ML17339B042: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:80 052     00  &~0 AVERAGE DA!LYUNIT POWER LEVEL DOCKET NO.     50   - 250 DATE   Feb. 3 1979 COMPI.ETED IIY     V. T. Chi 1s on MONTH         JANUARY, 1979 DAY       AVERAGE DAILYPOWER I.EVEL                             DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net)                                                     (MWe-Net) l7 18 19 20 21 22 24 10                                                             26 27 12                                                              28 13                                                            ~ '79 14                                                              30 15                                                              31 16 INSTRUCTIONS On this format, list the average daily unit power levei in LXIWe.Net for each day in the reporting tnonth. Compute to the nearest whole megawat t.
{{#Wiki_filter:AVERAGE DA!LYUNITPOWER LEVEL 80 052 0 0 &~0 DOCKET NO.
50 - 250 DATE Feb.
3 1979 COMPI.ETED IIY V. T. Chi 1s on MONTH JANUARY, 1979 DAY AVERAGE DAILYPOWER I.EVEL (MWe.Net)
DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) l7 18 19 20 21 22 24 10 12 13 14 15 16 26 27 28
~ '79 30 31 INSTRUCTIONS On this format, list the average daily unit power levei in LXIWe.Net for each day in the reporting tnonth. Compute to the nearest whole megawat t.
I9/77)
I9/77)


OPERATING DATA REPORT DOCKET NO   ~O-         250 12~~979 OPERATING STATUS DATE COliPLETED BY TELEPHONE   ~
OPERATING STATUS OPERATING DATAREPORT DOCKET NO
                                                                                                      ~Chilsos 552-3824 Turke Point Unit No.            3          Notes  Unit    No. 3 was remove
~O-250 DATE 12~~979 COliPLETED BY ~Chilsos TELEPHONE ~
552-3824 760 700
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:         Januar       1979                           from service on Jan. 1, 1979,
Turke Point Unit No.
: 3. I.icensed Thermal Power (MWt):                 2200                   for scheduled refueling, 760                  maintenance, and inspections.
3
: 2. Reporting Period:
Januar 1979
: 3. I.icensed Thermal Power (MWt):
2200
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):             693
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross M We):                 700
693
: 7. Maximum Dependable Capacity (Net MWe):                     666
: 6. Maximum Dependable Capacity (Gross MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 7. Maximum Dependable Capacity (Net MWe):
: 9. Power Level To which Restricted. If Any (Net MWc):
666 Notes Unit No.
: 10. Reasons For Restrictions,   lf Any This Month           Yr.-to Date         Cumu!ative
3 was remove from service on Jan.
: 11. Hours In Reporting Period                               744.0                744. 0         53'85.6
1, 1979, for scheduled refueling, maintenance, and inspections.
: 12. Number Of Hours Reactor Was Critical                       1;8                 1.8          42 574.2
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 13. Reactor Reserve Shutdown Hours                                                             194.      6
: 9. Power Level To which Restricted. IfAny (Net MWc):
: 14. Hours Generator On. Line                                   1.4                 1;4          41 178.7
: 10. Reasons For Restrictions, lfAny This Month Yr.-to Date Cumu!ative 744. 0 1.8 1;4 707.0 175.0
: 15. Unit Reserve Shutdown Hours                                                                 97.3
- 1 756.0 0.2 0.2 11. Hours In Reporting Period 744.0
: 16. Gross Thermal Energy Generated (MWH)                     707.0                707.0           81 767 655
: 12. Number Of Hours Reactor Was Critical 1;8
: 17. Gross Electrical Energy Generated (MWH)                                       175.0          26 034 605
: 13. Reactor Reserve Shutdown Hours 14. Hours Generator On. Line 1.4
: 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 707.0
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
                                                      -   1 756.0         -  1  756.0          24 645 421
- 1 756.0
: 19. Unit Service Factor                                         0.2                 0.2                76.3
: 19. Unit Service Factor 0.2
: 20. Unit Availability Factor                                   0.2                  0.2                 76.5
: 20. Unit Availability Factor 0.2
: 21. Unit Capacity Factor (Using hIDC Net)                                                       69.2
: 21. Unit Capacity Factor (Using hIDC Net) 22. Unit Capacity Factor IUsing DER Net) 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
: 22. Unit Capacity Factor IUsing DER Net)                                                           65.      9
53'85.6 42 574.2 194. 6 41 178.7 97.3 81 767 655 26 034 605 24 645 421 76.3 76.5 69.2
: 23. Unit Forced Outage Rate                                                     24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
: 65. 9 2.6'5.
2.6'5.
IfShut Down At End Of Report Period, Estimated Date of Startup.'6.
If Shut Down At End Of Report Period, Estimated Date of   Startup.'6.
Units In Test Status {Priorto Commercial Operation):
April    1, 1979 Units In Test Status {Prior to Commercial Operation):                       Forecast           Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/771
April 1, 1979 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/771


UNIT SHUTDOWNS AND POWER REDUCTIONS                       DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
IJInit.No. 3 REPORT MON'fII                 979
IJInit.No. 3 REPORT MON'fII 979 No.
                                                    ~rI
Date f5a-
                                        <<I No.          Date          f5        U1 ri
<<I U1ri CI
                                                ~-c 4n        Li<<cnscc Event Cause Ec Corre<<tive Action to a-        CI
~rI c
                                                ~ Cll  Q Rcport tr                                    Prcvcnt Rc<<uncncc 79-01-01         742.6                           N/A                 FUELXX     Unit No. 3 was removed         from service for scheduled refueling, maintenance, and inspections. (Nuclear and non-nuclear systems) 3                                4 F: Forced         Reason:                                            Method:                            Exhibit C - Instructions S: Schcdulcd     A-Equipment Failure (Explain)                       I -Manual                          for Preparation of Data 8-hlaintenancc or Test                             2 hlanual Scram.                  Entry Sheets ior Licensee C-ltcfucling                                       3 Autonlat!c Scfanl.              Event Rcport (LER) File (NUREC-D.Regulatory Restriction                           4.0!hcr (Explain)                  016I )
~- n4
L Operator Training k, License Examination F-Admi>>istrativc G.Operational Lrrur (Explain)                                                         Exhibit  I - Sante Source
~ Cll Q
(')177)               II.Other (Explahl)
Li<<cnscc Event Rcport tr Cause Ec Corre<<tive Action to Prcvcnt Rc<<uncncc 79-01-01 742.6 N/A FUELXX Unit No.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
F: Forced S: Schcdulcd
(')177)
Reason:
A-Equipment Failure (Explain) 8-hlaintenancc or Test C-ltcfucling D.Regulatory Restriction LOperator Training k, License Examination F-Admi>>istrativc G.Operational Lrrur (Explain)
II.Other (Explahl) 3 Method:
I -Manual 2 hlanual Scram.
3 Autonlat!c Scfanl.
4.0!hcr (Explain) 4 Exhibit C - Instructions for Preparation of Data Entry Sheets ior Licensee Event Rcport (LER) File (NUREC-016I )
Exhibit I - Sante Source


AVERAGE DAILYUNIT POWER LEVEL DOCKET NO         50     251 Turkey Point Feb     3     1979 MONTH         JANUARY           1979 DAY       AVERAGE DAlLYPO'IVER LEVEL                           DAY         AVERAGE DAILYPO>VER LEVEL (MWe-Net)                                                      (MWe.Net)
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO 50 251 Turkey Point Feb 3
I                          235                                  17 243                                  18 I9                       327 629                                20                       596 21                       597 637                                22 634                                23 635                                                          597 537                                '75 10                          326                                16                         599 27                         596 12                          315                                28                         5  4 13                                                            ! g9 30 15                                                              31                         455 l6                            321 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net   for each day in thc reporting ntonth. Compute to the nearest tvhole m gavvatt.
1979 MONTH JANUARY 1979 DAY AVERAGE DAlLYPO'IVER LEVEL (MWe-Net)
I 235 243 DAY AVERAGE DAILYPO>VER LEVEL (MWe.Net) 17 18 10 12 13 15 l6 629 637 634 635 537 326 315 321 I9 20 21 22 23
'75 16 27 28
! g9 30 31 327 596 597 597 599 596 5
4 455 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in thc reporting ntonth. Compute to the nearest tvhole m gavvatt.
(c)!77 )
(c)!77 )


OPERATING DATA REPORT DOCKET NO. 50  251 DATE EtBJJj~97 9 COMPLETED BY      ~Chilson TELEPHONE      Q~      552-3824 OPERATING STATUS Turke      Point Unit No.      4          Notes  Unit No. 4 operated
OPERATING DATAREPORT 700 OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:
a      1979                          at reduced reactor power
Turke Point Unit No. 4
: 2. Reporting Period:                                                   level to extend operation
: 2. Reporting Period:
: 3. Licensed Thermal Power (hOVt):                 2200 760 of Core Cycle V.
a 1979
: 3. Licensed Thermal Power (hOVt):
2200
: 4. Nameplate Rating (Cross MWe):
: 4. Nameplate Rating (Cross MWe):
760
: 5. Design Electrical Rating (Net hIWe):
: 5. Design Electrical Rating (Net hIWe):
: 6. Maximum Dependable Capacity (Gross hIWe):               700
: 6. Maximum Dependable Capacity (Gross hIWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
DOCKET NO.
: 9. Power Level To Which Restricted. If Any (Ne! MWe):           ONE
50 251 DATE EtBJJj~97 9 COMPLETED BY ~Chilson TELEPHONE Q~ 552-3824 Notes Unit No.
: 10. Reasons For Restrictions, lf Any:
4 operated at reduced reactor power level to extend operation of Core Cycle V.
This Month           Yr,-to-Date           Cumulative I I. Hours In Reporting Period                              744.0               744.0             47'13.0
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 12. Number Of Hours Reactor Was Critical                   744.0                744.0             35  091.7
: 9. Power Level To Which Restricted. IfAny (Ne! MWe):
: 13. Reactor Reserve Shutdown Hours                                                             138. 8
: 10. Reasons For Restrictions, lfAny:
: 14. Hours Generator On-Line                                 744.0               744.0            33  563:1
ONE This Month Yr,-to-Date Cumulative 744.0 744.0 744.0 1 161 667 364 965 342 476 100.0 100.0 69.1 66.4 II. Hours In Reporting Period 744.0
: 15. Unit Reserve Shutdown   Hours                                                               16. Gross Thermal Energy Generated (hIWH)                 1 161   667       1 161 667            69 301 534
: 12. Number Of Hours Reactor Was Critical 744.0
: 17. Gross Electrical Energy Generated (MWH)                 364   965           364 965            22 200 690 Ig. Net Electrical Energy Generated (hIWH)                 342 476             342 476            21 027 181
: 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744.0
: 19. Unit Service Factor                                     100.0                100.0                   70.3
: 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (hIWH) 1 161 667
: 20. Unit Availability Factor                               100.0               100.0                    70 ..3
: 17. Gross Electrical Energy Generated (MWH) 364 965 Ig. Net Electrical Energy Generated (hIWH) 342 476
: 21. Unit Capacity Factor (Using hIDC Net)                     69.1                 69.1                  66.6
: 19. Unit Service Factor 100.0
: 22. Unit Capacity Factor (Using DER Net)                     66.4                66.4                   63.6
: 20. Unit Availability Factor 100.0
: 23. Unit Forced Outage Rate                                                                       2.7
: 21. Unit Capacity Factor (Using hIDC Net) 69.1
: 24. Shutdowns Scheduled Over Next 6 h(onths (Type, Date. and Duration   of Eachl:
: 22. Unit Capacity Factor (Using DER Net) 66.4
e uled refuelin           maintenance     and   ins   ections-
: 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 h(onths (Type, Date. and Duration of Eachl:
: 25. If Shut Down At End Of Report Period. Estimated Date     of Startup:
e uled refuelin maintenance and ins ections-47'13.0 35 091.7 138. 8 33 563:1 69 301 534 22 200 690 21 027 181 70.3 70..3 66.6 63.6 2.7
: 26. Units ln Test Status [Prior to Commercial Operation):                       Forecast             Achieved, INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units ln Test Status [Prior to Commercial Operation):
Forecast
: Achieved, INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77 )
('>/77 )


UNIT SHUTD01VNS AND POWER REDUCTIONS COhIPLETED OY
UNITSHUTD01VNS AND POWER REDUCTIONS REPORT hIONTII JANUARY 1979
                                                                                                                            . N=               it No. 4 REPORT hIONTII JANUARY        1979 C
.N=
Liccnscc    c~41      og5 ~Cl                Cause  Ec Corrective Ni).         Date                                             Event CP an ~                                   Action to Report P    mG           E~
COhIPLETED OY it No.
O                     Prcvcnt Recurrence 22       78-12-23   S                                     N/A     ZZ                 Load reduction to approximately 200 Mfe due to system load require-ments and to extend operation of Core Cycle V. (Continued from pre-vious month) 79-01-09   S                                     N/A     ZZ                 Load reduction to approximately 50% R.'P. to extend     operation of Core Cycle V.
4 Ni).
79-01-29   F             A                       N/A     HC       HTEXCH     Load reduction to approximately (D)    50% R.P. to   repair condenser tube leak.     (Non-nuclear system)
Date Liccnscc Event Report P c~
I                                                                       3                                  4 F: Forced         Reason:                                            hlcthod:                            Exhtbt t G Inst ruit tons S: Schcdulcd       A-Equipmcnt Failure (Explain)                       l.hianual                            for Preparation of Data B.hiaintcnance or Test                             2 hlanual Scram.                    Entry Shccts for Li<<ensec C-Rcfuclinl;                                       3.Autotuatic Scrant.                Event Rcport (LL'R) File (NUREG-D.Rct,ulatory Restriction                           4 Other (Explain)                    OI61)
CP 41 an ~
I -Operator Trainin Sc Liccnsc Exatuination F.Adm! nistrativc G Operatlollal Lrror (I'xplalll)                                                         Exhibit I ~ Same Source I I Other (Explain)
mG C
o ~
g5 Cl E~
O Cause Ec Corrective Action to Prcvcnt Recurrence 22 78-12-23 S N/A ZZ Load reduction to approximately 200 Mfe due to system load require-ments and to extend operation of Core Cycle V. (Continued from pre-vious month) 79-01-09 S N/A ZZ Load reduction to approximately 50% R.'P. to extend operation of Core Cycle V.
79-01-29 F A N/A HC HTEXCH (D)
Load reduction to approximately 50% R.P. to repair condenser tube leak.
(Non-nuclear system)
I F: Forced S: Schcdulcd Reason:
A-Equipmcnt Failure (Explain)
B.hiaintcnance or Test C-Rcfuclinl; D.Rct,ulatory Restriction I -Operator Trainin Sc Liccnsc Exatuination F.Adm!nistrativc G Operatlollal Lrror (I'xplalll)
I I Other (Explain) 3 hlcthod:
l.hianual 2 hlanual Scram.
3.Autotuatic Scrant.
4 Other (Explain) 4 Exhtbt t G Inst ruittons for Preparation of Data Entry Shccts for Li<<ensec Event Rcport (LL'R) File (NUREG-OI61)
Exhibit I ~ Same Source


AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. St. Lucie Feb.
St. Lucie Feb. 3     1979 COMPLETED 8Y         V. T. Chi lson TELEPHONE                         824 JANUARYr 1979 DAY       AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                   (~fWe.Net)
3 1979 COMPLETED 8Y V. T. Chilson TELEPHONE 824 JANUARYr 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)
I                          790                                17                     791 7 7                                18 19 791                               20                       769 791                                21 784                                22                         02 23 24 787                                '75 10                          773                                26 761                                27 12 13                          789                              a 19                       770 14                                                              30                       788 15                          791                                31                       790 16                                                              NOTE:       Average       daily power level greater than 777 MWe due to cooler condenser         cooling water.
I 790 7
7 DAY AVERAGE DAILYPOWER LEVEL
(~fWe.Net) 791 17 18 19 10 12 13 14 15 16 791 791 784 787 773 761 789 791 20 21 22 23 24
'75 26 27 a 19 30 31 NOTE:
769 02 770 788 790 Average daily power level greater than 777 MWe due to cooler condenser cooling water.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting rnontlt. Compute to the nearest whole megawatt.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting rnontlt. Compute to the nearest whole megawatt.
(9/77)
(9/77)


OPERATING DATA REPORT DOCKET NO.
OPERATING DATAREPORT DOCKET NO.
DATE F h       '~79 COMPLETED BY       ~~ltilson TELEPHONE 43CL'~~-3824 OPERATING STATUS St. Lucie Unit No.        1          Notes - Unit operated at
DATE F h '~79 COMPLETED BY ~~ltilson TELEPHONE 43CL'~~-3824 OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:             J           179                     approximately 100% R.P., ex-
St. Lucie Unit No.
: 3. Licensed Thermal Power (hi Wt):                     2560           cept for outages of Jan. 19 and 22-28, 1979.
1
: 2. Reporting Period:
J 179
: 3. Licensed Thermal Power (hi Wt):
2560
: 4. Nameplate Rating (Gross MWe):
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net hf We):                 802
: 5. Design Electrical Rating (Net hfWe):
: 6. Maximum Dependable Capacity (Gross MWe):                   822
802
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 6. Maximum Dependable Capacity (Gross MWe):
: 9. Power Level To Which Restricted. If Any (Net MWe):
822 Notes - Unit operated at approximately 100% R.P., ex-cept for outages of Jan.
: 10. Reasons For Restrictions, lf Any:
19 and 22-28, 1979.
This Month           Yr..to.Date           Cumulative
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 11. Hours In Reporting Period                                                   744.0              18 528.0
: 9. Power Level To Which Restricted. IfAny (Net MWe):
: 12. Number Of Hours Reactor Was Critical                                         609.5              15 397.0
: 10. Reasons For Restrictions, lfAny:
: 13. Reactor Reserve Shutdown Hours                                                         '18.5
This Month Yr..to.Date Cumulative 744.0 609.5 14 956.3 21.0 0
: 14. Hours Generator On-Line                                                     597.1             14  956.3
641 35 723 789 490 470 11 597 420 10 904 475 461 637 80.3 80.3 80.8 73.4 7.1
. 15. Unit Reserve Shutdown Hours                                                                 21.0 0 641                                35 723 789
: 11. Hours In Reporting Period 18 528.0
: 17. Gross Electrical Energy Generated (hf WH)               490 470            490 470           11 597 420
: 12. Number Of Hours Reactor Was Critical 15 397.0
: 18. Net Electrical Energy Generated (MWH)                   461 637            461 637           10 904 475 IR.9
: 13. Reactor Reserve Shutdown Hours '18.5
: 19. Unit Service Factor                                       80. 3               80.3                  80.7
: 14. Hours Generator On-Line 597.1
: 20. Unit Availability Factor                                  80.3               80. 3                  80.8 22: Unit Capacity Factor (Using DER Net)
. 15. Unit Reserve Shutdown Hours 17. Gross Electrical Energy Generated (hfWH) 490 470
: 23. Unit Forced Outage Rate 77.4 19.7
: 18. Net Electrical Energy Generated (MWH) 461 637
                                                                            '7.4    19 ~ 7 75.7 73.4 7.1
: 19. Unit Service Factor
: 80. 3 80.7
: 20. Unit AvailabilityFactor
: 80. 3
 
IR.9 75.7 22: Unit Capacity Factor (Using DER Net) 77.4
'7.4
: 23. Unit Forced Outage Rate 19.7 19 ~ 7
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Scheduled refuelin             maintenance, and ins ections             April     1 - Hay 26, 1979.
Scheduled refuelin maintenance, and ins ections April 1 - Hay 26, 1979.
: 25. If Shut Down At End Of Report Period. Estimated Date     of Startup:
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
: 6. Units In Test Status (Prior to Commercial Operation):                     Forecast             Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhf ERCIA L OPER ATION (u/77 )
: 6. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPER ATION (u/77 )


DOCKET NO. 5O UNITSHUTDOWNS AND POWER REDUCTIONS                                                             No.
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT hIONgI JANUARY 1979 DOCKET NO. 5O COMPLETED BY 552-824 No.
COMPLETED BY REPORT hION gI JANUARY        1979                                            552- 824
Date
                                          )')
)')
Cause h. Corrcctivc 4J Liccnscc             o)-e) 'o~
rl Cl 4J
Date                      rl                  Event                                              Action to Cl Rcport P              E~
~CA $
O                    Prcvcnt Rccurrcnce
C5 Liccnscc Event Rcport P
                                                  ~CA $
)-o ~
C5 79-01-19           6.6       H                   N/A       EB                   Unit was manually tripped due to er-(D)      roneous indication of reactor trip caused by loss of auxiliary bus No. 1A3 when a relay was actuated by severe vibration from construction activities on Unit No. 2.
e) 'o E~
79-01-22 P     140.3         A       1           N/A       CB       VESSEL     Unit was removed from         service to re-(B)      place failed gasket         on pressurizer manway closure.       (Nuclear System) 335-79-1              CRDRVE    Outage was extended         to restore CEA No. 43 to operable       condition. Cor-rective actions included mechanically exercising the CEA to demonstrate freedom of movement. (Nuclear S stem)
O Cause h. Corrcctivc Action to Prcvcnt Rccurrcnce 79-01-19 6.6 H
I F I'I)reed       Reason:                                              hlethod:                            Exhibit G - Instructions S: Scheduled     A.E<luipmcnt Failure (Explain)                       I-hianual                          I'or Prep~ration ot Data B.hlaintcnancc or Test                               2 hianual Scram.                    Entry Shccts lor Licensee C'.Rc fueiint',                                     3-Automatic Scram.                  Event Rcport (LER) File (NUREC.
N/A EB (D)
D Rct',ulat))ry Restriction                         4-Other (Explain)                  OI 6 I)
Unit was manually tripped due to er-roneous indication of reactor trip caused by loss of auxiliary bus No.
F. Operator Training S; License I:xanllnailon F.Administrative C Oi)cfattonal Error (I'.xplain)                                                         Exhibit  I - Sante Source I )/77)              I I.Other (Lxplain)
1A3 when a relay was actuated by severe vibration from construction activities on Unit No. 2.
79-01-22 P
140.3 A
1 N/A 335-79-1 CB VESSEL (B)
CRDRVE Unit was removed from service to re-place failed gasket on pressurizer manway closure.
(Nuclear System)
Outage was extended to restore CEA No. 43 to operable condition. Cor-rective actions included mechanically exercising the CEA to demonstrate freedom of movement.
(Nuclear S stem)
I F
I'I)reed S: Scheduled I )/77)
Reason:
A.E<luipmcnt Failure (Explain)
B.hlaintcnancc or Test C'.Rc fueiint',
D Rct',ulat))ry Restriction F. Operator Training S; License I:xanllnailon F.Administrative C Oi)cfattonal Error (I'.xplain)
I I.Other (Lxplain) hlethod:
I-hianual 2 hianual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions I'or Prep~ration ot Data Entry Shccts lor Licensee Event Rcport (LER) File (NUREC.
OI 6I)
Exhibit I - Sante Source


FLORIDA POWER 4 LIGHT COMPANY February 3, 1979 Of fice of Management Information and. Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
FLORIDA POWER 4 LIGHTCOMPANY February 3,
Attached are the January, 1979, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
1979 Office of Management Information and. Program Controls U.
Very truly yours, A. D. Schmidt, Vice President Power Resources VTC/DDC cc:   Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the January,
: 1979, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.       50 250 Turkey Point UNIT     Unit No. 3 Dl'..TE   Feb. 3, 1979 COMPLETED BY       V. T. Chilson TELEPHONE       305 552-3824 QEPORT MONTH       JANUARY, 1979 Unit was removed   from service on January 1, 1979, for scheduled refueling, maintenance,   and inspections. Refer to "Unit Shutdowns and Power Reduc-tions." section of the January, 1979, Operating Status Report for additional in formation.
OF OPERATING EXPERIENCE DOCKET NO.
Major Safety-related maintenance     activities   performed 'during the month included:
50 250 Turkey Point UNIT Unit No.
Completed performance   of Steam Generator Tube Inspection Program.
3 Dl'..TE Feb.
3, 1979 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 QEPORT MONTH JANUARY, 1979 Unit was removed from service on January 1,
1979, for scheduled refueling, maintenance, and inspections.
Refer to "Unit Shutdowns and Power Reduc-tions." section of the January, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed 'during the month included:
Completed performance of Steam Generator Tube Inspection Program.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE
OF OPERATING EXPERIENCE
                                                    'OCKET NO.
'OCKET NO.
Turkey Point UNIT              4 Dl'.TE   ebruar 3   19 79 COMPLETED BY   V. T. Chilson TELEPHONE       305 552-3824 gEPORT MONTH    JANUARY g 1979 Unit operated at reduced reactor power level to extend operation of Core Cycle V. Refer to "Unit Shutdowns and Power Reductions" section of the January, 1979, Operating Status Report for additional infor-mation.
UNIT Turkey Point 4
Dl'.TE ebruar 3
19 79 COMPLETED BY V. T. Chilson gEPORT MONTH JANUARY g 1979 TELEPHONE 305 552-3824 Unit operated at reduced reactor power level to extend operation of Core Cycle V.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1979, Operating Status Report for additional infor-mation.
No Major Safety-related maintenance was performed during the month.
No Major Safety-related maintenance was performed during the month.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.         0 St. Lucie UNIT     nit No. 1 Dl'.TE   Feb. 3   19 79 COMPLETED BY         V. T. Chilson TELEPHONE         305   55 2-3824
OF OPERATING EXPERIENCE DOCKET NO.
~PORT   MONTH     JANUARY, 1979 Unit operated at approximately 100"-. R.P., except for outages of Jan. 19, and 22-28, 1979. Refer to "Unit Shutdowns and Power Reductions" section of the January, -1979, Operating Status Report for additional information.
0 St. Lucie UNIT nit No.
                                                'I Major Safety-related maintenance     activities     performed during the month included:
1 Dl'.TE Feb.
Replaced   failed gasket. on pressurizer       manway closure.
3 19 79 COMPLETED BY V. T. Chilson TELEPHONE 305 55 2-3824
Restored   CEA No. 43 to operable condition.
~PORT MONTH JANUARY, 1979 Unit operated at approximately 100"-. R.P.,
Charg'ing pump No. 1A was returned to service.
except for outages of Jan.
Corrective actions included installing new pump casing.}}
19, and 22-28, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the January, -1979, Operating Status Report for additional information.
'I Major Safety-related maintenance activities performed during the month included:
Replaced failed gasket.
on pressurizer manway closure.
Restored CEA No.
43 to operable condition.
Charg'ing pump No.
1A was returned to service.
Corrective actions included installing new pump casing.}}

Latest revision as of 13:55, 7 January 2025

Monthly Operating Repts for Jan 1979
ML17339B042
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 02/03/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17339B041 List:
References
NUDOCS 8005200639
Download: ML17339B042 (14)


Text

AVERAGE DA!LYUNITPOWER LEVEL 80 052 0 0 &~0 DOCKET NO.

50 - 250 DATE Feb.

3 1979 COMPI.ETED IIY V. T. Chi 1s on MONTH JANUARY, 1979 DAY AVERAGE DAILYPOWER I.EVEL (MWe.Net)

DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) l7 18 19 20 21 22 24 10 12 13 14 15 16 26 27 28

~ '79 30 31 INSTRUCTIONS On this format, list the average daily unit power levei in LXIWe.Net for each day in the reporting tnonth. Compute to the nearest whole megawat t.

I9/77)

OPERATING STATUS OPERATING DATAREPORT DOCKET NO

~O-250 DATE 12~~979 COliPLETED BY ~Chilsos TELEPHONE ~

552-3824 760 700

1. Unit Name:

Turke Point Unit No.

3

2. Reporting Period:

Januar 1979

3. I.icensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

693

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

666 Notes Unit No.

3 was remove from service on Jan.

1, 1979, for scheduled refueling, maintenance, and inspections.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To which Restricted. IfAny (Net MWc):
10. Reasons For Restrictions, lfAny This Month Yr.-to Date Cumu!ative 744. 0 1.8 1;4 707.0 175.0

- 1 756.0 0.2 0.2 11. Hours In Reporting Period 744.0

12. Number Of Hours Reactor Was Critical 1;8
13. Reactor Reserve Shutdown Hours 14. Hours Generator On. Line 1.4
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 707.0
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

- 1 756.0

19. Unit Service Factor 0.2
20. Unit Availability Factor 0.2
21. Unit Capacity Factor (Using hIDC Net) 22. Unit Capacity Factor IUsing DER Net) 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

53'85.6 42 574.2 194. 6 41 178.7 97.3 81 767 655 26 034 605 24 645 421 76.3 76.5 69.2

65. 9 2.6'5.

IfShut Down At End Of Report Period, Estimated Date of Startup.'6.

Units In Test Status {Priorto Commercial Operation):

April 1, 1979 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/771

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

IJInit.No. 3 REPORT MON'fII 979 No.

Date f5a-

<<I U1ri CI

~rI c

~- n4

~ Cll Q

Li<<cnscc Event Rcport tr Cause Ec Corre<<tive Action to Prcvcnt Rc<<uncncc 79-01-01 742.6 N/A FUELXX Unit No.

3 was removed from service for scheduled refueling, maintenance, and inspections.

(Nuclear and non-nuclear systems)

F: Forced S: Schcdulcd

(')177)

Reason:

A-Equipment Failure (Explain) 8-hlaintenancc or Test C-ltcfucling D.Regulatory Restriction LOperator Training k, License Examination F-Admi>>istrativc G.Operational Lrrur (Explain)

II.Other (Explahl) 3 Method:

I -Manual 2 hlanual Scram.

3 Autonlat!c Scfanl.

4.0!hcr (Explain) 4 Exhibit C - Instructions for Preparation of Data Entry Sheets ior Licensee Event Rcport (LER) File (NUREC-016I )

Exhibit I - Sante Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO 50 251 Turkey Point Feb 3

1979 MONTH JANUARY 1979 DAY AVERAGE DAlLYPO'IVER LEVEL (MWe-Net)

I 235 243 DAY AVERAGE DAILYPO>VER LEVEL (MWe.Net) 17 18 10 12 13 15 l6 629 637 634 635 537 326 315 321 I9 20 21 22 23

'75 16 27 28

! g9 30 31 327 596 597 597 599 596 5

4 455 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in thc reporting ntonth. Compute to the nearest tvhole m gavvatt.

(c)!77 )

OPERATING DATAREPORT 700 OPERATING STATUS

1. Unit Name:

Turke Point Unit No. 4

2. Reporting Period:

a 1979

3. Licensed Thermal Power (hOVt):

2200

4. Nameplate Rating (Cross MWe):

760

5. Design Electrical Rating (Net hIWe):
6. Maximum Dependable Capacity (Gross hIWe):

DOCKET NO.

50 251 DATE EtBJJj~97 9 COMPLETED BY ~Chilson TELEPHONE Q~ 552-3824 Notes Unit No.

4 operated at reduced reactor power level to extend operation of Core Cycle V.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Ne! MWe):
10. Reasons For Restrictions, lfAny:

ONE This Month Yr,-to-Date Cumulative 744.0 744.0 744.0 1 161 667 364 965 342 476 100.0 100.0 69.1 66.4 II. Hours In Reporting Period 744.0

12. Number Of Hours Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (hIWH) 1 161 667
17. Gross Electrical Energy Generated (MWH) 364 965 Ig. Net Electrical Energy Generated (hIWH) 342 476
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using hIDC Net) 69.1
22. Unit Capacity Factor (Using DER Net) 66.4
23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 h(onths (Type, Date. and Duration of Eachl:

e uled refuelin maintenance and ins ections-47'13.0 35 091.7 138. 8 33 563:1 69 301 534 22 200 690 21 027 181 70.3 70..3 66.6 63.6 2.7

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status [Prior to Commercial Operation):

Forecast

Achieved, INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

('>/77 )

UNITSHUTD01VNS AND POWER REDUCTIONS REPORT hIONTII JANUARY 1979

.N=

COhIPLETED OY it No.

4 Ni).

Date Liccnscc Event Report P c~

CP 41 an ~

mG C

o ~

g5 Cl E~

O Cause Ec Corrective Action to Prcvcnt Recurrence 22 78-12-23 S N/A ZZ Load reduction to approximately 200 Mfe due to system load require-ments and to extend operation of Core Cycle V. (Continued from pre-vious month) 79-01-09 S N/A ZZ Load reduction to approximately 50% R.'P. to extend operation of Core Cycle V.

79-01-29 F A N/A HC HTEXCH (D)

Load reduction to approximately 50% R.P. to repair condenser tube leak.

(Non-nuclear system)

I F: Forced S: Schcdulcd Reason:

A-Equipmcnt Failure (Explain)

B.hiaintcnance or Test C-Rcfuclinl; D.Rct,ulatory Restriction I -Operator Trainin Sc Liccnsc Exatuination F.Adm!nistrativc G Operatlollal Lrror (I'xplalll)

I I Other (Explain) 3 hlcthod:

l.hianual 2 hlanual Scram.

3.Autotuatic Scrant.

4 Other (Explain) 4 Exhtbt t G Inst ruittons for Preparation of Data Entry Shccts for Li<<ensec Event Rcport (LL'R) File (NUREG-OI61)

Exhibit I ~ Same Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. St. Lucie Feb.

3 1979 COMPLETED 8Y V. T. Chilson TELEPHONE 824 JANUARYr 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)

I 790 7

7 DAY AVERAGE DAILYPOWER LEVEL

(~fWe.Net) 791 17 18 19 10 12 13 14 15 16 791 791 784 787 773 761 789 791 20 21 22 23 24

'75 26 27 a 19 30 31 NOTE:

769 02 770 788 790 Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting rnontlt. Compute to the nearest whole megawatt.

(9/77)

OPERATING DATAREPORT DOCKET NO.

DATE F h '~79 COMPLETED BY ~~ltilson TELEPHONE 43CL'~~-3824 OPERATING STATUS

1. Unit Name:

St. Lucie Unit No.

1

2. Reporting Period:

J 179

3. Licensed Thermal Power (hi Wt):

2560

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hfWe):

802

6. Maximum Dependable Capacity (Gross MWe):

822 Notes - Unit operated at approximately 100% R.P., ex-cept for outages of Jan.

19 and 22-28, 1979.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, lfAny:

This Month Yr..to.Date Cumulative 744.0 609.5 14 956.3 21.0 0

641 35 723 789 490 470 11 597 420 10 904 475 461 637 80.3 80.3 80.8 73.4 7.1

11. Hours In Reporting Period 18 528.0
12. Number Of Hours Reactor Was Critical 15 397.0
13. Reactor Reserve Shutdown Hours '18.5
14. Hours Generator On-Line 597.1

. 15. Unit Reserve Shutdown Hours 17. Gross Electrical Energy Generated (hfWH) 490 470

18. Net Electrical Energy Generated (MWH) 461 637
19. Unit Service Factor
80. 3 80.7
20. Unit AvailabilityFactor
80. 3

IR.9 75.7 22: Unit Capacity Factor (Using DER Net) 77.4

'7.4

23. Unit Forced Outage Rate 19.7 19 ~ 7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Scheduled refuelin maintenance, and ins ections April 1 - Hay 26, 1979.

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
6. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPER ATION (u/77 )

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT hIONgI JANUARY 1979 DOCKET NO. 5O COMPLETED BY 552-824 No.

Date

)')

rl Cl 4J

~CA $

C5 Liccnscc Event Rcport P

)-o ~

e) 'o E~

O Cause h. Corrcctivc Action to Prcvcnt Rccurrcnce 79-01-19 6.6 H

N/A EB (D)

Unit was manually tripped due to er-roneous indication of reactor trip caused by loss of auxiliary bus No.

1A3 when a relay was actuated by severe vibration from construction activities on Unit No. 2.

79-01-22 P

140.3 A

1 N/A 335-79-1 CB VESSEL (B)

CRDRVE Unit was removed from service to re-place failed gasket on pressurizer manway closure.

(Nuclear System)

Outage was extended to restore CEA No. 43 to operable condition. Cor-rective actions included mechanically exercising the CEA to demonstrate freedom of movement.

(Nuclear S stem)

I F

I'I)reed S: Scheduled I )/77)

Reason:

A.E<luipmcnt Failure (Explain)

B.hlaintcnancc or Test C'.Rc fueiint',

D Rct',ulat))ry Restriction F. Operator Training S; License I:xanllnailon F.Administrative C Oi)cfattonal Error (I'.xplain)

I I.Other (Lxplain) hlethod:

I-hianual 2 hianual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions I'or Prep~ration ot Data Entry Shccts lor Licensee Event Rcport (LER) File (NUREC.

OI 6I)

Exhibit I - Sante Source

FLORIDA POWER 4 LIGHTCOMPANY February 3,

1979 Office of Management Information and. Program Controls U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the January,

1979, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, A. D. Schmidt, Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50 250 Turkey Point UNIT Unit No.

3 Dl'..TE Feb.

3, 1979 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 QEPORT MONTH JANUARY, 1979 Unit was removed from service on January 1,

1979, for scheduled refueling, maintenance, and inspections.

Refer to "Unit Shutdowns and Power Reduc-tions." section of the January, 1979, Operating Status Report for additional information.

Major Safety-related maintenance activities performed 'during the month included:

Completed performance of Steam Generator Tube Inspection Program.

SUMMARY

OF OPERATING EXPERIENCE

'OCKET NO.

UNIT Turkey Point 4

Dl'.TE ebruar 3

19 79 COMPLETED BY V. T. Chilson gEPORT MONTH JANUARY g 1979 TELEPHONE 305 552-3824 Unit operated at reduced reactor power level to extend operation of Core Cycle V.

Refer to "Unit Shutdowns and Power Reductions" section of the January, 1979, Operating Status Report for additional infor-mation.

No Major Safety-related maintenance was performed during the month.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0 St. Lucie UNIT nit No.

1 Dl'.TE Feb.

3 19 79 COMPLETED BY V. T. Chilson TELEPHONE 305 55 2-3824

~PORT MONTH JANUARY, 1979 Unit operated at approximately 100"-. R.P.,

except for outages of Jan.

19, and 22-28, 1979.

Refer to "Unit Shutdowns and Power Reductions" section of the January, -1979, Operating Status Report for additional information.

'I Major Safety-related maintenance activities performed during the month included:

Replaced failed gasket.

on pressurizer manway closure.

Restored CEA No.

43 to operable condition.

Charg'ing pump No.

1A was returned to service.

Corrective actions included installing new pump casing.