{{#Wiki_filter:* Entergy
{{#Wiki_filter:*  
.=:=.
.=:=. Entergy PNP 2018-030 June 6,2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager  
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2018-030 June 6,2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Voluntary Response to NRC Regulatory Issue Summary 2018-02:
Voluntary Response to NRC Regulatory Issue Summary 2018-02:
Preparation and Scheduling of Operator Licensing Examinations Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Preparation and Scheduling of Operator Licensing Examinations Palisades Nuclear Plant Docket 50-255 License No. DPR-20  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," requests that licensees submit, on a voluntary basis, an NRC Form 536, "Operator Licensing Examination Data." Estimates are requested for calendar years 2020 through 2023.
Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," requests that licensees submit, on a voluntary basis, an NRC Form 536, "Operator Licensing Examination Data." Estimates are requested for calendar years 2020 through 2023.
The purpose of these estimates is to assist the NRC in budgeting and scheduling resources.
The purpose of these estimates is to assist the NRC in budgeting and scheduling resources.
In response to this request, Entergy Nuclear Operations, Inc. is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant (PNP).
In response to this request, Entergy Nuclear Operations, Inc. is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant (PNP).
This letter makes no new commitments or revises previous commitments.
This letter makes no new commitments or revises previous commitments.
Sincerely, JAH/bed
Sincerely, JAH/bed  


==Attachment:==
==Attachment:==
: 1. NRC Form 536 - Operator Licensing Examination Data CC     Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
: 1. NRC Form 536 - Operator Licensing Examination Data CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC  


ATTACHMENT 1 NRC FORM 536 - OPERATOR LICENSING EXAMINATION DATA NRC FORM 536             US NUCLEAR REGULATORY COMMISSION           APPROVED BY OMB NO. 3150-0131     EXPIRES 11 /30/2020 (11-2017)                                                           Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-2 F43), u.s. Nuclear Regulatory Commission, Washington, DC OPERATOR LICENSING                                20555-0001, or by email to Infocoliects.Resource@nrc.gov, EXAMINATION DATA                                 and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection .
ATTACHMENT 1 NRC FORM 536 - OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES 11 /30/2020 (11-2017)
FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043                 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY2020             CY2021                   CY2022                         CY2023 ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                 0                       0                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                 0                       0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY2020             CY2021                   CY2022                         CY2023 NUMBER OF REACTOR                   2                 0                       0                               0 OPERATORS NUMBER OF SENIOR REACTOR               10                 0                       0                               0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR                 0                 0                       0                               0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR                 0                 0                       0                               0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE           4/6/20 - 4/17/20         NIA                     NIA                             N/A ALTERNATE DATE           4/27/20 - 5/8120         NIA                     NIA                             N/A NRC Form 536 (11-2017)
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-2 OPERATOR LICENSING F43), u.s. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocoliects.Resource@nrc.gov, EXAMINATION DATA and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 ESTIMATED NUMBER OF 1
0 0
0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0
0 0
0 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR 2
0 0
0 OPERATORS NUMBER OF SENIOR REACTOR 10 0
0 0
OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 4/6/20 - 4/17/20 NIA NIA N/A ALTERNATE DATE 4/27/20 - 5/8120 NIA NIA N/A NRC Form 536 (11-2017)
Page 1 of 1}}
Page 1 of 1}}

Latest revision as of 19:30, 5 January 2025

Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations
ML18158A293
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 06/06/2018
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2018-030, RIS-2018-002
Download: ML18158A293 (2)


Text

.=:=. Entergy PNP 2018-030 June 6,2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager

SUBJECT:

Voluntary Response to NRC Regulatory Issue Summary 2018-02:

Preparation and Scheduling of Operator Licensing Examinations Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Dear Sir or Madam:

Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," requests that licensees submit, on a voluntary basis, an NRC Form 536, "Operator Licensing Examination Data." Estimates are requested for calendar years 2020 through 2023.

The purpose of these estimates is to assist the NRC in budgeting and scheduling resources.

In response to this request, Entergy Nuclear Operations, Inc. is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant (PNP).

This letter makes no new commitments or revises previous commitments.

Sincerely, JAH/bed

Attachment:

1. NRC Form 536 - Operator Licensing Examination Data CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ATTACHMENT 1 NRC FORM 536 - OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES 11 /30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-2 OPERATOR LICENSING F43), u.s. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocoliects.Resource@nrc.gov, EXAMINATION DATA and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 ESTIMATED NUMBER OF 1

0 0

0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

0 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY2021 CY2022 CY2023 NUMBER OF REACTOR 2

0 0

0 OPERATORS NUMBER OF SENIOR REACTOR 10 0

0 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 4/6/20 - 4/17/20 NIA NIA N/A ALTERNATE DATE 4/27/20 - 5/8120 NIA NIA N/A NRC Form 536 (11-2017)