{{#Wiki_filter:REGULATORY                 NFORMATION DISTRIBUTION SY       EM (RIDS)
{{#Wiki_filter:REGULATORY NFORMATION DISTRIBUTION SY EM (RIDS)
ACCESSION NBR: 8012050085                       DOC ~ DATE! 8g/12/03   NOTARIZED:   NO         DOCKET FACIL:STN-50-528 Palo Verde.,Nuclear Stationi Unit                         1~ Arizona Publi     05000528 AUTH+ NAME             AUTHOR AFFILIATION VAN.BRUNTiE.E.         Arizona Public Service Co, RECIP ~ iVAME         RECIPIENT AFFILIATION KNIGHTONg G ~ Ii ~         Licensing Branch               3
ACCESSION NBR: 8012050085 DOC ~ DATE! 8g/12/03 NOTARIZED:
NO DOCKET FACIL:STN-50-528 Palo Verde.,Nuclear Stationi Unit 1~ Arizona Publi 05000528 AUTH+NAME AUTHOR AFFILIATION VAN.BRUNTiE.E.
Arizona Public Service Co, RECIP ~ iVAME RECIPIENT AFFILIATION KNIGHTONg G ~ Ii ~
Licensing Branch 3


==SUBJECT:==
==SUBJECT:==
Informs of addition of                   PJ McGuire- to corporate    staff, Resume encl, DISTRIBUTION CODE: 8001D TITLE: Licensing Submittal: PSAR/FSAR Amdts COPIES RECEIVED:LTR 8,
Informs of addition of PJ McGuire-to
ENCL   . SIZE; Related Correspondence NOTES;Standardized        plant            ~                                                    05000528 RECIPIENT                       COPIES            RECIPIENT            COPIES ID CODE/NAME                     LTTR ENCL      ID CODE/NAME          LTTR ENCL NRR/DL/ADL                                 0    NRR L83 BC                1    0 NRR L83 LA                           1      0    LICITRAgE        01      1    1 INTERNAL; ACRS                 01                 6      6    ADM/LFMB                  1    0 ELD/HDS3                             1      0    IE FILE                  1    1 IE/DEPER/EPB                         1      1    IE/DEPER/IRB 35          1    1 SIP/QA 82136"'E/DQA NRR  ROEgMiL NRR/DE/AEAB NRR/DE/EHEB 1
: encl, DISTRIBUTION CODE:
8001D COPIES RECEIVED:LTR TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8,
NOTES;Standardized plant ~
corporate staff, Resume ENCL.
SIZE; Related Correspondence 05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L83 LA INTERNAL; ACRS 01 ELD/HDS3 IE/DEPER/EPB 36"'E/DQA SIP/QA 821 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32'RR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 AB 22'EG FI 04 DAMI/MIB EXTERNAL: BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02'TIS COPIES LTTR ENCL 0
1 0
6 6
1 0
1 1
1 1
1 0
1 2
2 1
1 1
1 1
1 1
1 1
0 1
0 1
NRR/DE/CEB NRR/DE/EQB ll 13 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR L83 BC LICITRAgE 01 ADM/LFMB IE FILE IE/DEPER/IRB 35 NRR ROEgMiL NRR/DE/CEB ll NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBCO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DS I/RSB 23 RGN5 DMB/DSS'AMDTS)
LPDR 03 NSIC 05 PNL GRUELiR COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 1
1 1
1 2
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
2 NRR/DE/GB        28                  2      2    NRR/DE/MEB      18      1    1 NRR/DE/MTEB 17                      1      1    NRR/DE/SAB      24      1    1 NRR/DE/SGEB 25                      1      1    NRR/DHFS/HFEBCO          1    1 NRR/DHFS/LQB                        1      1    NRR/DHFS/PSRB            1    1 32'RR/DL/SSPB 1      0    NRR/DS I/AEB 26          1    1 NRR/DS I/ASB                        1      1    NRR/DSI/CPB 10            1    1 NRR/DSI/CSB 09                              1    NRR/DSI/ICSB 16          1    1 NRR/DSI/METB 12                            1    NRR/DSI/PSB 19            1    1.
1.
AB                      1      1    NRR/DS I/RSB    23      ,1   1 FI 22'EG 04                        1    RGN5                      3 DAMI/MIB                        1     0 EXTERNAL: BNL(AMDTS ONLY)                                1     DMB/DSS'AMDTS)                1 FEMA REP DIV 39                      1      1    LPDR            03            1 NRC  PDR                            1      1    NSIC            05            1 PNL GRUELiR 02'TIS 1      1                                    1 TOTAI NUMBER OF COPIES                     REQUIRED: LTTR     5e   ENCL   46
,1 1
3 1
1 1
1 TOTAI NUMBER OF COPIES REQUIRED:
LTTR 5e ENCL 46


4                     1         , ~
4 1
I I gaff                   I rt h
,~
1
I I
                            'I                  II
gaff
                                                                      ~             ~ II V
'I I
h     II II, I                                                                ~l
rt 1
"'> 1'1         II                                             II >                           s "II t.
II V
lf                                                       ll',
h II
rr I
~
Irr 1
~
h                                                        II Id%
II h
"'> 1'1 II II, I II >
~l s
"II t.
lf 1
rr ll',
I Irr Id%
J.'>
J.'>
tl   h I     ')jg I r rr I
h II tl h
Il
I
                              'T     h I
')jg I
r rr I Il
'T h
I


Arizona Public Service Company ANPP-31296-EEVB/WFQ December 3, 1984 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.         20555
Arizona Public Service Company Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ANPP-31296-EEVB/WFQ December 3,
1984


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station     (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Addition of Corporate Advisor Docket No. STN 50-528 File: 84-056-026'.1.01.10
Unit 1
Addition of Corporate Advisor Docket No.
STN 50-528 File:
84-056-026'.1.01.10


==Dear Mr. Knighton:==
==Dear Mr. Knighton:==
This letter is to inform you of the addition of Mr. Paul J. McGuire to the APS Corporate Staff for PVNGS.
Mr. McGuire was hired as a full time APS employee effective August 15, 1984 and reports directly to me in an advisor capacity.
Mr. McGuire's function is to provide assistance and consultation to APS corporate management in nuclear management.
Attached please find a copy of the resume'or Mr. McGuire.
Because of his extensive background and experience in managing the operation of nuclear facilities, I believe that the addition of Mr. McGuire significantly enhances our organization by bringing nuclear oper'ational perspectives to our corporate staff. I believe this is a positive move for, the successful operation of Palo Verde. It is my intention that such an advisor will be used on the Palo Verde corporate staff until we gain additional experience in direct nuclear operation management.
If you have any questions, please contact me.
Very truly yours, APS Vice President Nuclear Production ANPP Project Director EEVB/WFQ/mb Attachment cc: A. C. Gehr D. B. Karner R. P.
Zimmerman 8412050085 841203 PDR ADQCK 05000528 H
PDR


This  letter is to inform  you  of the addition of Mr. Paul J. McGuire to the APS  Corporate Staff  for  PVNGS. Mr. McGuire was hired as a full time APS employee effective August 15, 1984 and reports directly to me in an advisor capacity. Mr. McGuire's function is to provide assistance and consultation to APS corporate management in nuclear management.
~
Attached please find  a copy of the resume'or Mr. McGuire. Because of his extensive background and experience in managing the operation of nuclear facilities, I believe that the addition of Mr. McGuire significantly enhances our organization by bringing nuclear oper'ational perspectives to our corporate staff. I believe this is a positive move for, the successful operation of Palo Verde. It is my intention that such an advisor will be used on the Palo Verde corporate staff until we gain additional experience in direct nuclear operation management.
C
If you  have any questions,  please contact me.
\\
Very  truly yours, APS  Vice President Nuclear Production ANPP  Project Director EEVB/WFQ/mb Attachment cc: A. C. Gehr D. B. Karner R. P. Zimmerman 8412050085 841203 PDR ADQCK 05000528 H                  PDR
~
 
~
      ~ C
    \
~ ~


PAUL J. McGUIRE PVNGS OPERATIONS ADVISOR SALARY Seventeen   years of management experience, in a broad range of posi'tions, involving construction, startup, operations, engineering and project management. Thirteen years in nuclear power and four years fossil power.
PAUL J.
EXPERIENCE ARIZONA PUBLIC SERVICE COMPANY (1984 TO PRESENT) 08/84-Present         Provide assistance and consultation to APS Corporate Management   in the day to day decision making, concerning PVNGS Operations Management.
McGUIRE PVNGS OPERATIONS ADVISOR SALARY Seventeen years of management experience, in a broad range of posi'tions, involving construction,
UNITED ENERGY SERVICES CORPORATION (1981 TO 1984) 03/84-08/84           Involved in the preparation and review of the APS Nuclear Administrative Policies and Procedures Manual.
: startup, operations, engineering and project management.
ll/82-03/84           Management consultant       to the Plant Manager at the Shoreham Nuclear Power       Plant involved in operational readiness     review     of     operations,     maintenance,
Thirteen years in nuclear power and four years fossil power.
                    ,engineering, licensing,     and health   physics. Developed systematic approach   to plant completion.
EXPERIENCE ARIZONA PUBLIC SERVICE COMPANY (1984 TO PRESENT) 08/84-Present Provide assistance and consultation to APS Corporate Management in the day to day decision
06/81-11/82           Management   consultant to the Plant Manager and Vice President     at waterford       III, involved in the development   of management   controls,   plant staffing and training.
: making, concerning PVNGS Operations Management.
NOTE:   Vice President, Secretary and Board of Directors Member for United Energy Services Corporation BOSTON EDISON COMPANY     (1976 TO 1981) 09/80-06/81           Assigned to the     Institute of Nuclear Power Operations as a   Evaluation   Team Manager.     Involved with three utility   evaluations   as   well as   development of the evaluation   criteria.
UNITED ENERGY SERVICES CORPORATION (1981 TO 1984) 03/84-08/84 Involved in the preparation and review of the APS Nuclear Administrative Policies and Procedures Manual.
06/76-09/80         Plant Manager of the Pilgrim Nuclear Power Station responsible     for. the operation, maintenance,           and modification of the plant.
ll/82-03/84 Management consultant to the Plant Manager at the Shoreham Nuclear Power Plant involved in operational readiness review of operations, maintenance,
,engineering, licensing, and health physics.
Developed systematic approach to plant completion.
06/81-11/82 Management consultant to the Plant Manager and Vice President at waterford
: III, involved in the development of management
: controls, plant staffing and training.
NOTE:
Vice President, Secretary and Board of Directors Member for United Energy Services Corporation BOSTON EDISON COMPANY (1976 TO 1981) 09/80-06/81 Assigned to the Institute of Nuclear Power Operations as a
Evaluation Team Manager.
Involved with three utility evaluations as well as development of the evaluation criteria.
06/76-09/80 Plant Manager of the Pilgrim Nuclear Power Station responsible for.
the operation, maintenance, and modification of the plant.


    ~ ~ ~ c n
~~
~
c n
f
f


Paul J. McGuire Page Two I
Paul J. McGuire Page Two I
GENERAL ELECTRIC 'COMPANY           (1971 TO 1976) 09/75-06/76         Project Manager for first time refueling outages at four utilities', responsible for planning, organizing, scheduling and work completion.
GENERAL ELECTRIC 'COMPANY (1971 TO 1976) 09/75-06/76 Ol/75-09/75 Project Manager for first time refueling outages at four utilities', responsible for planning, organizing, scheduling and work completion.
Ol/75-09/75        Project'anager for the placement of safety-related piping     at   two             Japanese     utilities including engineering, fabrication, installation and testing.
Project'anager for the placement of safety-related piping at two Japanese utilities including engineering, fabrication, installation and testing.
03/72-01/75       -Startup of the Cooper. Nuclear Station as a Shift Supervisor during phases of construction,'tartup and power ascension. SRO         certified.
03/72-01/75
12/71-03/72         Training at the Dresden Nuclear Station involved in simulator activities. SRO certified.
-Startup of the Cooper.
NUS CORPORATION   (1970         TO 1971) 11/70-12/71         Startup of the Peach Bottom                   II   Nuclear Station, involved in the preoperational               testing of both the NSSS and Balance of Plaqt.'ONG ISLAND LIGHTING COMPANY (1967 TO 1970) 06/67-11/70         Responsible   for fossil plant operations, instrument and controls, and maintenance, as well as the startup of a fossil unit. Positions held included Maintenance Engineer, Results Engineer and Operations Engineer.
Nuclear Station as a
Shift Supervisor during phases of construction,'tartup and power ascension.
SRO certified.
12/71-03/72 Training at the Dresden Nuclear Station involved in simulator activities.
SRO certified.
NUS CORPORATION (1970 TO 1971) 11/70-12/71 Startup of the Peach Bottom II Nuclear
: Station, involved in the preoperational testing of both the NSSS and Balance of Plaqt.'ONG ISLAND LIGHTING COMPANY (1967 TO 1970) 06/67-11/70 Responsible for fossil plant operations, instrument and controls, and maintenance, as well as the startup of a fossil unit.
Positions held included Maintenance
: Engineer, Results Engineer and Operations Engineer.
EDUCATION B.S. in Mechanical Engineering, 1967 M.S. in Nuclear Engineering, 1971
EDUCATION B.S. in Mechanical Engineering, 1967 M.S. in Nuclear Engineering, 1971


P g     '
P g
1 r
1 r
    ,A r'
,A r'
          'f t>         I}}
'f t>
I}}

Latest revision as of 03:33, 8 January 2025

Informs of Addition of Pj McGuire to Corporate Staff.Resume Encl
ML17298B558
Person / Time
Site: Palo Verde 
Issue date: 12/03/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-31296-EEVB, NUDOCS 8412050085
Download: ML17298B558 (8)


Text

REGULATORY NFORMATION DISTRIBUTION SY EM (RIDS)

ACCESSION NBR: 8012050085 DOC ~ DATE! 8g/12/03 NOTARIZED:

NO DOCKET FACIL:STN-50-528 Palo Verde.,Nuclear Stationi Unit 1~ Arizona Publi 05000528 AUTH+NAME AUTHOR AFFILIATION VAN.BRUNTiE.E.

Arizona Public Service Co, RECIP ~ iVAME RECIPIENT AFFILIATION KNIGHTONg G ~ Ii ~

Licensing Branch 3

SUBJECT:

Informs of addition of PJ McGuire-to

encl, DISTRIBUTION CODE:

8001D COPIES RECEIVED:LTR TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8,

NOTES;Standardized plant ~

corporate staff, Resume ENCL.

SIZE; Related Correspondence 05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L83 LA INTERNAL; ACRS 01 ELD/HDS3 IE/DEPER/EPB 36"'E/DQA SIP/QA 821 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32'RR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 AB 22'EG FI 04 DAMI/MIB EXTERNAL: BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 02'TIS COPIES LTTR ENCL 0

1 0

6 6

1 0

1 1

1 1

1 0

1 2

2 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR L83 BC LICITRAgE 01 ADM/LFMB IE FILE IE/DEPER/IRB 35 NRR ROEgMiL NRR/DE/CEB ll NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBCO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DS I/RSB 23 RGN5 DMB/DSS'AMDTS)

LPDR 03 NSIC 05 PNL GRUELiR COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1.

,1 1

3 1

1 1

1 TOTAI NUMBER OF COPIES REQUIRED:

LTTR 5e ENCL 46

4 1

,~

I I

gaff

'I I

rt 1

II V

h II

~

~

II h

"'> 1'1 II II, I II >

~l s

"II t.

lf 1

rr ll',

I Irr Id%

J.'>

h II tl h

I

')jg I

r rr I Il

'T h

I

Arizona Public Service Company Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 ANPP-31296-EEVB/WFQ December 3,

1984

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1

Addition of Corporate Advisor Docket No.

STN 50-528 File:

84-056-026'.1.01.10

Dear Mr. Knighton:

This letter is to inform you of the addition of Mr. Paul J. McGuire to the APS Corporate Staff for PVNGS.

Mr. McGuire was hired as a full time APS employee effective August 15, 1984 and reports directly to me in an advisor capacity.

Mr. McGuire's function is to provide assistance and consultation to APS corporate management in nuclear management.

Attached please find a copy of the resume'or Mr. McGuire.

Because of his extensive background and experience in managing the operation of nuclear facilities, I believe that the addition of Mr. McGuire significantly enhances our organization by bringing nuclear oper'ational perspectives to our corporate staff. I believe this is a positive move for, the successful operation of Palo Verde. It is my intention that such an advisor will be used on the Palo Verde corporate staff until we gain additional experience in direct nuclear operation management.

If you have any questions, please contact me.

Very truly yours, APS Vice President Nuclear Production ANPP Project Director EEVB/WFQ/mb Attachment cc: A. C. Gehr D. B. Karner R. P.

Zimmerman 8412050085 841203 PDR ADQCK 05000528 H

PDR

~

C

\\

~

~

PAUL J.

McGUIRE PVNGS OPERATIONS ADVISOR SALARY Seventeen years of management experience, in a broad range of posi'tions, involving construction,

startup, operations, engineering and project management.

Thirteen years in nuclear power and four years fossil power.

EXPERIENCE ARIZONA PUBLIC SERVICE COMPANY (1984 TO PRESENT) 08/84-Present Provide assistance and consultation to APS Corporate Management in the day to day decision

making, concerning PVNGS Operations Management.

UNITED ENERGY SERVICES CORPORATION (1981 TO 1984) 03/84-08/84 Involved in the preparation and review of the APS Nuclear Administrative Policies and Procedures Manual.

ll/82-03/84 Management consultant to the Plant Manager at the Shoreham Nuclear Power Plant involved in operational readiness review of operations, maintenance,

,engineering, licensing, and health physics.

Developed systematic approach to plant completion.

06/81-11/82 Management consultant to the Plant Manager and Vice President at waterford

III, involved in the development of management
controls, plant staffing and training.

NOTE:

Vice President, Secretary and Board of Directors Member for United Energy Services Corporation BOSTON EDISON COMPANY (1976 TO 1981) 09/80-06/81 Assigned to the Institute of Nuclear Power Operations as a

Evaluation Team Manager.

Involved with three utility evaluations as well as development of the evaluation criteria.

06/76-09/80 Plant Manager of the Pilgrim Nuclear Power Station responsible for.

the operation, maintenance, and modification of the plant.

~~

~

c n

f

Paul J. McGuire Page Two I

GENERAL ELECTRIC 'COMPANY (1971 TO 1976) 09/75-06/76 Ol/75-09/75 Project Manager for first time refueling outages at four utilities', responsible for planning, organizing, scheduling and work completion.

Project'anager for the placement of safety-related piping at two Japanese utilities including engineering, fabrication, installation and testing.

03/72-01/75

-Startup of the Cooper.

Nuclear Station as a

Shift Supervisor during phases of construction,'tartup and power ascension.

SRO certified.

12/71-03/72 Training at the Dresden Nuclear Station involved in simulator activities.

SRO certified.

NUS CORPORATION (1970 TO 1971) 11/70-12/71 Startup of the Peach Bottom II Nuclear

Station, involved in the preoperational testing of both the NSSS and Balance of Plaqt.'ONG ISLAND LIGHTING COMPANY (1967 TO 1970) 06/67-11/70 Responsible for fossil plant operations, instrument and controls, and maintenance, as well as the startup of a fossil unit.

Positions held included Maintenance

Engineer, Results Engineer and Operations Engineer.

EDUCATION B.S. in Mechanical Engineering, 1967 M.S. in Nuclear Engineering, 1971

P g

1 r

,A r'

'f t>

I