{{#Wiki_filter:~r,     gc CE~ RATED           Dl AUBUTlON                          DE CONSTRION               SY) TEM if REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:~r, gc CE~ RATED DlAUBUTlON DE CONSTRION SY) TEM if REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903150005                           DOC.DATE: 89/03/06     NOTARIZED: NO           DOCKET g FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                           & Light   Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power                         & Light   Co. 05000389 AUTH. NAME             AUTHOR AFFILIATION CONWAY,W.F.           Florida                   Power & Light Co.
ACCESSION NBR:8903150005 DOC.DATE: 89/03/06 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document                       Control Desk)
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Responds       to NRC                 Bulletin 88-011, "Pressurizer Surge Line Thermal   Stratification."
Responds to NRC Bulletin 88-011, "Pressurizer Surge Line Thermal Stratification."
DISTRIBUTION CODE: IE11D                         COPIES RECEIVED:LTR       ENCL     SIZE:
DISTRIBUTION CODE:
TITLE:   Bulletin   Response                   (50 DKT)
IE11D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Bulletin Response (50 DKT)
NOTES':
NOTES':
RECIPIENT                         COPIES          RECIPIENT          COPIES ID CODE/NAME                       LTTR ENCL      ID  CODE/NAME        LTTR ENCL            h PD2-2 LA                               1    0    PD2-2 PD                1      1 NORRIS,J                               1    1                                                ,D INTERNAL: AEOD/DOA                                   1    1    AEOD/DSP/TPAB            1    1 NRR/DEST/ADE 8H                         1    1    NRR/DEST/ADS 7E          1     1 NRR/DEST/MEB 9H                        1    1    NRR/DOEA/EAB 1 1       1      1 '
DOCKET g 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: AEOD/DOA NRR/DEST/ADE 8H NRR/DEST/MEB 9H
                'RR DOEA/GCB 11                          1    1    NRR/DREP/EPB 10               1 LRB12                      1    1    NUDOCS-ABSTRACT         1      1 EG FILE        02                    1    1    RES/DSIR/EIB           1     1 RG        ILE 01                        1     1 EXTERNAL: LPDR                                      1     1     NRC PDR                1     1 NSIC                                    1     1 NCTE 10 ALL "RIDS" RECIPZENIS'LEASE HELP US 'IO REDUCE WASTE!               CXNZACT 'IHE DOCUMENI'GVZROL DESK, KCH Pl-37 (EXT. 20079)                 TO ELDGZATE YOUR NAME FRY DISTRIBUTION LISTS H)R DOCUMENTS YOU DGN'T HEED!
'RR DOEA/GCB 11 LRB12 EG FILE 02 RG ILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR                           19   ENCL     18
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DEST/ADS 7E NRR/DOEA/EAB 1 1 NRR/DREP/EPB 10 NUDOCS-ABSTRACT RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 '
1 1
1 1
1 1
1 h
,D NCTE 10 ALL "RIDS" RECIPZENIS'LEASE HELP US 'IO REDUCE WASTE!
CXNZACT 'IHE DOCUMENI'GVZROL DESK, KCH Pl-37 (EXT. 20079)
TO ELDGZATE YOUR NAME FRY DISTRIBUTION LISTS H)R DOCUMENTS YOU DGN'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 18


P.O. Box14000, Juno Beach, FL 33408-0420 MARCH       6 1989 L-89-82 U. S.       Nuclear Regulatory Commission Attn:         Document Control Desk Washington, D. C.                       20555 Gentlemen:
P.O. Box14000, Juno Beach, FL 33408-0420 MARCH 6
Re:       St. Lucie Units               1 and 2 Docket Nos. 50-335 and 50-389 Response         to     NRC Bulletin No. 88-11 Pressurizer Sur               e Line Thermal Stratification As   requested             by the subject       NRC Bulletin, the purpose of this letter is to inform the staff of actions taken to resolve NRC concerns associated with the issue of pressurizer surge line
1989 L-89-82 U. S. Nuclear Regulatory Commission Attn:
'thermal stratification. The Combustion Engineering Owners Group (CEOG) became aware of this issue in April 1987 when INPO issued a draft SER on surge line thermal cycling observed in a German nuclear plant. The CEOG proceeded to initiate a data collection program in June 1987 followed by actual data collection activities at two CEOG plants in June and August 1988.
Document Control Desk Washington, D.
In October 1988, the CEOG authorized the ongoing CEOG program "Reduction and Analysis of Pressurizer Surge Line Data Collected from CEOG Plants", to address surge line thermal stratification concerns.           NRC Bulletin 88-11 was subsequently issued in December 1988. Action No. 1.b requested that, within four months of receipt of the Bulletin, licensees of plants in operation over ten years demonstrate that the pressurizer surge line meets the applicable design codes and other regulatory commitments for the licensed life of the plant. The Staff suggested that this could be accomplished by performing a plant specific or generic bounding analysis.
C.
20555 Gentlemen:
Re:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389
 
===Response===
to NRC Bulletin No. 88-11 Pressurizer Sur e Line Thermal Stratification As requested by the subject NRC Bulletin, the purpose of this letter is to inform the staff of actions taken to resolve NRC concerns associated with the issue of pressurizer surge line
'thermal stratification.
The Combustion Engineering Owners Group (CEOG) became aware of this issue in April 1987 when INPO issued a draft SER on surge line thermal cycling observed in a German nuclear plant.
The CEOG proceeded to initiate a data collection program in June 1987 followed by actual data collection activities at two CEOG plants in June and August 1988.
In October
: 1988, the CEOG authorized the ongoing CEOG program "Reduction and Analysis of Pressurizer Surge Line Data Collected from CEOG Plants",
to address surge line thermal stratification concerns.
NRC Bulletin 88-11 was subsequently issued in December 1988.
Action No. 1.b requested that, within four months of receipt of the Bulletin, licensees of plants in operation over ten years demonstrate that the pressurizer surge line meets the applicable design codes and other regulatory commitments for the licensed life of the plant.
The Staff suggested that this could be accomplished by performing a plant specific or generic bounding analysis.
Licensees of plants in operation less than ten years were requested to complete the analysis within one year.
Licensees of plants in operation less than ten years were requested to complete the analysis within one year.
            ]~iOOOb WP F Ij:t A                                                                                                   gg(J an fPL Grou,". conloui.,
]~iOOOb F Ij:t WP A
gg(J an fPL Grou,". conloui.,


U. S. Nuclear Regulatory .Commission L-89-82 Page two The NRC Staff and the CEOG met on February 13, 1989. During this meeting, the CEOG presented the goals and-scope of the ongoing GEOG surge line program which included a presentation of actual plant data and a discussion on the issue of thermal striping. The CEOG then requested relief from the four month/one year schedule requirement in Requested Action 1.b and suggested that the CEOG program be allowed to proceed as scheduled.
U. S. Nuclear Regulatory.Commission L-89-82 Page two The NRC Staff and the CEOG met on February 13, 1989.
During this meeting, the CEOG presented the goals and-scope of the ongoing GEOG surge line program which included a presentation of actual plant data and a discussion on the issue of thermal striping.
The CEOG then requested relief from the four month/one year schedule requirement in Requested Action 1.b and suggested that the CEOG program be allowed to proceed as scheduled.
As a result of this meeting, the CEOG and NRC Staff agreed on
As a result of this meeting, the CEOG and NRC Staff agreed on
.several action items to be completed as follows:
.several action items to be completed as follows:
The CEOG will perform a preliminary bounding evaluation of CEOG surge lines using actual data collected from CEOG plants by July 1, 1989. This activity will address the intent of Requested   Action 1.b.
The CEOG will perform a preliminary bounding evaluation of CEOG surge lines using actual data collected from CEOG plants by July 1, 1989.
: 2. Actual plant data will be used to define loading conditions for input to the fatigue and 'stress evaluations.
This activity will address the intent of Requested Action 1.b.
: 3. The CEOG agreed to meet with NRC staff to discuss the load definitions prior to finalizing the bounding analysis described in item 1 above.
2.
Florida Power & Light Company is participating in the CEOG program for St. Lucie Units 1 and 2 and agrees to support the above action items and alternative schedule for responding to NRC Bulletin 88-11 Action 1.b.       Reporting Requirement 2 in the Bulletin is considered to be appropriately addressed by this letter.
Actual plant data will be used to define loading conditions for input to the fatigue and 'stress evaluations.
3.
The CEOG agreed to meet with NRC staff to discuss the load definitions prior to finalizing the bounding analysis described in item 1 above.
Florida Power
& Light Company is participating in the CEOG program for St. Lucie Units 1 and 2 and agrees to support the above action items and alternative schedule for responding to NRC Bulletin 88-11 Action 1.b.
Reporting Requirement 2
in the Bulletin is considered to be appropriately addressed by this letter.
Very truly yours, p+zc~~
Very truly yours, p+zc~~
W. F. Co   y Senior V'     President Nuclear WFC/MSD/re cc:   Stewart D. Ebneter, Regional Administrator, Region   II, USNRC                                       I Senior Resident Inspector, USNRC, St. Lucie Plant}}
W. F.
Co y
Senior V' President Nuclear WFC/MSD/re cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC I
Senior Resident Inspector, USNRC, St. Lucie Plant}}

Latest revision as of 14:33, 8 January 2025

Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Ongoing Surge Line Program to Collect Data from Plants Authorized.Nrc Agreed on Listed Action Items to Be Completed Based on Program
ML17222A705
Person / Time
Site: Saint Lucie  
Issue date: 03/06/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, L-89-82, NUDOCS 8903150005
Download: ML17222A705 (3)


Text

~r, gc CE~ RATED DlAUBUTlON DE CONSTRION SY) TEM if REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903150005 DOC.DATE: 89/03/06 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC Bulletin 88-011, "Pressurizer Surge Line Thermal Stratification."

DISTRIBUTION CODE:

IE11D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response (50 DKT)

NOTES':

DOCKET g 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: AEOD/DOA NRR/DEST/ADE 8H NRR/DEST/MEB 9H

'RR DOEA/GCB 11 LRB12 EG FILE 02 RG ILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DEST/ADS 7E NRR/DOEA/EAB 1 1 NRR/DREP/EPB 10 NUDOCS-ABSTRACT RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 '

1 1

1 1

1 1

1 h

,D NCTE 10 ALL "RIDS" RECIPZENIS'LEASE HELP US 'IO REDUCE WASTE!

CXNZACT 'IHE DOCUMENI'GVZROL DESK, KCH Pl-37 (EXT. 20079)

TO ELDGZATE YOUR NAME FRY DISTRIBUTION LISTS H)R DOCUMENTS YOU DGN'T HEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 18

P.O. Box14000, Juno Beach, FL 33408-0420 MARCH 6

1989 L-89-82 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389

Response

to NRC Bulletin No. 88-11 Pressurizer Sur e Line Thermal Stratification As requested by the subject NRC Bulletin, the purpose of this letter is to inform the staff of actions taken to resolve NRC concerns associated with the issue of pressurizer surge line

'thermal stratification.

The Combustion Engineering Owners Group (CEOG) became aware of this issue in April 1987 when INPO issued a draft SER on surge line thermal cycling observed in a German nuclear plant.

The CEOG proceeded to initiate a data collection program in June 1987 followed by actual data collection activities at two CEOG plants in June and August 1988.

In October

1988, the CEOG authorized the ongoing CEOG program "Reduction and Analysis of Pressurizer Surge Line Data Collected from CEOG Plants",

to address surge line thermal stratification concerns.

NRC Bulletin 88-11 was subsequently issued in December 1988.

Action No. 1.b requested that, within four months of receipt of the Bulletin, licensees of plants in operation over ten years demonstrate that the pressurizer surge line meets the applicable design codes and other regulatory commitments for the licensed life of the plant.

The Staff suggested that this could be accomplished by performing a plant specific or generic bounding analysis.

Licensees of plants in operation less than ten years were requested to complete the analysis within one year.

]~iOOOb F Ij:t WP A

gg(J an fPL Grou,". conloui.,

U. S. Nuclear Regulatory.Commission L-89-82 Page two The NRC Staff and the CEOG met on February 13, 1989.

During this meeting, the CEOG presented the goals and-scope of the ongoing GEOG surge line program which included a presentation of actual plant data and a discussion on the issue of thermal striping.

The CEOG then requested relief from the four month/one year schedule requirement in Requested Action 1.b and suggested that the CEOG program be allowed to proceed as scheduled.

As a result of this meeting, the CEOG and NRC Staff agreed on

.several action items to be completed as follows:

The CEOG will perform a preliminary bounding evaluation of CEOG surge lines using actual data collected from CEOG plants by July 1, 1989.

This activity will address the intent of Requested Action 1.b.

2.

Actual plant data will be used to define loading conditions for input to the fatigue and 'stress evaluations.

3.

The CEOG agreed to meet with NRC staff to discuss the load definitions prior to finalizing the bounding analysis described in item 1 above.

Florida Power

& Light Company is participating in the CEOG program for St. Lucie Units 1 and 2 and agrees to support the above action items and alternative schedule for responding to NRC Bulletin 88-11 Action 1.b.

Reporting Requirement 2

in the Bulletin is considered to be appropriately addressed by this letter.

Very truly yours, p+zc~~

W. F.

Co y

Senior V' President Nuclear WFC/MSD/re cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC I

Senior Resident Inspector, USNRC, St. Lucie Plant