Text
AVERAGE DA!LYUNITPOWER LEVEL 80 052 0 0 &~0 DOCKET NO.
50 - 250 DATE Feb.
3 1979 COMPI.ETED IIY V. T. Chi 1s on MONTH JANUARY, 1979 DAY AVERAGE DAILYPOWER I.EVEL (MWe.Net)
DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) l7 18 19 20 21 22 24 10 12 13 14 15 16 26 27 28
~ '79 30 31 INSTRUCTIONS On this format, list the average daily unit power levei in LXIWe.Net for each day in the reporting tnonth. Compute to the nearest whole megawat t.
I9/77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO
~O-250 DATE 12~~979 COliPLETED BY ~Chilsos TELEPHONE ~
552-3824 760 700
- 1. Unit Name:
Turke Point Unit No.
3
- 2. Reporting Period:
Januar 1979
- 3. I.icensed Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
693
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
666 Notes Unit No.
3 was remove from service on Jan.
1, 1979, for scheduled refueling, maintenance, and inspections.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted. IfAny (Net MWc):
- 10. Reasons For Restrictions, lfAny This Month Yr.-to Date Cumu!ative 744. 0 1.8 1;4 707.0 175.0
- 1 756.0 0.2 0.2 11. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 1;8
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On. Line 1.4
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 707.0
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 1 756.0
- 19. Unit Service Factor 0.2
- 20. Unit Availability Factor 0.2
- 21. Unit Capacity Factor (Using hIDC Net) 22. Unit Capacity Factor IUsing DER Net) 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
53'85.6 42 574.2 194. 6 41 178.7 97.3 81 767 655 26 034 605 24 645 421 76.3 76.5 69.2
- 65. 9 2.6'5.
IfShut Down At End Of Report Period, Estimated Date of Startup.'6.
Units In Test Status {Priorto Commercial Operation):
April 1, 1979 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/771
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
IJInit.No. 3 REPORT MON'fII 979 No.
Date f5a-
<<I U1ri CI
~rI c
~- n4
~ Cll Q
Li<<cnscc Event Rcport tr Cause Ec Corre<<tive Action to Prcvcnt Rc<<uncncc 79-01-01 742.6 N/A FUELXX Unit No.
3 was removed from service for scheduled refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
F: Forced S: Schcdulcd
(')177)
Reason:
A-Equipment Failure (Explain) 8-hlaintenancc or Test C-ltcfucling D.Regulatory Restriction LOperator Training k, License Examination F-Admi>>istrativc G.Operational Lrrur (Explain)
II.Other (Explahl) 3 Method:
I -Manual 2 hlanual Scram.
3 Autonlat!c Scfanl.
4.0!hcr (Explain) 4 Exhibit C - Instructions for Preparation of Data Entry Sheets ior Licensee Event Rcport (LER) File (NUREC-016I )
Exhibit I - Sante Source
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO 50 251 Turkey Point Feb 3
1979 MONTH JANUARY 1979 DAY AVERAGE DAlLYPO'IVER LEVEL (MWe-Net)
I 235 243 DAY AVERAGE DAILYPO>VER LEVEL (MWe.Net) 17 18 10 12 13 15 l6 629 637 634 635 537 326 315 321 I9 20 21 22 23
'75 16 27 28
! g9 30 31 327 596 597 597 599 596 5
4 455 INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in thc reporting ntonth. Compute to the nearest tvhole m gavvatt.
(c)!77 )
OPERATING DATAREPORT 700 OPERATING STATUS
- 1. Unit Name:
Turke Point Unit No. 4
- 2. Reporting Period:
a 1979
- 3. Licensed Thermal Power (hOVt):
2200
- 4. Nameplate Rating (Cross MWe):
760
- 5. Design Electrical Rating (Net hIWe):
- 6. Maximum Dependable Capacity (Gross hIWe):
DOCKET NO.
50 251 DATE EtBJJj~97 9 COMPLETED BY ~Chilson TELEPHONE Q~ 552-3824 Notes Unit No.
4 operated at reduced reactor power level to extend operation of Core Cycle V.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Ne! MWe):
- 10. Reasons For Restrictions, lfAny:
ONE This Month Yr,-to-Date Cumulative 744.0 744.0 744.0 1 161 667 364 965 342 476 100.0 100.0 69.1 66.4 II. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (hIWH) 1 161 667
- 17. Gross Electrical Energy Generated (MWH) 364 965 Ig. Net Electrical Energy Generated (hIWH) 342 476
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using hIDC Net) 69.1
- 22. Unit Capacity Factor (Using DER Net) 66.4
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 h(onths (Type, Date. and Duration of Eachl:
e uled refuelin maintenance and ins ections-47'13.0 35 091.7 138. 8 33 563:1 69 301 534 22 200 690 21 027 181 70.3 70..3 66.6 63.6 2.7
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units ln Test Status [Prior to Commercial Operation):
Forecast
- Achieved, INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('>/77 )
UNITSHUTD01VNS AND POWER REDUCTIONS REPORT hIONTII JANUARY 1979
.N=
COhIPLETED OY it No.
4 Ni).
Date Liccnscc Event Report P c~
CP 41 an ~
mG C
o ~
g5 Cl E~
O Cause Ec Corrective Action to Prcvcnt Recurrence 22 78-12-23 S N/A ZZ Load reduction to approximately 200 Mfe due to system load require-ments and to extend operation of Core Cycle V. (Continued from pre-vious month) 79-01-09 S N/A ZZ Load reduction to approximately 50% R.'P. to extend operation of Core Cycle V.
79-01-29 F A N/A HC HTEXCH (D)
Load reduction to approximately 50% R.P. to repair condenser tube leak.
(Non-nuclear system)
I F: Forced S: Schcdulcd Reason:
A-Equipmcnt Failure (Explain)
B.hiaintcnance or Test C-Rcfuclinl; D.Rct,ulatory Restriction I -Operator Trainin Sc Liccnsc Exatuination F.Adm!nistrativc G Operatlollal Lrror (I'xplalll)
I I Other (Explain) 3 hlcthod:
l.hianual 2 hlanual Scram.
3.Autotuatic Scrant.
4 Other (Explain) 4 Exhtbt t G Inst ruittons for Preparation of Data Entry Shccts for Li<<ensec Event Rcport (LL'R) File (NUREG-OI61)
Exhibit I ~ Same Source
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. St. Lucie Feb.
3 1979 COMPLETED 8Y V. T. Chilson TELEPHONE 824 JANUARYr 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)
I 790 7
7 DAY AVERAGE DAILYPOWER LEVEL
(~fWe.Net) 791 17 18 19 10 12 13 14 15 16 791 791 784 787 773 761 789 791 20 21 22 23 24
'75 26 27 a 19 30 31 NOTE:
769 02 770 788 790 Average daily power level greater than 777 MWe due to cooler condenser cooling water.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting rnontlt. Compute to the nearest whole megawatt.
(9/77)
OPERATING DATAREPORT DOCKET NO.
DATE F h '~79 COMPLETED BY ~~ltilson TELEPHONE 43CL'~~-3824 OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit No.
1
- 2. Reporting Period:
J 179
- 3. Licensed Thermal Power (hi Wt):
2560
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hfWe):
802
- 6. Maximum Dependable Capacity (Gross MWe):
822 Notes - Unit operated at approximately 100% R.P., ex-cept for outages of Jan.
19 and 22-28, 1979.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, lfAny:
This Month Yr..to.Date Cumulative 744.0 609.5 14 956.3 21.0 0
641 35 723 789 490 470 11 597 420 10 904 475 461 637 80.3 80.3 80.8 73.4 7.1
- 11. Hours In Reporting Period 18 528.0
- 12. Number Of Hours Reactor Was Critical 15 397.0
- 13. Reactor Reserve Shutdown Hours '18.5
- 14. Hours Generator On-Line 597.1
. 15. Unit Reserve Shutdown Hours 17. Gross Electrical Energy Generated (hfWH) 490 470
- 18. Net Electrical Energy Generated (MWH) 461 637
- 19. Unit Service Factor
- 80. 3 80.7
- 20. Unit AvailabilityFactor
- 80. 3
IR.9 75.7 22: Unit Capacity Factor (Using DER Net) 77.4
'7.4
- 23. Unit Forced Outage Rate 19.7 19 ~ 7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Scheduled refuelin maintenance, and ins ections April 1 - Hay 26, 1979.
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 6. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPER ATION (u/77 )
UNITSHUTDOWNS AND POWER REDUCTIONS REPORT hIONgI JANUARY 1979 DOCKET NO. 5O COMPLETED BY 552-824 No.
Date
)')
rl Cl 4J
~CA $
C5 Liccnscc Event Rcport P
)-o ~
e) 'o E~
O Cause h. Corrcctivc Action to Prcvcnt Rccurrcnce 79-01-19 6.6 H
N/A EB (D)
Unit was manually tripped due to er-roneous indication of reactor trip caused by loss of auxiliary bus No.
1A3 when a relay was actuated by severe vibration from construction activities on Unit No. 2.
79-01-22 P
140.3 A
1 N/A 335-79-1 CB VESSEL (B)
CRDRVE Unit was removed from service to re-place failed gasket on pressurizer manway closure.
(Nuclear System)
Outage was extended to restore CEA No. 43 to operable condition. Cor-rective actions included mechanically exercising the CEA to demonstrate freedom of movement.
(Nuclear S stem)
I F
I'I)reed S: Scheduled I )/77)
Reason:
A.E<luipmcnt Failure (Explain)
B.hlaintcnancc or Test C'.Rc fueiint',
D Rct',ulat))ry Restriction F. Operator Training S; License I:xanllnailon F.Administrative C Oi)cfattonal Error (I'.xplain)
I I.Other (Lxplain) hlethod:
I-hianual 2 hianual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions I'or Prep~ration ot Data Entry Shccts lor Licensee Event Rcport (LER) File (NUREC.
OI 6I)
Exhibit I - Sante Source
FLORIDA POWER 4 LIGHTCOMPANY February 3,
1979 Office of Management Information and. Program Controls U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the January,
- 1979, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 250 Turkey Point UNIT Unit No.
3 Dl'..TE Feb.
3, 1979 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 QEPORT MONTH JANUARY, 1979 Unit was removed from service on January 1,
1979, for scheduled refueling, maintenance, and inspections.
Refer to "Unit Shutdowns and Power Reduc-tions." section of the January, 1979, Operating Status Report for additional information.
Major Safety-related maintenance activities performed 'during the month included:
Completed performance of Steam Generator Tube Inspection Program.
SUMMARY
OF OPERATING EXPERIENCE
'OCKET NO.
UNIT Turkey Point 4
Dl'.TE ebruar 3
19 79 COMPLETED BY V. T. Chilson gEPORT MONTH JANUARY g 1979 TELEPHONE 305 552-3824 Unit operated at reduced reactor power level to extend operation of Core Cycle V.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1979, Operating Status Report for additional infor-mation.
No Major Safety-related maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
0 St. Lucie UNIT nit No.
1 Dl'.TE Feb.
3 19 79 COMPLETED BY V. T. Chilson TELEPHONE 305 55 2-3824
~PORT MONTH JANUARY, 1979 Unit operated at approximately 100"-. R.P.,
except for outages of Jan.
19, and 22-28, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the January, -1979, Operating Status Report for additional information.
'I Major Safety-related maintenance activities performed during the month included:
Replaced failed gasket.
on pressurizer manway closure.
Restored CEA No.
43 to operable condition.
Charg'ing pump No.
1A was returned to service.
Corrective actions included installing new pump casing.