division 01 56, Section 13.60-0600, page 20
: 3. R.S. Means (2011) Division 01 5433, Section 40-6360, page 664
* Material and consumable costs were adjusted using the regional indices for San Luis Obispo, California.
TLG Services, Inc.
 
Diablo Canyon Power Plant                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                          Appendix B, Page 1 of 7 APPENDIXB UNIT COST FACTOR LISTING (DECON: Power Block Structures Only)
TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix B, Page 2 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                          Cost/Unit($)
Removal of clean instrument and sampling tubing, $Ilinear foot                      0.34 Removal of clean instrument and sampling tubing, $/linear foot                      0.62 Removal of clean pipe 0.25 to 2 inches diameter, $/linear foot                      6.65 Removal of clean pipe >2 to 4 inches diameter, $/linear foot                        9.42 Removal of clean pipe >4 to 8 inches diameter, $/linear foot                      18.11 Removal of clean pipe >8 to 14 inches diameter, $/linear foot                      35.21 Removal of clean pipe> 14 to 20 inches diameter, $/linear foot                    45.67 Removal of clean pipe >20 to 36 inches diameter, $/linear foot                    67.22 Removal of clean pipe >36 inches diameter, $Ilinear foot                          79.92 Removal of clean valve >2 to 4 inches                                            120.67 Removal of clean valve >4 to 8 inches                                            181.05 Removal of clean valve >8 to 14 inches                                          352.11 Removal of clean valve> 14 to 20 inches                                          456.72 Removal of clean valve >20 to 36 inches                                          672.25 Removal of clean valve >36 inches                                                799.18 Removal of clean pipe hanger for small bore piping                                39.70 Removal of clean pipe hanger for large bore piping                              145.82 Removal of clean pump, <300 pound                                                303.21 Removal of clean pump, 300-1000 pound                                            837.32 Removal of clean pump, 1000-10,000 pound                                      3,332.94 Removal of clean pump, >10,000 pound                                          6,438.29 Removal of clean pump motor, 300-1000 pound                                      352.43 Removal of clean pump motor, 1000-10,000 pound                                1,388.37 Removal of clean pump motor, > 10,000 pound                                    3,123.85 Removal of clean heat exchanger <3000 pound                                    1,786.79 Removal of clean heat exchanger >3000 pound                                    4,487.38 Removal of clean feedwater heater/deaerator                                  12,670.50 Removal of clean moisture separator/reheater                                  26,076.35 Removal of clean tank, <300 gallons                                              390.29 Removal of clean tank, 300-3000 gallon                                        1,234.81 TLG Services, Inc.
 
Diablo Canyon Power Plant                                Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                  Appendix B, Page 3 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                        CostlUnit($)
Removal of clean electrical equipment, <300 pound                              166.34 Removal of clean electrical equipment, 300-1000 pound                          573.79 Removal of clean electrical equipment, 1000-10,000 pound                    1,147.59 Removal of clean electrical equipment, > 10,000 pound                        2,720.43 Removal of clean electrical transformer < 30 tons                            1,889.30 Removal of clean electrical transformer> 30 tons                            5,440.85 Removal of clean standby diesel generator, <100 kW                          1,929.75 Removal of clean standby diesel generator, 100 kW to 1 MW                    4,307.34 Removal of clean standby diesel generator, > 1 MW                            8,917.06 Removal of clean electrical cable tray, $/linear foot                            15.49 Removal of clean electrical conduit, $/linear foot                                6.76 Removal of clean mechanical equipment, <300 pound                              166.34 Removal of clean mechanical equipment, 300-1000 pound                          573.79 Removal of clean mechanical equipment, 1000-10,000 pound                    1,147.59 Removal of clean mechanical equipment, > 10,000 pound                        2,720.43 Removal of clean HVAC equipment, <300 pound                                    201.14 Removal of clean HVAC equipment, 300-1000 pound                                689.47 Removal of clean HVAC equipment, 1000-10,000 pound                          1,374.09 Removal of clean HVAC equipment, > 10,000 pound                              2,720.43 Removal of clean HVAC ductwork, $/pound                                          0.66 Removal of contaminated instrument and sampling tubing, $/linear foot            2.04 Removal of contaminated pipe 0.25 to 2 inches diameter, $/linear foot            27.70 Removal of contaminated pipe >2 to 4 inches diameter, $/linear foot              47.43 Removal of contaminated pipe >4 to 8 inches diameter, $/linear foot              75.37 Removal of contaminated pipe >8 to 14 inches diameter, $/linear foot          147.47 Removal of contaminated pipe> 14 to 20 inches diameter, $/linear foot          177.17 Removal of contaminated pipe >20 to 36 inches diameter, $/linear foot          245.44 Removal of contaminated pipe >36 inches diameter, $/linear foot                290.25 Removal of contaminated valve >2 to 4 inches                                  577.75 Removal of contaminated valve >4 to 8 inches                                  689.57 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix B, Page 4 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                          CostlUnit($)
Removal of contaminated valve >8 to 14 inches                                  1,413.45 Removal of contaminated valve> 14 to 20 inches                                  1,796.30 Removal of contaminated valve >20 to 36 inches                                  2,393.21 Removal of contaminated valve >36 inches                                        2,841.23 Removal of contaminated pipe hanger for small bore piping                        190.43 Removal of contaminated pipe hanger for large bore piping                        623.87 Removal of contaminated pump, <300 pound                                        1,227.21 Removal of contaminated pump, 300-1000 pound                                    2,803.76 Removal of contaminated pump, 1000-10,000 pound                                9,063.05 Removal of contaminated pump, > 10,000 pound                                  22,071.48 Removal of contaminated pump motor, 300-1000 pound                              1,193.21 Removal of contaminated pump motor, 1000-10,000 pound                          3,690.68 Removal of contaminated pump motor, > 10,000 pound                              8,286.03 Removal of contaminated heat exchanger <3000 pound                              5,517.42 Removal of contaminated heat exchanger >3000 pound                            15,980.87 Removal of contaminated tank, <300 gallons                                      2,040.84 Removal of contaminated tank, >300 gallons, $/square foot                          39.33 Removal of contaminated electrical equipment, <300 pound                          957.45 Removal of contaminated electrical equipment, 300-1000 pound                    2,294.23 Removal of contaminated electrical equipment, 1000-10,000 pound                4,418.75 Removal of contaminated electrical equipment, > 10,000 pound                    8,612.27 Removal of contaminated electrical cable tray, $/linear foot                        46.12 Removal of contaminated electrical conduit, $/linear foot                          22.38 Removal of contaminated mechanical equipment, <300 pound                        1,065.25 Removal of contaminated mechanical equipment, 300-1000 pound                    2,533.85 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix B, Page 5 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                        CostlUnit($)
Removal of contaminated mechanical equipment, 1000-10,000 pound              4,872.29 Removal of contaminated mechanical equipment, > 10,000 pound                  8,612.27 Removal of contaminated HVAC equipment, <300 pound                            1,065.25 Removal of contaminated HVAC equipment, 300-1000 pound                        2,533.85 Removal of contaminated HVAC equipment, 1000-10,000 pound                    4,872.29 Removal of contaminated HVAC equipment, > 10,000 pound                        8,612.27 Removal of contaminated HVAC ductwork, $/pound                                    2.77 Removal/plasma arc cut of contaminated thin metal components, $/linear in.        5.00 Additional decontamination of surface by washing, $/square foot                  10.55 Additional decontamination of surfaces by hydrolasing, $/square foot              43.80 Decontamination rig hook up and flush, $1 250 foot length                    8,987.09 Chemical flush of components/systems, $/gallon                                    19.14 Removal of clean standard reinforced concrete, $/cubic yard                    165.89 Removal of grade slab concrete, $/cubic yard                                    221.88 Removal of clean concrete floors, $/cubic yard                                  423.47 Removal of sections of clean concrete floors, $/cubic yard                    1,280.23 Removal of clean heavily rein concrete wl#9 rebar, $/cubic yard                276.86 Removal of contaminated heavily rein concrete wl#9 rebar, $/cubic yard        2,579.29 Removal of clean heavily rein concrete wl#18 rebar, $/cubic yard                349.92 Removal of contaminated heavily rein concrete wl#18 rebar, $/cubic yard      3,411.52 Removal heavily rein concrete wl#18 rebar & steel embedments, $/cubic yard 544.96 Removal of below-grade suspended floors, $/cubic yard                          423.47 Removal of clean monolithic concrete structures, $/cubic yard                1,073.10 Removal of contaminated monolithic concrete structures, $/cubic yard          2,568.55 Removal of clean foundation concrete, $/cubic yard                              841.27 Removal of contaminated foundation concrete, $/cubic yard                    2,392.56 Explosive demolition of bulk concrete, $/cubic yard                              36.16 Removal of clean hollow masonry block wall, $/cubic yard                        119.27 Removal of contaminated hollow masonry block wall, $/cubic yard                422.83 Removal of clean solid masonry block wall, $/cubic yard                        119.27 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix B, Page 6 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                          CostlUnit($)
Removal of contaminated solid masonry block wall, $/cubic yard                    422.83 BackfIll of below-grade yoids, $/cubic yard                                        34.85 Removal of subterranean tunnels/voids, $/linear foot                              137.89 Placement of concrete for below-grade voids, $/cubic yard                        143.45 Excavation of clean material, $/cubic yard                                          3.69 Excavation of contaminated material, $/cubic yard                                  49.48 Removal of clean concrete rubble (tipping fee included), $/cubic yard              26.59 Removal of contaminated concrete rubble, $/cubic yard                              30.10 Removal of building by volume, $/cubic foot                                          0.35 Removal of clean building metal siding, $/square foot                                1.48 Removal of contaminated building metal siding, $/square foot                        5.44 Removal of standard asphalt roofIng, $/square foot                                  2.91 Removal of transite panels, $/square foot                                            2.60 Scarifying contaminated concrete surfaces (drill & spall), $/square foot            15.71 Scabbling contaminated concrete floors, $/square foot                                9.77 Scabbling contaminated concrete walls, $/square foot                              26.03 Scabbling contaminated ceilings, $/square foot                                    89.56 Scabbling structural steel, $/square foot                                            8.04 Removal of clean overhead crane/monorail < 10 ton capacity                        794.26 Removal of contaminated overhead crane/monorail < 10 ton capacity              2,338.53 Removal of clean overhead crane/monorail> 10-50 ton capacity                    1,906.21 Removal of contaminated overhead crane/monorail> 10-50 ton capacity            5,611.50 Removal of polar crane> 50 ton capacity                                        7,948.73 Removal of gantry crane> 50 ton capacity                                      34,005.31 Removal of structural steel, $/pound                                                0.25 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix B, Page 7 of 7 APPENDIXB UNIT COST FACTOR LISTING (Power Block Structures Only)
Unit Cost Factor                                                          CostlUnit($)
Removal of clean steel floor grating, $/square foot                                5.51 Removal of contaminated steel floor grating, $/square foot                        16.62 Removal of clean free standing steel liner, $/square foot .                        15.36 Removal of contaminated free standing steel liner, $/square foot                  46.07 Removal of clean concrete-anchored steel liner, $/square foot                      7.68 Removal of contaminated concrete-anchored steel liner, $/square foot              53.66 Placement of scaffolding in clean areas, $/square foot                            19.77 Placement of scaffolding in contaminated areas, $/square foot                      33.59 Landscaping with topsoil, $/acre                                              31,625.69 Cost of CPC B-88 LSA box & preparation for use                                2,361.61 Cost of CPC B-25 LSA box & preparation for use                                2,164.01 Cost of CPC B-12V 12 gauge LSA box & preparation for use                      1,763.72 Cost of CPC B-144 LSA box & preparation for use                              11,896.44 Cost of LSA drum & preparation for use                                          231.23 Cost of cask liner for CNSI 8 120A cask (resins)                              8,816.85 Cost of cask liner for CNSI 8 120A cask (filters)                              9,211.82 Decontamination of surfaces with vacuuming, $/square foot                          0.96 TLG Services, Inc.
 
Diablo Canyon Power Plant                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                      Appendix C, Page 1 of 20 APPENDIXC DETAILED COST ANALYSIS DECON TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                Appendix C, Page 2 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial/              Utility and Activity                                              Decon Removal Packaging  Transport  Processing Disposal  Other    Total    Total    Lic. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                Cost  Cost    Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours PERIOD la - Shutdown through Transition Period la Direct Decommissioning Activities 1a.1.1    Prepare preliminary decommissioning cost                                                                191          41      232        232                                                                                                      1,300 1a.1.2    Notification of Cessation of Operations                                                                                        a la.1.3    Remove fuel & source material                                                                                                nfa la.1.4    Notification of Permanent Defueling                                                                                            a 1a.1.5    Deactivate plant systems & process waste                                                                                        a 1a.1.6    Prepare and submit PSDAR                                                                                294          63      357        357                                                                                                      2,000 1a.1.7    Review plant dwgs & specs.                                                                              676          144      820        820                                                                                                      4,600 1a.1.8    Perform detailed rad survey                                                                                                    a la.1.9    Estimate by-product inventory                                                                          147          31      178        178                                                                                                      1,000 1a. 1. 10  End product description                                                                                147          31      178        178                                                                                                      1,000 1a. 1. 11  Detailed by-product inventory                                                                          191          41      232        232                                                                                                      1,300 1a.1.12    Define major work sequence                                                                            1,103          235    1,337      1,337                                                                                                      7,500 1a.1.13    Perform SER and EA                                                                                      456          97      553        553                                                                                                      3,100 1a.1.14    Perform Site-Specific Cost Study                                                                        735          156      891        891                                                                                                      5,000 1a.1.15    Prepare/submit License Termination Plan                                                                602          128      730        730                                                                                                      4,096 1a.1.16    Receive NRC approval oftermination plan                                                                                        a Activity Specifications 1a.1.17.1 Plant & temporary facilities                                                                            723          154      877        789                        88                                                                            4,920 1a.1.17.2 Plant systems                                                                                            613          130      743        669                        74                                                                            4,167 la.1.17.3 NSSS Decontamination Flush                                                                                74          16      89          89                                                                                                        500 1a.1.17.4 Reactor internals                                                                                      1,044          222    1,266      1,266                                                                                                      7,100 la.1.17.5 Reactor vessel                                                                                          956          203    1,159      1,159                                                                                                      6,500 1a.1.17.6 Biological shield                                                                                        74          16      89          89                                                                                                        500 1a.1.17.7 Steam generators                                                                                        459          98      556        556                                                                                                      3,120 1a.1.17.8 Reinforced concrete                                                                                      235          50      285        143                      143                                                                            1,600 la.1.17.9 Main Turbine                                                                                              59          13      71                                    71                                                                              400 1a.1.17.10 Main Condensers                                                                                          59          13      71                                    71                                                                              400 1a.1.17.11 Plant structures & buildings                                                                            459          98      556        278                      278                                                                            3,120 1a.1.17.12 Waste management                                                                                        676          144      820        820                                                                                                      4,600 1a.1.17.13 Facility & site closeout                                                                                132          28      160          80                        80                                                                              900 la.1.17    Total                                                                                                5,561        1,184    6,744      5,938                      806                                                                          37,827 Planning  & Site Preparations 1a.1.18    Prepare dismantling sequence                                                                            353          75      428        428                                                                                                      2,400 1a.1.19    Plant prep. & temp. svces                                                                            2,800          596    3,396      3,396 1a.1.20    Design water clean-up system                                                                            206          44      250        250                                                                                                      1,400 1a.1.21    Rigging/Cont. Cntd Envlps/tooling/etc.                                                                2,200          468    2,668      2,668 1a.1.22    Procure caskslliners & containers                                                                      181          38      219        219                                                                                                      1,230 1a.1      Subtotal Period 1a Activity Costs                                                                    15,842        3,372  19,214      18,408                      806                                                                          73,753 Period 1a Additional Costs 1a.2.1    Spent Fuel Pool Isolation                                                                            19,825        4,220  24,045      24,045 la.2.2    Disposal of Contaminated Tools & Equipment                      234        97                3,145                1,170    4,646      4,646                                      10,245                              609,715      317 1a.2      Subtotal Period 1a Additional Costs                            234        97                3,145  19,825        5,389  28,691      28,691                                      10,245                              609,715      317 Period la Period-Dependent Costs 1a.4.1    Insurance                                                                                            1,056          150    1,205      1,205 1a.4.2    Property taxes                                                                                          165          23      189        189 1a.4.3    Health physics supplies                              485                                                            172      657        657 1a.4.4    Heavy equipment rental                              480                                                            102      582        582 la.4.5    Disposal ofDAW generated                                        15          4                  49                  21      89          89                                          645                                13,281        20 1a.4.6    Plant energy budget                                                                                  1,156          246    1,402      1,402 1a.4.7    NRC Fees                                                                                              1,177          167    1,344      1,344 1a.4.8    Emergency Planning Fees                                                                              1,001          142    1,143                    1,143 1a.4.9    Spent Fuel Pool O&M                                                                                    763          162      926                      926 1a.4.10    ISFSI Operating Costs                                                                                    45          10      54                      54 1a.4.11    Severance Related Costs                                                                              35,456        7,547  43,002      43,002 1a.4.12    Spent Fuel Storage Canisters/Overpacks                                                                7,353        1,565    8,919                    8,919 1a.4.13    Security Staff Cost                                                                                  14,837        3,158  17,995      17,995                                                                                                    229,429 1a.4.14    Utility Staff Cost                                                                                  33,000        7,024  40,024      40,024                                                                                                    423,400 1a.4      Subtotal Period 1a Period-Dependent Costs            965        15          4                  49  96,010      20,489 117,533      106,491      11,042                            645                                13,281        20      652,829 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                      Appendix C, Page 3 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial f            Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours 1a.0        TOTAL PERIOD la COST                                      965        249        101                3,194 131,677      29,250 165,437      153,590      11,042          806            10,890                              622,996      337      726,581 PERIOD 1b - Decommissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures Ib. 1. 1.1 Plant systems                                                                                                696          148      844        759                        84                                                                            4,733 lb. 1. 1.2 NSSS Decontamination Flush                                                                                    147          31      178        178                                                                                                      1,000 1b.1.1.3 Reactor internals                                                                                              368          78      446        446                                                                                                      2,500 1h. 1. 1.4 Remaining buildings                                                                                          198          42      241          60                      181                                                                            1,350 lb. 1. 1.5 CRD cooling assembly                                                                                          147          31      178        178                                                                                                      1,000 lb. 1. 1.6 CRD housings & ICI tubes                                                                                      147          31      178        178                                                                                                      1,000 lb. 1. 1. 7 Incore instrumentation                                                                                      147          31      178        178                                                                                                      1,000 lb. 1. 1.8 Reactor vessel                                                                                                534          114      647        647                                                                                                      3,630 lb. 1.1.9 Facility closeout                                                                                              176          38      214        107                      107                                                                            1,200 lb. 1. 1.10 Missile shields                                                                                              66          14      80          80                                                                                                        450 1h. 1. 1.11 Biological shield                                                                                            176          38      214        214                                                                                                      1,200 1h. 1. 1.12 Steam generators                                                                                            676          144      820        820                                                                                                      4,600 lb. 1. 1.13 Reinforced concrete                                                                                          147          31      178          89                        89                                                                            1,000 lb. 1. 1.14 Main Turbine                                                                                                229          49      278                                  278                                                                            1,560 lb. 1. 1.15 Main Condensers                                                                                              229          49      278                                  278                                                                            1,560 lb. 1. 1.16 Auxiliary building                                                                                          401          85      487        438                        49                                                                            2,730 lb. 1.1.17 Reactor building                                                                                              401          85      487        438                        49                                                                            2,730 lb. 1.1    Total                                                                                                      4,887        1,040  5,927        4,812                    1,115                                                                          33,243 1h.1.2      Decon primary loop                              750                                                                      532    1,283      1,283                                                                                        1,067 1b.1        Subtotal Period 1b Activity Costs                750                                                      4,887        1,573    7,210      6,095                    1,115                                                              1,067        33,243 Period 1b Additional Costs 1b.2.1      Site Characterization                                                                                      4,765        2,029  6,794        6,794                                                                                      25,000        9,412 1b.2.2      Hazardous Waste Management                                                                                  204          43      247        247 1b.2.3      Mixed Waste Management                                                                                      270          57      327        327 1h.2        Subtotal Period 1b Additional Costs                                                                        5,239        2,129  7,368        7,368                                                                                      25,000        9,412 Period 1b Collateral Costs 1b.3.1      Decon equipment                                  931                                                                      198    1,129      1,129 1b.3.2      DOC staff relocation expenses                                                                              1,415          301    1,716      1,716 1b.3.3      Process decommissioning water waste              46                  21        66                  88                  81      302        302                                          291                                17,471        57 1b.3.4      Process decommissioning chemical flush waste      2                  63        256                6,210                2,267  8,797        8,797                                                  887                      94,531      166 1b.3.5      Small tool allowance                                        3                                                              1        3          3 1b.3.6      Pipe cutting equipment                                  1,100                                                            234    1,334      1,334 1b.3.7      Decon rig                                      1,500                                                                      319    1,819      1,819 1b.3.8      Spent Fuel Transfer - Pool to ISFSI                                                                        1,989          423  2,412                    2,412 1b.3        Subtotal Period 1b Collateral Costs            2,479    1,103        84        321                6,298  3,404        3,825  17,513      15,100        2,412                            291      887                      112,002      223 Period 1b Period-Dependent Costs 1b.4.1      Decon supplies                                    28                                                                      10      38          38 1b.4.2      Insurance                                                                                                    523          74      598        598 1b.4.3      Property taxes                                                                                                82          12      94          94 1b.4.4      Health physics supplies                                  269                                                              96      365        365 1h.4.5      Heavy equipment rental                                    238                                                              51      288        288 1b.4.6      DisposalofDAW generated                                                9          3                  28                  12      52          52                                          375                                7,718        12 1b.4.7      Plant energy budget                                                                                        1,147          244    1,391      1,391 1b.4.8      NRC Fees                                                                                                    346          49      395        395 1b.4.9      Emergency Planning Fees                                                                                      497          70      567                      567 1h.4.10    Spent Fuel Pool O&M                                                                                          378          81      459                      459 1h.4.11    ISFSI Operating Costs                                                                                        22            5      27                      27 1b.4.12    Severance Related Costs                                                                                    5,351        1,139  6,490        6,490 1b.4.13    Spent Fuel Storage Canisters/Overpacks                                                                    7,347        1,564  8,911                    8,911 1b.4.14    Security Staff Cost                                                                                        7,357        1,566  8,924        8,924                                                                                                    113,771 Ib.4.15    DOC Staff Cost                                                                                            6,563        1,397  7,960        7,960                                                                                                    63,091 1b.4.16    Utility Staff Cost                                                                                        16,460        3,504  19,963      19,963                                                                                                    210,994 1b.4        Subtotal Period 1b Period-Dependent Costs        28      507          9          3                  28  46,074        9,872  56,522      46,557        9,964                            375                                7,718        12      387,857 1h.0        TOTAL PERIOD 1b COST                          3,257    1,610        93        324                6,326  59,604      17,399  88,612      75,121      12,377        1,115                666      887                      119,720    26,301      430,512 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix C, Page 4 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management    Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs        Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet Wt., Lbs. Manhours  Manhours PERIOD 1 TOTALS                                          3,257    2,575        342        425                9,520 191,280      46,649 254,049      228,711        23,418        1,920            11,556      887                        742,716    26,638    1,157,093 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping                            370      354        52        40                1,342                  880    3,038      3,038                                          2,276                                260,153    10,138 2a. 1. 1.2 Pressurizer Quench Tank                          39      35          8          6                  189                  110      387        387                                            329                                  36,557    1,073 2a.1.1.3 Reactor Coolant Pumps & Motors                    118      126        103        185                1,443                  694    2,669      2,669                                          4,701                                774,960    4,185          100 2a.1.1.4 Pressurizer                                        50      70        448        114                  750                  414    1,846      1,846                                          2,443                                286,592    2,365          938 2a.1.1.5 Steam Generators                                  477    4,206      3,368      1,922              12,807                7,260  30,039      30,039                                        41,712                                3,350,761    27,047        1,750 2a.1.1.6 Retired Steam Generator Units                                        2,496      1,878              12,597                5,223  22,194      22,194                                        41,031                                3,125,629    14,613        1,125 2a.1.1.7 CRDMslICIs/Service Structure Removal              196      112        262        37                  444                  381    1,433      1,433                                          3,881                                  86,025    4,285 2a.1.1.8 Reactor Vessel Internals                          175    3,110    14,996      1,468              10,438    283      16,741  47,212      47,212                                          1,753      845      574              359,588    30,500        1,352 2a. 1. 1.9 Reactor Vessel                                  122    5,226      2,439        742                2,651    283        8,718  20,181      20,181                                          8,794                                957,382    30,500        1,352 2a.1.1    Totals                                        1,546  13,241    24,170      6,392              42,661    567      40,422 128,998      128,998                                      106,920      845      574            9,237,647  124,706        6,617 Removal of Major Equipment 2a.1.2    Main Turbine/Generator                                    202                                                              43      245                                    245                                                                3,033 2a.1.3    Main Condensers                                          668                                                            142      810                                    810                                                                9,875 Cascading Costs from Clean Building Demolition 2a.1.4.1 *Reactor                                                  1,194                                                            254    1,448      1,448                                                                                          11,895 2a.1.4.2 Containment Penetration Area                                73                                                              16      89          89                                                                                              704 2a.1.4.3 Fuel Handling                                              193                                                              41      234        234                                                                                            1,746 2a.1.4    Totals                                                  1,460                                                            311    1,771      1,771                                                                                          14,345 Disposal of Plant Systems 2a.1.5.1 Auxiliary Steam                                            148                                                              31      179                                    179                                                                2,310 2a.1.5.2 Auxiliary Steam (RCA)                                      277        61        19                  652                  342    1,351      1,351                                          2,054                                126,415    3,758 2a.1.5.3 Condensate System                                          679                                                            145      824                                    824                                                                10,671 2a.1.5.4 Condensate System (Insulated)                              281                                                              60      341                                    341                                                                4,367 2a.1.5.5 Containment Spray                                          249        167        53                1,786                  757    3,011      3,011                                          5,631                                346,093    3,734 2a.1.5.6 Extraction Steam & Heater Drip                              263                                                              56      318                                    318                                                                4,152 2a.1.5.7 Feedwater System                                            46                                                              10      56                                    56                                                                  706 2a.1.5.8 Feedwater System (Insulated)                                168                                                              36      204                                    204                                                                2,655 2a.1.5.9 Feedwater System (RCA Insulated)                            126        43        15                  506                  234      923        923                                          1,595                                  98,042    1,811 2a.1.5.10 Feedwater System (RCA)                                      6          2          1                  27                  12      48          48                                            84                                  5,160        87 2a.1.5.11 Lube Oil Distribution & Purification                      115                                                              25      140                                    140                                                                1,817 2a.1.5.12 Nitrogen & Hydrogen                                        20                                                              4      24                                    24                                                                  315 2a.1.5.13 Nitrogen & Hydrogen (Insulated)                              1                                                              0        1                                                                                                          17 2a.1.5.14 Nitrogen & Hydrogen (RCA Insulated)                          6          1          0                    5                    4      16          16                                            17                                  1,040        78 2a.1.5.15 Nitrogen & Hydrogen (RCA)                                  110        12          3                  102                  78      305        305                                            320                                  19,767    1,478 2a.1.5.16 Oily Water Separator & TB Sump                              37        12          5                  157                  72      282        282                                            494                                  30,347      480 2a.1.5.17 Saltwater System                                          190                                                              41      231                                    231                                                                2,926 2a.1.5.18 Turbine Steam Supply                                      759                                                            161      920                                    920                                                                11,955 2a.1.5.19 Turbine Steam Supply (RCA)                                862        335        112                3,799                1,725    6,833      6,833                                        11,974                                  736,290    12,374 2a.1.5.20 Turbine and Generator                                      80                                                              17      98                                    98                                                                1,244 2a.1.5.21 Turbine and Generator (Insulated)                          26                                                              6      32                                    32                                                                  422 2a.1.5    Totals                                                  4,450        633        207                7,034                3,814  16,138      12,770                      3,368            22,169                                1,363,155    67,355 2a.1.6    Scaffolding in support of decommissioning              2,465          9          5                  113                  917    3,509      3,509                                            369                                  32,791    16,818 2a.1      Subtotal Period 2a Activity Costs              1,546  22,486    24,812      6,604              49,808    567      45,648 151,472      147,048                      4,424            129,458      845      574          10,633,590  236,132        6,617 Period 2a Additional Costs 2a.2.1    Retired Reactor Head                                                225        179                1,557                  622    2,583      2,583                                          5,072                                322,442    2,098          750 2a.2      Subtotal Period 2a Additional Costs                                  225        179                1,557                  622    2,583      2,583                                          5,072                                322,442    2,098          750 Period 2a Collateral Costs 2a.3.1    Process decommissioning water waste              84                  40        122                  163                  149      558        558                                            540                                  32,379      105 2a.3.2    Process decommissioning chemical flush waste 2a.3.3    Small tool allowance                                      287                                                              61      348        313                        35 2a.3.4    Spent Fuel Transfer - Pool to ISFSI                                                                        9,666        2,057  11,723                    11,723 2a.3      Subtotal Period 2a Collateral Costs              84      287        40        122                  163  9,666        2,267  12,629        871        11,723          35                540                                  32,379      105 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix C, Page 5 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                                Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet  Wt.,Lbs. Manhours  Manhours Period 2a Period-Dependent Costs 2a.4.1        Decon supplies                                92                                                                        32      124        124 2a.4.2        Insurance                                                                                                  765          109      873        873 2a.4.3        Property taxes                                                                                            267          38      304        274                        30 2a.4.4      Health physics supplies                              1,863                                                            661  2,523        2,523 2a.4.5      Heavy equipment rental                                3,362                                                            716  4,077        4,077 2a.4.6      Disposal of DAW generated                                          96        27                  305                  127      555        555                                        4,010                                  82,574      124 2a.4.7      Plant energy hudget                                                                                      1,770          377  2,146        2,146 2a.4.8      NRC Fees                                                                                                1,022          145    1,167      1,167 2a.4.9        Emergency Planning Fees                                                                                  1,152          163    1,315                    1,315 2a.4.10      Spent Fuel Pool O&M                                                                                      1,229          262    1,491                    1,491 2a.4.11      ISFSI Operating Costs                                                                                      72          15      87                      87 2a.4.12      Severance Related Costs                                                                                  3,173          675  3,848        3,848 2a.4.13      Spent Fuel Storage Canisters/Overpacks                                                                  20,381        4,338  24,720                    24,720 2a.4.14      Security Staff Cost                                                                                    23,902        5,087  28,989      28,989                                                                                                      369,600 2a.4.15      DOC Staff Cost                                                                                          26,041        5,543  31,584      31,584                                                                                                      255,360 2a.4.16      Utility Staff Cost                                                                                      36,803        7,834  44,636      44,636                                                                                                      467,141 2a.4        Suhtotal Period 2a Period-Dependent Costs      92    5,224        96        27                  305 116,577      26,122 148,443      120,799      27,613          30              4,010                                  82,574      124    1,092,101 2a.0        TOTAL PERIOD 2a COST                        1,722    27,997    25,173      6,932              51,833 126,809      74,660 315,127      271,302      39,336        4,489            139,080      845      574          11,070,990  238,459    1,099,468 PERIOD 2b - Site Decontamination Period 2h Direct Decommissioning Activities Disposal of Plant Systems 2h. 1. 1.1 Capital Additions 85*2002 (clean)                        182                                                              39      220                                  220                                                                2,830 2h.1.1.2 Capital Additions 85*2002 (contaminated)                    485        54        19                  635                  409    1,603      1,603                                        2,017                                123,100    6,781 2h.1.1.3 Chemical & Volume Control                        875    1,229        197        67                2,277                1,907  6,551        6,551                                        7,273                                441,322    27,754 2h. 1. 1.4 Chemical & Volume Control (Insulated)          324      465        50        14                  466                  570    1,887      1,887                                        1,463                                  90,248    10,807 2h.1.1.5 Component Cooling Water                                    196                                                              42      237                                  237                                                                3,078 2h.1.1.6 Component Cooling Water (RCA)                              617        194        67                2,260                1,063  4,201        4,201                                        7,126                                438,014    8,605 2h.1.1.7 Compressed Air                                              174                                                              37      211                                  211                                                                2,744 2h.1.1.8 Compressed Air (Insulated)                                    6                                                              1        7                                    7                                                                    98 2h.1.1.9 Compressed Air (RCA Insulated)                              29          4          1                  31                  22      87          87                                            98                                  6,066      397 2h. 1. 1.10 Compressed Air (RCA)                                    534        67        18                  595                  414    1,626      1,626                                        1,868                                115,262    7,278 2h. 1. 1. 11 Diesel Engine-Generator                                179                                                              38      217                                  217                                                                2,760 2h.1.1.12 Diesel Engine-Generator (Insulated)                        11                                                              2      14                                    14                                                                  178 2b.1.1.13 Electrical (Clean)                                      2,130                                                            453  2,584                                  2,584                                                                32,770 2b. 1. 1.14 Electrical (Contaminated)                                633        91        38                1,275                  698  2,735        2,735                                        4,028                                247,187    8,649 2b. 1. 1.15 Electrical (Decontaminated)                            3,324                                                            708  4,032                                  4,032                                                                49,541 2b. 1. 1.16 Fire Protection                                          386        147        54                1,820                  815  3,222        3,222                                        5,929                                352,716    5,474 2b. 1. 1.17 Gaseous Radwaste                                          88        10          3                  91                  66      258        258                                          287                                  17,725    1,175 2b.1.l.18 HVAC (Clean Insulated)                                      29                                                              6      35                                    35                                                                  475 2b.1.1.19 HVAC (Clean)                                              372                                                              79      451                                  451                                                                6,016 2b.1.1.20 HVAC (Contaminated Insulated)                              309        55        22                  733                  382  1,501        1,501                                        2,315                                142,139    4,107 2h.1.1.21 HVAC (Contaminated)                                      1,372        272        108                3,662                1,848  7,262        7,262                                      11,560                                  709,746    18,491 2b.1.1.22 Liquid Radwaste                                  582      785        116        38                1,283                1,171  3,973        3,973                                        4,116                                248,609    18,831 2b.1.1.23 Liquid Radwaste (Insulated)                      69        86        10          3                  91                  114      372        372                                          287                                  17,717    2,114 2b.1.1.24 Make-up Water                                              360                                                              77      437                                  437                                                                5,614 2b.1.1.25 Make-up Water (Insulated)                                  33                                                              7      40                                    40                                                                  521 2h.1.1.26 Make-up Water (RCA Insulated)                              44          8          2                  81                  46      182        182                                          255                                  15,691      602 2h.1.1.27 Make-up Water (RCA)                                        237        46        14                  459                  256    1,012      1,012                                        1,443                                  88,918    3,184 2b.1.1.28 Miscellaneous Reactor Coolant                    21      137        17          5                  155                  121      455        455                                          491                                  30,030    2,172 2b.1.1.29 Nuclear Stearn Supply Sampling                            182        13          4                  141                  117      457        457                                          444                                  27,315    2,715 2b.1.1.30 Nuclear Stearn Supply Sampling (Insulated                  55          2          1                  19                  27      103        103                                            58                                  3,590      826 2b.1.1.31 Residual Heat Removal                            319      336        165        55                1,873                1,045  3,793        3,793                                        5,901                                363,036    6,105 2h.1.1.32 Safety Injection                                          128        22          7                  245                  137      538        538                                          784                                  47,397    1,860 2b.1.1.33 Safety Injection (Insulated)                                6          1          0                  11                    6      24          24                                            33                                  2,043        90 2b.1.1.34 Safety Injection (RCA Insulated)                            42          9          3                  95                  50      198        198                                          299                                  18,385      564 2b.1.1.35 Safety Injection (RCA)                                    350        80        25                  854                  444    1,753      1,753                                        2,689                                165,467    4,712 2b.1.1.36 Service Cooling Water                                      118                                                              25      143                                  143                                                                1,856 2b.1.1.37 Service Cooling Water (RCA)                                30          7          2                  73                  38      149        149                                          228                                  14,053      411 2b.l.l      Totals                                      2,188    15,679      1,635        567              19,225              13,278  52,572      43,945                    8,628            60,992                                3,725,778  252,189 2h.1.2      Scaffolding in support of decommissioning            3,081        12          6                  141                1,146  4,387        4,387                                          462                                  40,989    21,023 TLG Services. Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                          Appendix C, Page 6 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes            Burial!              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lic. Term. Management    Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs        Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours Decontamination of Site Buildings 2b.1.3.1 *Reactor                                            958    2,483      1,120      5,645              26,011              12,149  48,366      48,366                                      331,897                              33,045,180    43,301 2b.1.3.2 Capital Additions 85-2004                            33        27          7          3                  96                  69      236        236                                            317                                18,653      847 2b.1.3.3 Containment Penetration Area                        327      213        26        28                  379                  452    1,425      1,425                                          2,121                                172,739    7,351 2b.1.3    Totals                                          1,318    2,724      1,153      5,677              26,486              12,669  50,027      50,027                                      334,335                              33,236,570    51,499 2b.1      Subtotal Period 2b Activity Costs              3,506    21,484      2,800      6,250              45,852              27,093 106,986      98,358                      8,628            395,789                              37,003,340  324,711 Period 2b Collateral Costs 2b.3.1    Process decommissioning water waste              133                  65        199                  266                  241      904        904                                            881                                52,880      172 2b.3.2    Process decommissioning chemical flush waste        3                  103        420                  782                  384    1,692      1,692                                          1,459                                155,522      273 2b.3.3    Small tool allowance                                        408                                                              87      495        495 2b.3.4    Spent Fuel Transfer - Pool to ISFSI                                                                          7,355        1,566    8,921                    8,921 2b.3      Subtotal Period 2b Collateral Costs              136      408        168        620                1,048  7,355        2,277  12,012        3,091        8,921                            2,341                                208,402      445 Period 2b Period-Dependent Costs 2b.4.1    Decon supplies                                    796                                                                      283    1,079      1,079 2b.4.2    Insurance                                                                                                    1,138          162    1,300      1,300 2b.4.3    Property taxes                                                                                                397          56      453        453 2b.4.4    Health physics supplies                                  2,527                                                            897    3,424      3,424 2b.4.5    Heavy equipment rental                                    4,962                                                          1,056    6,018      6,018 2b.4.6    Disposal ofDAW generated                                              104        29                  330                  138      601        601                                          4,338                                89,346      134 2b.4.7    Plant energy budget                                                                                          2,079          443    2,522      2,522 2b.4.8    NRC Fees                                                                                                    1,521          216    1,737      1,737 2b.4.9    Emergency Planning Fees                                                                                      1,714          243    1,957                    1,957 2b.4.10    Spent Fuel Pool O&M                                                                                          1,829          389    2,219                    2,219 2b.4.11    Liquid Radwaste Processing Equipment/Services                                                                  465          99      563        563 2b.4.12    ISFSI Operating Costs                                                                                          107          23      130                      130 2b.4.13    Severance Related Costs                                                                                      7,661        1,631    9,291      9,291 2b.4.14    Spent Fuel Storage Canisters/Overpacks                                                                      11,034        2,349  13,383                    13,383 2b.4.15    Security Staff Cost                                                                                        35,568        7,571  43,139      43,139                                                                                                      550,000 2b.4.16    DOC Staff Cost                                                                                              26,233        5,584  31,816      31,816                                                                                                      270,000 2b.4.17    Utility Staff Cost                                                                                          38,925        8,285  47,210      47,210                                                                                                      502,500 2b.4      Subtotal Period 2b Period-Dependent Costs        796    7,490        104        29                  330 128,671      29,422 166,842      149,153        17,689                            4,338                                89,346      134    1,322,500 2b.0      TOTAL PERIOD 2b COST                            4,439    29,382      3,072      6,899              47,230 136,026      58,793 285,840      250,603        26,610        8,628            402,468                              37,301,080  325,289    1,322,500 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1    Spent Fuel Transfer - Pool to ISFSI                                                                          7,990        1,701    9,691                    9,691 2c.3      Subtotal Period 2c Collateral Costs                                                                          7,990        1,701    9,691                    9,691 Period 2c Period-Dependent Costs 2c.4.1    Insurance                                                                                                    3,475          493    3,968      3,968 2c.4.2    Property taxes                                                                                              1,211          172    1,383      1,383 2c.4.3    Health physics supplies                                  2,437                                                            864    3,301      3,301 2c.4.4    Disposal ofDAW generated                                                70        20                  220                  92      401        401                                          2,896                                59,642        89 2c.4.5    Plant energy budget                                                                                          1,692          360    2,053      2,053 2c.4.6    NRC Fees                                                                                                    2,671          379    3,050      3,050 2c.4.7    Emergency Planning Fees                                                                                      5,232          742    5,975                    5,975 2c.4.8    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  12,973        2,761  15,735                    15,735 2c.4.9    Spent Fuel Pool O&M                                                                                          5,585        1,189    6,773                    6,773 2c.4.10    Liquid Radwaste Processing Equipment/Services                                                                  355          75      430        430 2c.4.11    ISFSI Operating Costs                                                                                          327          70      397                      397 2c.4.12    Spent Fuel Storage Canisters/Overpacks                                                                      11,985        2,551  14,535                    14,535 2c.4.13    Security Staff Cost                                                                                        108,574      23,110 131,684      131,684                                                                                                    1,678,914 2c.4.14    Utility Staff Cost                                                                                          8,384        1,785  10,169      10,169                                                                                                      114,471 2c.4      Subtotal Period 2c Period-Dependent Costs                2,437        70        20                  220 162,464      34,644 199,853      156,438        43,415                            2,896                                59,642        89    1,793,386 2c.0      TOTAL PERIOD 2c COST                                      2,437        70        20                  220 170,454      36,344 209,544      156,438        53,106                            2,896                                59,642        89    1,793,386 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POI-I648-00I, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix C, Page 7 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site    Processed            Burial Volumes            Burial!              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Wt., Lbs. Manhours  Manhours PERIOD 2d - Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activities 2d.1.1    Remove spent fuel racks                          585        56        174        36                1,207                  896    2,954      2,954                                        3,812                                233,945      962 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated) - FHB                              184        14          6                  194                  138      536        536                                          614                                37,673    2,491 2d.1.2.2 Electrical (Decontaminated) - FHB                          1,165        133        53                1,781                1,075    4,206      4,206                                        5,623                                345,118    15,061 2d.1.2.3 Fire Protection (RCA)                                        250        50        14                  471                  266    1,052      1,052                                        1,481                                91,338    3,363 2d.1.2.4 HVAC (Contaminated) - FHB                                    326        64        25                  838                  427    1,680      1,680                                        2,644                                162,353    4,383 2d.1.2.5 Spent Fuel Pit Cooling                                        94        65        21                  706                  297    1,183      1,183                                        2,223                                136,855    1,433 2d.1.2.6 Spent Fuel Pit Cooling - FHB                                  130        70        23                  764                  332    1,319      1,319                                        2,405                                148,051    1,959 2d.1.2    Totals                                                  2,150        396        140                4,754                2,535    9,976      9,976                                      14,990                                921,389    28,690 Decontamination of Site Buildings 2d.1.3.1 Fuel Handling                                      811      859        63        41                  637                1,124    3,534      3,534                                        3,443                                251,129    23,547 2d.1.3    Totals                                            811      859        63        41                  637                1,124    3,534      3,534                                        3,443                                251,129    23,547 2d.1.4    Scaffolding in support of decommissioning                  616          2                              28                  229      877        877                                          92                                  8,198    4,205 2d.l      Subtotal Period 2d Activity Costs              1,396    3,682        635        218                6,626                4,784  17,342      17,342                                      22,337                              1,414,661    57,404 Period 2d Additional Costs 2d.2.1    License Termination Survey Planning                                                                            800          340    1,140      1,140                                                                                                      6,240 2d.2      Subtotal Period 2d Additional Costs                                                                            800          340    1,140      1,140                                                                                                      6,240 Period 2d Collateral Costs 2d.3.1    Process decommissioning water waste                34                  19        58                  77                  67      255        255                                          257                                15,400        50 2d.3.2    Process decommissioning chemical flush waste 2d.3.3    Small tool allowance                                        84                                                              18      101        101 2d.3.4    Decommissioning Equipment Disposition                                  155        54                1,828                  682    2,718      2,718                                        5,771                                354,194        88 2d.3      Subtotal Period 2d Collateral Costs                34        84        174        112                1,905                  766    3,075      3,075                                        6,028                                369,594      138 Period 2d Period-Dependent Costs 2d.4.1    Decon supplies                                    209                                                                        74      283        283 2d.4.2    Insurance                                                                                                      219          31      250        250 2d.4.3    Property taxes                                                                                                  76          11      87          87 2dAA      Health physics supplies                                    443                                                            157      600        600 2dA.5      Heavy equipment rental                                      953                                                            203    1,156      1,156 2dA.6      Disposal of DAW generated                                              34          9                  106                  44      194        194                                        1,397                                28,775        43 2dA.7      Plant energy budget                                                                                            213          45      258        258 2dA.8      NRC Fees                                                                                                      250          35      285        285 2dA.9      Emergency Planning Fees                                                                                        165          23      188                      188 2dA.10    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    690          147      837                      837 2dA.11    Liquid Radwaste Processing Equipment/Services                                                                  178          38      216        216 2dA.12    ISFSI Operating Costs                                                                                          21            4      25                      25 2dA.13    Severance Related Costs                                                                                      9,595        2,042  11,637      11,637 2dA.14    Security Staff Cost                                                                                          1,035          220    1,255      1,255                                                                                                      18,960 2dA.15    DOC Staff Cost                                                                                              3,363          716    4,078      4,078                                                                                                      35,040 2dA.16    Utility Staff Cost                                                                                          4,500          958    5,458      5,458                                                                                                      58,080 2d.4      Subtotal Period 2d Period-Dependent Costs        209    1,396        34          9                  106  20,304        4,750  26,808      25,757        1,050                          1,397                                28,775        43      112,080 2d.0      TOTAL PERIOD 2d COST                            1,639    5,161        842        339                8,638  21,103      10,641  48,364      47,314        1,050                        29,762                              1,813,030    57,585      118,320 PERIOD 2f - License Termination Period 2f Direct Decommissioning Activities 2f.1.1    ORISE confirmatory survey                                                                                      178          76      254        254 2f.1.2    Terminate license                                                                                                                    a 2f.1      Subtotal Period 2f Activity Costs                                                                              178          76      254        254 Period 2f Additional Costs 2f.2.1    License Termination Survey                                                                                  9,248        3,937  13,184      13,184                                                                                      126,393        3,120 2f.2      Subtotal Period 2f Additional Costs                                                                          9,248        3,937  13,184      13,184                                                                                      126,393        3,120 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                    Document POJ-J648-00J, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                      Appendix C, Page 8 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial!              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lic. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                  Activit                      Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs    Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Wt., Lbs. Manhours  Manhours Period 2f Collateral Costs 2f.3.1    DOC staff relocation expenses                                                                            1,415          301  1,716      1,716 2f.3      Subtotal Period 2f Collateral Costs                                                                      1,415          301  1,716      1,716 Period 2fPeriod-Dependent Costs 2fA.1      Insurance                                                                                                  319            45    365        365 2fA.2      Property taxes                                                                                              125            18    142        142 2&#xa3;.1.3    Health physics supplies                                  632                                                              224    856        856 2&#xa3;.1.1    Disposal of DAW generated                                            9          2                  27                    11      49          49                                          356                                  7,337        11 2&#xa3;.1.5    Plant energy budget                                                                                        174            37    211        211 2&#xa3;.1.6    NRC Fees                                                                                                    462            66    528        528 2fA.7      Emergency Planning Fees                                                                                    269            38    308                      308 2fA.8      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                1,130          241  1,371                    1,371 2&#xa3;.4.9    ISFSI Operating Costs                                                                                        34            7      41                      41 2fA.10    Security Staff Cost                                                                                      1,694          361  2,055      2,055                                                                                                      31,036 2&#xa3;.1.11    DOC Staff Cost                                                                                            4,689          998  5,687      5,687                                                                                                      46,750 2&#xa3;.4.12    Utility Staff Cost                                                                                        5,150        1,096  6,246      6,246                                                                                                      60,107 2&#xa3;.1      Subtotal Period 2&#xa3; Period-Dependent Costs                632          9          2                  27  14,047        3,142  17,859      16,140        1,719                            356                                  7,337        11      137,893 2f.O      TOTAL PERIOD 2fCOST                                      632          9          2                  27  24,887        7,456  33,012      31,293        1,719                            356                                  7,337  126,404      141,013 PERIOD 2 TOTALS                                        7,800    65,609    29,166    14,192              107,948 479,280      187,894 891,887    756,949      121,822      13,117            574,562      845      574          50,252,080  747,827    4,474,686 PERIOD 3b - Site Restoration Period 3b DiI'ect Decommissioning Activities Demolition of Remaining Site Buildings 3b.LLl *Reactor                                                  6,798                                                            1,447  8,245                                8,245                                                              67,914 3b.l.l.2 Capital Additions 85-2004                                  302                                                              64    366                                  366                                                                3,572 3b.l.l.3 Containment Penetration Area                              686                                                              146    832                                  832                                                                6,563 3b.l.l.4 Miscellaneous                                              28                                                                6      34                                    34                                                                  249 3b.l.l.5 Turbine                                                  3,659                                                              779  4,438                                4,438                                                              38,603 3b.l.l.6 Turbine Pedestal                                        1,318                                                              281  1,599                                1,599                                                              11,300 3b.l.l.7 Fuel Handling                                            1,858                                                              395  2,253                                2,253                                                              16,750 3b.Ll      Totals                                                14,650                                                            3,118  17,768                                17,768                                                              144,951 Site Closeout Activities 3b.l.2    Grade & landscape site                                2,758                                                              587  3,345                                3,345                                                                4,587 3b.1.3    Final report to NRC                                                                                        229            49    278        278                                                                                                        1,560 3b.1      Subtotal Period 3b Activity Costs                    17,407                                                229        3,754  21,391        278                    21,113                                                              149,538        1,560 Period 3b Additional Costs 3b.2.1    Concrete Crushing                                        476                                                  0          101    577                                  577                                                                1,971 3b.2.2    Cofferdam Construction and Teardown                      478                                                              102    580                                  580                                                                4,004 3b.2.3    Soil f Sediment Control Plant Area                    1,052                                                              224  1,276                                1,276                                                              10,271 3b.2      Subtotal Period 3b Additional Costs                    2,006                                                  0          427  2,433                                2,433                                                              16,247 Period 3b Collateral Costs 3b.3.1    Small tool allowance                                    210                                                              45    254                                  254 3b.3      Subtotal Period 3b Collateral Costs                      210                                                              45    254                                  254 Period 3b Period-Dependent Costs 3bA.1      Insurance                                                                                                  525            74    599                      599 3bA.2      Property taxes                                                                                              410            58    468                      468 3bA.3      Heavy equipment rental                                7,347                                                            1,564  8,911                                8,911 3bAA      Plant energy budget                                                                                        286            61    347                                  347 3bA.5      NRC ISFSI Fees                                                                                              348            49    397                      397 3bA.6      Emergency Planning Fees                                                                                    885          126  1,011                    1,011 3bA.7      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                3,711          790  4,501                    4,501 3b.4.8    ISFSI Operating Costs                                                                                      111            24    134                      134 3bA.9      Security Staff Cost                                                                                      5,569        1,185  6,754          0        5,471        1,283                                                                            102,023 3bA.10    DOC Staff Cost                                                                                          14,111        3,003  17,114                                17,114                                                                            136,891 3bA.ll    Utility Staff Cost                                                                                        7,357        1,566  8,923                    1,785        7,138                                                                            87,197 3bA        Subtotal Period 3b Period-Dependent Costs              7,347                                            33,312        8,501  49,160          0      14,366      34,794                                                                            326,112 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning C~st Analysis                                                                                                                                                                                                                                    Appendix C, Page 9 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I            Utility and Activity                                              Decon Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                    tion      Cost  Cost      Costs      Costs      Costs    Costs    Costs  Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt., Lbs. Manhours  Manhours 3b.0      TOTAL PERIOD 3b COST                                26,970                                            33,542      12,726  73,238          278      14,366      58,594                                                              165,784      327,672 PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Period*Dependent Costs 3c.4.1    Insurance                                                                                              3,099          440    3,539                    3,539 3c.4.2    Property taxes                                                                                          2,420          343    2,764                    2,764 3e.4.3    Plant energy budget 3c.4.4    NRC ISFSI Fees                                                                                          2,054          292    2,346                    2,346 3e.4.5    Emergency Planning Fees                                                                                5,228          742    5,970                    5,970 3e.4.6    Spent Fuel Transfer* Pool or ISFSI to DOE                                                              21,995        4,682  26,676                    26,676 3c.4.7    ISFSI Operating Costs                                                                                    654          139      793                      793 3c.4.8    Security Staff Cost                                                                                    26,771        5,698  32,469                    32,469                                                                                        411,789 3c.4.9    Utility Staff Cost                                                                                      8,802        1,874  10,676                  10,676                                                                                        103,100 3c.4      Subtotal Period 3c Period* Dependent Costs                                                            71,024      14,209  85,233                    85,233                                                                                        514,888 3c.0      TOTAL PERIOD 3c COST                                                                                  71,024      14,209  85,233                    85,233                                                                                        514,888 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d. 1.1.1 Vessel & Internals GTCC Disposal                                2,500                          9,179                2,309  13,988      13,988                                                                    1,785    350,510 3d.l.l    Totals                                                          2,500                          9,179                2,309  13,988      13,988                                                                    1,785    350,510 3d.l      Subtotal Period 3d Activity Costs                              2,500                          9,179                2,309  13,988      13,988                                                                    1,785    350,510 Period 3d Collateral Costs 3d.3      Subtotal Period 3d Collateral Costs Period 3d Period-Dependent Costs 3d.4.1    Insurance                                                                                                  10                    11                      11 3dA.2      Property taxes                                                                                              8                    9                        9 3dA.3      Plant energy budget 3dA.4      NRC ISFSI Fees                                                                                              6            1        7                        7 3dA.5      ISFSI Operating Costs                                                                                      2            0        3                        3 3dA.6      Security Staff Cost                                                                                        85          18      103                      103                                                                                          1,311 3d.4.7    Utility Staff Cost                                                                                        28            6      34                      34                                                                                            328 3dA        Subtotal Period 3d Period-Dependent Costs                                                                139          28      167                      167                                                                                          1,640 3d.0      TOTAL PERIOD 3d COST                                            2,500                          9,179    139        2,336  14,155      13,988          167                                                        1,785    350,510                  1,640 PERIOD 3e - ISFSI Decontamination Period 3e Direet Decommissioning Activities Period 3e Additional Costs 3e.2.1    ISFSI License Termination                              40          6        14                  393    622          290    1,365                    1,365                            1,305                                108,721    4,535          360 3e.2      Subtotal Period 3e Additional Costs                    40          6        14                  393    622          290    1,365                    1,365                            1,305                                108,721    4,535          360 Period 3e Collateral Costs 3e.3.1    Small tool allowance                                                                                                    0 3e.3      Subtotal Period 3e Collateral Costs                                                                                      0 Period 3e Period-Dependent Costs 3e.4.1    Insurance 3eA.2      Property taxes                                                                                            55            8      63                      63 3e.4.3    Heavy equipment rental                                136                                                              29      165                      165 3e.4.4    Plant energy budget 3eA.5      NRC ISFSI Fees                                                                                            94          13      107                      107 3e.4.6    Security Staff Cost                                                                                        61          13      74                      74                                                                                          1,901 3eA.7      Utility Staff Cost                                                                                        163          35      198                      198                                                                                          1,901 3e.4      Subtotal Period 3e Period*Dependent Costs              136                                                373          98      607                      607                                                                                          3,803 3e.0      TOTAL PERIOD 3e COST                                  177          6        14                  393    995          388    1,973                    1,973                            1,305                                108,721    4,535        4,163 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                                                        Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                                                                          Appendix C, Page 10 of 20 Table C-l Diablo Canyon Unit 1 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site    LLRW                                        NRC      Spent Fuel      Site      Processed                              Burial Volumes                                                            Burial!              Utility and Activity                                                          Decon    Removal  Packaging  Transport    Processing  Disposal    Other    Total      Total  Lie. Term. Management  Restoration  Volume -C:::::-Ia-s-s-:A:----:C::CI:=-a.::ss::.:::B::......:...::::C:::I:::as:.::s:::.C-:::---:G"'T=C:::-::C,--- Processed  Craft    Contractor Index                                                            Cost    Cost      Costs      Costs        Costs      Costs      Costs  Contin enc    Costs    Costs      Costs        Costs      Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Cu. Feet                                                                  Wt., Lhs. Manhours  Manhours PERIOD 3f - ISFSI Site Restoration Period 3fDirect Decommissioning Activities Period 3f Additional Costs 3f.2.1      ISFSI Demolition and Site Restoration                            1,371                                                      27          297    1,695                    1,695                                                                                                                                              15,387            80 3f.2.2      ISFSI Area Soil! Sediment Control                                    16                                                                    4        20                      20                                                                                                                                              2,568 3f.2        Subtotal Period 3f Additional Costs                              1,387                                                      27          301    1,715                    1,715                                                                                                                                              17,955            80 Period 3f Collateral Costs 3f.3.1      Small tool allowance                                                20                                                                    4        24                      24 3f.3        Subtotal Period 3&#xa3; Collateral Costs                                  20                                                                    4        24                      24 Period 3fPeriod-Dependent Costs 3f.4.1      Insurance 3f.4.2      Property taxes                                                                                                                28            4        32                      32 3f.4.3      Heavy equipment rental                                              54                                                                    11        65                      65 3f.4.4      Plant energy budget 3f.4.5      Security Staff Cost                                                                                                          11            2        14                      14                                                                                                                                                              349 3f.4.6      Utility Staff Cost                                                                                                            69          15        83                      83                                                                                                                                                              784 3&#xa3;.4        Subtotal Period 3fPeriod-Dependent Costs                            54                                                      108          32      193                      193                                                                                                                                                            1,133 3&#xa3;.0        TOTAL PERIOD 3f COST                                              1,461                                                      134          338    1,932                    1,932                                                                                                                                              17,955        1,213 PERIOD 3 TOTALS                                                              28,607      2,506          14                  9,572  105,834      29,997  176,531      14,266      103,672      58,594                      1,305                                                                          1,785            459,231  188,274      849,575 TOTAL COST TO DECOMMISSION                                        11,057    96,791    32,014    14,632                127,040    776,395      264,540 1,322,468    999,926      248,912        73,630                587,422                      1,732                            574                  1,785        51,454,030  962,738    6,481,355 TOTAL COST TO DECOMMISSION WITH 25.01% CONTINGENCY:                                            $1,322,468  thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 75.61% OR:                                                $999,926  thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 18.82% OR:                                                        $248,912  thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 5.57% OR:                                                          $73,630  thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                          49,854 Tons TOTAL CRAFT LABOR REQUIREMENTS:                                                                    962,738 Man-hours EndNotes:
nla - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
o - indicates that this value is less than 0.5 but is non-zero.
a cell containing" - " indicates a zero value TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                              Appendix C, Page 11 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial I            Utility and Activity                                              Decon Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                Cost  Cost    Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours PERIOD Ia - Shutdown through Transition Period Ia Direct Decommissioning Activities 1a.1.1    Prepare preliminary decommissioning cost                                                                  82          17        99          99                                                                                                      556 la.1.2    Notification of Cessation of Operations                                                                                            a 1a.1.3    Remove fuel & source material                                                                                                    nla 1a.1.4    Notification of Permanent Defueling                                                                                                a 1a.1.5    Deactivate plant systems & process waste                                                                                            a 1a.1.6    Prepare and submit PSDAR                                                                                  126          26      152          152                                                                                                      856 1a.1.7    Review plant dwgs & specs.                                                                                289          61      350          350                                                                                                    1,969 1a.1.8    Perform detailed rad survey                                                                                                        a la.1.9    Estimate by-product inventory                                                                              63          13        76          76                                                                                                      428 1a.l.10    End  product description                                                                                  63          13        76          76                                                                                                      428 1a.1.11    Detailed by-product inventory                                                                              82          17        99          99                                                                                                      556 1a.1.12    Define major work sequence                                                                                472          99      571          571                                                                                                    3,210 1a.1.13    Perform SER and EA                                                                                        195          41      236          236                                                                                                    1,327 1a.1.14    Perform Site-Specific Cost Study                                                                          315          66      381          381                                                                                                    2,140 1a.1.15    Prepare/submit License Termination Plan                                                                  258          54      312          312                                                                                                    1,753 1a.1.16    Receive NRC approval of termination plan                                                                                            a Activity Specifications 1a.1.17.1 Plant & temporal'y facilities                                                                              310          65      375          337                        37                                                                          2,106 1a.1.17.2 Plant systems                                                                                              262          55      317          286                        32                                                                          1,783 1a.1.17.3 NSSS Decontamination Flush                                                                                  31            7        38          38                                                                                                      214 1a.1.17.4 Reactor internals                                                                                          447          94      541          541                                                                                                    3,039 1a.1.17.5 Reactor vessel                                                                                            409          86      495          495                                                                                                    2,782 la.1.17.6 Biological shield                                                                                          31            7        38          38                                                                                                      214 1a.1.17.7 Steam generators                                                                                          196          41      238          238                                                                                                    1,335 1a.1.17.8 Reinforced concrete                                                                                        101          21      122          61                        61                                                                            685 1a.1.17.9 Main Turbine                                                                                                25            5        30                                    30                                                                            171 la.1.17.10 Main Condensers                                                                                            25            5        30                                    30                                                                            171 1a.1.17.11 Plant structures & buildings                                                                              196          41      238          119                      119                                                                          1,335 1a.1.17.12 Waste management                                                                                          289          61      350          350                                                                                                    1,969 1a.1.17.13 Facility & site closeout                                                                                  57          12        69          34                        34                                                                            385 1a.1.17    Total                                                                                                  2,380          500    2,880        2,536                      344                                                                          16,190 Planning & Site Preparations 1a.U8      Prepare dismantling sequence                                                                              151          32      183          183                                                                                                    1,027 1a.l.19    Plant prep. & temp. svces                                                                              2,800          589    3,389        3,389 1a.l.20    Design water clean-up system                                                                              88          19      107          107                                                                                                      599 1a.l.21    Rigging/Cant. Cntrl Envlps/tooling/etc.                                                                2,200          463    2,663        2,663 1a.l.22    Procure caskslliners & containers                                                                          77          16        94          94                                                                                                      526 1a.1      Subtotal Period 1a Activity Costs                                                                      9,640        2,027    11,668      11,323                      344                                                                          31,566 Period la Additional Costs 1a.2.1    Spent Fuel Pool Isolation                                                                              13,217        2,779    15,996      15,996 1a.2.2    Disposal of Contaminated Tools & Equipment                      234        97                3,145                1,156    4,632        4,632                                      10,245                              609,715      317 la.2      Subtotal Period 1a Additional Costs                              234        97                3,145  13,217        3,935    20,628      20,628                                      10,245                              609,715      317 Period 1a Period-Dependent Costs 1a.4.1    Insurance                                                                                              1,056          148    1,204        1,204 1a.4.2    Property taxes                                                                                            165          23      189          189 1a.4.3    Health physics supplies                              457                                                              160      617          617 la.4.4    Heavy equipment rental                                480                                                              101      580          580 1a.4.5    Disposal ofDAW generated                                          14          4                  45                    19        83          83                                          598                                12,310        18 1a.4.6    Plant energy budget                                                                                    1,156          243    1,399        1,399 1aA.7      NRC Fees                                                                                                  838          117      955          955 la.4.8    Emergency Planning Fees                                                                                1,001          140    1,142                    1,142 la.4.9    Spent Fuel Pool O&M                                                                                      763          160      924                      924 la.4.10  ISFSI Operating Costs                                                                                      45            9        54                      54 la.4.11  Severance Related Costs                                                                                38,503        8,097    46,600      46,600 1a.4.12    Spent Fuel Storage Canisters/Overpacks                                                                  5,714        1.202    6,916                    6,916 1a.4.13  Security Staff Cost                                                                                    14,837        3,120    17,957      17,957                                                                                                  229,429 la.4.14  Utility Staff Cost                                                                                    26,317        5,534    31,851      31,851                                                                                                  346,229 la.4      Subtotal Period 1a Period-Dependent Costs            936        14          4                  45  90,395      19.075  110,470      101,435        9,035                            598                                12,310        18      575,657 TLG Services, Inc_
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                  Appendix C, Page 12 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial I            Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                    Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours 1a.0        TOTAL PERIOD 1a COST                                      936        248        101                3,190  113,252      25,038  142,766    133,387        9,035          344            10,843                              622,025      336      607,223 PERIOD Ib - Decommissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures 1b.l.1.1 Plant systems                                                                                                    298          63      360        324                        36                                                                          2,026 lb. 1. 1.2 NSSS Decontamination Flush                                                                                      63          13        76          76                                                                                                      428 lb. 1. 1.3 Reactor internals                                                                                              157          33      190        190                                                                                                    1,070 lb. 1. 1.4 Remaining buildings                                                                                              85          18      103          26                        77                                                                            578 1b.1.1.5 CRD cooling assembly                                                                                              63          13        76          76                                                                                                      428 1b.1.1.6 CRD housings & ICI tubes                                                                                          63          13        76          76                                                                                                      428 1b.l.l. 7 Incore instrumentation                                                                                            63          13        76          76                                                                                                      428 lb. 1. 1.8 Reactor vessel                                                                                                  228          48    *276          276                                                                                                    1,554 1b.1.1.9 Facility closeout                                                                                                  75          16        91          46                        46                                                                            514 lb. l. 1.10 Missile shields                                                                                                28            6        34          34                                                                                                      193 Ib.1.1.11 Biological shield                                                                                                75          16        91          91                                                                                                      514 1b.1.1.12 Steam generators                                                                                                289          61      350        350                                                                                                    1,969 1b.1.1.13 Reinforced concrete                                                                                              63          13        76          38                        38                                                                            428 1b.1.1.14 Main Turbine                                                                                                      98          21      119                                  119                                                                            668 lb. l. 1.15 Main Condensers                                                                                                98          21      119                                  119                                                                            668 lb. 1. 1.16 Auxiliary building                                                                                            172          36      208        187                        21                                                                          1,168 lb. 1. 1.17 Reactor building                                                                                              172          36      208        187                        21                                                                          1,168 1b.1.l      Total                                                                                                      2,092          440    2,531      2,055                      476                                                                          14,228 1b.1.2      Decon primary loop                              750                                                                      526    1,276      1,276                                                                                        1,067 1b.1        Subtotal Period 1b Activity Costs                750                                                        2,092          966    3,808      3,332                      476                                                              1,067      14,228 Period 1b Additional Costs 1b.2.1      Site Characterization                                                                                      2,038          857    2,895      2,895                                                                                      10,690        4,024 1b.2.2      Hazardous Waste Management                                                                                    204          43      247        247 1b.2.3      Mixed Waste Management                                                                                        270          57      327        327 1b.2        Subtotal Period 1b Additional Costs                                                                        2,512          957    3,468      3,468                                                                                      10,690        4,024 Period 1b Collateral Costs 1b.3.1      Decon equipment                                  931                                                                      196    1,126      1,126 1b.3.2      DOC staff relocation expenses                                                                              1,415          297    1,712      1,712 1b.3.3      Process decommissioning water waste              46                  21        66                  88                    80      301        301                                          291                                17,471        57 1b.3A        Process decommissioning chemical flush waste      2                  63        256                6,210                2,240    8,770      8,770                                                  887                      94,531      166 1b.3.5      Small tool allowance                                        3                                                                1        3          3 1b.3.6      Pipe cutting equipment                                  1,100                                                              231    1,331      1,331 1b.3.7      Decon rig                                      1,500                                                                      315    1,815      1,815 1b.3        Subtotal Period Ib Collateral Costs            2,479    1,103        84        321                6,298    1,415        3,361    15,060      15,060                                          291      887                      112,002      223 Period 1b  Period* Dependent Costs 1bA.1        Decon supplies                                    28                                                                        10        38          38 1b.4.2      Insurance                                                                                                    523          73      597        597 IbA.3        Property taxes                                                                                                82          12        94          94 1b.4A        Health physics supplies                                  249                                                              87      336        336 IbA.5        Heavy equipment rental                                    238                                                              50      288        288 IbA.6        Disposal ofDAW generated                                              8          2                  26                    11        47          47                                          341                                7,016        11 1bA.7        Plant energy budget                                                                                        1,147          241    1,388      1,388 1bA.8        NRC Fees                                                                                                      237          33      270        270 Ib.4.9      Emergency Planning Fees                                                                                      497          70      566                      566 IbA.I0      Spent Fuel Pool O&M                                                                                          378          80      458                      458 IbA.ll      ISFSI Operating Costs                                                                                          22            5        27                      27 1b.4.12      Severance Related Costs                                                                                    2,018          424    2,442      2,442 IbA.13      Spent Fuel Storage Canisters/Overpacks                                                                      3,086          649    3,735                    3,735 1b.4.14      Security Staff Cost                                                                                        7,357        1,547    8,905      8,905                                                                                                  113,771 1bA.15      DOC Staff Cost                                                                                              4,664          981    5,645      5,645                                                                                                    46,543 1b.4.16      Utility Staff Cost                                                                                        13,050        2,744    15,795      15,795                                                                                                  171,691 1b.4        Subtotal Period 1b Period*Dependent Costs        28      487          8          2                  26  33,062        7,017    40,630      35,844        4,786                            341                                7,016        11      332,006 1b.0        TOTAL PERIOD Ib COST                          3,257    1,589        92        324                6,323  39,080      12,300    62,965      57,703        4,786          476                632      887                      119,017    11,990      350,258 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                  Appendix C, Page 13 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial!            Utility and Activity                                            Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                              Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet Wt., Lbs. Manhours  Manhours PERIOD 1 TOTALS                                        3,257    2,525        341        425                9,514  152,332      37,338  205,731    191,090      13,821          820            11,475      887                        741,042    12,325      957,482 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.l Reactor Coolant Piping                          370      354        52        40                1,342                  869    3,027      3,027                                        2,276                                260,153    10,138 2a.1.1.2 Pressurizer Quench Tank                          39        35          8          6                  189                  108      385        385                                          329                                  36,557    1,073 2a.1.1.3 Reactor Coolant Pumps & Motors                  118      126        103        185                1,443                  686    2,661      2,661                                        4,701                                774,960    4,185          100 2a.1.1.4 Pressurizer                                      50        70        448        114                  750                  409    1,841      1,841                                        2,443                                286,592    2,365          938 2a.1.1.5 Steam Generators                                477    4,206      3,368      1,922              12,807                7,173    29,952      29,952                                      41,712                                3,350,761    27,047        1,750 2a.1.1.6 Retired Steam Generator Units                                      2,496      1,878              12,597                5,160    22,131      22,131                                      41,031                                3,125,629    14,613        1,125 2a.1.1.7 CRDMsllCIs/Service Structure Removal            196      112        262        37                  444                  377    1,428      1,428                                        3,881                                  86,025    4,285 2a.1.1.8 Reactor Vessel Internals                        163    3,064    14,919      1,413              10,366      278      16,385    46,588      46,588                                        1,502      845      574              352,188    29,833        1,325 2a.L1.9 Reactor Vessel                                  122    5,180      2,387        742                2,651      278        8,545    19,905      19,905                                        8,794                                957,382    29,833        1,325 2a.1.1    Totals                                      1,534    13,148    24,042      6,336              42,589      556      39,714  127,919    127,919                                      106,670      845      574            9,230,247  123,373        6,564 Removal of Major Equipment 2a.1.2    Main Turbine/Generator                                  202                                                              43      245                                  245                                                                3,033 2a.1.3    Main Condensers                                        668                                                              141      809                                  809                                                                9,875 Cascading Costs from Clean Building Demolition 2a.L4.1 *Reactor                                                1,194                                                              251    1,445      1,445                                                                                          11,895 2a.L4.2 Auxiliary                                                  719                                                              151      870        870                                                                                          7,054 2a.1.4.3 Containment Penetration Area                              73                                                              15        89          89                                                                                            704 2a.L4.4 Radwaste Storage                                            91                                                              19      110        110                                                                                            918 2a.1.4.5 Fuel Handling                                            193                                                              41      234        234                                                                                          1,746 2a.1.4    Totals                                                2,270                                                              477    2,747      2,747                                                                                          22,317 Disposal of Plant Systems 2a.1.5.1 Auxiliary Steam                                            76                                                              16        92                                    92                                                                1,179 2a.1.5.2 Auxiliary Steam (RCA)                                    141        32          9                  319                  168      670        670                                        1,004                                  61,868    1,935 2a.1.5.3 Building Services (Non-Power Block)                        7                                                                1        8                                    8                                                                  106 2a.1.5.4 Condensate System                                        619                                                              130      749                                  749                                                                9,716 2a.1.5.5 Condensate System (Insulated)                            274                                                              58      332                                  332                                                                4,253 2a.1.5.6 Containment Spray                                        235        161        51                1,719                  718    2,885      2,885                                        5,421                                333,235    3,521 2a.1.5.7 Extraction Steam & Heater Drip                            230                                                              48      279                                  279                                                                3,625 2a.1.5.8 Feedwater System                                          67                                                              14        82                                    82                                                                1,038 2a.1.5.9 Feedwater System (Insulated)                              162                                                              34      196                                  196                                                                2,547 2a.1.5.10 Feedwater System (RCA Insulated)                        119        42        15                  497                  225      897        897                                        1,567                                  96,264    1,710 2a.L5.11 Feedwater System (RCA)                                      6          2          1                  26                    12        46          46                                            82                                  5,067        82 2a.1.5.12 NSSS Sampling                                            159          9          3                  100                    93      364        364                                          315                                  19,386    2,404 2a.1.5.13 NSSS Sampling (Insulated)                                47          1          0                  10                    20        78          78                                            31                                  1,903      712 2a.1.5.14 Nitrogen & Hydrogen                                      19                                                                4        23                                    23                                                                  309 2a.1.5.15 Nitrogen & Hydrogen (Insulated)                            1                                                                0        1                                    1                                                                    16 2a.1.5.16 Nitrogen & Hydrogen (RCA Insulated)                        5                    0                    5                    4        15          15                                            15                                    937        74 2a.1.5.17 Nitrogen & Hydrogen (RCA)                                103        11          3                  92                    71      280        280                                          288                                  17,804    1,405 2a.1.5.18 Oily Water Separator & TB Sump                            29        11          3                  102                    48      192        192                                          319                                  19,671      410 2a.1.5.19 Saltwater System                                        181                                                              38      219                                  219                                                                2,779 2a.1.5.20 Turbine Steam Supply                                    762                                                              160      922                                  922                                                                12,007 2a.1.5.21 Turbine Steam Supply (RCA)                              878        345        117                3,961                1,769    7,070      7,070                                      12,485                                  767,598    12,605 2a.1.5.22 Turbine and Generator                                    81                                                              17        98                                    98                                                                1,250 2a.1.5.23 Turbine and Generator (Insulated)                        24                                                                5        29                                    29                                                                  378 2a.1.5    Totals                                                4,226        614        201                6,830                3,653    15,525      12,496                    3,029            21,528                                1,323,732    64,060 2a.1.6    Scaffolding in support of decommissioning            4,785        21        11                  251                1,770    6,838      6,838                                          818                                  72,662    35,763 2a.1      Subtotal Period 2a Activity Costs          1,534    25,300    24,677      6,548              49,671      556      45,798  154,083    150,001                    4,082            129,016      845      574            10,626,640  258,421        6,564 Period 2a Additional Costs 2a.2.1    Retired Reactor Head                                              225        179                1,557                  615    2,576      2,576                                        5,072                                322,442    2,098          750 2a.2      Subtotal Period 2a Additional Costs                                225        179                1,557                  615    2,576      2,576                                        5,072                                322,442    2,098          750 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                      Appendix C, Page 14 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I            Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activit                        Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet  Wt., Lbs. Manhours  Manhours Period 2a Collateral Costs 2a.3.1      Process decommissioning water waste              85                  40        123                  165                  149      562        562                                          545                                  32,727      106 2a.3.2      Process decommissioning chemical flush waste 2a.3.3      Small tool allowance                                      315                                                              66      381        343                        38 2a.3.4      Spent Fuel Transfer - Pool to ISFSI                                                                          2,279          479    2,758                    2,758 2a.3        Subtotal Period 2a Collateral Costs              85      315        40        123                  165    2,279          694    3,701        905        2,758          38                545                                  32,727      106 Period 2a Period-Dependent Costs 2aA.1      Decon supplies                                    92                                                                        32      124        124 2aA.2      Insurance                                                                                                      768          108      875        875 2aA.3      Property taxes                                                                                                268          38      305        275                        31 2aA.4      Health physics supplies                                  1,968                                                              690    2,658      2,658 2aA.5      Heavy equipment rental                                  3,373                                                              709    4,082      4,082 2aA.6      Disposal ofDAW generated                                              110        31                  349                  144      635        635                                        4,593                                  94,597      142 2aA.7      Plant energy budget                                                                                          1,776          373    2,149      2,149 2aA.8      NRC Fees                                                                                                      724          102      826        826 2aA.9      Emergency Planning Fees                                                                                      1,156          162    1,318                    1,318 2aA.10      Spent Fuel Pool O&M                                                                                          1,234          259    1,493                    1,493 2aA.ll      ISFSI Operating Costs                                                                                          72          15        88                      88 2aA.12      Severance Related Costs                                                                                        494          104      598        598 2aA.13      Spent Fuel Storage Canisters/Overpacks                                                                      3,418          719    4,137                    4,137 2aA.14      Security Staff Cost                                                                                        23,983        5,044    29,027      29,027                                                                                                      370,857 2aA.15      DOC Staff Cost                                                                                              26,130        5,495    31,625      31,625                                                                                                      256,229 2aA.16      Utility Staff Cost                                                                                          37,794        7,948    45,742      45,742                                                                                                      477,057 2aA        Subtotal Period 2a Period-Dependent Costs        92    5,341        110        31                  349  97,815      21,942  125,681    118,615        7,035          31              4,593                                  94,597      142    1,104,143 2a.0        TOTAL PERIOD 2a COST                          1,711    30,956    25,052      6,881              51,741  100,650      69,049  286,040    272,096        9,793        4,151            139,227      845      574          11,076,410  260,767    1,111,457 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b. 1. 1.1 Capital Additions 85-2002 (Clean)                          450                                                              95      544                                  544                                                                7,040 2b. 1. 1.2 Capital Additions 85-2002 (contaminated)                    483        61        24                  797                  462    1,827      1,827                                        2,532                                154,520    6,606 2b.1.1.3 Chemical & Volume Control                          809    1,066        172        58                1,966                1,666    5,736      5,736                                        6,290                                380,935    24,738 2b. 1. 1.4 Chemical & Volume Control (Insulated)            294      432        47        13                  438                  520    1,744      1,744                                        1,376                                  84,904    9,960 2b.L1.5 Component Cooling Water                                        190                                                              40      230                                  230                                                                2,984 2h.LL6 Component Cooling Water (RCA)                                  595        191        66                2,245                1,036    4,133      4,133                                        7,077                                435,000    8,301 2h.L1.7 Compressed Air                                                118                                                              25      143                                  143                                                                1,881 2h.L1.8 Compressed Air (Insulated)                                      6                                                                1        8                                    8                                                                    99 2h.L1.9 Compressed Air (RCA Insulated)                                  29          4          1                  33                    23        89          89                                          104                                  6,415      404 2h.L1.10 Compressed Air (RCA)                                          531        69        19                  629                  420    1,667      1,667                                        1,976                                121,884    7,315 2h.Ll.11 Diesel Engine-Generator                                      137                                                              29      165                                  165                                                                2,089 2h.L1.l2 Diesel Engine-Generator (Insulated)                            3                                                                1        4                                    4                                                                    48 2h.1.1.13 Electrical (Clean)                                        3,115                                                              655    3,770                                3,770                                                                47,918 2h.L1.l4 Electrical (Contaminated)                                    360        44        18                  613                  351    1,386      1,386                                        1,936                                118,833    4,901 2h.L1.15 Electrical (RCA)                                            1,875                                                              394    2,269                                2,269                                                                27,955 2h.1.1.16 Fire Protection                                              364        148        53                1,792                  788    3,145      3,145                                        5,838                                347,206    5,173 2h.L1.l7 Gaseous Radwaste                                              133        20          6                  217                  127      502        502                                          690                                  41,995    1,842 2h. 1. 1.18 HVAC (Clean Insulated)                                      40                                                                8        48                                    48                                                                  662 2h.L1.l9 HVAC (Clean)                                                  428                                                              90      518                                  518                                                                7,019 2h. 1. 1.20 HVAC (Contaminated Insulated)                              232        37        15                  506                  267    1,057      1,057                                        1,598                                  98,113    3,075 2h.l.l.21 HVAC (Contaminated)                                        1,033        185        76                2,563                1,302    5,159      5,159                                        8,091                                496,626    13,890 2b.1.1.22 Liquid Radwaste                                    362      447        74        25                  862                  728    2,498      2,498                                        2,791                                166,964    11,333 2b.1.1.23 Liquid Radwaste (Insulated)                        29        44          5                              45                    53      177        177                                          142                                  8,780    1,007 2h. 1. 1.24 Luhe Oil Distribution & Purification                      126                                                              26      152                                  152                                                                1,964 2h. 1. 1.25 Make-up Water                                              244                                                              51      296                                  296                                                                3,794 2h.1.1.26 Make-up Water (Insulated)                                    24                                                                5        29                                    29                                                                  376 2h. 1. 1.27 Make-up Water (RCA Insulated)                              32          7          2                  67                    36      144        144                                          210                                  12,938      448 2h.L1.28 Make-up Water (RCA)                                          164        39        11                  378                  198      790        790                                        1,190                                  73,314    2,245 2h. 1. 1.29 Mechanical Department Equipment                              1                                                                0        1                                                                                                          19 2h.1.1.30 Miscellaneous Reactor Coolant                      21      141        17          5                  158                  123      464        464                                          500                                  30,589    2,240 2b.1.1.31 Nuclear Steam Supply Sampling                                21          2          1                  21                    15        61          61                                            66                                  4,072      282 2b.1.1.32 Nuclear Steam Supply Sampling (Insulated 2b.1.1.33 Residual Heat Removal                              307 9
305 1
162          &deg; 54 9
1,845 7
1,003 26 3,675 26 3,675 28 5,811 1,745 357,510 121 5,524 2b.L1.34 Safety Injection                                              124        21          7                  242                  133      527        527                                          776                                  46,891    1,799 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                      Appendix C, Page 15 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed            Burial Volumes            Burial!              Utility and Activity                                                  Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                      tion          Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours Disposal of Plant Systems (continued) 2h. 1. 1.35 Safety Injection (Insulated)                                  5          1          0                  10                    6        23          23                                            32                                  1,987        76 2h. 1. 1.36 Safety Injection (RCAlnsulated)                              38          8          3                  92                    48      189        189                                          291                                17,880      522 2h.1.1.37 Safety Injection (RCA)                                        322        76        24                  830                  420    1,672      1,672                                        2,616                                160,916    4,326 2h. 1. 1.38 Service Cooling Water                                        138                                                              29      167                                  167                                                                2,186 2h.L1.39 Service Cooling Water (RCA)                                      37          9          3                  96                    49      195        195                                          303                                18,679      513 2h.1.1.40 Sewer System Expansion                                          47                                                              10        57                                    57                                                                  746 2h.1.l      Totals                                          1,821    13,893      1,400        485              16,454                11,238    45,291      36,887                    8,403            52,266                              3,188,694  223,417 2h.1.2      Scaffolding in support of decommissioning                5,982        26        14                  313                2,213    8,548      8,548                                        1,023                                90,828    44,703 Decontamination of Site Buildings 2h.1.3.1 *Reactor                                              959    2,483      1,120      5,645              26,011                12,003    48,221      48,221                                      331,897                              33,045,180    43,302 2h.1.3.2 Auxiliary                                          1,325      739        65        98                  927                1,542    4,695      4,695                                        6,943                                585,598    28,092 2h.1.3.3 Capital Additions 85*2004                            423      168        10        20                  151                  414    1,187      1,187                                        1,331                                117,734    8,113 2h.1.3.4 Containment Penetration Area                          327      213        26        28                  379                  446    1,420      1,420                                        2,121                                172,739    7,351 2h.1.3.5 Radwaste Storage                                        8        62          4          9                  59                    51      194        194                                          627                                55,654      867 2h.L3        Totals                                          3,042    3,666      1,224      5,801              27,526                14,457    55,716      55,716                                      342,918                              33,976,900    87,726 2h.1        Suhtotal Period 2b Activity Costs              4,863    23,541      2,650      6,300              44,293                27,908  109,554    101,151                    8,403            396,208                              37,256,420  355,847 Period 2b  Collateral Costs 2h.3.1      Process decommissioning water waste              143                  69        213                  284                  254      964        964                                          942                                56,542      184 2h.3.2      Process decommissioning chemical flush waste        3                  90        369                  687                  333    1,482      1,482                                        1,281                                136,538      240 2b.3.3      Small tool allowance                                        445                                                              94      539        539 2b.3.4      Spent Fuel Transfer - Pool to 1SFS1                                                                          7,172        1,508    8,681                    8,681 2h.3        Subtotal Period 2b Collateral Costs              145      445        160        582                  971    7,172        2,189    11,665      2,985        8,681                            2,224                                193,081      424 Period 2b  Period-Dependent Costs 2hA.1        Decon supplies                                  1,456                                                                        510    1,966      1,966 2hA.2        Insurance                                                                                                    1,136          159    1,295      1,295 2hA.3        Property taxes                                                                                                  396          55      451        451 2h.4.4      Health physics supplies                                  2,764                                                              969    3,733      3,733 2bA.5        Heavy equipment rental                                    4,951                                                            1,041    5,992      5,992 2b.4.6      Disposal of DAW generated                                              127        36                  401                  166      730        730                                        5,286                                108,867      163 2h.4.7      Plant energy budget                                                                                          2,074          436    2,510      2,510 2bA.8        NRC Fees                                                                                                      1,072          150    1,222      1,222 2bA.9        Emergency Planning Fees                                                                                      1,710          240    1,950                    1,950 2h.4.10      Spent Fuel Pool O&M                                                                                          1,825          384    2,209                    2,209 2bA.ll      Liquid Radwaste Processing Equipment/Services                                                                  463          97      561        561 2bA.12      ISFSI Operating Costs                                                                                          107          22      129                      129 2bA.13      Severance Related Costs                                                                                      7,908        1,663    9,571      9,571 2b.4.14      Spent Fuel Storage Canisters/Overpacks                                                                      10,760        2,263    13,023                  13,023 2bA.15      Security Staff Cost                                                                                          35,487        7,463    42,950      42,950                                                                                                    548,743 2bA.16      DOC Staff Cost                                                                                              37,206        7,824    45,030      45,030                                                                                                    364,166 2bA.17      Utility Staff Cost                                                                                          53,628      11,278    64,905      64,905                                                                                                    675,951 2bA          Subtotal Period 2b Period-Dependent Costs      1,456    7,715        127        36                  401  153,771      34,722  198,227    180,916      17,311                            5,286                                108,867      163    1,588,860 2b.0        TOTAL PERIOD 2b COST                            6,464    31,701      2,936      6,918              45,666  160,943      64,819  319,447    285,051      25,992        8,403            403,718                              37,558,370  356,433    1,588,860 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1      Spent Fuel Transfer - Pool to ISFSl                                                                          7,549        1,588    9,137                    9,137 2c.3        Subtotal Period 2c Collateral Costs                                                                          7,549        1,588    9,137                    9,137 Period 2c  Period-Dependent Costs 2c.4.1      Insurance                                                                                                    3,088          433    3,521      3,521 2c.4.2      Property taxes                                                                                                1,076          151    1,227      1,227 2cA.3        Health physics supplies                                  2,326                                                              815    3,142      3,142 2cA,4        Disposal of DAW generated                                              68        19                  216                    89      392        392                                        2,839                                58,472        88 2cA.5        Plant energy budget                                                                                          1,504          316    1,820      1,820 2cA.6        NRC Fees                                                                                                      2,000          280    2,281      2,281 2cA.7        Emergency Planning Fees                                                                                      4,651          652    5,303                    5,303 2cA.8        Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  13,947        2,933    16,880                  16,880 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                  Appendix C, Page 16 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site    Processed            Burial Volumes            Burial f            Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Wt., Lbs. Manhours  Manhours Period 2c Period*Dependent Costs (continued) 2c.4.9    Spent Fuel Pool O&M                                                                                          4,964        1,044    6,007                    6,007 2c.4.10    Liquid Radwaste Processing Equipment/Services                                                                  315          66      381        381 2c.4.11    ISFSI Operating Costs                                                                                          291          61      352                      352 2c.4.12    Spent Fuel Storage Canisters/Overpacks                                                                      11,323        2,381    13,704                  13,704 2c.4.13    Security Staff Cost                                                                                          96,501      20,294  116,795    116,795                                                                                                1,492,229 2c.4.14    Utility Staff Cost                                                                                          42,556        8,950    51,506      51,506                                                                                                  535,846 2c.4      Subtotal Period 2c Period* Dependent Costs              2,326          68        19                  216  182,217      38,467  223,313    181,066      42,246                          2,839                                58,472        88    2,028,074 2c.O      TOTAL PERIOD 2c COST                                    2,326          68        19                  216  189,766      40,054  232,449    181,066      51,383                          2,839                                58,472        88    2,028,074 PERIOD 2d - Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activities 2d.1.l    Remove spent fuel racks                          585        56        174        36                1,207                  885    2,943      2,943                                        3,812                              233,945      962 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated) - FHB                              111          8          3                  115                    81      317        317                                          362                                22,201    1,497 2d.L2.2 Electrical (RCA).FHB                                          690        78        31                1,042                  624    2,464      2,464                                        3,290                              201,925    8,926 2d.L2.3 Fire Protection (RCA)                                          264        67        18                  613                  321    1,283      1,283                                        1,925                              118,758    3,614 2d.L2.4 HVAC (Contaminated) - FHB                                      231        39        16                  542                  280    1,107      1,107                                        1,711                              104,999    3,086 2d.L2.5 Spent Fuel Pit Cooling                                          94        65        21                  712                  296    1,189      1,189                                        2,243                              138,063    1,442 2d.L2.6 Spent Fuel Pit Cooling* FHB                                    130        71        23                  772                  331    1,327      1,327                                        2,430                              149,602    1,956 2d.L2      Totals                                                    1,520        328        112                3,795                1,933    7,688      7,688                                      11,961                                735,547    20,523 Decontamination of Site Buildings 2d.L3.1 Fuel Handling                                        811      859        63        41                  637                1,110    3,521      3,521                                        3,443                              251,129    23,547 2d.L3      Totals                                            811      859        63        41                  637                1,110    3,521      3,521                                        3,443                              251,129    23,547 2d.L4      Scaffolding in support of decommissioning                1,196          5          3                  63                  443    1,710      1,710                                          205                                18,166    8,941 2d.1      Subtotal Period 2d Activity Costs              1,396    3,632        570        191                5,702                4,370    15,862      15,862                                      19,420                              1,238,787    53,973 Period 2d Additional Costs 2d.2.1    License Termination Survey Planning                                                                            800          336    1,136      1,136                                                                                                    6,240 2d.2      Subtotal Period 2d Additional Costs                                                                            800          336    1,136      1,136                                                                                                    6,240 Period 2d Collateral Costs 2d.3.1    Process decommissioning water waste                37                  20        62                  82                    70      271        271                                          272                                16,319        53 2d.3.2    Process decommissioning chemical flush waste 2d.3.3    Small tool allowance                                        79                                                              17        96          96 2d.3.4    Decommissioning Equipment Disposition                                  155        54                1,828                  674    2,710      2,710                                        5,771                              354,194        88 2d.3      Subtotal Period 2d Collateral Costs                37        79        175        115                1,910                  760    3,076      3,076                                        6,043                              370,513      141 Period 2d Period-Dependent Costs 2d.4.1    Decon supplies                                    209                                                                        73      282        282 2d.4.2    Insurance                                                                                                      219          31      249        249 2d.4.3    Property taxes                                                                                                  76          11        87          87 2d.4.4    Health physics supplies                                    445                                                              156      601        601 2d.4.5    Heavy equipment rental                                      953                                                              200    1,153      1,153 2d.4.6    Disposal of DAW generated                                              45        13                  143                    59      260        260                                        1,885                                38,817        58 2d.4.7    Plant energy budget                                                                                            213          45      258        258 2d.4.8    NRC Fees                                                                                                        175          24      199        199 2d.4.9    Emergency Planning Fees                                                                                        165          23      188                      188 2d.4.10    Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    1,216          256    1,472                    1,472 2d.4.11    Liquid Radwaste Processing Equipment/Services                                                                  178          38      216        216 2d.4.12    ISFSI Operating Costs                                                                                            21            4        25                      25 2d.4.13    Severance Related Costs                                                                                      12,313        2,589    14,902      14,902 2d.4.14    Security Staff Cost                                                                                          1,035          218    1,253      1,253                                                                                                    18,960 2d.4.15    DOC Staff Cost                                                                                                4,884        1,027    5,911      5,911                                                                                                    48,000 2d.4.16    Utility Staff Cost                                                                                            7,532        1,584    9,117      9,117                                                                                                    91,680 2d.4      Subtotal Period 2d Period-Dependent Costs        209    1,398        45        13                  143  28,027        6,338    36,173      34,488        1,685                          1,885                                38,817        58      158,640 2d.0      TOTAL PERIOD 2d COST                            1,642    5,108        790        319                7,755  28,826      11,805    56,246      54,561        1,685                        27,348                              1,648,117    54,172      164,880 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                    Appendix C, Page 17 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial I            Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lic. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                                      tion      Cost    Cost      Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Wt.,Lbs. Manhours  Manhours PERIOD 2f - License Termination Period 2fDirect Decommissioning Activities 2&#xa3;.1.1      ORISE confirmatory survey                                                                                    178            75      253          253 2&#xa3;.1.2      Terminate license                                                                                                                    a 2&#xa3;.1        Subtotal Period 2f Activity Costs                                                                            178            75      253          253 Period 2f Additional Costs 2&#xa3;.2.1      License Termination Survey                                                                                14,399        6,056  20,456      20,456                                                                                        200,468        3,120 2&#xa3;2        Subtotal Period 2f Additional Costs                                                                      14,399        6,056  20,456      20,456                                                                                        200,468        3,120 Period 2f Collateral Costs 2f.3.1      DOC staff relocation expenses                                                                              1,415          297    1,712        1,712 2f.3        Subtotal Period 2f Collateral Costs                                                                        1,415          297    1,712        1,712 Period 2fPeriod-Dependent Costs 2f.4.1      Insurance                                                                                                    319            45      364          364 2f.4.2      Property taxes                                                                                              125            17      142          142 2f.4.3      Health physics supplies                                  834                                                              292    1,127        1,127 2f.4.4      Disposal of DAW generated                                            9          2                  27                    11      49          49                                          356                                  7,337        11 2f.4.5      Plant energy budget                                                                                          174            37      211          211 2&#xa3;.4.6      NRC Fees                                                                                                    312            44      356          356 2&#xa3;.4.7      Emergency Planning Fees                                                                                      269            38      307                      307 2f.4.8      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                1,130          238    1,368                    1,368 2f.4.9      ISFSI Operating Costs                                                                                        34            7      41                        41 2&#xa3;.4.10    Security Staff Cost                                                                                        1,694          356    2,050        2,050                                                                                                      31,036 2f.4.11    DOC Staff Cost                                                                                            4,689          986    5,675        5,675                                                                                                      46,750 2f.4.12    Utility Staff Cost                                                                                        5,150        1,083    6,233        6,233                                                                                                      60,107 2f.4        Subtotal Period 2fPeriod-Dependent Costs                834          9          2                  27  13,897        3,154  17,924      16,208        1,716                            356                                  7,337        11      137,893 2f.O        TOTAL PERIOD 2f COST                                    834          9          2                  27  29,889        9,583  40,345      38,629        1,716                            356                                  7,337  200,479      141,013 PERIOD 2 TOTALS                                          9,816    70,926    28,855    14,141              105,405  510,074      195,310  934,527      831,404      90,569      12,554            573,488      845      574          50,348,710  871,939    5,034,284 PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 *Reactor                                                  6,798                                                            1,430    8,228                                  8,228                                                              67,914 3b. 1. 1.2 Administration                                          1,067                                                              224    1,291                                  1,291                                                              10,358 3b. 1. 1.3 Auxiliary                                              6,587                                                            1,385    7,972                                  7,972                                                              64,471 3b. 1. 1.4 Capital Additions 85-2004                              4,359                                                              917    5,276                                  5,276                                                              47,403 3b.1.1.5 Chemical Storage                                              4                                                                1        5                                      5                                                                  46 3b. 1. 1.6 Chlorination                                                9                                                                2      11                                    11                                                                  99 3b. 1. 1.7 Circulating Water Tunnels                              1,153                                                              243    1,396                                  1,396                                                              12,194 3b. 1. 1.8 Cold Machine Shop                                        396                                                                83      479                                    479                                                                3,785 3b.1.1.9 Communication                                                4                                                                1        5                                    5                                                                  44 3b. 1. 1.10 Condensate PolishingrI'echnical Support                  870                                                              183    1,053                                  1,053                                                                9,300 3b. 1. 1.11 Containment Penetration Area                            686                                                              144      830                                    830                                                                6,565 3b. 1. 1.12 Discharge Structure                                      937                                                              197    1,134                                  1,134                                                                8,321 3b. 1. 1.13 Fabrication Shop                                        120                                                                25      145                                    145                                                                1,223 3b. 1. 1.14 Fire Pump House                                            5                                                                1        6                                      6                                                                  55 3b.1.1.15 Hazardous Waste Storage Facility                            39                                                                8      48                                    48                                                                  430 3b. 1. 1.16 Intake Structure                                      5,309                                                            1,116    6,425                                  6,425                                                              46,364 3b. 1. 1.17 Maintenance Shop                                        365                                                                77      442                                    442                                                                3,444 3b.1.1.18 Miscellaneous Structures                                    64                                                                13      77                                    77                                                                  673 3b. 1. 1.19 NPO Permanent Warehouse                                1,367                                                              287    1,654                                  1,654                                                              14,093 3b. 1. 1.20 Ponds                                                      2                                                                0        2                                      2                                                                  24 3b.1.1.21 Portable Fire Pump & Fuel Cart                              1                                                                0        2                                      2                                                                  14 3b.1.1.22 Pretreatment                                                10                                                                2      12                                    12                                                                  108 3b.1.1.23 Radwaste Storage                                        1,777                                                              374    2,150                                  2,150                                                              17,854 3b.1.1.24 Radwaste Storage Facility (Additional)                      49                                                                10      60                                    60                                                                  662 3b.1.1.25 Rotor Warehouse                                            847                                                              178    1,025                                  1,025                                                                9,938 3b.1.1.26 Security                                                  344                                                                72      417                                    417                                                                3,944 3b. 1. 1.27 Security Buildings (additional)                          53                                                                11      65                                    65                                                                  722 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                            Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                            Appendix C, Page 18 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial/            Utility and Activity                                                Decon Removal  Packaging Transport Processing Disposal Other      Total      Total    Lic. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                  Cost  Cost      Costs    Costs    Costs    Costs  Costs    Contin enc    Costs      Costs      Costs        Costs        Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours Demolition of Remaining Site Buildings (continued) 3b.1.1.28 Simulator                                                413                                                            87      500                                    500                                                            4,191 3b.1.1.29 Steam Generator Storage Facility                          909                                                          191    1,100                                1,100                                                              8,888 3b.1.1.30 Telephone Terminal                                          3                                                            1        3                                      3                                                                28 3b.1.1.31 Turbine                                                5,538                                                        1,165    6,703                                6,703                                                            57,744 3b.1.1.32 Turbine Pedestal                                        1,318                                                          277    1,596                                1,596                                                            11,300 3b.1.1.33 Vehicle Maintenance                                        34                                                            7        41                                    41                                                              367 3b.1.1.34 Waste Water Holding & Treatment Facility                  23                                                            5        27                                    27                                                              238 3b.1.1.35 Fuel Handling                                          1,858                                                          391    2,248                                2,248                                                            16,750 3b.1.1    Totals                                                43,321                                                        9,110    52,431                                52,431                                                            429,552 Site Closeout Activities 3b.1.2    Grade & landscape site                                2,758                                                          580    3,338                                3,338                                                              4,587 3b.1.3    Final report to NRC                                                                                        98          21      119        119                                                                                                      668 3b.1      Subtotal Period 3b Activity Costs                    46,079                                              98        9,711    55,888        119                    55,769                                                            434,139          668 Period 3b Additional Costs 3b.2.1    Backfill Structures & Remove Concrete Rubble          35,142                                                        7,390    42,532                                42,532                                                            160,418 3b.2.2    Breakwater Demolition and Removal                    41,893                                                        14,684    56,577                                56,577                                                            128,379      46,649 3b.2.3    Cofferdam Construction and Teardown                      478                                                          101      579                                    579                                                            4,004 3b.2.4    Concrete Crushing                                      9,113                                                5        1,917    11,035                                11,035                                                            37,775 3b.2.5    Disposal of Galbestos Siding                                                                              317          67      383                                    383 3b.2.6    Disposition of Mobile Barriers                        1,318                                                          277    1,595                                1,595                                                              4,362 3b.2.7    Soil/Sediment Control Plant Area                      1,052                                                          221    1,273                                1,273                                                            10,271 3b.2      Subtotal Period 3b Additional Costs                  88,996                                              321      24,657  113,975                              113,975                                                            345,209      46,649 Period 3b Collateral Costs 3b.3.1    Small tool allowance                                  1,107                                                          233    1,340                                1,340 3b.3      Subtotal Period 3b Collateral Costs                    1,107                                                          233    1,340                                1,340 Period 3b Period-Dependent Costs 3b.4.1    Insurance                                                                                                525          74      598                      598 3b.4.2    Property taxes                                                                                            410          57      467                      467 3b.4.3    Heavy equipment rental                                7,347                                                        1,545    8,892                                8,892 3b.4.4    Plant energy budget                                                                                      286          60      347                                    347 3b.4.5    NRC ISFSI Fees                                                                                            348          49      397                      397 3b.4.6    Emergency Planning Fees                                                                                  885          124    1,010                    1,010 3b.4.7    Spent Fuel Transfer - Pool or ISFSI to DOE                                                              3,711          780    4,491                    4,491 3b.4.8    ISFSI Operating Costs                                                                                    111          23      134                      134 3b.4.9    Security Staff Cost                                                                                    5,569        1,171    6,740                    5,459        1,281                                                                        102,023 3b.4.10    DOC Staff Cost                                                                                        14,111        2,967    17,078                                17,078                                                                        136,891 3b.4.11    Utility Staff Cost                                                                                      7,357        1,547    8,904                    1,781        7,123                                                                          87,197 3b.4      Subtotal Period 3b Period-Dependent Costs              7,347                                          33,312        8,399    49,058                  14,338      34,721                                                                        326,112 3b.0      TOTAL PERIOD 3b COST                                143,529                                          33,732        42,999  220,261        119      14,338      205,804                                                            779,348      373,428 PERIOD 3c - Fuel Storage Operations/Shipping Period 3e Direct Decommissioning Activities Period 3e Period-Dependent Costs 3c.4.1    Insurance                                                                                              3,099          434    3,534                    3,534 3c.4.2    Property taxes                                                                                          2,420          339    2,760                    2,760 3e.4.3    Plant energy budget 3e.4.4    NRC ISFSI Fees                                                                                          2,054          288    2,342                    2,342 3e.4.5    Emergency Planning Fees                                                                                5,228          733    5,961                    5,961 3e.4.6    Spent Fuel Transfer - Pool or ISFSI to DOE                                                            21,995        4,625    26,620                  26,620 3e.4.7    ISFSI Operating Costs                                                                                    654          138      792                      792 3e.4.8    Security Staff Cost                                                                                  26,771        5,630    32,401                  32,401                                                                                      411,789 3e.4.9    Utility Staff Cost                                                                                      8,802        1,851    10,654                  10,654                                                                                      103,100 3e.4      Subtotal Period 3e Period-Dependent Costs                                                            71,024        14,039    85,063                  85,063                                                                                      514,888 3e.0      TOTAL PERIOD 3e COST                                                                                  71,024        14,039    85,063                  85,063                                                                                      514,888 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                              Appendix C, Page 19 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site    Processed            Burial Volumes              Burial!            Utility and Activity                                            Decon Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                  Activit                    Cost  Cost      Costs      Costs      Costs    Costs    Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt.,Lbs. Manhours  Manhours PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.1.1.1 Vessel & Internals GTCC Disposal                                2,500                          9,179                2,281    13,960      13,960                                                                    1,785    350,510 3d.1.1    Totals                                                        2,500                          9,179                2,281    13,960      13,960                                                                    1,785    350,510 3d.1      Subtotal Period 3d Activity Costs                              2,500                          9,179                2,281    13,960      13,960                                                                    1,785    350,510 Period 3d Collateral Costs 3d.3      Subtotal Period 3d Collateral Costs Period 3d Period-Dependent Costs 3dA.1      Insurance                                                                                                  10                    11                      11 3dA.2      Property taxes                                                                                              8                      9                        9 3dA.3      Plant energy budget 3dAA      NRC ISFSI Fees                                                                                              6            1                                  7 3dA.5      ISFSI Operating Costs                                                                                      2            0                                  3 3dA.6      Security Staff Cost                                                                                        85          18      103                      103                                                                                        1,311 3d.4.7    Utility Staff Cost                                                                                        28            6        34                      34                                                                                          328 3d.4      Subtotal Period 3d Period-Dependent Costs                                                                139            28      167                      167                                                                                        1,640 3d.0      TOTAL PERIOD 3d COST                                          2,500                          9,179    139        2,308    14,127      13,960          167                                                      1,785    350,510                  1,640 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1    ISFSI License Termination                              40          6        14                  393    622          286    1,362                    1,362                          1,305                                108,721    4,535          360 3e.2      Subtotal Period 3e Additional Costs                    40          6        14                  393    622          286    1,362                    1,362                          1,305                                108,721    4,535          360 Period 3e Collateral Costs 3e.3.1    Small tool allowance                                                                                                    0 3e.3      Subtotal Period 3e Collateral Costs                                                                                      0 Period 3e Period-Dependent Costs 3eA.1      Insurance 3e.4.2    Property taxes                                                                                            55            8        63                      63 3e.4.3    Heavy equipment rental                                136                                                              29      165                      165 3eAA      Plant energy budget 3eA.5      NRC ISFSI Fees                                                                                            94          13      107                      107 3eA.6      Security Staff Cost                                                                                        61          13        74                      74                                                                                        1,901 3e.4.7    Utility Staff Cost                                                                                      163            34      198                      198                                                                                        1,901 3e.4      Subtotal Period 3e Period-Dependent Costs            136                                                373            97      606                      606                                                                                        3,803 3e.0      TOTAL PERIOD 3e COST                                  177          6        14                  393    995          383    1,968                    1,968                          1,305                                108,721    4,535        4,163 PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3f.2.1    ISFSI Demolition and Site Restoration              1,371                                                  27          294    1,692                    1,692                                                                          15,387          80 3f.2.2    ISFSI Area Soil I Sediment Control                    16                                                                3        20                      20                                                                            2,568 3f.2      Subtotal Period 3f Additional Costs                1,387                                                  27          297    1,712                    1,712                                                                          17,955          80 Period 3f Collateral Costs 3f.3.1    Small tool allowance                                  20                                                                4        24                      24 3f.3      Subtotal Period 3f Collateral Costs                    20                                                                4        24                      24 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                                                        Appendix C, Page 20 of 20 Table C-2 Diablo Canyon Unit 2 DECON Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site    LLRW                                          NRC      Spent Fuel      Site      Processed _==-_""7"'"_...",.:B:;:;.u::;r::.:i=a::..I..:.V..::o.:,:lu~m=e:::..s""'_---.,=-=-=,....- Burial!              Utility and Activity                                                        Decon    Removal  Packaging  Transport    Processing  Disposal    Other      Total      Total    Lic. Term. Management  Restoration  Volume        Class A                  Class B                  Class C              GTCC        Processed    Craft    Contractor Index                                                            Cost      Cost      Costs      Costs        Costs      Costs      Costs    Contin enc    Costs      Costs      Costs        Costs      Cu. Feet    Cu. Feet Cu. Feet Cu. Feet Cu. Feet                                                  Wt., Lbs. Manhours  Manhours Period 3fPeriod-Dependent Costs 3f.4.1      Insurance 3f.4.2      Property taxes                                                                                                                  28            4        32                      32 3f.4.3      Heavy equipment rental                                                54                                                                    11        65                      65 3f.4.4      Plant energy budget 3f.4.5      Security Staff Cost                                                                                                            11            2        14                      14                                                                                                                                                349 3f.4.6      Utility Staff Cost                                                                                                              69          14        83                      83                                                                                                                                                784 3f.4        Subtotal Period 3f Period-Dependent Costs                            54                                                      108          32      193                      193                                                                                                                                              1,133 3f.O        TOTAL PERIOD 3fCOST                                                1,461                                                      134          333    1,928                    1,928                                                                                                                                17,955        1,213 PERIOD 3 TOTALS                                                              145,167      2,506        14                    9,572    106,024      60,063  323,347      14,079      103,464      205,804                      1,305                                                              1,785      459,231    801,837      895,332 TOTAL COST TO DECOMMISSION                                        13,073    218,618      31,702    14,580                124,490    768,430      292,711 1,463,605  1,036,573    207,854      219,179                  586,268                      1,732                        574          1,785    51,548,980  1,686,102  6,887,098 TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:                                                $1,463,605  thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 70.82% OR:                                                $1,036,573  thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 14.2% OR:                                                          $207,854  thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 14.98% OR:                                                        $219,178  thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                          77,728 Tons TOTAL CRAFT LABOR REQUIREMENTS:                                                                  1,686,102 Man-hours End Notes:
nJa - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0- indicates that this value is less than 0.5 but is non-zero.
a cell containing" - " indicates a zero value TLG Services, Inc.
 
Diablo Canyon Power Plant                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                      Appendix D, Page 1 of 22 APPENDIXD DETAILED COST ANALYSIS SAFSTOR TLG Services, Inc.
 
Decommissioning Cost Analysis for the Diablo Canyon Power Plant, Appendix D Intentionally not included.
 
Diablo Canyon Power Plant                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                            Appendix E, Page 1 of 28 APPENDIXE DETAILED COST ANALYSIS DECON - 20 YEAR LICENSE RENEWAL This Appendix contains the following Figures and Tables Figure E.l    DECON Alternative - 20 Year License Renewal Decommissioning Timeline ................................................................................................ E-3 Table E-l    DECON Alternative - 20 Year License Renewal Schedule of Total Annual Expenditures, Unit 1 ............................................................... E-4 Table E-2    DECON Alternative - 20 Year License Renewal Schedule of Total Annual Expenditures, Unit 2 ............................................................... E-6 Table E-3    DECON Alternative - 20 Year License Renewal Decommissioning Cost Elements, Unit 1. .......................................................................... E-8 Table E-4    DECON Alternative - 20 Year License Renewal Decommissioning Cost Elements, Unit 2 ........................................................................... E-9 Table E-5    DECON Alternative - 20 Year License Renewal Decommissioning Waste Summary, Unit 1 ..................................................................... E-I0 Table E-6    DECON Alternative - 20 Year License Renewal Decommissioning Waste Summary, Unit 1 ..................................................................... E-ll Table E-7    DECON Alternative - 20 Year License Renewal Decommissioning Cost Estimate, Unit 1 ......................................................................... E-12 Table E-8    DECON Alternative - 20 Year License Renewal Decommissioning Cost Estimate, Unit 2 ......................................................................... E-21 TLG Services, Inc.
 
Diablo Canyon Power Plant                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                    Appendix E, Page 2 of 28 E.1    Background and Objective The DECON and SAFSTOR scenario estimates provided in the main body of this report are based on Diablo Canyon operating until the end of the current license, year 2024 and 2025 for Units 1 and 2, respectively. Alternate DECON scenario estimates have been prepared based on Diablo Canyon receiving a 20 year license renewal, and then operating until 2044 and 2045.
E.2    Estimating Approach The principal changes associated with this expanded period of operations that would impact the decommissioning estimate include the following:
* Shut down dates are revised which delays decommissioning expenditures.
* An additional 2,112 spent fuel assemblies are projected to be generated as a result of the extended period of operations. However, since the DOE is accepting spent fuel during much of this extended operating period, there is no need to construct additional ISFSI storage pads
* The post-shutdown ISFSI operations schedule is revised to reflect the projected removal of all spent fuel from the ISFSI.
* The reactor and internals will be subject to an additional 20 years of neutron activation which could impact waste packaging and disposal costs.
Since the estimate is developed in year* 20 11 constant dollars there are no other significant cost impacts to the decommissioning estimate other than those identified above.
E.3    Results Incorporating the impact of the changes associated with operating the Diablo Canyon station for an additional 20 years results in an estimated decommissioning cost of $2,624.4 million, including 25% contingency (2011 dollars). Similar to the figures and tables provided in the main body of this report, the following are provided in this appendix:
Decommissioning Timeline (Figure E-l)
Schedule of Total Annual Expenditures (Tables E-l and E-2)
Decommissioning Cost Elements (Tables E-3 and E-4)
Decommissioning Waste Summary (Tables E-5 and E-6)
DECON Decommissioning Cost Estimates (Tables E-7 and E-8)
TLG Services, Inc.
 
Diablo Canyon Power Plant                                            Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                              Appendix E, Page 3 of 28 FIGURE E.I DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL DECOMMISSIONING TIMELINE (not to scale)
Unit I (Shutdown November 2, 2044)
Pool and ISFSI Operations                ISFSIOperations Period 1            Period 2                            Period 3 Transition and                                      Site Preparations    Decommissioning          Restoration  ISFSIOperations  ISFSI D&D 11/2044        05/2046                    11/2058      05/2061            12/2071    07/2072 Storage Pools Empty Unit 1 - 11/2056 Unit 2 - 08/2057 Unit 2 (Shutdown August 26, 2045)
Period 1            Period 2                            Period 3 Transition and                                    Site Prepara tions    Decommissioning        Restoration  ISFSIOperations  ISFSI D&D 08/2045      02/2047                    11/2058      05/2061            12/2071    07/2072 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                Appendix E, Page 4 of 28 TABLEE-1 DECON ALTERNATIVE- 20 YEAR LICENSE RENEWAL SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 1 (thousands, 2011 dollars)
PG&E                              Equipment &                                                  Contractor                            LLRW Year                            Labor                                    Materials                                                        Labor                    Disposal                      Other                            Total
-~~~~!f --~-~:-:~~-l------::::i:!!f- F-::~~~~~~~~:::f::---d~F:::--- 4-H~Ff=:=:::~~tf~FI i
2046                              ' 49,746 :                                                          24,695                    l                    40,117                      36,644                      19,220 I                      170,423          I 2047                        45,136                                                    27,128                  I                      39,072                      45,144                      15,959'                        172,438 2048                        37,703                                                            8,401            I                      25,241                      26,667                      15,547                        113,559 2049                        37,600                                                            8,378                                    25,172                      26,595                      15,504                        113,249
. . . . . . . .?.9.Q.9.... . . . .,. . . . ?&sect;.J.. 4.~.?.. . . . .1 ..........................................??..4.&sect;..7..                                  ~, 593
                                                                                                                          ""'fl.... ........................        . . . . . . . . .&sect;.?.~.&sect;.~..........        9,991 I                      56,522 I 2051                        19,339                i                                              956 ,                                          166                            40 "''''''''''''''-''''''''~j'~i8'9''''''''l  """2'7'~'6'96 ""'I
~952__l                                    19,392                i                                              958          I                                167_,____4_Q___                                    7,209                I      27,766 i 2053                        19,339                                                                956          I                                166                            40                  7,189                  I    27,690 2054                        19,339                                                                956                                            166                            40                  7,189                        27,690 2059 2060                          6,332                                                          7,947            I                      12,290                                    0                2,407!                      28,977 2061                          4,079                                                          2,671            I                            4,130                                0                2,350                        13,230
                                                                                                                                          =_ _QT
!---------;----'---+-
_ +_
2062                          2,943 i                                                                  0        I                                  0 i                            0                2,324                          5,267        I
___~Q&sect;~____l ___ g,~:t~__
2064              ;          2,951 r::=:==___Q i                          _                        0,                                          0 O~J~~!l______&sect;,g&sect;Lj 0                2,330                          5,281 I 2065                          2,943                                                                    0                                          0                              0                2,324                          5,267 I 2066                          2,943                                                                    0                                          0                              0                2,324                          5,267 I 2067                          2,943                                                                    0                                          0                              0                2,324                          5,267 I 2068                          2,951                                                                    0        I                                  0                              0                2,330                          5,281 I 2072                              368                                                            736          I                              1,258                        530                    1,003                          3,895        I L. Total                          i 454,197                                                      118,058                                        246,033                      163,672                        239,761                        1,221,721 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                  Document PO 1-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                Appendix E, Page 5 of 28 TABLE E-2 DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL SCHEDULE OF TOTAL ANNUAL EXPENDITURES, UNIT 2 (thousands, 2011 dollars)
PG&E                                                              Equipment &                                                                Contractor                          LLRW Labor                                                                Materials                                                            Labor                              Disposal                                  Other                                                Total
      ................................................+..............1. . 7
                                                                          . . . ,'. .4. . . 4. . . .3. . . . . . . ,1. . * *. * . * *. . * . *. . * * . * *. ******2*:*i2*S*. *. * . r*: : *.: . ::*::*:::.*::&sect;:::9.&sect;i:::**:*i. . :.:*: :. :* *. *. *. . *. "1':.508            :*.:::::*.:*::::.:::*:*.*iQ*~::i&sect;.&sect;.:::*:. : *I:*.*: :  . . . . . . . . . .4.~.~. ?~.?.                        :".: \
49,741                                        1 ....*.. *............*........*............ 9*)2*4. . . . '1".. 23,417 i                                                                8,819                                43,204                        I                      134,206                                          I 46,707                                                                                    27,199 I                                        38,391                                  41,766                                    13,607 I                                            167,670 I 46,039                                                                                    24,695 I                                        38,808                                  41,195                                    13,534 I                                            164,270 I 45,033                                                                                      9,703 I                                      32,012                                  25,732                                    14,826 I                                            127,307 I 45,033                                                                                      9,703                                        32,012                                  25,732                                    14,826 I                                            127,307 I
                                                            . . . .28,733
                                                                  . . . . . . . . . . . . . . . . . . ' .. . . . . . . . . . . . .2,342                        . . . . . . . . . . . . . . . .+I            4,978                                      . .??..~..l.&sect;.........                    8,343                                                .*. . *. . . . . . *. . *. . . . . . . . . 1I
                                                                                                                                                                                                                                                                                                                  . . . . . . ]I. . . . . . . . . . . . . 48,312 r---_ _-+-_                                                        2_5",QJ2...                                                                                  1,039 I                                        182 '                                                45                              7,213 I                                              34,390 I 25,841 I                                                                                      1,036 I                                        182                                                  45                              7,193                                                34,297 I
          - - -.. . . . . . . 5.!.......,8-4-1"'*"'*...;...-                                                                                                1,036 I                                        182                                                  45                              7,193                                                34,297 I 25,841                                                                                        1,036                            I            182                                                  45                              7,193                                                34,297 4,075                                                                              14,803                              I          11,930                                                      0                          2,400 I                                              33,208                                      I 2,940                                                                                                    0            I                0                                                    0                          2,321 I                                                    5,261 2,940                                                                                                    0            I                0                                                    0                          2,321 I                                                    5,261 2,940                                  I                                                                0 I*                            0                                                    0                          2,321                                                      5,261 2,940                                  I                                                                0                              0                                                    0                          2,321                                                      5,261 2,948                                  i                                                                0                              0                                                    0                          2,328                                                      5,276 2,940                                  i                                                                0                              0                                                    0                          2,321                                                      5,261
    --~6~i---l- --~~{6-J
    . *. . . *2()'7*2..                                                              368 : . . . *. . . *. . . . *. *. . *. *. *. *. . . . . .
2, 84~-------- --- ----ri--" --------------6----ii~-ji---f---::::!ii~~::1
                                                                                                                                                                        ~i3*5*          . . . . r........ i,. 25.7. *. *. * *. . . . . . . *. . . . *. . . *. . *5*2*9*. * . . . . . . ."1')0'2.*. *. *]"                                                      3,891 I
: l. . . Total . . .                                  ..1......4..~.Q.?&sect;.?&sect;.. . . ...1 .............................?...!.9.?..&sect;.4..7.. . . ....l ...............?.Q.&sect;.?..~.&sect;..?. . . . . . . . . . . ..!.&sect;..~.~. ~.?&sect; . . . . . . . . . . . . ?.?..?..?..9.~.&sect;.. . . . . . . . . . . . . . . . .9.??.f?..~.7. . ...l TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                            Appendix E, Page 6 of 28 TABLE E-3 DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL DECOMMISSIONING COST ELEMENTS, UNIT 1 (thousands of 2011 dollars)
I Cost Element                                                                                                              Total~rcentage Decontamination                                                                                                        17,212                                  1.4 I RllYn()val                                                                            . ____1~2.1~Q.__ .._.._._--------                                      10.6
                                            ~-  -.-----~------~----_._-----_._-
i -n    1
                  !ring                                                                                                        40,158                                  3.3
        ~ransportation                                                                                                            18,014                                1.5 Waste Disposal
        ---------_._-_        .._-_._-_._--_.._._--_.._._._--_._------._--_.__.._-_. __._. __. ______ 174, 7} 9 __.._._-----------                                    14.3 Program Management [1]                                                                                              311,678                                25.5 Security                                                                                                            263,946                                21.6 Spent Fuel Pool Isolation                                                                                              23,989                                  2.0 Spent Fuel Management [2]                                                                                          103,865                                    8.5 I!!~.~~~!!.~_~. _~.!!~. .R~_K~!~~.Q~y_[~.~~__._._. _. _.__.____.____ .._.........._._._-.....__._._..._20,212          .._._._--- -~
1.7 Energy                                                                                                                10,306                                  0.8 Characterization and Licensing Surveys                                                                                21,286                                  1.7 i Property Taxes                                                                                                            5,222                              0.4 Severance                                                                                                              74,095                                  6.1
        )~~!~~~_g~.!!~g~~_. ~g.~.!P..~~!!.!. ._. __. . _. _.___. .._._. _________. __._._. . . ._. ._. ._.__. _. ._. . . . ___._. __7L&sect;_~ --_._._--_.....__............_0.6 Total [3]                                                                                                  1,221,721                                  100.0
      , Cost Element                                                                        i                                    Total        Percentage                            I I
License Termination                                                                                              997,101 ---_._-_._-_.._-----                81.6 Spent Fuel Management                                                                                            151,162                                    12.4 Site  Restoration                                                                I
      '------_._----_. . _----_. _...__._. . _--_. _----_._.__.-------.j..........._----_._----- 1------_.._._..._ - -6.0      73,457                                        --
i I
I Total [3]                                                                            I                    1,221,721                                        100.0
[1]  Includes engineering costs
[2]  Excludes program management costs (staffing) but includes costs for spent fuel loading/transfer costs/spent fuel pool O&M and EP fees
[3]  Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                              Appendix E, Page 7 of 28 TABLEE-4 DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL DECOMMISSIONING COST ELEMENTS, UNIT 2 (thousands of 2011 dollars)
Cost Element                                                                                                                        Total                Percentage Decontamination                                                                                                                    20,362                                                1.5
        ~-
Removal
              ..-------.--.-------.-...----.-----..      -.~-.-~-.----.------_.
_._____..__..~~~2..~~Q._. ._._-_._._--_.-----                        20.1 Packaging                                                                                                                          39,723                                                2.8 Transportation                                                                                                                    17,927                                                1.3
_~_~~~~_!?i~posaL_._.__. . ___.__. _____._______.___. ._.__ ---------                                                            171,032 12.2 Program Management [1]                                                                                                          364,934                                            26.0 Security                                                                                                                        249,060                                              17.8 Spent Fuel Pool Isolation                                                                                                          15,974                                                1.1 I  Spent Fuel Management [2]                                                                                                        101,694                                                  7.3
        . _.l:g.~.~~~!?_~~_~ndJ~~~_~gu!~~.9._~yJf~.~.~_. . . ._. . . _. . . . . _. _. _. ___. _.__._..._--_.__.... .._.-.-.17,374      _      __.._---_._.. -_._.__..._._.__......__._..._-_._-._-- 1.2 Energy                                                                                                                            10,069                                                0.7 Characterization and Licensing Surveys                                                                                            24,682                                                1.8 Property Taxes                                                                                                                        5,065                                              0.4 Severance                                                                                                                          74,012                                                5.3
: l. ._Mi~~~.!!~p.eo~~J~~.g.~!I?.!!?-_~.!?-..!_. .__._. _. . _. ._. . . . _. . . ._. . ._. . . . . ._. . _. __._. __. .__._____._._____.&sect;L!Q!L ...            ~.--.~-~.--
0.6 Total    [3]                                                                                                                1,402,667                                        100.0 Cost Element                                                                                                                        Total                    Percent License Termination                                                                                          I              1,034,886                                                    73.8
      ***S--*~*~t-*F~~l"*M_;~;*-~~~~t---**---*----*-****---**-**--****--*_******-*-****-*                        . . *T*-**-*_*_*-..***--*-148:940 --..*--*-* -* ---** * -* * .        **--i()"~6 Site Restoration
        --~~~.--~-.-~--~---~~---.-.--------.-.---.--------"1-----.----
I                218,842 tal  [3]                                                                                                              1,402,667
[1]  Includes engineering costs
[2]  Excludes program management costs (staffing) but includes costs for spent fuel loadingltransfer costs/spent fuel pool O&M and EP fees
[3]    Columns may not add due to rounding TLG Services, Inc.
 
Diablo Canyon Power Plant                                            Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                  Appendix E, Page 8 of 28 TABLE E-5 DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 1 I!                                      Waste Volume                      Weight Waste            !
Cost Basis    Class    [1]        (cubic feet)          I      (pounds)
I                                                                I
                              !                                                                I I!
Low -Level Radioactive      I EnergySolutions Waste (near-surface        I Large Component          A                          94,9591              7,860',384 disposal)                      EnergySolutions                                              I I General                A
                                                    -_._._-_._---                147,369 I              9,579,584
                                                                  -"-'---"-"-"---'--~-'---'-'l"'-'----'----'---'-'-_ ..._._._-
EnergySolutions                                              !
Bulk                  A                        331,077 I            33,107,720 i!
I EnergySolutions                                                  !
I IDAW                    A                          14,017    I            288,673 I                                                                  !
Iwcs                      B                            1,7321                197,501 Iwcs                      C                              574\                  69,650 Greater than Class C        I Spent Fuel (geologic repository)        I Equivalent          GTCC                            1,7851                350,510 I
I
                                                                                                ~
I!
                              !                                                              Ii I!
Total [2]                    i                                                  591,5141            51,454,022
[1]  Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]    Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                              Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                    Appendix E, Page 9 of 28 TABLE E-6 DECON ALTERNATIVE - 20 YEAR LICENSE RENEWAL DECOMMISSIONING WASTE
 
==SUMMARY==
, UNIT 2 I                                                      Waste Volume              I      Weight Waste            I I    Cost Basis                Class        [1]          (cubic feet)                  (pounds)
I I                                                                                  I Low-Level Radioactive        I EnergySolutions Waste (near-surface          I La~ge Component                        A                            94,959      I          7,860,384 disposal)                    I EnergySolutions                                                                  i I
I l_Q~~~~~-L. __--------.-.. . .. -~ .. A ..
                                                                    --~>.-- ----.~.
138,015 I              9,004,003
                                                                                    ~----'----'---""----'--'---"'-""!'----'-'---"'--_ ...._._._-_._..
I EnergySolutions                                                                  I I Bulk                                  A                          337,395 I              33,739,520 I EnergySolutions
-.------..- -                  IDAW                                    A                            15,898                  327,416 I WeB                                    B                              1,732                  197,501 Iwcs                                      C                                574    I i              69,650 Greater than Class C        I Spent Fuel (geologic repository)        I Equivalent                      GTCC                                  1,785    I            350,510 i
I                                                                                  I I
I                                                                                  I I
* Total [2]                    I                                                                    590,3591              51,548,984
[1]    Waste is classified according to the requirements as delineated in Title 10 CFR, Part 61.55
[2]    Columns may not add due to rounding.
TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                  Appendix E, Page 10 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial/              Utility and Activity                                            Decon Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                  Activity Description        Cost  Cost    Costs      Costs      Costs    Costs    Costs  Contingency  Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Wt., Lbs. Manhours  Manhours PERIOD la - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.1.1    Prepare preliminary decommissioning cost                                                                191          40      231          231                                                                                                        1,300 1a.L2      Notification of Cessation of Operations                                                                                          a 1a.L3      Remove fuel & source material                                                                                                  n1a la.L4      Notification of Permanent Defueling                                                                                              a la.L5      Deactivate plant systems & process waste                                                                                          a la.1.6    Prepare and submit PSDAR                                                                                294          62      356          356                                                                                                        2,000 la.L7      Review plant dwgs & specs.                                                                              676          142      818          818                                                                                                        4,600 la.L8      Perform detailed rad survey                                                                                                      a 1a.L9      Estimate by.product inventory                                                                            147          31      178          178                                                                                                        1,000 la.1.10    End product description                                                                                  147          31      178          178                                                                                                        1.000 1a.L11    Detailed by-product inventory                                                                            191          40      231          231                                                                                                        1,300 1a.L12    Define major work sequence                                                                            1,103          232    1,334        1,334                                                                                                        7,500 la.1.13    Perform SER and EA                                                                                      456          96      551          551                                                                                                        3,100 1a.1.14    Perform Site-Specific Cost Study                                                                        735          154      889          889                                                                                                        5,000 1a.1.15    Prepare/submit License Termination Plan                                                                  602          126      729          729                                                                                                        4,096 la.l.16    Receive NRC approval of termination plan                                                                                          a Activity Specifications 1a.1.17.1 Plant & temporal'Y facilities                                                                            723          152      875          788                        88                                                                              4,920 1a.1.17.2 Plant systems                                                                                            613          129      741          667                        74                                                                              4,167 la.L17.3 NSSS Decontamination Flush                                                                                  74          15        89          89                                                                                                          500 1a.L17.4 Reactor internals                                                                                        1,044          219    1,263        1,263                                                                                                        7,100 la.l.17.5 Reactor vessel                                                                                            956          201    1,156        1,156                                                                                                        6,500 la.1.17.6 Biological shield                                                                                          74          15        89          89                                                                                                          500 la.1.17.7 Steam generators                                                                                          459          96      555          555                                                                                                        3,120 la.1.17.8 Reinforced concrete                                                                                      235          49      285          142                      142                                                                              1,600 1a.1.17.9 Main Turbine                                                                                              59          12        71                                    71                                                                                400 1a.1.17.10 Main Condensers                                                                                          59          12        71                                    71                                                                                400 la.L17.11 Plant structures & buildings                                                                              459          96      555          277                      277                                                                              3,120 la.L17.12 Waste management                                                                                          676          142      818          818                                                                                                        4,600 la.1.17.13 Facility & site closeout                                                                                132          28      160          80                        80                                                                                900 la.1.17    Total                                                                                                  5,561        1,168    6,728        5,925                      804                                                                            37,827 Planning & Site Preparations la.1.18    Prepare dismantling sequence                                                                            353          74      427          427                                                                                                        2,400 1a.L19    Plant prep. & temp. svces                                                                              2,800          588    3,388        3,388 1a.L20    Design water clean-up system                                                                            206          43      249          249                                                                                                        1,400 la.1.21    Rigging/Cont. Cntrl Envlps/tooling/etc.                                                                2,200          462    2,662        2,662 la.L22    Procure caskslliners & containers                                                                        181          38      219          219                                                                                                        1,230 la.1      Subtotal Period 1a Activity Costs                                                                    15,842        3,327  19,168      18,365                      804                                                                            73.753 Period 1a Additional Costs 1a.2.1    Spent Fuel Pool Isolation                                                                            19,825        4,163  23,989      23,989 la.2.2    Disposal of Contaminated Tools & Equipment                      234        97                3,145                1,154    4,630        4,630                                      10,245                                609,715        317 1a.2      Subtotal Period 1a Additional Costs                              234        97                3,145  19,825        5,317  28,618      28,618                                      10,245                                609,715        317 Period la Period-Dependent Costs 1a.4.1    Insurance                                                                                              1,056          148    1,203        1,203 1a.4.2    Property taxes                                                                                          165          23      189          189 1a.4.3    Health physics supplies                              485                                                            170      655          655 1a.4.4    Heavy equipment rental                                480                                                            101      580          580 1a.4.5    Disposal ofDAW generated                                          15          4                  48                  20        88          88                                          645                                  13.281        20 1a.4.6    Plant energy budget                                                                                    1,156          243    1,399        1,399 1a.4.7    NRC Fees                                                                                              1,177          165    1,342        1,342 1a.4.8    Emergency Planning Fees                                                                                1,001          140    1,142                    1,142 1a.4.9    Spent Fuel Transfer - Pool or ISFSI to DOE                                                            2,507          526    3,033                    3,033 1a.4.10    Spent Fuel Pool O&M                                                                                      763          160      923                      923 1n.4.11    ISFSI Operating Costs                                                                                    45            9        54                      54 la.4.12    Severance Related Costs                                                                              35.456        7,446  42,901      42,901 1a.4.13    Security Staff Cost                                                                                  14,837        3,116  17,953      17,953                                                                                                      229,429 la.4.14    Utility Staff Cost                                                                                    33,000        6,930  39,930      39,930                                                                                                      423,400 la.4      Subtotal Period 1a Period*Dependent Costs            965        15          4                  48  91,163      19,197  111,393      106,241        5.152                            645                                  13,281        20      652,829 TLG SenJices, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                          Appendix E, Page 11 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed          Burial Volumes            Burial I            Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                                                  Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs      Costs        Costs        Costs        Cu. Feet Cu. Feet Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours la.O        TOTAL PERIOD la COST                                      965        249        101                3,193 126,830        27,841  159,180      153,224        5,152          804            10,890                              622,996      337      726,581 PERIOD lb - Decommissioning Preparations Period Ib Direct Decommissioning Activities Detailed Work Procedures lb. 1. 1.l Plant systems                                                                                                    696          146    842          758                        84                                                                            4,733 Ib.1.1.2 NSSS Decontamination Flush                                                                                          147            31    178          178                                                                                                      1,000 Ib.U.3 Reactor internals                                                                                                    368            77    445          445                                                                                                      2,500 1b.1.1.4 Remaining buildings                                                                                                198            42    240            60                        180                                                                            1,350 1b.U.5 CRD cooling assembly                                                                                                  147            31    178          178                                                                                                      1,000 Ib.1.1.6 CRD housings & ICI tubes                                                                                            147            31    178          178                                                                                                      1,000 1b.1.1.7 Incore instrumentation                                                                                              147            31    178          178                                                                                                      1,000 Ib.1.1.8 Reactor vessel                                                                                                      534          112    646          646                                                                                                      3,630 Ib.1.1.9 Facility closeout                                                                                                  176            37    213          107                        107                                                                            1,200 Ib.1.1.10 Missile shields                                                                                                    66            14      80            80                                                                                                        450 Ib.1.l.l1 Biological shield                                                                                                  176            37    213          213                                                                                                      1,200 lb. 1. 1.12 Steam generators                                                                                                676          142    818          818                                                                                                      4,600 1b.1.1.13 Reinforced concrete                                                                                                147            31    178            89                        89                                                                            1,000 lb. 1. 1.14 Main Turbine                                                                                                    229            48    277                                      277                                                                            1,560 1b.1.1.15 Main Condensers                                                                                                    229            48    277                                      277                                                                            1,560 lb. 1. 1.16 Auxiliary building                                                                                              401            84    486          437                        49                                                                            2,730 lb. 1. 1.17 Reactor building                                                                                                401            84    486          437                        49                                                                            2,730 1b.1.l      Total                                                                                                        4,887        1,026  5,913        4,801                      1,112                                                                          33,243 lb. 1.2      Decon primary loop                              750                                                                          525  1,276        1,276                                                                                        1,067 1b.l        Subtotal Period Ib Activity Costs                750                                                          4,887        1,551  7,189        6,076                      1,112                                                              1,067      33,243 Period 1b Additional Costs 1b.2.1      Site Characterization                                                                                        4,765        2,001  6,766        6,766                                                                                        25,000        9,412 1b.2.2      Hazardous Waste Management                                                                                      204            43    247          247 1b.2.3      Mixed Waste Management                                                                                          270            57    327          327 Ib.2        Subtotal Period Ib Additional Costs                                                                          5,239        2,101  7,340        7,340                                                                                        25,000        9,412 Period 1b Collateral Costs Ib.3.1      Decon equipment                                  931                                                                          195  1,126        1,126 Ib.3.2      DOC staff relocation expenses                                                                                1,415          297  1,712        1,712 Ib.3.3      Process decommissioning water waste              46                  21          66                  88                    80    301          301                                          291                                17,471        57 Ib.3.4      Process decommissioning chemical flush waste      2                  63        256                6,210                  2,237  8,767        8,767                                                    887                      94,531      166 Ib.3.5      Small tool allowance                                        3                                                                  1        3            3 Ib.3.6      Pipe cutting equipment                                  1,100                                                                231  1,331        1,331 Ib.3.7      Decon rig                                      1,500                                                                          315  1,815        1,815 Ib.3        Subtotal Period 1b Collateral Costs            2,479    1,103        84        321                6,298    1,415        3,356  15,055        15,055                                          291      887                      112,002      223 Period Ib  Period-Dependent Costs Ib.4.1      Decon supplies                                    28                                                                          10      38          38 1b.4.2      Insurance                                                                                                      523            73    597          597 Ib.4.3      Property taxes                                                                                                  82            11      94          94 Ib.4.4      Health physics supplies                                    269                                                                94    364          364 Ib.4.5      Heavy equipment rental                                    238                                                                50    288          288 Ib.4.6      Disposal of DAW generated                                              9          3                  28                    12      51          51                                          375                                7,718        12 Ib.4.7      Plant energy budget                                                                                          1,147          241  1,388        1,388 Ib.4.8      NRC Fees                                                                                                        346            48    394          394 Ib.4.9      Emergency Planning Fees                                                                                        497            70    566                        566 Ib.4.l0      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    1,488          312  1,800                      1,800 Ib.4.11    Spent Fuel Pool O&M                                                                                            378            79    458                        458 Ib.4.12    ISFSI Operating Costs                                                                                            22            5      27                        27 Ib.4.13    Severance Related Costs                                                                                      5,351        1,124  6,475        6,475 Ib.4.14    Security Staff Cost                                                                                          7,357        1,545  8,903        8,903                                                                                                    113,771 Ib.4.15    DOC Staff Cost                                                                                                6,563        1,378  7,941        7,941                                                                                                    63,091 Ib.4.16    Utility Staff Cost                                                                                          16,460        3,457  19,917        19,917                                                                                                    210,994 Ib.4        Subtotal Period 1b Period-Dependent Costs        28      507          9          3                  28  40,214        8,509  49,299      46,448        2,851                              375                                7,718        12      387,857 Ib.O        TOTAL PERIOD 1b COST                          3,257    1,610        93        324                6,326  51,755        15,518  78,882        74,919        2,851        1,112                666      887                      119,720    26,301      430,512 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                              Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                Appendix E, Page 12 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed __~__~__~B~u:r~i~a~I~V~o~lu~m~es~____~____ Burial!                Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration    Volume    Class A  Class B      Class C      GTCC  Processed    Craft    Contractor Index                    Activity Descri tion          Cost    Cost      Costs      Costs    . Costs    Costs    Costs  Contingency  Costs      Costs      Costs        Costs      Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Cu. Feet        Wt.,Lbs. Manhours  Manhours PERIOD 1 TOTALS                                            3,257    2,575        342        425                9,519 178,585      43,358  238,062      228,143        8,003        1,916              11,556      887                            742,716    26,638    1,157,093 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping                              370      354        52          40                1,342                  868  3,026        3,026                                          2,276                                    260,153    10,138 2a.1.1.2 Pressurizer Quench Tank                              39        35          8          6                  189                  108    385          385                                            329                                      36,557      1,073 2a. 1. 1.3 Reactor Coolant Pumps & Motors                    118      126        103        185                1,443                  685  2,660        2,660                                          4,701                                    774,960      4,185          100 2a. 1. 1. 4 Pressurizer                                      50        70        448        1Ho                  750                  409  1,841        1,841                                          2,443                                    286,592      2,365          938 2a.1.1.5 Steam Generators                                    477    4,206      3,368      1,922                12,807                7,163  29,942      29,942                                          41,712                                  3,350,761    27,047        1,750 2a. 1. 1.6 Retired Steam Generator Units                                        2,496      1,878                12,597                5,153  22,124      22,124                                          41,031                                  3,125,629    14,613        1,125 2a. 1. 1. 7 CRDMsIICIs/Service Structure Removal            196      112        262          37                  444                  376  1,428        1,428                                          3,881                                      86,025      4,285 2a. 1. 1.8 Reactor Vessel Internals                          175    3,110    14,996      1,468                10,438    283        16,517  46,988      46,988                                          1,753      845          574              359,588    30,500        1,352 2a. 1. 1. 9 Reactor Vessel                                  122    5,226      2,439        742                2,651    283        8,601  20,065      20,065                                          8,794                                    957,382    30,500        1,352 2a.1.1      Totals                                        1,546    13,241    24,170      6,392                42,661    567      39,880  128,457      128,457                                        106,920      845          574            9,237,647    124,706        6,617 Removal of Major Equipment 2a.1. 2    Main Turbine/Generator                                    202                                                                42    245                                    245                                                                      3,033 2a.1.3      Main Condensers                                            668                                                              140    808                                    808                                                                      9,875 Cascading Costs from Clean Building Demolition 2a.1.4.1 *Reactor                                                    1,194                                                              251  1,444        1,444                                                                                                11,895 2a.1. 4.2 Containment Penetration Area                                  73                                                                15      89          89                                                                                                    704 2a.1.4.3 Fuel Handling                                                193                                                                41    234          234                                                                                                  1,746 2a.1.4      Totals                                                  1,460                                                              307  1,767        1,767                                                                                                14,345 Disposal of Plant Systems 2a.1. 5.1 Auxiliary Steam                                              148                                                                31    179                                    179                                                                      2,310 2a.1.5.2 Auxiliary Steam (RCA)                                        277        61          19                  652                  338  1,347        1,347                                          2,054                                    126,415      3,758 2a.1.5.3 Condensate System                                            679                                                              143    822                                    822                                                                      10,671 2a.1.5.4 Condensate System (Insulated)                                281                                                                59    341                                    341                                                                      4,367 2a.1.5.5 Containment Spray                                            249        167          53                1,786                  747  3,001        3,001                                          5,631                                    346,093      3,734 2a.1.5.6 Extraction Steam & Heater Drip                                263                                                                55    318                                    318                                                                      4,152 2a.1.5.7 Feedwater System                                              46                                                                10      55                                      55                                                                        706 2a.1.5.8 Feedwater System (Insulated)                                  168                                                                35    204                                    204                                                                      2,655 2a.1.5.9 Feedwater System (RCA Insulated)                              126        43          15                  506                  230    920          920                                          1,595                                      98,042      1,811 2a.1.5.10 Feedwater System (RCA)                                        6          2          1                  27                    12      48          48                                              84                                      5,160        87 2a.1.5.11 Lube Oil Distribution & Purification                        115                                                                24    139                                    139                                                                      1,817 2a.1.5.12 Nitrogen & Hydrogen                                          20                                                                4      24                                    24                                                                        315 2a.1.5.13 Nitrogen & Hydrogen (Insulated)                                1                                                                o        1                                                                                                                17 2a.1.5.14 Nitrogen & Hydrogen (RCA Insulated)                            6          1          o                    5                    4      16          16                                              17                                      1,040        78 2a.1.5.15 Nitrogen & Hydrogen (RCA)                                    110        12          3                  102                    77    304          304                                            320                                      19,767      1,478 2a.1.5.16 Oily Water Separator & TB Sump                                37        12          5                  157                    71    281          281                                            494                                      30,347        480 2a.1.5.17 Saltwater System                                            190                                                                40    230                                    230                                                                      2,926 2a.1.5.18 Turbine Steam Supply                                        759                                                              159    918                                    918                                                                      11,955 2a.1.5.19 Turbine Steam Supply (RCA)                                  862        335        112                3,799                1,702  6,810        6,810                                          11,974                                    736,290    12,374 2a.1.5.20 Turbine and Generator                                        80                                                                17      97                                      97                                                                      1,244 2a.1.5.21 Turbine and Generator (Insulated)                            26                                                                6      32                                    32                                                                        422 2a.1.5      Totals                                                  4,450        633        207                7,034                3,763  16,087      12,727                      3,360              22,169                                  1,363,155    67,355 2a.1.6      Scaffolding in support of decommissioning                2,465          9          5                  113                  905  3,497        3,497                                            369                                      32,791    16,818 2a.1        Subtotal Period 2a Activity Costs              1,546    22,486    24,812      6,604                49,808    567      45,037  150,861      146,448                      4,413              129,458      845          574          10,633,590    236,132        6,617 Period 2a Additional Costs 2a.2.1      Retired Reactor Head                                                  225        179                1,557                  614  2,575        2,575                                          5,072                                    322,442      2,098          750 2a.2        Subtotal Period 2a Additional Costs                                  225        179                1,557                  614  2,575        2,575                                          5,072                                    322,442      2,098          750 Period 2a Collateral Costs 2a.3.1      Process decommisSioning water waste              84                  40        122                  163                  147    556          556                                            540                                      32,379        105 2a.3.2      Process decommissioning chemical flush waste 2a.3.3      Small tool allowance                                      287                                                                60    347          313                        35 2a.3        Subtotal Period 2a Collateral Costs              84      287        40        122                  163                  207    903          868                        35                  540                                      32,379        105 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix E, Page 13 of 28 Table E-7*
Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial!              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management    Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description        Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs      Costs        Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet Wt.,Lhs. Manhours  Manhours Period 2a Period-Dependent Costs 2a.4.1      Decon supplies                                  92                                                                        32      124        124 2a.4.2      Insurance                                                                                                  765          107      872        872 2a.4.3      Property taxes                                                                                              267          37      304        274                        30 2a.4.4      Health physics supplies                                1,863                                                            652    2,514      2,514 2a.4.5      Heavy equipment rental                                3,362                                                            706    4,068      4,068 2a.4.6      Disposal of DAW generated                                            96        27                  300                  124      548        548                                          4,010                                  82,574      124 2a.4.7      Plant energy budget                                                                                      1,770          372    2,141      2,141 2a.4.8      NRC Fees                                                                                                  1,022          143    1,165      1,165 2a.4.9      Emergency Planning Fees                                                                                  1,152          161    1,313                    1,313 2a.4.10      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                4,833        1,015    5,848                    5,848 2a.4.11      Spent Fuel Pool O&M                                                                                      1,229          258    1,488                    1,488 2a.4.12      ISFSI Operating Costs                                                                                        72          15      87                        87 2a.4.13      Severance Related Costs                                                                                  3,173          666    3,839      3,839 2a.4.14      Security Staff Cost                                                                                      23,902        5,019  28,921      28,921                                                                                                        369,600 2a.4.15      DOC Staff Cost                                                                                          26,041        5,469  31,510      31,510                                                                                                        255,360 2a.4.16      Utility Staff Cost                                                                                      36,803        7,729  44,532      44,532                                                                                                        467,141 2a.4        Subtotal Period 2a Period-Dependent Costs      92    5,224        96        27                  300 101,028      22,506  129,273    120,507        8,736            30              4,010                                  82,574      124    1,092,101 2a.0        TOTAL PERIOD 2a COST                        1,722    27,997    25,173      6,932              51,829 101,595      68,364  283,612    270,398        8,736        4,478            139,080      845      574          11,070,990  238,459    1,099,468 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b.1.1.1 Capital Additions 85-2002 (clean)                            182                                                              38      220                                    220                                                                2,830 2b.1.1.2 Capital Additions 85-2002 (contaminated)                    485        54        19                  635                  404    1,597      1,597                                          2,017                                123,100    6,781 2b.1.1.3 Chemical & Volume Control                          875    1,229        197        67                2,277                1,881    6,526      6,526                                          7,273                                441,322    27,754 2b.1.1.4 Chemical & Volume Control (Insulated)              324      465        50        14                  466                  562    1,879      1,879                                          1,463                                  90,248    10,807 2b.1.1.5 Component Cooling Water                                      196                                                              41      237                                    237                                                                3,078 2b.1.1.6 Component Cooling Water (RCA)                                617        194        67                2,260                1,048    4,186      4,186                                          7,126                                438,014    8,605 2b.1.1. 7 Compressed Air                                              174                                                              37      211                                    211                                                                2,744 2b.l.l.8 Compressed Air (Insulated)                                    6                                                              1        7                                      7                                                                    98 2b.1.1.9 Compressed Air (RCA Insulated)                                29          4          1                  31                  22      87          87                                            98                                  6,066      397 2b. 1. 1.10 Compressed Air (RCA)                                      534        67        18                  595                  408    1,621      1,621                                          1,868                                115,262    7,278 2b. 1. 1. 11 Diesel Engine-Generator                                  179                                                              38      217                                    217                                                                2,760 2b.1.1.12 Diesel Engine-Generator (Insulated)                          11                                                              2      14                                    14                                                                  178 2b.1.1.13 Electrical (Clean)                                        2,130                                                            447    2,578                                  2,578                                                                32,770 2b.1.1.l4 Electrical (Contaminated)                                  633        91        38                1,275                  689    2,726      2,726                                          4,028                                247,187    8,649 2b.1.1.l5 Electrical (Decontaminated)                              3,324                                                            698    4,022                                  4,022                                                                49,541 2b.1.1.16 Fire Protection                                            386        147        54                1,820                  804    3,211      3,211                                          5,929                                352,716    5,474 2b.l.l.17 Gaseous Radwaste                                            88        10          3                  91                  65      258        258                                            287                                  17,725    1,175 2b.l.l.18 HVAC (Clean Insulated)                                      29                                                              6      35                                    35                                                                  475 2b.1.1.19 HVAC (Clean)                                                372                                                              78      450                                    450                                                                6,016 2b.1.1.20 HVAC (Contaminated Insulated)                              309        55        22                  733                  377    1,496      1,496                                          2,315                                142,139    4,107 2b.l.l.21 HVAC (Contaminated)                                      1,372        272        108                3,662                1,823    7,237      7,237                                        11,560                                  709,746    18,491 2b.1.1.22 Liquid Radwaste                                  582      785        116        38                1,283                1,155    3,958      3,958                                          4,1i6                                248,609    18,831 2b.1.1.23 Liquid Radwaste (Insulated)                        69        86        10          3                  91                  112      371        371                                            287                                  17,717    2,114 2b.1.1.24 Make*up Water                                              360                                                              76      436                                    436                                                                5,614 2b.1.1.25 Make-up Water (Insulated)                                    33                                                              7      39                                    39                                                                  521 2b. 1. 1.26 Make-up Water (RCA Insulated)                              44          8          2                  81                  46      181        181                                            255                                  15,691      602 2b.1.1.27 Make-up Water (RCA)                                        237        46        14                  459                  253    1,008      1,008                                          1,443                                  88,918    3,184 2b.1.1.28 Miscellaneous Reactor Coolant                      21      137        17          5                  155                  120      453        453                                            491                                  30,030    2,172 2b.1.1.29 Nuclear Steam Supply Sampling                              182        13          4                  141                  116      456        456                                            444                                  27,315    2,715 2b.1.1.30 Nuclear Steam Supply Sampling (Insulated                    55          2          1                  19                  26      103        103                                            58                                  3,590      826 2b.1.1.31 Residual Heat Removal                            319      336        165        55                1,873                1,031    3,779      3,779                                          5,901                                363,036    6,105 2b.1.1.32 Safety Injection                                            128        22          7                  245                  135      537        537                                            784                                  47,397    1,860 2b.1.1.33 Safety Injection (Insulated)                                  6          1          0                  11                    6      24          24                                            33                                  2,043        90 2b.1.1.34 Safety Injection (RCA Insulated)                            42          9          3                  95                  50      198        198                                            299                                  18,385      564 2b.1.1.35 Safety Injection (RCA)                                      350        80        25                  854                  438    1,747      1,747                                          2,689                                165,467    4,712 2b.1.1.36 Service Cooling Water                                      118                                                              25      142                                    142                                                                1,856 2b.1.1.37 Service Cooling Water (RCA)                                  30          7          2                  73                  37      149        149                                            228                                  14,053      411 2b.1.1      Totals                                      2,188    15,679      1,635        567              19,225              13,100  52,395      43,787                      8,607            60,992                                3,725,778  252,189 2b.1.2      Scaffolding in support of decommissioning              3,081        12          6                  141                1,131    4,371      4,371                                            462                                  40,989    21,023 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                          Appendix E, Page 14 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes            Burial!              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                  Activity Description            Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs        Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt.,Lbs. Manhours  Manhours Decontamination of Site Buildings 2b.1.3.1 *Reactor                                            958    2,483      1,120      5,645              26,011                11,986  48,204      48,204                                      331,897                              33,045,180    43,301 2b.1.3.2 Capital Additions 85*2004                            33        27          7          3                  96                    68    235          235                                            317                                18,653        847 2b.1.3.3 Containment Penetration Area                        327      213        26        28                  379                    446  1,419        1,419                                          2,121                                172,739      7,351 2b.1.3    Totals                                          1,318    2,724      1,153      5,677              26,486                12,500  49,857      49,857                                      334,335                              33,236,570    51,499 2b.1      Subtotal Period 2b Activity Costs              3,506    21,484      2,800      6,250              45,852                26,731  106,623      98,016                    8,607            395,789                              37,003,340    324,711 Period 2b Collateral Costs 2b.3.1    Process decommissioning water waste              133                  65        199                  266                    237    901          901                                            881                                52,880        172 2b.3.2    Process decommissioning chemical flush waste        3                  103        420                  782                    379  1,687        1,687                                          1,459                                155,522        273 2b.3.3    Small tool allowance                                        408                                                                86    493          493 2b.3      Subtotal Period 2b Collateral Costs              136      408        168        620                1,048                    702  3,082        3,082                                          2,341                                208,402        445 Period 2b Period*Dependent Costs 2bA.1      Decon supplies                                    796                                                                        279  1,075        1,075 2bA.2      Insurance                                                                                                    1,138          159  1,298        1,298 2bA.3      Property taxes                                                                                                  397            56    452          452 2bAA      Health physics supplies                                  2,527                                                              885  3,412        3,412 2bA.5      Heavy equipment rental                                    4,962                                                            1,042  6,004        6,004 2bA.6      Disposal ofDAW generated                                              104        29                  325                    134    593          593                                          4,338                                89,346        134 2bA.7      Plant energy budget                                                                                          2,079          437  2,516        2,516 2bA.8      NRC Fees                                                                                                      1,521          213  1,734        1,734 2bA.9      Emergency Planning Fees                                                                                      1,714          240  1,954                    1,954 2bA.10    Spent Fuel Transfer* Pool or ISFSI to DOE                                                                    7,184        1,509  8,692                    8,692 2hA.11    Spent Fuel Pool O&M                                                                                          1,829          384  2,214                    2,214 2hA.12    Liquid Radwaste Processing Equipment/Services                                                                  465            98    562          562 2hA.13    ISFSI Operating Costs                                                                                          107            23    130                      130 2bA.14    Severance Related Costs                                                                                      7,661        1,609  9,269        9,269 2bA.15    Security Staff Cost                                                                                          35,568        7,469  43,037      43,037                                                                                                      550,000 2bA.16    DOC Staff Cost                                                                                              26,233        5,509  31,741      31,741                                                                                                      270,000 2bA.17    Utility Staff Cost                                                                                          38,925        8,174  47,100      47,100                                                                                                      502,500 2b.4      Subtotal Period 2b Period*Dependent Costs        796    7,490        104        29                  325  124,820      28,218  161,783    148,793        12,990                            4,338                                89,346        134    1,322,500 2b.0      TOTAL PERIOD 2b COST                            4,439    29,382      3,072      6,899              47,225  124,820      55,650  271,488    249,891        12,990        8,607            402,468                              37,301,080    325,289    1,322,500 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1    Spent Fuel Transfer* Pool to ISFSI                                                                            4,000          840  4,840                    4,840 2c.3      Subtotal Period 2c Collateral Costs                                                                          4,000          840  4,840                    4,840 Period 2c Period.Dependent Costs 2c.4.1    Insurance                                                                                                    3,475          486  3,961        3,961 2c.4.2    Property taxes                                                                                                1,211          170  1,381        1,381 2cA.3      Health physics supplies                                  2,437                                                              853  3,290        3,290 2cA.4      Disposal ofDAW generated                                                70        20                  217                    90    396          396                                          2,896                                59,642        89 2cA.5      Plant energy budget                                                                                          1,692          355  2,048        2,048 2cA.6      NRC Fees                                                                                                      2,671          374  3,045        3,045 2c.4.7    Emergency Planning Fees                                                                                      5,232          733  5,965                    5,965 2cA.8      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  19,638        4,124  23,763                    23,763 2c.4.9    Spent Fuel Pool O&M                                                                                          5,585        1,173  6,757                    6,757 2cA.10    Liquid Radwaste Processing Equipment/Services                                                                  355            74    429          429 2cA.ll    ISFSI Operating Costs                                                                                          327            69    396                      396 2c.4.12  Spent Fuel Storage Canisters/Overpacks                                                                        4,000          840  4,840                    4,840 2cA.13    Security Staff Cost                                                                                        108,574      22,801  131,374      131,374                                                                                                    1,678,914 2cA.14    Utility Staff Cost                                                                                            8,384        1,761  10,145      10,145                                                                                                      114,471 2c.4      Subtotal Period 2c Period* Dependent Costs                2,437        70        20                  217  161,144        33,902 197,788      156,068      41,721                            2,896                                59,642        89    1,793,386 2c.0      TOTAL PERIOD 2c COST                                      2,437        70        20                  217  165,144        34,742 202,628      156,068      46,561                            2,896                                59,642        89    1,793,386 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                        Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                          Appendix E, Page 15 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site    Processed            Burial Volumes            Burial I              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Descri tion            Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs    Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt.,Lbs. Manhours  Manhours PERIOD 2d - Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activities 2d.l.l      Remove spent fuel racks                          585        56        174          36                1,207                    884  2,942        2,942                                        3,812                                233,945        962 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated)
* FHB                                184        14          6                  194                    136    534          534                                          614                                37,673      2,491 2d.1.2.2 Electrical (Decontaminated) - FHB                            1,165        133          53                1,781                  1,061  4,192        4,192                                        5,623                                345,118    15,061 2d.1.2.3 Fire Protection (RCA)                                          250        50          14                  471                    262  1,048        1,048                                        1,481                                91,338      3,363 2d.1.2.4 HVAC (Contaminated)
* FHB                                      326        64          25                  838                    422  1,674        1,674                                        2,644                                162,353      4,383 2d.1.2.5 Spent Fuel Pit Cooling                                          94        65          21                  706                    293  1,179        1,179                                        2,223                                136,855      1,433 2d.1.2.6 Spent Fuel Pit Cooling - FHB                                  130        70          23                  764                    328  1,315        1,315                                        2,405                                148,051      1,959 2d.L2      Totals                                                    2,150        396        140                4,754                  2,501  9,942        9,942                                      14,990                                921,389    28,690 Decontamination of Site Buildings 2d.1.3.1 Fuel Handling                                        811      859        63          41                  637                  1,109  3,519        3,519                                        3,443                                251,129    23,547 2d.1.3      Totals                                            811      859        63          41                  637                  1,109  3,519        3,519                                        3,443                                251,129    23,547 2d.1.4      Scaffolding in support of decommissioning                  616          2                              28                    226    874          874                                          92                                  8,198      4,205 2d.1        Subtotal Period 2d Activity Costs              1,396    3,682        635        218                6,626                  4,720  17,278      17,278                                        22,337                              1,414,661    57,404 Period 2d Additional Costs 2d.2.1      License Termination Survey Planning                                                                              800          336  1,136        1,136                                                                                                        6,240 2d.2        Subtotal Period 2d Additional Costs                                                                              800          336  1,136        1,136                                                                                                        6,240 Period 2d  Collateral Costs 2d.3.1      Process decommissioning water waste                34                  19          58                  77                    66    254          254                                          257                                15,400        50 2d.3.2      Process decommissioning chemical flush waste 2d.3.3      Small tool allowance                                        84                                                                18    101          101 2d.3.4      Decommissioning Equipment Disposition                                  155          54                1,828                    673  2,709        2,709                                        5,771                                354,194        88 2d.3        Subtotal Period 2d Collateral Costs                34        84        174        112                1,905                    756  3,064        3,064                                        6,028                                369,594        138 Period 2d Period*Dependent Costs 2d.4.1      Decon supplies                                    209                                                                          73    282          282 2d.4.2      Insurance                                                                                                        219            31    249          249 2d.4.3      Property taxes                                                                                                    76            11      87          87 2d.4.4      Health physics supplies                                    443                                                                155    598          598 2d.4.5      Heavy equipment rental                                      953                                                                200  1,153        1,153 2d.4.6      Disposal of DAW genera ted                                              34          9                  105                    43    191          191                                        1,397                                28,775        43 2d.4.7      Plant energy budget                                                                                              213            45    258          258 2d.4.8      NRC Fees                                                                                                        250            35    285          285 2d.4.9      Emergency Planning Fees                                                                                          165            23    188                      188 2d.4.10    Spent Fuel Transfer* Pool or ISFSI to DOE                                                                        460            97    557                      557 2d.4.11    Liquid Radwaste Processing Equipment/Services                                                                    178            37    216          216 2d.4.12    ISFSI Operating Costs                                                                                            21            4      25                        25 2d.4.13    Severance Related Costs                                                                                        9,595        2,015  11,610      11,610 2d.4.14    Security Staff Cost                                                                                            1,035          217  1,252        1,252                                                                                                      18,960 2d.4.15    DOC Staff Cost                                                                                                3,363          706  4,069        4,069                                                                                                      35,040 2d.4.16    Utility Staff Cost                                                                                            4,500          945  5,445        5,445                                                                                                      58,080 2d.4      Subtotal Period 2d Period.Dependent Costs        209    1,396        34          9                  105  20,074        4,637  26,463      25,694        769                            1,397                                28,775        43      112,080 2d.0      TOTAL PERIOD 2d COST                            1,639    5,161        842        339                8,636  20,873        10,449  47,941      47,171          769                          29,762                              1,813,030    57,585      118,320 PERIOD 2f - License Termination Period 2fDirect Decommissioning Activit.ies 2f.l.l    ORISE confirmatory survey                                                                                        178            75    253          253 2f.1.2    Terminate license                                                                                                                        a 2f.l      Subtotal Period 2f Activity Costs                                                                                178            75    253          253 Period 2f Additional Costs 2f.2.1    License Termination Survey                                                                                    9,248        3,884  13,132      13,132                                                                                        126,393        3,120 2f.2      Subtotal Period 2f Additional Costs                                                                            9,248        3,884  13,132      13,132                                                                                        126,393        3,120 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix E, Page 16 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial!              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description        Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs      Costs        Costs        Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours Period 2f Collateral Costs 2f.3.1      DOC staff relocation expenses                                                                              1,415          297  1,712      1,712 2f.3        Subtotal Period 2f Collateral Costs                                                                        1,415          297  1,712      1,712 Period 2fPeriod-Dependent Costs 2f.4.1      Insurance                                                                                                    319            45    364        364 2f.4.2      Property taxes                                                                                                125            17    142        142 2f.4.3      Health physics supplies                                  632                                                              221    853        853 2f.4.4      Disposal ofDAW generated                                              9          2                  27                    11      49          49                                          356                                  7,337        11 2f.4.5      Plant energy budget                                                                                          174            37    211        211 2f.4.6      NRC Fees                                                                                                      462            65    527        527 2f.4.7      Emergency Planning Fees                                                                                      269            38    307                      307 2f.4.8      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    753          158    912                      912 2f.4.9      ISFSI Operating Costs                                                                                          34            7      41                      41 2f.4.10    Security Staff Cost                                                                                        1,694          356  2,050      2,050                                                                                                        31,036 2f.4.11    DOC Staff Cost                                                                                              4,689          985  5,674      5,674                                                                                                        46,750 2f.4.12    Utility Staff Cost                                                                                          5,150        1,082  6,232      6,232                                                                                                        60,107 2f.4        Subtotal Period 2f Period-Dependent Costs                632          9          2                  27  13,670        3,021  17,360      16,101        1,259                              356                                  7,337        11      137,893 2f.0        TOTAL PERIOD 2f COST                                      632          9          2                  27  24,510        7,276  32,456      31,197        1,259                              356                                  7,337    126,404      141,013 PERIOD 2 TOTALS                                          7,800    65,609    29,166    14,192              107,933 436,943        176,482 838,125    754,724      70,315      13,086            574,562      845      574          50,252,080    747,827    4,474,686 PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 *Reactor                                                  6,798                                                            1,428  8,226                                  8,226                                                                67,914 3b.1.1.2 Capital Additions 85-2004                                  302                                                                63    365                                    365                                                                3,572 3b.1.1.3 Containment Penetration Area                                686                                                              144    830                                    830                                                                6,563 3b.1.1.4 Miscellaneous                                                28                                                                6      34                                    34                                                                  249 3b.1.1.5 Turbine                                                  3,659                                                              768  4,428                                  4,428                                                                38,603 3b. 1. 1.6 Turbine Pedestal                                        1,318                                                              277  1,595                                  1,595                                                                11,300 3b.1.1.7 Fuel Handling                                            1,858                                                              390  2,248                                  2,248                                                                16,750 3b.Ll      Totals                                                14,650                                                            3,076  17,726                                17,726                                                                144,951 Site Closeout Activities 3b.1.2    Grade & landscape site                                  2,758                                                              579  3,337                                  3,337                                                                4,587 3b.1.3    Final report to NRC                                                                                          229            48    277        277                                                                                                          1,560 3b.1      Subtotal Period 3b Activity Costs                      17,407                                                229        3,704  21,340        277                    21,063                                                                149,538        1,560 Period 3b Additional Costs 3b.2.1    Concrete Crushing                                        476                                                  0          100    576                                    576                                                                1,971 3b.2.2    Cofferdam Construction and Teardown                      478                                                              100    579                                    579                                                                4,004 3b.2.3    Soil! Sediment Control Plant Area                      1,052                                                              221  1,273                                  1,273                                                                10,271 3b.2      Subtotal Period 3b Additional Costs                    2,006                                                  0          421  2,427                                  2,427                                                                16,247 Period 3b Collateral Costs 3b.3.1    Small tool allowance                                      210                                                                44    254                                    254 3b.3      Subtotal Period 3b Collateral Costs                      210                                                                44    254                                    254 Period 3b Period-Dependent Costs 3b.4.1    Insurance                                                                                                    525            73    598                      598 3b.4.2    Property taxes                                                                                                410            57    467                      467 3b.4.3      Heavy equipment rental                                7,347                                                            1,543  8,890                                  8,890 3b.4.4      Plant energy budget                                                                                          286            60    347                                    347 3b.4.5      NRC ISFSI Fees                                                                                              348            49    397                      397 3b.4.6      Emergency Planning Fees                                                                                      885          124  1,009                    1,009 3b.4.7      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                2,474          520  2,994                    2,994 3b.4.8      ISFSI Operating Costs                                                                                        111            23    134                      134 3b.4.9      Security Staff Cost                                                                                        5,569        1,169  6,738          0        5,458        1,280                                                                            102,023 3b.4.10    DOC Staff Cost                                                                                            14,111        2,963  17,074                                17,074                                                                            136,891 3b.4.11    Utility Staff Cost                                                                                        7,357        1,545  8,902                    1,780        7,121                                                                            87,197 3b.4        Subtotal Period 3b Period-Dependent Costs              7,347                                              32,075        8,127  47,550          0      12,838      34,712                                                                            326,112 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                    Appendix E, Page 17 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel        Site      Processed            Burial Volumes              Burial/              Utility and Activity                                            Decon Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lie. Term. Management    Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                  Activity Description        Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Co'sts        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt.,Lhs. Manhours  Manhours 3b.0      TOTAL PERIOD 3b COST                                26,970                                            32,305        12,296  71,571        277        12,838        58,456                                                              165,784      327,672 PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Period-Dependent Costs 3e.4.1    Insurance                                                                                                2,251          315  2,566                      2,566 3e.4.2    Property taxes                                                                                          1,758          246  2,004                      2,004 3e.4.3    Plant energy budget 3e.4.4    NRC ISFSI Fees                                                                                          1,492          209  1,701                      1.701 3e.4.5    Emergency Planning Fees                                                                                  3,797          532  4,329                      4,329 3e.4.6    Spent Fuel Transfer - Pool or ISFSI to DOE                                                              11,163        2,344  13,507                    13,507 3c.4.7    ISFSI Operating Costs                                                                                      475          100    575                        575 3e.4.8    Security Staff Cost                                                                                    19,444        4,083  23,527                    23,527                                                                                          299,083 3e.4.9    Utility Staff Cost                                                                                      6,393        1,343  7,736                      7,736                                                                                          74,881 3e.4      Subtotal Period 3c Period-Dependent Costs                                                              46,773        9,172  55,945                    55,945                                                                                          373,964 3e.0      TOTAL PERIOD 3c COST                                                                                  46,773        9,172  55,945                    55,945                                                                                          373,964 PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d.1.1.1 Vessel & Internals GTCC Disposal                                  2,500                          9,179                2,278  13,957      13,957                                                                      1,785    350,510 3d.1.1    Totals                                                          2,500                          9,179                2,278  13,957      13,957                                                                      1,785    350,510 3d.1      Subtotal Period 3d Activity Costs                              2,500                          9,179                2,278  13,957      13,957                                                                      1,785    350,510 Period 3d Collateral Costs 3d.3      Subtotal Period 3d Collateral Costs Period 3d Period-Dependent Costs 3d.4.1    Insurance                                                                                                  10                  11                        11 3d.4.2    Property taxes                                                                                              8                    9                          9 3d.4.3    Plant energy budget*
3d.4.4    NRC ISFSI Fees                                                                                              6            1      7                          7 3d.4.5    ISFSI Operating Costs                                                                                        2            0      3                          3 3d.4.6    Security Staff Cost                                                                                        85          18    103                        103                                                                                          1,311 3d.4.7    Utility Staff Cost                                                                                          28            6      34                        34                                                                                              328 3d.4      Subtotal Period 3d Period-Dependent Costs                                                                  139          28    167                        167                                                                                            1,640 3d.0      TOTAL PERIOD 3d COST                                            2,500                          9,179      139        2,305  14,123      13,957            167                                                        1,785    350,510                    1,640 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1    ISFSI License Termination                              40          6        14                  393      622          286  1,361                      1,361                            1,305                                108,721      4,535          360 3e.2      Subtotal Period 3e Additional Costs                    40          6        14                  393      622          286  1,361                      1,361                            1,305                                108,721      4,535          360 Period 3e Collateral Costs 3e.3.1    Small tool allowance                                    1                                                                0 3e.3      Subtotal Period 3e Collateral Costs                                                                                      0 Period 3e Period-Dependent Costs 3e.4.1    Insurance 3e.4.2    Property taxes                                                                                              55            8      63                        63 3e.4.3    Heavy equipment rental                                136                                                              29    164                        164 3e.4.4    Plant energy budget 3e.4.5    NRC ISFSI Fees                                                                                              94          13    107                        107 3e.4.6    Security Staff Cost                                                                                        61          13      74                        74                                                                                          1.901 3e.4.7    Utility Staff Cost                                                                                        163          34    198                        198                                                                                          1.901 3e.4      Subtotal Period 3e Period-Dependent Costs              136                                                373          96    605                        605                                                                                          3,803 3e.0      TOTAL PERIOD 3e COST                                  177          6        14                  393      995          383  1,968                      1,968                            1,305                                108,721      4,535        4,163 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                        Document POI-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                          Appendix E, Page 18 of 28 Table E-7 Diablo Canyon Unit 1 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site    LLRW                                        NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I            Utility and Activity                                                        Decon    Removal  Packaging  Transport      Processing  Disposal    Other    Total      Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                    Activity Description                  Cost      Cost      Costs      Costs    '    Costs      Costs      Costs  Contingency    Costs    Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet  Wt., Lbs. Manhours  Manhours PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3f,2,1      ISFSI Demolition and Site Restoration                              1,371                                                        27          294    1,691                    1,691                                                                            15,387            80 3f.2.2      ISFSI Area Soil I Sediment Control                                    16                                                                      3        20                      20                                                                              2,568 3f.2        Subtotal Period 3f Additional Costs                                1,387                                                        27          297    1,711                    1,711                                                                            17.955            80 Period 3f Collateral Costs 3f.3.1      Small tool allowance                                                  20                                                                      4        24                      24 3f.3        Subtotal Period 3f Collateral Costs                                  20                                                                      4        24                      24 Period 3f Period-Dependent Costs 3f.4.1      Insurance 3f.4.2      Property taxes                                                                                                                  28            4        32                      32 3f.4.3      Heavy equipment rental                                                54                                                                      11        65                      65 3f.4.4      Plant energy budget 3f.4.5      Security Staff Cost                                                                                                              11            2        14                      14                                                                                              349 3f.4.6      Utility Staff Cost                                                                                                              69          14        83                      83                                                                                              784 3f.4        Subtotal Period 3fPeriod-Dependent Costs                              54                                                        108          32      193                      193                                                                                            1,133 3f.O        TOTAL PERIOD 3f COST                                              1,461                                                        134          333    1,928                    1,928                                                                            17,955          1,213 PERIOD 3 TOTALS                                                              28,607      2,506          14                    9,572    80,347      24,488  145,535      14,234      72,845      58,456              1,305                        1,785    459,231  188,274      708,651 TOTAL COST TO DECOMMISSION                                        11,057    96,791    32,014    14,632                    127,024  695,875      244,329 1,221,721    997,101      151,163        73,457            587,422      1,732      574    1,785 51,454,030  962,738    6,340,431 TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:                                                $1,221,721    thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 81.61 % OR:                                                $997,101    thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 12.37% OR:                                                          $151,162    thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 6.01% OR:                                                          $73,457    thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                          49,854 Tons TOTAL CRAFT LABOR REQUIREMENTS:                                                                    962,738 Man-hours End Notes:
nla - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0- indicates that this value is less than 0.5 but is non-zero.
a cell containing" - " indicates a zero value TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                  Document P01-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                    Appendix E, Page 19 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial/              Utility and Activity                                              Decon Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                  Activity Description        Cost  Cost    Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet  Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours PERIOD la - Shutdown through Transition Period 1a Direct Decommissioning Activities 1a.L1      Prepare preliminary decommissioning cost                                                                  82            17      99          99                                                                                                          556 1a.L2      Notification of Cessation of Operations                                                                                          a 1a.L3      Remove fuel & source material                                                                                                  nJa 1a.L4      Notification of Permanent Defueling                                                                                              a 1a.L5      Deactivate plant systems & process waste                                                                                          a 1a.L6      Prepare and submit PSDAR                                                                                  126            26    152          152                                                                                                          856 1a.L7      Review plant dwgs & specs.                                                                                289            60    350          350                                                                                                        1,969 1a.L8      Perform detailed rad survey                                                                                                      a 1a.L9      Estimate by-product inventory                                                                              63            13      76          76                                                                                                          428 la.1.l0    End  product description                                                                                  63            13      76          76                                                                                                          428 1a.L11      Detailed by-product inventory                                                                              82            17      99          99                                                                                                          556 1a.1.12    Define major work sequence                                                                                472            98    570          570                                                                                                        3,210 1a.1.13    Perform SER and EA                                                                                        195            41    236          236                                                                                                        1,327 1a.1.l4    Perform Site-Specific Cost Study                                                                          315            66    380          380                                                                                                        2,140 1a.1.15    Prepare/submit License Termination Plan                                                                  258            54    311          311                                                                                                        1,753 1a.l.l6    Receive NRC approval of termination plan                                                                                          a Activity Specifications 1a.L17.1    Plant & temporary facilities                                                                              310            65    374          337                        37                                                                              2,106 1a.L17.2    Plant systems                                                                                            262            55    317          285                        32                                                                              1,783 1a.1.l7.3  NSSS Decontamination Flush                                                                                31            7      38          38                                                                                                          214 1a.1.17.4  Reactor internals                                                                                        447            93    540          540                                                                                                        3,039 1a.1.l7.5  Reactor vessel                                                                                            409            85    494          494                                                                                                        2,782 1a.1.17.6  Biological shield                                                                                          31            7      38          38                                                                                                          214 1a.l.l7.7  Steam generators                                                                                          196            41    237          237                                                                                                        1,335 1a.L17.8    Reinforced concrete                                                                                      101            21    122          61                        61                                                                                685 la.L17.9  Main Turbine                                                                                              25            5      30                                    30                                                                                171 la.L17.10  Main Condensers                                                                                            25            5      30                                    30                                                                                171 la.1.17.11 Plant structures & buildings                                                                              196            41    237          119                      119                                                                              1,335 la.1.17.12 Waste management                                                                                          289            60    350          350                                                                                                        1,969 la.1.17.13 Facility & site closeout                                                                                  57            12      68          34                        34                                                                                385 1a.l.l7    Total                                                                                                  2,380          497  2,876        2,533                      344                                                                            16,190 Planning & Site Preparations 1a.L18    Prepare dismantling sequence                                                                              151            32    183          183                                                                                                        1,027 la.l.19    Plant prep. & temp. svces                                                                              2,800          584  3,384        3,384 la.l.20    Design water clean-up system                                                                              88            18    106          106                                                                                                          599 la.L21    Rigging/Cant. Cntrl Envlpsftoolingfetc.                                                                2,200          459  2,659        2,659 la.l.22    Procure casksfliners & containers                                                                          77            16      94          94                                                                                                          526 la.1      Subtotal Period 1a Activity Costs                                                                      9,640        2,011  11,652      11,308                      344                                                                            31,566 Period 1a Additional Costs la.2.1    Spent Fuel Pool Isolation                                                                              13,217        2,758  15,974      15,974 la.2.2    Disposal of Contaminated Tools & Equipment                      234        97                3,145                  1,146  4,622        4,622                                        10,245                                609,715      317 la.2      Subtotal Period 1a Additional Costs                              234        97                3,145  13,217        3,904  20,597      20,597                                        10,245                                609,715      317 Period 1a Period-Dependent Costs la.4.1    Insurance                                                                                              1,056          147  1,202        1,202 la.4.2    Property taxes                                                                                            165            23    189          189 la.4.3    Health physics supplies                              457                                                              159    615          615 la.4.4    Heavy equipment rental                                480                                                              100    580          580 la.4.5    Disposal ofDAW generated                                          14          4                  45                    19      82          82                                          598                                12,310        18 la.4.6    Plant energy budget                                                                                    1,156          241  1,398        1,398 la.4.7    NRC Fees                                                                                                  838          117    954          954 la.4.8    Emergency Planning Fees                                                                                1,001          139  1,141                    1,141 la.4.9    Spent Fuel Transfer - Pool or ISFSI to DOE                                                              4,123          860  4,984                    4,984 la.4.10    Spent Fuel Pool O&M                                                                                      763          159    922                      922 laA.ll    ISFSI Operating Costs                                                                                      45            9      54                        54 laA.12    Severance Related Costs                                                                                38,503        8,034  46,537      46,537 la.4.13    Security Staff Cost                                                                                    14,837        3,096  17,933      17,933                                                                                                      229,429 la.4.14    Utility Staff Cost                                                                                    26,317        5,491  31,808      31,808                                                                                                      346,229 laA        Subtotal Period la Period-Dependent Cost,s            936        14          4                  45  88,804        18,594 108,398      101,297        7,101                              598                                12,310        18      575,657 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix E, Page 20 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial I              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description          Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs      Costs        Costs      Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Wt.,Lbs. Manhours  Manhours 1a.0        TOTAL PERIOD 1a COST                                      936        248        101                3,190 111,661        24,509  140,647    133,202        7,101          344            10,843                                622,025        336      607,223 PERIOD Ib - Deconunissioning Preparations Period 1b Direct Decommissioning Activities Detailed Work Procedures 1b.l.l.l Plant systems                                                                                                      298            62    360        324                        36                                                                              2,026 1b.l.1.2 NSSS Decontamination Flush                                                                                          63            13      76          76                                                                                                          428 1b.l.1.3 Reactor internals                                                                                                  157            33    190        190                                                                                                        1,070 1b.l.l.4 Remaining buildings                                                                                                85            18    103          26                        77                                                                                578 1b.Ll.5 CRD cooling assembly                                                                                                63            13      76          76                                                                                                          428 Ib.l.1.6 CRD housings & ICI tubes                                                                                            63            13      76          76                                                                                                          428 1b.1.l.7 Incore instrumentation                                                                                              63            13      76          76                                                                                                          428 1b.l.l.8 Reactor vessel                                                                                                    228            48    276        276                                                                                                        1,554 lb.L1.9 Facility closeout                                                                                                    75            16      91          46                        46                                                                                514 lb. 1. 1.10 Missile shields                                                                                                  28            6      34          34                                                                                                          193 lb. 1. l.l 1 Biological shield                                                                                              75            16      91          91                                                                                                          514 lb. 1. 1.12 Steam generators                                                                                                289            60    350        350                                                                                                        1,969 lb. l. 1. 13 Reinforced concrete                                                                                            63            13      76          38                        38                                                                                428 lb. 1. 1.14 Main Turbine                                                                                                    98            20    119                                  119                                                                                668 lb. 1. 1.15 Main Condensers                                                                                                  98            20    119                                  119                                                                                668 lb. 1. 1.16 Auxiliary building                                                                                              172            36    208        187                        21                                                                              1,168 lb. 1. 1.17 Reactor building                                                                                                172            36    208        187                        21                                                                              1,168 1b.Ll        Total                                                                                                        2,092          436  2,528      2,053                      475                                                                            14,228 1b.1.2      Decon primary loop                              750                                                                        522  1,272      1,272                                                                                          1,067 1b.l        Subtotal Period Ib Activity Costs                750                                                        2,092          958  3,800      3,325                      475                                                                1,067        14,228 Period 1b Additional Costs 1b.2.1      Site Characterization                                                                                        2,038          850  2,888      2,888                                                                                        10,690          4,024 lb.2.2      Hazardous Waste Management                                                                                    204            43    247        247 1b.2.3      Mixed Waste Management                                                                                        270            56    326        326 Ib.2        Subtotal Period Ib Additional Costs                                                                          2,512          949  3,461      3,461                                                                                        10,690          4,024 Period Ib Collateral Costs Ib.3.1      Decon equipment                                  931                                                                        194  1,125      1,125 1b.3.2      DOC staff relocation expenses                                                                                1,415          295  1,710      1,710 Ib.3.3      Process decommissioning water waste              46                  21        66                  88                    79    300        300                                          291                                  17,471        57 1b.3A        Process decommissioning chemical flush waste      2                  63        256                6,210                2,223    8,752      8,752                                                  887                        94,531      166 1b.3.5      Small tool allowance                                        3                                                                1      3          3 1b.3.6      Pipe cutting equipment                                  1,100                                                              230  1,330      1,330 lb.3.7      Decon rig                                      1,500                                                                        313  1,813      1,813 1b.3        Subtotal Period Ib Collateral Costs            2,479    1,103        84        321                6,298    1,415        3,334  15,033      15,033                                          291      887                      112,002        223 Period 1b Period-Dependent Costs 1bA.l        Decon supplies                                    28                                                                          10      38          38 1bA.2        Insurance                                                                                                      523            73    596        596 1bA.3        Property taxes                                                                                                  82            11      93          93 1bAA        Health physics supplies                                    249                                                                86    335        335 1bA.5        Heavy equipment rental                                    238                                                                50    287        287 1bA.6        Disposal ofDAW generated                                                8          2                  26                    11      47          47                                          341                                  7,016        11 1bA.7        Plant energy budget                                                                                          1,147          239  1,386      1,386 1bA.8        NRC Fees                                                                                                      237            33    270        270 1bA.9        Emergency Planning Fees                                                                                        497            69    566                      566 1bA.10      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                  1,240          259  1,498                    1,498 1b.4.11      Spent Fuel Pool O&M                                                                                            378            79    457                      457 1bA.12      ISFSI Operating Costs                                                                                          22            5      27                      27 1bA.13      Severance Related Costs                                                                                      2,018          421  2,439      2,439 1bA.14      Security Staff Cost                                                                                          7,357        1,535  8,893      8,893                                                                                                      113,771 IbA.15      DOC Staff Cost                                                                                              4,664          973  5,637      5,637                                                                                                      46,543 IbA.16      Utility Staff Cost                                                                                          13,050        2,723  15,773      15,773                                                                                                      171,691 IbA          Subtotal Period 1b Period-Dependent Costs        28      487          8          2                  26  31,216        6,577  38,343      35,795        2,548                            341                                  7,016        11      332,006 1b.0        TOTAL PERIOD 1b COST                          3,257    1,589        92        324                6,323  37,233      11,818  60,637      57,614        2,548          475                632      887                      119,017    11,990      350,258 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                        Document POl-1648-001, Rev. 0 DecoJnmissioning Cost Analysis                                                                                                                                                                                                                                        Appendix E, Page 21 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial f              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other    Total    Total    Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                      Activity Description        Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs      Costs      Costs        Costs        Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet Wt.,Lbs. Manhours  Manhours PERIOD 1 TOTALS                                          3,257    2,525        341        425                9,514 148,895      36,328  201,284    190,816        9,649          819              11,475      887                        741,042    12,325      957,482 PERIOD 2a - Large Component Removal Period 2a Direct Decommissioning Activities Nuclear Steam Supply System Removal 2a.1.1.1 Reactor Coolant Piping                            370      354          52          40                1,342                  863    3,021      3,021                                          2,276                                260,153    10,138 2a.1.1.2 Pressurizer Quench Tank                            39        35          8          6                  189                  107      385        385                                            329                                  36,557      1,073 2a.1.1.3 Reactor Coolant Pumps & Motors                    118      126        103        185                1,443                  680    2,656      2,656                                          4,701                                774,960      4,185          100 2a. 1. 1.4 Pressurizer                                      50        70        448          114                  750                  406    1,838      1,838                                          2,443                                286,592      2,365          938 2a.1.1.5 Steam Generators                                  477    4,206      3,368      1,922                12,807                7,117  29,895      29,895                                        41,712                                3,350,761    27,047        1,750 2a.1.1.6 Retired Steam Generator Units                                        2,496      1,878                12,597                5,120  22,091      22,091                                        41,031                                3,125,629    14,613        1,125 2a. 1. 1. 7 CRDMsflCls/Service Structure Removal            196      112        262          37                  444                  374    1,425      1,425                                          3,881                                  86,025      4,285 2a. 1: 1.8 Reactor Vessel Internals                        163    3,064    14,919      1,413                10,366    278      16,257  46,459      46,459                                          1,502      845      574              352,188    29,833        1,325 2a. 1. 1.9 Reactor Vessel                                  122    5,180      2,387        742                2,651    278        8,478  19,838      19,838                                          8,794                                957,382    29,833        1,325 2a.1.1        Totals                                      1,534    13,148    24,042      6,336                42,589    556      39,403  127,607    127,607                                      106,670      845      574            9,230,247    123,373        6,564 Removal of Major Equipment 2a.1.2        Main Turbine/Generator                                  202                                                                42      245                                    245                                                                  3,033 2a.1.3        Main Condensers                                        668                                                              139      807                                    807                                                                  9,875 Cascading Costs from Clean Building Demolition 2a.1.4.1 *Reactor                                                  1,194                                                              249    1,443      1,443                                                                                            11,895 2a.1.4.2 Auxiliary                                                    719                                                              150      869        869                                                                                            7,054 2a.1.4.3 Containment Penetration Area                                  73                                                                15      89          89                                                                                              704 2a.1.4.4 Radwaste Storage                                              91                                                                19      110        110                                                                                              918 2a.1.4.5 Fuel Handling                                                193                                                                40      233        233                                                                                            1,746 2a.1.4        Totals                                                2,270                                                              474    2,744      2,744                                                                                            22,317 Disposal of Plant Systems 2a.1.5.1 Auxiliary Steam                                              76                                                                16      91                                    91                                                                  1,179 2a.1.5.2 Auxiliary Steam (RCA)                                        141          32          9                  319                  167      669        669                                          1,004                                  61,868      1,935 2a.1.5.3 Building Services (Non-Power Block)                            7                                                                1        8                                      8                                                                    106 2a.1.5.4 Condensate System                                            619                                                              129      748                                    748                                                                  9,716 2a.1.5.5 Condensate System (Insulated)                                274                                                                57      332                                    332                                                                  4,253 2a.1.5.6 Containment Spray                                            235        161          51                1,719                  713    2,879      2,879                                          5,421                                333,235      3,521 2a.1.5.7 Extraction Steam & Heater Drip                              230                                                                48      278                                    278                                                                  3,625 2a.1.5.8 Feedwater System                                              67                                                                14      81                                    81                                                                  1,038 2a.1.5.9 Feedwater System (Insulated)                                162                                                                34      195                                    195                                                                  2,547 2a.1.5.10 Feedwater System (RCA Insulated)                            119          42          15                  497                  223      895        895                                          1,567                                  96,264      1,710 2a.1.5.11 Feedwater System (RCA)                                        6          2          1                  26                  12      46          46                                            82                                  5,067        82 2a.1.5.12 NSSS Sampling                                              159          9          3                  100                  92      363        363                                            315                                  19,386      2,404 2a.1.5.13 NSSS Sampling (Insulated)                                    47                      0                  10                  20      78          78                                            31                                  1,903        712 2a.1.5.14 Nitrogen & Hydrogen                                          19                                                                4      23                                    23                                                                    309 2a.1.5.15 Nitrogen & Hydrogen (Insulated)                              1                                                                0        1                                      1                                                                    16 2a.1.5.16 Nitrogen & Hydrogen (RCA Insulated)                          5                      0                    5                    4      15          15                                            15                                    937        74 2a.1.5.17 Nitrogen & Hydrogen (RCA)                                  103          11          3                  92                  70      279        279                                            288                                  17,804      1,405 2a.1.5.18 Oily Water Separator & TB Sump                              29          11          3                  102                  48      192        192                                            319                                  19,671        410 2a.1.5.19 Saltwater System                                          181                                                                38      218                                    218                                                                  2,779 2a.1.5.20 Turbine Steam Supply                                      762                                                              159      921                                    921                                                                12,007 2a.1.5.21 Turbine Steam Supply (RCA)                                878        345          117                3,961                1,755    7,056      7,056                                        12,485                                767,598    12,605 2a.1.5.22 Turbine and Generator                                      81                                                                17      98                                    98                                                                  1,250 2a.1.5.23 Turbine and Generator (Insulated)                          24                                                                5      29                                    29                                                                    378 2a.1.5    . Totals                                                4,226        614          201                6,830                3,624  15,496      12,472                      3,025              21,528                              1,323,732    64,060 2a.1.6      Scaffolding in support of decommissioning            4,785          21          11                  251                1,756    6,824      6,824                                            818                                  72,662    35,763 2a.l        Subtotal Period 2a Activity Costs          1,534    25,300    24,677      6,548                49,671    556      45,438  153,724    149,647                      4,077            129,016      845      574          10,626,640    258,421        6,564 Period 2a Additional Costs 2a.2.1      Retired Reactor Head                                              225          179                1,557                  610    2,571      2,571                                          5,072                                322,442      2,098          750 2a.2        Subtotal Period 2a Additional Costs                                225        179                1,557                  610    2,571      2,571                                          5,072                                322,442      2,098          750 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                            Appendix E, Page 22 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial I              Utility and Activity                                                  Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management    Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description          Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs        Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet  Wt.,Lbs. Manhours  Manhours Period 2a Collateral Costs 2a.3.1      Process decommissioning water waste              85                    40        123                  165                  148    561        561                                            545                                  32,727      106 2a.3.2      Process decommissioning chemical flush waste 2a.3.3      Small tool allowance                                      315                                                                66    381        343                          38 2a.3        Subtotal Period 2a Collateral Costs              85      315          40        123                  165                  213    941        903                          38                545                                  32,727      106 Period 2a Period-Dependent Costs 2a.4.1      Decon supplies                                    92                                                                          32    124        124 2a.4.2      Insurance                                                                                                      768          107    874        874 2a.4.3      Property taxes                                                                                                268            37    305        274                          30 2a.4.4      Health physics supplies                                  1,968                                                              684  2,653      2,653 2a.4.5      Heavy equipment rental                                  3,373                                                              704  4,077      4,077 2a.4.6      Disposal ofDAW gcncrated                                              110          31                  349                  143    633        633                                          4,593                                  94,597      142 2a.4.7      Plant energy budget                                                                                          1,776          370  2,146      2,146 2a.4.8      NRC Fees                                                                                                      724          101    825        825 2a.4.9      Emergency Planning Fees                                                                                      1,156          161  1,317                    1,317 2a.4.10      Spent Fuel Transfer* Pool or ISFSI to DOE                                                                    4,036          842  4,878                    4,878 2a.4.11      Spent Fuel Pool O&M                                                                                          1,234          257  1,491                    1,491 2a.4.12      ISFSI Operating Costs                                                                                          72            15      87                        87 2a.4.13      Severance Related Costs                                                                                        494          103    597        597 2a.4.14      Security Staff Cost                                                                                        23,983        5,004  28,987      28,987                                                                                                        370,857 2a.4.15      DOC Staff Cost                                                                                              26,130        5,452  31,582      31,582                                                                                                        256,229 2a.4.16      Utility Staff Cost                                                                                          37,794        7,886  45,679      45,679                                                                                                        477,057 2a.4        Subtotal Period 2a Period*Dependent Costs        92    5,341        110          31                  349  98,433      21,899  126,256    118,452        7,773            30              4,593                                  94,597      142    1,104,143 2a.0        TOTAL PERIOD 2a COST                          1,711    30,956    25,052      6,881              51,741  98,989      68,161  283,491    271,573        7,773        4,145            139,227      845      574          11,076,410  260,767    1,111,457 PERIOD 2b - Site Decontamination Period 2b Direct Decommissioning Activities Disposal of Plant Systems 2b.1.1.1 Capital Additions 85*2002 (Clean)                              450                                                                94    544                                    544                                                                7,040 2b.1.1.2 Capital Additions 85*2002 (contaminated)                      483          61        24                  797                  459  1,823      1,823                                          2,532                                154,520    6,606 2b.1.1.3 Chemical & Volume Control                            809    1,066        172          58                1,966                1,653  5,723      5,723                                          6,290                                380,935    24,738 2b.1.1.4 Chemical & Volume Control (Insulated)                294      432          47        13                  438                  516  1,740      1,740                                          1,376                                  84,904    9,960 2b.1.1.5 Component Cooling Water                                        190                                                                40    230                                    230                                                                2,984 2b.1.1.6 Component Cooling Water (RCA)                                  595        191        66                2,245                1,028  4,125      4,125                                          7,077                                435,000    8,301 2b.1.1.7 Compressed Air                                                118                                                                25    143                                    143                                                                1,881 2b.1.1.8 Compressed Air (Insulated)                                      6                                                                1      8                                      8                                                                    99 2b.1.1.9 Compressed Air (RCA Insulated)                                  29          4          1                  33                    22      89          89                                            104                                  6,415      404 2b.1.1.10 Compressed Air (RCA)                                          531          69        19                  629                  417  1,663      1,663                                          1,976                                121,884    7,315 2b. 1. 1. 11 Diesel Engine-Generator                                    137                                                                29    165                                    165                                                                2,089 2b.1.1.12 Diesel Engine-Generator (Insulated)                            3                                                                1      4                                      4                                                                    48 2b.1.1.13 Electrical (Clean)                                          3,115                                                              650  3,765                                  3,765                                                                47,918 2b. 1. 1.14 Electrical (Contaminated)                                  360          44        18                  613                  348  1,384      1,384                                          1,936                                118,833    4,901 2b.1.1.15 Electrical (RCA)                                            1,875                                                              391  2,266                                  2,266                                                                27,955 2b. 1. 1. 16 Fire Protection                                            364        148        53                1,792                  781  3,138      3,138                                          5,838                                347,206    5,173 2b. 1. 1.17 Gaseous Radwaste                                            133          20          6                  217                  126    501        501                                            690                                  41,995    1,842 2b.1.1.18 HVAC (Clean Insulated)                                        40                                                                8      48                                      48                                                                  662 2b.1.1.19 HVAC (Clean)                                                  428                                                                89    518                                    518                                                                7,019 2b. 1. 1.20 HVAC (Contaminated Insulated)                              232          37        15                  506                  265  1,055      1,055                                          1,598                                  98,113    3,075 2b.1.1.21 HVAC (Contaminated)                                        1,033        185        76                2,563                1,292  5,149      5,149                                          8,091                                496,626    13,890 2b. 1. 1.22 Liquid Radwaste                                  362      447          74        25                  862                  722  2,493      2,493                                          2,791                                166,964    11,333 2b. 1. 1.23 Liquid Radwaste (Insulated)                        29        44          5                              45                    52    177        177                                            142                                  8,780    1,007 2b.1.1.24 Lube Oil Distribution & Purification                          126                                                                26    152                                    152                                                                1,964 2b. 1. 1.25 Make-up Water                                              244                                                                51    295                                    295                                                                3,794 2b.1.1.26 Make-up Water (Insulated)                                      24                                                                5      29                                      29                                                                  376 2b.1.1.27 Make.up Water (RCA Insulated)                                  32          7          2                  67                    36    144        144                                            210                                  12,938      448 2b.1.1.28 Make*up Water (RCA)                                          164          39        11                  378                  196    788        788                                          1,190                                  73,314    2,245 2b. 1. 1.29 Mechanical Department Equipment                              1                                                                0      1                                                                                                            19 2b.1.1.30 Miscellaneous Reactor Coolant                        21      141          17          5                  158                  122    463        463                                            500                                  30,589    2,240 2b.1.1.31 Nuclear Steam Supply Sampling                                  21          2          1                  21                    15      61          61                                              66                                  4,072      282 2b. 1. 1.32 Nuclear Steam Supply Sampling (Insulated                      9          1          0                    9                    7      26          26                                              28                                  1,745      121 2b.1.1.33 Residual Heat Removal                              307      305        162        54                1,845                  995  3,668      3,668                                          5,811                                357,510    5,524 2b. 1. 1.34 Safety Injection                                            124          21          7                  242                  132    526        526                                            776                                  46,891    1,799 2b.1.1.35 Safety Injection (Insulated)                                    5                      0                  10                    6      23          23                                              32                                  1,987        76 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                            Appendix E, Page 23 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed            Burial Volumes            Burial/              Utility and Activity                                                  Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description            Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs        Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Wt.,Lbs. Manhours  Manhours Disposal of Plant Systems (continued) 2b. 1. 1.36 Safety Injection (RCA Insulated)                              38          8          3                  92                    47    189          189                                            291                                17,880        522 2b. 1. 1.37 Safety Injection (RCA)                                      322          76        24                  830                    416  1,669        1,669                                          2,616                                160,916      4,326 2b.1.1.38 Service Cooling Water                                          138                                                                29    167                                    167                                                                2,186 2b.1.1.39 Service Cooling Water (RCA)                                    37          9          3                  96                    48    194          194                                            303                                18,679        513 2b.1.1.40 Sewer System Expansion                                          47                                                                10      57                                      57                                                                  746 2b.1.1      Totals                                          1,821    13,893      1,400        485              16,454                11,150  45,202      36,810                    8,392              52,266                              3,188,694  223,417 2b.1.2      Scaffolding in support of decommissioning                5,982          26        14                  313                  2,196  8,530        8,530                                          1,023                                90,828    44,703 Decontamination of Site Buildings 2b.1.3.1 *Reactor                                            959    2,483      1,120      5,645              26,011                11,909  48,127      48,127                                      331,897                              33,045,180    43,302 2b.1.3.2 Auxiliary                                          1,325      739          65        98                  927                  1,530  4,683        4,683                                          6,943                                585,598    28,092 2b.1.3.3 Capital Additions 85-2004                            423      168          10        20                  151                    411  1,184        1,184                                          1,331                                117,734      8,113 2b.1.3.4 Containment Penetration Area                        327      213          26        28                  379                    443  1,416        1,416                                          2,121                                172,739      7,351 2b.1.3.5 Radwaste Storage                                      8        62          4          9                  59                    50    193          193                                            627                                55,654        867 2b.1.3      Totals                                          3,042    3,666      1,224      5,801              27,526                14,343  55,603      55,603                                      342,918                              33,976,900    87,726 2b.1        Subtotal Period 2b Activity Costs              4,863    23,541      2,650      6,300              44,293                27,689  109,335      100,943                      8,392            396,208                              37,256,420    355,847 Period 2b  Collateral Costs 2b.3.1      Process decommissioning water waste              143                    69        213                  284                    252    962          962                                            942                                56,542        184 2b.3.2      Process decommissioning chemical flush waste        3                    90        369                  687                    330  1,479        1,479                                          1,281                                136,538        240 2b.3.3      Small tool allowance                                        445                                                                93    538          538 2b.3        Subtotal Period 2b Collateral Costs              145      445        160        582                  971                    675  2,979        2,979                                          2,224                                193,081        424 Period 2b  Period-Dependent Costs 2b.4.1      Decon supplies                                  1,456                                                                          506  1,962        1,962 2b.4.2      Insurance                                                                                                      1,136          158  1,294        1,294 2b.4.3      Property taxes                                                                                                  396            55    451          451 2b.4.4      Health physics supplies                                  2,764                                                                961  3,725        3,725 2b.4.5      Heavy equipment rental                                    4,951                                                              1,033  5,984        5,984 2bA.6      Disposal of DAW generated                                              127        36                  401                    165    729          729                                          5,286                                108,867        163 2hA.7      Plant energy hudget                                                                                            2,074          433  2,507        2,507 2bA.8      NRC Fees                                                                                                      1,072          149  1,221        1,221 2bA.9      Emergency Planning Fees                                                                                        1,710          238  1,948                    1,948 2hA.10      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    5,978        1,247  7,225                    7,225 2bA.11      Spent Fuel Pool O&M                                                                                            1,825          381  2,206                    2,206 2bA.12      Liquid Radwaste Processing Equipment/Services                                                                    463            97    560          560 2bA.13      ISFSI Operating Costs                                                                                            107            22    129                      129 2hA.14      Severance Related Costs                                                                                        7,908        1,650  9,558        9,558 2bA.15      Security Staff Cost                                                                                          35,487        7,404  42,891      42,891                                                                                                      548,743 2bA.16      DOC Staff Cost                                                                                                37,206        7,763  44,968      44,968                                                                                                      364,166 2hA.17      Utility Staff Cost                                                                                            53,628        11,189  64,817      64,817                                                                                                      675,951 2hA        Subtotal Period 2h Period-Dependent Costs      1,456    7,715        127        36                  401  148,989        33,452 192,175      180,666      11,509                            5,286                                108,867        163    1,588,860 2b.0        TOTAL PERIOD 2b COST                            6,464    31,701      2,936      6,918              45,666  148,989        61,816 304,489      284,589      11,509        8,392            403,718                              37,558,370    356,433    1,588,860 PERIOD 2c - Spent fuel delay prior to SFP decon Period 2c Direct Decommissioning Activities Period 2c Collateral Costs 2c.3.1      Spent Fuel Transfer - Pool to ISFSI                                                                            3,896          813  4,709                    4,709 2c.3        Subtotal Period 2c Collateral Costs                                                                            3,896          813  4,709                    4,709 Period 2c Period-Dependent Costs 2cA.1      Insurance                                                                                                      3,088          430  3,518        3,518 2cA.2      Property taxes                                                                                                1,076          150  1,226        1,226 2cA.3      Health physics supplies                                  2,326                                                                809  3,135        3,135 2cA.4      Disposal of DAW generated                                                68        19                  216                    88    392          392                                          2,839                                58,472        88 2cA.5      Plant energy budget                                                                                            1,504          314  1,818        1,818 2cA.6      NRC Fees                                                                                                      2,000          278  2,279        2,279 2cA.7      Emergency Planning Fees                                                                                        4,651          647  5,297                    5,297 2cA.8      Spent Fuel Transfer - Pool or ISFSI to DOE                                                                    15,422        3,218  18,640                    18,640 2cA.9      Spent Fuel Pool O&M                                                                                            4,964        1,036  5,999                    5,999 2cA.10      Liquid Radwaste Processing Equipment/Services                                                                    315            66    381          381 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                    Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                      Appendix E, Page 24 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site    Processed            Burial Volumes            Burial/              Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                  Activity Description            Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs      Costs        Costs    Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt., Lbs. Manhours  Manhours Period 2c Period* Dependent Costs (continued) 2c.4.11    ISFSI Operating Costs                                                                                            291          61    352                      352 2c.4.12    Spent Fuel Storage Canisters/Overpacks                                                                        6.000        1.252  7.252                    7.252 2c.4.13    Security Staff Cost                                                                                          96.501      20.135 116,636    116,636                                                                                                  1,492.229 2c.4.14    Utility Staff Cost                                                                                            42.556        8,879  51,436      51,436                                                                                                    535,846 2c.4      Subtotal Period 2c Period*Dependent Costs                2.326        68          19                  216  178.368      37,362 218,360    180.820      37.540                          2.839                                58.472        88    2.028.074 2c.O      TOTAL PERIOD 2c COST                                      2,326        68          19                  216  182,264      38,175 223,068    180,820      42,248                          2,839                                58.472        88    2,028.074 PERIOD 2d - Decontamination Following Wet Fuel Storage Period 2d Direct Decommissioning Activities 2d.1.l    Remove spent fuel racks                          585        56        174          36                1,207                  878  2,936      2,936                                        3.812                                233,945      962 Disposal of Plant Systems 2d.1.2.1 Electrical (Contaminated). FHB                                111          8          3                  115                    80    317        317                                          362                                22,201    1,497 2d.1.2.2 Electrical (RCA).FHB                                          690        78          31                1,042                  619  2,459      2,459                                        3,290                                201,925    8.926 2d.1.2.3 Fire Protection (RCA)                                        264        67          18                  613                  318  1.281      1,281                                        1,925                                118.758    3.614 2d.1.2.4 . HVAC (Contaminated)
* FHB                                  231        39          16                  542                  277  1.105      1,105                                        1,711                                104.999    3,086 2d.1.2.5 Spent Fuel Pit Cooling                                        94        65          21                  712                  294  1.187      1,187                                        2,243                                138.063    1.442 2d.1.2.6 Spent Fuel Pit Cooling* FHB                                  130        71          23                  772                  328  1.324      1,324                                        2,430                                149,602    1.956 2d.1.2    Totals                                                    1.520        328        112                3,795                1,917  7.673      7,673                                      11,961                                735.547    20.523 Decontamination of Site Buildings 2d.1.3.1 FuelHandling                                        811      859        63          41                  637                1,101  3.512      3,512                                        3.443                                251,129    23,547 2d.1.3    Totals                                            811      859        63          41                  637                1.101  3.512      3,512                                        3,443                                251,129    23.547 2d.1.4    Scaffolding in support of decommissioning                1,196          5          3                  63                  439  1,706      1.706                                          205                                18.166    8,941 2d.1      Subtotal Period 2d Activity Costs              1,396    3.632        570        191                5,702                4,336  15,827      15,827                                      19,420                              1,238,787    53.973 Period 2d Additional Costs 2d.2.1    License Termination Survey Planning                                                                              800          334  1,133      1,133                                                                                                        6.240 2d.2      Subtotal Period 2d Additional Costs                                                                              800          334  1.133      1,133                                                                                                      6,240 Period 2d Collateral Costs 2d.3.1    Process decommissioning water waste                37                  20          62                  82                    70    270        270                                          272                                16,319        53 2d.3.2    Process decommissioning chemical flush waste 2d.3.3    Small tool allowance                                        79                                                                16      95          95 2d.3.4    Decommissioning Equipment Disposition                                  155          54                1,828                  668  2,705      2,705                                        5,771                                354,194        88 2d.3.5    Spent Fuel Transfer* Pool to ISFSI                                                                            2,104          439  2.543                    2,543 2d.3      Subtotal Period 2d Collateral Costs                37        79        175        115                1,910    2.104        1.194  5,613      3,070        2.543                          6,043                                370,513      141 Period 2d Period* Dependent Costs 2d.4.1    Decon supplies                                    209                                                                          73    282        282 2d.4.2    Insurance                                                                                                        219          30    249        249 2d.4.3    Property taxes                                                                                                    76          11      87          87 2d.4.4    Health physics supplies                                    445                                                              155    599        599 2d.4.5    Heavy equipment rental                                      953                                                              199  1,152      1,152 2d.4.6    Disposal of DAW generated                                              45          13                  143                    59    260        260                                        1,885                                38.817        58 2d.4.7    Plant energy budget                                                                                              213          44    257        257 2d.4.8    NRC Fees                                                                                                        175          24    199        199 2d.4.9    Emergency Planning Fees                                                                                          165          23    187                      187 2d.4.10    Spent Fuel Transfer* Pool or ISFSI to DOE                                                                        811          169    980                      980 2d.4.11    Liquid Radwaste Processing Equipment/Services                                                                    178          37    216        216 2d.4.12    ISFSI Operating Costs                                                                                            21            4      25                      25 2d.4.13    Severance Related Costs                                                                                      12,313        2,569  14,882      14,882 2d.4.14    Security Staff Cost                                                                                            1,035          216  1,251      1.251                                                                                                      18,960 2d.4.15    DOC Staff Cost                                                                                                4.884        1.019  5,903      5,903                                                                                                      48.000 2d.4.16    Utility Staff Cost                                                                                            7,532        1,572  9,104      9,104                                                                                                      91,680 2d.4      Subtotal Period 2d Period*Dependent Costs        209    1,398        45          13                  143  27,621        6.204  35.633      34.440        1,192                          1.885                                38.817        58      158,640 2d.0      TOTAL PERIOD 2d COST                            1,642    5,108        790        319                7,755  30.525      12,067  58.207      54,471        3,736                        27,348                              1,648,117    54,172      164,880 PERIOD 2f - License Termination TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                      Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                        Appendix E, Page 25 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                        NRC      Spent Fuel      Site      Processed          Burial Volumes              Burial!              Utility and Activity                                              Decon  Removal  Packaging  Transport  Processing Disposal  Other      Total      Total    Lie. Term. Management  Restoration    Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description        Cost    Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs      Costs      Costs        Costs        Cu. Feet Cu. Feet Cu. Feet Cu. Feet  Cu. Feet Wt.,Lbs. Manhours  Manhours Period 2f Direct Decommissioning Activities 2f.1.1      ORISE confirmatory survey                                                                                  178            74    252          252 2f.1.2      Terminate license                                                                                                                  a 2f.l        Subtotal Period 2f Activity Costs                                                                          178            74    252          252 Period 2f Additional Costs 2f.2.1      License Termination Survey                                                                              14,399        6,009  20,408      20,408                                                                                        200,468          3,120 2f.2        Subtotal Period 2f Additional Costs                                                                      14,399        6,009  20,408      20,408                                                                                        200,468          3,120 Period 2f Collateral Costs 2f.3.1      DOC staff relocation expenses                                                                            1,415          295  1,710        1,710 2f.3        Subtotal Period 2f Collateral Costs                                                                      1,415          295  1,710        1,710 Period 2f Period* Dependent Costs 2f.4.1      Insurance                                                                                                  319            44    364          364 2f.4.2      Property taxes                                                                                              125            17    142          142 2f.4.3      Health physics supplies                                834                                                              290  1,124        1,124 2f.4.4      Disposal of DAW generated                                            9          2                  27                    11      49          49                                          356                                  7,337        11 2f.4.5      Plant energy budget                                                                                        174            36    211          211 2f.4.6      NRC Fees                                                                                                    312            43    356          356 2f.4.7      Emergency Planning Fees                                                                                    269            37    307                      307 2f.4.8      Spent Fuel Transfer* Pool or ISFSI to DOE                                                                  753          157    911                      911 2f.4.9      ISFSI Operating Costs                                                                                        34            7      41                        41 2f.4.10      Security Staff Cost                                                                                      1,694          353  2,048        2,048                                                                                                        31,036 2f.4.11      DOC Staff Cost                                                                                            4,689          978  5,668        5,668                                                                                                        46,750 2f.4.12      Utility Staff Cost                                                                                        5,150        1,075  6,225        6,225                                                                                                        60,107 2f.4        Subtotal Period 2fPeriod-Dependent Costs                834          9          2                  27  13,521        3,051  17,444      16,186        1,258                              356                                  7,337        11      137,893 2f.O        TOTAL PERIOD 2f COST                                    834          9          2                  27  29,513        9,429  39,814      38,556        1,258                              356                                  7,337  200,479      141,013 PERIOD 2 TOTALS                                          9,816    70,926    28,855    14,141              105,405 490,279        189,648 909,070      830,009      66,524      12,537            573,488      845      574          50,348,710  871,939    5,034,284 PERIOD 3b - Site Restoration Period 3b Direct Decommissioning Activities Demolition of Remaining Site Buildings 3b.1.1.1 *Reactor                                                  6,798                                                            1,418  8,216                                  8,216                                                              67,914 3b.1.1.2 Administration                                            1,067                                                              223  1,289                                  1,289                                                              10,358 3b.Ll.3 Auxiliary                                                  6,587                                                            1,374  7,961                                  7,961                                                              64,471 3b.1.1.4 Capital Additions 85*2004                                4,359                                                              910  5,269                                  5,269                                                              47,403 3b.Ll.5 Chemical Storage                                              4                                                                1        5                                      5                                                                    46 3b.1.1.6 Chlorination                                                  9                                                                2      11                                    11                                                                    99 3b.1.1.7 Circulating Water Tunnels                                1,153                                                              241  1,394                                  1,394                                                              12,194 3b.1.1.8 Cold Machine Shop                                          396                                                                83    479                                    479                                                                3,785 3b.1.1.9 Communication                                                4                                                                1        5                                      5                                                                    44 3b.1.1.10 Condensate Polishingtrechnical Support                    870                                                              182  1,052                                  1,052                                                                9,300 3b. 1. 1. 11 Containment Penetration Area                            686                                                              143    829                                    829                                                                6,565 3b. 1. 1.12 Discharge Structure                                      937                                                              196  1,133                                  1,133                                                                8,321 3b.1.1.13 Fabrication Shop                                          120                                                                25    145                                    145                                                                1,223 3b. 1. 1.14 Fire Pump House                                            5                                                                1        6                                      6                                                                    55 3b. 1.1. 15 Hazardous Waste Storage Facility                          39                                                                8      48                                    48                                                                  430 3b. 1. 1. 16 Intake Structure                                      5,309                                                            1,108  6,416                                  6,416                                                              46,364 3b. 1. 1.17 Maintenance Shop                                        365                                                                76    441                                    441                                                                3,444 3b. 1. 1. 18 Miscellaneous Structures                                64                                                                13      77                                    77                                                                  673 3b. 1. 1. 19 NPO Permanent Warehouse                              1,367                                                              285  1,652                                  1,652                                                              14,093 3b.1.1.20 Ponds                                                        2                                                                0        2                                      2                                                                    24 3b.1.1.21 Portable Fire Pump & Fuel Cart                              1                                                                0        2                                      2                                                                    14 3b.1.1.22 Pretreatment                                                10                                                                2      12                                    12                                                                  108 3b. 1. 1.23 Radwaste Storage                                      1,777                                                              371  2,147                                  2,147                                                              17,854 3b. 1. 1.24 Radwaste Storage Facility (Additional)                    49                                                                10      59                                    59                                                                  662 3b.1.1.25 Rotor Warehouse                                            847                                                              177  1,024                                  1,024                                                                9,938 3b.l.L26 Security                                                    344                                                                72    416                                    416                                                                3,944 3b.l.L27 Security Buildings (additional)                              53                                                                11      65                                    65                                                                  722 3b.l.L28 Simulator                                                  413                                                                86    499                                    499                                                                4,191 3b.1. L29 Steam Generator Storage Facility                          909                                                              190  1,099                                  1,099                                                                8,888 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                                                                  Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                                                                    Appendix E, Page 26 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site      Processed                                  Burial Volumes                                                          Burial/            Utility and Activity                                              Decon Removal  Packaging Transport Processing Disposal  Other      Total      Total  Lie. Term. Management  Restoration    Volume -C::::-I:-a-s-s-:A---:C:::':I::..a;::;ss:.:B:::::-..:....::;":'C::::la:::sc:.s::..C:::---:G~T=C:::-:::C;-- Processed  Craft    Contractor Index                  Activity Description          Cost  Cost      Costs    Costs    Costs    Costs    Costs  Contingency  Costs    Costs      Costs        Costs      Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Cu. Feet                                                                    Wt.,Lbs. Manhours  Manhours Demolition of Remaining Site Buildings (continued) 3b.1.1.30 Telephone Terminal                                          3                                                              1      3                                      3                                                                                                                                      28 3b.1.l.31 Turbine                                                5,538                                                        1,156    6,694                                6,694                                                                                                                                  57,744 3b.1.1.32 Turbine Pedestal                                        1,318                                                            275  1,594                                  1,594                                                                                                                                  11,300 3b.1.1.33 Vehicle Maintenance                                        34                                                              7      41                                    41                                                                                                                                    367 3b.l.l.34 Waste Water Holding & Treatment Facility                  23                                                              5      27                                    27                                                                                                                                    238 3b.1.1.35 Fuel Handling                                          1,858                                                            388  2,245                                2,245                                                                                                                                  16,750 3b.L1      Totals                                                43,321                                                        9,039  52,360                                52,360                                                                                                                                429,552 Site Closeout Activities 3b.1.2    Grade & landscape site                                2,758                                                            575  3,333                                  3,333                                                                                                                                  4,587 3b.1.3    Final report to NRC                                                                                        98            20    119        119                                                                                                                                                                            668 3b.l      Subtotal Period 3b Activity Costs                    46,079                                              98        9,635  55,812        119                    55,693                                                                                                                                434,139          668 Period 3b Additional Costs 3b.2.1    Backfill Structures & Remove Concrete Rubble          35,142                                                        7,332  42,474                                42,474                                                                                                                                  160,418 3b.2.2    Breakwater Demolition and Removal                    41,893                                                        14,568  56,461                                56,461                                                                                                                                  128,379      46,649 3b.2.3    Cofferdam Construction and Teardown                      478                                                            100    578                                    578                                                                                                                                  4,004 3b.2A      Concrete Crushing                                      9,113                                                5        1,902  11,020                                11,020                                                                                                                                  37,775 3b.2.5    Disposal of Galbestos Siding                                                                              317            66    383                                    383 3b.2.6    Disposition of Mobile Barriers                        1,318                                                            275  1,593                                  1,593                                                                                                                                  4,362 3b.2.7    Soil/ Sediment Control Plant Area                      1,052                                                            219  1,272                                  1,272                                                                                                                                  10,271 3b.2      Subtotal Period 3b Additional Costs                  88,996                                              321      24,463  113,781                              113,781                                                                                                                                345,209        46,649 Period 3b Collateral Costs 3b.3.1    Small tool allowance                                  1,107                                                            231  1,338                                  1,338 3b.3      Subtotal Period 3b Collateral Costs                    1,107                                                            231  1,338                                  1.338 Period 3b Period*Dependent Costs 3bA.1      Insurance                                                                                                525            73    598                      598 3bA.2      Property taxes                                                                                            410            57    467                      467 3bA.3      Heavy equipment rental                                7,347                                                        1,533    8,880                                8,880 3bA,4      Plant energy budget                                                                                      286            60    346                                    346 3bA.5      NRC ISFSI Fees                                                                                            348            48    396                      396 3bA.6      Emergency Planning Fees                                                                                  885          123  1,009                    1,009 3bA.7      Spent Fuel Transfer* Pool or ISFSI to DOE                                                              2,474          516  2,990                    2,990 3bA.8      ISFSI Operating Costs                                                                                    111            23    134                      134 3bA.9      Security Staff Cost                                                                                    5,569        1,162  6,731          0        5,452        1,279                                                                                                                                              102,023 3bA.10    DOC Staff Cost                                                                                        14,111        2,944  17,055                                17,055                                                                                                                                              136,891 3bA.ll    Utility Staff Cost                                                                                      7,357        1,535  8,892                    1,778        7,113                                                                                                                                              87,197 3bA        Subtotal Period 3b Period*Dependent Costs              7,347                                          32,075        8,075  47,497          0      12,824      34,673                                                                                                                                              326,112 3b.0      TOTAL PERIOD 3b COST                                143,529                                          32,495      42,404  218,428        119      12,824      20(j,485                                                                                                                                779,348      373,428 PERIOD 3c - Fuel Storage Operations/Shipping Period 3c Direct Decommissioning Activities Period 3c Period*Dependent Costs 3cA.1      Insurance                                                                                              2,251          313  2,564                    2,564 3cA.2      Property taxes                                                                                          1,758          245  2,002                    2,002 3cA.3      Plant energy budget 3cAA      NRC ISFSI Fees                                                                                          1,492          208  1,700                    1,700 3cA.5      Emergency Planning Fees                                                                                3,797          528  4,326                    4,326 3cA.6      Spent Fuel Transfer* Pool or ISFSI to DOE                                                              11,163        2,329  13,492                  13,492 3cA.7      ISFSI Operating Costs                                                                                    475            99    574                      574 3cA.8      Security Staff Cost                                                                                    19,444        4,057  23,501                  23,501                                                                                                                                                            299,083 3eA.9      Utility Staff Cost                                                                                      6,393        1,334  7,727                    7,727                                                                                                                                                            74,881 3eA        Subtotal Period 3c Period*Dependent Costs                                                              46,773        9,113  55,886                  55,886                                                                                                                                                            373,964 3c.0      TOTAL PERIOD 3c COST                                                                                  46,773        9,113  55,886                  55,886                                                                                                                                                            373,964 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                  Appendix E, Page 27 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site  LLRW                                      NRC      Spent Fuel      Site    Processed            Burial Volumes              Burial!              Utility and Activity                                              Decon Removal  Packaging  Transport  Processing Disposal  Other      Total    Total  Lic. Term. Management    Restoration  Volume  Class A  Class B  Class C  GTCC    Processed  Craft    Contractor Index                    Activity Description        Cost  Cost      Costs      Costs      Costs    Costs    Costs  Contingency  Costs    Costs        Costs        Costs    Cu. Feet Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Wt.,Lbs. Manhours  Manhours PERIOD 3d - GTCC shipping Period 3d Direct Decommissioning Activities Nuclear Steam Supply System Removal 3d. 1. 1.1 Vessel & Internals GTCC Disposal                                2,500                          9,179                2,263  13,942      13,942                                                                    1,785    350,510 3d. 1.1    Totals                                                        2,500                          9,179                2,263  13,942      13,942                                                                    1,785    350,510 3d.1        Subtotal Period 3d Activity Costs                              2,500                          9,179                2,263  13,942      13,942                                                                    1,785    350,510 Period 3d Period-Dependent Costs 3d.4.1      Insurance                                                                                                10                    11                        11 3d.4.2      Property taxes                                                                                              8                    9                        9 3d.4.3      Plant energy budget 3d.4.4      NRC ISFSI Fees                                                                                              6            1      7                        7 3d.4.5      ISFSI Operating Costs                                                                                      2            0      3                        3 3d.4.6      Security Staff Cost                                                                                      85            18    103                      103                                                                                          1,311 3d.4.7      Utility Staff Cost                                                                                        28            6      34                        34                                                                                            328 3d.4        Subtotal Period 3d Period-Dependent Costs                                                                139            27    167                      167                                                                                          1,640 3d.0        TOTAL PERIOD 3d COST                                          2,500                          9,179    139        2,290  14,109      13,942          167                                                      1,785    350,510                    1,640 PERIOD 3e - ISFSI Decontamination Period 3e Direct Decommissioning Activities Period 3e Additional Costs 3e.2.1      ISFSI License Termination                              40          6        14                  393    622          284  1,359                    1,359                          1,305                                108,721    4,535            360 3e.2        Subtotal Period 3e Additional Costs                    40          6        14                  393    622          284  1,359                    1,359                          1,305                                108,721    4,535            360 Period 3e Collateral Costs 3e.3.1      Small tool allowance                                                                                                    0 3e.3        Subtotal Period 3e Collateral Costs                                                                                      0 Period 3e  Period-Dependent Costs 3e.4.1      Insurance 3e.4.2      Property taxes                                                                                            55            8      62                        62 3e.4.3      Heavy equipment rental                                136                                                              28    164                      164 3e.4.4      Plant energy budget 3e.4.5      NRC ISFSI Fees                                                                                            94            13    107                      107 3e.4.6      Security Staff Cost                                                                                      61            13      74                        74                                                                                          1,901 3e.4.7      Utility Staff Cost                                                                                      163            34    197                      197                                                                                          1,901 3e.4        Subtotal Period 3e Period-Dependent Costs            136                                                373            96    605                      605                                                                                          3,803 3e.0        TOTAL PERIOD 3e COST                                  177          6        14                  393    995          380  1,965                    1,965                          1,305                                108,721    4,535          4,163 PERIOD 3f - ISFSI Site Restoration Period 3f Direct Decommissioning Activities Period 3f Additional Costs 3&#xa3;.2.1      ISFSI Demolition and Site Restoration              1,371                                                27          292  1,689                    1,689                                                                          15,387            80 3&#xa3;.2.2      ISFSI Area Soil f Sediment Control                    16                                                                3      20                        20                                                                            2,568 3&#xa3;.2        Subtotal Period 3f Additional Costs                1,387                                                27          295  1,709                    1,709                                                                          17,955            80 Period 3f Collateral Costs 3&#xa3;.3.1      Small tool allowance                                  20                                                                4      24                        24 3&#xa3;.3        Subtotal Period 3&#xa3; Collateral Costs                    20                                                                4      24                        24 Period 3f Period-Dependent Costs 3&#xa3;.4.1      Insurance 3&#xa3;.4.2      Property taxes                                                                                            28            4      32                        32 3f.4.3      Heavy equip;nent rental                                54                                                              11      65                        65 3&#xa3;.4.4      Plant energy budget 3&#xa3;.4.5      Security Staff Cost                                                                                      11            2      14                        14                                                                                            349 3&#xa3;.4.6      Utility Staff Cost                                                                                        69            14      83                        83                                                                                            784 3f.4        Subtotal Period 3f Period-Dependent Costs              54                                                108            32    193                      193                                                                                          1,133 TLG Services, Inc.
 
Diablo Canyon Power Plant                                                                                                                                                                                                                                                          Document POl-1648-001, Rev. 0 Decommissioning Cost Analysis                                                                                                                                                                                                                                                            Appendix E, Page 28 of 28 Table E-8 Diablo Canyon Unit 2 DECON 60 Year Decommissioning Cost Estimate (Thousands of 2011 Dollars)
Off-Site    LLRW                                        NRC      Spent Fuel      Site      Processed            Burial Volumes              Burial!              Utility and Activity                                                          Decon    Removal  Packaging  Transport    Processing  Disposal    Other    Total      Total  Lie. Term. Management  Restoration  Volume  Class A  Class B  Class C  GTCC    Processed    Craft    Contractor Index                    Activity Description                    Cost      Cost      Costs      Costs        Costs      Costs      Costs  Contingency    Costs      Costs      Costs        Costs      Cu. Feet Cu. Feet  Cu. Feet Cu. Feet  Cu. Feet  Wt.,Lbs. Manhours    Manhours 3f.0        TOTAL PERIOD 3f COST                                              1,461                                                      134          331    1,926                    1,926                                                                              17,955          1,213 PERIOD 3 TOTALS                                                              145,167      2,506          14                    9,572    80,537      54,518  292,313      14,061      72,767      205,485              1,305                        1,785    459,231    801,837      754,408 TOTAL COST TO DECOMMISSION                                          13,073  218,618      31,702      14,580                  124,490  719,711      280,493 1,402,667  1,034,886      148,940      218,842            586,268      1,732      574    1,785 51,548,980  1,686,102    6,746,173 TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:                                                  $1,402,667  thousands of 2011 dollars TOTAL NRC LICENSE TERMINATION COST IS 73.78% OR:                                                  $1,034,886  thousands of 2011 dollars SPENT FUEL MANAGEMENT COST IS 10.62% OR:                                                            $148,940  thousands of 2011 dollars NON-NUCLEAR DEMOLITION COST IS 15.6% OR:                                                            $218,842  thousands of 2011 dollars TOTAL SCRAP METAL REMOVED:                                                                            77,728 Tons TOTAL CRAFT LABOR REQUIREMENTS:                                                                    1,686102 Man-hours End Notes:
nla - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
0- indicates that this value is less than 0.5 but is non-zero.
a cell containing" - " indicates a zero value TLG Services, Inc.
 
OUTGOING CORRESPONDENCE SCREEN (Remove prior to NRC submittal)
Document:          PG&E Letter DCL-13-033
 
==Subject:==
.        Decommissioning Funding Report for Diablo Canyon Power Plant Units 1 and 2 File Location:    S:\RS\CLERICAL\DCLS - FINAL\2013 DECOMMISSIONING FUNDING REPORT\DCL-13-033.DOCX FSAR Update Review Utilizing the guidance in XI3.ID2, does the FSAR Update need to be revised? Yes [] No [X]
If "Yes", submit an FSAR Update Change Request in accordance with X13.ID2 (or if this is an LAR, process in accordance with WG-9)
Commitment #1 Statement of Commitment: None Clarification: None ARorNCR          AEorACT Tracking Document:
NAME            ORGANIZA TION CODE Assigned To:
FIRM OR TARGET  DUE DATE:
Commitment Type:
YES OR NO        IF YES, WHICH? (E.G., 2R9, 1R10, ETC.)
Outage Commitment?
YES OR NO        IF YES, LIST THE IMPLEMENTING DOCUMENTS (IF KNOWN)
PCD Commitment?
YES OR NO        IF YES, LIST PCD NUMBER (e.g., T35905, etc.)
Duplicate of New NCR Commitment in PCD?
YES OR NO        1. IF YES, LIST PCD NUMBER, AND
: 2. CLARIFY TO CLERICAL HOW COMMITMENT TO BE REVISED Old PCD Commitment being changed?
 
Target Submittal Date:    -------------------
Firm Submittal Date:                                N/AD
                                                                                                            ~tL ... &oex.
Date
: 1. References & bases identified for factual information.
: 2. Statements requiring verification identified in form RS-3.                          N/A W
: 3. Licensing Submittal Compliance Map (RS-13) completed.                              N/A~
: 4. Outgoing Correspondence Screen (RS-2) completed & commitments captured per XI4.ID1.
: 5. RS Manager's concurrence for release obtained and Phase 1 of RS-16 completed.
: 6. Record of Review Checklist completed & signed per X11.ID1 and Phase 2 of RS-16 completed.
: 7. Clerical reviews completed. Draft # - ' - -          {!b.i I~
Draft #            _ _ _1_ _-                                Final (on signatory letterhead)  ~
: 8. Peer Review Checklist (RS-4) completed.
: 9. 'PSRC Review and Signoff. Meeting # _ _ _ _ _ _ _ _ __                              N/A  }l1
: 10. Provide this checklist, the final letter & enclosures, Record of Review Checklist, &
Outgoing Correspondence Screen to signatory.                                                  -4'~
* For FIRM submittals, was 2 days met?                      Yes ~ No D            N/A D      ~
: 11. Will entire submittal, including enclosures, be placed in RS & ACTS libraries and
        . FileNet?                                                    Yes~        No D              .
If NO, complete form RS-1A, indicating where the enclosures, etc. will be maintained.
: 12. Indicate RMS access level. Check one box only.
flXI Reg    Regular
[ ] "D'!    Proprietary (Ref. 10 CFR 2.390)
[ ] "8"    Personnel Record or Security Related (Access Level S in SUPNO)
[ ] "A"    Security Safeguards Information (SSI)
* RMS folder name _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
(Le., LAR, LER, etc.)
* Put in envelope with a copy of this form attached on outside and put in SSI safe in RS Manager's office.
: 13. Scan and place a .pdf copy of this checklist (including RS-1A, if applicable), the submittal & enclosures, Record of Review Checklist, & the Outgoing Correspondence Screen as one document in RMS E-Docs (or the SSI safe, if applicable).
: 14. Deliver this checklist (including RS-1A, if applicable), original of signed submittal &
enclosures, Outgoing Correspondence Screen, & Record of Review Checklist to RS                      I Admin. Staff.                                                                                          <f , 1J
: 15. Tracking documents have been updated for submittal completion                    N/A;W-
: 16. Verify commitment entry on SAP within 15 days.                                              _ _ _ 1--_ _-1 RS-1                                                                                                      Rev. 3 - 1/22/13
 
SUBMITTAL PROCESSING CHECKLIST - Supplement Identify the enclosures, etc. (e.g., proprietary, personal, or SSI) that will NOT be filed in the RS and ACTS libraries, or EDMS, and where the. actual documents will be maintained.
Examples:              . NRC 396 forms are retained by Learning Services and the DCPP (Personal information) Medical Facility.                The diskettes are maintained by Radiation Protection.
(Diskette)
Entire Document            The complete proprietary version of this document is available in the PG&E Law Department in San Francisco.
Item                                            Location RS-1A
 
Statements Requiring Verification PG&E Letter:
 
==Subject:==
[Title]
The purpose of this form .is to document departmental concurrence regarding the accuracy and completeness of information provided for PG&E submittals to the Re.
X11.ID1 requires that all statements requiring verification be verified for submi al completeness and accuracy.
As defined in XI3.ID1, "Facility License Change Process," a statement r uJrlng verification is a regulatory submittal statement that is not contained in quality document and in which the statement is:
: 1) ' Central to the issue.
: 2)  Could influence a reviewer in the conduct  0
: 3)  Is intended to have a net positive effect.
: 4)  Is not speculative or opinionated.
Reviewer Name            St tem    Requiring Verification      SAPN-T~Sk Department/Group                                                                        Docume ting (Print)                      ement or SAPN-Task)
Verificat on RS-3                                                                                Rev. 0
 
Guidelines for Identifying Verifiable Statements
: 1) The lead licensing engineer should evaluate the content of the submittal remembering the definition of a verifiable statement and make a judgment as to the materiality of each statement.
Statements which should be verified will usually meet the following criteria:
a)  The statement is central to the issue.
b)  The statement could influence a reviewer in the conduct of regulatory responsibilities.
c)  The statement is intended to have a net positive effect.
d)  The statement is not speculative or opinionated.
: 2) The lead licensing engineer should annotate (e.g., underline, high-light, bold text, uniquely number, etc.) "verifiable statements" in the submittal. The lead licensing engineer must be careful to distinguish between a factual statement and a verifiable statement. For instance, it is usual for submittals to contain an introductory section describing the history of the issue in order to place the submittal in context for the reader. While the historical perspective is factual, it is usually not material and could be omitted without affecting the purpose of the submittal. The lead licensing engineer should make an effort to identify the core of the PG&E's position that a regulatory reviewer would use to decide an issue.
: 3) Certain statements, while factual, may also be excluded from the verification process. These include:
a)  Statements describing intermediate steps of logical progression if the endpoint must depend on the preceding steps for instance, "PG&E submitted a request to change the TS governing operation with DGs out-of-service. The changes were approved in Amendment 5 to the operating license." In this case the submittal of a TS change request must occur in order to obtain an amended TS. It is NOT necessary to verify the TS change request submittal. Only the endpoint (the newTS) should be verified.
b)  Statements of opinion for instance, "Based on the preceding discussion, PG&E believes that..."
While opinions may be important to the resolution of an issue, they are a matter of interpretation.'
The key supporting facts leading to the opinion, however, may require verification.
c)  Statements that simply reiterate statements contained in NRC documents.
d)  Statements of planned actions, although material, do not have to be verified when a separately controlled commitment tracking process is in place.
: 4) A paragraph that has more than one material aspect may be broken down to ensure that each individual aspect is verified. Several verification references may be required to address a single paragraph.
RS-3                                                                                                    Rev. 0
 
Licensing Submittal Compliance Map
'G&E Letter:
 
==Subject:==
{Title]
The purpose of this form is to document compliance mapping to all aspects of the current licensing basis All compliance mapping and technical information providectto licensing for use in the LAR shall be verified or accuracy by the nuclear generation section providing the information.
* XI3.ID1, "Facility License Cha e Process," contains the procedural requirements for this form.
Licensing              Licensing            Means of Establishing            Complia ce
* SAPN-Task Source              Requirement                  Compliance to              Imple nting Document                                    Licensin Re uirement . Do ment Rev. 0
 
DCPP Form 69-20996 (06/25/12)                                                                    XI1.1D1 Attachment 2 Page 1 of 1 Regu latory Submittal - Record of Review Checklist D N/A Primary Reviewers                                                                            Comments          Resolved Yes      No    Yes      No
                                                                                                              ~
1 Lead Technical Reviewer:                                                                    ~      D                D 1
Lead Technical Manager:                                                                      D      D        D      D Director Review: 1, 2                                                                        ~      D        ~      D 1
Submittal Lead Management:                                                                  ~      D        ~      D 1
Independent Technical Reviewer:                                                              12      D        ~      D Cross Discipline R'eviewer(s):                                                              D      D        D      D D        Operations:                                                                        D      D        D      D D        Maintenance:                                                                      D      D        D      D D        Engineering:                                                                      D      D        D      D D        Site Services:                                                                    D      D        D      D D        Quality:                                                                          D      D        D      D
~                                                                                            D      ~        D      D D                                                                                            D      D        D      D D                                                                                            D      D        D      D M                                                                                            ~      D        ~      D
~                                                                                            ~      D        ~      D m                                                                                            Ikr    D        H      D Secondary Reviewers                                                                          Comments          Resolved Yes      No      Yes      No g          ~~8 StnieS                                                                        ~
D D
D
                                                                                                              ~
D D
D D                                                                                            D      D        D      D D                                                                                            D      D        D      D D                                                                                            D      D        D      D D                                                                                            D      D        D      D D                                                                                            D      D        D      D I have reviewed and verified that all statements of fact in the submittal are correct.
(Mark N/A and attach a copy of e-mail if documentation of ITR is electronic.)3                                $'N/A Independent Technical Reviewer(s):          Se.e.,      cxtlnc1e&. emC1\' ) fuM              Date: ~
r,R.            ~ 3J~?h'3 e. 11:13                    Date:      ~
r    I Concurrence has been received from prim ry reviewers. Technical comments have been resolved.
The independent tech reviewer has rev.Y..,I;*Il:i"'YoIIS~'C\~      (n - ditorial) changes to the sUbmitta~        I Lead Licensing Engineer:        --~~~~~iilCi~~ '-..IooL..._________                                Date:  ~?jI3 These reviewers are considered to be the minimum required primary reviewers for submittals not containing an oath or affirmation or requiring PSRC review. Regulatory Services Manager approval is required to not obtain the review from any of these reviewers.
2 Director review is satisfied if the submittal undergoes a review by the PSRC.
Attach a table of "statements requiring verification" and ITR approvals.
69-20996.DOC 0625.1421
 
Landreth, Will From:                      Winterton, Brooke Sent:                      Wednesday, March 27, 2013 11 :23 AM To:                        Landreth, Will Cc:                        Kapus, Robert
 
==Subject:==
RE: Phase 2 Review: Decommissioning Funding Report for DCPP Units 1 & 2
: Will, I have reviewed and verified that all statements of fact in the submittal are correct for the DCPP Units 1 & 2 Report.
: Thanks, Brooke From: Landreth, Will Sent: Tuesday, March 26, 2013 3:46 PM To: Summy, Jeff; Corippo, Peter; Baldwin, Thomas (DCPP); Padovan, Mark; Post, Jennifer (Law); Winterton, Brooke; Kapus, Robert Cc: Sokolsky, David
 
==Subject:==
Phase 2 Review: Decommissioning Funding Report for DCPP Units 1 & 2
: All, lAW X11.1D1, Section 5.2.7, please participate in this Phase 2 Review by reviewing the attached documents and providing your comments back to me no later than 1600, tomorrow, Wednesday, March 27, 2013. This Decommissioning Funding Report is due to the NRC on April 1, 2013 in accordance with 10 CFR 50.75(f).
Please provide your comments or state that you have no comments.
: Brooke, Please perform an ITR (contact me with any questions about this role). Once complete and you are satisfied with the technical content of this submittal, please simply reply with the following statement if you have no comments: "I have reviewed and verified that all statements of fact in the submittal are correct." Otherwise, please reply with your comments.
Lead Technical Reviewer:
Bob Kapus Lead Technical Manager:
Tom Baldwin Independent Technical Reviewer:
Brooke Winterton Primary Reviewers:
Jeff Summy Tom Baldwin 1
 
Mark Padovan Jennifer Post Peter Corippo Secondary Reviewers:
David Sokolsky Will Landreth Thank you all very much for your time and support for the 2013 DCPP Decommissioning Funding Report!
Will Landreth Regulatory Services Engineer Pacific Gas & Electric Company Diablo Canyon Power Plant PO Box 56, Mailstop 104j5j23A Avila Beach, CA 93424 Phone: 805-545-6980 Email: wrl8@pge.com 2
 
PEER REVIEW CHECKLIST LICENSING SUBMITTAL (To be performed on final draft only.)
*1 PG&E letter No. (e.g.,Oel, Oil, etc.)                            peL 033 ITEM                                          DESCRIPTION                                  INITIALS*
Cover Letter    Correct signatory letterhead (Ref. X11.1D2)
Names spelled correctly and agree with attachments; Full names used for signatory & cc list; right people listed Title correct I'
Letter number verified against outgoing correspondence log Letter number appears on all pages Enclosure(s) - the word is correctly placed on the cover letter if required.
All pages numbered, except first page Date correct and appears on all pages (month, day, and year)
Address and docket number(s) correct Text reviewed for obvious errors TS and/or 10 CFR references correct If affidavit required or NOV response, verify Law Department has reviewed All Submittals    T ext reviewed for obvious errors Revision bars included (if applicable)
TS and/or 10 CFR references correct References to other documents correct (e.g., DCLs, FSAR, etc.)
Submittal addresses the specific regulation requirements Enclosures labeled and signed as appropriate Outgoing      Letter number and title correct Corres pondence    FSAR Update Review - one box checked.
Screen (RS-2)      Commitment implemented before or after LA receipt (LARs/RAls only)
Commitment(s) quoted verbatim (& clarifications made if needed)
Tracking Document - SAPN / Task / Order / Operation                              ,I Assigned To - Name & Organization Code Commitment Type - Firm or Target & Due Date                                    I Outage Commitment - Y or N indicator & Applicable Outage PCD Commitment - Y or N indicator & Implementing Documents                          tV LER Forms      LER number correct; consistent with cover letter (NRC Form 366)      LER number & docket number(s) on first & remaining pages (NRC Form 366a)      Title consistent with cover letter & Outgoing Correspondence Screen (RS-2) .
Dates correct on first page header (month, day, & year)
Dates & times consistent with 10 CFR 50.72 ENS reports made Dates & times consistent with other source documents                                I I
Dates & times consistent between abstract and narrative Page numbers correct & all pages accounted for Abstract word count lAW NRC Form 366 IEEE 803 codes entered and correct                                              " V Procedure Submittals  Procedure revision numbers current using EDMS (e.g., EPIP)
Filing Instructions Filing instructions clear (Per RS-1 A, if applicable)
ROR Checklist      Record of Review Checklist completed and signed Final Draft    All discrepancies resolved with Lead Licensing Engineer
* Enter N/A where not applicable.
I have reviewed this submittal for t e items initialed above. This submittal is ready for the signatory.
(}1/ZS/;)
Date RS-4
 
OUTGOING CORRESPONDENCE SCREEN (Remove prior to NRC submittal)
Document:          PG&E Letter DCL-13-0XX
 
==Subject:==
Decommissioning Funding Report for Diablo Canyon Power Plant Units 1 and 2 File Location:    S:\RS\CLERICAL\DCLS - DRAFn2013 DECOMMISSIONING FUNDING REPORT\DCL-13-0XX, DECOMMISSIONING FUNDING REPORT.DOCX FSAR Update Review Utilizing the guidance in XI3.ID2, does the FSAR Update need to be revised? Yes [] No [X]
If "Yes", submit an FSAR Update Change Request in accordance with X13.ID2 (or if this is an LAR, process in accordance with WG-9)
Commitment #1 Statement of Commitment: None Clarification: None ARorNCR          AEorACT Tracking Document:
NAME            ORGANIZA TlON CODE Assigned To:
FIRM OR TARGET  DUE DATE:
Commitment Type:
YES OR NO        IF YES, WHICH? (E.G.,2R9, 1R10, ETC.)
Outage Commitment?
YES OR NO        IF YES, LIST THE IMPLEMENTING DOCUMENTS (IF KNOWN)
PCD Commitment?
YES OR NO        IF YES, LIST PCD NUMBER (e.g., T35905, etc.)
Duplicate of New NCR Commitment in PCD?
YES OR NO        1. IF YES, LIST PCD NUMBER, AND
: 2. CLARIFY TO CLERICAL HOW COMMITMENT TO BE REVISED Old PCD Commitment being changed?}}