L-17-297, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21): Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:FE NOC' RrstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B. Bezilla Vice President, Nuclear | ||
- SAFEGUARDS INFORMATION WHEN.SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED October 30, 2017 L-17-297 ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001 | |||
DOCUMENT AS DECONTROLLED October 30, 2017 | |||
ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 10 CFR 50.4 10 CFR _50.54(p) | |||
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) . | Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21). | ||
The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is b~ing submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan. | 419-321-7676 The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is b~ing submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan. | ||
The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure. | The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure. | ||
There are no regulatory commitments contained | There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager; Site Protection, at (419) 321-7253. | ||
Sincerely, . | Sincerely,. | ||
. /I _l/l | |||
SAFEGUARDS INFORMATION | . '/2 *it ii l1 t/lli Iv !)Al Mark B. Bezilla / | ||
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE,*HANDLE THIS DOCUMENT AS DECdNTROLLED | |||
DOCUMENT AS DECdNTROLLED | |||
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2 | SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2 | ||
==Enclosure:== | ==Enclosure:== | ||
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) cc: | |||
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) cc: | NRG Region Ill Administrator DB-1 NRG Resident Inspector (w/o Enclosures) | ||
DB-1 NRR Project Manager (w/o Enclosures) | DB-1 NRR Project Manager (w/o Enclosures) | ||
Utility Radiological Safety Board- (w/o Enclosures) | Utility Radiological Safety Board- (w/o Enclosures) | ||
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS | SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED | ||
DOCUMENT AS DECONTROLLED | |||
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS | SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) | ||
DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) | SAFEGUARDS INFORMATION | ||
SAFEGUARDS INFORMATION | . WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED}} | ||
. WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS | |||
DOCUMENT AS DECONTROLLED}} | |||
Latest revision as of 01:56, 8 January 2025
| ML17306A075 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/30/2017 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-17-297 | |
| Download: ML17306A075 (3) | |
Text
FE NOC' RrstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B. Bezilla Vice President, Nuclear
- SAFEGUARDS INFORMATION WHEN.SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED October 30, 2017 L-17-297 ATTN: Document Control Desk United States Nudear Regulatory Commission Washington, D.C. 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 10 CFR 50.4 10 CFR _50.54(p)
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21).
419-321-7676 The FirstEnergy Nuclear Operating Company hereby submits Revision 21 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is b~ing submitted in accordance with provisions of 10 CFR 50.54(p)(2). A report of the changes made is included with the revised plan.
The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager; Site Protection, at (419) 321-7253.
Sincerely,.
. /I _l/l
. '/2 *it ii l1 t/lli Iv !)Al Mark B. Bezilla /
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE,*HANDLE THIS DOCUMENT AS DECdNTROLLED
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-297 Page 2 of 2
Enclosure:
Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) cc:
NRG Region Ill Administrator DB-1 NRG Resident Inspector (w/o Enclosures)
DB-1 NRR Project Manager (w/o Enclosures)
Utility Radiological Safety Board- (w/o Enclosures)
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED
SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED Enclosure L-17-297 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21)
SAFEGUARDS INFORMATION
. WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED