{{#Wiki_filter:Q ~ Lola REQULA       INFORMATION DISTR IBUTI'0     'YSTEM (R IDS)
{{#Wiki_filter:Q ~ Lola REQULA INFORMATION DISTR IBUTI'0
,ACCESSION NBR:8605160048         DOC. DATE: 86/05/05     NQTARIZED: NQ         DOCNET 0 FACIL: 50-271 Vermont Yankee Nuclear Power Stationi Uermont Yankee             05000271 AUTH. NAME           AUTHOR AFFILIATION MURPHY'. P           Uermont Yankee Nuclear Potuer Corp.
'YSTEM (R IDS)
REC IP. NAME         RECIPIENT AFFILIATION RQQNEYi V. L.         BMR Prospect Directorate 2
,ACCESSION NBR:8605160048 DOC. DATE: 86/05/05 NQTARIZED:
NQ DOCNET 0 FACIL:50-271 Vermont Yankee Nuclear Power Stationi Uermont Yankee 05000271 AUTH. NAME AUTHOR AFFILIATION MURPHY'. P Uermont Yankee Nuclear Potuer Corp.
REC IP. NAME RECIPIENT AFFILIATION RQQNEYi V. L.
BMR Prospect Directorate 2


==SUBJECT:==
==SUBJECT:==
Responds to Qeneric Ltr 86M4I "Policy Statement on Engineeering Expertise on Shift. "No specific eqvivalencg criteria established for shift engineer. No changes to shift technical advisor program anticipated at present.
Responds to Qeneric Ltr 86M4I "Policy Statement on Engineeering Expertise on Shift. "No specific eqvivalencg criteria established for shift engineer.
DISTRIBUTION CODE: NCOSD TITLE: Operator COPIES RECEIVED: LTR Requalification Program L   ENCL   Q SIZE:
No changes to shift technical advisor program anticipated at present.
NOTES:
DISTRIBUTION CODE:
REC IP IENT       COPIES            REC IP lENT        COPIES ID CODE/NAME         LTTR ENCL           GODET ME         LTTR ENCL BNR PD2 PD              1 INTERNAL. NRR/DHFT/HFIB                           NRR/DHFT/MTB REC FILE       04                   RQN1 EXTERNAL: 24X                                     LPDR            03 NRC PDR                             NSIC             05 TOTAL NUMBER OF COPIES       REQUIRED'TTR       10   ENCL     48
NCOSD COPIES RECEIVED: LTR L ENCL Q SIZE:
TITLE: Operator Requalification Program NOTES:
REC IP IENT ID CODE/NAME BNR PD2 PD COPIES REC IPlENT LTTR ENCL GODET ME 1
COPIES LTTR ENCL INTERNAL. NRR/DHFT/HFIB REC FILE 04 EXTERNAL: 24X NRC PDR NRR/DHFT/MTB RQN1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED'TTR 10 ENCL 48


r ERMONT YANKEE NUCLEAR POWER CORPORATION RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 FVY   86-39 REPLY TO:
r ERMONT YANKEE NUCLEAR POWER CORPORATION v)r RD 5, Box 169, Ferry Road, Brattleboro, VT05301 FVY 86-39 REPLY TO:
v)r                                                                            ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM,MASSACHUSETTS 01701 TELEPHONE 817-872-8100 Hay 5, 1986 U.S. Nu'clear.Regulatory Commission Washington, D.C. 20555 Attn:       Office of Nuclear Reacto r Regulation Yern L. Rooney, Sr. Project Manager BWR Project Directorate No.       2 Division of BWR Licensing
ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM,MASSACHUSETTS 01701 TELEPHONE 817-872-8100 Hay 5, 1986 U.S. Nu'clear.Regulatory Commission Washington, D.C.
20555 Attn:
Office of Nuclear Reacto r Regulation Yern L. Rooney, Sr. Project Manager BWR Project Directorate No.
2 Division of BWR Licensing


==References:==
==References:==
a)   License No. OPR-28 (Docket No. 50-271) b)  Letter,   USNRC to All Power Reactor Licensees and Applicants for Power Reactor Licenses, NVY 86-39, dated 2/13/86, Generic Letter 86-04
a) b)
 
License No.
==Dear  Sir:==
OPR-28 (Docket No. 50-271)
: Letter, USNRC to All Power Reactor Licensees and Applicants for Power Reactor Licenses, NVY 86-39, dated 2/13/86, Generic Letter 86-04


==Dear Sir:==
==Subject:==
==Subject:==
Policy Statement on Engineering Expertise               On Shift (Generic Letter 86-04)
Policy Statement on Engineering Expertise On Shift (Generic Letter 86-04)
Generic Letter 86-04, dated February 13, 1986 [Reference b)] provided a copy of the Federal ~Re inter notice of the Policy Statement on Engineering Expertise on Shift and requested that Licensees respond with information con-cerning their present status and future plans regarding the options addressed in the Policy Statement.
Generic Letter 86-04, dated February 13, 1986 [Reference b)] provided a
copy of the Federal
~Re inter notice of the Policy Statement on Engineering Expertise on Shift and requested that Licensees respond with information con-cerning their present status and future plans regarding the options addressed in the Policy Statement.
In response to the three specific information requests contained in the Generic Letter, Vermont Yankee herein provides the following:
In response to the three specific information requests contained in the Generic Letter, Vermont Yankee herein provides the following:
: 1.   "Your current program   for providing engineering expertise             on shift"
1.
"Your current program for providing engineering expertise on shift"


===RESPONSE===
===RESPONSE===
Vermont Yankee assigns one     Shift Engineer (SE) to each operating crew                 who then rotates with that crew.       The Shift Engineer reports to the Shift Supervisor (SS) while on duty and to the Senior Operations Engineer                     when not performing shift duties.
Vermont Yankee assigns one Shift Engineer (SE) to each operating crew who then rotates with that crew.
Currently, each Shift Engineer has a Bachelor's Degree in an engineering discipline and has received at least 12 weeks of initial plant training at Vermont Yankee before becoming qualified. The training program, as specified in VY Procedure AP 0713, Shift Engineer Training, consists of Sb05160048 860505                                                                     +05 PDR     ADOCK 05000271 PDR
The Shift Engineer reports to the Shift Supervisor (SS) while on duty and to the Senior Operations Engineer when not performing shift duties.
                                                                                                  ]8
Currently, each Shift Engineer has a Bachelor's Degree in an engineering discipline and has received at least 12 weeks of initial plant training at Vermont Yankee before becoming qualified.
The training program, as specified in VY Procedure AP 0713, Shift Engineer Training, consists of Sb05160048 860505 PDR ADOCK 05000271 PDR
+05
]8


VERMONT YANKEENUCL AR POWER CORPORATION U.S. Nuclear Regulatory Commission May 5, 1986 Page 2 training in Reactor Theory, Chemistry, Nuclear Materials,       Thermal Sciences, Instrumentation, FireProtection, Health Physics, Process       Computer, Emer-gency Plan, Plant Systems,     Transient and Accident Analysis, and Recognition
VERMONTYANKEENUCL AR POWER CORPORATION U.S. Nuclear Regulatory Commission May 5, 1986 Page 2
      ,and Mitigation of core'amage. Fire brigade and fire fighting training is also included for each Shift Engineer since the SE is assigned as the Fire Brigade Commander.
training in Reactor Theory, Chemistry, Nuclear Materials, Thermal Sciences, Instrumentation, FireProtection, Health Physics, Process
Once qualified, each SE participates in an annual requalification training program which includes transient and accident analysis as well as simulator training.
: Computer, Emer-gency Plan, Plant Systems, Transient and Accident Analysis, and Recognition
: 2.     "If your   current STA program   utilizes 'equivalency'riteria to   an engi-neering degree, provide     a description of the criteria used"
,and Mitigation of core'amage.
Fire brigade and fire fighting training is also included for each Shift Engineer since the SE is assigned as the Fire Brigade Commander.
Once qualified, each SE participates in an annual requalification training program which includes transient and accident analysis as well as simulator training.
2.
"If your current STA program utilizes 'equivalency'riteria to an engi-neering degree, provide a description of the criteria used"


===RESPONSE===
===RESPONSE===
Vermont Yankee's "STA" has been given the       title "Shift Engineer" (SE). In accordance with Technical Specifications, Vermont Yankee SE's qualitica-tions are specified as "a bachelor's degree or equivalent in a scientific or "engineering discipline with specific training in plant design,       and response and analysis of the plant for transients and accidents."
Vermont Yankee's "STA" has been given the title "Shift Engineer" (SE).
Vermont Yankee has not established specific equivalency criteria. Any situation involving equivalency would be evaluated on a case-by-case basis.
In accordance with Technical Specifications, Vermont Yankee SE's qualitica-tions are specified as "a bachelor's degree or equivalent in a scientific or "engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents."
: 3.     "A description of any modifications you intend to propose to your current program in, order to take advantage of the options identified in the Commission's Policy Statement"
Vermont Yankee has not established specific equivalency criteria.
Any situation involving equivalency would be evaluated on a case-by-case basis.
3.
"A description of any modifications you intend to propose to your current program in, order to take advantage of the options identified in the Commission's Policy Statement"


===RESPONSE===
===RESPONSE===
We   anticipate no changes   in our current program at this time.
We anticipate no changes in our current program at this time.
We   trust that the information provided     above is responsive; however, should you have any questions or     r equire additional information, please contact us.
We trust that the information provided above is responsive;
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Afc~~  +wag Vice President and Manager of Operations
: however, should you have any questions or r equire additional information, please contact us.
/dm cc:   Mr. F. Rowsome Oivision of Human Factors Technology U.S. Nuclear Regulatory Commission Washington, D.C. 20555
/dm cc:
Mr. F.
Rowsome Oivision of Human Factors Technology U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Afc~~ +wag Vice President and Manager of Operations


I
I
~ f}}
~
f}}

Latest revision as of 03:05, 7 January 2025

Responds to Generic Ltr 86-04, Policy Statement on Engineering Expertise on Shift. No Specific Equivalency Criteria Established for Shift Engineer.No Changes to Shift Technical Advisor Program Anticipated at Present
ML18030B373
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/05/1986
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: Rooney V
Office of Nuclear Reactor Regulation
References
FVY-86-39, GL-86-04, GL-86-4, NUDOCS 8605160048
Download: ML18030B373 (5)


Text

Q ~ Lola REQULA INFORMATION DISTR IBUTI'0

'YSTEM (R IDS)

,ACCESSION NBR:8605160048 DOC. DATE: 86/05/05 NQTARIZED:

NQ DOCNET 0 FACIL:50-271 Vermont Yankee Nuclear Power Stationi Uermont Yankee 05000271 AUTH. NAME AUTHOR AFFILIATION MURPHY'. P Uermont Yankee Nuclear Potuer Corp.

REC IP. NAME RECIPIENT AFFILIATION RQQNEYi V. L.

BMR Prospect Directorate 2

SUBJECT:

Responds to Qeneric Ltr 86M4I "Policy Statement on Engineeering Expertise on Shift. "No specific eqvivalencg criteria established for shift engineer.

No changes to shift technical advisor program anticipated at present.

DISTRIBUTION CODE:

NCOSD COPIES RECEIVED: LTR L ENCL Q SIZE:

TITLE: Operator Requalification Program NOTES:

REC IP IENT ID CODE/NAME BNR PD2 PD COPIES REC IPlENT LTTR ENCL GODET ME 1

COPIES LTTR ENCL INTERNAL. NRR/DHFT/HFIB REC FILE 04 EXTERNAL: 24X NRC PDR NRR/DHFT/MTB RQN1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED'TTR 10 ENCL 48

r ERMONT YANKEE NUCLEAR POWER CORPORATION v)r RD 5, Box 169, Ferry Road, Brattleboro, VT05301 FVY 86-39 REPLY TO:

ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM,MASSACHUSETTS 01701 TELEPHONE 817-872-8100 Hay 5, 1986 U.S. Nu'clear.Regulatory Commission Washington, D.C.

20555 Attn:

Office of Nuclear Reacto r Regulation Yern L. Rooney, Sr. Project Manager BWR Project Directorate No.

2 Division of BWR Licensing

References:

a) b)

License No.

OPR-28 (Docket No. 50-271)

Letter, USNRC to All Power Reactor Licensees and Applicants for Power Reactor Licenses, NVY 86-39, dated 2/13/86, Generic Letter 86-04

Dear Sir:

Subject:

Policy Statement on Engineering Expertise On Shift (Generic Letter 86-04)

Generic Letter 86-04, dated February 13, 1986 [Reference b)] provided a

copy of the Federal

~Re inter notice of the Policy Statement on Engineering Expertise on Shift and requested that Licensees respond with information con-cerning their present status and future plans regarding the options addressed in the Policy Statement.

In response to the three specific information requests contained in the Generic Letter, Vermont Yankee herein provides the following:

1.

"Your current program for providing engineering expertise on shift"

RESPONSE

Vermont Yankee assigns one Shift Engineer (SE) to each operating crew who then rotates with that crew.

The Shift Engineer reports to the Shift Supervisor (SS) while on duty and to the Senior Operations Engineer when not performing shift duties.

Currently, each Shift Engineer has a Bachelor's Degree in an engineering discipline and has received at least 12 weeks of initial plant training at Vermont Yankee before becoming qualified.

The training program, as specified in VY Procedure AP 0713, Shift Engineer Training, consists of Sb05160048 860505 PDR ADOCK 05000271 PDR

+05

]8

VERMONTYANKEENUCL AR POWER CORPORATION U.S. Nuclear Regulatory Commission May 5, 1986 Page 2

training in Reactor Theory, Chemistry, Nuclear Materials, Thermal Sciences, Instrumentation, FireProtection, Health Physics, Process

Computer, Emer-gency Plan, Plant Systems, Transient and Accident Analysis, and Recognition

,and Mitigation of core'amage.

Fire brigade and fire fighting training is also included for each Shift Engineer since the SE is assigned as the Fire Brigade Commander.

Once qualified, each SE participates in an annual requalification training program which includes transient and accident analysis as well as simulator training.

2.

"If your current STA program utilizes 'equivalency'riteria to an engi-neering degree, provide a description of the criteria used"

RESPONSE

Vermont Yankee's "STA" has been given the title "Shift Engineer" (SE).

In accordance with Technical Specifications, Vermont Yankee SE's qualitica-tions are specified as "a bachelor's degree or equivalent in a scientific or "engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents."

Vermont Yankee has not established specific equivalency criteria.

Any situation involving equivalency would be evaluated on a case-by-case basis.

3.

"A description of any modifications you intend to propose to your current program in, order to take advantage of the options identified in the Commission's Policy Statement"

RESPONSE

We anticipate no changes in our current program at this time.

We trust that the information provided above is responsive;

however, should you have any questions or r equire additional information, please contact us.

/dm cc:

Mr. F.

Rowsome Oivision of Human Factors Technology U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Afc~~ +wag Vice President and Manager of Operations

I

~

f